Method, device and equipment for adjusting incentive electricity price and storage medium
By dynamically adjusting electricity prices, using user load prediction data and mapping relationship models to optimize the incentive electricity prices, the problem that traditional electricity price mechanism cannot guide users to adjust their electricity consumption behaviors, and improve the efficiency of power resource utilization and the stability of the power system.
Patent Information
- Application Number
- CN202410926808.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-01
AI Technical Summary
The traditional electricity price mechanism cannot effectively guide users to adjust their electricity consumption behavior at different times, resulting in imbalance in power supply and demand and waste of resources.
By real-time monitoring and analysis of user load prediction data, dynamically adjust the electricity price in each period, obtain the mapping relationship model between user load prediction data and the incentive electricity price, and determine the optimal parameters based on the optimization indicators to adjust the incentive electricity price.
Reduce peak load, encourage users to adjust their power consumption behavior, and improve power resource utilization efficiency and power system stability.
Smart Images

Figure CN118886938A_ABST
Abstract
Description
Technical Field
[0001] Embodiments of the present invention relate to the field of power grid technology, and in particular to a method, device, equipment and storage medium for adjusting an incentive electricity price. Background Art
[0002] In the electricity market, the traditional electricity price mechanism often cannot effectively guide users' electricity consumption behavior at different times. The demand response is mostly initiated during peak hours of electricity consumption, and users have fewer choices when adjusting their loads, which is not conducive to fully tapping the user-side regulation potential, resulting in an imbalance in electricity supply and demand and waste of resources. Summary of the invention
[0003] The embodiments of the present invention provide a method, device, equipment and storage medium for adjusting incentive electricity prices. By real-time monitoring and analysis of user load forecast data, the electricity price for each time period is dynamically adjusted, while the peak load is reduced, and users are encouraged to adjust their electricity consumption behavior in different time periods, thereby improving the utilization efficiency of power resources and improving the stability of the power system.
[0004] In a first aspect, an embodiment of the present invention provides a method for adjusting an incentive electricity price, the method comprising:
[0005] Obtain user load forecast data and incentive electricity prices for each period of the target power grid;
[0006] Determine a mapping relationship model between the user load forecast data and the incentive electricity price;
[0007] Obtaining an optimization index of the mapping model;
[0008] The optimal parameters of the mapping relationship model are determined based on the optimization index, and the incentive electricity price is adjusted based on the optimal parameters.
[0009] In a second aspect, an embodiment of the present invention further provides a method and device for adjusting an incentive electricity price, the device comprising:
[0010] A data acquisition module, used to obtain user load forecast data and incentive electricity prices for each period of the target power grid;
[0011] A relationship model determination module, used to determine a mapping relationship model between the user load forecast data and the incentive electricity price;
[0012] An indicator acquisition module, used to obtain the optimization indicator of the mapping model;
[0013] The incentive electricity price adjustment module determines the optimal parameters of the mapping relationship model based on the optimization index, and adjusts the incentive electricity price based on the optimal parameters.
[0014] In a third aspect, an embodiment of the present disclosure further provides an electronic device, the electronic device comprising:
[0015] one or more processors;
[0016] a storage device for storing one or more programs,
[0017] When the one or more programs are executed by the one or more processors, the one or more processors implement the method for adjusting the incentive electricity price provided in the embodiment of the present disclosure.
[0018] In a fourth aspect, the embodiments of the present disclosure further provide a storage medium comprising computer executable instructions, which, when executed by a computer processor, are used to implement the method for adjusting the incentive electricity price provided by the embodiments of the present disclosure.
[0019] In a fifth aspect, the embodiments of the present disclosure further provide a computer program product, which includes a computer program. When the computer program is executed by a processor, it implements the method for adjusting the incentive electricity price provided by the embodiments of the present disclosure.
[0020] The present invention discloses a method, device, equipment and storage medium for adjusting incentive electricity prices, the method comprising: obtaining user load forecast data and incentive electricity prices for each time period of the target power grid; determining a mapping relationship model between the user load forecast data and the incentive electricity price; obtaining an optimization index of the mapping model; determining the optimal parameters of the mapping relationship model based on the optimization index, and adjusting the incentive electricity price based on the optimal parameters. Utilizing this method: by real-time monitoring and analysis of user load forecast data, dynamically adjusting the electricity price for each time period, while reducing peak load, and encouraging users to adjust their electricity consumption behavior in different time periods, thereby improving the utilization efficiency of power resources and improving the stability of the power system. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and the originals and elements are not necessarily drawn to scale.
