Method and system for optimizing inductive reactive power compensation scheme of regional 220kV power grid

By calculating power grid data and constructing an optimization objective function, the problem of reliability and accuracy of the inductive reactive power compensation scheme of the regional 220 kV power grid was solved, efficient reactive power compensation was achieved, and the stability and resource utilization efficiency of the power system were improved.

CN118748415AActive Publication Date: 2024-10-08STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED +2
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202410752603.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2024-10-08
Estimated Expiration
2044-06-12

AI Technical Summary

Technical Problem

The existing inductive reactive power compensation scheme of the 220 kV power grid in the region has problems such as large human factors, poor reliability, and poor accuracy, resulting in a waste of resources and insufficient power system stability.

Method used

By obtaining power grid data, calculating the voltage mean square error and inductive reactive power compensation capacity requirements, constructing an optimization objective function, and optimizing based on the reactive power compensation degree index, the automation and accuracy of the inductive reactive power compensation scheme can be improved.

Benefits of technology

It improves the reliability and accuracy of the inductive reactive power compensation scheme, reduces resource waste, and enhances the stability and voltage control capabilities of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118748415A_ABST
    Figure CN118748415A_ABST
Patent Text Reader

Abstract

The invention discloses an inductive reactive compensation scheme optimization method for a regional 220kV power grid. The method comprises the following steps: acquiring data information of a target regional 220kV power grid; calculating voltage mean square error data and inductive reactive compensation capacity demand data of each transformer substation in the 220kV power grid of the target area; reactive compensation degree indexes of all the transformer substations in the 220-kilovolt power grid of the target area are obtained through calculation; and an inductive reactive power compensation scheme optimization objective function is constructed, and optimization of the inductive reactive power compensation scheme of the regional 220kV power grid is solved and completed. The invention also discloses a system for realizing the method for optimizing the inductive reactive power compensation scheme of the regional 220kV power grid. According to the invention, optimization of reactive compensation is realized based on real-time working parameter data of a regional 220kV power grid, so that the reliability is higher, the accuracy is better, and the overall efficiency of the system is also higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of electrical automation, and in particular relates to a method and system for optimizing an inductive reactive power compensation scheme of a regional 220 kV power grid. Background Art

[0002] With the development of economy and technology and the improvement of people's living standards, electricity has become an indispensable secondary energy source in people's production and life, bringing endless convenience to people's production and life. Therefore, ensuring the stable and reliable supply of electricity has become one of the most important tasks of the power system.

[0003] Voltage is an important indicator of power quality, and voltage quality is of great significance to the safety and economic operation of the power system. In an inductive power system, the distribution and flow of reactive power determine the voltage distribution and level of the power system. In order to maintain the appropriate voltage level and control the voltage of the power system, it is necessary to set up a reactive compensation device of a certain capacity in the network to ensure the reactive power balance of the system, that is, to meet the requirements of reactive power stratification and partition balance in steady state, and also require a certain reserve capacity. Therefore, a reasonable reactive compensation scheme can not only ensure the voltage quality of the power system, but also improve the stability and safety of the power system operation.

[0004] At present, the inductive reactive power compensation scheme of the regional 220 kV power grid still remains at the empirical reactive power compensation setting scheme, that is, according to the historical working status and predicted working status of the 220 kV power grid in the target area, a reactive power compensation device of a certain capacity is empirically set in advance at each substation, and then the reactive power compensation device is adjusted according to the real-time operating status of the power system. Although this method is convenient and fast, this type of scheme still has the problems of large human factors, poor reliability and poor accuracy; moreover, in order to ensure the normal operation of the power system, this type of scheme often arranges a large number of reactive power compensation devices, resulting in a certain waste of resources. Summary of the invention

[0005] One of the purposes of the present invention is to provide a method for optimizing the inductive reactive power compensation scheme of a regional 220 kV power grid with high reliability, good accuracy and high efficiency.

[0006] The second object of the present invention is to provide a system for realizing an optimization method of the inductive reactive power compensation scheme of the 220 kV power grid in the region.

