Strategy bidding method for flexible resource aggregator to participate in power distribution network flexible market

By adopting a strategic bidding method in the distribution network, formulating a pre-scheduling plan and a strategic bidding model for flexible resource aggregators, the problem of not considering operating constraints and compensation costs in the bidding strategy of flexible resource aggregators is solved, and flexible resource aggregators are realized. Participation in the economic benefits of sexual resources and the effective operation of the market.

CN118747677APending Publication Date: 2024-10-08ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID JIBEI ELECTRIC POWER CO LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410932429.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

In the existing distribution network flexibility market, the bidding strategies of flexibility resource aggregators fail to effectively consider the operational constraints and compensation costs of flexibility resources, resulting in end users and flexibility resource aggregators being unwilling to participate due to uncertain returns. market.

Method used

A strategic bidding method is adopted to formulate a pre-scheduling plan for user equipment through a pre-scheduling model, a bidding strategy is formulated based on the flexible resource aggregator strategic bidding model, the DFM clearing model is used to determine the purchase proportion of flexibility services, and then the The dispatch model adjusts the pre-dispatch plan to meet the needs of the distribution network and users. The method includes objective functions and constraints to ensure revenue maximization and cost compensation for flexibility resource aggregators.

Benefits of technology

It realizes the bidding strategy that maximizes the revenue of the flexibility resource aggregator, determines the optimal amount of flexibility and power recovery period, takes into account the operational constraints of the flexibility resources, and ensures the economic benefits of participating in the distribution network flexibility market.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118747677A_ABST
    Figure CN118747677A_ABST
Patent Text Reader

Abstract

The invention discloses a strategic bidding method for a flexible resource aggregator to participate in a flexible market of a power distribution network. The method comprises the following steps: making a pre-scheduling plan of user equipment based on a power demand and an electricity price; formulating a bidding strategy of a flexible service based on the pre-scheduling plan and a power distribution network demand; determining a proportion of purchasing the flexible service, namely a DFM clearing plan, based on the bidding strategy; and adjusting the pre-scheduling plan based on the DFM clearing plan to meet the operation of the power distribution network and the requirements of users. According to the method, a bidding strategy enabling the income of a flexibility resource aggregator to be maximum is determined, namely, the optimal flexibility amount, the electric energy recovery time period and the total amount of recovered electric energy provided by each blocking time period are determined, and modeling is carried out on operation constraints of flexibility resources; meanwhile, the method considers the compensation of the cost of providing the flexible service for the flexible resources by the flexible resource aggregator, and ensures the economic benefits of the flexible resources or the flexible resource aggregator participating in the flexible market of the power distribution network.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of optimized operation of distribution network flexibility market, and in particular relates to a strategic bidding method for flexibility resource aggregators to participate in the distribution network flexibility market. Background Art

[0002] With the large-scale deployment of massive distributed energy resources (DERs) in distribution networks, traditional distribution networks have transformed from single, passive acceptance of power transmission from the upper power grid to bidirectional, active provision of power to or consumption of power. The paradigm shift of distribution networks has brought some operational challenges to distribution system operators (DSOs), such as network congestion caused by non-coordinated power demand of distributed resources (such as electric vehicles).

[0003] In order to solve the network congestion problem in an economical and efficient manner, distribution system operators currently use the distribution-level flexibility market (DFM) to call on the flexibility of distributed resources, change the power consumption curve of end users by giving economic incentives, and solve the network congestion problem for the distribution network.

