Ballast line arrangement method for combining ballast tank with ballast line
By combining the slender permanent ballast tanks with ballast pipelines to form a ballast ring network, the problems of complex layout and corrosion risks of the traditional ballast pipeline network are solved, and the internal piping system setup of the floating wind turbine is simplified and the cost is reduced. effect.
Patent Information
- Application Number
- CN202410935201.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2024-10-08
AI Technical Summary
Traditional dry and wet ballast pipe networks have complex layout difficulties and corrosion risks in offshore floating facilities, which increase maintenance costs and leak risks, making it difficult to simplify maintenance and reduce manufacturing costs.
The slender permanent ballast tank is used as part of the ballast pipe network and is combined with the ballast pipeline. The ballast ring network is realized through the ballast discharge system and floating leveling, simplifying the internal piping system settings of the floating wind turbine and reducing manufacturing costs. and maintenance costs.
It simplifies the internal piping arrangement of floating fans, reduces basic manufacturing and later maintenance costs, reduces the difficulty of piping arrangement, and improves the convenience of maintenance.
Smart Images

Figure CN118744778A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wind turbine foundation ballast discharge, and in particular to a ballast pipeline arrangement method combining a ballast tank with a ballast pipeline. Background Art
[0002] At present, the common ballast pipe networks of offshore floating facilities are divided into two types: dry pipe networks and wet pipe networks. The dry pipe network arranges the ballast pipelines in the cabin air environment, and personnel can enter for operation and maintenance, while the wet pipe network arranges the pipelines in the liquid tank. Relatively speaking, the wet pipe network can reduce the difficulty of piping layout, and there is no need to set up special empty tanks to arrange ballast pipelines, which can simplify the cabin division of the hull; however, the ballast pipelines are immersed in seawater for a long time, and the risk of corrosion is relatively high. At the same time, the ballast pipelines penetrate the cabins and increase the risk of leakage. Personnel need to drain the seawater and ventilate the pipelines before entering for maintenance, which increases the difficulty of maintenance. The traditional dry-type pipeline system is complex and difficult to arrange.
[0003] Therefore, there is an urgent need for a ballast pipeline layout method that has the advantages of easy maintenance and reduced difficulty in pipeline layout. Summary of the invention
[0004] In view of the above problems, the object of the present invention is to provide a ballast pipeline layout method that combines ballast tanks with ballast pipelines, and uses slender permanent ballast tanks as part of the ballast pipeline network, thereby simplifying the internal piping settings of floating wind turbines and reducing the foundation manufacturing and subsequent maintenance costs of floating wind turbines.
[0005] To achieve the above object, the present invention adopts the following technical solutions: The ballast pipeline arrangement method combining a ballast tank with a ballast pipeline according to the present invention comprises the following steps: A pontoon is provided at the bottom of the floating wind turbine foundation hull, through which the three columns of the wind turbine foundation are connected together, and a slender permanent ballast tank is provided in the pontoon; The engine room and column ballast tank are separated inside the column; A set of ballast loading systems is arranged in the engine room of each column. All ballast loading systems and three slender permanent ballast tanks are alternately connected in sequence to form a ballast ring network, so that the ballast water load adjustment and transfer between the ballast tanks in the columns can be realized through the ballast ring network, and finally the floating leveling of the floating wind turbine foundation can be realized.
[0006] In the ballast pipeline arrangement method, preferably, the ballast-discharge system includes a ballast pipeline, a discharge pump and a valve; through the interaction of the ballast pipeline, the discharge pump and a plurality of the valves, water can be controlled to be transported from the column ballast tank to the adjacent permanent slender ballast tank, and water can also be controlled to flow back from the permanent slender ballast tank to the column ballast tank.
[0007] In the ballast pipeline arrangement method, preferably, the ballast ring network of the three columns and the slender permanent ballast tank are integrated into a ballast ring network, so that the slender permanent ballast tank serves as a part of the ballast ring network.
[0008] The ballast pipeline arrangement method is preferably such that, when adjusting the load between columns, the ballast water in the ballast tank of the column is pumped into the ballast pipeline of the ballast system where the column is located through a load-discharging pump, and then enters the slender permanent ballast tank between the columns. The power provided by another load-discharging pump drives the water in the slender permanent ballast tank into the ballast pipeline of the ballast system of another column, and finally reaches the target adjustable ballast tank to realize the load adjustment function.
[0009] In the ballast pipeline arrangement method, preferably, the valve is a hydraulic remote control valve.