[0022] Figure 1 A flowchart of a method for adjusting an incentive electricity price provided by an embodiment of the present disclosure;
[0023] Figure 2 A schematic diagram of the structure of an incentive electricity price adjustment device provided in an embodiment of the present disclosure;
[0024] Figure 3 A schematic diagram of the structure of an electronic device provided by an embodiment of the present disclosure. DETAILED DESCRIPTION
[0025] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments described herein, which are instead provided for a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.
[0026] It should be understood that the various steps described in the method embodiments of the present disclosure may be performed in different orders and / or in parallel. In addition, the method embodiments may include additional steps and / or omit the steps shown. The scope of the present disclosure is not limited in this respect.
[0027] The term "including" and its variations used herein are open inclusions, i.e., "including but not limited to". The term "based on" means "based at least in part on". The term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one additional embodiment"; the term "some embodiments" means "at least some embodiments". The relevant definitions of other terms will be given in the following description.
[0028] It should be noted that the concepts such as "first" and "second" mentioned in the present disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.
[0029] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".
[0030] The names of the messages or information exchanged between multiple devices in the embodiments of the present disclosure are only used for illustrative purposes and are not used to limit the scope of these messages or information.
[0031] It is understandable that before using the technical solutions disclosed in the embodiments of the present disclosure, the types, scope of use, usage scenarios, etc. of the personal information involved in the present disclosure should be informed to the user and the user's authorization should be obtained in an appropriate manner in accordance with relevant laws and regulations.
[0032] For example, in response to receiving an active request from a user, a prompt message is sent to the user to clearly prompt the user that the operation requested to be performed will require obtaining and using the user's personal information. Thus, the user can autonomously choose whether to provide personal information to software or hardware such as an electronic device, application, server, or storage medium that performs the operation of the technical solution of the present disclosure according to the prompt message.
[0033] As an optional but non-limiting implementation, in response to receiving an active request from the user, the prompt information may be sent to the user in the form of a pop-up window, in which the prompt information may be presented in text form. In addition, the pop-up window may also carry a selection control for the user to choose "agree" or "disagree" to provide personal information to the electronic device.
[0034] It is understandable that the above notification and the process of obtaining user authorization are merely illustrative and do not constitute a limitation on the implementation of the present disclosure. Other methods that meet the relevant laws and regulations may also be applied to the implementation of the present disclosure.
[0035] It is understandable that the data involved in this technical solution (including but not limited to the data itself, the acquisition or use of the data) shall comply with the requirements of relevant laws, regulations and relevant provisions.
[0036] Embodiment 1
[0037] Figure 1 A flowchart of an incentive electricity price adjustment method provided in an embodiment of the present disclosure. The embodiment of the present disclosure is applicable to a situation where a solution to the problem of adjusting the incentive electricity price is provided. The method can be executed by an incentive electricity price adjustment method device, which can be implemented in the form of software and / or hardware, and optionally, by an electronic device, which can be a mobile terminal, a PC or a server, etc.
[0038] like Figure 1 As shown, a method for adjusting an incentive electricity price provided by an embodiment of the present disclosure may specifically include the following steps:
[0039] S110, obtaining user load forecast data and incentive electricity prices for each time period of the target power grid.
[0040] In this embodiment, the user load forecast data may be the future power demand trend. The incentive power price may be the price per kilowatt-hour of electricity in each time period.
[0041] Specifically, the power grid dispatching system collects power demand data in the target power grid area, analyzes historical data on net load of the power grid, confirms the power grid demand level in different time periods, analyzes characteristic data such as net load peak, average value, peak-to-valley difference, and analyzes historical annual load and output based on big data to predict net load in each future period, thereby obtaining the power demand trend in the future period and obtaining incentive electricity prices.
[0042] Based on the above embodiment, obtaining the load forecast data of the target power grid in each time period specifically includes the following steps:
[0043] a1) Obtain historical load data of users in each period of the target power grid.
[0044] b1) Input the historical load data into the pre-trained power demand trend forecasting model and output the user load forecast data of the target power grid in each period.
[0045] In this embodiment, the electricity demand trend prediction function may be a pre-trained big data model.
