Redundancy design method and system for fresh water system of LNG (Liquefied Natural Gas) electric propulsion ship

By connecting the backup low-temperature cooling fresh water pump and the central cooler in parallel in the fresh water system of the LNG electric propulsion ship, a redundant system is formed, which solves the problem of fresh water cooling system failure affecting the propulsion system and ensures navigation safety.

CN118744791AInactive Publication Date: 2024-10-08HUDONG ZHONGHUA SHIPBUILDINGGROUP
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202410872386.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2024-10-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During maritime transportation of LNG ships, due to the low-temperature characteristics of liquid methane, there is a risk of liquid bombs, and a single equipment or system failure in the freshwater cooling system will affect the normal operation of the propulsion system, resulting in increased navigation risks.

Method used

Design a redundancy design method for the fresh water system of LNG electric push boats. By connecting the standby cryogenic cooling fresh water pump and the central cooler in parallel, a redundant system is formed to ensure automatic switching when a single equipment fails and maintain cooling for multiple users on the left and right sides. Operate normally to avoid affecting the propulsion system.

Benefits of technology

It realizes that the cooling of left and right side users will not be affected when a single device or two devices fail, ensuring the normal operation of the propulsion system and reducing navigation risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118744791A_ABST
    Figure CN118744791A_ABST
Patent Text Reader

Abstract

The invention discloses a redundancy design method and system for a fresh water system of an LNG (Liquefied Natural Gas) electric propulsion ship. A standby low-temperature fresh water cooling pump and a standby central cooler are arranged between a first circulating system for cooling a plurality of starboard users and a second circulating system for cooling a plurality of larboard users; the standby low-temperature cooling fresh water pump is respectively connected with a first low-temperature cooling fresh water pump of the first circulating system and a second low-temperature cooling fresh water pump of the second circulating system in parallel, and the standby central cooler is respectively connected with a first central cooler of the first circulating system and a second central cooler of the second circulating system in parallel; redundancy is formed by equipment in two circulating systems of the port and the starboard, cooling of users of the port and the starboard is not affected if a single device or two devices break down, and normal work of the propelling system is not affected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of shipbuilding, and in particular to a redundancy design method and system for a fresh water system of an LNG electric propulsion ship. Background Art

[0002] LNG ships transport methane at -163℃, which is undoubtedly a liquid bomb at sea. In order to reduce the risk of LNG ships at sea, LNG ships are usually designed with two propulsion devices, and classification societies require that in the event of failure of one propulsion device, the remaining power can still meet the ship's navigation at a low speed. This requires that the ship must have a certain degree of redundancy when it is designed to meet the requirements of the ship. Ship electric propulsion usually consists of a thrust motor, a gearbox, a propulsion shaft system and a propeller. The main generator provides power to the propulsion motor to enable the ship to sail. The seawater system cools the low-temperature fresh water, and the low-temperature fresh water cools the diesel engine, frequency converter, transformer and generator of the main generator. The seawater system will eventually carry away the heat of the ship's equipment to ensure the normal operation of the ship's equipment. Failure of a single device or system in the freshwater cooling system will affect the normal operation of the propulsion system. Summary of the invention

[0003] In view of this, the present invention provides a redundancy design method and system for a fresh water system of an LNG electric propulsion ship, so as to solve the problems existing in the above-mentioned background technology.

[0004] A redundancy design method for a fresh water system of an LNG electric propulsion ship specifically comprises the following steps:

[0005] S1, connecting the standby low-temperature cooling fresh water pump in parallel with the first low-temperature cooling fresh water pump of the first circulation system and the second low-temperature cooling fresh water pump of the second circulation system through pipelines;

[0006] The standby central cooler is connected in parallel with the first central cooler of the first circulation system and the second central cooler of the second circulation system respectively through pipelines;

[0007] The first circulation system is used to cool multiple users on the starboard side, and the second circulation system is used to cool multiple users on the port side;

[0008] S2, when the first low-temperature cooling fresh water pump of the first circulation system fails, the standby low-temperature cooling fresh water pump is used to replace the first low-temperature cooling fresh water pump, and the first standby system consisting of the standby low-temperature cooling fresh water pump and the first central cooler is used to cool multiple users on the starboard side;

[0009] When the first central cooler of the first circulation system fails, the standby central cooler replaces the first central cooler, and the third standby system consisting of the standby central cooler and the first low-temperature cooling fresh water pump is used to cool multiple users on the starboard side;

[0010] When the second low-temperature cooling fresh water pump of the second circulation system fails, the standby low-temperature cooling fresh water pump is used to replace the second low-temperature cooling fresh water pump, and the second standby system composed of the standby low-temperature cooling fresh water pump and the second central cooler is used to cool the port side multiple users;

[0011] When the second central cooler of the second circulation system fails, the standby central cooler replaces the second central cooler, and the fourth standby system composed of the standby central cooler and the second low-temperature cooling fresh water pump is used to cool multiple users on the port side.

[0012] Preferably, a first control valve is provided on the first connecting pipeline between the inlet valve of the first low-temperature cooling fresh water pump of the first circulation system and the outlet valve of the first central cooler;

[0013] A second control valve is provided on the second connecting pipeline between the inlet valve of the second low-temperature cooling fresh water pump of the second circulation system and the outlet valve of the second central cooler;

[0014] The inlet of the standby low-temperature cooling fresh water pump is connected to the outlet of the first control valve through a first standby pipeline, and the outlet is connected to the inlet of the starboard multi-user through a second standby pipeline, so as to be connected in parallel with the first low-temperature cooling fresh water pump. A third control valve is provided on the first standby pipeline, and a fifth control valve is provided on the second standby pipeline.