[0007] The method for optimizing the inductive reactive power compensation scheme of the regional 220 kV power grid provided by the present invention comprises the following steps:

[0008] S1. Obtain data information of 220 kV power grid in target area;

[0009] S2. According to the data information obtained in step S1, the voltage mean square error data of each substation in the target area 220 kV power grid is calculated;

[0010] S3. According to the data information obtained in step S1, the inductive reactive power compensation capacity demand data of each substation in the target area 220 kV power grid is calculated;

[0011] S4. Calculate the reactive power compensation index of each substation in the 220 kV power grid in the target area according to the inductive reactive power compensation capacity configured for each substation in the 220 kV power grid in the target area;

[0012] S5. According to the reactive power compensation index obtained in step S4, combined with the voltage mean square error data, construct an optimization objective function for the inductive reactive power compensation scheme;

[0013] S6. Solve the optimization objective function of the inductive reactive power compensation scheme constructed in step S5 to complete the optimization of the inductive reactive power compensation scheme of the regional 220 kV power grid.

[0014] Step S2, according to the data information obtained in step S1, calculates the voltage mean square error data of each substation in the 220 kV power grid in the target area, and specifically includes the following steps:

[0015] Get the annual maximum voltage value set U of each substation in the 220 kV power grid in the target area V,max And the annual minimum voltage set U V,min :

[0016] U V,max = {U 1,V,max ,…,U i,V,max ,...,U n,V,max}

[0017] U V,min = {U 1,V,min ,…,U i,V,min ,...,U n,V,min}

[0018] Where U i,V,max is the annual maximum voltage value of the i-th substation, and i∈(1,n), n is the total number of substations; U i,V,min is the lowest voltage value of the ith substation throughout the year;

[0019] The following formula is used to calculate the mean square error σ when the substation maximum voltage value is higher than the voltage upper limit control value: max The mean square error σ when the substation minimum voltage value is higher than the voltage upper limit control value min :

[0020]

[0021] Where U 0,V,max is the upper voltage limit control value of 220 kV substation; calculate σ max When U i,V,max -U 0,V,max <0, then take U i,V,max -U 0,V,max =0; calculate σ min When U i,V,min -U 0,V,max <0, then take U i,V,min -U 0,V,max =0;σ max and σ min The larger the value, the greater the reactive power compensation demand of the 220 kV power grid in the target area; when σ max and σ min Any value greater than the set value (preferably 0.01U N , U N When is the system rated voltage, taking 220), it indicates that the 220 kV power grid in the target area needs reactive power compensation.

[0022] Step S3, according to the data information obtained in step S1, calculates the inductive reactive power compensation capacity demand data of each substation in the 220 kV power grid in the target area, and specifically includes the following steps:

[0023] In the 220 kV grid in the target area, the impact of charging power of 110 kV lines is ignored;

[0024] The theoretical inductive reactive power compensation capacity Q of the i-th substation is calculated using the following formula: i,0 :

[0025]

[0026] Where m is the number of transmission lines in and out of the ith substation; k i,j is the unit charging power of the jth transmission line at the i-th substation; L i,j is the length of the jth transmission line at the ith substation; r is the ratio of the minimum operating current of the transmission line to the rated current; I i,jN is the rated current of the jth transmission line at the ith substation; x i,j is the reactance of the jth transmission circuit of the ith substation; d i is the other excess reactive power on the grid side that needs to be compensated at the i-th substation under the small mode;

[0027] According to the theoretical inductive reactive power compensation capacity Q of the i-th substation i,0 And engineering margin, calculate the inductive reactive power compensation capacity Q of the i-th substation i for

[0028] Get the inductive reactive power compensation capacity set Q that has been configured for each substation in the 220 kV power grid in the target area 0,N Q 0,N = {Q 0,1,N ,…,Q 0,i,N ,...,Q 0,n,N}, Q 0,i,N is the inductive reactive power compensation capacity configured for the i-th substation;

[0029] Finally, the inductive reactive power compensation capacity demand data of each substation in the 220 kV power grid in the target area is calculated using the following formula:

[0030] ΔQ 0,i,N =Q i -Q 0,i,N

[0031] Where ΔQ 0,i,N It is the inductive reactive power compensation capacity demand data of the i-th substation in the 220 kV power grid in the target area.

[0032] Step S4, according to the inductive reactive power compensation capacity configured for each substation in the 220 kV power grid in the target area, calculates the reactive power compensation index of each substation in the 220 kV power grid in the target area, and specifically includes the following steps:

[0033] The reactive power compensation index of each substation in the 220 kV power grid in the target area is calculated using the following formula:

[0034]

[0035] Where α i It is the reactive power compensation index of the i-th substation in the 220 kV power grid in the target area.

