LNG ship cylinder oil system and redundancy design method thereof
By designing a redundant cylinder oil system on the LNG ship, using the redundant connection between the left and right main engines and the liquid level switch control interlocking, the problem of propulsion system failure caused by a single equipment failure is solved, and the ship's safety at low speeds is achieved. The ability to navigate improves the safety and economy of the system.
Patent Information
- Application Number
- CN202410872423.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2044-07-01
AI Technical Summary
During maritime transportation of LNG ships, a single equipment or system failure in the cylinder oil system may cause the propulsion system to fail. It is difficult to design sufficient redundancy with existing technology to ensure safe navigation of the ship at low speeds.
Design an LNG ship cylinder oil system based on redundancy. The main engine cylinder oil systems are respectively set up on the left and right sides, and the connecting pipes are used to realize redundant connections between main engines to ensure that the cylinder oil system can be maintained when one side of the main engine or equipment fails. It can still run normally. The system includes a cylinder oil storage cabinet, oil main pipe, oil branch pipe, cylinder oil daily cabinet, main engine and pump. It forms a control interlock with the pump through the liquid level switch to realize the automatic replenishment function.
It improves the safety and reliability of the cylinder oil system, ensures that the ship can still propel normally in the event of a single-side failure, reduces the number of equipment, saves costs, and simplifies operations.
Smart Images

Figure CN118744792A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of shipbuilding, and in particular to an LNG ship cylinder oil system and a redundancy design method thereof. Background Art
[0002] LNG ships transport methane at -163℃, which is undoubtedly a liquid bomb at sea. In order to reduce the risk of LNG ships at sea, LNG ships are usually designed with two propulsion devices, and classification societies require that in the event of the failure of one propulsion device, the remaining power can still meet the ship's low speed navigation. This requires that the ship must have a certain degree of redundancy when it is designed to meet the requirements of the ship. When the low-speed diesel engine is working, the cylinder oil will be sprayed into the cylinder regularly to lubricate the moving piston. LNG ships must always ensure that there is power propulsion, and the propulsion system will not be affected by the failure of a single device or system, which requires the redundancy design of the LNG ship cylinder oil system.
[0003] Therefore, how to design a redundancy design method for the cylinder oil system of LNG ships has become an urgent problem to be solved. Summary of the invention
[0004] In view of this, the present invention provides an LNG ship cylinder oil system and a redundancy design method thereof, which can ensure that the ship propulsion system can still operate normally when a single device or a single-side system fails, ensuring the safe and reliable navigation of the LNG ship at sea.
[0005] A cylinder oil system of an LNG ship based on redundancy design includes a cylinder oil storage tank, an oil main pipe connected to the outlet of the cylinder oil storage tank, a first oil branch pipe and a second oil branch pipe connected to the end of the oil main pipe, a first cylinder oil daily tank connected to the first oil branch pipe, a second cylinder oil daily tank connected to the second oil branch pipe, a first main engine connected to the first cylinder oil daily tank through a first connecting pipe, and a second main engine connected to the second cylinder oil daily tank through a second connecting pipe.
[0006] The oil main pipe is provided with a first stop valve.
[0007] The first oil delivery branch pipe is provided with a first control valve group and a first cylinder oil pump, the second oil delivery branch pipe is provided with a second control valve group and a second cylinder oil pump, a connecting pipe is connected between the first oil delivery branch pipe and the second oil delivery branch pipe, and a sixth stop valve is provided on the connecting pipe, and the sixth stop valve is in a closed state when the cylinder oil system is working normally;
[0008] The first cylinder oil daily cabinet is provided with a first liquid level switch for detecting the cylinder oil level in the cabinet, and a control interlock is formed between the first liquid level switch and the first cylinder oil pump. The second cylinder oil daily cabinet is provided with a second liquid level switch for detecting the cylinder oil level in the cabinet, and a control interlock is formed between the second liquid level switch and the second cylinder oil pump.
[0009] Preferably, the first control valve group includes a second stop valve and a first stop check valve, and the second stop valve and the first stop check valve are respectively arranged on the pipelines on the oil inlet side and the oil outlet side of the first cylinder oil pump.
[0010] The second control valve group includes a fourth stop valve and a second stop check valve, which are respectively located on the pipelines on the oil inlet side and the oil outlet side of the second cylinder oil pump, and the connection node between the connecting pipe and the first oil delivery branch pipe and the second oil delivery branch pipe is located downstream of the first stop check valve and the second stop check valve.
