Construction quality checking method and system for provincial-side electricity consumption information acquisition system
Through graph neural network technology, a twin network verification and evaluation model is constructed, which solves the problem that the traditional electricity consumption information collection system cannot meet the demand for high-frequency and high-quality data, realizes the business execution quality evaluation of the electricity consumption information collection system, and improves the efficiency of the electricity consumption information collection system. Accuracy and reliability of system quality assessment.
Patent Information
- Application Number
- CN202410809757.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2044-06-21
AI Technical Summary
The traditional provincial power information collection system cannot meet business needs such as power dispatching, especially in terms of high frequency, high-quality data, reliability of system control instruction execution, real-time load monitoring, and power bill clearing and settlement capabilities.
Using graph neural network technology, by obtaining the historical operating data of the power consumption information collection system, generating a graph neural network data sample set, constructing a graph neural network model and a mirror model, establishing a twin network verification and evaluation model, and determining the values of various quality evaluation indicators. and perform weighted fusion to evaluate system quality.
Effectively evaluate the business execution quality of the power information collection system, improve the accuracy and reliability of system quality assessment, and adapt to the needs of power market reform and the development of new energy systems.
Smart Images

Figure CN118747284A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of intelligent power information processing, and more specifically, to a method and system for verifying the construction quality of a provincial power consumption information collection system. Background Art
[0002] In recent years, faced with new situations and new requirements such as the accelerated integration of the energy revolution and the digital revolution, the in-depth advancement of electricity market-oriented reforms, and the increasingly tight electricity supply and demand situation, a "one body and four wings" development layout has been proposed, and a new power system with new energy as the main body has been actively built. Not only is the demand for high-frequency and high-quality data from the electricity consumption information collection system increasing day by day, but it also puts forward higher requirements on the reliability of system control command execution, real-time load monitoring, accuracy of user power outage analysis and judgment, and ability to clear and settle electricity consumption and electricity charges. The traditional electricity consumption information collection systems independently built by each province can no longer meet the needs of business development such as power dispatching. Summary of the invention
[0003] In view of the above problems, the present invention proposes a method for checking the construction quality of a provincial power consumption information collection system, comprising:
[0004] Acquire historical operation data of a target power consumption information collection system, and generate a graph neural network data sample set of the target power consumption information collection system based on the historical operation data;
[0005] Generate a graph neural network model and a mirror model of the graph neural network model based on the graph neural network data sample set, and construct a twin network verification and evaluation model based on the graph neural network model and the mirror model;
[0006] According to the twin network verification and evaluation model, the quality evaluation index values of the target electricity consumption information collection system are determined, and the quality evaluation index values are weighted and fused to obtain weighted quality evaluation index values. According to the weighted quality evaluation index values, the quality of the target electricity consumption collection system is determined.
[0007] Optionally, historical operation data includes: time series monitoring data of network nodes in the electricity consumption information collection system diagram monitored in different time periods.
[0008] Optionally, generating a graph neural network model according to the graph neural network data sample set includes:
[0009] Convert the time series monitoring data in the graph neural network data sample set into graph data form;
[0010] Generate a node adjacency matrix according to the interconnection of the data flow process in the power consumption information collection system, and generate a node topology connection diagram of the target power consumption information collection system according to the adjacency matrix, wherein the nodes are the functional modules of the target power consumption information collection system;
[0011] The graph neural network data sample set converted into graph data form is input into each node in the node topology connection graph according to the corresponding relationship of the nodes to obtain the input data of the model;
[0012] The input data is input into the graph neural network for training to generate a graph neural network model.
[0013] Optionally, constructing a twin network verification and evaluation model includes: determining the similarity value between the output of the graph neural network model and the mirror model, using the similarity value as the accuracy compensation value of the mirror model, adjusting the parameters of the mirror model to generate a corrected mirror model, and constructing the twin network verification and evaluation model using the corrected mirror model.
[0014] Optionally, determining various quality assessment index values of the target electricity consumption information collection system includes:
[0015] Determine the timeliness and quality of business execution of each node of the target power consumption collection system under different business execution scenarios, and determine the business execution completion index value based on the timeliness and quality of business execution;
[0016] Determine the values of various quality assessment indicators based on the business execution completion indicator values.
