Method and device for reconstructing plane line shape of existing station track of railway

By acquiring and processing the rail top centerline measurement points in the intelligent survey data, the track centerline measurement point data is determined and the line position is reconstructed, which solves the applicability problem of the track plane linear reconstruction in the intelligent survey scenario. Efficient and accurate station track reconstruction and turnout center positioning are achieved.

CN118747781APending Publication Date: 2024-10-08CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410892677.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

The existing railway station track plane alignment reconstruction technology is not suitable for intelligent survey scenarios, especially because the line center line measurement point data obtained by traditional survey methods cannot be directly applied under intelligent survey conditions, and the turnout center positioning method is Seamless track and smart survey situations are difficult to achieve.

Method used

By obtaining the rail top centerline measuring point data of each existing track in the station, the track centerline measuring point data is determined, and based on these data, independent line position reconstruction is performed, the initial track plane alignment is optimized, and the slope of the line segment is adjusted. In order to meet the target of the optimal sum of squares of track diversion, at the same time determine the turnout center and generate a floor plan.

Benefits of technology

It achieves the accurate reconstruction of the plane alignment of existing railway station tracks in an intelligent survey scenario. It is suitable for intelligent survey scenarios, improves the efficiency and accuracy of station track reconstruction, and solves the problem that traditional methods cannot be directly applied.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118747781A_ABST
    Figure CN118747781A_ABST
Patent Text Reader

Abstract

The invention discloses an existing railway station track plane linear reconstruction method and device, and relates to the technical field of railway engineering surveying, and the method comprises the steps: determining track center line measuring point data according to steel rail top center line measuring point data of each existing track in a station yard; the method comprises the following steps: performing independent line position reconstruction on each existing station track in a station yard based on station track center line measuring point data, obtaining an initial station track plane line shape under a first optimization target, and determining an initial optimal total track lining quantity sum of squares; on the basis of a second optimization target and constraint conditions, the line segment slope in the initial station track plane line shape is adjusted, and an optimized station track plane line shape is obtained; and determining the turnout center in the optimized station track plane line shape, and generating the existing station track plane graph of the station yard. By means of the mode, the point cloud data produced through intelligent survey are directly used for reconstructing the plane line shape of the existing station track of the railway, the method is suitable for intelligent survey scenes, the reconstruction result of the existing station track of the station is optimized, and the reconstruction efficiency and accuracy are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of railway engineering survey, and in particular to a method and device for reconstructing the plane alignment of existing railway stations and tracks. Background Art

[0002] At present, the existing track plane alignment reconstruction technology for existing railway stations uses the line centerline measurement points obtained by traditional surveying methods as input data. However, in current actual production, most intelligent surveying methods have been adopted, and the data obtained are dense point cloud data of the centerline of the rail top, rather than the track centerline data. It is not suitable for the reconstruction of the track plane alignment of existing railway stations under intelligent surveying conditions. The turnout center positioning method in the existing track plane alignment reconstruction technology for existing railway stations is usually based on the known measurement point position of the turnout center. However, it is difficult to directly obtain the measurement points representing the turnout center in actual surveying work, such as in the case of seamless track and intelligent surveying, and the scope of application is relatively narrow.

[0003] In addition, the existing railway station track plane alignment reconstruction technology is to first fit the baseline of the station track line reconstruction, and then simply offset the remaining station track according to the calculated line spacing. Although the parallel relationship between tracks can be guaranteed, due to over-reliance on the baseline, the fitting results of other station tracks may be poor, and the selection of the baseline and the quality of the baseline measurement data will directly affect the reconstruction results of the entire station plane alignment.

[0004] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention

[0005] The main purpose of this application is to provide a method and device for reconstructing the plane alignment of an existing railway station track, aiming to solve the technical problem that the existing technology is not suitable for intelligent survey scenarios.

[0006] To achieve the above-mentioned purpose, the present application provides a method for reconstructing the plane alignment of an existing railway station track, the method comprising:

[0007] Acquire the rail top centerline measurement point data of each existing track in the station, and determine the track centerline measurement point data based on the rail top centerline measurement point data;

[0008] Based on the track centerline measurement point data, each existing track in the station is independently reconstructed, the initial track plane alignment is obtained under the first optimization goal, and the initial optimal total track shifting amount square sum is determined, and the first optimization goal is to minimize the track shifting amount square sum;

[0009] Based on the second optimization objective and the constraint condition, the line segment slope in the initial track plane alignment is adjusted to obtain the optimized track plane alignment, wherein the second optimization objective is to minimize the difference between the optimal total track shifting amount sum of squares and the initial optimal total track shifting amount sum of squares, and the constraint condition is that the change rate of the single track optimal track shifting amount is less than or equal to a preset change threshold;

[0010] The turnout center is determined in the optimized track plane alignment, and the existing track plane diagram of the station is generated.

[0011] In one embodiment, the step of reconstructing the independent line positions of the existing tracks in the station field based on the track centerline measurement point data to obtain the initial track plane alignment under the first optimization objective includes:

[0012] Determining the estimated curvature of the centerline measuring point of the existing track according to the track centerline measuring point data;

[0013] Determining the straightness and curvature properties of the centerline measuring point of the existing track based on a preset curvature threshold and an estimated curvature of the centerline measuring point;

[0014] Based on the straightness and curvature attributes of the centerline measuring points, straightness and curvature segmentation is performed to determine the range of the transition curve in the existing track, and the straightness and curvature attributes of the centerline measuring points within the range of the transition curve are adjusted;

[0015] Determining the plane line position parameters of the existing track based on the curve elements of the existing track and the first optimization target, wherein the curve elements at least include a radius and a length of a transition curve;

[0016] Based on the plane line position parameters of the existing track, the initial track plane line shape is obtained.

[0017] In one embodiment, the step of determining the estimated curvature of the centerline measurement point of the existing track according to the track centerline measurement point data comprises:

[0018] Determine the centerline measuring points of the existing track and the adjacent measuring points of each centerline measuring point according to the track centerline measuring point data;

[0019] Generate a measuring point circular curve based on the centerline measuring point and the adjacent measuring points of the centerline measuring point;

[0020] Based on the measuring point circular curve, the curvature value of the center line measuring point is determined.

[0021] In one embodiment, the step of determining the straightness and curvature properties of the centerline measuring point of the existing track based on a preset curvature threshold and an estimated curvature of the centerline measuring point comprises:

[0022] When the estimated curvature of the centerline measuring point of the existing track is greater than the preset curvature threshold, determining the straight-curvature attribute of the centerline measuring point as a curve segment point;

[0023] When the estimated curvature of the centerline measuring point of the existing track is less than or equal to the preset curvature threshold, the straightness and curvature attribute of the centerline measuring point is determined to be a straight line segment point.

