Network construction effect pre-evaluation method and device, equipment and storage medium

By analyzing the path loss and antenna gain difference between the built network and the network to be built, a measurement report of the network to be built is generated, which solves the problem of inaccurate service quality assessment caused by differences in network types in the traditional method, and improves the prediction of network construction effects. Accuracy of assessment.

CN118748819AActive Publication Date: 2024-10-08CHINA UNITED NETWORK COMM GRP CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411073948.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-08
Estimated Expiration
2044-08-06

AI Technical Summary

Technical Problem

When traditional wireless network analysis is used to pre-evaluate the network construction effect, due to the difference between the network type in the collected measurement report and the network type to be built, the network service quality evaluation is inaccurate, which reduces the accuracy of the pre-evaluation of the network construction effect.

Method used

By obtaining the measurement report of the built network in the target area, determine the path loss and antenna gain difference between the built network and the network to be built, and process the measurement report of the built network based on these differences to generate the measurement of the network to be built Report to simulate the service quality of the network to be built and provide an accurate demand assessment for the area to be built.

Benefits of technology

It improves the accuracy of pre-assessment of network construction effects and ensures that the network needs of the areas to be constructed are accurately identified and met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118748819A_ABST
    Figure CN118748819A_ABST
Patent Text Reader

Abstract

The invention provides a network construction effect pre-evaluation method and device, equipment and a storage medium, relates to the technical field of communication, and is used for solving the problem of low accuracy of network construction effect pre-evaluation. The method comprises the following steps: acquiring a measurement report of a built network in a target area; and determining path loss and antenna gain difference between the established network and the network to be established in the target area based on the measurement report of the established network. And processing the measurement report of the established network based on the path loss and the antenna gain difference to obtain the measurement report of the network to be established. Based on the measurement report of the to-be-built network, pre-evaluation information is determined, and the pre-evaluation information is used for indicating the demand degree of the target area on the to-be-built network.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of communication technology, and in particular to a method, device, equipment and storage medium for pre-evaluating the effect of network construction. Background Art

[0002] Preliminary assessment of network construction effects is an important step before the formal deployment of a new network and the implementation of infrastructure construction. It can help operators and network providers understand key indicators such as network performance and coverage before actual construction, and conduct comprehensive and systematic analysis and prediction of expected construction results.

[0003] Traditional wireless network analysis, when conducting preliminary evaluation of network construction effects, is based on the measurement report (MR) corresponding to the area to be built collected by the operator to evaluate the network service quality of the area to be built before network construction, determine the network demand of the area to be built, and then achieve preliminary evaluation of network construction effects.

[0004] However, in the above technical solution, since the network type corresponding to the collected MR (such as frequency band, mobile communication network type, operator) may be different from the network type to be built, it cannot provide an accurate reference for the network service quality evaluation of the network construction, which in turn affects the determination of the network demand situation in the construction area and reduces the accuracy of the preliminary evaluation of the network construction effect. Summary of the invention

[0005] The present application provides a network construction effect pre-evaluation method, device, equipment and storage medium, which are used to solve the problem of low accuracy of network construction effect pre-evaluation.

[0006] In order to achieve the above objectives, this application adopts the following technical solutions:

[0007] In a first aspect, the present application provides a method for pre-evaluating the effect of network construction, the method comprising: a pre-evaluation device for network construction effect (hereinafter referred to as "pre-evaluation device") obtains a measurement report of a constructed network in a target area. The pre-evaluation device determines the path loss and antenna gain difference between the constructed network and the network to be constructed in the target area based on the measurement report of the constructed network. The pre-evaluation device processes the measurement report of the constructed network based on the path loss and antenna gain difference to obtain a measurement report of the network to be constructed. The pre-evaluation device determines pre-evaluation information based on the measurement report of the network to be constructed, and the pre-evaluation information is used to indicate the demand for the network to be constructed in the target area.

[0008] The technical solution provided by the present application brings at least the following beneficial effects: by obtaining the measurement report of the constructed network in the target area, the path loss and antenna gain difference between the constructed network and the network to be constructed in the target area are determined. Based on the path loss and antenna gain difference, the measurement report of the constructed network is processed to obtain the measurement report of the network to be constructed. Then the pre-evaluation information is determined, and the pre-evaluation information is used to indicate the demand for the construction of the network in the target area. In other words, based on the path loss and antenna gain difference between different networks, the differences between the measurement reports of different networks can be eliminated, and then before the construction of the network to be constructed in the area to be constructed is completed, the measurement report of the network to be constructed after the construction is completed is simulated based on the measurement reports of other networks in the area to be constructed, so as to provide an accurate reference for the pre-evaluation of the network service quality after the construction of the network to be constructed, and determine the demand for the construction of the network in the area to be constructed. Therefore, the accuracy of the pre-evaluation of the network construction effect can be improved.

[0009] Optionally, the measurement report includes: the reference signal received power of the sampling point. The target area includes multiple first sampling points, and the network type of the first sampling point is a constructed network. The above-mentioned method of "processing the measurement report of the constructed network based on the path loss and the antenna gain difference to obtain the measurement report of the network to be constructed" includes: processing the reference signal received power of each first sampling point among the multiple first sampling points based on the path loss and the antenna gain difference to obtain the reference signal received power of multiple second sampling points in the target area. Among them, one second sampling point corresponds to one first sampling point, the network type of the second sampling point is a network to be constructed, and the reference signal received power of the second sampling point is equal to the reference signal received power of the corresponding first sampling point after processing.

[0010] Optionally, the method further includes: when the constructed network is a preset network, based on the first preset receiving power threshold, selecting at least one third sampling point from the multiple first sampling points, the reference signal receiving power of the third sampling point being less than the first preset receiving power threshold. Based on the path loss and the antenna gain difference, the reference signal receiving power of each first sampling point in the multiple first sampling points is processed to obtain the reference signal receiving power of multiple second sampling points in the target area, including: based on the path loss and the antenna gain difference, the reference signal receiving power of each third sampling point in the at least one third sampling point is processed to obtain the reference signal receiving power of the multiple second sampling points.

[0011] Optionally, the measurement report also includes: the signal to interference plus noise ratio and the uplink rate of the sampling point. The above-mentioned method of "processing the measurement report of the constructed network based on the path loss and the antenna gain difference to obtain the measurement report of the network to be constructed" also includes: for each second sampling point, determining the signal to interference plus noise ratio and the uplink rate of each second sampling point according to the first operation, and the first operation includes. Based on the reference signal received power of the target sampling point and the reference signal received power of multiple fourth sampling points, determine the signal to interference plus noise ratio of the target sampling point, the target sampling point is any sampling point among the multiple second sampling points, and the fourth sampling point is a sampling point adjacent to the target sampling point among the multiple second sampling points. Based on the reference signal received power and the signal to interference plus noise ratio of the target sampling point, determine the uplink rate of the target sampling point.

[0012] Optionally, the method of "determining pre-assessment information based on a measurement report of a network to be constructed" includes: based on a first preset rate threshold, selecting at least one fifth sampling point from a plurality of second sampling points, wherein the uplink rate of the fifth sampling point is greater than the first preset rate threshold. The pre-assessment information is determined based on a first ratio between the number of the fifth sampling points and the number of the second sampling points, wherein the first ratio is positively correlated with the demand for the network to be constructed in the target area.

[0013] Optionally, the method further includes: rasterizing the target area to obtain multiple first grids. Obtaining application service data of each first sampling point. Based on the application service data of each first sampling point, locating multiple first sampling points in the target area, and determining the first sampling point in each first grid. Based on the measurement report of the network to be constructed, determining pre-evaluation information, including: based on a second preset rate threshold, determining a second ratio corresponding to each first grid, the second ratio being the ratio between the number of sixth sampling points in the first grid and the number of second sampling points, the sixth sampling point being a sampling point among multiple second sampling points whose uplink rate is greater than the second preset rate threshold. Based on the first preset ratio threshold, screening out at least one second grid from multiple first grids, the second ratio corresponding to the second grid being greater than the first preset ratio threshold. Determining pre-evaluation information based on the distribution of at least one second grid in the target area.

[0014] In a second aspect, the present application provides a device for pre-evaluating the effect of network construction, the device comprising: an acquisition module and a processing module.

[0015] The acquisition module is used to obtain the measurement report of the constructed network in the target area. The processing module is used to determine the path loss and antenna gain difference between the constructed network and the network to be constructed in the target area based on the measurement report of the constructed network. The processing module is also used to process the measurement report of the constructed network based on the path loss and antenna gain difference to obtain the measurement report of the network to be constructed. The processing module is also used to determine pre-evaluation information based on the measurement report of the network to be constructed, and the pre-evaluation information is used to indicate the demand for the network to be constructed in the target area.

[0016] In a third aspect, the present application provides a device for pre-evaluation of network construction effects, the device comprising: a processor and a memory, the processor and the memory being coupled, the memory being used to store one or more programs, the one or more programs comprising computer execution instructions, and when the device for pre-evaluation of network construction effects is running, the processor executes the computer execution instructions stored in the memory to implement the method for pre-evaluation of network construction effects described in the first aspect or any optional aspect in the first aspect.

[0017] In a fourth aspect, the present application provides a computer-readable storage medium, which stores instructions. When the instructions are executed on a computer, the computer executes the method for pre-evaluating the network construction effect described in the first aspect or any optional aspect of the first aspect.

[0018] In a fifth aspect, the present application provides a computer program product applied to a server, the computer program product comprising computer instructions. When the computer instructions are executed on the server, the server implements the method for pre-evaluation of the network construction effect described in the first aspect or any optional aspect of the first aspect.

[0019] In the above scheme, the technical problems that can be solved and the technical effects achieved by the pre-evaluation device, equipment, computer storage medium or computer program product for network construction effects can be referred to the technical problems and technical effects solved by the above-mentioned first aspect, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A schematic diagram of a communication system provided in an embodiment of the present application;

[0021] Figure 2 A flowchart of a method for pre-evaluating the effect of network construction provided in an embodiment of the present application;

[0022] Figure 3 A flowchart of another method for pre-evaluating the effect of network construction provided in an embodiment of the present application;

[0023] Figure 4A flowchart of another method for pre-evaluating the effect of network construction provided in an embodiment of the present application;

[0024] Figure 5 A flowchart of another method for pre-evaluating the effect of network construction provided in an embodiment of the present application;

[0025] Figure 6 A flowchart of another method for pre-evaluating the effect of network construction provided in an embodiment of the present application;

[0026] Figure 7 A flowchart of another method for pre-evaluating the effect of network construction provided in an embodiment of the present application;

[0027] Figure 8 A schematic diagram of the structure of a network construction effect pre-evaluation device provided in an embodiment of the present application;

[0028] Fig. 9 A schematic diagram of the structure of a network construction effect pre-evaluation device provided in an embodiment of the present application;

[0029] Fig.10 A conceptual partial view of a computer program product provided for an embodiment of the present application. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0031] In this article, the character " / " generally indicates that the objects before and after are in an "or" relationship. For example, A / B can be understood as A or B.