[0046] Specifically, the historical load data of users in each time period of the target power grid is obtained, the historical load data is input into a pre-trained power demand trend prediction model, and the user load prediction data of each time period of the target power grid is output.
[0047] S120: Determine a mapping relationship model between user load forecast data and incentive electricity price.
[0048] In this embodiment, the mapping relationship model can be a model that reflects the corresponding relationship between the user load forecast data and the incentive electricity price.
[0049] Specifically, a load peak-valley difference sub-mapping model is constructed according to the user load forecast data, and a power user electricity cost sub-mapping model is constructed according to the user load forecast data and the initial electricity price. The load peak-valley difference sub-mapping model and the power user electricity cost sub-mapping model are linearly superimposed according to the set weights to obtain a mapping relationship model between the user load forecast data and the incentive electricity price.
[0050] Based on the above embodiment, determining the mapping relationship model between user load forecast data and incentive electricity price specifically includes the following steps:
[0051] a2) Construct a load peak-valley difference sub-mapping model based on user load forecast data.
[0052] b2) Construct a sub-mapping model of electricity user's electricity cost based on user load forecast data and initial electricity price.
[0053] c2) The load peak-valley difference sub-mapping model and the power user electricity cost sub-mapping model are linearly superimposed according to the set weights to obtain a mapping relationship model between the user load forecast data and the incentive electricity price.
[0054] The mapping relationship model includes at least one of the following:
[0055] The load peak-valley difference sub-mapping model includes:
[0056]
[0057] The electricity cost sub-mapping model for power users includes:
[0058]
[0059] Among them, J1 represents the peak-to-valley difference; represents the adjusted peak value in period t, represents the adjusted valley value in time period t; J2 represents the electricity cost of the power user; P t o is the incentive electricity price in period t; P t DR is the adjusted incentive electricity price in period t; is the electricity consumption before adjustment in period t; is the adjusted electricity consumption in time period t.
[0060] In this embodiment, the load peak-valley difference sub-mapping model and the power user electricity cost sub-mapping model are linearly superimposed according to respective set weights to obtain a mapping relationship model between user load forecast data and incentive electricity price.
[0061] S130: Obtain optimization indicators of the mapping model.
[0062] Based on the above embodiment, the optimization index includes: stability index and economic benefit index; determining different scheduling strategies of the virtual power plant according to the number of instability times, and scheduling the virtual power plant according to the scheduling strategy specifically includes the following steps:
[0063] a3) The difference between the power consumption after adjustment and the power consumption before adjustment is equal to the reducible power consumption and is used as the optimization indicator.
[0064] b3) The adjusted peak value and the adjusted valley value being less than or equal to a first threshold are set as optimization indicators.
[0065] c3) The difference between the peak electricity price and the valley electricity price in the adjusted incentive electricity price is greater than or a second threshold is set as an optimization indicator.
[0066] d3) The difference between the adjusted electricity consumption and the electricity consumption before adjustment and the difference between the initial electricity price and the adjusted electricity price satisfy the set relationship as the optimization indicator.
[0067] In this embodiment, the total power consumption remains unchanged: in order to conform to the actual consumption situation as much as possible and to facilitate calculation and comparison, the total load before the user participates in the demand response can be reduced by a coefficient, wherein the reduction coefficient is set to a smaller fixed value, that is, the total power after the user participates in the demand response is the total power before the demand response minus the reduction power consumption:
[0068]
[0069] In the formula, Q t To adjust the power consumption before Adjusted electricity consumption; Respectively represent the elastic part of the power load; β t To reduce the load factor.
[0070] The amount of electricity within the incentive electricity price should be limited, namely:
[0071]
[0072] In the formula, They are the upper and lower thresholds of the power respectively; They are the limit values of peak load after considering the user's electricity consumption structure and electricity price incentive conditions and adjusting by demand response; It is the minimum load of users during the off-peak period before DR.
[0073] The implementation of the contract mechanism model under demand response requires sufficient electricity price incentives and must meet the following constraints:
[0074] Δ fg =λ fg / K fg +α fg
[0075] In the formula, λ fg is the peak-to-valley load transfer rate; K fg is the slope of the linear region that meets the electricity price incentive conditions; α fg is the threshold of the electricity price incentive insensitive zone; Δ fg It is the difference between the peak electricity price and the valley electricity price in the adjusted incentive electricity price.