[0015] The inlet of the standby low-temperature cooling fresh water pump is connected to the outlet of the second control valve through the third standby pipeline, and the outlet is connected to the inlet of the port multi-user through the fourth standby pipeline, so as to be connected in parallel with the second low-temperature cooling fresh water pump. The third standby pipeline is provided with a fourth control valve, and the fourth standby pipeline is provided with a sixth control valve.

[0016] When the first low-temperature cooling fresh water pump of the first circulation system fails, the low-temperature cooling fresh water flows from the outlet of the standby low-temperature cooling fresh water pump, sequentially through the fifth control valve of the second standby pipeline, the starboard multi-user, the first central cooler, the first control valve of the first connecting pipeline, the third control valve of the first standby pipeline, and flows back to the inlet of the standby low-temperature cooling fresh water pump;

[0017] When the second low-temperature cooling fresh water pump of the second circulation system fails, the low-temperature cooling fresh water flows from the outlet of the standby low-temperature cooling fresh water pump, through the sixth control valve of the fourth standby pipeline, the port multi-user, the second central cooler, the second control valve of the second connecting pipeline, the fourth control valve of the third standby pipeline, and flows back to the inlet of the standby low-temperature cooling fresh water pump.

[0018] Preferably, the first control valve and the second control valve are both temperature control valves, and the third control valve, the fourth control valve, the fifth control valve and the sixth control valve are all remote control valves.

[0019] Preferably, the inlet of the standby central cooler is connected to the outlet of the starboard multi-user via a fifth standby pipeline, and the outlet is connected to the inlet of the first control valve via a sixth standby pipeline so as to be connected in parallel with the first central cooler, a ninth control valve is provided on the fifth standby pipeline, and a seventh control valve is provided on the sixth standby pipeline;

[0020] The inlet of the standby central cooler is connected to the outlet of the port multi-user through the seventh standby pipeline, and the outlet is connected to the inlet of the second control valve through the eighth standby pipeline to achieve parallel connection with the second central cooler. The seventh standby pipeline is provided with a tenth control valve, and the eighth standby pipeline is provided with an eighth control valve.

[0021] When the first central cooler of the first circulation system fails, the low-temperature cooling fresh water flows from the outlet of the first low-temperature cooling fresh water pump, sequentially through the starboard multi-user, the ninth control valve of the fifth standby pipeline, the standby central cooler, the seventh control valve of the sixth standby pipeline, the first control valve of the first connecting pipeline, and flows back to the inlet of the first low-temperature cooling fresh water pump;

[0022] When the second central cooler of the second circulation system fails, the low-temperature cooling fresh water flows from the outlet of the second low-temperature cooling fresh water pump, in sequence, to the port multi-user, the tenth control valve of the seventh standby pipeline, the standby central cooler, the eighth control valve of the eighth standby pipeline, the second control valve of the second connecting pipeline, and flows back to the inlet of the second low-temperature cooling fresh water pump.

[0023] Preferably, the seventh control valve, the eighth control valve, the ninth control valve and the tenth control valve are all stop valves.

[0024] Preferably, the capacities of the first low-temperature cooling fresh water pump, the second low-temperature cooling fresh water pump and the standby low-temperature cooling fresh water pump are all 100%, and the capacities of the first central cooler, the second central cooler and the standby central cooler are all 100%.

[0025] A fresh water system for an LNG electric pusher ship, comprising a first circulation system for cooling multiple users on the starboard side, a second circulation system for cooling multiple users on the port side, a standby low-temperature cooling fresh water pump and a standby central cooler.

[0026] A first control valve is provided on the first connecting pipeline between the inlet valve of the first low-temperature cooling fresh water pump of the first circulation system and the outlet valve of the first central cooler;

[0027] A second control valve is provided on the second connecting pipeline between the inlet valve of the second low-temperature cooling fresh water pump of the second circulation system and the outlet valve of the second central cooler;

[0028] The inlet of the standby low-temperature cooling fresh water pump is connected to the outlet of the first control valve through a first standby pipeline, and the outlet is connected to the inlet of the starboard multi-user through a second standby pipeline, so as to be connected in parallel with the first low-temperature cooling fresh water pump. A third control valve is provided on the first standby pipeline, and a fifth control valve is provided on the second standby pipeline.

[0029] The inlet of the standby low-temperature cooling fresh water pump is connected to the outlet of the second control valve through the third standby pipeline, and the outlet is connected to the inlet of the port multi-user through the fourth standby pipeline, so as to be connected in parallel with the second low-temperature cooling fresh water pump. The third standby pipeline is provided with a fourth control valve, and the fourth standby pipeline is provided with a sixth control valve.

[0030] The inlet of the standby central cooler is connected to the outlet of the starboard multi-user through the fifth standby pipeline, and the outlet is connected to the inlet of the first control valve through the sixth standby pipeline to achieve parallel connection with the first central cooler. The fifth standby pipeline is provided with a ninth control valve, and the sixth standby pipeline is provided with a seventh control valve.

[0031] The inlet of the standby central cooler is connected to the outlet of the port side multi-user through the seventh standby pipeline, and the outlet is connected to the inlet of the second control valve through the eighth standby pipeline, thereby being connected in parallel with the second central cooler. The seventh standby pipeline is provided with a tenth control valve, and the eighth standby pipeline is provided with an eighth control valve.