[0036] According to the reactive power compensation index obtained in step S4, the optimization objective function of the inductive reactive power compensation scheme is constructed in step S5 in combination with the voltage mean square error data, which specifically includes the following steps:

[0037] The following formula is used as the optimization objective function of the inductive reactive power compensation scheme:

[0038] min F=Q total β total ·δ total

[0039] Where F is the objective function value; Q total is the total value of the inductive reactive power compensation capacity of each substation in the 220 kV power grid in the target area, and ΔQ' 0,i,Nis the added value of the inductive reactive power compensation capacity of the i-th substation in the 220 kV power grid in the target area; β total is the standard deviation of the inductive reactive compensation degree and the total compensation degree of each substation in the 220 kV power grid in the target area, and α′ i is the inductive reactive power compensation degree after the inductive reactive power is supplemented in the i-th substation and α total is the 220 kV inductive reactive power compensation degree for the entire region, and δ total To increase the inductive reactive power compensation degree deviation of the 220 kV substation in the area after inductive reactive power compensation, and

[0040] The present invention also provides a system for realizing the inductive reactive power compensation scheme optimization method of the 220 kV power grid in the region, comprising a data acquisition module, a mean square error calculation module, a demand calculation module, an index calculation module, an objective function construction module and a scheme optimization module; the data acquisition module, the mean square error calculation module, the demand calculation module, the index calculation module, the objective function construction module and the scheme optimization module are connected in series in sequence; the data acquisition module is used to acquire data information of the 220 kV power grid in the target region, and upload the data information to the mean square error calculation module; the mean square error calculation module is used to calculate the voltage mean square error data of each substation in the 220 kV power grid in the target region according to the received data information, and upload the data information to the demand calculation module; the demand calculation module is used to calculate the voltage mean square error data of each substation in the 220 kV power grid in the target region according to the received data information The inductive reactive compensation capacity demand data of each substation in the network is obtained, and the data information is uploaded to the indicator calculation module; the indicator calculation module is used to calculate the reactive compensation degree index of each substation in the 220 kV power grid in the target area according to the received data information and the inductive reactive compensation capacity configured by each substation in the 220 kV power grid in the target area, and upload the data information to the objective function construction module; the objective function construction module is used to construct the inductive reactive compensation scheme optimization objective function according to the received data information, the obtained reactive compensation degree index, and the voltage mean square error data, and upload the data information to the scheme optimization module; the scheme optimization module is used to solve the constructed inductive reactive compensation scheme optimization objective function according to the received data information, and complete the optimization of the inductive reactive compensation scheme of the regional 220 kV power grid.

[0041] The method and system for optimizing the inductive reactive power compensation scheme of the regional 220 kV power grid provided by the present invention calculate the real-time working data and parameters of the regional 220 kV power grid, and construct and solve the corresponding optimization model, thereby completing the optimization of the inductive reactive power compensation scheme; the present invention realizes the optimization of reactive power compensation based on the real-time working parameter data of the regional 220 kV power grid, so the present invention has higher reliability, better accuracy, and higher overall efficiency of the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 The figure is a schematic diagram of the method flow of the present invention.

[0043] Figure 2 This is a schematic diagram of the voltage condition of a regional 220 kV power grid before inductive reactive power compensation according to an embodiment of the method of the present invention.

[0044] Figure 3 This is a schematic diagram of the voltage condition of a regional 220 kV power grid after inductive reactive power compensation according to an embodiment of the method of the present invention.

[0045] Figure 4 Schematic diagram of the functional modules of the system of the present invention. DETAILED DESCRIPTION

[0046] like Figure 1 The method flow diagram of the method of the present invention is shown as follows: The method for optimizing the inductive reactive power compensation scheme of the regional 220 kV power grid disclosed by the present invention comprises the following steps:

[0047] S1. Obtain data information of 220 kV power grid in target area;

[0048] S2. According to the data information obtained in step S1, the voltage mean square error data of each substation in the 220 kV power grid in the target area is calculated; specifically comprising the following steps:

[0049] Get the annual maximum voltage value set U of each substation in the 220 kV power grid in the target area V,max And the annual minimum voltage set U V,min :

[0050] U V,max = {U 1,V,max ,…,U i,V,max ,...,U n,V,max}

[0051] U V,min = {U 1,V,min ,…,U i,V,min ,...,U n,V,min}

[0052] Where U i,V,maxis the annual maximum voltage value of the i-th substation, and i∈(1,n), n is the total number of substations; U i,V,min is the lowest voltage value of the ith substation throughout the year;

