Method for replacing small-size part attached to cabin crane

By relying on the small-size parts replacement method of the nacelle crane, the problems of high cost and complex construction in traditional methods are solved, efficient repair of small-size parts of offshore wind power is achieved, the construction steps and ship machine requirements are simplified, and the repair efficiency is improved.

CN118757326APending Publication Date: 2024-10-11中交海峰风电发展股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411071429.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The traditional small-size component replacement method relies on self-elevating platform ships, which has high costs, complicated construction procedures, and strict requirements on sea geological conditions and water depth, which affects the repair efficiency.

Method used

The small-size parts replacement method that relies on the engine room crane is adopted. The transport ship is carried to the designated position, and the engine room crane is used to remove, install and restore the components. This avoids the use of large construction ships and simplifies the construction steps and ship machine requirements.

Benefits of technology

It reduces construction costs and time, improves the repair efficiency of small-sized parts, avoids special requirements for sea areas and water depths, and simplifies construction procedures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757326A_ABST
    Figure CN118757326A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of offshore wind power fan component replacement, and discloses a small-size component replacement method attached to a cabin crane, which comprises the following steps: S1, construction preparation; s2, the transport ship enters a point; s3, cabin components are dismantled; s4, a cabin cover and old small-size components are disassembled; s5, new small-size components and a cabin cover are installed; s6, cabin components are recovered; and S7, debugging and recovering. According to the method for replacing the small-size parts attached to the engine room crane, the crane is located at the fan engine room, construction can be conducted without relying on large construction ships such as external ships and crane ships, no special requirements for sea water depth, seabed geological conditions and the like exist, relying on large self-elevating platform ships is avoided, the requirement for ship machines is low, meanwhile, construction steps are simple, and construction cost is low. The steps of pile inserting and pulling, pre-pressing and pressure stabilizing and the like of a large workboat such as a self-elevating platform are avoided, the operation time is shortened, and the repairing efficiency of the small-size component of the fan is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of replacing offshore wind turbine components, and in particular to a method for replacing small-sized components attached to a nacelle crane. Background Art

[0002] Offshore wind power has developed rapidly and has become an important part of the global clean energy market. Compared with onshore wind power, offshore wind power has more stable wind resources, higher annual average utilization hours, closer to the power consumption market, and does not occupy arable land. It has developed rapidly in recent years. By the end of March 2024, the country's cumulative offshore wind power grid-connected capacity reached 38.03 million kilowatts. With more and more offshore wind farms entering the operation period, offshore wind turbines will inevitably have certain quality problems. According to relevant statistics, among the causes of offshore wind turbine failures, failures of small-size components such as wind turbine gearboxes and generators account for a high proportion, which affects the downtime of wind turbines for a long time and has a significant impact on the power generation of wind turbines. Therefore, small-size component replacement technology has received more and more attention.

[0003] The traditional method of replacing small-sized components generally relies on a self-elevating platform ship, using the stable platform created by the platform ship standing on piles for construction. It has high requirements for ship machinery, high costs, and complex construction procedures. Before the platform ship moves into position, it is also necessary to conduct sea sweeping and other preparatory work in the construction area. It has strict requirements on the geological conditions and water depth of the sea area. The construction preparation stage takes a long time, which greatly affects the repair efficiency of small-sized components.

[0004] In order to solve the above technical problems, a method for replacing small-sized components attached to a nacelle crane is proposed. Summary of the invention

[0005] In view of the deficiencies of the prior art, the present invention provides a method for replacing small-sized components attached to a nacelle crane, which solves the problems mentioned in the above background.

[0006] The present invention provides the following technical solution: a method for replacing a small-sized component attached to a nacelle crane, comprising the following steps:

[0007] Step S1, construction preparation, prepare various tools and rigging for construction;

[0008] Step S2, the transport ship approaches the designated position of the aircraft to be repaired according to the planned approach route;

[0009] Step S3, removing cabin components;

[0010] Step S4, removing the nacelle cover and old small-sized components;

[0011] Step S5, installing new small-sized components and the nacelle cover;

[0012] Step S6, restoring cabin components;

[0013] Step S7, debugging and recovery.