[0004] Existing literature studies methods to solve congestion problems using DFM. Designing Decentralized Markets for Distribution System Flexibility proposes a DFM based on bilateral contracts, where transactions are conducted between DSOs and flexibility resource aggregators, and between flexibility resource aggregators and end users. In this market, each pair of tradable agents has a contract and transactions are conducted based on a bilateral flexibility contract network. Pool-based demand response exchange–concept and modeling proposes a DFM based on resource pools, where flexibility buyers and sellers in the market bid, and DFM operators clear based on different operational objectives. A market-based framework for demandside flexibility scheduling and dispatching proposes a DFM framework for day-ahead and intraday congestion management, where market participants are DSOs, market operators, balancing responsible parties (BRPs), and flexibility resource aggregators. DSOs are the only flexibility buyers in the day-ahead congestion management DFM, while BRPs participate in the intraday congestion management DFM and compete with DSOs for flexibility to minimize imbalance costs. Market operators use a mixed integer linear programming (MILP) model to solve day-ahead and intraday market clearing problems with the goal of maximizing social welfare. In the Local market framework for exploiting flexibility from the end users, this DFM framework is complemented with real-time dispatch strategies. If market-based solutions cannot resolve the congestion problem, the DSO takes over the control of flexibility resources to adjust energy dispatch.

[0005] At present, there are still some challenges in the bidding strategy of flexibility resource aggregators in the method of using DFM to solve the congestion problem:

[0006] (1) A key element of a flexibility resource aggregator's bid for providing flexibility services is the energy recovery conditions, i.e. the total amount and time of energy recovery. However, in the existing DFM framework, these conditions are determined without considering the operating constraints of flexibility resources.

[0007] (2) The flexibility resource aggregator's quotation does not take into account the compensation cost for flexibility resources, that is, the fee paid to flexibility resources for providing flexibility. This will make end users and flexibility resource aggregators unwilling to participate in DFM due to uncertainty about benefits. Summary of the invention

[0008] The purpose of the present invention is to provide a strategic bidding method for flexibility resource aggregators to participate in the distribution network flexibility market, so as to solve the problems existing in the above-mentioned prior art.

[0009] To achieve the above object, the present invention provides a strategic bidding method for a flexibility resource aggregator to participate in the distribution network flexibility market, comprising:

[0010] Based on the power demand and the power price, a pre-dispatch plan of the user equipment is formulated by using a pre-dispatch model, wherein the equipment includes an electric vehicle EV and a heat pump HP;

[0011] Based on the pre-dispatch plan and the demand of the distribution network, the flexibility resource aggregator formulates a bidding strategy for flexibility services using a flexibility resource aggregator strategic bidding model;

[0012] Based on the bidding strategy, the distribution network operator uses the DFM clearing model to determine the proportion of purchasing the flexibility service, namely, the DFM clearing plan;

[0013] Based on the DFM clearing plan, the pre-dispatch plan is adjusted using a re-dispatch model to meet the operation of the distribution network and the needs of users.

[0014] Optionally, the objective function of the pre-dispatch model is based on the predicted day-ahead electricity price. Minimize the electricity cost of EV and HP, specifically:

[0015]

[0016] in, They are the power consumption of the e-th EV and the h-th HP during period t respectively.

[0017] Optionally, the constraints of the pre-scheduling model include:

[0018] The upper and lower limits of the state of charge (SOC) level of electric vehicles:

[0019]

[0020] in, and are the lower and upper limits of the SOC level of the e-th EV, is the initial SOC level of the e-th EV, d t,e is the power consumption of the e-th EV in period t;

[0021] EV charging power capability constraints:

[0022]

[0023] The total charging power of an EV is equal to the total electrical power used:

[0024]

[0025] User's household heat balance equation:

[0026]

[0027] in, is the performance coefficient of the hth HP, k1 and k2 are the heat transfer coefficients, and are the indoor and outdoor temperatures of the hth HP in period t, respectively;

[0028] Indoor temperature is limited to the thermal comfort range:

[0029]

[0030] in, and are the lower and upper limits of the indoor temperature when using the hth HP, respectively;

[0031] HP power usage limit:

[0032]

[0033] in, and They are the lower and upper limits of HP power consumption respectively.

[0034] Optionally, the objective function of the flexible resource aggregator strategic bidding model is: for a given bid price at node n The flexibility resource aggregator a, when DFM accepts the bid price, maximizes the profit of the flexibility resource aggregator, specifically:

[0035]

[0036] The first item indicates the bid price. Income from the sale of flexibility, where is the available flexibility provided by flexibility resource aggregator a at node n during period t; the second and third items represent the flexibility fees paid to the flexibility resources, where and are the flexibility provided by the e-th EV and the h-th HP in period t, and are the flexibility cost coefficients of the e-th EV and the h-th HP in period t, and are the additional day-ahead electricity costs of the e-th EV and the h-th HP respectively.