[0017] On the other hand, the present invention also proposes a system for checking the construction quality of a provincial power consumption information collection system, comprising:
[0018] A data acquisition unit, used to obtain historical operation data of a target power consumption information acquisition system, and generate a graph neural network data sample set of the target power consumption information acquisition system based on the historical operation data;
[0019] A model generation unit, used to generate a graph neural network model according to the graph neural network data sample set, and generate a mirror model of the graph neural network model in the simulation environment of the target electricity consumption collection system, and construct a twin network verification and evaluation model according to the graph neural network model and the mirror model;
[0020] An evaluation unit is used to determine the quality evaluation index values of the target electricity consumption information collection system according to the twin network verification evaluation model, perform weighted fusion on the quality evaluation index values to obtain weighted quality evaluation index values, and determine the quality of the target electricity consumption collection system according to the weighted quality evaluation index values.
[0021] Optionally, the historical operation data of the data collection unit includes: time series monitoring data of the network nodes of the electricity consumption information collection system diagram monitored in different time periods.
[0022] Optionally, the model generation unit generates a graph neural network model according to the graph neural network data sample set, including:
[0023] Convert the time series monitoring data in the graph neural network data sample set into graph data format;
[0024] Generate a node adjacency matrix according to the interconnection of the data flow process in the power consumption information collection system, and generate a node topology connection diagram of the target power consumption information collection system according to the adjacency matrix, wherein the nodes are the functional modules of the target power consumption information collection system;
[0025] The graph neural network data sample set converted into graph data form is input into each node in the node topology connection graph according to the corresponding relationship of the nodes to obtain the input data of the model;
[0026] The input data is input into the graph neural network for training to generate a graph neural network model.
[0027] Optionally, the evaluation unit is also used to construct a twin network verification and evaluation model, including: determining the similarity value between the output of the graph neural network model and the mirror model, using the similarity value as the accuracy compensation value of the mirror model, adjusting the parameters of the mirror model to generate a corrected mirror model, and using the corrected mirror model to construct a twin network verification and evaluation model.
[0028] Optionally, the evaluation unit determines the quality evaluation index values of the target power consumption information collection system, including:
[0029] Determine the timeliness and quality of business execution of each node of the target power consumption collection system under different business execution scenarios, and determine the business execution completion index value based on the timeliness and quality of business execution;
[0030] Determine the values of various quality assessment indicators based on the business execution completion indicator values.
[0031] In yet another aspect, the present invention further provides a computing device, comprising: one or more processors;
[0032] a processor for executing one or more programs;
[0033] When the one or more programs are executed by the one or more processors, the above-described method is implemented.
[0034] In yet another aspect, the present invention further provides a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed, the method described above is implemented.
[0035] Compared with the prior art, the present invention has the following beneficial effects:
[0036] The present invention provides a method for checking the construction quality of a provincial power consumption information collection system, including: obtaining the historical operation data of a target power consumption information collection system, and generating a graph neural network data sample set of the target power consumption information collection system based on the historical operation data; generating a graph neural network model based on the graph neural network data sample set, and generating a mirror model of the graph neural network model in a simulation environment of the target power consumption collection system, and constructing a twin network verification and evaluation model based on the graph neural network model and the mirror model; determining the various quality evaluation index values of the target power consumption information collection system based on the twin network verification and evaluation model, performing weighted fusion on the various quality evaluation index values to obtain a weighted quality evaluation index value, and determining the quality of the target power consumption collection system based on the weighted quality evaluation index value. The present invention can effectively evaluate the business execution quality of the power consumption information collection system. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 is a flow chart of the method of the present invention;
[0038] Figure 2 is a flow chart of an embodiment of the present invention;
[0039] Figure 3 This is a diagram of a graph model training structure according to an embodiment of the present invention;
[0040] Figure 4 A schematic diagram of the attention mechanism working of an embodiment of the present invention;
[0041] Figure 5 It is a flowchart of calculating the similarity between the estimated probability value of the construction quality level of each node and the expected probability value of the construction quality level of each node in the twin network of an embodiment of the present invention;
[0042] Figure 6 A structural diagram of a comprehensive weighted quality assessment model of a new generation of electricity consumption information collection system at the provincial side of a twin network according to an embodiment of the present invention;
[0043] Figure 7 A fully connected layer weight parameter diagram of a comprehensive weighted quality assessment of a new generation of electricity consumption information collection system at the provincial side of a twin network according to an embodiment of the present invention;
[0044] Figure 8 It is a structural diagram of the system of the present invention. DETAILED DESCRIPTION
[0045] Now, exemplary embodiments of the present invention are described with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms used in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.
