Decoration project fine construction planning positioning management method
Through multi-dimensional data collection and intelligent planning technology, combined with advanced positioning and monitoring methods, precise construction planning and positioning management of decoration projects are achieved, solving the problem of low efficiency and large errors in construction planning and positioning management, and improving construction efficiency and quality.
Patent Information
- Application Number
- CN202410782862.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2024-10-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing construction planning and positioning management of decoration projects have low efficiency, large errors, lack of real-time monitoring and adaptive adjustment mechanisms, and are difficult to cope with the complexity and variability of the construction site.
Using multi-dimensional data collection and modeling, intelligent planning and simulation, dynamic positioning and monitoring, adaptive adjustment and optimization, interactive collaboration and decision support, quality assessment and risk warning, continuous learning and iterative improvement, comprehensive evaluation and feedback loop, combined with three-dimensional Laser scanning, drone aerial photography, infrared thermal imaging, BIM, machine learning, artificial intelligence, Internet of Things and other technologies enable precise construction planning and positioning management.
It improves the accuracy and efficiency of construction planning, reduces errors and costs, improves the management efficiency and response speed of the construction site, and ensures construction quality and customer satisfaction.
Smart Images

Figure CN118747694A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of decoration engineering, and in particular to a method for fine construction planning and positioning management of decoration engineering. Background Art
[0002] The function of decoration project is to protect various components of buildings from natural erosion of wind, rain and moisture, improve heat insulation, sound insulation and moisture-proof functions, enhance the durability of buildings, extend the service life of buildings, and at the same time, create a good production, living and working environment for people.
[0003] In the current field of decoration engineering, construction planning and positioning management still face a series of challenges. Traditional construction planning relies on two-dimensional drawings and manual experience, lacks accurate spatial information, and leads to errors and conflicts during the construction process. At the same time, the personnel and equipment management of the construction site mainly relies on manual scheduling, which is inefficient and prone to errors. The existing construction management methods lack effective real-time monitoring and adaptive adjustment mechanisms, and are difficult to cope with the complexity and variability of the construction site. Therefore, an innovative method for fine construction planning and positioning management of decoration projects is needed to improve construction efficiency, reduce errors, reduce costs, and ensure construction quality. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a method for fine construction planning and positioning management of decoration projects, which solves the problems of low efficiency and high error in construction planning and positioning management in the prior art.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: A method for fine construction planning and positioning management of decoration projects, comprising the following steps:
[0006] S1. Multi-dimensional data collection and modeling, obtain spatial data and environmental information of the decoration project, and establish a digital model containing multi-dimensional information such as geometric structure, material properties, and environmental factors;
[0007] S2. Intelligent planning and simulation, automatically generating construction plans on digital models and predicting potential conflicts and problems by simulating the construction process;
[0008] S3. Dynamic positioning and monitoring, real-time monitoring of the location of personnel and equipment at the construction site;
[0009] S4. Adaptive adjustment and optimization: Adaptive adjustment of construction plans based on real-time data;
[0010] S5. Interactive collaboration and decision support, to achieve real-time communication and decision support between the construction site and the design, construction and owner parties;
[0011] S6. Quality assessment and risk warning, monitoring construction quality and conducting risk assessment and warning;
[0012] S7. Continuous learning and iterative improvement to optimize construction planning algorithms;
[0013] S8. Comprehensive evaluation and feedback loop: conduct comprehensive evaluation and continuous improvement of construction methods after construction is completed.
[0014] Preferably, in S1, three-dimensional laser scanning, drone aerial photography, infrared thermal imaging and other technologies are used to collect data and a digital model is created in combination with building information modeling (BIM) technology.
[0015] Preferably, in S2, a machine learning algorithm is used to automatically generate a construction plan, and the construction process is simulated by virtual reality (VR) technology.
[0016] Preferably, the S3 performs positioning by integrating GPS, Wi-Fi, Bluetooth and ultra-wideband (UWB) technologies, and performs data aggregation and analysis through a cloud platform.
[0017] Preferably, the artificial intelligence algorithm is used in S4 to adaptively adjust the construction plan and provide dynamic guidance to on-site personnel through mobile applications.