[0037] Optionally, it is characterized in that the constraints of the flexibility resource aggregator strategic bidding model include:

[0038] Flexibility calculation constraints:

[0039] The amount of flexibility provided by each EV and each HP during each congestion period is calculated as follows:

[0040]

[0041] in, and are the pre-scheduling results of the e-th EV and the h-th HP in period t, respectively;

[0042] Constraints for calculation of recovered electric energy:

[0043] The amount of regenerative power required by each EV and each HP during each permitted regenerative period As follows:

[0044]

[0045] Calculation constraints for total flexibility and total recovered electricity:

[0046] Calculating the total amount of flexibility and the total amount of recovered electrical energy As follows:

[0047]

[0048] Time limit for recycling electric energy:

[0049] Restrict the flexibility resource aggregator to recover electricity only within one hour, as follows:

[0050]

[0051] Among them, if The flexibility resource aggregator a of node n has recycled power at time t, and the value of M is 10 4 ;

[0052] Recycling power ratio limit:

[0053] The amount of recovered electricity is limited by the maximum return percentage α specified in the flexibility demand table FRT, as follows:

[0054]

[0055] The operating constraints of EV and HP are as follows:

[0056]

[0057] The additional day-ahead electricity cost for EV and HV is calculated as follows:

[0058]

[0059] Optionally, the objective function of the DFM clearing model is to minimize the flexibility service procurement cost, specifically:

[0060]

[0061] in, is the total amount of flexibility purchased from flexibility resource aggregator a on node n at time t.

[0062] Optionally, the constraints of the DFM clearing model are:

[0063] Active power balance constraints:

[0064] The active power balance of each node in each period is as follows:

[0065]

[0066] Among them, p t,n is the active power consumption of node n in period t, F t,l is the active power flow of line l at time t, G n,l is the mapping matrix;

[0067] Reactive power balance constraints:

[0068] Keep the power factor of each node constant as follows:

[0069]

[0070] Among them, q t,n is the reactive power consumption of node n in period t, cos(φ n ) is the power factor of node n;

[0071] Constraints on the relationship between pre-dispatched power consumption and final power consumption:

[0072] Pre-dispatched electricity consumption The relationship between the final electricity consumption after providing flexibility is as follows:

[0073]

[0074] Flexible volume purchasing constraints:

[0075] The amount of flexibility purchased in each flexibility service bid is as follows:

[0076]

[0077] in, is the purchase percentage of flexibility bids provided by flexibility resource aggregator a at node n in period t;

[0078] The line capacity is limited as follows:

[0079]

[0080] in, is the line capacity of line l;

[0081] The linearized voltage amplitude constraint is as follows:

[0082]

[0083] Among them, V s is the voltage amplitude of the substation node, V min is the lower limit of the voltage amplitude, Re() is the operation of extracting the real part of the complex number, is the partial node admittance matrix Y ll The elements of the inverse matrix of the nth row and the nth*th column, and the partial node admittance matrix Y ll is a submatrix of the total admittance matrix Y:

[0084] Optionally, the rescheduling model is specifically:

[0085] Min(8)

[0086] Subject to:(9)-(19);

[0087] The technical effects of the present invention are:

[0088] (1) The present invention proposes a strategic bidding method for flexibility resource aggregators to participate in DFM. The method determines the bidding strategy that maximizes the benefits of the flexibility resource aggregators, that is, the optimal flexibility amount, power recovery period and total amount of recovered power provided in each congestion period, and models the operation constraints of the flexibility resources. The method has wide compatibility and strong adaptability.