[0024] In one embodiment, the step of determining the plane line position parameters of the existing track based on the curve elements of the existing track and the first optimization objective includes:

[0025] Based on the curve elements of the existing track, determining the sum of squares of the track shifting amounts of the existing track;

[0026] When the sum of squares of the track shifting amounts of the existing track satisfies the first optimization objective, the curve element is used as a plane line position parameter of the existing track;

[0027] When the sum of squares of the track shifting amounts of a single track of the existing track does not meet the first optimization target, the curve element is optimized, and the step of returning to determine the sum of squares of the track shifting amounts of a single track of the existing track based on the curve element of the existing track is executed.

[0028] In one embodiment, the step of adjusting the line segment slope in the initial track plane alignment based on the second optimization objective and the constraint condition to obtain the optimized track plane alignment comprises:

[0029] Selecting a track to be parallelized that needs to be parallelized from the existing tracks;

[0030] Determining a slope value range based on the slopes of the parallel straight line segments between the tracks to be parallelized;

[0031] Determining an optimal slope that meets the second optimization objective and the constraint condition within the slope value range;

[0032] The slope of the parallel straight line segment between the to-be-parallelized tracks is adjusted to the optimal slope.

[0033] In one embodiment, the method further comprises:

[0034] Obtain the corresponding relationship between the initial single-track optimal shifting amount square sum, the single-track optimal shifting amount square sum and the single-track optimal shifting amount change rate;

[0035] The change rate of the single track optimal shifting amount is obtained according to the square sum of the initial single track optimal shifting amount of the existing track, the square sum of the single track optimal shifting amount of the existing track and the corresponding relationship.

[0036] In one embodiment, the step of determining the turnout center in the optimized track plane alignment comprises:

[0037] Acquire a potential turnout track corresponding to the existing track and a vertical distance between the existing track and the corresponding potential turnout track, wherein the potential turnout track corresponding to the existing track satisfies a turnout condition;

[0038] Determine a minimum vertical distance according to the vertical distance between the existing track and the corresponding potential switch track, and determine that the potential switch track corresponding to the minimum vertical distance is the switch track of the existing track, and there is a switch between the starting straight segment of the existing track and the corresponding switch track;

[0039] The starting straight line segment of the existing track corresponding to the turnout is extended, the track intersection point between the existing track and the corresponding turnout track is determined, and the track intersection point is used as the turnout center.

[0040] In one embodiment, the turnout condition includes:

[0041] A perpendicular line between the existing track and the corresponding potential turnout track has a foot of perpendicularity, and the foot of perpendicularity is located on a straight line segment of the potential turnout track;

[0042] The vertical distance between the existing track and the corresponding potential turnout track is less than or equal to a preset distance threshold;

[0043] The frog angle difference corresponding to the angle between the existing track and the corresponding potential switch track is less than or equal to a preset angle threshold.

[0044] In addition, to achieve the above-mentioned purpose, the present application also proposes a device for reconstructing the plane linear shape of an existing railway station track, the device comprising:

[0045] An acquisition module is used to acquire the rail top centerline measurement point data of each existing track in the station, and determine the track centerline measurement point data based on the rail top centerline measurement point data;

[0046] A reconstruction module, for independently reconstructing the line positions of the existing tracks in the station based on the track centerline measurement point data, obtaining the initial track plane alignment under a first optimization objective, and determining the initial optimal total track shifting amount square sum, wherein the first optimization objective is to minimize the total track shifting amount square sum;

[0047] The reconstruction module is further used to adjust the line segment slope in the initial track plane alignment based on a second optimization objective and a constraint condition to obtain an optimized track plane alignment, wherein the second optimization objective is to minimize the difference between the optimal total track shifting amount sum of squares and the initial optimal total track shifting amount sum of squares, and the constraint condition is that the change rate of the single track optimal track shifting amount is less than or equal to a preset change threshold;

[0048] The reconstruction module is also used to determine the turnout center in the optimized track plane alignment and generate the existing track plane diagram of the station.

[0049] In addition, to achieve the above-mentioned purpose, the present application also proposes a device for reconstructing the plane alignment of an existing railway station track, the device comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, the computer program being configured to implement the steps of the method for reconstructing the plane alignment of an existing railway station track as described above.

[0050] In addition, to achieve the above-mentioned purpose, the present invention also proposes a storage medium, which is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the method for reconstructing the plane linearity of an existing railway station track are implemented as described above.

[0051] In addition, to achieve the above-mentioned purpose, the present application also provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, it implements the steps of the method for reconstructing the plane alignment of an existing railway station track as described above.

[0052] The present application provides a method for reconstructing the plane alignment of an existing railway station track, which comprises obtaining the centerline measurement point data of the rail top of each existing track in the station, and determining the centerline measurement point data of the track according to the centerline measurement point data of the rail top; reconstructing the independent line position of each existing track in the station based on the centerline measurement point data of the track, obtaining the initial track plane alignment under a first optimization goal, and determining the initial optimal total sum of squares of track shifting, wherein the first optimization goal is to minimize the sum of squares of track shifting; adjusting the line segment slope in the initial track plane alignment based on a second optimization goal and a constraint condition, obtaining the optimized track plane alignment, wherein the second optimization goal is to minimize the difference between the optimal total sum of squares of track shifting and the initial optimal total sum of squares of track shifting, wherein the constraint condition is that the change rate of the optimal track shifting amount of a single track is less than or equal to a preset change threshold; determining the switch center in the optimized track plane alignment, and generating a plan view of the existing track in the station. This application can directly use the rail top centerline point cloud data produced by intelligent survey to reconstruct the plane line shape of the existing railway station track, and can calculate the turnout center, which is suitable for intelligent survey scenarios and ensures the adaptability of the scenario. At the same time, considering the constraint relationship between the station line track and the main line and the overall track shifting amount, the reconstruction results of each track are optimized, the efficiency and accuracy of the reconstruction of the existing station track are improved, and the technical problem that the traditional method is not suitable for intelligent survey scenarios is solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0054] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0055] Figure 1 This is a flow chart of Embodiment 1 of the method for reconstructing the plane alignment of an existing railway station track in the present application;

[0056] Figure 2 A schematic diagram of the point cloud data of the center line of the rail top of the existing station track plane linear reconstruction method provided in the first embodiment of the present application;

[0057] Figure 3 A schematic diagram of track centerline measurement point data for a method for reconstructing the plane alignment of an existing railway station track provided in Example 1 of the present application;

[0058] Figure 4 A schematic diagram of the initial track plane alignment of the method for reconstructing the track plane alignment of an existing railway station provided in Example 1 of the present application;

[0059] Figure 5 A schematic diagram of the curvature characteristics of a railway curve in the method for reconstructing the plane linearity of an existing railway station track provided in Example 1 of the present application;

[0060] Figure 6 A schematic diagram of a planar alignment reconstruction process of a planar alignment reconstruction method for an existing railway station track provided in Example 1 of the present application;

[0061] Figure 7 A schematic diagram of turnout positioning for a method for reconstructing the plane alignment of an existing railway station track provided in Example 1 of the present application;

[0062] Figure 8 This is a schematic diagram of the module structure of the device for reconstructing the plane linear shape of an existing railway station track in an embodiment of the present application;

[0063] Fig. 9 It is a schematic diagram of the equipment structure of the hardware operating environment involved in the method for reconstructing the plane linearity of an existing railway station track in the embodiment of the present application.