[0076] When power users participate in regulation and response, they are not only constrained by the demand of the current period, but also by the demand of electricity in the adjacent period. Therefore, the elasticity coefficient of power users participating in grid transactions is divided into self-elasticity coefficient and mutual elasticity coefficient, which respectively represent the influence of electricity prices on participating in transactions in the current period and adjacent periods, as shown in the following formulas.
[0077]
[0078] Where: ε ii is the elastic coefficient; ε ij is the mutual elastic coefficient; Q i With ΔQ i They represent the power consumption and change in time period i respectively; p i 、p j With Δp i , Δp j Represent the electricity price and the change in electricity price in time period i and j respectively. Since self-elasticity is a direct control response that directly switches on and off loads through remote switches, ΔQ i With Δp i Shows an opposite relationship.
[0079] The behavior rules of load-side market entities participating in electricity trading satisfy the multiplicative competition interaction model, as shown in the following formula.
[0080]
[0081] Where: S i is the attractiveness of electricity price to consumers at time i; α i is the fixed impact coefficient of the user's electricity price at time i; p t is the electricity price at time t; is the electricity price deviation at time i; η t is the influence coefficient of the current electricity price on users. t It can be estimated through linear regression.
[0082] Combined with the characteristics of natural logarithms, the above formula can be rewritten in a linear simplified form as
[0083]
[0084] Where: D ei is the response power of user i; D hi is the electricity demand of the hth user at time i. ej D is the amount of electricity transferred by the user at time j; hj is the amount of electricity transferred from the hth user to the jth period.
[0085] For direct regulation, price compensation for response transactions is realized in the form of real-time flexible electricity prices. In order to reflect the value of the response electricity volume on the user side, the flexible electricity price is based on the real-time transaction clearing price during the load response period, as shown in the following formula.
[0086]
[0087] Where: p i,t The user's response elasticity price in period i; ΔQk is the response power of the kth user; P i 0 is the clearing price of real-time market transactions during this period; Q need,k is the actual power demand of the kth user; ε i It is the comprehensive elastic coefficient, which is affected by the self-elastic coefficient and the mutual elastic coefficient.
[0088] The actual settlement price of electricity users participating in electricity trading consists of two parts: winning bid and actual call, which can be expressed as
[0089]
[0090] Where: p rea l is the actual settlement price of direct regulation during peak electricity consumption period; n is the number of market entities participating in the response to regulation; p by It provides a reserve clearing price for load-side market entities to participate in the regulation and response of the ancillary service market.
[0091] S140: Determine optimal parameters of the mapping relationship model based on the optimization index, and adjust the incentive electricity price based on the optimal parameters.
[0092] In this embodiment, the optimal parameters may be the adjusted incentive electricity price and the adjusted user load and electricity consumption.
[0093] Based on the above embodiment, determining the optimal parameters of the mapping relationship model based on the optimization index specifically includes the following steps:
[0094] a4) optimizing the mapping relationship model based on a preset optimization algorithm under the constraints of the optimization index, wherein the preset optimization algorithm includes at least one of a particle swarm optimization algorithm and a wolf pack optimization algorithm.
[0095] b4) Obtaining the relationship mapping parameters in the optimal state of the mapping relationship model as the optimal parameters.
[0096] Specifically, for the optimization solution of the incentive electricity price mentioned above, the particle swarm algorithm is used to solve the problem in combination with the above model, determine the optimal electricity price plan, and evaluate the implementation effect of the incentive electricity price algorithm based on the dynamic adjustment and real-time feedback process, including the balance of electricity supply and demand, user response, etc. The incentive electricity price strategy is dynamically adjusted according to the real-time monitoring of electricity demand and electricity price response. Users can view electricity price information in real time through smart meters or mobile applications, adjust their electricity consumption behavior according to the incentive electricity price, form new electricity demand, feed back the new electricity demand data to the algorithm, optimize the parameters of the model, and carry out the next round of electricity price optimization.
[0097] The present invention discloses a method for adjusting an incentive electricity price, including: obtaining user load forecast data and incentive electricity prices in each time period of a target power grid; determining a mapping relationship model between the user load forecast data and the incentive electricity price; obtaining an optimization index of the mapping model; determining the optimal parameters of the mapping relationship model based on the optimization index, and adjusting the incentive electricity price based on the optimal parameters. Using this method: by real-time monitoring and analysis of user load forecast data, the electricity price in each time period is dynamically adjusted, while the peak load is reduced, and users are encouraged to adjust their electricity consumption behavior in different time periods, thereby improving the utilization efficiency of power resources and improving the stability of the power system.