[0089] (2) The present invention takes into account the compensation of the flexibility resource aggregator for the cost of providing flexibility services for the flexibility resources, thereby ensuring the economic benefits of the flexibility resources and the flexibility resource aggregator participating in DFM. BRIEF DESCRIPTION OF THE DRAWINGS

[0090] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0091] Figure 1 This is an operation mechanism diagram of DFM participating in day-ahead congestion management in an embodiment of the present invention;

[0092] Figure 2 is a single-line diagram of a distribution network of node 4 in an embodiment of the present invention;

[0093] Figure 3 This is a DFM funds flow diagram in an embodiment of the present invention. DETAILED DESCRIPTION

[0094] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0095] This embodiment provides a strategic bidding method for a flexibility resource aggregator to participate in the distribution network flexibility market, such as Figure 1 The operation mechanism of DFM participating in day-ahead congestion management shown is divided into four optimization stages:

[0096] Phase 1: Pre-scheduling model

[0097] Using the predicted day-ahead electricity price, assuming that each user has an electric vehicle (EV) and a heat pump (HP), the pre-dispatch plan of the EV and the heat pump is obtained by minimizing the day-ahead electricity cost while satisfying the operation constraints.

[0098] Phase 2: Flexible Resource Aggregator Strategic Bidding Model

[0099] According to the pre-dispatch results of EVs and HPs and the flexibility requirement table (FRT), flexibility resource aggregators can provide flexibility services by rescheduling the electricity consumption curves of EVs and HPs, such as by shifting the electricity consumption load during peak hours to peak and valley hours. First, each flexibility resource aggregator sets a bid price based on the maximum bid price specified by the FRT and historical data. A bid price that is too high may result in the bid being unacceptable in the DFM, while a bid price that is too low means less revenue. Therefore, the bid price should be appropriately determined so that the bid is competitive in the DFM and the flexibility resource aggregator can obtain as much revenue as possible at the same time. This method mainly gives the optimal flexibility service bidding scheme under a given bid price. By solving the optimization model, the optimal amount of flexibility provided in each congestion period, the energy recovery period, and the total amount of recovered energy are determined.

[0100] Phase 3: DFM Clearance Model

[0101] After the flexibility service bidding process is over, the DFM needs to be cleared to determine the purchase ratio of flexibility service bids, so as to solve the congestion problem with the minimum flexibility service purchase cost.

[0102] Phase 4: Rescheduling Model

[0103] After the DFM is cleared, each flexibility resource aggregator re-dispatches the electricity consumption curves of EVs and HPs according to the amount of flexibility purchased in the DFM.

[0104] The specific mathematical model is as follows:

[0105] Model 1: Pre-scheduling model

[0106] The objective function of the optimization model is based on the predicted day-ahead electricity price. Minimize electricity costs for EV and HP:

[0107]

[0108] In the formula, They are the power consumption of the e-th EV and the h-th HP during period t respectively.

[0109] The constraints are as follows:

[0110] The upper and lower limits of the state of charge (SOC) level of electric vehicles can be expressed as:

[0111]

[0112] Where: and are the lower and upper limits of the SOC level of the e-th EV, is the initial SOC level of the e-th EV, d t,e is the power consumption of the e-th EV in period t;

[0113] The charging power capability constraint of EV can be expressed as:

[0114]

[0115] Where: and are the lower and upper limits of the charging power of the e-th EV, st,e is the charging capacity of the e-th EV at time t;

[0116] Formula (4) shows that the total charging power of EV is equal to the total power consumption:

[0117]

[0118] The user's household heat balance equation can be expressed as:

[0119]

[0120] Where: is the performance coefficient of the hth HP, k1 and k2 are the heat transfer coefficients, and are the indoor and outdoor temperatures of the hth HP in period t, respectively;

[0121] Formula (6) limits the indoor temperature to the thermal comfort range:

[0122]

[0123] Where: and are the lower and upper limits of the indoor temperature when using the hth HP, respectively;

[0124] Formula (7) limits the power consumption of HP:

[0125]

[0126] Where: and They are the lower and upper limits of HP power consumption respectively.