[0032] The terms “first” and “second” in the description and claims of the present application are used to distinguish different objects rather than to describe a specific order of the objects.

[0033] In addition, the terms "including" and "having" and any variations thereof mentioned in the description of this application are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or modules is not limited to the listed steps or modules, but may optionally include other steps or modules that are not listed, or may optionally include other steps or modules that are inherent to these processes, methods, products or devices.

[0034] In addition, in the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present concepts in a specific way.

[0035] Before introducing in detail the method for pre-evaluation of network construction effects provided in the embodiment of the present application, the implementation environment and application scenarios of the embodiment of the present application are first introduced.

[0036] First, the application scenarios of the embodiments of the present application are introduced.

[0037] Network construction effect pre-assessment is an indispensable and critical step before deploying a new network and its infrastructure. It provides operators and network service providers with a forward-looking perspective, through in-depth analysis and prediction, so that they can fully grasp the performance expectations of core elements such as network performance and coverage before formally investing in construction.

[0038] Traditional wireless network analysis, when conducting a preliminary assessment of the network construction effect, is based on the operator collecting MRs corresponding to the area to be built, so as to evaluate the network service quality of the area to be built before the network is built, determine the network demand of the area to be built, and then achieve a preliminary assessment of the network construction effect.

[0039] In other words, the planning and construction of wireless base stations can utilize the wireless coverage field strength information reported by MR in combination with location information to accurately evaluate the basic coverage performance of the existing network, identify coverage gaps or weak coverage areas, and fill coverage gaps through blind spot construction to achieve the purpose of network optimization.

[0040] However, MR data has certain drawbacks, that is, only the coverage information of the cell of the operator can be obtained in the same grid, and the coverage information of the cell of another operator cannot be obtained. In addition, traditional wireless network analysis is mainly through the collection and analysis of key performance indicators (KPI) of the background network management, drive test (DT), call quality test (CQT) and MR data. The data in these analysis methods are mostly from the respective operators, and the DT drive test and CQT test of the traditional test method are all selected for relatively fixed routes or locations. Therefore, the data has the limitations of a single operator and cannot fully simulate the user's real usage environment and scenarios.

[0041] In summary, since the network type corresponding to the collected MR (such as frequency band, mobile communication network type, operator) may be different from the network type to be built, it cannot provide an accurate reference for the network service quality evaluation of the network construction, which in turn affects the determination of the network demand situation in the construction area and reduces the accuracy of the preliminary evaluation of the network construction effect.

[0042] In order to solve the above problems, the embodiment of the present application provides a pre-evaluation method of the network construction effect, and the pre-evaluation method of the network construction effect provided by the embodiment of the present application is applied to the scenario of pre-evaluation of the network construction effect. The embodiment of the present application can be based on the path loss (PL) and antenna gain difference (AGD) between different networks, and can eliminate the differences between the measurement reports of different networks, and then before completing the construction of the network to be constructed in the area to be constructed, the measurement report of the network to be constructed after the construction is completed is simulated based on the measurement reports of other networks in the area to be constructed, and the pre-evaluation of the network service quality after the construction of the network to be constructed is provided with an accurate reference, and the demand for the network to be constructed in the area to be constructed is determined. Therefore, the accuracy of the pre-evaluation of the network construction effect can be improved.

[0043] The implementation environment of the embodiments of the present application is introduced below.

[0044] like Figure 1 As shown, it is a schematic diagram of a communication system provided in an embodiment of the present application, and the communication system may include: a pre-evaluation device 101 and at least one collection device (such as a collection device 102, a collection device 103). The pre-evaluation device 101 may be connected to the collection device 102, the collection device 103 by wire or wirelessly.

[0045] Specifically, the collection device 102 may collect measurement reports of the network served in the area to be constructed, and upload the collected measurement reports to the pre-evaluation device 101. Then, the pre-evaluation device 101 may receive the measurement report from the collection device 102, and modify the measurement report based on the path loss and antenna gain difference between the network to be constructed and the network served by the collection device 102, and then determine the demand for the network to be constructed in the area to be constructed based on the modified measurement report, so as to pre-evaluate the network construction effect of the network to be constructed in the area to be constructed.

[0046] Optionally, the network to be built can be a 5G low-frequency network. Due to the characteristics that the lower the electromagnetic wave spectrum, the stronger the wall penetration ability, the smaller the spatial loss of long-distance propagation, and the stronger the coverage ability. Each operator regards the steeply lower frequency band network as the "golden frequency band", and the "golden frequency band" of each operator is different. However, the bandwidth resources of the low-frequency network are generally small, and the service perception is far less than that of the main bearer network of the 5G medium frequency. There will be a large number of users or resource congestion, resulting in limited user service perception. Therefore, in the high-low frequency networking scenario, the low-frequency network is usually set to a lower priority, that is, when the main frequency band coverage is insufficient, the network will guide users to access the 5G low-frequency network through interoperability configuration. Therefore, how to pre-evaluate the 5G network before the construction of the 5G low-frequency network, so as to carry out the construction of the 5G low-frequency base network in a targeted manner, has become a key issue that operators need to solve. The 5G low-frequency network can be used as a network to be built, so as to effectively enhance network coverage and improve the perception of edge users.

[0047] Similarly, the collection device 103 can collect measurement reports of the network served in the area to be constructed, and upload the collected measurement reports to the pre-evaluation device 101. Then, the pre-evaluation device 101 can receive the measurement report from the collection device 103, and modify the measurement report based on the path loss and antenna gain difference between the network to be constructed and the network served by the collection device 103, and then determine the demand for the network to be constructed in the area to be constructed based on the modified measurement report, so as to pre-evaluate the network construction effect of the network to be constructed in the area to be constructed.

[0048] Optionally, in an embodiment of the present application, the network served by the collection device 102 and the network served by the collection device 103 may be the same network, or the network served by the collection device 102 and the network served by the collection device 103 may be two different networks.

[0049] It should be noted that the embodiments of the present application do not limit the pre-evaluation device (i.e., the pre-evaluation device 101) and the collection device (i.e., the collection device 102, the collection device 103). For example, the pre-evaluation device may be a server, and the collection device may be a base station. For another example, the pre-evaluation device may be a terminal, and the collection device may be a server. For another example, the pre-evaluation device may be a base station, and the collection device may be a core network element.

[0050] The server may be a single physical server or a server cluster consisting of multiple servers. Alternatively, the server cluster may be a distributed cluster. Alternatively, the server may be a cloud server. The embodiments of the present application do not limit the specific implementation of the server.

[0051] The terminal may be a mobile phone, tablet computer, desktop, laptop, handheld computer, notebook computer, ultra-mobile personal computer (UMPC), netbook, etc. with transceiver functions. The present application does not impose any special restrictions on the specific form of the terminal. It may interact with the user through one or more methods such as keyboard, touch pad, touch screen, remote control, voice interaction or handwriting device.

[0052] The base station may include various forms of base stations, such as macro base stations, micro base stations (also called small stations), relay stations, access points, etc. Specifically, it may be an access point (AP) in a wireless local area network (WLAN), a base station (Base Transceiver Station, BTS) in a global system for mobile communications (GSM) or code division multiple access (CDMA), a base station (NodeB, NB) in wideband code division multiple access (WCDMA), an evolved Node B (eNB or eNodeB) in LTE, or a relay station or access point, as well as a base station in a future sixth generation mobile communication technology (6G) network or a base station in a future evolved public land mobile network (PLMN) network, etc.

[0053] The core network elements may include various network functions, such as access and mobility management function (AMF), session management function (SMF), user plane function (UPF), policy control function (PCF), unified data management (UDM), location management function (LMF), etc.

[0054] After introducing the application scenario and implementation environment of the embodiment of the present application, the pre-evaluation method of the network construction effect provided by the embodiment of the present application is introduced in detail in combination with the above-mentioned implementation environment.

[0055] The methods in the following embodiments can all be implemented in the above application scenarios and implementation environments. The embodiments of the present application are described in detail below in conjunction with the accompanying drawings.

[0056] Figure 2 The flowchart of a method for pre-evaluating the effect of network construction provided in an embodiment of the present application is as follows. Figure 2 As shown, the method may include: S201-S204.

[0057] S201: Obtain a measurement report of a constructed network in a target area.

[0058] The target area is an area where a new network (ie, a network to be constructed) is required to be constructed.

[0059] For example, if area A has completed the construction of the fourth generation mobile communication technology (4G) network but has not built the fifth generation mobile communication technology (5G) network, the 5G network is the network to be built and area A is the target area.

[0060] It should be noted that the constructed network is not limited in this embodiment. For example, the constructed network may be a 4G low-frequency network. For another example, the constructed network may be a 5G low-frequency network of a certain operator. For another example, the constructed network may be a 4G medium-frequency network.

[0061] In the embodiment of the present application, the network to be constructed and the constructed network are two different networks, that is, the network type (such as frequency band, mobile communication network type, operator) corresponding to the network to be constructed is different from the network type corresponding to the constructed network.

[0062] For example, the network to be built is a 5G network, and the built network is a 4G network. For another example, the network to be built is a 5G low-frequency network, and the built network is a 4G low-frequency network. For another example, the network to be built is the 5G low-frequency network of operator A, and the built network is the 5G low-frequency network of operator B.

[0063] As a possible implementation manner, the pre-assessment device may interact with a base station corresponding to the constructed network to obtain a measurement report of the constructed network collected by the base station.

[0064] As another possible implementation manner, the pre-assessment device may interact with the server to obtain the measurement report of the constructed network uploaded to the server by the base station corresponding to the constructed network.

[0065] S202: Determine the path loss and antenna gain difference between the constructed network and the network to be constructed in the target area based on the measurement report of the constructed network.

[0066] The path loss between the constructed network and the network to be constructed is used to indicate the deviation between the energy attenuation corresponding to the constructed network and the energy attenuation corresponding to the network to be constructed during wireless signal transmission;

[0067] The antenna gain difference between the constructed network and the network to be constructed is used to measure the deviation of the ability of the antenna of the constructed network and the antenna of the network to be constructed to transmit or receive signals in a specific direction;

[0068] As a possible implementation method, for the path loss between the constructed network and the network to be constructed, the pre-evaluation device can determine the path loss between the constructed network and the network to be constructed based on the frequency of the network to be constructed, the frequency of the constructed network in the measurement report of the constructed network, and the distance between the base station corresponding to the constructed network and the target area.

[0069] As a possible design, the path loss between the constructed network and the network to be constructed can be expressed by the following formulas 1, 2 and 3.

[0070] PL f =[46.3+33.9*LOG(f)-13.82*LOG(25)-(1.1*LOG(f)-0.7)*1.5-(1.56*LOG(f)-0.8)+(44.9-6.55*LOG(25))*LOG(D)+3] Formula 1.