[0046] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.
[0047] Embodiment 1:
[0048] The present invention proposes a method for checking the construction quality of a provincial power consumption information collection system. Figure 1 As shown, including:
[0049] Step 1: Obtain historical operation data of a target power consumption information collection system, and generate a graph neural network data sample set of the target power consumption information collection system based on the historical operation data;
[0050] Step 2: Generate a graph neural network model and a mirror model of the graph neural network model based on the graph neural network data sample set, and construct a twin network verification and evaluation model based on the graph neural network model and the mirror model;
[0051] Step 3: According to the twin network verification and evaluation model, determine the quality evaluation index values of the target electricity consumption information collection system, perform weighted fusion on the quality evaluation index values to obtain weighted quality evaluation index values, and determine the quality of the target electricity consumption collection system according to the weighted quality evaluation index values.
[0052] Among them, the historical operation data includes: time series monitoring data of the network nodes of the electricity consumption information collection system diagram in different time periods.
[0053] Wherein, generating a graph neural network model according to the graph neural network data sample set includes:
[0054] Convert the time series monitoring data in the graph neural network data sample set into graph data form;
[0055] Generate a node adjacency matrix according to the interconnection of the data flow process of the power consumption information collection system, and generate a node topology connection diagram of the target power consumption information collection system according to the adjacency matrix, wherein the nodes are the functional modules of the target power consumption information collection system;
[0056] The graph neural network data sample set converted into graph data form is input into each node in the node topology connection graph according to the corresponding relationship of the nodes to obtain the input data of the model;
[0057] The input data is input into the graph neural network for training to generate a graph neural network model.
[0058] Among them, constructing a twin network verification and evaluation model includes: determining the similarity value between the output of the graph neural network model and the mirror model, using the similarity value as the accuracy compensation value of the mirror model, adjusting the parameters of the mirror model, generating a corrected mirror model, and constructing a twin network verification and evaluation model with the corrected mirror model.
[0059] Among them, determining the quality evaluation index values of the target electricity consumption information collection system includes:
[0060] Determine the timeliness and quality of business execution of each node of the target power consumption collection system under different business execution scenarios, and determine the business execution completion index value based on the timeliness and quality of business execution;
[0061] Determine the values of various quality assessment indicators based on the business execution completion indicator values.
[0062] The following is an example of the new generation of electricity consumption information collection system on the provincial side. The specific implementation steps include:
[0063] The specific process is as follows Figure 2 As shown, including:
[0064] A. Based on the new generation of electricity consumption information collection system built by the provincial side, the historical operation data of the new generation of electricity consumption information collection system on the provincial side is collected to form a graph neural network data sample set;
[0065] Among them, the historical operation data is the time series monitoring data obtained by the graph network node monitoring data in different time periods;
[0066] B. Convert the time series monitoring data in the graph neural network data sample set into graph data format to form a graph neural network sample data set;
[0067] Abstract each functional module and terminal device in the system as a node and construct the feature matrix of each node Abstract the data flow path within the system as edges and construct an adjacency matrix A sample data set of a graph neural network is formed, where n is the number of nodes, f is the dimension of node monitoring indicators, and m is the number of edges of the node. The construction of the node feature matrix is as follows:
[0068] For dynamic data, suppose the node data sequence feature In has n time steps Pr1, Pr2, ..., Pr n , forming the node feature V G , then V G The evolution process of data sequence characteristics starting from In can be expressed as:
[0069] V G =(I n ,P r ) (1)
[0070] Where Pr is a set of time steps, Pr = {Pr1, Pr2, ..., Pr n}.