[0064] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0065] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.

[0066] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.

[0067] The main solution of the embodiment of the present application is: obtaining the rail top centerline measurement point data of each existing track in the station, and determining the track centerline measurement point data based on the rail top centerline measurement point data; based on the track centerline measurement point data, independently reconstructing the line position of each existing track in the station, obtaining the initial track plane alignment under the first optimization goal, and determining the initial optimal total track shifting amount square sum, the first optimization goal is to minimize the track shifting amount square sum; based on the second optimization goal and the constraint condition, according to the change rate of the existing track and the track shifting amount square sum, adjust the line segment slope in the initial track plane alignment to obtain the optimized track plane alignment, the second optimization goal is to minimize the difference between the optimal total track shifting amount square sum and the initial optimal total track shifting amount square sum, the constraint condition is that the change rate of the optimal track shifting amount of a single track is less than or equal to the preset change threshold; determine the switch center in the optimized track plane alignment, and generate a station field existing track plane map.

[0068] At present, the existing railway station track plane alignment reconstruction technology uses the line centerline measurement points measured by traditional surveying methods as input data. However, intelligent surveying methods are mostly used in current actual production, and the data obtained are dense rail top centerline point cloud data rather than track centerline data. It is not suitable for railway station track plane alignment reconstruction under intelligent survey conditions.

[0069] The present application provides a solution that can directly use the rail top centerline point cloud data produced by intelligent survey to reconstruct the plane line shape of the existing railway station track. It is suitable for intelligent survey scenarios and ensures the adaptability of the scenarios. At the same time, it takes into account the constraint relationship between the station line track and the main line and the overall track shifting amount, optimizes the reconstruction results of each track, improves the efficiency and accuracy of the reconstruction of the existing station track, and solves the technical problem that the traditional method is not suitable for intelligent survey scenarios.

[0070] It should be noted that the execution subject of this embodiment can be a computing service device with data processing, network communication and program running functions, such as a tablet computer, a personal computer, a mobile phone, etc., or an electronic device capable of realizing the above functions, a plane linear reconstruction device for track in existing railway stations, etc., and this embodiment does not specifically limit this. The following takes the plane linear reconstruction device for track in existing railway stations as an example to illustrate this embodiment and the following embodiments.

[0071] The present application provides a method for reconstructing the plane alignment of an existing railway station track. Figure 1 , Figure 1 This is a flow chart of the first embodiment of the method for reconstructing the plane alignment of an existing railway station track in the present application.

[0072] In this embodiment, the method for reconstructing the plane alignment of an existing railway station track includes steps S10 to S40:

[0073] Step S10, obtaining the rail top centerline measurement point data of each existing track in the station, and determining the track centerline measurement point data based on the rail top centerline measurement point data;

[0074] It should be noted that the rail top centerline measurement point data is the point cloud data produced by intelligent survey, which usually includes information such as longitude and latitude distance and whether it is a point on the main line. Figure 2 A track includes two rails, namely the left rail and the right rail. Since the railway design is generally carried out based on the track centerline, this embodiment needs to convert the rail top centerline measurement point data into track centerline measurement point data, such as Figure 3 shown.

[0075] Step S20, based on the track centerline measurement point data, independently reconstruct the line position of each existing track in the station, obtain the initial track plane line shape under the first optimization goal, and determine the initial optimal total track shifting amount square sum, the first optimization goal is to minimize the track shifting amount square sum;

[0076] It should be noted that the initial track plane alignment is the initial line position reconstruction result. Figure 4 As shown, independent line position reconstruction is performed based on the centerline measurement points of each track, that is, each track independently reconstructs the plane line position and preliminarily obtains its plane line shape.

[0077] It is understandable that in order to improve efficiency, multi-threading technology is used in actual application, and all tracks simultaneously carry out plane line reconstruction to obtain the optimal plane line shape of each track without considering the parallel relationship, and record the sum of the squares of each shift amount and the total sum of the squares of the shift amount.

[0078] In a feasible implementation, step S20 may include steps S201 to S205:

[0079] Step S201, determining the estimated curvature of the centerline measuring point of the existing track according to the track centerline measuring point data;

[0080] It should be noted that a railway curve is generally composed of five line elements: a front straight line, a front transition curve, a circular curve, a rear transition curve, and a rear straight line. The curvature of any point on a straight line is 0, which can be considered as a circular curve with a curvature of 0. The curvature of any point on a circular curve is a constant 1 / R. The curvature of a point on a transition curve is proportional to the length of the curve from the point to the starting point of the transition curve. Therefore, the curvature diagram of a railway curve is a trapezoid, such as Figure 5 shown.

[0081] It can be understood that, in view of the curvature characteristics of the railway plane curve, a quadratic circular curve can be used to calculate the curvature of each measuring point. Three adjacent measuring points are grouped together, and the curvature of these three measuring points is calculated using the "three-point circle method". Then, the distance between the measuring points (or the length of the curve) is weighted averaged to obtain the estimated curvature of each measuring point.

[0082] In a feasible implementation, step S201 may include: determining the centerline measuring points of the existing track and the adjacent measuring points of each centerline measuring point according to the track centerline measuring point data; generating a measuring point circular curve based on the centerline measuring point and the adjacent measuring points of the centerline measuring point; determining the curvature value of the centerline measuring point based on the measuring point circular curve; and performing weighted averaging on the curvature values ​​of the centerline measuring points based on the curve length corresponding to the centerline measuring point in the measuring point circular curve to obtain an estimated curvature of each centerline measuring point.

[0083] It should be noted that the track centerline measurement point data, find the centerline measurement point of each existing track, and the adjacent measurement points are the two adjacent measurement points of each centerline measurement point. The centerline measurement point and the two adjacent measurement points of each centerline measurement point are regarded as a group of measurement points, so that the curvature value of the three measurement points in this group can be calculated by the "three-point circle method", and the measurement point circle curve is the circle that can be generated by each group of measurement points.