[0098] Embodiment 2
[0099] Figure 2 The present invention also provides a schematic diagram of a method for adjusting an incentive electricity price. Figure 2 As shown, a data acquisition module 210, a relationship model determination module 220, an indicator acquisition module 230 and an incentive electricity price adjustment module 240.
[0100] The data acquisition module 210 is used to obtain the user load forecast data and incentive electricity price of the target power grid in each period;
[0101] A relationship model determination module 220, used to determine a mapping relationship model between the user load forecast data and the incentive electricity price;
[0102] An indicator acquisition module 230, used to acquire the optimization indicator of the mapping model;
[0103] The incentive electricity price adjustment module 240 determines the optimal parameters of the mapping relationship model based on the optimization index, and adjusts the incentive electricity price based on the optimal parameters.
[0104] The technical solution provided in the embodiment of the present disclosure utilizes this method: by real-time monitoring and analysis of user load forecast data, the electricity price for each time period is dynamically adjusted, while the peak load is reduced, and users are encouraged to adjust their electricity consumption behavior in different time periods, thereby improving the utilization efficiency of power resources and improving the stability of the power system.
[0105] Furthermore, the relationship model determination module 220 may be used to:
[0106] Constructing a load peak-valley difference sub-mapping model according to the user load forecast data;
[0107] Constructing a power user electricity cost sub-mapping model according to the user load forecast data and the initial electricity price;
[0108] The load peak-valley difference sub-mapping model and the power user electricity cost sub-mapping model are linearly superimposed according to respective set weights to obtain the mapping relationship model between the user load forecast data and the incentive electricity price.
[0109] Furthermore, the indicator acquisition module 230 can also be used to:
[0110] The optimization indexes include: stability index and economic benefit index;
[0111] The difference between the adjusted power consumption and the power consumption before the adjustment is equal to the reducible power consumption as the optimization index;
[0112] The adjusted peak value and the adjusted valley value are less than or equal to a first threshold value as the optimization indicator;
[0113] The difference between the peak electricity price and the valley electricity price in the adjusted incentive electricity price is greater than or a second threshold is set as the optimization indicator;
[0114] The difference between the adjusted power consumption and the pre-adjusted power consumption and the difference between the initial power price and the adjusted power price satisfy a set relationship as the optimization index.
[0115] Furthermore, the relationship model determination module 220 may also be used to:
[0116] The mapping relationship model includes at least one of the following:
[0117] The load peak-valley difference sub-mapping model includes:
[0118]
[0119] The power user electricity cost sub-mapping model includes:
[0120]
[0121] Among them, J1 represents the peak-to-valley difference; represents the adjusted peak value in period t, represents the adjusted valley value in time period t; J2 represents the electricity cost of the power user; P t o is the incentive electricity price in time period t; t DR is the adjusted incentive electricity price in period t; is the electricity consumption before adjustment in time period t; is the adjusted electricity consumption in time period t.
[0122] Furthermore, the data acquisition module 210 may also be used to:
[0123] Obtain historical user load data of the target power grid in each period;
[0124] The historical load data is input into a pre-trained electricity demand trend prediction function, and the user load prediction data for each time period of the target power grid is output, wherein the user load prediction data includes at least one of the following: power consumption before adjustment, load peak value before adjustment, and load valley value before adjustment.
[0125] Furthermore, the incentive electricity price adjustment module 230 can also be used to:
[0126] Under the restriction of the optimization index, the mapping relationship model is optimized and iterated based on a preset optimization algorithm, wherein the preset optimization algorithm includes at least one of a particle swarm optimization algorithm and a wolf pack optimization algorithm;
[0127] The relationship mapping parameters of the mapping relationship model in an optimal state are obtained as the optimal parameters.
[0128] The above device can execute the methods provided by all the above embodiments of the present invention, and has the corresponding functional modules and beneficial effects of executing the above methods. For technical details not described in detail in this embodiment, please refer to the methods provided by all the above embodiments of the present invention.
[0129] Embodiment 3
[0130] Figure 3 A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is given. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0131] like Figure 3As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0132] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0133] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as the method for adjusting the incentive electricity price.