[0011] Preferably, the connection node between the connecting pipe and the first oil delivery branch pipe and the second oil delivery branch pipe is close to the valve outlets of the first stop check valve and the second stop check valve.
[0012] Preferably, when the ship is operating normally, the cylinder oil in the cylinder oil storage cabinet is delivered to the first main engine and the second main engine through the first cylinder oil path and the second cylinder oil path respectively.
[0013] When the first cylinder oil pump fails, the sixth stop valve is opened and the first control valve group is closed, and the cylinder oil in the cylinder oil storage cabinet is delivered to the first main engine through the third cylinder oil path;
[0014] When the second cylinder oil pump fails, the sixth stop valve is opened and the second control valve group is closed, and the cylinder oil in the cylinder oil storage cabinet is delivered to the second main engine through the fourth cylinder oil path.
[0015] Preferably, the first cylinder oil path is: cylinder oil storage cabinet → oil main pipe → first oil branch pipe → first cylinder oil daily cabinet → first connecting pipe → first main engine;
[0016] The second cylinder oil path is: cylinder oil storage cabinet → oil main pipe → second oil branch pipe →
[0017] Second cylinder oil daily cabinet → second connecting pipe → second main engine;
[0018] The third cylinder oil path is: cylinder oil storage cabinet → oil main pipe → the fourth stop valve of the second oil branch pipe, the second cylinder oil pump and the second stop check valve → connecting pipe → the first oil branch pipe → the first cylinder oil daily cabinet → the first connecting pipe → the first main engine;
[0019] The fourth cylinder oil path is: cylinder oil storage cabinet → oil main pipe → the second stop valve, the first cylinder oil pump and the first stop check valve of the first oil branch pipe → connecting pipe → second oil branch pipe → second cylinder oil daily cabinet → second connecting pipe → second main engine.
[0020] Preferably, the cylinder oil storage tank, the first main engine and the second main engine are all arranged in the engine room, the first main engine is arranged in the engine room near the port side, the second main engine is arranged in the engine room near the starboard side, the first cylinder oil daily tank and the second cylinder oil daily tank are arranged at the same height position on both sides of the centerline of the ship, the arrangement height of the first cylinder oil daily tank and the second cylinder oil daily tank is higher than the arrangement height of the cylinder oil storage tank, the first main engine and the second main engine, and the arrangement height of the first cylinder oil pump and the second cylinder oil pump is equal to the arrangement height of the cylinder oil storage tank.
[0021] Preferably, a third stop valve is provided on the first connecting pipe, and a fifth stop valve is provided on the second connecting pipe.
[0022] A redundancy design method for a cylinder oil system of an LNG ship specifically comprises the following steps:
[0023] S1, a first cylinder oil daily tank and a second cylinder oil daily tank are respectively arranged on both sides of the centerline in the engine room, a cylinder oil storage tank is arranged below the first cylinder oil daily tank and the second cylinder oil daily tank, a first main engine is arranged near the port side in the engine room and its height is lower than the first cylinder oil daily tank, and a second main engine is arranged near the starboard side in the engine room and its height is lower than the second cylinder oil daily tank;
[0024] S2, connect the oil outlet of the cylinder oil storage cabinet with a horizontal oil main pipe, and horizontally lay the first oil branch pipe at the end of the oil main pipe toward the left bulkhead. The first oil branch pipe is horizontally laid to the left bulkhead and vertically upward along the deck until it is connected to the oil inlet of the first cylinder oil daily cabinet, and then connect the oil outlet of the first cylinder oil daily cabinet with the oil inlet of the first main engine through the first connecting pipe;
[0025] At the same time, a second oil delivery branch pipe is horizontally laid at the end of the oil delivery main pipe in the direction toward the right bulkhead. The second oil delivery branch pipe is horizontally laid to the right bulkhead and vertically upward along the deck until it is connected to the oil inlet of the second cylinder oil daily tank. Then, the oil outlet of the second cylinder oil daily tank is connected to the oil inlet of the second main engine through a second connecting pipe.