[0032] The beneficial effects of the present invention are:

[0033] The present invention arranges a spare low-temperature fresh water cooling pump and a spare central cooler between a first circulation system for cooling multiple users on the starboard side and a second circulation system for cooling multiple users on the port side, and the spare low-temperature cooling fresh water pump is respectively connected in parallel with the first low-temperature cooling fresh water pump of the first circulation system and the second low-temperature cooling fresh water pump of the second circulation system, and the spare central cooler is respectively connected in parallel with the first central cooler of the first circulation system and the second central cooler of the second circulation system, thereby forming redundancy with the equipment in the two circulation systems on the port and starboard sides. If a single device or two devices fail, it will not affect the cooling of the port and starboard users, and will not affect the normal operation of the propulsion system. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0035] Figure 1 It is a structural schematic diagram of the system of the present invention.

[0036] Figure 2It is a schematic diagram of the circulation path of low-temperature cooling fresh water when the first circulation system and the second circulation system are in operation.

[0037] Figure 3 It is a schematic diagram of the circulation path of low-temperature cooling fresh water when the first low-temperature cooling fresh water pump 4 fails and the first backup system and the second circulation system are in operation.

[0038] Figure 4 It is a schematic diagram of the circulation path of the low-temperature cooling fresh water when the second low-temperature cooling fresh water pump 6 fails and the second backup system and the first circulation system are in operation.

[0039] Figure 5 It is a schematic diagram of the circulation path of low-temperature cooling fresh water when the first central cooler 1 fails and the third backup system and the second circulation system are in operation.

[0040] Figure 6 It is a schematic diagram of the circulation path of low-temperature cooling fresh water when the second central cooler 3 fails and the fourth backup system and the first circulation system are in operation.

[0041] The meanings of the numbers in the figure are:

[0042] 1 is the first central cooler, 2 is the spare central cooler, 3 is the second central cooler, 4 is the first low-temperature cooling fresh water pump, 5 is the spare low-temperature cooling fresh water pump, 6 is the second low-temperature cooling fresh water pump, 7 is the first control valve, 8 is the second control valve, 9 is the first control valve, 10 is the second control valve, 11 is the third control valve, 12 is the fourth control valve, 13 is the first control valve, 14 is the second control valve, 15 is the third control valve, 16 is the fourth control valve, 17 is the first spare pipeline, 18 is the second spare pipeline, 19 is the third spare pipeline, 20 is the fourth spare pipeline, 21 is the first connecting pipeline, 22 is the second connecting pipeline, 23 is the fifth spare pipeline, 24 is the sixth spare pipeline, 25 is the seventh spare pipeline, 26 is the eighth spare pipeline, 27 is the third connecting pipeline, 28 is the fourth connecting pipeline, 29 is the fifth connecting pipeline, 30 is the sixth connecting pipeline, 31 is the starboard multi-user, and 32 is the port multi-user. DETAILED DESCRIPTION

[0043] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is described below by the specific embodiments shown in the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0044] The terms used in this disclosure are for the purpose of describing specific embodiments only and are not intended to limit the disclosure. The singular forms of "a", "said" and "the" used in this disclosure and the appended claims are also intended to include plural forms unless the context clearly indicates otherwise. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.

[0045] It should be understood that although the terms first, second, third, etc. may be used in the present disclosure to describe various information, such information should not be limited to these terms and should not be understood as indicating or implying relative importance. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present disclosure, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information.

[0046] In order to better understand the technical solution of the present invention, the present invention is described in detail below with reference to the accompanying drawings.

[0047] The present invention provides a redundancy design method for a fresh water system of an LNG electric propulsion ship, which specifically comprises the following steps:

[0048] S1, connecting the standby low-temperature cooling fresh water pump 5 in parallel with the first low-temperature cooling fresh water pump 4 of the first circulation system and the second low-temperature cooling fresh water pump 6 of the second circulation system through pipelines;

[0049] The standby central cooler 2 is connected in parallel with the first central cooler 1 of the first circulation system and the second central cooler 3 of the second circulation system respectively through pipelines;

[0050] The first circulation system is used to cool multiple users on the starboard side, and the second circulation system is used to cool multiple users on the port side;

[0051] S2, when the first low-temperature cooling fresh water pump 4 of the first circulation system fails, the standby low-temperature cooling fresh water pump 5 is used to replace the first low-temperature cooling fresh water pump 4, and the first standby system composed of the standby low-temperature cooling fresh water pump 5 and the first central cooler 1 is used to cool multiple users on the starboard side;

[0052] When the first central cooler 1 of the first circulation system fails, the standby central cooler 2 replaces the first central cooler 1, and the third standby system composed of the standby central cooler 2 and the first low-temperature cooling fresh water pump 4 is used to cool multiple users on the starboard side;

[0053] When the second low-temperature cooling fresh water pump 6 of the second circulation system fails, the standby low-temperature cooling fresh water pump 5 replaces the second low-temperature cooling fresh water pump 6, and the second standby system composed of the standby low-temperature cooling fresh water pump 5 and the second central cooler 3 is used to cool multiple users on the port side;

[0054] When the second central cooler 3 of the second circulation system fails, the backup central cooler 2 replaces the second central cooler 3, and the fourth backup system composed of the backup central cooler 2 and the second low-temperature cooling fresh water pump 6 is used to cool multiple users on the port side.