[0134] In some embodiments, the method for adjusting the incentive electricity price may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the method for adjusting the incentive electricity price described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the method for adjusting the incentive electricity price in any other appropriate manner (e.g., by means of firmware).
[0135] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0136] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0137] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0138] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0139] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0140] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0141] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0142] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for adjusting incentive electricity prices, characterized in that: include: Obtain user load forecast data and incentive electricity prices for each period of the target power grid; Determine a mapping relationship model between the user load forecast data and the incentive electricity price; Obtaining an optimization index of the mapping model; The optimal parameters of the mapping relationship model are determined based on the optimization index, and the incentive electricity price is adjusted based on the optimal parameters.
2. The method according to claim 1, characterized in that Determining a mapping relationship model between the user load forecast data and the incentive electricity price includes: Constructing a load peak-valley difference sub-mapping model according to the user load forecast data; Constructing a power user electricity cost sub-mapping model according to the user load forecast data and the initial electricity price; The load peak-valley difference sub-mapping model and the power user electricity cost sub-mapping model are linearly superimposed according to respective set weights to obtain the mapping relationship model between the user load forecast data and the incentive electricity price.
3. The method according to claim 1, characterized in that The optimization index includes: a stability index and an economic benefit index. Accordingly, the optimization index of the incentive electricity price is obtained, including at least one of the following: The difference between the adjusted power consumption and the power consumption before the adjustment is equal to the reducible power consumption as the optimization index; The adjusted peak value and the adjusted valley value are less than or equal to a first threshold value as the optimization indicator; The difference between the peak electricity price and the valley electricity price in the adjusted incentive electricity price is greater than or a second threshold is set as the optimization indicator; The difference between the adjusted power consumption and the pre-adjusted power consumption and the difference between the initial power price and the adjusted power price satisfy a set relationship as the optimization index.
4. The method according to claim 1, characterized in that Determining optimal parameters of the mapping model based on the optimization index includes: Under the restriction of the optimization index, the mapping relationship model is optimized and iterated based on a preset optimization algorithm, wherein the preset optimization algorithm includes at least one of a particle swarm optimization algorithm and a wolf pack optimization algorithm; The relationship mapping parameters of the mapping relationship model in an optimal state are obtained as the optimal parameters.
5. The method according to claim 2, characterized in that: The mapping relationship model includes at least one of the following: The load peak-valley difference sub-mapping model includes: The power user electricity cost sub-mapping model includes: Among them, J1 represents the peak-to-valley difference; represents the adjusted peak value in period t, represents the adjusted valley value in time period t; J2 represents the electricity cost of the power user; P t o is the incentive electricity price in time period t; t DR is the adjusted incentive electricity price in period t; is the electricity consumption before adjustment in time period t; is the adjusted electricity consumption in time period t.
6. The method according to claim 1, characterized in that Obtain the load forecast data of the target power grid for each period, including: Obtain historical user load data of the target power grid in each period; The historical load data is input into a pre-trained electricity demand trend prediction model, and the user load prediction data for each time period of the target power grid is output, wherein the user load prediction data includes at least one of the following: power consumption before adjustment, load peak value before adjustment, and load valley value before adjustment.
7. An incentive electricity price adjustment device, characterized in that: include: A data acquisition module, used to obtain user load forecast data and incentive electricity prices for each period of the target power grid; A relationship model determination module, used to determine a mapping relationship model between the user load forecast data and the incentive electricity price; An indicator acquisition module, used to obtain the optimization indicator of the mapping model; The incentive electricity price adjustment module determines the optimal parameters of the mapping relationship model based on the optimization index, and adjusts the incentive electricity price based on the optimal parameters.
8. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can perform the method for adjusting the incentive electricity price according to any one of claims 1 to 6.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for adjusting the incentive electricity price according to any one of claims 1 to 6 when executed.
10. A computer program product, characterized in that The computer program product comprises a computer program, and when the computer program is executed by a processor, the computer program implements the method for adjusting the incentive electricity price according to any one of claims 1 to 6.
Citation Information
Cited By
Electricity selling strategy optimization method based on market factors and resource configuration optimization
CN119784175A
A market factor and resource allocation optimization-based power selling strategy optimization method
CN119784175B
Micro-grid regulation and control method based on intelligent data analysis, program product and equipment
CN121238552A