[0014] Preferably, the step S1 includes:

[0015] Step S11, surveying the sea areas within the offshore wind farm and the required navigation channels to ensure smooth navigation and normal operation of ship equipment;

[0016] Step S12: The small-sized components are transferred to a transport ship and secured.

[0017] Preferably, in step S2, the machine position has an operating platform and has enough space to place the small-sized components, and the small-sized components are hoisted onto the operating platform.

[0018] Preferably, in step S2, the machine position has no operating platform or does not have a sufficient area, and the transport ship is anchored at a designated location to facilitate the lifting of small-sized components.

[0019] Preferably, the step S3 includes:

[0020] Step S31, safety preparation work, remotely shut down the fan, change the "remote / local" handle of the control cabinet from "remote" to "local", change the "automatic / maintenance" handle of the cabin fire control cabinet from "automatic" to "maintenance", switch the valve of the cabin main hydraulic station from "running" to "maintenance", and lock the mechanical lock of the fan impeller high-speed shaft;

[0021] Step S32, removing relevant components in the cabin.

[0022] Preferably, the step S4 includes:

[0023] Step S41, removing the fasteners related to the nacelle cover;

[0024] Step S42, opening the cabin upper cover;

[0025] Step S43, disassembling small-sized component fasteners;

[0026] Step S44, assembling the sling;

[0027] Step S45, lifting the small-sized components to the deck or operating platform;

[0028] When using the crane on the wind turbine to lift small-sized components, the load should be calculated.

[0029] Preferably, when lifting the small-sized components, no less than 2 guy ropes should be provided to prevent the small-sized components from shaking or colliding with the tower. After the small-sized components are lifted to the deck, fixing measures should be taken in time; after being lifted to the wind turbine operating platform, they should be transferred to the deck and fixed in time.

[0030] Preferably, the step S5 includes:

[0031] Step S51, assembling the sling;

[0032] Step S52, lifting the small-sized component to the cabin;

[0033] Step S53, installing small-size component fasteners;

[0034] Step S54, closing the cabin upper cover;

[0035] Step S55, reinstalling the fasteners related to the nacelle cover;

[0036] When lifting small-sized components, no less than 2 guy ropes should be used to prevent the small-sized components from shaking or colliding with the tower.

[0037] Preferably, in step S6,

[0038] Restore the components removed earlier in the cabin. The restoration process is carried out in reverse order of the removal steps. Small-sized components are reinstalled in place. The relevant connecting bolts are tightened with a hydraulic wrench before the slings can be removed.

[0039] Preferably, in step S7,

[0040] After the replacement is completed, on-site debugging work is carried out. After completing all debugging work, the entire small-size component replacement site is cleaned and the entire fan is checked, especially the control cabinet, the inside of the hub, etc., the high-speed and low-speed wind wheel locks are released, and the high-speed hydraulic brake is in automatic working state. Finally, according to the power-off sequence, the fan is powered on in reverse.

[0041] Compared with the prior art, the present invention has the following beneficial effects:

[0042] In the present invention, the crane is located at the wind turbine cabin, so that construction can be carried out without relying on external ships, crane ships and other large construction vessels, and there are no special requirements for the water depth, seabed geological conditions, etc. It does not rely on large self-elevating platform ships, has low requirements on ship machinery, and is convenient for controlling construction time. At the same time, the construction steps are simple, avoiding the steps of inserting and removing piles, pre-pressing and stabilizing pressure, etc. of large construction ships such as self-elevating platforms, thereby improving construction efficiency and improving the repair efficiency of small-sized components. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a flow chart of the present invention;

[0044] Figure 2 Prepare a flow chart for the construction of the present invention;

[0045] Figure 3 This is a flow chart of the removal of cabin components of the present invention;

[0046] Figure 4 It is a flow chart of the removal of the nacelle cover and old small-sized parts of the present invention;

[0047] Figure 5 This is a flowchart for installing the new small-size components and the nacelle cover of the present invention;

[0048] Figure 6 It is a schematic diagram of the lifting structure of small-sized components attached to the cabin crane of the present invention.