[0055] Specifically, the first circulation system includes a first central cooler 1 and a first low-temperature cooling fresh water pump 4, a first connecting pipeline 21 is connected between the inlet valve of the first low-temperature cooling fresh water pump 4 and the outlet valve of the first central cooler 1, and a first control valve 7 is provided on the first connecting pipeline 21; the outlet valve of the first low-temperature cooling fresh water pump 4 is connected to the inlet of the starboard multi-user through the third connecting pipeline 27, and the outlet of the starboard multi-user is connected to the inlet valve of the first central cooler 1 through the fourth connecting pipeline 28.

[0056] When the first circulation system is in operation, the circulation path of the low-temperature cooling fresh water is: the outlet of the first low-temperature cooling fresh water pump 4 → the third connecting pipeline 27 → the starboard multi-user → the fourth connecting pipeline 28 → the first central cooler 1 → the first connecting pipeline 21 and the first control valve 7 thereon → the inlet of the first low-temperature cooling fresh water pump 4.

[0057] The second circulation system includes a second central cooler 3 and a second low-temperature cooling fresh water pump 6, a second connecting pipe 22 is connected between the inlet valve of the second low-temperature cooling fresh water pump 6 and the outlet valve of the second central cooler 3, and a second control valve 8 is provided on the second connecting pipe 22; the outlet valve of the second low-temperature cooling fresh water pump 6 is connected to the inlet of the port side multi-user through the fifth connecting pipe 29, and the outlet of the port side multi-user is connected to the inlet valve of the second central cooler 3 through the sixth connecting pipe 30.

[0058] When the second circulation system is in operation, the circulation path of the low-temperature cooling fresh water is: the outlet of the second low-temperature cooling fresh water pump 6 → the fifth connecting pipeline 29 → the port side multi-user → the sixth connecting pipeline 30 → the second central cooler 3 → the second connecting pipeline 22 and the second control valve 8 thereon → the inlet of the second low-temperature cooling fresh water pump 6.

[0059] The inlet of the standby low-temperature cooling fresh water pump 5 is connected to the outlet of the first control valve 7 through the first standby pipeline 17, and the outlet is connected to the inlet of the multi-user on the starboard side through the second standby pipeline 18, thereby being connected in parallel with the first low-temperature cooling fresh water pump 4. The first standby pipeline 17 is provided with a third control valve 9, and the second standby pipeline 18 is provided with a fifth control valve 11.

[0060] The inlet of the standby low-temperature cooling fresh water pump 5 is connected to the outlet of the second control valve 8 through the third standby pipeline 19, and the outlet is connected to the inlet of the port side multi-user through the fourth standby pipeline 20, thereby being connected in parallel with the second low-temperature cooling fresh water pump 6. The third standby pipeline 19 is provided with a fourth control valve 10, and the fourth standby pipeline 20 is provided with a sixth control valve 12.

[0061] The inlet of the standby central cooler 2 is connected to the outlet of the starboard multi-user through the fifth standby pipeline 23, and the outlet is connected to the inlet of the first control valve 7 through the sixth standby pipeline 24, thereby being connected in parallel with the first central cooler 1. The fifth standby pipeline 23 is provided with a ninth control valve 15, and the sixth standby pipeline 24 is provided with a seventh control valve 13.

[0062] The inlet of the standby central cooler 2 is connected to the outlet of the port side multi-user through the seventh standby pipeline 25, and the outlet is connected to the inlet of the second control valve 8 through the eighth standby pipeline 26, thereby being connected in parallel with the second central cooler 3. The seventh standby pipeline 25 is provided with a tenth control valve 16, and the eighth standby pipeline 26 is provided with an eighth control valve 14.

[0063] When the ship is sailing normally, the first circulation system and the second circulation system are in operation.

[0064] When the first low-temperature cooling fresh water pump 4 of the first circulation system fails, the standby low-temperature cooling fresh water pump 5 replaces the first low-temperature cooling fresh water pump 4, and the first standby system composed of the standby low-temperature cooling fresh water pump 5 and the first central cooler 1 is used to cool the starboard multi-users, that is, when the first standby system is in operation, the circulation path of the low-temperature cooling fresh water is: the outlet of the standby low-temperature cooling fresh water pump 5 → the second standby pipeline 18 and the fifth control valve 11 thereon → the starboard multi-users → the first central cooler 1 → the first connecting pipeline 21 and the first control valve 7 thereon → the first standby pipeline 17 and the third control valve 9 thereon → the inlet of the standby low-temperature cooling fresh water pump 5. Since the second circulation system has not failed, the second circulation system operates normally under this failure condition.

[0065] When the first low-temperature cooling fresh water pump 4 fails, the first backup system and the second circulation system are in operation, the outlet valve of the standby low-temperature cooling fresh water pump 5, the fifth control valve 11, the inlet and outlet valves of the first central cooler 1, the first control valve 7 and the third control valve 9 are all opened, and the fourth control valve 10, the sixth control valve 12, the seventh control valve 13, the eighth control valve 14, the ninth control valve 15, the tenth control valve 16, the inlet and outlet valves of the standby central cooler 2, and the inlet and outlet valves of the first low-temperature cooling fresh water pump 4 are all closed.