[0018] Preferably, in S5, augmented reality (AR) technology is used to overlay a digital model on the construction site to establish a collaboration platform for real-time communication.
[0019] Preferably, the S6 combines Internet of Things technology to perform quality monitoring, and uses big data analysis technology to perform risk assessment and early warning.
[0020] Preferably, the S7 records lessons learned and best practices by building a knowledge base and optimizes the construction planning algorithm using machine learning technology.
[0021] The present invention provides a method for fine construction planning and positioning management of decoration projects. It has the following beneficial effects:
[0022] 1. The present invention realizes high-precision digital representation of the decoration project site through multi-dimensional data collection and modeling, provides accurate basic data for construction planning, and can automatically generate construction plans before construction. By simulating the construction process, potential problems can be predicted and adjustments can be made in advance, thereby improving the accuracy and feasibility of construction planning, and can improve construction efficiency, reduce errors, and reduce costs.
[0023] 2. The present invention realizes real-time positioning and monitoring of personnel and equipment on the construction site, adaptively adjusts the construction plan according to real-time data, optimizes resource allocation and construction process, and improves construction flexibility, construction site management efficiency and response speed. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a diagram of the method steps of the present invention. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the specification of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] Example:
[0027] Please see attached Figure 1 The embodiment of the present invention provides a method for fine construction planning and positioning management of a decoration project, comprising the following steps:
[0028] S1. Multi-dimensional data collection and modeling, obtain spatial data and environmental information of the decoration project, and establish a digital model containing multi-dimensional information such as geometric structure, material properties, and environmental factors;
[0029] S2. Intelligent planning and simulation, automatically generating construction plans on digital models and predicting potential conflicts and problems by simulating the construction process;
[0030] S3. Dynamic positioning and monitoring, real-time monitoring of the location of personnel and equipment at the construction site;
[0031] S4. Adaptive adjustment and optimization: Adaptive adjustment of construction plans based on real-time data;
[0032] S5. Interactive collaboration and decision support, to achieve real-time communication and decision support between the construction site and the design, construction and owner parties;
[0033] S6. Quality assessment and risk warning, monitoring construction quality and conducting risk assessment and warning;
[0034] S7. Continuous learning and iterative improvement to optimize construction planning algorithms;
[0035] S8. Comprehensive evaluation and feedback loop: conduct comprehensive evaluation and continuous improvement of construction methods after construction is completed.
[0036] Specifically, through multi-dimensional data collection and modeling, a high-precision digital representation of the decoration project site is achieved, providing accurate basic data for construction planning; the intelligent planning and simulation step can automatically generate the construction plan, and predict potential problems by simulating the construction process, and make adjustments in advance, thereby improving the accuracy and feasibility of the construction plan; the dynamic positioning and monitoring step realizes the real-time positioning and monitoring of personnel and equipment on the construction site, improving the management efficiency and response speed of the construction site; the adaptive adjustment and optimization step can adaptively adjust the construction plan according to real-time data, optimize resource allocation and construction process, and improve the flexibility and response speed of construction; the interactive collaboration and decision support step realizes real-time communication and decision support between the construction site and the designer, the constructor and the owner, promoting the efficiency of collaboration and decision-making; the quality assessment and risk warning step can monitor the construction quality in real time and conduct risk assessment and warning, reducing the uncertainty and risk in the construction process; the continuous learning and iterative improvement step can optimize the construction planning algorithm and improve the intelligence level of the construction planning positioning management method; the comprehensive evaluation and feedback loop step can conduct comprehensive evaluation and continuous improvement after the construction is completed, improving the quality of the decoration project and customer satisfaction
[0037] S1 uses 3D laser scanning, drone aerial photography, infrared thermal imaging and other technologies to collect data and combines building information modeling (BIM) technology to create a digital model.