[0071] PL f′ =[46.3+33.9*LOG(f′)-13.82*LOG(25)-(1.1*LOG(f′)-0.7)*1.5-(1.56*LOG(f′)-0.8)+(44.9-6.55*LOG(25))*LOG(D)+3] Formula 2.

[0072] PL f-f′ =PL f -PL f′ Formula three.

[0073] Where f is the frequency of the constructed network, f′ is the frequency of the network to be constructed, D is the distance between the base station corresponding to the constructed network and the target area (or the center point of the target area), PLf2 is the path loss of the constructed network, PL f1 is the path loss of the network to be built.

[0074] It should be noted that f and f′ are calculated uniformly using the COST-231 Hata model (a model used to predict the propagation loss of radio signals in urban environments). For other frequency bands, they can be calculated based on the link budget model actually used in engineering simulation. For example, 3.5 GHz new radio (NR) / 2.1G NR can use the 38.901 urban macro-cellular (Uma) model (a model used to simulate the propagation characteristics of wireless signals in urban macro base station scenarios) or the 36.873Uma model, and these two Uma model versions are different.

[0075] The following is an example of the path loss between the constructed network and the network to be constructed, combining the constructed networks of the above different network types.

[0076] If the network under construction is a 4G low-frequency network frequency point (i.e., f = f2), and the network to be constructed is a 5G low-frequency network frequency point (i.e., f′ = f1), then PL f-f′ is the antenna gain difference between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, which can be expressed as PL f2-f1 .

[0077] If the network under construction is the 5G low-frequency network frequency point of operator B (i.e. f = f3), and the network to be constructed is the 5G low-frequency network frequency point of operator A (i.e. f′ = f1), then PL f-f′ is the antenna gain difference between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, which can be expressed as PL f3-f1 .

[0078] If the network under construction is a 4G medium-frequency network (i.e., f = f4), and the network to be constructed is a 5G low-frequency network (i.e., f′ = f1), then PL f-f′ is the antenna gain difference between the 4G mid-band network frequency point and the 5G low-band network frequency point, which can be expressed as PL f4-f1 .

[0079] Optionally, for the antenna gain difference between the constructed network and the network to be constructed, the pre-evaluation device can determine the antenna gain difference between the constructed network and the network to be constructed based on the frequency of the network to be constructed and the frequency of the constructed network in the measurement report of the constructed network.

[0080] Where f is the frequency of the built network, and f′ is the frequency of the network to be built. f-f′ is the antenna gain difference between the constructed network and the network to be constructed, and AGf-f′ Calculation is performed based on the actual working parameter data of the target area.

[0081] For example, if the network under construction is a 4G low-frequency network frequency point (i.e., f = f2), and the network to be constructed is a 5G low-frequency network frequency point (i.e., f′ = f1), then AG f-f′ is the antenna gain difference between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, which can be expressed as AG f2-f1 .

[0082] If the network under construction is the 5G low-frequency network of operator B (i.e. f = f3), and the network to be constructed is the 5G low-frequency network of operator A (i.e. f′ = f1), then AG f-f′ is the antenna gain difference between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, which can be expressed as AG f3-f1 .

[0083] If the network under construction is a 4G medium-frequency network frequency point (i.e. f = f4), and the network to be constructed is a 5G low-frequency network frequency point (i.e. f′ = f1), then AG f-f′ It is the antenna gain difference between the 4G mid-band network frequency point and the 5G low-band network frequency point, which can be expressed as AG f4-f1 .

[0084] S203: Based on the path loss and the antenna gain difference, the measurement report of the constructed network is processed to obtain the measurement report of the network to be constructed.

[0085] As a possible implementation, the pre-evaluation device may determine a first correction factor for processing the test report based on the path loss and the antenna gain difference. Then, the pre-evaluation device may process the measurement report of the constructed network based on the first correction factor to obtain the measurement report of the network to be constructed.

[0086] It should be noted that the embodiments of the present application do not limit the mathematical relationship between the first correction factor and the path loss and the antenna gain difference. For example, the first correction factor is equal to the sum of the path loss and the antenna gain difference. For another example, the first correction factor is equal to the product of the path loss and the antenna gain difference. For another example, the first correction factor is equal to the difference between the path loss and the antenna gain difference.

[0087] In the embodiment of the present application, when the pre-evaluation device processes the measurement report of the constructed network based on the first correction factor, the pre-evaluation device can process any indicator value and the first correction factor in the measurement report of the constructed network based on a preset calculation method.

[0088] It should be noted that the embodiments of the present application do not limit the preset calculation method. For example, the preset calculation method may be a calculation method for finding a difference. For another example, the preset calculation method may be a calculation method for finding a sum. For another example, the preset calculation method may be a calculation method for finding a product.

[0089] Optionally, in the process of the pre-evaluation device processing any indicator value and the first correction factor in the measurement report of the constructed network based on a preset calculation method, the pre-evaluation device can process each indicator value and the first correction factor in the measurement report of the constructed network based on the preset calculation method corresponding to each indicator in the measurement report of the constructed network.

[0090] Exemplarily, the measurement report may include: indicator A, indicator B and indicator C, and the value of indicator A is 1, the value of indicator B is 2, and the value of indicator C is 3. Among them, the preset calculation method corresponding to indicator A is a calculation method for finding a difference, the preset calculation method corresponding to indicator B is a calculation method for finding a sum, and the preset calculation method corresponding to indicator C is a calculation method for finding a product. If the first correction factor is 0.5, the value of indicator A in the processed measurement report is 0.5 (or -0.5), the value of indicator B is 2.5, and the value of indicator C is 1.5.

[0091] S204: Determine pre-assessment information based on the measurement report of the network to be constructed.

[0092] The pre-assessment information is used to indicate the demand for network construction in the target area.

[0093] It should be noted that, for the process of determining the pre-evaluation information based on the measurement report of the network to be built, reference can be made to the prior art of determining the network service quality in combination with the measurement report to reflect the degree of demand for the network in the network service area, which will not be repeated here.

[0094] The technical solution provided by the above embodiment brings at least the following beneficial effects: by obtaining the measurement report of the constructed network in the target area, the path loss and antenna gain difference between the constructed network and the network to be constructed in the target area are determined. Based on the path loss and antenna gain difference, the measurement report of the constructed network is processed to obtain the measurement report of the network to be constructed. Then the pre-evaluation information is determined, and the pre-evaluation information is used to indicate the demand for the network to be constructed in the target area. That is to say, based on the path loss and antenna gain difference between different networks, the differences between the measurement reports of different networks can be eliminated, and then before the construction of the network to be constructed in the area to be constructed is completed, the measurement report of the network to be constructed after the construction is completed is simulated based on the measurement reports of other networks in the area to be constructed, so as to provide an accurate reference for the pre-evaluation of the network service quality after the construction of the network to be constructed, and determine the demand for the network to be constructed in the area to be constructed. Therefore, the accuracy of the pre-evaluation of the network construction effect can be improved.

[0095] It should be noted that in the process of evaluating the network construction effect in a region, it is necessary to comprehensively consider the network usage experience of each user device, and then refine the evaluation object from the entire region to each user device, so as to improve the reference value of the evaluation results for the network construction effect.

[0096] In some embodiments, Figure 3 As shown, before S203, the network construction effect pre-evaluation method may further include: S301.

[0097] S301: Determine a plurality of first sampling points in a target area.

[0098] The sampling point is the spatial location of the user equipment using the network, and the network type of the first sampling point is an established network.

[0099] It should be noted that, in the embodiment of the present disclosure, the number of the constructed networks may be one, or the number of the constructed networks may be at least two, wherein one constructed network corresponds to a plurality of first sampling points.

[0100] Exemplarily, the target area includes: user equipment A, user equipment B and user equipment C, and the network type of user equipment A and the network type of user equipment B are both operator A (i.e., the network has been built), and the network type of user equipment C is operator B (i.e., the network has been built), then the multiple first sampling points corresponding to operator A include the location where user equipment A is located and the location where user equipment B is located, and the multiple first sampling points corresponding to operator B include the location where user equipment C is located.

[0101] The following description takes the number of networks already built in the target area as one.

[0102] As a possible implementation manner, the pre-evaluation device may obtain DT test data and CQT test data of an already constructed network in the target area, and determine a plurality of first sampling points in the target area.

[0103] It should be noted that the DT test data and the CQT test data are obtained by performing the DT test and the CQT test on a preset route or preset position, so the first sampling point is a sampling point in the preset route or preset position corresponding to the DT test and the CQT test in the target area.

[0104] That is, the first sampling point determined by the DT test and the CQT test is a sampling point obtained by simulating a user equipment for testing at a preset route or a preset location.

[0105] In some embodiments, the measurement report may include: Reference Signal Received Power (RSRP) of the sampling point.

[0106] That is, the measurement report may include the reference signal received power of the user equipment at different locations to the communication network.

[0107] In the embodiment of the present disclosure, S203 may include: S302.

[0108] S302: Based on the path loss and the antenna gain difference, process the reference signal received power of each first sampling point among the multiple first sampling points to obtain the reference signal received power of multiple second sampling points in the target area.

[0109] Among them, one second sampling point corresponds to one first sampling point, the network type of the second sampling point is a network to be built, and the reference signal received power of the second sampling point is equal to the processed reference signal received power of the corresponding first sampling point.

[0110] That is, by correcting the RSRP of the first sampling point, the network type of the first sampling point is simulated from a built network to a network to be built, and the RSRP of the second sampling point corresponding to the network to be built is obtained.

[0111] As a possible implementation, in combination with the above embodiment, the first correction factor corresponding to the reference signal received power may be an RSRP correction factor, and the RSRP correction factor is the sum of the path loss and the antenna gain difference. The pre-evaluation device may sum the reference signal received power of each first sampling point and the RSRP correction factor to obtain the reference signal received power of multiple second sampling points.

[0112] It should be noted that since the reference signal received power will be affected by the penetration loss of the building, in the process of determining the RSRP correction factor, it is necessary to divide the sampling points into two categories: indoor sampling points and outdoor sampling points based on the positions corresponding to different sampling points, and combine the penetration loss of the reference signal received power of the building where the indoor sampling point is located to determine the RSRP correction factor corresponding to each first sampling point.

[0113] As a possible design, the reference signal received power at the second sampling point can be expressed by the following formulas 4 and 5.

[0114]

[0115]

[0116] Among them, RSRP f-f′ is the RSRP correction factor, is the RSRP correction factor corresponding to the outdoor sampling point, is the RSRP correction factor corresponding to the indoor sampling point, Penetration f-f′ is the penetration loss of the building to the reference signal received power, RSRP is the reference signal received power at the first sampling point, and RSRP′ is the reference signal received power at the second sampling point.

[0117] It should be noted that the penetration loss of different frequency bands in different scenarios can be referred to in Table 1 below.