[0071] A single time step Pr of the evolution process of the data sequence characteristics i (1≤i≤n) contains input In i 、various types of sequence op i , Sequence logic processing i and output VG i The four aspects are:
[0072] P ri =(I ni ,op i ,f i ,V Gi ) (2)
[0073] In the formula, In i =((In1, In2, ..., In iu ), TB i ,TE i ) represents input, In1, In2, …, In iu Indicates input i u (u ≥ 1) data sequence attributes, TB i and TE i Respectively represent the start time and end time of the input; op i =(OP i , TB' i ,TE' i ) represents each type of sequence, OP i Indicates the name of each type of sequence, TB' i and TE' i Respectively represent the start time and end time of each type of sequence, f i :In i →VGi Represents the sequence logic processing function from input to output, that is, splicing operations are performed on each type of sequence according to the time step, V Gi =((V G1 , V G2 , …, V Gis ), TB i+1 ,TE i+1 ) represents output, V G1 , V G2 , …, V Gis Represents the output s (s ≥ 1) data sequence attributes, TB i+1 and TE i+1 Indicates the start time and end time of the output. Through the above process, the sequence feature V of the node is finally obtained G For static data, its data content is directly spliced at the end of the dynamic data sequence to express the complete node information. Adjacency matrix A G It is formed according to the topological structure of the data flow link of the electricity consumption information collection system.
[0074] For the node features V obtained in the above steps G The Z-score method is used for normalization:
[0075]
[0076] In formula (3), is the node feature V G The mean of all values in a dimension, is the node feature V G The variance of all values in a certain dimension; the adjacency matrix combined with the link topology constitutes the graph data required for the data flow link of the electricity consumption information collection system.
[0077] C. Based on the functional submodules of the new generation of electricity consumption information collection system on the provincial side as nodes, they are connected to each other according to the data flow process of the new generation of electricity consumption information collection system on the provincial side, and the node adjacency matrix generated is used to represent the correlation between each neighbor node to form a node topology connection diagram;
[0078] D. Input the graph data of each node in the graph neural network sample data set into the nodes of the node topology connection graph, and the output data of the input node layer enters the graph attention layer, the fully connected layer and the softmax layer in turn, and outputs the construction quality level probability value of each node. After adjusting the graph attention neural network parameters based on the business execution indicator data of the graph neural network sample data set, the fixed parameters are used as the graph neural network model for evaluating the construction quality of the new generation of electricity consumption information collection system on the provincial side;
[0079] The graph model training structure of the electricity consumption information collection system based on graph attention neural network is as follows: Figure 3 As shown in the figure, the graph data is used as input, and the features of each node in the graph data are input into the graph attention layer. Each node aggregates the features of neighboring nodes according to the adjacency matrix generated by the data flow link topology of the power consumption information collection system. The spatial distribution features of various data indicators of the system are extracted by updating the node expression, and then the intermediate result of the fusion of the spatial distribution features of the power consumption information collection system is expanded into a one-dimensional vector. The graph neural network model is trained through a fully connected layer and a Softmax function.
[0080] D1. Based on the business execution data of the graph neural network sample data set, define the business execution completion indicators, and based on the business execution completion indicators, define the construction quality level of each node;
[0081] Among them, the business execution completion index includes the response speed level and the business execution completion level; the construction quality level of each node is 1-5, and the construction quality level is divided according to the business execution completion index level. The maximum and minimum values are normalized and expressed in percentage;
[0082] D2. Input the graph neural network sample data converted in step B into the nodes of the node topology connection graph, and input the output data of each node in the node topology connection graph into the graph attention layer;
[0083] The node feature vector is continuously input into two graph attention layers. In the graph attention layer, a linear transformation is learned to transform the input feature into a higher-level feature vector. The process first uses a common parameter moment W to perform a linear transformation on the features of each node, and then calculates the attention coefficient of the target node and each adjacent node through the attention mechanism, as shown in formula (4):
[0084]
[0085] Where LeakReLU(·) is the activation function, which can increase the nonlinear ability of the model. As shown in formula (5), H is the node feature vector, FFN is the feedforward neural network, is the concatenation vector operation, β' ij Indicates the importance of the node features of neighbor node j to the target node i;
[0086]
[0087] Among them, the parameter α is set to 0.2;
[0088] D3. The graph attention layer uses a multi-head attention mechanism to update and adjust the association weights between neighbor nodes. The weight size represents the influence of the feature data of the neighbor node on the feature data of the target node. The implicit value of each target node after the influence association between the target node and each neighbor node is output;
[0089] In order to integrate the multi-faceted features of neighbor nodes into the target node, a multi-head attention mechanism is used to calculate the weights of each neighbor node. First, K different W parameter matrices are initialized to calculate the weights of neighbor nodes from multiple angles. The attention mechanism at each angle works independently. The multi-head attention mechanism is shown in the figure. Figure 4 In order to use attention weights to compare the importance of different nodes, the Softmax function is used to normalize the attention coefficients of all neighboring nodes of the target node, and the attention weights of each neighboring node are calculated, as shown in formula (6):
[0090]
[0091] Where N i represents the neighbor nodes of the target node, W K Represents the Kth parameter matrix among multiple sets of parameter matrices for node initialization.