[0084] It can be understood that, assuming that there are n centerline measuring points in a track, since the first measuring point and the last measuring point (nth measuring point) have only one adjacent measuring point, the first group of measuring points for calculating the curvature value using the "three-point circle method" are the first measuring point, the second measuring point and the third measuring point, and the last group of measuring points for calculating the curvature value using the "three-point circle method" are the n-2th measuring point, the n-1th measuring point and the nth measuring point, so the first measuring point and the nth measuring point each have one curvature value, the second measuring point and the n-1th measuring point each have two curvature values, and the other measuring points have three curvature values. Then, the estimated curvature of each measuring point is obtained by weighted average according to the curve length of each measuring point.

[0085] Step S202, determining the straightness and curvature properties of the centerline measuring point of the existing track based on a preset curvature threshold and an estimated curvature of the centerline measuring point;

[0086] It should be noted that the straightness and curvature attributes of the centerline measuring point include two cases: curve segment point and straight line segment point. The straightness and curvature attributes of the centerline measuring point are curve segment points, that is, the measuring point is a point on the curve segment; the straightness and curvature attributes of the centerline measuring point are straight line segment points, that is, the measuring point is a point on the straight line segment.

[0087] In a feasible implementation, when the estimated curvature of the centerline measuring point of the existing track is greater than the preset curvature threshold, the straight-curvature attribute of the centerline measuring point is determined to be a curve segment point; when the estimated curvature of the centerline measuring point of the existing track is less than or equal to the preset curvature threshold, the straight-curvature attribute of the centerline measuring point is determined to be a straight line segment point.

[0088] It can be understood that the curvature of any point on a straight line is 0. Therefore, when the estimated curvature of a measuring point is small, the measuring point can be considered to be a point on a straight line segment, and when the estimated curvature of a measuring point is large, the measuring point can be considered to be a point on a curve segment. The preset curvature threshold is a set curvature threshold. This embodiment uses the preset curvature threshold to determine the straightness and curvature properties of the measuring point. If the estimated curvature of a centerline measuring point is greater than the preset curvature threshold, it usually indicates that the measuring point is a curve segment point. If the estimated curvature of a centerline measuring point is less than or equal to the preset curvature threshold, it usually indicates that the measuring point is a straight line segment point. By using the preset curvature threshold, all centerline measuring points in an existing track are divided into straight line segment points or curve segment points.

[0089] Step S203, performing straight-curve segmentation based on the straight-curve attributes of the centerline measuring points, determining the range of the transition curve in the existing track, and adjusting the straight-curve attributes of the centerline measuring points within the range of the transition curve;

[0090] It should be noted that the straight-curve attributes of the measuring points are used to perform straight-curve segmentation in combination with certain merging rules, and the straight-curve attributes of some measuring points need to be modified during the process. According to the results of the straight-curve segmentation, the range of the transition curve is calculated, and the straight-curve attributes of the measuring points within the range are changed to points on the transition curve.

[0091] Step S204, determining the plane line position parameters of the existing track based on the curve elements of the existing track and the first optimization target, wherein the curve elements at least include a radius and a length of a transition curve;

[0092] In a feasible implementation, step S204 may include: determining the sum of squares of the single track shifting amounts of the existing track based on the curve elements of the existing track; when the sum of squares of the single track shifting amounts of the existing track meets the first optimization target, using the curve elements as the plane line position parameters of the existing track; when the sum of squares of the single track shifting amounts of the existing track does not meet the first optimization target, optimizing the curve elements, and returning to execute the step of determining the sum of squares of the single track shifting amounts of the existing track based on the curve elements of the existing track.

[0093] It should be noted that the first optimization goal is to minimize the sum of squares of the shifting amount of a single track, that is, the sum of squares of the shifting amount from all measuring points on the track to the reconstructed line plane is minimized, and the sum of squares of the shifting amount of a single track is the sum of squares of the shifting amount of a single existing track.

[0094] In addition, it should be noted that the curve element at least includes the radius and the length of the transition curve. The sum of squares of the shifting amount of a single track meets the first optimization goal, which means that the sum of squares of the shifting amount of a single track reaches the minimum. If the sum of squares of the shifting amount of a single track reaches the minimum, the curve element at this time is the optimal plane line position parameter. If the sum of squares of the shifting amount of a single track does not meet the first optimization goal, it means that the curve element needs to be further optimized.

[0095] It can be understood that, with curve elements (radius, length of front and rear transition curves) as independent variables and minimizing the sum of squares of shifting amounts from all measuring points on the track to the reconstructed line plane as the optimization goal, the curve elements are gradually optimized through an iterative algorithm, and finally the curve element corresponding to the minimum sum of squares of plane shifting amounts is used as the optimal plane line position parameter. At this time, the sum of squares of the shifting amounts of each existing track can be considered as the optimal sum of squares of the shifting amounts of a single track, that is, the initial optimal sum of squares of the shifting amounts of a single track. The initial optimal sum of squares of the total shifting amounts can be obtained by adding up the initial optimal sums of squares of the shifting amounts of all single tracks.

[0096] Step S205, obtaining the initial track plane alignment based on the plane alignment parameters of the existing track.

[0097] In this embodiment, reference Figure 6 First, the curvature of each measuring point is calculated, and then the straightness and curvature attributes of the measuring point are judged. According to the straightness and curvature attributes of the measuring point, the straightness and curvature are segmented, and then the transition curve is identified and the whole line is fitted. Finally, the optimal plane line position parameters are obtained to realize plane line shape reconstruction.

[0098] Step S30, based on the second optimization objective and the constraint condition, adjusting the line segment slope in the initial track plane alignment to obtain the optimized track plane alignment, wherein the second optimization objective is to minimize the difference between the optimal total track shifting amount sum of squares and the initial optimal total track shifting amount sum of squares, and the constraint condition is that the change rate of the single track optimal track shifting amount is less than or equal to a preset change threshold;

[0099] In a feasible implementation, step S30 may include steps S301 to S303:

[0100] Step S301, selecting a track to be parallelized that needs to be parallelized from the existing tracks, and determining a slope value range based on the slopes of the parallel straight line segments between the tracks to be parallelized;

[0101] It should be noted that the track to be paralleled is the existing track that needs to be paralleled. First, a track can be selected as the baseline, and then a track that is parallel to it can be selected to determine a group of tracks to be paralleled. The slope of the parallel straight line segments in each group of tracks can be found to obtain a slope value range {K min ,K max}.