[0118] Table 1 Penetration loss in different frequency bands under different scenarios (unit: dB)

[0119] Scene / Band Dense urban area county seat suburbs rural 700MHz 15 13.5 8.5 5.5 800MHz 15.2 13.7 8.7 5.7 900MHz 15.5 14 9 6 1800MHz 18 16 11 8 2.1GHz 19 17 12 9 2.6GHz 21 19 13.5 10.5 3.5GHz 23 21 15.5 12.5 4.9GHz 26 23 17 14

[0120] In combination with the constructed networks of the above-mentioned different network types, examples are given below of the reference signal received power of the second sampling point of the indoor sampling point category and the reference signal received power of the second sampling point of the outdoor sampling point category between the constructed network and the network to be constructed.

[0121] For example, the network that has been built is a 4G low-frequency network frequency point (i.e., f = f2), and the network to be built is a 5G low-frequency network frequency point (i.e., f′ = f1), then PL f-f′ is the antenna gain difference between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, which can be expressed as PL f2-f1 , A.G. f-f′ is the antenna gain difference between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, which can be expressed as AG f2-f1 RSRP f-f′ It is the RSRP correction factor between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, which can be expressed as RSRP f2-f1 , and it is divided into two situations: indoor sampling points and outdoor sampling points.

[0122] For outdoor sampling points, It represents the RSRP correction factor corresponding to the outdoor sampling point between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, that is, So, is the reference signal received power of the second sampling point between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, which is an outdoor sampling point, and can be expressed as For indoor sampling points, use It represents the RSRP correction factor corresponding to the indoor sampling point between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, that is, So, is the reference signal received power of the second sampling point between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, which is an indoor sampling point, and can be expressed as

[0123] For another example, if the network under construction is the 5G low-frequency network frequency point of operator B (i.e., f=f3), and the network to be constructed is the 5G low-frequency network frequency point of operator A (i.e., f′=f1), then PL f-f′ is the antenna gain difference between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, which can be expressed as PL f3-f1 , A.G. f-f′ is the antenna gain difference between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, which can be expressed as AG f3-f1 RSRP f-f′ It is the RSRP correction factor between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, which can be expressed as RSRP f3-f1 , and it is divided into two situations: indoor sampling points and outdoor sampling points.

[0124] For outdoor sampling points, It represents the RSRP correction factor corresponding to the outdoor sampling point between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, that is, So, is the reference signal received power of the second sampling point between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, which is an outdoor sampling point, and can be expressed as For indoor sampling points, use It represents the RSRP correction factor of the indoor sampling point between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, that is, So, is the reference signal received power of the second sampling point between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, which is an indoor sampling point, and can be expressed as

[0125] For another example, if the network that has been built is a 4G medium-frequency network frequency point (i.e., f = f4), and the network to be built is a 5G low-frequency network frequency point (i.e., f′ = f1), then PL f-f′ is the antenna gain difference between the 4G mid-band network frequency point and the 5G low-band network frequency point, which can be expressed as PL f4-f1 , A.G. f-f′ It is the antenna gain difference between the 4G mid-band network frequency point and the 5G low-band network frequency point, which can be expressed as AG f4-f1 RSRP f-f′It is the RSRP correction factor between the 4G medium-frequency network frequency point and the 5G low-frequency network frequency point, which can be expressed as RSRP f4-f1 , and it is divided into two situations: indoor sampling points and outdoor sampling points.

[0126] For outdoor sampling points, It represents the RSRP correction factor corresponding to the outdoor sampling point between the 4G medium-frequency network frequency point and the 5G low-frequency network frequency point, that is, So, is the reference signal received power of the second sampling point between the 4G medium frequency network frequency point and the 5G low frequency network frequency point, which is an outdoor sampling point, and can be expressed as For indoor sampling points, use It represents the RSRP correction factor corresponding to the indoor sampling point between the 4G medium-frequency network frequency point and the 5G low-frequency network frequency point, that is, So, is the reference signal received power of the second sampling point between the 4G medium frequency network and the 5G low frequency network, which is an indoor sampling point, and can be expressed as

[0127] It can be understood that by correcting the RSRP of the first sampling point, the network type of the first sampling point can be simulated from an established network to a network to be constructed, and the RSRP of the second sampling point corresponding to the network to be constructed can be obtained, so that before the construction of the network to be constructed is completed in the target area, the reference signal receiving power of the user equipment at different locations in the target area for the network to be constructed can be obtained. In this way, the network usage experience of each user equipment can be comprehensively considered, and the evaluation object can be refined from the entire area to each user equipment, providing an accurate reference for the subsequent evaluation of the demand for the construction of the network in the target area, so as to improve the reference value of the evaluation result for the network construction effect.

[0128] In some embodiments, for the above process of determining multiple first sampling points in the target area (ie, S301), the pre-evaluation device may obtain OTT data of each user device in the target area, and determine multiple first sampling points in the target area based on the OTT data of each user device.

[0129] Among them, the pre-evaluation device can obtain all OTT data (i.e., OTT sampling points) in the target area, and determine the OTT data corresponding to each user device based on the user IMEI data in each OTT data. Then, for each user device, based on the location information and time information in each OTT data corresponding to the user device, determine the seventh sampling point of the user device in the target area, and one seventh sampling point corresponds to at least one OTT data. Afterwards, based on the network type in the OTT data corresponding to each seventh sampling point, multiple first sampling points are screened out from multiple seventh samples in the target area.

[0130] It should be noted that the network type in at least one OTT data corresponding to a seventh sampling point may be different. Therefore, in the process of selecting multiple first sampling points from multiple seventh samples of the target area based on the network type in the OTT data corresponding to each seventh sampling point, the pre-evaluation device may use the network type with the highest frequency of occurrence in at least one OTT data corresponding to the seventh sampling point as the network type corresponding to the seventh sampling point.

[0131] Exemplarily, if all OTT data in the target area include: OTT data 1, OTT data 2 and OTT data 3, and OTT data 1 is the OTT data of user device A at position 1 at time 1, OTT data 2 is the OTT data of user device A at position 1 at time 2, and OTT data 3 is the OTT data of user device A at position 2 at time 1, then the sampling point of user device A at position 1 (i.e., the seventh sampling point) corresponds to OTT data 1 and OTT data 2, and the sampling point of user device A at position 2 (i.e., the seventh sampling point) corresponds to OTT data 2.

[0132] Optionally, in the process of the pre-evaluation device taking the network type with the highest frequency of occurrence in at least one OTT data corresponding to the seventh sampling point as the network type corresponding to the seventh sampling point, the pre-evaluation device may preferentially determine the network standard (i.e., mobile communication network type, such as 4G, 5G, 5G low frequency, 5G medium frequency) in the OTT data, and take the operator with the highest frequency of occurrence in the OTT data under the network standard corresponding to the network to be constructed as the corresponding belonging operator of the seventh sampling point, and then determine the network type corresponding to the seventh sampling point. Alternatively, when the network standard in at least one OTT data corresponding to the seventh sampling point is different from the network standard corresponding to the network to be constructed, take the operator with the highest frequency of occurrence in the OTT data under the same network standard as the corresponding belonging operator of the seventh sampling point, and then determine the network type corresponding to the seventh sampling point.

[0133] Exemplarily, the OTT data corresponding to the seventh sampling point include: OTT data 1, OTT data 2, OTT data 3, OTT data 4, OTT data 5, OTT data 6 and OTT data 7. Among them, the network type of OTT data 1 is the 5G low-frequency network of operator A, the network type of OTT data 2 is the 5G low-frequency network of operator A, the network type of OTT data 3 is the 4G network of operator B, the network type of OTT data 4 is the 5G low-frequency network of operator B, the network type of OTT data 5 is the 5G medium-frequency network of operator C, the network type of OTT data 6 is the 4G network of operator B, and the network type of OTT data 7 is the 4G network of operator B. If the network standard corresponding to the network to be built is 5G low-frequency, the network type corresponding to the seventh sampling point is the 5G low-frequency network of operator A. If the network standard corresponding to the network to be built is 5G high-frequency, the network type corresponding to the seventh sampling point is the 4G network of operator B.

[0134] That is to say, the user IMEI data in all OTT data is deduplicated, and all OTT sampling points generated by the user are screened out. The operator name ("OPERATOR" field) (i.e., network type) with the highest frequency of appearance among these network sampling points is recorded as the user's home operator. Alternatively, if there is no sampling point with a preset defined network type (such as 5G) among these OTT sampling points, the operator name with the highest frequency of appearance among the remaining sampling points is recorded as the user's home operator.

[0135] It is understandable that, compared with the first sampling point determined based on DT test data and CQT test data, OTT data can be directly collected from mobile user terminals, and is not limited by the network type of the operator. Therefore, it naturally has the characteristics of full network coverage and can fully understand the coverage situation. As a result, when analyzing wireless networks, full analysis can be performed independently of operators, and competitive analysis can also be performed across operators. At the same time, when OTT data is collected, it is the state of the mobile terminal when actual business occurs, so it can truly restore the user's usage environment and perception, which can be more objective and true, and closer to customer perception.

[0136] It should be noted that the process of switching (or simulating) between different network types will affect the transmission speed and connection quality. In order to ensure the service quality, user experience and effective use of network resources of the network, and to provide an accurate reference for subsequent evaluation of network construction requirements, the following embodiments can be used to obtain data of better sampling points from multiple sampling points for correction.

[0137] In some embodiments, Figure 4 As shown, after S301, the network construction effect pre-evaluation method may further include: S401-S402.

[0138] S401: Determine whether the constructed network is a preset network.

[0139] The switching (or simulation) between the preset network and the network to be constructed has an impact on the transmission speed and the connection quality that is greater than a preset impact threshold.

[0140] That is to say, the switching (or simulation) between the preset network and the network to be constructed has a greater impact on the transmission speed and connection quality.

[0141] As a possible implementation, the pre-evaluation device may store the identifier of the preset network. The pre-evaluation device may determine whether the constructed network is the preset network by comparing the identifier of the constructed network with the identifier of the preset network to see whether they are the same.

[0142] In some embodiments, if the pre-evaluation device determines that the constructed network is not a preset network, the pre-evaluation device may execute S203 .

[0143] In some other embodiments, if the pre-evaluation device determines that the constructed network is a preset network, the pre-evaluation device may execute S402.

[0144] S402: Filter out at least one third sampling point from multiple first sampling points based on a first preset receiving power threshold.

[0145] The reference signal receiving power at the third sampling point is less than the first preset receiving power threshold.

[0146] As a possible implementation manner, the pre-evaluation device may store a first preset receiving power threshold. The pre-evaluation device may determine the magnitude relationship between the reference signal receiving power of each first sampling point among the multiple first sampling points and the first preset receiving power threshold, and take the first sampling point among the multiple first sampling points whose reference signal receiving power is greater than the first preset receiving power threshold as the third sampling point to obtain at least one third sampling point.

[0147] In the embodiment of the present disclosure, the pre-evaluation device may perform S203 based on a third sampling point among the multiple first sampling points. That is, the pre-evaluation device processes the reference signal received power of each third sampling point among the at least one third sampling point based on the path loss and the antenna gain difference to obtain the reference signal received power of the multiple second sampling points.