[0092] The graph multi-head attention mechanism concatenates the updated node features obtained by each attention mechanism, and then uses the average operation to obtain the final target updated node features, as shown in formula (7):
[0093]
[0094] Where σ(·) represents the nonlinear activation function eLU, and its expression in the graph attention neural network is:
[0095]
[0096] The parameter θ in the formula takes the value of 1 in the graph attention neural network;
[0097] D4. The fully connected layer is expanded in one-dimensional space to reduce the dimension of the feature vector. After passing through the softmax layer, the probability value of the construction quality level of each target node can be obtained;
[0098] After the feature vector of the new target node is obtained, the feature vector of the target node at this time is expanded in one-dimensional space and input into a fully connected layer for feature dimension reduction. The vector after dimension reduction is sent into the softmax layer to obtain the probability value P of the construction quality level of the node, as shown in formula (9):
[0099]
[0100] Where W L is the parameter matrix of the fully connected layer, b L is the bias matrix of the fully connected layer.
[0101] D5. Calculate the cross entropy loss value based on the probability value of the construction quality level of each target node and the probability value of the construction quality level of each target node actually defined, feedback the adjustment parameters of each layer of the graph attention neural network, set the cross entropy loss value threshold, and when the cross entropy loss value is lower than the set threshold, fix the parameters and output the graph neural network model that evaluates the construction quality of the new generation of electricity consumption information collection system on the provincial side.
[0102] E. Deploy the graph neural network model based on the new generation of electricity consumption information collection system on the provincial side as a direct deployment model on the headquarters side. At the same time, deploy the graph neural network model built by the new generation of electricity consumption information collection system on the provincial side as a mirror model in the simulation test environment on the headquarters side. Build a twin network verification and evaluation model based on the direct deployment model and the mirror model to output the similarity of the probability value of the construction quality level of each node;
[0103] Among them, the direct deployment model inputs the terminal data of the provincial side and the time series monitoring data of each node, and the mirror model inputs the simulation terminal data of the provincial side system terminal collection data level;
[0104] E1. Deploy a graph neural network model based on the new generation of electricity consumption information collection system at the provincial level at the headquarters as a direct deployment model;
[0105] The direct deployment model obtains the time series monitoring data of each terminal and each node of the provincial system in real time;
[0106] E2. Deploy the graph neural network model built by the new generation of electricity consumption information collection system at the provincial side in the simulation test environment at the headquarters side as a mirror model;
[0107] The mirror model inputs simulated terminal data of the magnitude of data collected by the provincial-side system terminal;
[0108] E3. Input the terminal data of the provincial side and the time series monitoring data of each node into the direct deployment model, and output the estimated probability value of the construction quality level of each node;
[0109] According to the estimated probability value of the construction quality level output by each node, the system construction quality level evaluation can be realized;
[0110] E4. Based on the simulation of the data volume collected by the provincial terminal, the terminal data with the same data volume is input into the mirror model, and the expected probability value of the construction quality level of each node is output;
[0111] E5. Construct a twin network verification and evaluation model based on the direct deployment model and the mirror model, and calculate the similarity between the estimated probability value of the construction quality level of each node and the expected probability value of the construction quality level of each node, as the similarity evaluation value between the construction quality of each node on the provincial side and the construction quality of each node at the headquarters.
[0112] The graph node data sequences of the headquarters side and the provincial side are respectively sent to two identical graph attention neural networks. The structures and parameters of the two feature extraction networks are the same. The input data sequences are I p ={v1,v2,...,v p} and I q ={v1,v2,...,v q}, where I p is the input data sequence at the headquarters side, I q is the input data sequence of the province. The two data sequences may have differences in time length, monitoring data or human-caused differences. Two identical deep neural networks output a fixed-size vector O P ∈R M and O q ∈R M , the cosine similarity is used to calculate the similarity between the two output vectors, as shown in (10):
[0113]
[0114] F. Comprehensively evaluate the construction quality of the new generation of electricity consumption information collection system on the provincial side based on the comprehensive weighting of multi-scenario business, that is, under the execution of different scenarios, the timeliness and quality of business execution of each node are evaluated according to the business execution completion indicators. The weight coefficients calculated by the twin network are used to weightedly integrate the above evaluation indicators to generate the comprehensive weighted quality evaluation indicators of the new generation of electricity consumption information collection system on the provincial side.