[0127] Model 2: Flexible Resource Aggregator Strategic Bidding Model

[0128] For a given bid price at node n, The objective function (8) is to maximize the revenue of the flexibility resource aggregator a when DFM accepts the bid price:

[0129]

[0130] The first term of formula (8) represents the bid price Income from the sale of flexibility, where is the available flexibility provided by flexibility resource aggregator a at node n during period t; the second and third items represent the flexibility fees paid to the flexibility resources, where and are the flexibility provided by the e-th EV and the h-th HP in period t, and are the flexibility cost coefficients of the e-th EV and the h-th HP in period t. This method assumes that the flexibility cost of one unit is linearly related to the total amount of flexibility. Each user can adjust the coefficients and The last two items are the compensation that the flexibility resource aggregator gives to the user for the increased day-ahead electricity cost due to the re-dispatch of the electricity curve. and are the increased day-ahead electricity costs of the e-th EV and the h-th HP, respectively. When a user reduces electricity consumption at a certain time to provide flexibility, it is necessary to recover electricity at another time. Since the pre-dispatched electricity cost is the minimum, the re-dispatching of the electricity curve will lead to an increase in the user's electricity cost. In order to ensure that users make a profit when providing flexibility, the flexibility resource aggregator needs to compensate users for the increased day-ahead electricity cost.

[0131] The constraints are as follows:

[0132] Formula (9) calculates the flexibility provided by each EV and each HP in each congestion period:

[0133]

[0134] Where: and are the pre-scheduling results of the e-th EV and the h-th HP in period t, respectively;

[0135] Formula (10) calculates the regenerative power required by each EV and each HP in each allowed regenerative period:

[0136]

[0137] Formula (11) calculates the total flexibility and the total amount of recovered electrical energy

[0138]

[0139] Formula (12) limits the flexibility resource aggregator to recover power within one hour, which can be expressed as:

[0140]

[0141] Among them, if The flexibility resource aggregator a of node n has recycled power at time t, and M is a large number, such as 10 4 ;

[0142] Formula (13) shows that the amount of recovered electric energy is limited by the maximum return percentage α specified by FRT:

[0143]

[0144] Equations (14)-(18) are the operating constraints of EV and HP:

[0145]

[0146]

[0147]

[0148]

[0149] Formula (19) calculates the additional day-ahead electricity cost of EV and HV:

[0150]

[0151] Model 3: DFM Clearance Model

[0152] The objective function is to minimize the flexibility service procurement cost. is the total amount of flexibility purchased from flexibility resource aggregator a on node n at time t:

[0153]

[0154] The constraints are as follows:

[0155] The active power balance of each node in each time period can be expressed as:

[0156]

[0157] In the formula, pt,n is the active power consumption of node n in period t, F t,l is the active power flow of line l at time t, G n,l is the mapping matrix;

[0158] In order to keep the power factor of each node constant, the reactive power is calculated as follows:

[0159]

[0160] In the formula, q t,n is the reactive power consumption of node n in period t, cos(φ n ) is the power factor of node n;

[0161] Pre-dispatched electricity consumption The relationship between the final electricity consumption after providing flexibility can be expressed as:

[0162]

[0163] The amount of flexibility purchased from each flexibility service bid is:

[0164]

[0165] In the formula, is the purchase percentage of flexibility bids provided by flexibility resource aggregator a at node n in period t;

[0166] Formula (25) is the line capacity limitation, which can be expressed as:

[0167]

[0168] Where: is the line capacity of line l;

[0169] Formula (26) is the linearized voltage amplitude constraint condition, which can be expressed as:

[0170]

[0171] Where: V s is the voltage amplitude of the substation node, V min is the lower limit of the voltage amplitude, Re() is the operation of extracting the real part of the complex number, is the partial node admittance matrix Y ll The elements of the inverse matrix of the nth row and the nth*th column, and the partial node admittance matrix Y ll is a submatrix of the total admittance matrix Y:

[0172] Model 4: Rescheduling Model

[0173] The redispatching model is to convert the flexibility resource aggregator flexibility bidding model of equations (8)-(19) into The variable is fixed to the total amount of flexibility services purchased by flexibility resource aggregators in the DFM clearing results.