[0053] Normally, when the substation is under high voltage, the voltage upper limit needs to be controlled within the set range; therefore, the following formula is used to calculate the mean square error σ when the substation maximum voltage value is higher than the voltage upper limit control value. max The mean square error σ when the substation minimum voltage value is higher than the voltage upper limit control value min :

[0054]

[0055] Where U 0,V,max is the upper voltage limit control value of 220 kV substation; calculate σ max When U i,V,max -U 0,V,max <0, then take U i,V,max -U 0,V,max =0; calculate σ min When U i,V,min -U 0,V,max <0, then take U i,V,min -U 0,V,max =0;σ max and σ min The larger the value, the greater the reactive power compensation demand of the 220 kV power grid in the target area; when σ max and σ min Any value greater than the set value (preferably 0.01U N , U N When is the rated voltage of the system, taking 220), it indicates that the 220 kV power grid in the target area needs reactive power compensation;

[0056] S3. According to the data information obtained in step S1, the inductive reactive power compensation capacity demand data of each substation in the 220 kV power grid in the target area is calculated; specifically comprising the following steps:

[0057] Normally, the charging power per unit length of a 110 kV line is less than one-fifth of that of a 220 kV line, and the length of a 110 kV line is not too long; therefore, in the 220 kV power grid in the target area, the impact of the charging power of the 110 kV line is ignored;

[0058] According to the Technical Guidelines for Reactive Power Compensation in Power Systems, the inductive reactive power compensation capacity of a 220 kV substation is calculated based on the residual charging power of the transmission lines (cables) entering and leaving the substation. Therefore, the theoretical inductive reactive power compensation capacity Q of the ith substation is calculated using the following formula: i,0 :

[0059]

[0060] Where m is the number of transmission lines in and out of the ith substation; k i,j is the unit charging power of the jth transmission line of the ith substation (in Mvar / km, for 220 kV line, the value is 0.14 for a single conductor and 0.19 for a double split conductor); L i,j is the length of the jth transmission line at the ith substation; r is the ratio of the minimum operating current of the transmission line to the rated current (usually between 0 and 0.2); I i,jN is the rated current of the jth transmission line at the ith substation; x i,j is the reactance of the jth transmission circuit of the ith substation; d i is the excess reactive power on the grid side that needs to be compensated at the i-th substation under the small mode (if it cannot be determined, it is directly taken as 0);

[0061] According to the theoretical inductive reactive power compensation capacity Q of the i-th substation i,0 and engineering margin. Inductive reactive power compensation is usually calculated and analyzed when the transmission line is unloaded. Therefore, the inductive reactive power compensation capacity Q of the i-th substation is calculated as i for

[0062] Get the inductive reactive power compensation capacity set Q that has been configured for each substation in the 220 kV power grid in the target area 0,N Q 0,N = {Q 0,1,N ,…,Q 0,i,N ,...,Q 0,n,N}, Q 0,i,N is the inductive reactive power compensation capacity configured for the i-th substation;

[0063] Finally, the inductive reactive power compensation capacity demand data of each substation in the 220 kV power grid in the target area is calculated using the following formula:

[0064] ΔQ 0,i,N =Q i -Q 0,i,N

[0065] Where ΔQ 0,i,N is the inductive reactive power compensation capacity demand data of the i-th substation in the 220 kV power grid in the target area; ΔQ 0,i,N It indicates the value when the inductive reactive power of each 220 kV substation is 100% compensated. However, since the existing inductive reactive power devices are usually 10 MVar per group, only when ΔQ 0,i,NWhen it is an integer multiple of 10, it can just meet 100% compensation. When it is not an integer multiple of 10, it is necessary to compare the compensation effect when one more or one less inductive reactive power compensation device is used. This value is useful in case analysis. If the value is considered, Indicates no more than integer;

[0066] S4. According to the inductive reactive power compensation capacity configured for each substation in the 220 kV power grid in the target area, the reactive power compensation index of each substation in the 220 kV power grid in the target area is calculated; specifically, the steps include:

[0067] According to the operation of the power system and the actual project, the inductive reactive configuration capacity should be able to fully compensate the line charging power. However, for some substations, the charging power value cannot be exactly equal to the capacity of the inductive reactive device. Therefore, the following formula is used to calculate the reactive compensation index of each substation in the 220 kV power grid in the target area:

[0068]

[0069] Where α i is the reactive power compensation index of the ith substation in the 220 kV power grid in the target area;

[0070] S5. According to the reactive power compensation index obtained in step S4, combined with the voltage mean square error data, construct an optimization objective function for the inductive reactive power compensation scheme; specifically comprising the following steps:

[0071] The following formula is used as the optimization objective function of the inductive reactive power compensation scheme:

[0072] min F=Q total β total ·δ total

[0073] Where F is the objective function value; Q total is the total value of the inductive reactive power compensation capacity of each substation in the 220 kV power grid in the target area, and ΔQ' 0,i,N is the added value of the inductive reactive power compensation capacity of the i-th substation in the 220 kV power grid in the target area; β total is the standard deviation of the inductive reactive compensation degree and the total compensation degree of each substation in the 220 kV power grid in the target area, and α i ' is the inductive reactive power compensation degree after the inductive reactive power is supplemented by the i-th substation and α total is the 220 kV inductive reactive power compensation degree for the entire region, and δ totalTo increase the inductive reactive power compensation degree deviation of the 220 kV substation in the area after inductive reactive power compensation, and

[0074] S6. Solve the optimization objective function of the inductive reactive power compensation scheme constructed in step S5 to complete the optimization of the inductive reactive power compensation scheme of the regional 220 kV power grid.

[0075] The method of the present invention is further described below in conjunction with embodiments:

[0076] Taking the prefecture-level 220 kV power grid as an example, there are 9 220 kV substations in the region. The maximum and minimum voltage values ​​of the 9 220 kV substations are shown in Table 1 below. The mean square error when the maximum voltage value of the regional 220 kV substation is higher than the voltage upper limit control value and the mean square error when the minimum voltage value of the regional 220 kV substation is higher than the voltage upper limit control value are shown in Table 1 below:

[0077] Table 1 Schematic diagram of voltage situation of 220 kV substation in the region

[0078]

[0079] Through the flow calculation and analysis, it can be known that based on the current situation, the voltage of the regional 220 kV power grid is as follows Figure 2 As shown;

[0080] The charging power, inductive reactive configuration and inductive reactive compensation degree of the regional 220 kV substation are shown in Table 2:

[0081] Table 2 Schematic diagram of inductive reactive power situation of 220 kV substation in the region

[0082] Serial number Substation <![CDATA[Q i (MVar)]]> <![CDATA[Q 0,i,N (MVar)]]> <![CDATA[α i ]]> 1 FX 21.2 10 47.2% 2 XZ 26.6 10 37.6% 3 GS 20.2 10 49.5% 4 WRJ 18.2 0 0.0% 5 YRP 16.8 20 119.0% 6 QC 18 20 111.1% 7 DH 10.9 20 183.5% 8 PPC 43.7 20 45.8% 9 ZG 10.5 10 95.2%

[0083] According to the existing 220 kV inductive reactive configuration device capacity, it is usually 10 MVar. Therefore, according to the objective function, the inductive reactive compensation of each substation can be obtained, as shown in Table 3:

[0084] Table 3 Schematic diagram of inductive reactive power compensation scheme

[0085]

[0086] The objective function value and the parameter values ​​in the objective function can be calculated from Table 3, as shown below:

[0087] Q total =80

[0088] α total =0.075

[0089] β total =0.073

[0090] F=Q total β total α total =0.438

[0091] After inductive reactive power compensation, the voltage of the regional 220 kV power grid is as follows: Figure 3 shown; from Figure 3 It can be seen that the voltages of the nine 220 kV substations in Table 3 can be controlled within 230 kV, meeting the voltage verification requirements; this shows that the method of the present invention has good practicability, reliability and accuracy.