[0066] When the second low-temperature cooling fresh water pump 6 of the second circulation system fails, the standby low-temperature cooling fresh water pump 5 replaces the second low-temperature cooling fresh water pump 6, and the second standby system composed of the standby low-temperature cooling fresh water pump 5 and the second central cooler 3 is used to cool the port multi-users, that is, when the second standby system is in operation, the circulation path of the low-temperature cooling fresh water is: the outlet of the standby low-temperature cooling fresh water pump 5 → the fourth standby pipeline 20 and the sixth control valve 12 thereon → the port multi-users → the second central cooler 3 → the second connecting pipeline 22 and the second control valve 8 thereon → the third standby pipeline 19 and the fourth control valve 10 thereon → the inlet of the low-temperature cooling fresh water pump 5. Since the first circulation system has not failed, the first circulation system operates normally under this failure condition.

[0067] When the second low-temperature cooling fresh water pump 6 fails, the second backup system and the first circulation system are in operation, the outlet valve of the backup low-temperature cooling fresh water pump 5, the sixth control valve 12, the inlet and outlet valves of the second central cooler 3, the second control valve 8 and the fourth control valve 10 are all opened, and the third control valve 9, the fifth control valve 11, the seventh control valve 13, the eighth control valve 14, the ninth control valve 15, the tenth control valve 16, the inlet and outlet valves of the backup central cooler 2, and the inlet and outlet valves of the second low-temperature cooling fresh water pump 6 are all closed.

[0068] When the first central cooler 1 of the first circulation system fails, the standby central cooler 2 replaces the first central cooler 1, and the third standby system composed of the standby central cooler 2 and the first low-temperature cooling fresh water pump 4 is used to cool the multiple users on the starboard side, that is, when the third standby system is in operation, the circulation path of the low-temperature cooling fresh water is: the outlet of the first low-temperature cooling fresh water pump 4 → multiple users on the starboard side → the fifth standby pipeline 23 and the ninth control valve 15 thereon → the standby central cooler 2 → the sixth standby pipeline 24 and its seventh control valve 13 → the first connecting pipeline 21 and its first control valve 7 → the inlet of the first low-temperature cooling fresh water pump 4. Since the second circulation system has not failed, the second circulation system operates normally under this failure condition.

[0069] When the first central cooler 1 fails, the third backup system and the second circulation system are in operation, the inlet and outlet valves of the first low-temperature cooling fresh water pump 4, the ninth control valve 15, the inlet and outlet valves of the backup central cooler 2, the seventh control valve 13, and the first control valve 7 are all opened, and the third control valve 9, the fourth control valve 10, the fifth control valve 11, the sixth control valve 12, the eighth control valve 14, the tenth control valve 16, the inlet and outlet valves of the first central cooler 1, and the outlet valve of the backup low-temperature cooling fresh water pump 5 are all closed.

[0070] When the second central cooler 3 of the second circulation system fails, the standby central cooler 2 replaces the second central cooler 3, and the fourth standby system composed of the standby central cooler 2 and the second low-temperature cooling fresh water pump 6 is used to cool the port multi-users, that is, when the fourth standby system is in operation, the circulation path of the low-temperature cooling fresh water is: the outlet of the second low-temperature cooling fresh water pump 6 → the port multi-users → the seventh standby pipeline 2 and the tenth control valve 16 thereon → the standby central cooler 2 → the eighth standby pipeline 26 and the eighth control valve 14 thereon → the second connecting pipeline 22 and the second control valve 8 thereon → the inlet of the second low-temperature cooling fresh water pump 6. Since the first circulation system has not failed, the first circulation system operates normally under this failure condition.

[0071] When the second central cooler 3 fails, the fourth backup system operates, the first circulation system operates, the outlet valve of the second low-temperature cooling fresh water pump 6, the tenth control valve 16, the inlet and outlet valves of the backup central cooler 2, the eighth control valve 14, the second control valve 8, and the inlet and outlet valves of the second low-temperature cooling fresh water pump 6 are all opened, and the third control valve 9, the fourth control valve 10, the fifth control valve 11, the sixth control valve 12, the seventh control valve 13, the ninth control valve 15, the outlet valve of the low-temperature cooling fresh water pump 5, and the inlet and outlet valves of the second central cooler 3 are all closed.

[0072] When both the first central cooler 1 and the first low-temperature cooling fresh water pump 4 of the first circulation system fail, the standby central cooler 2 replaces the second central cooler 3, and the standby low-temperature cooling fresh water pump 5 replaces the second low-temperature cooling fresh water pump 6, and the fifth standby system composed of the standby central cooler 2 and the standby low-temperature cooling fresh water pump 5 is used to cool multiple users on the starboard side. That is, when the fifth standby system is in operation, the circulation path of the low-temperature cooling fresh water is: the outlet of the standby low-temperature cooling fresh water pump 5 → the second standby pipeline 18 and the fifth control valve 11 thereon → multiple users on the starboard side → the fifth standby pipeline 23 and the ninth control valve 15 thereon → the standby central cooler 2 → the sixth standby pipeline 24 and the seventh control valve 13 → the first connecting pipeline 21 and the first control valve 7 → the first standby pipeline 17 and the third control valve 9 thereon → the inlet of the standby low-temperature cooling fresh water pump 5.