[0026] When laying the first oil delivery branch pipe, a first control valve group and a first cylinder oil pump are installed on the pipeline, and the first cylinder oil pump and the cylinder oil storage cabinet are arranged at the same height;
[0027] When laying the second oil delivery branch pipe, a second control valve group and a second cylinder oil pump are installed on the pipeline, and the second cylinder oil pump and the cylinder oil storage cabinet are arranged at the same height;
[0028] A connecting pipe is connected between the first oil delivery branch pipe and the second oil delivery branch pipe, and a sixth stop valve is provided on the connecting pipe;
[0029] S3, when the ship is operating normally, the cylinder oil in the cylinder oil storage cabinet is transported to the first main engine and the second main engine through the first cylinder oil path and the second cylinder oil path respectively.
[0030] When the first cylinder oil pump fails, the sixth stop valve is opened and the first control valve group is closed, and the cylinder oil in the cylinder oil storage cabinet is delivered to the first main engine through the third cylinder oil path;
[0031] When the second cylinder oil pump fails, the sixth stop valve is opened and the second control valve group is closed, and the cylinder oil in the cylinder oil storage cabinet is delivered to the second main engine through the fourth cylinder oil path.
[0032] Preferably, the first cylinder oil path is: cylinder oil storage cabinet → oil main pipe → first oil branch pipe → first cylinder oil daily cabinet → first connecting pipe → first main engine;
[0033] The second cylinder oil path is: cylinder oil storage cabinet → oil main pipe → second oil branch pipe →
[0034] Second cylinder oil daily cabinet → second connecting pipe → second main engine;
[0035] The third cylinder oil path is: cylinder oil storage cabinet → oil main pipe → the fourth stop valve of the second oil branch pipe, the second cylinder oil pump and the second stop check valve → connecting pipe → the first oil branch pipe → the first cylinder oil daily cabinet → the first connecting pipe → the first main engine;
[0036] The fourth cylinder oil path is: cylinder oil storage cabinet → oil main pipe → second stop valve, first cylinder oil pump and first stop check valve of the first oil branch → connecting pipe → second oil branch → second cylinder oil daily cabinet → second connecting pipe → second main engine.
[0037] The beneficial effects of the present invention are:
[0038] The present invention designs a main engine cylinder oil system on the port and starboard sides respectively, and connects the main engine cylinder oil systems on the port and starboard sides through a connecting pipe. When the ship is operating normally, the main engine cylinder oil systems on the port and starboard sides operate independently. When the main engine cylinder oil system on one side or a single device fails, the connecting pipe can still be used to maintain the normal operation of the two main engines, so that the cylinder oil systems on the port and starboard sides form redundancy, thereby improving the safety of the cylinder oil system.
[0039] Furthermore, the present invention forms a control interlock between the first liquid level switch and the first cylinder oil pump, and a control interlock between the second liquid level switch and the second cylinder oil pump, thereby automatically replenishing the oil in the two cylinder daily cabinets to ensure the normal operation of the main engine. In addition, the number of equipment in the cylinder oil system is small, which saves costs and is convenient for crew members to operate. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0041] Figure 1 It is a structural diagram of the cylinder oil system of the LNG carrier.
[0042] The meanings of the numbers in the figure are:
[0043] Cylinder oil storage cabinet 1, first stop valve 2, second stop valve 3, first cylinder oil pump 4, first stop check valve 5, first cylinder oil daily cabinet 6, first liquid level switch 7, third stop valve 8, first main engine 9, fourth stop valve 10, second cylinder oil pump 11, second stop check valve 12, second cylinder oil daily cabinet, second liquid level switch 14, fifth stop valve 15, second main engine 16, sixth stop valve 17, oil main pipe 18, first oil branch pipe 19, second oil branch pipe 20, first connecting pipe 21, second connecting pipe 22, connecting pipe 23. DETAILED DESCRIPTION
[0044] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is described below by the specific embodiments shown in the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.
[0045] The terms used in this disclosure are for the purpose of describing specific embodiments only and are not intended to limit the disclosure. The singular forms of "a", "said" and "the" used in this disclosure and the appended claims are also intended to include plural forms unless the context clearly indicates otherwise. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.
[0046] It should be understood that although the terms first, second, third, etc. may be used in the present disclosure to describe various information, such information should not be limited to these terms and should not be understood as indicating or implying relative importance. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present disclosure, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".
[0047] In the description of the present invention, it is necessary to understand that the terms "up", "down", "left", "right", "vertical", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0048] In the description of the present invention, unless otherwise specified and limited, it should be noted that the terms "installed", "connected" and "connected" should be understood in a broad sense. For example, it can be a mechanical connection or the internal connection between two components. It can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to the specific circumstances.