[0102] Step S302, determining an optimal slope that meets the second optimization objective and the constraint condition in the slope value range;

[0103] It should be noted that the second optimization goal is to minimize the difference between the optimal total sum of squares of the shifting amount and the initial optimal total sum of squares of the shifting amount. The optimal total sum of squares of the shifting amount is the optimal total sum of squares of the shifting amount obtained after adjusting the slope, that is, the optimal total sum of squares of the shifting amount calculated in real time during the iteration process. The second optimization goal is to minimize the difference between the optimal total sum of squares of the shifting amount and the initial optimal total sum of squares of the shifting amount. The constraint condition is that the change rate of the optimal shifting amount of a single track is less than or equal to the preset change threshold. The change rate of the optimal shifting amount of a single track is the change of the optimal sum of squares of the shifting amount of a single track before and after the slope adjustment. The preset change threshold is the threshold of the set change rate.

[0104] It can be understood that the slope K is taken within the slope value range i As the slope value of the parallel straight line segment in each group of parallel tracks, the plane line position of each existing track is reconstructed. Based on the second optimization goal, an optimal solution is obtained through iteration, that is, the optimal slope K best At the same time, it is also necessary to determine whether the optimal slope obtained is feasible.

[0105] In a feasible implementation manner, the correspondence between the initial single-track optimal shifting amount sum of squares, the single-track optimal shifting amount sum of squares and the single-track optimal shifting amount change rate is obtained; and the single-track optimal shifting amount change rate is obtained according to the initial single-track optimal shifting amount sum of squares of the existing track, the single-track optimal shifting amount sum of squares of the existing track and the correspondence.

[0106] It should be noted that the initial single-track optimal shifting amount sum of squares refers to the sum of squares of the shifting amounts of each track obtained after the initial reconstruction is completed, and the single-track optimal shifting amount sum of squares refers to the sum of squares of the shifting amounts of each track obtained after adjusting the slope. The corresponding relationship between the initial single-track optimal shifting amount sum of squares, the single-track optimal shifting amount sum of squares and the single-track optimal shifting amount change rate refers to the calculation relationship of the single-track optimal shifting amount change rate, as shown below:

[0107]

[0108] In the formula, θ nrepresents the change rate of the optimal shifting amount of a single track, q best-n represents the initial single-track optimal shifting amount square sum, q i-n Represents the square of the optimal shifting amount of a single track. Substituting the relevant data into the above calculation formula, the change rate of the optimal shifting amount of a single track can be obtained.

[0109] It can be understood that if the change rate of the single-track optimal shifting amount corresponding to the selected slope is less than or equal to the preset change threshold, the slope is considered to meet the constraint condition. If the difference between the optimal total shifting amount sum of squares and the initial optimal total shifting amount sum of squares under the slope can also meet the second optimization goal, the slope is taken as the optimal slope and step S303 is continued. If the change rate of the single-track optimal shifting amount corresponding to the selected slope is greater than the preset change threshold, the slope is considered to meet the unconstrained condition and the slope needs to be reselected.

[0110] Step S303: adjusting the slope of the parallel straight line segments between the parallel tracks to the optimal slope.

[0111] It can be understood that the optimal slope finally obtained is used as the slope of the parallel straight line segments between each group of parallel tracks, so as to optimize the initial track plane alignment and obtain the optimized track plane alignment.

[0112] In this embodiment, the constraint relationship between the station track and the main line is taken into account, and the reconstruction results of each track are taken into account. The overall track shifting amount is optimized, and the plane line fitting of multiple tracks of the railway station is achieved through an iterative algorithm to generate a plan view of the existing tracks in the station.

[0113] Step S40, determining the turnout center in the optimized track plane alignment, and generating a track plane diagram of the existing station.

[0114] In a feasible implementation, step S40 may include steps S401 to S403:

[0115] Step S401, obtaining a potential turnout track corresponding to the existing track and a vertical distance between the existing track and the corresponding potential turnout track, wherein the potential turnout track corresponding to the existing track satisfies a turnout condition;

[0116] It should be noted that the potential turnout track corresponding to the existing track refers to the track that may have a turnout between the existing track. According to the vertical line between the existing track and the remaining tracks, it is judged whether there is a potential turnout track that meets the turnout condition. The turnout condition refers to the condition that needs to be met when there may be a turnout between two tracks.

[0117] In a feasible implementation, the turnout conditions include: a perpendicular line between the existing track and the corresponding potential turnout track has a foot of a perpendicular, and the foot of the perpendicular is located on a straight segment of the potential turnout track; a vertical distance between the existing track and the corresponding potential turnout track is less than or equal to a preset distance threshold; a frog angle difference corresponding to the angle between the existing track and the corresponding potential turnout track is less than or equal to a preset angle threshold.

[0118] It should be noted that the preset distance threshold is a threshold of a set vertical distance, and the preset angle threshold is a threshold of a set angle. The frog angle difference corresponding to the angle between the existing track and the corresponding potential switch track refers to the difference between the angle and the frog angle corresponding to the angle.

[0119] It can be understood that, assuming that the potential turnout track of the existing track i is j, the turnout conditions that need to be met are: the foot of the perpendicular line between the tracks i and j is located on the straight segment Lj of the track j; the vertical distance is within the preset distance threshold range; the angle between the starting straight segment Ls of the track i and the straight segment Lj of the track j is within the preset angle threshold range; the difference in the frog angle corresponding to a certain number in the turnout number set M is within the preset angle threshold.

[0120] It should be understood that the vertical line may start from the starting point of an existing track or from the end point of an existing track.

[0121] Step S402, determining a minimum vertical distance according to the vertical distance between the existing track and the corresponding potential switch track, and determining that the potential switch track corresponding to the minimum vertical distance is the switch track of the existing track, and there is a switch between the starting straight segment of the existing track and the corresponding switch track;

[0122] It should be noted that the switch track of the existing track is a potential switch track with a switch between the starting straight segment of the existing track. The minimum vertical distance is the minimum value of the vertical distance. The minimum vertical distance is found, and the corresponding potential switch track n is the track that forms a switch with the starting straight segment Ls of the existing track i.

[0123] Step S403, extending the starting straight line segment of the existing track corresponding to the turnout, determining the track intersection point between the existing track and the corresponding turnout track, and using the track intersection point as the turnout center.

[0124] It should be noted that if it is determined that there is a turnout in the starting straight segment of the existing track i, the starting straight segment of the existing track i is extended until it intersects with the corresponding turnout track n. The intersection point is the turnout center, and the following equation can be obtained: Figure 7 The station shown has a plan view of the existing tracks.

[0125] It is understandable that traditional plane linear reconstruction usually locates the switch center based on the known measuring point position of the switch center. However, in most cases in actual survey work, it is difficult to directly obtain the measuring point representing the switch center (for example, in seamless track, intelligent survey, etc.). This embodiment calculates the switch center position through the vertical relationship between the tracks, which can be applied to different scenarios.