[0073] When both the first central cooler 1 and the first low-temperature cooling fresh water pump 4 fail, the fifth backup system operates, the second circulation system operates, the outlet valve of the standby low-temperature cooling fresh water pump 5, the fifth control valve 11, the ninth control valve 15, the inlet and outlet valves of the standby central cooler 2, the seventh control valve 13, the first control valve 7 and the third control valve 9 are all opened, and the fourth control valve 10, the sixth control valve 12, the eighth control valve 14, the tenth control valve 16, the inlet and outlet valves of the first low-temperature cooling fresh water pump 4, and the inlet and outlet valves of the first central cooler 1 are all closed.

[0074] When both the second central cooler 3 and the second low-temperature cooling fresh water pump 6 of the second circulation system fail, the standby central cooler 2 replaces the second central cooler 3, and the standby low-temperature cooling fresh water pump 5 replaces the second low-temperature cooling fresh water pump 6, and the sixth standby system composed of the standby central cooler 2 and the standby low-temperature cooling fresh water pump 5 is used to cool the multiple users on the port side, that is, when the sixth standby system is in operation, the circulation path of the low-temperature cooling fresh water is: the outlet of the standby low-temperature cooling fresh water pump 5 → the fourth standby pipeline 20 and the sixth control valve 12 thereon → the multiple users on the port side → the seventh standby pipeline 2 and the tenth control valve 16 thereon → the standby central cooler 2 → the eighth standby pipeline 26 and the eighth control valve 14 thereon → the second connecting pipeline 22 and the second control valve 8 thereon → the third standby pipeline 19 and the fourth control valve 10 thereon → the inlet of the standby low-temperature cooling fresh water pump 5.

[0075] When both the second central cooler 3 and the second low-temperature cooling fresh water pump 6 fail, the sixth backup system operates, the first circulation system operates, the outlet valve of the backup low-temperature cooling fresh water pump 5, the sixth control valve 12, the tenth control valve 16, the inlet and outlet valves of the backup central cooler 2, the eighth control valve 14, the second control valve 8 and the fourth control valve 10 are all opened, and the inlet and outlet valves of the second low-temperature cooling fresh water pump 6, the third control valve 9, the fifth control valve 11, the seventh control valve 13, the ninth control valve 15, and the inlet and outlet valves of the second central cooler 3 are all closed.

[0076] When both the first low-temperature cooling fresh water pump 4 of the first circulation system and the second central cooler 3 of the second circulation system fail, the standby low-temperature cooling fresh water pump 5 replaces the first low-temperature cooling fresh water pump 4, and the standby central cooler 2 replaces the second central cooler 3. The first standby system is used to cool multiple users on the starboard side, and the fourth standby system is used to cool multiple users on the port side. The circulation paths of the low-temperature cooling fresh water when the first standby system and the fourth standby system are in operation are as described above and will not be described in detail again.

[0077] The first low-temperature cooling fresh water pump 4 of the first circulation system and the second central cooler 3 of the second circulation system both fail, the inlet and outlet valves of the second central cooler 3, the inlet and outlet valves of the first low-temperature cooling fresh water pump 4, the fourth control valve 10, the sixth control valve 12, the seventh control valve 13, and the ninth control valve 15 are all closed, and the remaining valves are all open.

[0078] When both the first central cooler 1 of the first circulation system and the second low-temperature cooling fresh water pump 6 of the second circulation system fail, the standby low-temperature cooling fresh water pump 5 replaces the second low-temperature cooling fresh water pump 6, and the standby central cooler 2 replaces the first central cooler 1. The third standby system is used to cool multiple users on the starboard side and the second standby system is used to cool multiple users on the port side. The circulation path of the low-temperature cooling fresh water when the second standby system and the third standby system are in operation is as described above and will not be described in detail again.

[0079] When both the first central cooler 1 of the first circulation system and the second low-temperature cooling fresh water pump 6 of the second circulation system fail, the inlet and outlet valves of the first central cooler 1, the inlet and outlet valves of the second low-temperature cooling fresh water pump 6, the third control valve 9, the fifth control valve 11, the eighth control valve 14 and the tenth control valve 16 are all closed, and the remaining valves are all opened.

[0080] The first control valve 7 and the second control valve 8 are temperature control valves, the third control valve 9, the fourth control valve 10, the fifth control valve 11 and the sixth control valve 12 are remote control valves, and the seventh control valve 13, the eighth control valve 14, the ninth control valve 15 and the tenth control valve 16 are stop valves.

[0081] The capacities of the first low-temperature cooling fresh water pump 4, the second low-temperature cooling fresh water pump 6 and the standby low-temperature cooling fresh water pump 5 are all 100%, and the capacities of the first central cooler 1, the second central cooler 3 and the standby central cooler 2 are all 100%.

[0082] The present invention also provides a fresh water system for an LNG electric push ship, including a first circulation system for cooling multiple users on the starboard side, a second circulation system for cooling multiple users on the port side, a standby low-temperature cooling fresh water pump 5 and a standby central cooler 2.

[0083] A first control valve 7 is provided on the first connecting pipeline 21 between the inlet valve of the first low-temperature cooling fresh water pump 4 of the first circulation system and the outlet valve of the first central cooler 1;

[0084] A second control valve 8 is provided on the second connecting pipeline 22 between the inlet valve of the second low-temperature cooling fresh water pump 6 of the second circulation system and the outlet valve of the second central cooler 3;

[0085] The inlet of the standby low-temperature cooling fresh water pump 5 is connected to the outlet of the first control valve 7 through the first standby pipeline 17, and the outlet is connected to the inlet of the starboard multi-user through the second standby pipeline 18, so as to be connected in parallel with the first low-temperature cooling fresh water pump 4. The first standby pipeline 17 is provided with a third control valve 9, and the second standby pipeline 18 is provided with a fifth control valve 11;

[0086] The inlet of the standby low-temperature cooling fresh water pump 5 is connected to the outlet of the second control valve 8 through the third standby pipeline 19, and the outlet is connected to the inlet of the port multi-user through the fourth standby pipeline 20, so as to be connected in parallel with the second low-temperature cooling fresh water pump 6. The third standby pipeline 19 is provided with a fourth control valve 10, and the fourth standby pipeline 20 is provided with a sixth control valve 12.