[0049] The present application is further described in detail below through specific embodiments and in conjunction with the accompanying drawings.
[0050] The present invention provides an LNG ship cylinder oil system based on redundancy design, comprising a cylinder oil storage tank 1, an oil main pipe 18 connected to the outlet of the cylinder oil storage tank 1, a first oil branch pipe 19 and a second oil branch pipe 20 connected to the end of the oil main pipe 18, a first cylinder oil daily tank 6 connected to the first oil branch pipe 19, a second cylinder oil daily tank 13 connected to the second oil branch pipe 20, a first main engine 9 connected to the first cylinder oil daily tank 6 through a first connecting pipe 21, and a second main engine 16 connected to the second cylinder oil daily tank 13 through a second connecting pipe 22.
[0051] The oil main pipe 18 is provided with a first stop valve 2 , and the first stop valve 2 is used to control the on-off of the oil main pipe 18 .
[0052] The first oil delivery branch pipe 19 is provided with a first control valve group and a first cylinder oil pump 4, and the first control valve group is used to control the on-off of the pipeline of the first oil delivery branch pipe 19. In this embodiment, the first control valve group includes a second stop valve 3 and a first stop check valve 5, and the second stop valve 3 and the first stop check valve 5 are respectively arranged on the pipelines on the oil inlet side and the oil outlet side of the first cylinder oil pump 4.
[0053] The second oil delivery branch pipe 20 is provided with a second control valve group and a second cylinder oil pump 11, and the second control valve group is used to control the on-off of the pipeline of the second oil delivery branch pipe 20. In this embodiment, the second control valve group includes a fourth stop valve 10 and a second stop check valve 12, and the fourth stop valve 10 and the second stop check valve 12 are respectively located on the pipelines on the oil inlet side and the oil outlet side of the second cylinder oil pump 11.
[0054] A connecting pipe 23 is connected between the first oil delivery branch pipe 19 and the second oil delivery branch pipe 20. Specifically, the connection node between the connecting pipe 23 and the first oil delivery branch pipe 19 and the second oil delivery branch pipe 20 is located downstream of the first stop check valve 5 and the second stop check valve 12.
[0055] Preferably, the connection node between the connecting pipe 23 and the first oil delivery branch pipe 19 and the second oil delivery branch pipe 20 is close to the valve outlets of the first stop check valve 5 and the second stop check valve 12 .
[0056] The connecting pipe 23 is provided with a sixth stop valve 17, which is used to control the on-off of the connecting pipe 23. When the cylinder oil system works normally, the sixth stop valve 17 is in a closed state. When a single-side cylinder oil system fails, the sixth stop valve 17 is opened to make the cylinder oil systems on the port and starboard sides redundant, so as to ensure the safety of the cylinder oil system.
[0057] The first connecting pipe 21 is provided with a third stop valve 8 , and the second connecting pipe 22 is provided with a fifth stop valve 15 .
[0058] The first cylinder oil daily cabinet 6 is provided with a first liquid level switch 7 for detecting the cylinder oil level in the cabinet, and a control interlock is formed between the first liquid level switch 7 and the first cylinder oil pump 4. The second cylinder oil daily cabinet 13 is provided with a second liquid level switch 14 for detecting the cylinder oil level in the cabinet, and a control interlock is formed between the second liquid level switch 14 and the second cylinder oil pump 11.