[0038] Specifically, a 3D laser scanner is used to scan the construction site to obtain accurate geometric data. This data includes the location and size of walls, floors, ceilings, doors and windows, pipelines, equipment, etc.; drones are used for aerial photography to obtain bird's-eye images and videos of the construction site, which helps to understand the environment and layout of the entire construction area; infrared thermal imaging technology can be used to detect heat loss areas in the building, such as poor insulation or air leaks. The collected data is processed through denoising, splicing, compression, etc. to obtain a clear and accurate geometric model, and BIM software such as Autodesk Rev it or Arch iCAD is used to create an accurate geometric model based on the processed point cloud data.
[0039] S2 uses machine learning algorithms to automatically generate construction plans and simulates the construction process through virtual reality (VR) technology.
[0040] Specifically, the neural network model is designed, including an input layer, a hidden layer, and an output layer. The input layer receives construction data, and the output layer generates a construction plan. The collected data is normalized and standardized to improve the model training effect. The neural network model is trained using annotated data sets, and the network weights are adjusted through multiple iterations to improve the model's prediction accuracy. The data of new construction projects is input into the trained neural network model. Based on the input data, the model automatically predicts the construction plan, including construction sequence, resource allocation, time schedule, etc.
[0041] S3 integrates GPS, Wi-Fi, Bluetooth and ultra-wideband (UWB) technologies for positioning, and uses the cloud platform for data aggregation and analysis.
[0042] S4 uses artificial intelligence algorithms to make adaptive adjustments to construction plans and provide dynamic guidance to on-site personnel through mobile applications.
[0043] Specifically, various sensors such as temperature, humidity, light, noise, vibration, etc., as well as surveillance cameras are deployed at the construction site to collect environmental data and construction progress in real time; the working status of construction equipment and machinery is monitored through the Internet of Things technology, including operating time, energy consumption, failures, etc.; the collected data is integrated into the cloud computing platform for centralized processing and analysis; real-time data is processed and analyzed using big data analysis technology to identify key indicators and potential problems in the construction process; according to the needs of construction plan adjustment, appropriate artificial intelligence algorithms are selected, and the algorithm model is trained using historical data and expert knowledge to enable it to understand and predict various situations in the construction process; the algorithm model is used to monitor the construction site in real time to promptly discover anomalies and potential risks in the construction process; when changes in construction progress, resource usage, environmental factors, etc. are monitored, the algorithm model can automatically adjust the construction plan to adapt to the new situation.
[0044] In S5, augmented reality (AR) technology is used to overlay digital models on the construction site and establish a collaborative platform to achieve real-time communication.
[0045] Specifically, set positioning markers at the construction site or use technologies such as the Global Positioning System (GPS) and Indoor Positioning System (IPS) to ensure that the AR equipment can accurately identify the location of the construction site; use AR software for on-site calibration to ensure that the digital model is aligned with the actual construction site; use AR technology to overlay the digital model onto the real-time view of the construction site; adjust the scale, position and transparency of the model so that it corresponds to the actual structure to facilitate construction workers' understanding and operation; develop AR applications that allow construction workers to interact with the digital model, such as viewing different structural levels, system components and construction details, and provide functions such as zooming in, zooming out, rotating and layered display so that construction workers can understand the model from different angles and depths.
[0046] S6 combines Internet of Things technology for quality monitoring and uses big data analysis technology for risk assessment and early warning.
[0047] Specifically, identify key risk-related features, construct feature vectors for input into risk analysis and prediction models, select appropriate statistical models, machine learning algorithms or deep learning models based on risk assessment needs, use historical data to train the models, and optimize model parameters; input real-time data into the trained models to conduct risk assessment and probability prediction; classify and quantify risks based on model results, and determine risk levels; set warning thresholds and standards based on risk assessment results, and build a warning system; when the monitored risk indicators exceed the thresholds, the system automatically issues a warning signal.
[0048] S7 builds a knowledge base to record lessons learned and best practices and uses machine learning technology to optimize construction planning algorithms.