[0087] The inlet of the standby central cooler 2 is connected to the outlet of the starboard multi-user via the fifth standby pipeline 23, and the outlet is connected to the inlet of the first control valve 7 via the sixth standby pipeline 24, thereby being connected in parallel with the first central cooler 1. The fifth standby pipeline 23 is provided with a ninth control valve 15, and the sixth standby pipeline 24 is provided with a seventh control valve 13.

[0088] The inlet of the standby central cooler 2 is connected to the outlet of the port side multi-user through the seventh standby pipeline 25, and the outlet is connected to the inlet of the second control valve 8 through the eighth standby pipeline 26, thereby being connected in parallel with the second central cooler 3. The seventh standby pipeline 25 is provided with a tenth control valve 16, and the eighth standby pipeline 26 is provided with an eighth control valve 14.

[0089] It should be clear that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

Claims

1. A redundancy design method for a fresh water system of an LNG electric propulsion ship, characterized in that: The specific steps include: S1, connecting the standby low-temperature cooling fresh water pump (5) in parallel with the first low-temperature cooling fresh water pump (4) of the first circulation system and the second low-temperature cooling fresh water pump (6) of the second circulation system through pipelines; The standby central cooler (2) is connected in parallel with the first central cooler (1) of the first circulation system and the second central cooler (3) of the second circulation system through pipelines; The first circulation system is used to cool multiple users on the starboard side, and the second circulation system is used to cool multiple users on the port side; S2, when the first low-temperature cooling fresh water pump (4) of the first circulation system fails, the standby low-temperature cooling fresh water pump (5) replaces the first low-temperature cooling fresh water pump (4), and the first standby system composed of the standby low-temperature cooling fresh water pump (5) and the first central cooler (1) is used to cool multiple users on the starboard side; When the first central cooler (1) of the first circulation system fails, the standby central cooler (2) replaces the first central cooler (1), and the third standby system composed of the standby central cooler (2) and the first low-temperature cooling fresh water pump (4) is used to cool multiple users on the starboard side; When the second low-temperature cooling fresh water pump (6) of the second circulation system fails, the standby low-temperature cooling fresh water pump (5) replaces the second low-temperature cooling fresh water pump (6), and the second standby system composed of the standby low-temperature cooling fresh water pump (5) and the second central cooler (3) is used to cool multiple users on the port side; When the second central cooler (3) of the second circulation system fails, the standby central cooler (2) replaces the second central cooler (3), and the fourth standby system composed of the standby central cooler (2) and the second low-temperature cooling fresh water pump (6) is used to cool multiple users on the port side.

2. The redundancy design method for the fresh water system of an LNG electric propulsion ship according to claim 1 is characterized in that: A first control valve (7) is provided on a first connecting pipeline (21) between an inlet valve of a first low-temperature cooling fresh water pump (4) of the first circulation system and an outlet valve of a first central cooler (1); A second control valve (8) is provided on the second connecting pipeline (22) between the inlet valve of the second low-temperature cooling fresh water pump (6) of the second circulation system and the outlet valve of the second central cooler (3); The inlet of the standby low-temperature cooling fresh water pump (5) is connected to the outlet of the first control valve (7) through a first standby pipeline (17), and the outlet is connected to the inlet of the starboard multi-user through a second standby pipeline (18), thereby being connected in parallel with the first low-temperature cooling fresh water pump (4); a third control valve (9) is provided on the first standby pipeline (17), and a fifth control valve (11) is provided on the second standby pipeline (18); The inlet of the standby low-temperature cooling fresh water pump (5) is connected to the outlet of the second control valve (8) via a third standby pipeline (19), and the outlet is connected to the inlet of the port multi-user via a fourth standby pipeline (20), thereby being connected in parallel with the second low-temperature cooling fresh water pump (6); the third standby pipeline (19) is provided with a fourth control valve (10), and the fourth standby pipeline (20) is provided with a sixth control valve (12); When the first low-temperature cooling fresh water pump (4) of the first circulation system fails, the low-temperature cooling fresh water flows from the outlet of the standby low-temperature cooling fresh water pump (5), sequentially through the fifth control valve (11) of the second standby pipeline (18), the starboard multi-user, the first central cooler (1), the first control valve (7) of the first connecting pipeline (21), the third control valve (9) of the first standby pipeline (17), and flows back to the inlet of the standby low-temperature cooling fresh water pump (5); When the second low-temperature cooling fresh water pump (6) of the second circulation system fails, the low-temperature cooling fresh water flows from the outlet of the standby low-temperature cooling fresh water pump (5), sequentially through the sixth control valve (12) of the fourth standby pipeline (20), the port multi-user, the second central cooler (3), the second control valve (8) of the second connecting pipeline (22), the fourth control valve (10) of the third standby pipeline (19), and flows back to the inlet of the standby low-temperature cooling fresh water pump (5).