[0059] When the ship is operating normally, the first liquid level switch 7 detects the height of the cylinder oil liquid level in the first cylinder oil daily tank 6 in real time. When the liquid level in the first cylinder oil daily tank 6 is lower than the set value, the first liquid level switch 7 sends a signal to start the first cylinder oil pump 4 to replenish the cylinder oil to the first cylinder oil daily tank 6. When the liquid level is higher than the normal liquid level, the first liquid level switch 7 sends a signal to stop the first cylinder oil pump 4 to realize the automatic replenishment function of the cylinder oil in the first cylinder oil daily tank 6. Therefore, when the ship is operating normally, the cylinder oil in the cylinder oil storage tank 1 is transported to the first main engine 9 through the first cylinder oil path. The first cylinder oil path is: cylinder oil storage tank 1→oil main pipe 18→first oil branch pipe 19→first cylinder oil daily tank 6→first connecting pipe 21→first main engine 9;
[0060] At the same time, the second liquid level switch 14 also detects the height of the cylinder oil liquid level inside the second cylinder oil daily tank 13 in real time. When the liquid level in the second cylinder oil daily tank 13 is lower than the set value, the second liquid level switch 14 sends a signal to start the second cylinder oil pump 11 to replenish the cylinder oil to the second cylinder oil daily tank 13. When the liquid level is higher than the normal liquid level, the second liquid level switch 14 sends a signal to stop the second cylinder oil pump 11 to realize the automatic replenishment function of the cylinder oil inside the second cylinder oil daily tank 13. Therefore, when the ship is operating normally, the cylinder oil in the cylinder oil storage tank 1 is transported to the second main engine 16 through the second cylinder oil path. The second cylinder oil path is: cylinder oil storage tank 1→oil main pipe 18→second oil branch pipe 20→second cylinder oil daily tank 13→second connecting pipe 22→second main engine 16.
[0061] When the first cylinder oil pump 4 fails, the first cylinder oil path fails. At this time, the sixth stop valve 17 is opened and the second stop valve 3 and the first stop check valve 5 are closed. The cylinder oil in the cylinder oil storage cabinet 1 is delivered to the first main engine 9 through the third cylinder oil path. The third cylinder oil path is: cylinder oil storage cabinet 1→oil delivery main pipe 18→the fourth stop valve 10, the second cylinder oil pump 11 and the second stop check valve 12 of the second oil delivery branch pipe→connecting pipe 23→the first oil delivery branch pipe→the first cylinder oil daily cabinet 6→the first connecting pipe 21→the first main engine 9. In this case, the second cylinder oil path still works normally.
[0062] When the second cylinder oil pump 11 fails, the second cylinder oil path fails. At this time, the sixth stop valve 17 is opened and the fourth stop valve 10 and the second stop check valve 12 are closed. The cylinder oil in the cylinder oil storage cabinet 1 is delivered to the second main engine 16 through the fourth cylinder oil path. The fourth cylinder oil path is: cylinder oil storage cabinet 1→oil delivery main pipe 18→second stop valve 3, first cylinder oil pump 4 and first stop check valve 5 of the first oil delivery branch→connecting pipe 23→second oil delivery branch→second cylinder oil daily cabinet 13→second connecting pipe 22→second main engine 16. In this case, the first cylinder oil path still works normally.
[0063] The present invention also provides a redundancy design method for a cylinder oil system of an LNG ship, which specifically comprises the following steps:
[0064] S1, a first cylinder oil daily tank 6 and a second cylinder oil daily tank 13 are respectively arranged on both sides of the centerline in the engine room, and the first cylinder oil daily tank 6 and the second cylinder oil daily tank 13 are arranged at the same height;
[0065] Then, the cylinder oil storage tank 1 is arranged below the first cylinder oil daily tank 6 and the second cylinder oil daily tank 13, and the cylinder oil storage tank 1 is located between the first cylinder oil daily tank 6 and the second cylinder oil daily tank 13;
[0066] The first main engine 9 is arranged near the port side in the engine room and its height is lower than the first cylinder oil daily tank 6, and the second main engine 16 is arranged near the starboard side in the engine room and its height is lower than the second cylinder oil daily tank 13.
[0067] S2, connect the horizontal oil main pipe 18 to the oil outlet of the cylinder oil storage tank 1, and lay the first oil branch pipe 19 horizontally at the end of the oil main pipe 18 toward the left bulkhead. The first oil branch pipe 19 is laid horizontally to the left bulkhead and vertically upward along the deck until it is connected to the oil inlet of the first cylinder oil daily tank 6, and then connect the oil outlet of the first cylinder oil daily tank 6 to the oil inlet of the first main engine 9 through the first connecting pipe 21;
[0068] At the same time, a second oil delivery branch pipe 20 is horizontally laid at the end of the oil delivery main pipe 18 in the direction toward the right bulkhead. The second oil delivery branch pipe 20 is horizontally laid to the right bulkhead and vertically upward along the deck until it is connected to the oil inlet of the second cylinder oil daily tank 13, and then the oil outlet of the second cylinder oil daily tank 13 is connected to the oil inlet of the second main engine 16 through the second connecting pipe 22;
[0069] A connecting pipe 23 is connected between the first oil branch pipe 19 and the second oil branch pipe 20. The connection node between the connecting pipe 23 and the first oil branch pipe 19 and the second oil branch pipe 20 is close to the valve outlets of the first stop check valve 5 and the second stop check valve 12. The sixth stop valve 17 is installed on the connecting pipe 23.