[0115] Figure 5 The weight parameters of the fully connected layer are shown. The structure of the comprehensive weighted quality assessment model of the new generation of electricity consumption information collection system at the provincial side is as follows Figure 6 As shown, the network uses the headquarters side data sequence I' p and provincial data sequence I' q As input, I' p is the standard data sequence at the headquarters side, I' q is the actual input data sequence of the provincial side. The standard data sequence is the data sequence that enables the system to meet the standard indicators. The relevant standard indicators include the data transmission rate, data transmission capacity and data transmission failure of each node. The twin neural network MGAN is used to extract sequence features and output two fixed-size vectors O ps ∈R M and O qs ∈R M , and then concatenate the two eigenvectors together to form the eigenvector L(O ps ,O qs), the feature vector is processed by the fully connected layer and the Softmax function to obtain the relative quality score of the system. The weight parameters of MGAN are fixed, and only the weight parameters of the fully connected layer need to be learned during scoring, such as Figure 7 shown.
[0116] Score estimation process:
[0117] (1) The input data sequence of each indicator of the system can be calculated as:
[0118]
[0119] The first item is the contribution of the standard data series input to the headquarters model. The bias parameter is ignored during the calculation, and w is the weight parameter.
[0120] (2) Calculate the hidden layer output vector z, the calculation formula is:
[0121]
[0122] The first item is also the contribution of the standard data series input into the headquarters model.
[0123] The quality score is:
[0124]
[0125] The Softmax function maps the value between (0, 1), and takes two decimal places at this time. Let the quality score of the system index be S' o , then the training loss function of each indicator of the system is:
[0126]
[0127] Where N is the number of input data sequences.
[0128] G. Use the similarity value as the accuracy compensation weight for mirror modeling and direct deployment modeling, so as to reduce the difference between the nodes of the new generation power consumption information collection system on the provincial side in the test environment and the actual operation environment;
[0129] According to the precision compensation weight, the actual score of each module of the system, i.e. each functional node, is calculated;
[0130] The actual score of each functional node is shown in formula (23):
[0131]
[0132] Add the actual scores of each functional node and take the average:
[0133]
[0134] m represents the number of functional nodes, that is, the number of nodes in the graph neural network, and the score T s Can represent the final true score of the system;
[0135] In view of the complexity and diversity of the distributed architecture construction of the new generation of provincial electricity consumption information collection system, the present invention constructs a graph neural network model based on the terminal data and link topology structure of the new generation of provincial electricity consumption information collection system, that is, abstracting each functional module and terminal device in the system as a node, abstracting the data flow link as an edge, and outputting the construction quality assessment probability of each node. This method can characterize the spatial correlation between the various functional modules of the system, and at the same time take the time series monitoring data of each node as input, so as to continuously evaluate the construction quality of the provincial system over time and avoid the failure of the evaluation data;
[0136] In view of the differences in the construction systems of the new generation of electricity consumption information collection system on the provincial side, the headquarters-side mirror modeling is usually used to evaluate the provincial-side construction system. Due to the differences in deployment environment, there is a deviation between the actual operation data and the ideal operation environment, which seriously affects the accuracy of the evaluation of the provincial-side construction quality. In order to achieve real-time and fair verification and evaluation of the provincial-side construction quality, a direct deployment model and a mirror model are constructed based on the graph neural network model of the new generation of electricity consumption information collection system on the provincial side. As a twin network verification and evaluation model, the similarities and differences of the construction of each node of the headquarters-side and provincial-side systems are calculated, thereby improving the accuracy of the evaluation of the provincial-side construction quality;
[0137] In view of the fact that the selection of traditional system construction quality assessment indicators often lacks fairness and explainability, the present invention proposes a multi-scenario comprehensive weighted assessment method based on specific business execution completion indicators. After obtaining the assessment data based on the execution of each business, the precision compensation weights of the headquarters and provincial systems are calculated in combination with the twin network verification and assessment model to obtain the multi-scenario comprehensive weighted assessment score of the system, making the assessment result more reliable and authoritative.