[0174] Min(8)

[0175] Subject to:(9)-(19);

[0176] The redispatching model is to convert the flexibility resource aggregator flexibility bidding model of equations (8)-(19) into The variable is fixed to the total amount of flexibility services purchased by flexibility resource aggregators in the DFM clearing results.

[0177] Embodiment 1

[0178] The present invention performs a simulation on the Roy Billinton Test System (RBTS) node 4 distribution network, proving that the present invention guarantees the economic benefits of the flexibility resource aggregator participating in DFM. The single line diagram of the node 4 distribution network is shown in Figure 2 The line segment of feeder 1 is marked as L1-L 12 , the load point is marked as LP1-7 LP 11-16 LP 18-25 and LP 32-38 . Each residential load point has 200 users, each of whom owns an EV and an HP to provide flexibility. Assume that there are four aggregators (ag1, ag2, ag3, ag4) participating in DFM. At each residential load point, ag1 and ag4 each have contracts with 40 users, and ag2 and ag3 each have contracts with 60 customers. The example also contains the following data: conventional load curve, line parameters, predicted day-ahead spot price curve, load upper and lower limits, load point data, key parameters of EV and HP, and voltage amplitude lower limit.

[0179] In the present invention, the DSO pays for the flexibility service, and the flexibility resource aggregator and the user obtain income by providing the flexibility service. Table 1 shows the flexibility procurement cost of the DSO and the income obtained by the flexibility resource aggregator and the user. Figure 3 As shown in the fund flow, users receive compensation from flexibility resource aggregators for providing flexibility services and increasing day-ahead energy costs. Therefore, users do not need to pay extra fees for the increased energy costs due to providing flexibility services, and they always receive income when providing flexibility services. The flexibility resource aggregator obtains the flexibility service sales fee from the DFM or directly from the DSO, and pays the customer for providing flexibility services and increasing energy costs. The bidding for flexibility services aims to maximize the profits of the flexibility resource aggregator, which ensures that the flexibility resource aggregator will always make a profit as long as its bid is accepted. Therefore, the strategic bidding method for flexibility resources participating in DFM proposed in the present invention ensures the economic benefits of users and flexibility resource aggregators participating in DFM.

[0180] Table 1 Funds Settlement

[0181]

[0182] The above is only a preferred specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A strategic bidding method for a flexibility resource aggregator to participate in the distribution network flexibility market, characterized in that: The following steps are involved: Based on the power demand and the power price, a pre-dispatch plan of the user equipment is formulated by using a pre-dispatch model, wherein the equipment includes an electric vehicle EV and a heat pump HP; Based on the pre-dispatch plan and the demand of the distribution network, the flexibility resource aggregator formulates a bidding strategy for flexibility services using a flexibility resource aggregator strategic bidding model; Based on the bidding strategy, the distribution network operator uses the DFM clearing model to determine the proportion of purchasing the flexibility service, namely, the DFM clearing plan; Based on the DFM clearing plan, the pre-dispatch plan is adjusted using a re-dispatch model to meet the operation of the distribution network and the needs of users.

2. The strategic bidding method for flexibility resource aggregators to participate in the distribution network flexibility market according to claim 1 is characterized in that: The objective function of the pre-dispatch model is based on the predicted day-ahead electricity price. Minimize the electricity cost of EV and HP, specifically: in, They are the power consumption of the e-th EV and the h-th HP during period t respectively.

3. The strategic bidding method for flexibility resource aggregators to participate in the distribution network flexibility market according to claim 2 is characterized in that: The constraints of the pre-scheduling model include: The upper and lower limits of the state of charge SOC level of electric vehicles are as follows: in, and are the lower and upper limits of the SOC level of the e-th EV, is the initial SOC level of the e-th EV, d t,e is the power consumption of the e-th EV in period t; EV charging power capability constraints: The total charging power of an EV is equal to the total electrical power used: User's household heat balance equation: in, is the performance coefficient of the hth HP, k1 and k2 are the heat transfer coefficients, and are the indoor and outdoor temperatures of the hth HP in period t, respectively; Indoor temperature is limited to the thermal comfort range: in, and are the lower and upper limits of the indoor temperature when using the hth HP, respectively; HP power usage limit: in, and They are the lower and upper limits of HP power consumption respectively.