[0010] The present invention adopts the above technical solution, which has the following advantages: The present invention provides a ballast pipeline layout method that combines a ballast tank with a ballast pipeline. The method uses an elongated permanent ballast tank as a part of a ballast pipeline network. The method can be mainly applied to the ballast discharge system of a floating wind turbine foundation. By reducing wet ballast pipelines or ballast pipelines with relatively complex piping, the ballast discharge function is achieved while simplifying the hull design of the floating wind turbine, thereby reducing the manufacturing cost and the subsequent repair and maintenance cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Throughout the accompanying drawings, the same reference numerals are used to represent the same components. In the accompanying drawings: Figure 1 is a schematic diagram of the three-dimensional structure of the floating wind turbine in the present invention; Figure 2 is a schematic side view of the structure of the floating wind turbine in the present invention; Figure 3 It is a schematic diagram of the top view of the structure of the fan foundation in the present invention; Figure 4 It is a schematic diagram of the connection structure of the pressure discharge loading system in the present invention; Figure 5 It is a schematic diagram of the top view of the structure of the fan foundation in the present invention, which shows the flow direction of water in the ballast ring network. DETAILED DESCRIPTION
[0012] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0013] The present invention provides a ballast pipeline layout method combining a ballast tank with a ballast pipeline, wherein an elongated permanent ballast tank between three columns of a floating wind turbine foundation is used as a part of a ballast ring network, and a dry ballast pipeline in each column is connected to the elongated permanent ballast tank between the columns through a connector, which has the advantages of convenient maintenance and reduced difficulty in piping layout.
[0014] like Figures 1 to 3 As shown, the ballast pipeline arrangement method for combining a ballast tank with a ballast pipeline provided by the present invention comprises the following steps: (1) A buoyancy box is provided at the bottom of the floating wind turbine foundation hull, and the three columns of the wind turbine foundation are connected together by the buoyancy box. The buoyancy box has an elongated permanent ballast tank, wherein the elongated permanent ballast tank is Figure 3 The numbers in are 6, 7, 8, 9 and 10; (2) The engine room and column ballast tank are separated inside the column. Figure 2 or Figure 3 The numbers in are 1A, 1B, 2 and 3; (3) A pressure relief system is installed in the engine room of each column (see Figure 4 ), all the ballast discharge systems and three slender permanent ballast tanks are alternately connected in sequence to form a ballast ring network, so that the ballast water load and transfer between the ballast tanks in the columns can be realized through the ballast ring network, and finally the floating leveling of the floating wind turbine foundation can be achieved.
[0015] In the above embodiment, preferably, the ballast discharge system includes a ballast line, a discharge pump and a valve; through the interaction of the ballast line, the discharge pump and a plurality of the valves, water can be controlled to be transported from the column ballast tank to the adjacent permanent elongated ballast tank, and water can also be controlled to flow back from the permanent elongated ballast tank to the column ballast tank (see Figure 5 ).
[0016] In the above embodiment, preferably, the ballast ring network of the three columns and the elongated permanent ballast tank are integrated into a ballast ring network, so that the elongated permanent ballast tank serves as a part of the ballast ring network.
[0017] In the above embodiment, preferably, when adjusting the load between columns, the ballast water in the ballast tank of the column is pumped into the ballast pipeline of the ballast system where the column is located through the load-discharging pump, and then enters the slender permanent ballast tank between the columns. The power provided by another load-discharging pump drives the water in the slender permanent ballast tank into the ballast pipeline of the ballast system of another column, and finally reaches the target adjustable ballast tank to realize the load adjustment function.
[0018] In the above embodiment, preferably, the valve is a hydraulic remote control valve.
[0019] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A ballast pipeline layout method combining a ballast tank with a ballast pipeline, It is characterized in that The steps include: A pontoon is provided at the bottom of the floating wind turbine foundation hull, through which the three columns of the wind turbine foundation are connected together, and a slender permanent ballast tank is provided in the pontoon; The engine room and column ballast tank are separated inside the column; A set of ballast loading systems is arranged in the engine room of each column. All ballast loading systems and three slender permanent ballast tanks are alternately connected in sequence to form a ballast ring network, so that the ballast water load adjustment and transfer between the ballast tanks in the columns can be realized through the ballast ring network, and finally the floating leveling of the floating wind turbine foundation can be realized.
2. The ballast pipeline arrangement method according to claim 1, It is characterized in that The ballast-discharging system includes a ballast pipeline, a discharge pump and a valve; through the interaction of the ballast pipeline, the discharge pump and a plurality of the valves, water can be controlled to be transported from the column ballast tank to the adjacent permanent slender ballast tank, and water can also be controlled to flow back from the permanent slender ballast tank to the column ballast tank.
3. The ballast pipeline arrangement method according to claim 1, It is characterized in that The ballast ring nets of the three columns and the elongated permanent ballast tanks are integrated into a ballast ring net, so that the elongated permanent ballast tanks serve as a part of the ballast ring net.
4. The ballast pipeline arrangement method according to claim 2, It is characterized in that When adjusting the load between columns, the ballast water in the column ballast tank is pumped into the ballast pipeline of the ballast system where the column is located through the load-discharging pump, and then enters the slender permanent ballast tank between the columns. The power provided by another load-discharging pump drives the water in the slender permanent ballast tank into the ballast pipeline of the ballast system of another column, and finally reaches the target adjustable ballast tank to realize the load adjustment function.
5. The ballast pipeline arrangement method according to claim 2, It is characterized in that The valve is a hydraulic remote control valve.