[0138] Embodiment 2:
[0139] The present invention also proposes a quality inspection system 200 for the provincial power consumption information collection system. Figure 8 As shown, including:
[0140] The data acquisition unit 201 is used to obtain historical operation data of a target power consumption information acquisition system, and generate a graph neural network data sample set of the target power consumption information acquisition system based on the historical operation data;
[0141] A model generation unit 202 is used to generate a graph neural network model according to the graph neural network data sample set, and generate a mirror model of the graph neural network model in the simulation environment of the target power consumption collection system, and construct a twin network verification and evaluation model according to the graph neural network model and the mirror model;
[0142] The evaluation unit 203 is used to determine the quality evaluation index values of the target power consumption information collection system according to the twin network verification evaluation model, perform weighted fusion on the quality evaluation index values to obtain weighted quality evaluation index values, and determine the quality of the target power consumption collection system according to the weighted quality evaluation index values.
[0143] Among them, the historical operation data includes: time series monitoring data of the network nodes of the electricity consumption information collection system diagram in different time periods.
[0144] Wherein, generating a graph neural network model according to the graph neural network data sample set includes:
[0145] Convert the time series monitoring data in the graph neural network data sample set into graph data format;
[0146] Generate a node adjacency matrix according to the interconnection of the data flow process of the power consumption information collection system, and generate a node topology connection diagram of the target power consumption information collection system according to the adjacency matrix, wherein the nodes are the functional modules of the target power consumption information collection system;
[0147] The graph neural network data sample set converted into graph data form is input into each node in the node topology connection graph according to the corresponding relationship of the nodes to obtain the input data of the model;
[0148] The input data is input into the graph neural network for training to generate a graph neural network model.
[0149] Among them, the evaluation unit 203 is also used to construct a twin network verification and evaluation model, including: determining the similarity value between the output of the graph neural network model and the mirror model, using the similarity value as the accuracy compensation value of the mirror model, adjusting the parameters of the mirror model, generating a corrected mirror model, and using the corrected mirror model to construct a twin network verification and evaluation model.
[0150] Among them, determining the quality evaluation index values of the target electricity consumption information collection system includes:
[0151] Determine the timeliness and quality of business execution of each node of the target power consumption collection system under different business execution scenarios, and determine the business execution completion index value based on the timeliness and quality of business execution;
[0152] Determine the values of various quality assessment indicators based on the business execution completion indicator values.
[0153] The present invention can effectively evaluate the service execution quality of the electricity consumption information collection system.
[0154] Embodiment 3:
[0155] Based on the same inventive concept, the present invention also provides a computer device, which includes a processor and a memory, wherein the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions in the computer storage medium to implement the corresponding method flow or corresponding functions, so as to implement the steps of the method in the above embodiment.
[0156] Embodiment 4:
[0157] Based on the same inventive concept, the present invention also provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device for storing programs and data. It is understandable that the computer-readable storage medium here can include both a built-in storage medium in a computer device and an extended storage medium supported by the computer device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by a processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the steps of the method in the above embodiment.
[0158] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes. The schemes in the embodiments of the present invention may be implemented in various computer languages, for example, object-oriented programming language Java and literal scripting language JavaScript, etc.
[0159] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0160] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0161] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0162] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0163] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for checking the construction quality of a provincial power consumption information collection system, characterized in that: include: Obtain historical operation data of the target electricity consumption information collection system, and generate a graph neural network data sample set based on the historical operation data; Generate a graph neural network model and a mirror model of the graph neural network model according to the graph neural network data sample set, and construct a twin network verification and evaluation model according to the graph neural network model and the mirror model; According to the twin network verification and evaluation model, the quality evaluation index values of the target electricity consumption information collection system are determined, and the quality evaluation index values are weighted and fused to obtain weighted quality evaluation index values. Based on the weighted quality evaluation index values, the construction quality of the target electricity consumption collection system is determined.
2. The quality inspection method according to claim 1, characterized in that: The historical operation data includes: time series monitoring data of the network nodes of the power consumption information collection system diagram monitored in different time periods.