[0126] In the specific implementation, a track i is selected, and its starting point is circulated to the remaining track set Nn-i to make a perpendicular line. Assuming that track j is selected from the set Nn-i, a perpendicular line is made from the starting point of track i to track j. When the foot of the perpendicular exists and meets the following conditions, it is determined that there may be a turnout here: the foot of the perpendicular is located on the straight segment Lj of track j; the perpendicular distance is within the set distance threshold range; the difference between the angle between the starting straight segment Ls of track i and the straight segment Lj of track j is within the set angle threshold. If the conditions are met, the track j and the perpendicular distance dj are recorded and added to the set N, D. After traversing all the tracks in the set Nn-i, the final set N, D is obtained. The set N is all the tracks that may form a turnout with the starting straight segment Ls of track i. The minimum perpendicular distance dmin is found from the set D, and the track n corresponding to it is the track that forms a turnout with the starting straight segment Ls of track i. If it is determined that there is a turnout at the starting straight segment of track i, the starting straight segment of track i is extended until it intersects with track n. The intersection is the turnout center and the turnout number is preliminarily determined based on the angle between the two. Then, the same steps are performed at the end of track i to finally determine the turnout center between all tracks.

[0127] The present embodiment provides a method for reconstructing the plane alignment of an existing railway station track, which obtains the rail top centerline measurement point data of each existing track in the station, and determines the track centerline measurement point data according to the rail top centerline measurement point data; based on the track centerline measurement point data, independently reconstructs the line position of each existing track in the station, obtains the initial track plane alignment under the first optimization goal, and determines the initial optimal total square sum of track shifting amounts, and the first optimization goal is to minimize the square sum of track shifting amounts; based on the second optimization goal and the constraint condition, adjusts the line segment slope in the initial track plane alignment to obtain the optimized track plane alignment, and the second optimization goal is to minimize the difference between the optimal total square sum of track shifting amounts and the initial optimal total square sum of track shifting amounts, and the constraint condition is that the change rate of the optimal track shifting amount of a single track is less than or equal to a preset change threshold; determines the switch center in the optimized track plane alignment, and generates a plan view of the existing track in the station. The rail top centerline point cloud data produced by intelligent survey can be directly used to reconstruct the plane line shape of the existing railway station track, and the turnout center can be calculated. It is suitable for intelligent survey scenarios and ensures the adaptability of the scenarios. At the same time, the constraint relationship between the station line track and the main line and the overall track shifting amount are considered to optimize the reconstruction results of each track, thereby improving the efficiency and accuracy of the reconstruction of the existing track of the station.

[0128] It should be noted that the above examples are only used to understand the present application and do not constitute a limitation on the method for reconstructing the plane alignment of existing railway station tracks in the present application. More simple transformations based on this technical concept are all within the scope of protection of the present application.

[0129] This application also provides a device for reconstructing the plane alignment of an existing railway station track. Figure 8 The device for reconstructing the plane alignment of an existing railway station track comprises:

[0130] The acquisition module 10 is used to acquire the rail top centerline measurement point data of each existing track in the station, and determine the track centerline measurement point data based on the rail top centerline measurement point data.

[0131] The reconstruction module 20 is used to reconstruct the independent line position of each existing track in the station based on the track centerline measurement point data, obtain the initial track plane line shape under the first optimization goal, and determine the initial optimal total track shifting amount square sum, wherein the first optimization goal is to minimize the single track shifting amount square sum.

[0132] The reconstruction module 20 is also used to adjust the slope of the line segment in the initial track plane alignment based on the second optimization goal and the constraint condition to obtain the optimized track plane alignment, wherein the second optimization goal is to minimize the difference between the optimal total track shifting amount sum of squares and the initial optimal total track shifting amount sum of squares, and the constraint condition is that the change rate of the single track optimal track shifting amount is less than or equal to a preset change threshold.

[0133] The reconstruction module 20 is also used to determine the turnout center in the optimized track plane alignment and generate the existing track plane diagram of the station.

[0134] In a feasible implementation manner, the reconstruction module 20 is further used to determine the estimated curvature of the centerline measurement point of the existing track according to the track centerline measurement point data;

[0135] Determining the straightness and curvature properties of the centerline measuring point of the existing track based on a preset curvature threshold and an estimated curvature of the centerline measuring point;

[0136] Based on the straightness and curvature attributes of the centerline measuring points, straightness and curvature segmentation is performed to determine the range of the transition curve in the existing track, and the straightness and curvature attributes of the centerline measuring points within the range of the transition curve are adjusted;

[0137] Determining the plane line position parameters of the existing track based on the curve elements of the existing track and the first optimization target, wherein the curve elements at least include a radius and a length of a transition curve;

[0138] Based on the plane line position parameters of the existing track, the initial track plane line shape is obtained.

[0139] In a feasible implementation manner, the reconstruction module 20 is further used to determine the centerline measurement points of the existing track and the adjacent measurement points of each centerline measurement point according to the track centerline measurement point data;

[0140] Generate a measuring point circular curve based on the centerline measuring point and the adjacent measuring points of the centerline measuring point;

[0141] Based on the measuring point circular curve, the curvature value of the center line measuring point is determined.

[0142] In a feasible implementation manner, the reconstruction module 20 is further configured to determine that the straight-curvature attribute of the centerline measuring point of the existing track is a curve segment point when the estimated curvature of the centerline measuring point of the existing track is greater than the preset curvature threshold;

[0143] When the estimated curvature of the centerline measuring point of the existing track is less than or equal to the preset curvature threshold, the straightness and curvature attribute of the centerline measuring point is determined to be a straight line segment point.

[0144] In a feasible implementation manner, the reconstruction module 20 is further used to determine the square sum of the single track shifting amount of the existing track based on the curve elements of the existing track;

[0145] When the sum of squares of the track shifting amounts of the existing track satisfies the first optimization objective, the curve element is used as a plane line position parameter of the existing track;

[0146] When the sum of squares of the track shifting amounts of a single track of the existing track does not meet the first optimization target, the curve element is optimized, and the step of returning to determine the sum of squares of the track shifting amounts of a single track of the existing track based on the curve element of the existing track is executed.

[0147] In a feasible implementation manner, the reconstruction module 20 is further used to select a track to be parallelized that needs to be parallelized from the existing tracks;

[0148] Determining a slope value range based on the slopes of the parallel straight line segments between the tracks to be parallelized;

[0149] Determining an optimal slope that meets the second optimization objective and the constraint condition within the slope value range;

[0150] The slope of the parallel straight line segment between the to-be-parallelized tracks is adjusted to the optimal slope.