[0148] It can be understood that by referring to the influence of the transmission speed and the connection quality of switching (or simulating) between different network types, the RSRP of the third sampling point with reference value (i.e., the sampling point whose RSRP is less than the first preset receiving power threshold) among the multiple first sampling points of the network with greater influence (i.e., the preset network) is corrected to achieve the simulation of the network type of the third sampling point from the built network to the network to be built, and obtain the RSRP of the second sampling point corresponding to the network to be built. In this way, the service quality, user experience and effective use of network resources of the network can be ensured, and an accurate reference can be provided for the subsequent evaluation of the construction requirements of the network.

[0149] In some embodiments, the measurement report may further include: a signal to interference plus noise ratio (SINR) and an uplink rate (UL) at a sampling point.

[0150] That is, the measurement report may include the signal to interference plus noise ratio and uplink rate of the user equipment at different locations to the communication network.

[0151] It should be noted that there are differences in the types of indicators included in the measurement reports corresponding to different network types (for example, the measurement report of a 4G cell does not include an SINR value), so that in the process of processing the measurement report, the processed measurement report is not sufficient to provide a complete evaluation reference for the construction needs of other networks.

[0152] In the embodiments of the present disclosure, Figure 5 As shown, after S302, the network construction effect pre-evaluation method may further include: S501.

[0153] S501: For each second sampling point, determine a signal to interference plus noise ratio and an uplink rate of each second sampling point according to a first operation.

[0154] The first operation may include the following steps:

[0155] Step 1: The pre-evaluation device determines a signal to interference plus noise ratio of a target sampling point based on a reference signal received power of the target sampling point and reference signal received powers of a plurality of fourth sampling points.

[0156] The target sampling point is any sampling point among the plurality of second sampling points, and the fourth sampling point is a sampling point among the plurality of second sampling points that is adjacent to the target sampling point.

[0157] As a possible implementation manner, the pre-evaluation device stores a second preset receiving power threshold. The pre-evaluation device can screen out a plurality of fourth sampling points from a plurality of eighth sampling points adjacent to the target sampling point in the plurality of second sampling points based on the second preset receiving power threshold, where the fourth sampling point is a sampling point in which the reference signal receiving power is greater than the second preset receiving power threshold in the plurality of eighth sampling points.

[0158] Exemplarily, the adjacent sampling points of the target sampling point (i.e., the eighth sampling point) include: sampling point A, sampling point B, sampling point C, and sampling point D, and the RSRP of sampling point A is 1, the RSRP of sampling point B is 2, the RSRP of sampling point C is 3, and the RSRP of sampling point D is 4. If the second preset received power threshold is 2.5, the multiple fourth sampling points corresponding to the target sampling point include: sampling point C and sampling point D.

[0159] As a possible design, the signal to interference plus noise ratio of the target sampling point can be expressed by the following formula 6 and formula 7.

[0160]

[0161] PN=10·log 10 (K·T·W)+NF Formula VII.

[0162] Among them, SINR is the signal to interference plus noise ratio of the target sampling point, RSRP′ i is the reference signal received power at the fourth sampling point, n is the number of the fourth sampling points, PN is the white noise constant of the device receiver, K is the Boltzmann constant (i.e., 1.38×10-23J / K), T is the Kelvin temperature (normal temperature is 290K), W is the signal bandwidth, and NF is the receiver noise factor.

[0163] It should be noted that for the LTE system, the subcarrier spacing is 15kHz, the system noise factor NF is 9dB, and according to Formula 7, the system noise floor within a subcarrier bandwidth is approximately -123.22dBm, which can be expressed as PN = 10·log 10 (K·T·W)+NF=10(1.38×10-23J / K*290K*15*1000Nz)+NF=-123.22dBm.

[0164] Optionally, for the NR system, the subcarrier spacing is 30kHz, the system noise factor NF is 10dB, and according to Formula 7, the system noise floor within a subcarrier bandwidth is approximately -119.21dBm, which can be expressed as PN = 10·log 10 (K·T·W)+NF=10(1.38×10-23J / K*290K*30*1000Hz)+NF=-119.21dBm.

[0165] Step 2: The pre-evaluation device determines the uplink rate of the target sampling point based on the reference signal received power and the signal to interference plus noise ratio of the target sampling point.

[0166] As a possible implementation manner, the pre-evaluation device may process the reference signal received power and the signal to interference plus noise ratio of the target sampling point based on a preset calculation method to obtain the uplink rate of the target sampling point.

[0167] Optionally, the preset calculation method between the uplink rate and RSRP and SINR can be obtained by training with sample data consisting of DT test data and CQT test data, and the preset calculation methods corresponding to different scenarios (ie, indoors and outdoors) are also different.

[0168] Exemplarily, the pre-evaluation device can obtain DT test data and CQT test data of the constructed network in the target area, and obtain multi-input fitting curves of the reference signal receiving power, signal to interference plus noise ratio and uplink rate of the target sampling point in both outdoor and indoor scenarios through training.

[0169] As a possible design, the uplink rate of the target sampling point can be expressed by Formula 8, Formula 9 and Formula 10 of the following propagation model weighted algorithm.

[0170] THP UL,室外 =f UL,室外 (RSRP′,SINR)+C UL,室外 Formula eight.

[0171] THP UL,室内 =f UL,室内 (RSRP′,SINR)+C UL,室内 Formula nine.

[0172] f(X, Y) = α X *Ln(X)+α Y *Ln(Y)+β Formula 10.

[0173] Wherein, RSRP′ is the reference signal received power of the second sampling point (such as indoors or outdoors), and SINR is the signal to interference plus noise ratio of the target sampling point (such as indoors or outdoors). UL,室外 is the uplink constant in outdoor conditions, C UL,室内 is the uplink constant for indoor conditions, THP UL,室外 is the uplink rate of the target sampling point in the outdoor scene, THPU UL,室内is the uplink rate of the target sampling point in the indoor scenario, α and β represent the best fitting values ​​of the reference signal received power, signal to interference plus noise ratio and uplink rate of the target sampling point, f UL,室外 (RSRP, SINR) is the mathematical relationship between the reference signal received power and signal to interference plus noise ratio at the target sampling point in the outdoor scenario, f UL,室内 (RSRP, SINR) is the mathematical relationship between the reference signal received power and the signal to interference plus noise ratio at the target sampling point in the indoor scenario.

[0174] In the following, in combination with the reference signal received power of the target sampling point and the signal to interference plus noise ratio of the target sampling point, examples are given of the uplink rate of the target sampling point in different scenarios (such as indoors and outdoors).

[0175] For example, in combination with the above embodiment, the constructed network is a 4G low-frequency network frequency point, and the network to be constructed is a 5G low-frequency network frequency point. For outdoor sampling points, f UL,室外 (RSRP, SINR) is the mathematical relationship between the reference signal received power and the signal to interference plus noise ratio of the target sampling point that is an outdoor sampling point between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, where RSRP is the reference signal received power of the target sampling point that is an outdoor sampling point between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, and SINR is the signal to interference plus noise ratio of the target sampling point that is an outdoor sampling point between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point.

[0176] For indoor sampling points, use f UL,室内 (RSRP, SINR) represents the mathematical relationship between the reference signal received power and signal to interference plus noise ratio of the target sampling point that is classified as an indoor sampling point between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point. RSRP is the reference signal received power of the target sampling point that is classified as an indoor sampling point between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, and SINR is the signal to interference plus noise ratio of the target sampling point that is classified as an indoor sampling point between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point.

[0177] Then, THP UL,室外 is the uplink rate of the target sampling point between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point, which is an outdoor sampling point. UL,室内 It is the uplink rate of the target sampling point of the indoor sampling point category between the 4G low-frequency network frequency point and the 5G low-frequency network frequency point.

[0178] For another example, in combination with the above embodiment, the constructed network is the 5G low-frequency network frequency point of operator B, and the network to be constructed is the 5G low-frequency network frequency point of operator A. For outdoor sampling points, f UL,室外(RSRP, SINR) is the mathematical relationship between the reference signal received power and the signal to interference plus noise ratio of the target sampling point that is an outdoor sampling point between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, where RSRP is the reference signal received power of the target sampling point that is an outdoor sampling point between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, and SINR is the signal to interference plus noise ratio of the target sampling point that is an outdoor sampling point between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A.

[0179] For indoor sampling points, use f UL,室内 (RSRP, SINR) represents the mathematical relationship between the reference signal received power and signal to interference plus noise ratio of the target sampling point that is classified as an indoor sampling point between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A. RSRP is the reference signal received power of the target sampling point that is classified as an indoor sampling point between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, and SINR is the signal to interference plus noise ratio of the target sampling point that is classified as an indoor sampling point between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A.

[0180] Then, THP UL,室外 is the uplink rate of the target sampling point with the outdoor sampling point category between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A, THP UL,室内 It is the uplink rate of the target sampling point of the indoor sampling point category between the 5G low-frequency network frequency point of operator B and the 5G low-frequency network frequency point of operator A.

[0181] For another example, in combination with the above embodiment, the network that has been built is a 4G medium-frequency network frequency point, and the network to be built is a 5G low-frequency network frequency point. For outdoor sampling points, f UL,室外 (RSRP, SINR) is the mathematical relationship between the reference signal received power and the signal to interference plus noise ratio of the target sampling point that is classified as an outdoor sampling point between the 4G medium frequency network frequency point and the 5G low frequency network frequency point, where RSRP is the reference signal received power of the target sampling point that is classified as an outdoor sampling point between the 4G medium frequency network frequency point and the 5G low frequency network frequency point, and SINR is the signal to interference plus noise ratio of the target sampling point that is classified as an outdoor sampling point between the 4G medium frequency network frequency point and the 5G low frequency network frequency point.

[0182] For indoor sampling points, use f UL,室内(RSRP, SINR) represents the mathematical relationship between the reference signal received power and signal to interference plus noise ratio of the target sampling point that is classified as an indoor sampling point between the 4G medium frequency network frequency point and the 5G low frequency network frequency point. RSRP is the reference signal received power of the target sampling point that is classified as an indoor sampling point between the 4G medium frequency network frequency point and the 5G low frequency network frequency point, and SINR is the signal to interference plus noise ratio of the target sampling point that is classified as an indoor sampling point between the 4G medium frequency network frequency point and the 5G low frequency network frequency point.

[0183] Then, THP UL,室外 is the uplink rate of the target sampling point between the 4G medium-frequency network frequency point and the 5G low-frequency network frequency point, which is an outdoor sampling point. UL,室内 It is the uplink rate of the target sampling point of the indoor sampling point category between the 4G medium-frequency network frequency point and the 5G low-frequency network frequency point.

[0184] It can be understood that the signal to interference plus noise ratio of the target sampling point is determined by referring to the reference signal received power of the target sampling point and the reference signal received power of multiple fourth sampling points, and then the uplink rate of the target sampling point is determined based on the reference signal received power and the signal to interference plus noise ratio of the target sampling point. In this way, the problem of differences in the types of indicators included in the measurement reports corresponding to different network types can be solved, so that in the process of processing the measurement report, the processed measurement report can provide a complete evaluation reference for the construction needs of other networks.