[0070] When laying the oil main pipe 18, the first stop valve 2 is installed on the pipeline.
[0071] When laying the first oil delivery branch pipe 19, the second stop valve 3, the first stop check valve 5 and the first cylinder oil pump 4 are installed on the pipeline. The second stop valve 3 is arranged on the oil inlet side of the first cylinder oil pump 4, and the first stop check valve 5 is arranged on the oil outlet side of the first cylinder oil pump 4. The first cylinder oil pump 4 and the cylinder oil storage cabinet 1 are arranged at the same height;
[0072] When laying the second oil delivery branch pipe 20, a fourth stop valve 10, a second stop check valve 12 and a second cylinder oil pump 11 are installed on the pipeline, the fourth stop valve 10 is arranged on the oil inlet side of the second cylinder oil pump 11, the second stop check valve 12 is arranged on the oil outlet side of the second cylinder oil pump 11, and the second cylinder oil pump 11 and the cylinder oil storage cabinet 1 are arranged at the same height;
[0073] When laying the first connecting pipe 21, the third stop valve 8 is installed on the pipeline.
[0074] When laying the second connecting pipe 22, the fifth stop valve 15 is installed on the pipeline.
[0075] S3, when the ship is operating normally, the cylinder oil in the cylinder oil storage cabinet 1 is transported to the first main engine 9 and the second main engine 16 through the first cylinder oil path and the second cylinder oil path respectively.
[0076] When the first cylinder oil pump 4 fails, the sixth stop valve 17 is opened and the first control valve group is closed, and the cylinder oil in the cylinder oil storage cabinet 1 is delivered to the first main engine 9 through the third cylinder oil path and to the second main engine 16 through the second cylinder oil path;
[0077] When the second cylinder oil pump 11 fails, the sixth shut-off valve 17 is opened and the second control valve group is closed, and the cylinder oil in the cylinder oil storage cabinet 1 is delivered to the first main engine 9 through the first cylinder oil path and to the second main engine 16 through the fourth cylinder oil path.
[0078] At the same time, since the first liquid level switch 7 is controlled interlocked with the first cylinder oil pump 4, and the second liquid level switch 14 is controlled interlocked with the second cylinder oil pump 11, when supplying cylinder oil to the main engine, the first liquid level switch 7 and the second liquid level switch 14 detect the liquid levels in their respective cylinder oil daily tanks in real time, and control the start and stop of their respective corresponding cylinder oil pumps according to the changes in the liquid level to automatically replenish the oil in their respective cylinder oil daily tanks.
[0079] It should be clear that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
Claims
1. An LNG ship cylinder oil system based on redundancy design, characterized in that: The invention comprises a cylinder oil storage cabinet (1), an oil main pipe (18) connected to the outlet of the cylinder oil storage cabinet (1), a first oil branch pipe (19) and a second oil branch pipe (20) connected to the ends of the oil main pipe (18), a first cylinder oil daily cabinet (6) connected to the first oil branch pipe (19), a second cylinder oil daily cabinet (13) connected to the second oil branch pipe (20), a first main engine (9) connected to the first cylinder oil daily cabinet (6) via a first connecting pipe (21), and a second main engine (16) connected to the second cylinder oil daily cabinet (13) via a second connecting pipe (22). The oil delivery main pipe (18) is provided with a first stop valve (2). The first oil delivery branch pipe (19) is provided with a first control valve group and a first cylinder oil pump (4), the second oil delivery branch pipe (20) is provided with a second control valve group and a second cylinder oil pump (11), a connecting pipe (23) is connected between the first oil delivery branch pipe (19) and the second oil delivery branch pipe (20), a sixth stop valve (17) is provided on the connecting pipe (23), and the sixth stop valve (17) is in a closed state when the cylinder oil system is working normally; The first cylinder oil daily cabinet (6) is provided with a first liquid level switch (7) for detecting the cylinder oil liquid level in the cabinet, and a control interlock is formed between the first liquid level switch (7) and the first cylinder oil pump (4). The second cylinder oil daily cabinet (13) is provided with a second liquid level switch (14) for detecting the cylinder oil liquid level in the cabinet, and a control interlock is formed between the second liquid level switch (14) and the second cylinder oil pump (11).