4. The strategic bidding method for flexibility resource aggregators to participate in the distribution network flexibility market according to claim 1 is characterized in that: The objective function of the flexible resource aggregator strategic bidding model is: for a given bid price at node n The flexibility resource aggregator a, when DFM accepts the bid price, maximizes the profit of the flexibility resource aggregator, specifically: The first item indicates the bid price. Income from the sale of flexibility, where is the available flexibility provided by flexibility resource aggregator a at node n during period t; the second and third terms represent the flexibility fee paid to the flexibility resource, where and are the flexibility provided by the e-th EV and the h-th HP in period t, and are the flexibility cost coefficients of the e-th EV and the h-th HP in period t, and are the additional day-ahead electricity costs of the e-th EV and the h-th HP respectively.

5. The strategic bidding method for flexibility resource aggregators to participate in the distribution network flexibility market according to claim 4 is characterized in that: The constraints of the flexibility resource aggregator strategic bidding model include: Flexibility calculation constraints: The amount of flexibility provided by each EV and each HP during each congestion period is calculated as follows: in, and are the pre-scheduling results of the e-th EV and the h-th HP in period t, respectively; Constraints for calculation of recovered electric energy: The amount of regenerative power required by each EV and each HP during each permitted regenerative period As follows: Calculation constraints for total flexibility and total recovered energy: Calculating the total amount of flexibility and the total amount of recovered electrical energy As follows: Time limit for recovering electric energy: Restrict the flexibility resource aggregator to recover electricity only within one hour, as follows: Among them, if The flexibility resource aggregator a of node n has recycled power at time t, and the value of M is 10 4 ; Recycling power ratio limit: The amount of recovered electricity is limited by the maximum return percentage α specified in the flexibility demand table FRT, as follows: The operating constraints of EV and HP are as follows: The additional day-ahead electricity cost for EV and HV is calculated as follows:

6. The strategic bidding method for flexibility resource aggregators to participate in the distribution network flexibility market according to claim 1, characterized in that: The objective function of the DFM clearing model is to minimize the flexibility service procurement cost, specifically: in, is the total amount of flexibility purchased from flexibility resource aggregator a on node n at time t.

7. The strategic bidding method for flexibility resource aggregators to participate in the distribution network flexibility market according to claim 6, characterized in that: The constraints of the DFM clearing model are: Active power balance constraints: The active power balance of each node in each period is as follows: Among them, p t,n is the active power consumption of node n in period t, F t,l is the active power flow of line l at time t, G n,l is the mapping matrix; Reactive power balance constraints: Keep the power factor of each node constant as follows: Among them, q t,n is the reactive power consumption of node n in period t, cos(φ n ) is the power factor of node n; Constraints on the relationship between pre-dispatched power consumption and final power consumption: Pre-dispatched electricity consumption The relationship between the final electricity consumption after providing flexibility is as follows: Flexible quantity purchasing constraints: The amount of flexibility purchased in each flexibility service bid is as follows: in, is the purchase percentage of flexibility bids provided by flexibility resource aggregator a at node n in period t; The line capacity is limited as follows: Among them, F l max is the line capacity of line l; The linearized voltage amplitude constraint is as follows: Among them, V s is the voltage amplitude of the substation node, V min is the lower limit of the voltage amplitude, Re() is the operation of extracting the real part of the complex number, z n,n* is the partial node admittance matrix Y ll The elements of the inverse matrix of the nth row and the nth*th column, and the partial node admittance matrix Y ll is a submatrix of the total admittance matrix Y:

8. The strategic bidding method for flexibility resource aggregators to participate in the distribution network flexibility market according to claim 1, characterized in that: The rescheduling model is specifically: Min(8) Subject to:(9)-(19); a∈N ag ,n∈N nd 。

Citation Information

Cited By

  • High-proportion new energy power distribution network flexibility resource optimization scheduling method and device

    CN119891370A