[0185] It should be noted that after obtaining measurement reports corresponding to different network types in the area to be constructed, in order to better pre-evaluate the service quality of the network and determine the demand for the network to be constructed in the target area, the data of the second sampling point can be evaluated through the following embodiments.

[0186] In some embodiments, Figure 6 As shown, in the preliminary evaluation method of the network construction effect, S204 may include: S601-S602.

[0187] S601: Filter out at least one fifth sampling point from a plurality of second sampling points based on a first preset rate threshold.

[0188] The uplink rate of the fifth sampling point is greater than the first preset rate threshold.

[0189] As a possible implementation, the pre-evaluation device may store a first preset rate threshold. The pre-evaluation device may determine the magnitude relationship between the uplink rate of each second sampling point and the first preset rate threshold, and take a second sampling point whose uplink rate is greater than the first preset rate threshold among the plurality of second sampling points as a fifth sampling point, thereby obtaining at least one fifth sampling point.

[0190] Exemplarily, the plurality of second sampling points include: sampling point A, sampling point B, and sampling point C, and the uplink rate of sampling point A is 1 / 3 Megabits per second (Mbps), the uplink rate of sampling point B is 1 / 2Mbps, and the uplink rate of sampling point C is 2Mbps. If the first preset rate threshold is 1Mbps, sampling point C is the fifth sampling point.

[0191] S602: Determine pre-evaluation information based on a first ratio between the number of the fifth sampling points and the number of the second sampling points.

[0192] The first ratio is positively correlated with the target area's demand for network construction. The target area's demand for network construction refers to the degree of satisfaction of the network in the area to be constructed in terms of bandwidth rate and coverage.

[0193] That is, the first ratio is the ratio between the number of second sampling points satisfying the uplink rate greater than the first preset rate threshold and the total number of second sampling points. Furthermore, if the number of second sampling points satisfying the uplink rate greater than the first preset rate threshold is greater, the greater the first ratio is, and the higher the degree of satisfaction of the network bandwidth rate in the area to be constructed is.

[0194] For example, if the number of the fifth sampling points is 2 and the number of the second sampling points is 4, the first ratio is If the number of the fifth sampling point is 1, the first ratio is That is, the more the number of fifth sampling points is, the more the number of second sampling points that meet the first preset rate threshold is in the area to be constructed, the larger the first ratio is, and the higher the demand for the network to be constructed in the target area is.

[0195] The following is an example of the number of fifth sampling points between the constructed network and the network to be constructed, in combination with the constructed networks of different network types described above.

[0196] For example, if the constructed network is a 4G low-frequency network frequency point (i.e., f=f2), and the network to be constructed is a 5G low-frequency network frequency point (i.e., f′=f1), then the number of five sampling points is the second sampling point whose uplink rate is greater than Threshold1 (i.e., the first preset rate threshold) as the total number of the fifth sampling points, and M can be used. f2-f1 express.

[0197] If the constructed network is the 5G low-frequency network frequency point of operator B (i.e., f=f3), and the network to be constructed is the 5G low-frequency network frequency point of operator A (i.e., f′=f1), then the number of the five sampling points is the second sampling point whose uplink rate is greater than Threshold1 as the total number of the fifth sampling points, and M can be used. f3-f1 express.

[0198] If the network under construction is a 4G medium-frequency network frequency point (i.e., f = f4), and the network to be constructed is a 5G low-frequency network frequency point (i.e., f′ = f1), then the number of five sampling points is the second sampling point whose uplink rate is greater than Threshold1 as the total number of the fifth sampling points, and M can be used. f4-f1 express.

[0199] In summary, the number of the fifth sampling points is the sum of the second sampling points whose uplink rates are greater than the first preset rate threshold value, which can be expressed as M. f2-f1 +M f3-f1 +M f4-f1 express.

[0200] It can be understood that by determining the ratio of the number of sampling points with better uplink rate for the network to be constructed in the area to be constructed to all sampling points, the usage experience of user equipment in the area to be constructed for the network to be constructed can be simulated, so as to estimate the service quality of the network to be constructed in the construction area after the construction is completed, and then determine the demand for the network to be constructed in the area to be constructed.

[0201] In some embodiments, in the process of determining the pre-evaluation information (i.e., S602) based on the first ratio between the number of fifth sampling points and the number of second sampling points, the pre-evaluation device can determine a first network in the constructed network that is associated with the network to be constructed, and determine the pre-evaluation information based on the number of fifth sampling points, the number of second sampling points, the number of ninth sampling points corresponding to the first network, the number of tenth sampling points in the ninth sampling points whose uplink rate is greater than the third preset rate threshold, and the number of users in the target area of ​​the constructed network.

[0202] As a possible design, the pre-evaluation information may be expressed by the following Formula 11, Formula 12, Formula 13, Formula 14, and Formula 15.

[0203]

[0204]

[0205]

[0206] F1 业务满足度 =[F A +F B +F C ]*100% Formula 14.

[0207]

[0208] Among them, M in the denominator is the number of sampling points, and M in the numerator is the number of all sampling points that meet the uplink rate threshold Threshold1. There are two operators' network coverage in this area, operator A is the local operator, and operator B is a foreign operator. The frequency of the 5G low-frequency network to be built in this area is f1. The number of 5G users of operator A in this target area is N 运营商A,5G , the number of non-5G users of operator A is N 运营商A,非5G , the number of 5G users of operator B is N 运营商B,5G , the number of non-5G users of operator B is N 运营商B,非5G , the number of non-5G users can be the number of 4G users.

[0209] For Formula 11, M f2-f1 Indicates the number of fifth sampling points when the network built in the target area is a 4G low-frequency network frequency point and the network to be built is a 5G low-frequency network frequency point. The 5G medium-frequency network frequency point is the first network, and the M in the numerator 运营商A,5G中频 Indicates the number of the tenth sampling points whose uplink rate is greater than the third preset rate threshold among the ninth sampling points in the first network of the target area of ​​operator A. The M in the denominator 运营商A,5G中频 Indicates the number of the ninth sampling point of operator A. 运营商A,f2 Indicates the number of second sampling points when the network already built in the target area is a 4G low-frequency network frequency point and the network to be built is a 5G low-frequency network frequency point. N 运营商A,5G Indicates the number of 5G users of operator A in the target area, N 运营商A,4G Indicates the number of 4G users of operator A in the target area.

[0210] For Formula 12, M f3-f1 Indicates the number of fifth sampling points when the network already built in the target area is the 5G low-frequency network frequency point of the foreign operator B, and the network to be built is the 5G low-frequency network frequency point of the operator A. The 5G medium-frequency network frequency point is the first network, and the M in the numerator 运营商A,5G中频 Indicates the number of the tenth sampling points whose uplink rate is greater than the third preset rate threshold among the ninth sampling points in the first network of the target area of ​​operator A. The M in the denominator 运营商A,5G中频 Indicates the number of the ninth sampling point of operator A. 运营商A,f3 Indicates the number of second sampling points when the network already built in the target area is the 5G low-frequency network frequency point of the alien operator B and the network to be built is the 5G low-frequency network frequency point of the operator A. N 运营商B,5G Indicates the number of 5G users of different operator B in the target area, N 运营商B,4G Indicates the number of 4G users of operator B in the target area.

[0211] For Formula 13, M f4-f1Indicates the number of fifth sampling points when the network built in the target area is a 4G medium-frequency network frequency point and the network to be built is a 5G low-frequency network frequency point. The 5G medium-frequency network frequency point is the first network, and the M in the numerator 运营商A,5G中频 Indicates the number of the tenth sampling points whose uplink rate is greater than the third preset rate threshold among the ninth sampling points in the first network of the target area of ​​operator A. The M in the denominator 运营商A,5G中频 Indicates the number of the ninth sampling point of operator A. 运营商A,f4 Indicates the number of second sampling points when the network already built in the target area is a 4G medium-frequency network frequency point and the network to be built is a 5G low-frequency network frequency point. N 运营商B,5G Indicates the number of 5G users of different operator B in the target area, N 运营商B,4G Indicates the number of 4G users of operator B in the target area.

[0212] For Formula XIV, F1 业务满足度 Indicates the service satisfaction in three scenarios in the target area.

[0213] For Formula 15, Δ 业务满足度 Indicates the estimated improvement in business satisfaction in the target area under three scenarios.

[0214] It should be noted that in order to achieve an accurate pre-assessment of the network construction effect of the 5G low-frequency network frequency points, priority is given to construction in areas where the effect is most significantly improved, in order to reasonably guide the efficiency of network investment and improve the accuracy of network planning. The above embodiment proposes three scenarios for the target area. In scenario one, there is 4G low-frequency network coverage in the target area. Consider frequency flipping based on existing site resources to form a new 5G low-frequency coverage base network. In scenario two, there is 5G low-frequency network coverage of a different operator in the target area. In scenario three, there is no 4G low-frequency network coverage in the target area, but there is 4G medium-frequency network coverage.

[0215] It should be noted that there is no limitation on the type of network for pre-evaluation of network construction effects. For example, the network for pre-evaluation of network construction effects may be a 5G low-frequency network frequency point, for another example, the network for pre-evaluation of network construction effects may be a 5G medium-frequency network frequency point, for another example, the network for pre-evaluation of network construction effects may be a 4G low-frequency network frequency point.

[0216] It is understandable that by determining the service satisfaction and the estimated improvement in service satisfaction in the area to be constructed, the problem that wireless coverage data is difficult to truly evaluate the actual capabilities of the service can be solved. By strongly correlating the wireless coverage data and service perception, a set of accurate and reasonable service carrying capacity evaluation models can be formed to estimate the service quality of the network to be constructed in the construction area after the construction is completed, and then determine the demand for the construction of the network in the area to be constructed.

[0217] It should be noted that after obtaining measurement reports corresponding to different network types in the area to be constructed, in order to accurately obtain specific location information of the target sampling point, perform better pre-assessment, and increase the demand for network construction in the target area, the data of the second sampling point can be evaluated through the following embodiments.

[0218] In some embodiments, Figure 7 As shown, before S301, the network construction effect pre-evaluation method may further include: S701-S702.

[0219] S701: Rasterize the target area to obtain a plurality of first grids.

[0220] In other words, the scope of the target area is delineated, and the target area is decomposed into grids according to certain area sizes.

[0221] It should be noted that the specification of the first grid when decomposing the grid is not limited. For example, the specification of the target area decomposition may be 50 meters (m) × 50m, for another example, the specification of the target area decomposition may be 50m × 100m, for another example, the specification of the target area decomposition may be 100m × 50m.

[0222] S702: Obtain application service data of each first sampling point.

[0223] It should be noted that, for the process of the pre-evaluation device acquiring the OTT data of the first sampling point, reference may be made to the introduction of collecting OTT data in the prior art, which will not be described in detail here.