2. The LNG ship cylinder oil system based on redundancy design according to claim 1 is characterized in that: The first control valve group comprises a second stop valve (3) and a first stop check valve (5), wherein the second stop valve (3) and the first stop check valve (5) are respectively arranged on pipelines on the oil inlet side and the oil outlet side of the first cylinder oil pump (4). The second control valve group comprises a fourth stop valve (10) and a second stop check valve (12), the fourth stop valve (10) and the second stop check valve (12) are respectively located on the pipelines on the oil inlet side and the oil outlet side of the second cylinder oil pump (11), and the connection node between the connecting pipe (23) and the first oil delivery branch pipe (19) and the second oil delivery branch pipe (20) is located downstream of the first stop check valve (5) and the second stop check valve (12).
3. The LNG ship cylinder oil system based on redundancy design according to claim 2 is characterized in that: The connection node between the connecting pipe (23) and the first oil delivery branch pipe (19) and the second oil delivery branch pipe (20) is close to the valve outlets of the first stop check valve (5) and the second stop check valve (12).
4. The LNG ship cylinder oil system based on redundancy design according to claim 2 is characterized in that: When the ship is operating normally, the cylinder oil in the cylinder oil storage cabinet (1) is transported to the first main engine (9) and the second main engine (16) through the first cylinder oil path and the second cylinder oil path respectively. When the first cylinder oil pump (4) fails, the sixth stop valve (17) is opened and the first control valve group is closed, and the cylinder oil in the cylinder oil storage cabinet (1) is delivered to the first main engine (9) through the third cylinder oil path; When the second cylinder oil pump (11) fails, the sixth stop valve (17) is opened and the second control valve group is closed, and the cylinder oil in the cylinder oil storage cabinet (1) is transported to the second main engine (16) through the fourth cylinder oil path.
5. The LNG ship cylinder oil system based on redundancy design according to claim 4 is characterized in that: The first cylinder oil path is: cylinder oil storage cabinet (1) → oil main pipe (18) → first oil branch pipe (19) → first cylinder oil daily cabinet (6) → first connecting pipe (21) → first main engine (9); The second cylinder oil path is: cylinder oil storage cabinet (1) → oil main pipe (18) → second oil branch pipe (20) → second cylinder oil daily cabinet (13) → second connecting pipe (22) → second main engine (16); The third cylinder oil path is: cylinder oil storage cabinet (1) → oil main pipe (18) → fourth stop valve (10), second cylinder oil pump (11) and second stop check valve (12) of the second oil branch pipe → connecting pipe (23) → first oil branch pipe → first cylinder oil daily cabinet (6) → first connecting pipe (21) → first main engine (9); The fourth cylinder oil path is: cylinder oil storage cabinet (1) → oil main pipe (18) → second stop valve (3), first cylinder oil pump (4) and first stop check valve (5) of the first oil branch pipe → connecting pipe (23) → second oil branch pipe → second cylinder oil daily cabinet (13) → second connecting pipe (22) → second main engine (16).
6. The LNG ship cylinder oil system based on redundancy design according to claim 1 or 4, characterized in that: The cylinder oil storage cabinet (1), the first main engine (9) and the second main engine (16) are all arranged in the engine room. The first main engine (9) is arranged in the engine room at a position close to the port side, and the second main engine (16) is arranged in the engine room at a position close to the starboard side. The first cylinder oil daily cabinet (6) and the second cylinder oil daily cabinet (13) are arranged at the same height position on both sides of the centerline of the ship. The arrangement height of the first cylinder oil daily cabinet (6) and the second cylinder oil daily cabinet (13) is higher than the arrangement height of the cylinder oil storage cabinet (1), the first main engine (9) and the second main engine (16). The arrangement height of the first cylinder oil pump (4) and the second cylinder oil pump (11) is equal to the arrangement height of the cylinder oil storage cabinet (1).
7. The LNG ship cylinder oil system based on redundancy design according to claim 1 is characterized in that: The first connecting pipe (21) is provided with a third stop valve (8), and the second connecting pipe (22) is provided with a fifth stop valve (15).