[0049] The following is a specific implementation of the present invention: A renovation project involves the construction of multiple rooms and areas, including the installation of walls, floors, ceilings, pipelines and equipment. According to the method of the present invention, multi-dimensional data collection and modeling are first performed, using three-dimensional laser scanning, drone aerial photography and infrared thermal imaging technology to obtain spatial data and environmental information on the site, and establish a digital model containing multi-dimensional information such as geometric structure, material properties, and environmental factors;
[0050] Based on the digital model, machine learning algorithms are used to automatically generate construction plans, and virtual reality (VR) technology is used to simulate the construction process to predict potential conflicts and problems. Then, each construction worker and equipment on the construction site is equipped with a high-precision positioning device, and real-time data is aggregated, analyzed and monitored through a cloud platform. Based on real-time data, artificial intelligence algorithms are used to adaptively adjust the construction plan, and dynamic guidance is provided to on-site personnel through mobile applications;
[0051] Use augmented reality (AR) technology to overlay digital models on the construction site to assist construction personnel in intuitively understanding design intent and construction requirements. At the same time, establish a collaborative platform to achieve real-time communication and decision-making support between the construction site and the design, construction and owner parties. Combine IoT technology for quality monitoring, and use big data analysis technology for risk assessment and early warning;
[0052] After the construction is completed, a comprehensive evaluation is conducted, including indicators such as cost, quality, progress and customer satisfaction. Based on the evaluation results, feedback is looped back to the multi-dimensional data collection and modeling steps to continuously improve the construction planning and positioning management methods.
[0053] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for fine construction planning and positioning management of decoration engineering, characterized in that: The following steps are involved: S1. Multi-dimensional data collection and modeling, obtain spatial data and environmental information of the decoration project, and establish a digital model containing multi-dimensional information such as geometric structure, material properties, and environmental factors; S2. Intelligent planning and simulation, automatically generating construction plans on digital models and predicting potential conflicts and problems by simulating the construction process; S3. Dynamic positioning and monitoring, real-time monitoring of the location of personnel and equipment at the construction site; S4. Adaptive adjustment and optimization: Adaptive adjustment of construction plans based on real-time data; S5. Interactive collaboration and decision support, to achieve real-time communication and decision support between the construction site and the design, construction and owner parties; S6. Quality assessment and risk warning, monitoring construction quality and conducting risk assessment and warning; S7. Continuous learning and iterative improvement to optimize construction planning algorithms; S8. Comprehensive evaluation and feedback loop: conduct comprehensive evaluation and continuous improvement of construction methods after construction is completed.
2. A decoration engineering fine construction planning and positioning management method according to claim 1, characterized in that: In the S1, three-dimensional laser scanning, drone aerial photography or infrared thermal imaging technology is used to collect data and a digital model is created in combination with building information modeling (BIM) technology.
3. A decoration engineering fine construction planning and positioning management method according to claim 1, characterized in that: In the S2, a machine learning algorithm is used to automatically generate a construction plan, and the construction process is simulated through virtual reality (VR) technology.
4. A decoration engineering fine construction planning and positioning management method according to claim 1, characterized in that: The S3 integrates GPS, Wi-Fi, Bluetooth and ultra-wideband (UWB) technologies for positioning, and uses a cloud platform for data aggregation and analysis.
5. According to claim 1, a decoration engineering fine construction planning and positioning management method is characterized in that: The S4 uses artificial intelligence algorithms to adaptively adjust the construction plan and provide dynamic guidance to on-site personnel through mobile applications.
6. A decoration engineering fine construction planning and positioning management method according to claim 1, characterized in that: The S5 uses augmented reality (AR) technology to overlay digital models on the construction site and establish a collaborative platform to achieve real-time communication.
7. A decoration engineering fine construction planning and positioning management method according to claim 1, characterized in that: The S6 combines the Internet of Things technology to carry out quality monitoring, and uses big data analysis technology to carry out risk assessment and early warning.
8. A method for fine construction planning and positioning management of decoration engineering according to claim 1, characterized in that: The S7 builds a knowledge base to record lessons learned and best practices and uses machine learning technology to optimize construction planning algorithms.
Citation Information
Cited By
Inverted frustum structure installation precision control method and installation method
CN119475497A
Cast-in-place beam steel bar truss floor support plate installation construction quality control method and system based on BIM and VR
CN120470671A
Construction quality control method and system for cast-in-place beam steel truss floor deck installation based on BIM and VR
CN120470671B