[0224] In the embodiment of the present disclosure, S204 may include: S703-S706.

[0225] S703: Position multiple first sampling points in the target area according to the application service data of each first sampling point, and determine the first sampling point in each first grid.

[0226] As a possible implementation manner, the pre-evaluation device can map multiple first sampling points to the target area based on the location information in the OTT data of each first sampling point, and determine the first sampling point in each first grid according to the coverage of each first grid in the target area.

[0227] Optionally, all OTT data within a maintenance cycle (such as 7 days or 14 days) can be taken and decomposed into each grid based on the location information contained in the OTT data (generally the GPS information of the mobile phone). Then, a grid containing all OTT data in the target area can be obtained, a total of M grids.

[0228] It should be noted that the OTT data includes a coordinate information field. Based on the coordinate information field in the OTT data (see the "INDOOR" field in the location information), all grids are classified into two categories: outdoor grids or indoor grids.

[0229] S704: Determine a second ratio corresponding to each first grid based on a second preset rate threshold.

[0230] The second ratio is the ratio between the number of sixth sampling points and the number of second sampling points in the first grid, and the sixth sampling point is a sampling point whose uplink rate is greater than the second preset rate threshold among the multiple second sampling points.

[0231] That is, the second ratio is the ratio between the number of second sampling points satisfying the uplink rate being greater than the second preset rate threshold and the total number of second sampling points.

[0232] As a possible implementation, the pre-evaluation device may store a second preset rate threshold. The pre-evaluation device may determine the magnitude relationship between the uplink rate of each second sampling point and the second preset rate threshold, and take a sampling point whose uplink rate is greater than the second preset rate threshold among the plurality of second sampling points as a sixth sampling point, thereby obtaining at least one sixth sampling point.

[0233] S705. Based on the first preset ratio threshold, select at least one second grid from the plurality of first grids, wherein the second ratio corresponding to the second grid is greater than the first preset ratio threshold.

[0234] As a possible implementation, the pre-evaluation device may store a first preset ratio threshold. The pre-evaluation device may determine the magnitude relationship between the second ratio corresponding to each first grid and the first preset ratio threshold, and take the first grid whose second ratio is greater than the first preset ratio threshold among the plurality of first grids as the second grid, thereby obtaining at least one second grid.

[0235] That is, the second grid is a grid having a larger number of sampling points with a better uplink rate among the plurality of first grids.

[0236] S706: Determine pre-evaluation information according to the distribution of at least one second grid in the target area.

[0237] As a possible implementation, the pre-assessment device may determine the distribution of at least one second grid in the target area based on a third ratio between the number of second grids and the number of first grids in the target area, and then determine the pre-assessment information based on the third ratio. The third ratio is positively correlated with the demand for the network to be constructed in the target area.

[0238] That is to say, if the number of the second grids in the plurality of first grids is greater, the third ratio is greater, and the degree of satisfaction of the network bandwidth rate in the area to be constructed is higher.

[0239] As another possible implementation, the pre-assessment device may determine the corresponding aggregation degree of the second grid in the target area through a clustering algorithm, and determine the distribution of at least one second grid in the target area based on the corresponding aggregation degree of the second grid, and then determine the pre-assessment information according to the corresponding aggregation degree of the second grid. The corresponding aggregation degree of the second grid is positively correlated with the demand for the network to be constructed in the target area.

[0240] That is to say, the greater the corresponding concentration degree of the second grid in the target area, the higher the degree of satisfaction of the network bandwidth rate in the area to be constructed.

[0241] It should be noted that the embodiment of the present application does not limit the degree of aggregation corresponding to the second grid. For example, the degree of aggregation corresponding to the second grid can be determined by the number of clusters corresponding to at least one second grid. For another example, the degree of aggregation corresponding to the second grid can be determined by the number of grids in each cluster corresponding to at least one second grid. For another example, the degree of aggregation corresponding to the second grid can be determined by the number of clusters corresponding to at least one second grid and the number of grids in each cluster.

[0242] In the embodiment of the present application, the pre-evaluation information may be used to indicate the demand for a network to be constructed for a cluster corresponding to at least one second grid in the target area.

[0243] As a possible implementation, based on S602, the business satisfaction of each first grid can be calculated, and each first grid includes at least one second sampling point. The pre-evaluation device can store a preset satisfaction threshold, and the pre-evaluation device can determine the size relationship between the business satisfaction of each first grid and the preset satisfaction threshold, and take the first grid whose business satisfaction is less than the preset satisfaction threshold in the multiple first grids as the third grid, to obtain at least one third grid.

[0244] That is to say, the third grid is a grid with a poorer service satisfaction among the plurality of first grids.

[0245] Optionally, the pre-assessment device may determine the distribution of at least one third grid in the target area based on a fourth ratio between the number of third grids and the number of first grids, and then determine the pre-assessment information according to the fourth ratio, wherein the fourth ratio is negatively correlated with the demand for the network to be constructed in the target area.

[0246] The pre-evaluation device may store a second preset ratio threshold, and the pre-evaluation device may determine the pre-evaluation information by determining the magnitude relationship between the fourth ratio and the second preset ratio threshold. If the third ratio is greater than the second preset ratio threshold, the pre-evaluation information may indicate that the target area has a low demand for the network to be constructed (i.e., the area to be constructed does not need to construct the network to be constructed).

[0247] It should be noted that for some areas in the target area that cannot meet the demand for network construction (i.e., the area corresponding to the third grid in the target area), density clustering methods such as density-based spatial clustering of applications with noise (DBSCAN) can be used to cluster the poor-quality grids (equivalent to determining the distribution of the grids), and focus on increasing site additions and optimizing radio frequencies (RF) in areas where poor-quality grids are densely clustered to improve network coverage, thereby accurately guiding the construction of the network to be constructed.

[0248] It can be understood that by rasterizing the target area, mapping multiple first sampling points to the target area, selecting the second grid and determining the degree of satisfaction of the network bandwidth rate in the area to be constructed based on the ratio relationship between the second ratio corresponding to the second grid and the first preset ratio threshold, the pre-assessment information can also be determined based on the distribution of the target area where the second grid is located. In this way, the specific location information of the target sampling point can be accurately determined, the pre-assessment information can be better obtained, the demand for the network in the area to be constructed can be determined, and the pre-assessment accuracy of the network construction effect in the target area can be higher.

[0249] The above mainly introduces the solution provided by the embodiment of the present application from the perspective of computer equipment. It is understandable that in order to realize the above functions, the computer equipment includes hardware structures and / or software modules corresponding to the execution of each function. Those skilled in the art should easily realize that, in combination with the method steps of pre-evaluation of the network construction effect of each example described in the embodiment disclosed in this application, the present application can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0250] The embodiment of the present application also provides a pre-evaluation device for network construction effect. The pre-evaluation device for network construction effect can be a computer device, a CPU in the above-mentioned computer device, a processing module in the above-mentioned computer device for pre-evaluating network construction effect, or a client in the above-mentioned computer device for pre-evaluating network construction effect.

[0251] The embodiment of the present application can divide the pre-evaluation device of the network construction effect into functional modules or functional units according to the above method example. For example, each functional module or functional unit can be divided corresponding to each function, or two or more functions can be integrated into one processing module. The above integrated module can be implemented in the form of hardware or in the form of software functional modules or functional units. Among them, the division of modules or units in the embodiment of the present application is schematic, which is only a logical function division. There may be other division methods in actual implementation.

[0252] like Figure 8 FIG. 1 is a schematic diagram of a network construction effect pre-evaluation device provided in an embodiment of the present application. The network construction effect pre-evaluation device is used to perform Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 or Figure 7 The network construction effect pre-evaluation method shown in the figure, the network construction effect pre-evaluation device 800 may include: an acquisition module 801 and a processing module 802.

[0253] The acquisition module 801 is used to obtain the measurement report of the constructed network in the target area. The processing module 802 is used to determine the path loss and antenna gain difference between the constructed network and the network to be constructed in the target area based on the measurement report of the constructed network. The processing module 802 is also used to process the measurement report of the constructed network based on the path loss and antenna gain difference to obtain the measurement report of the network to be constructed. The processing module 802 is also used to determine the pre-evaluation information based on the measurement report of the network to be constructed, and the pre-evaluation information is used to indicate the demand for the network to be constructed in the target area.

[0254] Optionally, the measurement report includes: a reference signal received power of a sampling point. The target area includes multiple first sampling points, and the network type of the first sampling point is a constructed network. The processing module 802 is specifically used to process the reference signal received power of each first sampling point in the multiple first sampling points based on the path loss and the antenna gain difference to obtain the reference signal received power of multiple second sampling points in the target area. Among them, one second sampling point corresponds to one first sampling point, the network type of the second sampling point is a network to be constructed, and the reference signal received power of the second sampling point is equal to the reference signal received power of the corresponding first sampling point after processing.

[0255] Optionally, the processing module 802 is further specifically used to select at least one third sampling point from multiple first sampling points based on the first preset receiving power threshold when the constructed network is a preset network, and the reference signal receiving power of the third sampling point is less than the first preset receiving power threshold. Based on the path loss and the antenna gain difference, the reference signal receiving power of each first sampling point in the multiple first sampling points is processed to obtain the reference signal receiving power of multiple second sampling points in the target area, including: based on the path loss and the antenna gain difference, the reference signal receiving power of each third sampling point in the at least one third sampling point is processed to obtain the reference signal receiving power of the multiple second sampling points.

[0256] Optionally, the measurement report also includes: the signal to interference plus noise ratio and the uplink rate of the sampling point. The processing module 802 is also specifically used to determine the signal to interference plus noise ratio and the uplink rate of each second sampling point according to the first operation for each second sampling point, and the first operation includes: Based on the reference signal received power of the target sampling point and the reference signal received power of multiple fourth sampling points, the signal to interference plus noise ratio of the target sampling point is determined, the target sampling point is any sampling point among the multiple second sampling points, and the fourth sampling point is a sampling point adjacent to the target sampling point among the multiple second sampling points. Based on the reference signal received power and the signal to interference plus noise ratio of the target sampling point, the uplink rate of the target sampling point is determined.

[0257] Optionally, the processing module 802 is further configured to select at least one fifth sampling point from the plurality of second sampling points based on a first preset rate threshold, wherein the uplink rate of the fifth sampling point is greater than the first preset rate threshold, and determine the pre-evaluation information based on a first ratio between the number of the fifth sampling points and the number of the second sampling points, wherein the first ratio is positively correlated with the demand for the network to be constructed in the target area.

[0258] Optionally, the processing module 802 is also specifically used to grid the target area to obtain multiple first grids. Obtain application service data for each first sampling point. According to the application service data of each first sampling point, locate the multiple first sampling points in the target area, and determine the first sampling point in each first grid. Based on the measurement report of the network to be constructed, determine the pre-evaluation information, including: based on the second preset rate threshold, determine the second ratio corresponding to each first grid, the second ratio is the ratio between the number of sixth sampling points in the first grid and the number of second sampling points, and the sixth sampling point is a sampling point among the multiple second sampling points whose uplink rate is greater than the second preset rate threshold. Based on the first preset ratio threshold, filter out at least one second grid from the multiple first grids, and the second ratio corresponding to the second grid is greater than the first preset ratio threshold. Determine the pre-evaluation information based on the distribution of at least one second grid in the target area.