3. The quality inspection method according to claim 1, characterized in that: According to the graph neural network data sample set, a graph neural network model is generated, including: Convert the time series monitoring data in the graph neural network data sample set into graph data form; Generate a node adjacency matrix according to the interconnection of the data flow process in the power consumption information collection system, and generate a node topology connection diagram of the target power consumption information collection system according to the adjacency matrix, wherein the nodes are the functional modules of the target power consumption information collection system; The graph neural network data sample set converted into graph data form is input into each node in the node topology connection graph according to the corresponding relationship of the nodes to obtain the input data of the model; The input data is input into the graph neural network for training to generate a graph neural network model.
4. The quality inspection method according to claim 1, characterized in that: Constructing a twin network verification and evaluation model, including: determining the similarity value between the output of the graph neural network model and the mirror model, using the similarity value as the accuracy compensation value of the mirror model, adjusting the parameters of the mirror model to generate a corrected mirror model, and using the corrected mirror model to construct a twin network verification and evaluation model.
5. The quality inspection method according to claim 1, characterized in that: Determining the quality evaluation index values of the target power consumption information collection system includes: Determine the timeliness and quality of business execution of each node in the target power consumption collection system under different business execution scenarios, and determine the business execution completion index value according to the timeliness and quality of business execution; Determine the values of various quality assessment indicators based on the business execution completion indicator values.
6. A quality inspection system for the construction of a provincial electricity consumption information collection system, characterized in that: include: A data acquisition unit, used to obtain historical operation data of the target power consumption information acquisition system, and generate a graph neural network data sample set based on the historical operation data; A model generation unit, used to generate a graph neural network model according to the graph neural network data sample set, and generate a mirror model of the graph neural network model in the simulation environment of the target electricity consumption collection system, and construct a twin network verification and evaluation model according to the graph neural network model and the mirror model; An evaluation unit is used to determine the quality evaluation index values of the target electricity consumption information collection system according to the twin network verification evaluation model, perform weighted fusion on the quality evaluation index values to obtain weighted quality evaluation index values, and determine the quality of the target electricity consumption collection system according to the weighted quality evaluation index values.
7. The quality inspection system according to claim 6, characterized in that: The data acquisition unit is specifically used to collect time series monitoring data of network nodes in the power consumption information acquisition system diagram by time period.
8. The quality inspection system according to claim 6, characterized in that: The model generation unit is specifically used for: Convert the time series monitoring data in the graph neural network data sample set into graph data form; Generate a node adjacency matrix according to the interconnection of the data flow process in the power consumption information collection system, and generate a node topology connection diagram of the target power consumption information collection system according to the adjacency matrix, wherein the nodes are the functional modules of the target power consumption information collection system; The graph neural network data sample set converted into graph data form is input into each node in the node topology connection graph according to the corresponding relationship of the nodes to obtain the input data of the model; The input data is input into the graph neural network for training to generate a graph neural network model.
9. The quality inspection system according to claim 6, characterized in that: The evaluation unit is specifically used to determine the similarity value between the output of the graph neural network model and the mirror model, use the similarity value as the accuracy compensation value of the mirror model, adjust the parameters of the mirror model, generate a corrected mirror model, and use the corrected mirror model to construct a twin network verification and evaluation model.
10. The quality inspection system according to claim 6, characterized in that: The evaluation unit is specifically used to determine the timeliness and quality of business execution of each node of the target power consumption collection system under different business execution scenarios, and determine the business execution completion index value according to the timeliness and quality of business execution; Determine the values of various quality assessment indicators based on the business execution completion indicator values.
11. A computer device, characterized in that: include: one or more processors; a processor for executing one or more programs; When the one or more programs are executed by the one or more processors, the method according to any one of claims 1 to 5 is implemented.
12. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the computer program is executed, the method according to any one of claims 1 to 5 is implemented.
Citation Information
Patent Citations
Digital twin model correction method based on deep neural network
CN110851966A
Construction method, device and equipment of digital twinborn body and readable storage medium
CN115238586A
Distributed mutual inductor online monitoring method, system and equipment and storage medium
CN115598582A
Power equipment influence degree evaluation method and system based on semi-supervised graph neural network
CN117314252A
Customized product performance prediction method based on heterogeneous data difference compensation fusion
US20220122103A1