8. A redundancy design method for a cylinder oil system of an LNG ship, characterized in that: The specific steps include: S1, a first cylinder oil daily tank (6) and a second cylinder oil daily tank (13) are respectively arranged on both sides of the centerline in the engine room, a cylinder oil storage tank (1) is arranged below the first cylinder oil daily tank (6) and the second cylinder oil daily tank (13), a first main engine (9) is arranged near the port side in the engine room and its height is lower than the first cylinder oil daily tank (6), and a second main engine (16) is arranged near the starboard side in the engine room and its height is lower than the second cylinder oil daily tank (13); S2, a horizontal oil main pipe (18) is connected to the oil outlet of the cylinder oil storage tank (1), a first oil branch pipe (19) is horizontally laid at the end of the oil main pipe (18) in the direction toward the left bulkhead, the first oil branch pipe (19) is horizontally laid to the left bulkhead and vertically upward along the deck until it is connected to the oil inlet of the first cylinder oil daily tank (6), and then the oil outlet of the first cylinder oil daily tank (6) is connected to the oil inlet of the first main engine (9) through a first connecting pipe (21); At the same time, a second oil delivery branch pipe (20) is horizontally laid at the end of the oil delivery main pipe (18) in the direction toward the right bulkhead. The second oil delivery branch pipe (20) is horizontally laid to the right bulkhead and vertically upward along the deck until it is connected to the oil inlet of the second cylinder oil daily tank (13). Then, the oil outlet of the second cylinder oil daily tank (13) is connected to the oil inlet of the second main engine (16) through a second connecting pipe (22). When laying the first oil delivery branch pipe (19), a first control valve group and a first cylinder oil pump (4) are installed on the pipe, and the first cylinder oil pump (4) and the cylinder oil storage cabinet (1) are arranged at the same height; When laying the second oil delivery branch pipe (20), a second control valve group and a second cylinder oil pump (11) are installed on the pipe, and the second cylinder oil pump (11) and the cylinder oil storage cabinet (1) are arranged at the same height; A connecting pipe (23) is connected between the first oil delivery branch pipe (19) and the second oil delivery branch pipe (20), and a sixth stop valve (17) is provided on the connecting pipe (23); S3, when the ship is operating normally, the cylinder oil in the cylinder oil storage tank (1) is transported to the first main engine (9) and the second main engine (16) through the first cylinder oil path and the second cylinder oil path respectively, When the first cylinder oil pump (4) fails, the sixth stop valve (17) is opened and the first control valve group is closed, and the cylinder oil in the cylinder oil storage cabinet (1) is delivered to the first main engine (9) through the third cylinder oil path; When the second cylinder oil pump (11) fails, the sixth stop valve (17) is opened and the second control valve group is closed, and the cylinder oil in the cylinder oil storage cabinet (1) is transported to the second main engine (16) through the fourth cylinder oil path.
9. The method according to claim 8, characterized in that The first cylinder oil path is: cylinder oil storage cabinet (1) → oil main pipe (18) → first oil branch pipe (19) → first cylinder oil daily cabinet (6) → first connecting pipe (21) → first main engine (9); The second cylinder oil path is: cylinder oil storage cabinet (1) → oil main pipe (18) → second oil branch pipe (20) → second cylinder oil daily cabinet (13) → second connecting pipe (22) → second main engine (16); The third cylinder oil path is: cylinder oil storage cabinet (1) → oil main pipe (18) → fourth stop valve (10), second cylinder oil pump (11) and second stop check valve (12) of the second oil branch pipe → connecting pipe (23) → first oil branch pipe → first cylinder oil daily cabinet (6) → first connecting pipe (21) → first main engine (9); The fourth cylinder oil path is: cylinder oil storage cabinet (1) → oil main pipe (18) → second stop valve (3), first cylinder oil pump (4) and first stop check valve (5) of the first oil branch pipe → connecting pipe (23) → second oil branch pipe → second cylinder oil daily cabinet (13) → second connecting pipe (22) → second main engine (16).
Citation Information
Patent Citations
Compressor oil returning system, oil returning control method and double-compressor system
CN107101419A
Ship and double gas supply system thereof
CN107559105A
Electrohydraulic actuation system of a propulsion unit of a watercraft
DE102016204359A1
Propulsion installations for vehicles or vessels particularly for boats
GB1362316A
Air conditioning system of marine vessel using cold heat of LNG and seawater
JP2013091481A