[0259] Fig. 9 The present invention is a schematic diagram of a network construction effect pre-evaluation device according to an exemplary embodiment. The device may include a processor 902, and the processor 902 is used to execute application code to implement the network construction effect pre-evaluation method in the present application.

[0260] The processor 902 may be a CPU, a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits for controlling the execution of the program of the present application.

[0261] like Fig. 9 As shown, the network construction effect pre-evaluation device may further include a memory 903. The memory 903 is used to store application program codes for executing the solution of the present application, and is controlled by the processor 902 for execution.

[0262] The memory 903 may be a read-only memory (ROM) or other types of static storage devices that can store static information and instructions, a random access memory (RAM) or other types of dynamic storage devices that can store information and instructions, or an electrically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, optical disc storage (including compressed optical disc, laser disc, optical disc, digital versatile disc, Blu-ray disc, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto. The memory 903 may exist independently and be connected to the processor 902 via the bus 904. The memory 903 may also be integrated with the processor 902.

[0263] like Fig. 9 As shown, the network construction effect pre-assessment device may further include a communication interface 901, wherein the communication interface 901, the processor 902, and the memory 903 may be coupled to each other, for example, via a bus 904. The communication interface 901 is used to perform information interaction with other devices, for example, to support information interaction between the network construction effect pre-assessment device and other devices.

[0264] It should be pointed out that Fig. 9 The equipment structure shown in the figure does not constitute a limitation on the pre-evaluation equipment for the network construction effect, except Fig. 9 In addition to the components shown, the network construction effect preliminary assessment device may include more or fewer components than shown in the figure, or combine certain components, or have different component arrangements.

[0265] In actual implementation, the functions implemented by the processing module 802 can be Fig. 9 The processor 902 shown calls the program code in the memory 903 to implement.

[0266] The present application also provides a computer-readable storage medium, on which instructions are stored, and when the instructions in the computer-readable storage medium are executed by a processor of a computer device, the computer can execute the pre-evaluation method of the network construction effect provided in the above-mentioned embodiment. For example, the computer-readable storage medium may be a memory 903 including instructions, and the above instructions may be executed by a processor 902 of a computer device to complete the above method. Optionally, the computer-readable storage medium may be a non-temporary computer-readable storage medium, for example, a non-temporary computer-readable storage medium may be a ROM, RAM, CD-ROM, magnetic tape, floppy disk, optical data storage device, etc.

[0267] Fig.10 A conceptual partial view of a computer program product provided by an embodiment of the present application is exemplarily shown, where the computer program product includes a computer program for executing a computer process on a computing device.

[0268] In one embodiment, the computer program product is provided using a signal bearing medium 1000. The signal bearing medium 1000 may include one or more program instructions that, when executed by one or more processors, may provide the above-described Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 or Figure 7 Thus, for example, reference to Figure 2 In the embodiment shown in , one or more features of S201 to S204 may be undertaken by one or more instructions associated with the signal bearing medium 1000. In addition, Fig.10 The program instructions in also describe example instructions.

[0269] In some examples, the signal bearing medium 1000 may include a computer readable medium 1001, such as, but not limited to, a hard drive, a compact disk (CD), a digital video disk (DVD), a digital tape, a memory, a read-only memory (ROM) or a random access memory (RAM), and the like.

[0270] In some implementations, the signal bearing medium 1000 may include a computer recordable medium 1002 such as, but not limited to, a memory, a read / write (R / W) CD, R / W, DVD, or the like.

[0271] In some implementations, signal bearing medium 1000 may include communication medium 1003 such as, but not limited to, digital and / or analog communication media (eg, fiber optic cables, waveguides, wired communication links, wireless communication links, etc.).

[0272] The signal bearing medium 1000 may be communicated by a wireless form of communication medium 1003. The one or more program instructions may be, for example, computer executable instructions or logic implemented instructions.

[0273] In some examples, such as for Figure 8 The described network construction effect pre-assessment apparatus may be configured to provide various operations, functions, or actions in response to one or more program instructions in the computer-readable medium 1001 , the computer-recordable medium 1002 , and / or the communication medium 1003 .

[0274] Through the description of the above implementation methods, technical personnel in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional modules is used as an example. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the device can be divided into different functional modules to complete all or part of the functions described above.

[0275] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of modules or units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another device, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0276] The units described as separate components may or may not be physically separated, and the components shown as units may be one physical unit or multiple physical units, that is, they may be in one place or distributed in multiple different places. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0277] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0278] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a readable storage medium. Based on this understanding, the technical solution of the embodiment of the present application is essentially or the part that contributes to the prior art or the full classification part or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium, including a number of instructions to enable a device (which can be a single-chip microcomputer, chip, etc.) or a processor (processor) to execute the full classification part or part of the steps of each embodiment method of the present application. The aforementioned storage medium includes various media that can store program codes, such as-U disk, mobile hard disk, ROM, RAM, disk or CD.

[0279] The above are only specific implementations of the present application, but the protection scope of the present application is not limited thereto, and any changes or substitutions within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A method for pre-evaluating the effect of network construction, characterized in that: The method comprises: Obtain measurement reports of established networks in the target area; Determine, based on the measurement report of the constructed network, a path loss and an antenna gain difference between the constructed network and the network to be constructed in the target area; Processing the measurement report of the constructed network based on the path loss and the antenna gain difference to obtain the measurement report of the network to be constructed; Based on the measurement report of the network to be constructed, pre-evaluation information is determined, where the pre-evaluation information is used to indicate the demand of the target area for the network to be constructed.

2. The method according to claim 1, characterized in that The measurement report includes: a reference signal received power of a sampling point; the target area includes a plurality of first sampling points, and the network type of the first sampling points is the constructed network; The processing of the measurement report of the constructed network based on the path loss and the antenna gain difference to obtain the measurement report of the network to be constructed includes: Based on the path loss and the antenna gain difference, processing the reference signal received power of each first sampling point among the multiple first sampling points to obtain the reference signal received power of multiple second sampling points in the target area; Among them, one second sampling point corresponds to one first sampling point, the network type of the second sampling point is the network to be built, and the reference signal received power of the second sampling point is equal to the processed reference signal received power of the corresponding first sampling point.

3. The method according to claim 2, characterized in that After obtaining the measurement report of the constructed network in the target area, the method further includes: In a case where the constructed network is a preset network, based on a first preset reception power threshold, at least one third sampling point is selected from the plurality of first sampling points, and a reference signal reception power of the third sampling point is less than the first preset reception power threshold; The processing, based on the path loss and the antenna gain difference, of the reference signal received power of each first sampling point among the multiple first sampling points to obtain the reference signal received power of multiple second sampling points in the target area includes: Based on the path loss and the antenna gain difference, the reference signal received power of each third sampling point in the at least one third sampling point is processed to obtain the reference signal received power of the multiple second sampling points.

4. The method according to claim 2, characterized in that: The measurement report also includes: signal to interference plus noise ratio and uplink rate at the sampling point; The step of processing the measurement report of the constructed network based on the path loss and the antenna gain difference to obtain the measurement report of the network to be constructed further includes: For each of the second sampling points, determining a signal to interference plus noise ratio and an uplink rate of each of the second sampling points according to a first operation, wherein the first operation includes: determining a signal to interference plus noise ratio of the target sampling point based on a reference signal received power of the target sampling point and reference signal received powers of a plurality of fourth sampling points, wherein the target sampling point is any sampling point among the plurality of second sampling points, and the fourth sampling point is a sampling point among the plurality of second sampling points adjacent to the target sampling point; An uplink rate of the target sampling point is determined based on a reference signal received power and a signal to interference plus noise ratio of the target sampling point.

5. The method according to claim 4, characterized in that The determining of pre-assessment information based on the measurement report of the network to be constructed includes: Based on a first preset rate threshold, selecting at least one fifth sampling point from the plurality of second sampling points, wherein the uplink rate of the fifth sampling point is greater than the first preset rate threshold; The pre-evaluation information is determined based on a first ratio between the number of the fifth sampling points and the number of the second sampling points, wherein the first ratio is positively correlated with the demand of the target area for the network to be constructed.

6. The method according to claim 4, characterized in that The method further comprises: rasterizing the target area to obtain a plurality of first grids; Acquire application service data of each of the first sampling points; Positioning the plurality of first sampling points in the target area according to the application service data of each of the first sampling points, and determining the first sampling point in each of the first grids; The determining of pre-assessment information based on the measurement report of the network to be constructed includes: Based on a second preset rate threshold, determining a second ratio corresponding to each of the first grids, where the second ratio is a ratio between the number of sixth sampling points in the first grid and the number of the second sampling points, and the sixth sampling point is a sampling point among the plurality of second sampling points whose uplink rate is greater than the second preset rate threshold; Based on a first preset ratio threshold, selecting at least one second grid from the plurality of first grids, wherein a second ratio corresponding to the second grid is greater than the first preset ratio threshold; The pre-evaluation information is determined according to the distribution of the at least one second grid in the target area.

7. A pre-evaluation device for network construction effect, characterized in that: The device comprises: An acquisition module, used to obtain measurement reports of networks that have been built in the target area; A processing module, configured to determine a path loss and an antenna gain difference between the constructed network and the network to be constructed in the target area based on a measurement report of the constructed network; The processing module is further used to process the measurement report of the constructed network based on the path loss and the antenna gain difference to obtain the measurement report of the network to be constructed; The processing module is further used to determine pre-evaluation information based on the measurement report of the network to be constructed, where the pre-evaluation information is used to indicate the demand of the target area for the network to be constructed.

8. A pre-evaluation device for network construction effect, characterized in that: include: Processor and memory; The processor is coupled to the memory; The memory is used to store one or more programs, and the one or more programs include computer execution instructions. When the network construction effect pre-assessment device is running, the processor executes the computer execution instructions stored in the memory to enable the network construction effect pre-assessment device to perform the method as described in any one of claims 1-6.

9. A computer-readable storage medium, wherein instructions are stored in the computer-readable storage medium, characterized in that: When a computer executes the instructions, the computer performs the method according to any one of claims 1 to 6.

10. A computer program product, characterized in that The computer program product comprises computer program instructions, which implement the method according to any one of claims 1 to 6 when the computer program instructions are executed.

Citation Information

Patent Citations

  • Method for generating system simulation traffic channel position according to MR information

    CN104703208A

  • Base station addressing method, apparatus and device, and storage medium

    CN109462855A

  • A network site planning method and device

    CN109788488A

  • Network structure evaluation method and device, electronic equipment and storage medium

    CN115442813A

  • Base station performance evaluation method and device, equipment and storage medium

    CN115843039A