3. The redundancy design method for the fresh water system of the LNG electric propulsion ship according to claim 2 is characterized in that: The first control valve (7) and the second control valve (8) are both temperature control valves, and the third control valve (9), the fourth control valve (10), the fifth control valve (11) and the sixth control valve (12) are all remote control valves.

4. The redundancy design method for the fresh water system of an LNG electric propulsion ship according to claim 2 is characterized in that: The inlet of the standby central cooler (2) is connected to the outlet of the starboard multi-user via a fifth standby pipeline (23), and the outlet is connected to the inlet of the first control valve (7) via a sixth standby pipeline (24), thereby being connected in parallel with the first central cooler (1); a ninth control valve (15) is provided on the fifth standby pipeline (23), and a seventh control valve (13) is provided on the sixth standby pipeline (24); The inlet of the standby central cooler (2) is connected to the outlet of the port multi-user via a seventh standby pipeline (25), and the outlet is connected to the inlet of the second control valve (8) via an eighth standby pipeline (26), thereby being connected in parallel with the second central cooler (3); a tenth control valve (16) is provided on the seventh standby pipeline (25), and an eighth control valve (14) is provided on the eighth standby pipeline (26); When the first central cooler (1) of the first circulation system fails, low-temperature cooling fresh water flows from the outlet of the first low-temperature cooling fresh water pump (4), sequentially through the starboard multi-user, the ninth control valve (15) of the fifth standby pipeline (23), the standby central cooler (2), the seventh control valve (13) of the sixth standby pipeline (24), the first control valve (7) of the first connecting pipeline (21), and flows back to the inlet of the first low-temperature cooling fresh water pump (4); When the second central cooler (3) of the second circulation system fails, the low-temperature cooling fresh water flows from the outlet of the second low-temperature cooling fresh water pump (6), sequentially flows through the port multi-user, the tenth control valve (16) of the seventh standby pipeline (25), the standby central cooler (2), the eighth control valve (14) of the eighth standby pipeline (26), the second control valve (8) of the second connecting pipeline (22), and flows back to the inlet of the second low-temperature cooling fresh water pump (6).

5. The redundancy design method for the fresh water system of the LNG electric propulsion ship according to claim 4 is characterized in that: The seventh control valve (13), the eighth control valve (14), the ninth control valve (15) and the tenth control valve (16) are all stop valves.

6. The redundancy design method for the fresh water system of an LNG electric propulsion ship according to claim 1 is characterized in that: The capacities of the first low-temperature cooling fresh water pump (4), the second low-temperature cooling fresh water pump (6) and the standby low-temperature cooling fresh water pump (5) are all 100%, and the capacities of the first central cooler (1), the second central cooler (3) and the standby central cooler (2) are all 100%.

7. A fresh water system for LNG electric propulsion ship, characterized in that: It comprises a first circulation system for cooling multiple users on the starboard side, a second circulation system for cooling multiple users on the port side, a spare low-temperature cooling fresh water pump (5) and a spare central cooler (2), A first control valve (7) is provided on a first connecting pipeline (21) between an inlet valve of a first low-temperature cooling fresh water pump (4) of the first circulation system and an outlet valve of a first central cooler (1); A second control valve (8) is provided on the second connecting pipeline (22) between the inlet valve of the second low-temperature cooling fresh water pump (6) of the second circulation system and the outlet valve of the second central cooler (3); The inlet of the standby low-temperature cooling fresh water pump (5) is connected to the outlet of the first control valve (7) through a first standby pipeline (17), and the outlet is connected to the inlet of the starboard multi-user through a second standby pipeline (18), thereby being connected in parallel with the first low-temperature cooling fresh water pump (4); a third control valve (9) is provided on the first standby pipeline (17), and a fifth control valve (11) is provided on the second standby pipeline (18); The inlet of the standby low-temperature cooling fresh water pump (5) is connected to the outlet of the second control valve (8) via a third standby pipeline (19), and the outlet is connected to the inlet of the port multi-user via a fourth standby pipeline (20), thereby being connected in parallel with the second low-temperature cooling fresh water pump (6); the third standby pipeline (19) is provided with a fourth control valve (10), and the fourth standby pipeline (20) is provided with a sixth control valve (12); The inlet of the standby central cooler (2) is connected to the outlet of the starboard multi-user via a fifth standby pipeline (23), and the outlet is connected to the inlet of the first control valve (7) via a sixth standby pipeline (24), thereby being connected in parallel with the first central cooler (1); a ninth control valve (15) is provided on the fifth standby pipeline (23), and a seventh control valve (13) is provided on the sixth standby pipeline (24); The inlet of the standby central cooler (2) is connected to the outlet of the port multi-user via a seventh standby pipeline (25), and the outlet is connected to the inlet of the second control valve (8) via an eighth standby pipeline (26), thereby being connected in parallel with the second central cooler (3); a tenth control valve (16) is provided on the seventh standby pipeline (25), and an eighth control valve (14) is provided on the eighth standby pipeline (26).

Citation Information

Patent Citations

  • Ship energy-saving high-pressure circulating flushing system

    CN108860556A

  • Ship central cooling system

    CN203358863U

  • Cooling system for thruster

    KR1020130013114A

  • Cooling system of hydralic power pack unit for jack-up, cooling method thereof, and vessel and ocean construction including the same

    KR1020150125432A

  • Scavenge Air Cooling System and Method for Ship

    KR1020180006067A