[0151] In a feasible implementation manner, the reconstruction module 20 is further used to obtain the corresponding relationship between the initial single-track optimal shifting amount square sum, the single-track optimal shifting amount square sum and the single-track optimal shifting amount change rate;

[0152] The change rate of the single track optimal shifting amount is obtained according to the square sum of the initial single track optimal shifting amount of the existing track, the square sum of the single track optimal shifting amount of the existing track and the corresponding relationship.

[0153] In a feasible implementation manner, the reconstruction module 20 is further used to obtain a potential turnout track corresponding to the existing track and a vertical distance between the existing track and the corresponding potential turnout track, and the potential turnout track corresponding to the existing track satisfies the turnout condition;

[0154] Determine a minimum vertical distance according to the vertical distance between the existing track and the corresponding potential switch track, and determine that the potential switch track corresponding to the minimum vertical distance is the switch track of the existing track, and there is a switch between the starting straight segment of the existing track and the corresponding switch track;

[0155] The starting straight line segment of the existing track corresponding to the turnout is extended, the track intersection point between the existing track and the corresponding turnout track is determined, and the track intersection point is used as the turnout center.

[0156] In a feasible implementation manner, the turnout condition includes:

[0157] A perpendicular line between the existing track and the corresponding potential turnout track has a foot of perpendicularity, and the foot of perpendicularity is located on a straight line segment of the potential turnout track;

[0158] The vertical distance between the existing track and the corresponding potential turnout track is less than or equal to a preset distance threshold;

[0159] The frog angle difference corresponding to the angle between the existing track and the corresponding potential switch track is less than or equal to a preset angle threshold.

[0160] The device for reconstructing the plane alignment of tracks at existing railway stations provided by the present application adopts the method for reconstructing the plane alignment of tracks at existing railway stations in the above-mentioned embodiment, and can solve the technical problem that the traditional method is not suitable for intelligent surveying scenarios. Compared with the prior art, the beneficial effects of the device for reconstructing the plane alignment of tracks at existing railway stations provided by the present application are the same as the beneficial effects of the method for reconstructing the plane alignment of tracks at existing railway stations provided by the above-mentioned embodiment, and the other technical features of the device for reconstructing the plane alignment of tracks at existing railway stations are the same as the features disclosed in the above-mentioned embodiment method, and will not be repeated here.

[0161] The present application provides a device for reconstructing the plane alignment of an existing railway station track. The device comprises: at least one processor; and a memory connected to the at least one processor in communication; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the method for reconstructing the plane alignment of an existing railway station track in the above-mentioned embodiment 1.

[0162] Reference below Fig. 9 , which shows a schematic diagram of the structure of a device for reconstructing the plane alignment of an existing railway station track suitable for implementing the embodiment of the present application. The device for reconstructing the plane alignment of an existing railway station track in the embodiment of the present application may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Descriptions), PMPs (Portable Media Players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Fig. 9 The device for reconstructing the plane linearity of an existing railway station track shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0163] like Fig. 9As shown, the existing railway station track plane linear reconstruction device may include a processing device 1001 (such as a central processing unit, a graphics processor, etc.), which can perform various appropriate actions and processes according to the program stored in a read-only memory (ROM: Read Only Memory) 1002 or the program loaded from a storage device 1003 to a random access memory (RAM: Random Access Memory) 1004. In RAM1004, various programs and data required for the operation of the existing railway station track plane linear reconstruction device are also stored. The processing device 1001, ROM1002 and RAM1004 are connected to each other through a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Typically, the following systems can be connected to the I / O interface 1006: input devices 1007 including, for example, a touch screen, a touchpad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; output devices 1008 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 1003 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 1009. The communication device 1009 can allow the existing railway station track plane alignment reconstruction device to communicate wirelessly or wired with other devices to exchange data. Although the figure shows the existing railway station track plane alignment reconstruction device with various systems, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems may be implemented or have alternatively.

[0164] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.

[0165] The device for reconstructing the plane and linear shape of tracks of existing railway stations provided by the present application adopts the method for reconstructing the plane and linear shape of tracks of existing railway stations in the above-mentioned embodiment, which can solve the technical problem that the traditional method is not suitable for intelligent surveying scenarios. Compared with the prior art, the beneficial effects of the device for reconstructing the plane and linear shape of tracks of existing railway stations provided by the present application are the same as the beneficial effects of the method for reconstructing the plane and linear shape of tracks of existing railway stations provided by the above-mentioned embodiment, and the other technical features of the device for reconstructing the plane and linear shape of tracks of existing railway stations are the same as the features disclosed in the method of the previous embodiment, which will not be repeated here.

[0166] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.

[0167] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0168] The present application provides a computer-readable storage medium having computer-readable program instructions (ie, computer programs) stored thereon, and the computer-readable program instructions are used to execute the method for reconstructing the plane alignment of an existing railway station track in the above-mentioned embodiment.

[0169] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency), etc., or any suitable combination of the above.

[0170] The computer-readable storage medium may be included in the device for reconstructing the plane alignment of tracks at existing railway stations; or may exist independently without being assembled into the device for reconstructing the plane alignment of tracks at existing railway stations.

[0171] The computer-readable storage medium carries one or more programs. When the one or more programs are executed by the track plane alignment reconstruction device for existing railway stations, the track plane alignment reconstruction device for existing railway stations: obtains the rail top centerline measurement point data of each existing track in the station, and determines the track centerline measurement point data according to the rail top centerline measurement point data; based on the track centerline measurement point data, independently reconstructs the line position of each existing track in the station, obtains the initial track plane alignment under the first optimization goal, and determines the initial optimal total sum of squares of track shifting, and the first optimization goal is to minimize the sum of squares of track shifting; based on the second optimization goal and the constraint condition, adjusts the line segment slope in the initial track plane alignment to obtain the optimized track plane alignment, and the second optimization goal is to minimize the difference between the optimal total sum of squares of track shifting and the initial optimal total sum of squares of track shifting, and the constraint condition is that the change rate of the optimal track shifting amount of a single track is less than or equal to a preset change threshold; determines the switch center in the optimized track plane alignment, and generates a station field existing track plane map.

[0172] Computer program code for performing the operations of the present application may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0173] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0174] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.

[0175] The readable storage medium provided in the present application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned method for reconstructing the plane alignment of tracks at existing railway stations, and can solve the technical problem that the traditional method is not suitable for intelligent surveying scenarios. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided in the present application are the same as the beneficial effects of the method for reconstructing the plane alignment of tracks at existing railway stations provided in the above-mentioned embodiments, and will not be described in detail here.

[0176] The present application also provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of the above-mentioned method for reconstructing the plane alignment of an existing railway station track.

[0177] The computer program product provided by this application can solve the technical problem that the traditional method is not suitable for intelligent survey scenarios. Compared with the prior art, the beneficial effects of the computer program product provided by this application are the same as the beneficial effects of the method for reconstructing the plane alignment of existing railway stations provided by the above embodiment, which will not be repeated here.