[0092] like Figure 4 The functional module diagram of the system of the present invention is shown as follows: the system disclosed by the present invention for realizing the optimization method of the inductive reactive power compensation scheme of the 220 kV power grid in the said area comprises a data acquisition module, a mean square error calculation module, a demand calculation module, an index calculation module, an objective function construction module and a scheme optimization module; the data acquisition module, the mean square error calculation module, the demand calculation module, the index calculation module, the objective function construction module and the scheme optimization module are connected in series in sequence; the data acquisition module is used to acquire the data information of the 220 kV power grid in the target area, and upload the data information to the mean square error calculation module; the mean square error calculation module is used to calculate the voltage mean square error data of each substation in the 220 kV power grid in the target area according to the received data information, and upload the data information to the demand calculation module; the demand calculation module is used to calculate the target according to the received data information The inductive reactive compensation capacity demand data of each substation in the regional 220 kV power grid is collected, and the data information is uploaded to the indicator calculation module; the indicator calculation module is used to calculate the reactive compensation degree index of each substation in the target area 220 kV power grid according to the received data information and the configured inductive reactive compensation capacity of each substation in the target area 220 kV power grid, and upload the data information to the objective function construction module; the objective function construction module is used to construct the inductive reactive compensation scheme optimization objective function according to the received data information and the obtained reactive compensation degree index combined with the voltage mean square error data, and upload the data information to the scheme optimization module; the scheme optimization module is used to solve the constructed inductive reactive compensation scheme optimization objective function according to the received data information, and complete the optimization of the inductive reactive compensation scheme of the regional 220 kV power grid.

Claims

1. A method for optimizing the inductive reactive power compensation scheme of a regional 220 kV power grid, comprising the following steps: S1. Obtain data information of 220 kV power grid in target area; S2. According to the data information obtained in step S1, the voltage mean square error data of each substation in the target area 220 kV power grid is calculated; S3. According to the data information obtained in step S1, the inductive reactive power compensation capacity demand data of each substation in the target area 220 kV power grid is calculated; S4. Calculate the reactive power compensation index of each substation in the 220 kV power grid in the target area according to the inductive reactive power compensation capacity configured for each substation in the 220 kV power grid in the target area; S5. According to the reactive power compensation index obtained in step S4, combined with the voltage mean square error data, construct an optimization objective function for the inductive reactive power compensation scheme; S6. Solve the optimization objective function of the inductive reactive power compensation scheme constructed in step S5 to complete the optimization of the inductive reactive power compensation scheme of the regional 220 kV power grid.

2. The method for optimizing the inductive reactive power compensation scheme of a regional 220 kV power grid according to claim 1 is characterized in that Step S2, according to the data information obtained in step S1, calculates the voltage mean square error data of each substation in the 220 kV power grid in the target area, and specifically includes the following steps: Get the annual maximum voltage value set U of each substation in the 220 kV power grid in the target area V,max And the annual minimum voltage set U V,min : IN V,max ={U 1,V,max ,…,IN i,V,max ,...,IN n,V,max } IN V,min ={U 1,V,min ,…,IN i,V,min ,...,IN n,V,min } Where U i,V,max is the annual maximum voltage value of the i-th substation, and i∈(1,n), n is the total number of substations; U i,V,min is the lowest voltage value of the ith substation throughout the year; The following formula is used to calculate the mean square error σ when the substation maximum voltage value is higher than the voltage upper limit control value: max The mean square error σ when the substation minimum voltage value is higher than the voltage upper limit control value min : Where U 0,V,max is the upper voltage limit control value of 220 kV substation; calculate σ max When U i,V,max -U 0,V,max <0, then take U i,V,max -U 0,V,max =0; calculate σ min When U i,V,min -U 0,V,max <0, then take U i,V,min -U 0,V,max =0;σ max and σ min The larger the value, the greater the reactive power compensation demand of the 220 kV power grid in the target area; when σ max and σ min When any value is greater than the set value, it indicates that reactive power compensation is required for the 220 kV power grid in the target area.

3. The method for optimizing the inductive reactive power compensation scheme of the regional 220 kV power grid according to claim 2 is characterized in that Step S3, according to the data information obtained in step S1, calculates the inductive reactive power compensation capacity demand data of each substation in the 220 kV power grid in the target area, and specifically includes the following steps: In the 220 kV grid in the target area, the impact of charging power of 110 kV lines is ignored; The theoretical inductive reactive power compensation capacity Q of the i-th substation is calculated using the following formula: i,0 : Where m is the number of transmission lines in and out of the ith substation; k i,j is the unit charging power of the jth transmission line at the i-th substation; L i,j is the length of the jth transmission line at the ith substation; r is the ratio of the minimum operating current of the transmission line to the rated current; I i,jN is the rated current of the jth transmission line at the ith substation; x i,j is the reactance of the jth transmission circuit of the ith substation; d i is the other excess reactive power on the grid side that needs to be compensated at the i-th substation under the small mode; According to the theoretical inductive reactive power compensation capacity Q of the i-th substation i,0 And engineering margin, calculate the inductive reactive power compensation capacity Q of the i-th substation i for Get the inductive reactive power compensation capacity set Q that has been configured for each substation in the 220 kV power grid in the target area 0,N Q 0,N = {Q 0,1,N ,…,Q 0,i,N ,...,Q 0,n,N }, Q 0,i,N is the inductive reactive power compensation capacity configured for the i-th substation; Finally, the inductive reactive power compensation capacity demand data of each substation in the 220 kV power grid in the target area is calculated using the following formula: ΔQ 0,i,N =Q i -Q 0,i,N Where ΔQ 0,i,N It is the inductive reactive power compensation capacity demand data of the i-th substation in the 220 kV power grid in the target area.