[0178] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.

Claims

1. A method for reconstructing the plane alignment of an existing railway station track, characterized in that: The method comprises: Acquire the rail top centerline measurement point data of each existing track in the station, and determine the track centerline measurement point data based on the rail top centerline measurement point data; Based on the track centerline measurement point data, each existing track in the station is independently reconstructed, the initial track plane alignment is obtained under the first optimization goal, and the initial optimal total track shifting amount square sum is determined, and the first optimization goal is to minimize the single track shifting amount square sum; Based on the second optimization objective and the constraint condition, the line segment slope in the initial track plane alignment is adjusted to obtain the optimized track plane alignment, wherein the second optimization objective is to minimize the difference between the optimal total track shifting amount sum of squares and the initial optimal total track shifting amount sum of squares, and the constraint condition is that the change rate of the single track optimal track shifting amount is less than or equal to a preset change threshold; The turnout center is determined in the optimized track plane alignment, and the existing track plane diagram of the station is generated.

2. The method according to claim 1, characterized in that The step of independently reconstructing the line positions of the existing tracks in the station field based on the track centerline measurement point data to obtain the initial track plane line shape under the first optimization objective includes: Determining the estimated curvature of the centerline measuring point of the existing track according to the track centerline measuring point data; Determining the straightness and curvature properties of the centerline measuring point of the existing track based on a preset curvature threshold and an estimated curvature of the centerline measuring point; Based on the straightness and curvature attributes of the centerline measuring points, straightness and curvature segmentation is performed to determine the range of the transition curve in the existing track, and the straightness and curvature attributes of the centerline measuring points within the range of the transition curve are adjusted; Determining the plane line position parameters of the existing track based on the curve elements of the existing track and the first optimization target, wherein the curve elements at least include a radius and a length of a transition curve; Based on the plane line position parameters of the existing track, the initial track plane line shape is obtained.

3. The method according to claim 2, characterized in that The step of determining the estimated curvature of the centerline measuring point of the existing track according to the track centerline measuring point data comprises: Determine the centerline measuring points of the existing track and the adjacent measuring points of each centerline measuring point according to the track centerline measuring point data; Generate a measuring point circular curve based on the centerline measuring point and the adjacent measuring points of the centerline measuring point; Based on the measuring point circular curve, the curvature value of the center line measuring point is determined.

4. The method according to claim 2, characterized in that The step of determining the straightness and curvature properties of the centerline measuring point of the existing track based on the preset curvature threshold and the estimated curvature of the centerline measuring point comprises: When the estimated curvature of the centerline measuring point of the existing track is greater than the preset curvature threshold, determining the straightness attribute of the centerline measuring point as a curve segment point; When the estimated curvature of the centerline measuring point of the existing track is less than or equal to the preset curvature threshold, the straightness and curvature attribute of the centerline measuring point is determined to be a straight line segment point.

5. The method according to claim 2, characterized in that The step of determining the plane line position parameters of the existing track based on the curve elements of the existing track and the first optimization objective comprises: Based on the curve elements of the existing track, determining the sum of squares of the single track shifting amounts of the existing track; When the sum of squares of the track shifting amounts of the existing track satisfies the first optimization objective, the curve element is used as a plane line position parameter of the existing track; When the sum of squares of the track shifting amounts of a single track of the existing track does not meet the first optimization target, the curve element is optimized, and the step of returning to determine the sum of squares of the track shifting amounts of a single track of the existing track based on the curve element of the existing track is executed.

6. The method according to claim 2, characterized in that The step of adjusting the line segment slope in the initial track plane alignment based on the second optimization objective and the constraint condition to obtain the optimized track plane alignment comprises: Selecting a track to be parallelized that needs to be parallelized from the existing tracks; Determining a slope value range based on the slopes of the parallel straight line segments between the tracks to be parallelized; Determining an optimal slope that meets the second optimization objective and the constraint condition within the slope value range; The slope of the parallel straight line segment between the to-be-parallelized tracks is adjusted to the optimal slope.

7. The method according to claim 6, characterized in that The method further comprises: Obtain the corresponding relationship between the initial single-track optimal shifting amount square sum, the single-track optimal shifting amount square sum and the single-track optimal shifting amount change rate; The change rate of the single track optimal shifting amount is obtained according to the square sum of the initial single track optimal shifting amount of the existing track, the square sum of the single track optimal shifting amount of the existing track and the corresponding relationship.

8. The method according to claim 1, characterized in that The step of determining the turnout center in the optimized track plane alignment comprises: Acquire a potential turnout track corresponding to the existing track and a vertical distance between the existing track and the corresponding potential turnout track, wherein the potential turnout track corresponding to the existing track satisfies a turnout condition; Determine a minimum vertical distance according to the vertical distance between the existing track and the corresponding potential switch track, and determine that the potential switch track corresponding to the minimum vertical distance is the switch track of the existing track, and there is a switch between the starting straight segment of the existing track and the corresponding switch track; The starting straight line segment of the existing track corresponding to the turnout is extended, the track intersection point between the existing track and the corresponding turnout track is determined, and the track intersection point is used as the turnout center.

9. The method according to claim 8, characterized in that The turnout conditions include: A perpendicular line between the existing track and the corresponding potential turnout track has a foot of perpendicularity, and the foot of perpendicularity is located on a straight line segment of the potential turnout track; The vertical distance between the existing track and the corresponding potential turnout track is less than or equal to a preset distance threshold; The frog angle difference corresponding to the angle between the existing track and the corresponding potential switch track is less than or equal to a preset angle threshold.

10. A device for reconstructing the plane alignment of an existing railway station track, characterized in that: The device for reconstructing the plane alignment of an existing railway station track comprises: An acquisition module is used to acquire the rail top centerline measurement point data of each existing track in the station, and determine the track centerline measurement point data based on the rail top centerline measurement point data; A reconstruction module, for independently reconstructing the line positions of the existing tracks in the station based on the track centerline measurement point data, obtaining the initial track plane alignment under a first optimization objective, and determining the initial optimal total track shifting amount square sum, wherein the first optimization objective is to minimize the total track shifting amount square sum; The reconstruction module is further used to adjust the line segment slope in the initial track plane alignment based on a second optimization objective and a constraint condition to obtain an optimized track plane alignment, wherein the second optimization objective is to minimize the difference between the optimal total track shifting amount sum of squares and the initial optimal total track shifting amount sum of squares, and the constraint condition is that the change rate of the single track optimal track shifting amount is less than or equal to a preset change threshold; The reconstruction module is also used to determine the turnout center in the optimized track plane alignment and generate the existing track plane diagram of the station.