4. The method for optimizing the inductive reactive power compensation scheme of a regional 220 kV power grid according to claim 3 is characterized in that Step S4, according to the inductive reactive power compensation capacity configured for each substation in the 220 kV power grid in the target area, calculates the reactive power compensation index of each substation in the 220 kV power grid in the target area, and specifically includes the following steps: The reactive power compensation index of each substation in the 220 kV power grid in the target area is calculated using the following formula: Where α i It is the reactive power compensation index of the i-th substation in the 220 kV power grid in the target area.

5. The method for optimizing the inductive reactive power compensation scheme of a regional 220 kV power grid according to claim 4 is characterized in that According to the reactive power compensation index obtained in step S4, the optimization objective function of the inductive reactive power compensation scheme is constructed in step S5 in combination with the voltage mean square error data, which specifically includes the following steps: The following formula is used as the optimization objective function of the inductive reactive power compensation scheme: min F=Q total ·b total ·d total Where F is the objective function value; Q total is the total value of the inductive reactive power compensation capacity of each substation in the 220 kV power grid in the target area, and ΔQ' 0,i,N is the added value of the inductive reactive power compensation capacity of the i-th substation in the 220 kV power grid in the target area; β total is the standard deviation of the inductive reactive compensation degree and the total compensation degree of each substation in the 220 kV power grid in the target area, and α i ' is the inductive reactive power compensation degree after the inductive reactive power is supplemented by the i-th substation and α total is the 220 kV inductive reactive power compensation degree for the entire region, and δ total To increase the inductive reactive power compensation degree deviation of the 220 kV substation in the area after inductive reactive power compensation, and 6. A system for realizing the method for optimizing the inductive reactive power compensation scheme of a regional 220 kV power grid according to any one of claims 1 to 5, characterized in that It includes a data acquisition module, a mean square error calculation module, a demand calculation module, an index calculation module, an objective function construction module and a scheme optimization module; the data acquisition module, the mean square error calculation module, the demand calculation module, the index calculation module, the objective function construction module and the scheme optimization module are connected in series in sequence; the data acquisition module is used to acquire data information of the 220 kV power grid in the target area, and upload the data information to the mean square error calculation module; the mean square error calculation module is used to calculate the voltage mean square error data of each substation in the 220 kV power grid in the target area according to the received data information, and upload the data information to the demand calculation module; the demand calculation module is used to calculate the inductive reactive power compensation capacity demand data of each substation in the 220 kV power grid in the target area according to the received data information, and upload the data information to the index calculation module; The index calculation module is used to calculate the reactive power compensation index of each substation in the 220 kV power grid in the target area according to the received data information and the inductive reactive power compensation capacity configured for each substation in the 220 kV power grid in the target area, and upload the data information to the objective function construction module; The objective function construction module is used to construct the optimization objective function of the inductive reactive power compensation scheme according to the received data information, the obtained reactive power compensation index and the voltage mean square error data, and upload the data information to the scheme optimization module; the scheme optimization module is used to solve the constructed optimization objective function of the inductive reactive power compensation scheme according to the received data information, and complete the optimization of the inductive reactive power compensation scheme of the regional 220 kV power grid.

Citation Information

Patent Citations

  • Inductive reactive compensation method for power grid for avoiding voltage off-normal risks

    CN102522756A

  • Branch voltage stability analysis based selection method for reactive power compensation point of microgrid

    CN103208804A

  • Offshore wind plant reactive power optimization configuration method considering wind turbine generator reactive power regulation

    CN111799813A

  • Compensation optimization calculation method for reactive power device of 110kV transformer substation

    CN112838593A

  • Reactive power optimization control method for photovoltaic power station participating in active voltage regulation of power grid

    CN113972665A