[0049] In the figure: 1. Transport ship; 2. Small-sized parts; 3. Crane; 4. Engine room; 5. Guy rope. DETAILED DESCRIPTION

[0050] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0051] See also Figure 1-5 A method for replacing a small-sized component attached to a nacelle crane comprises the following steps:

[0052] Step S1, construction preparation, prepare various tools and rigging for construction;

[0053] Step S2, the transport ship 1 approaches the designated position of the aircraft to be repaired according to the planned approach route;

[0054] Step S3, removing components of the nacelle 4;

[0055] Step S4, the nacelle 4 cover and the old small-sized component 2 are removed;

[0056] Step S5, installing the new small-size component 2 and the nacelle 4 cover;

[0057] Step S6, the cabin 4 components are restored;

[0058] Step S7, debugging and recovery.

[0059] Step S1 includes:

[0060] Step S11, surveying the sea areas within the offshore wind farm and the required navigation channels to ensure smooth navigation and normal operation of ship equipment;

[0061] Step S12, the small-sized components 2 are transferred to the transport ship 1 and fixed.

[0062] In step S2, the machine position has an operating platform and has enough space to place the small-sized component 2, and the small-sized component 2 is hoisted onto the operating platform.

[0063] In step S2 , if the machine position has no operating platform or does not have a sufficient area, the transport ship 1 is anchored at a designated location to facilitate the lifting of the small-sized component 2 .

[0064] Step S3 includes:

[0065] Step S31, safety preparation work, remotely shut down the fan, change the "remote / local" handle of the control cabinet from "remote" to "local", change the "automatic / maintenance" handle of the fire control cabinet in the engine room 4 from "automatic" to "maintenance", switch the valve of the main hydraulic station in the engine room 4 from "running" to "maintenance", and lock the mechanical lock of the high-speed shaft of the fan impeller;

[0066] Step S32, relevant components in the nacelle 4 are removed.

[0067] In a specific embodiment, the replaced component is the gearbox, and the dismantling of related components in the cabin mainly includes dismantling of the coupling guard, dismantling of the coupling intermediate, draining of the gearbox, removal of the gearbox fixing pile bolts, unfastening of the cable bracket fixing cables, dismantling of the oil pipe, dismantling of the slip ring wiring and slip ring, dismantling of the floor and support beam, dismantling of the cover ring and dismantling of the clamping ring, etc.

[0068] Step S4 includes:

[0069] Step S41, removing the fasteners related to the nacelle 4 cover;

[0070] Step S42, opening the upper cover of the nacelle 4;

[0071] Step S43, disassembling the fastener of the small-sized component 2;

[0072] Step S44, assembling the sling;

[0073] Step S45, lifting the small-sized component 2 to the deck or operating platform surface;

[0074] When using the crane 3 on the wind turbine to lift the small-sized component 2, the load should be calculated.

[0075] When lifting the small-sized component 2, no less than two guy ropes 5 should be provided to prevent the small-sized component 2 from shaking or colliding with the tower. After the small-sized component 2 is lifted to the deck, fixing measures should be taken in time; after being lifted to the wind turbine operating platform, it should be transferred to the deck and fixed in time.

[0076] Step S5 includes:

[0077] Step S51, assembling the sling;

[0078] Step S52, lifting the small-sized component 2 to the nacelle 4;

[0079] Step S53, installing the fasteners of the small-sized component 2;

[0080] Step S54, closing the upper cover of the nacelle 4;

[0081] Step S55, reinstalling the fasteners related to the nacelle 4 cover;

[0082] When the small-sized component 2 is lifted, no less than two guy ropes 5 should be provided to prevent the small-sized component 2 from shaking or colliding with the tower.

[0083] In step S6, the components previously removed from the nacelle 4 are restored. The restoration process is carried out in reverse order of the removal process. The small-sized components 2 are reinstalled in place, and the related connecting bolts are tightened with a hydraulic wrench before the slings can be removed.

[0084] In a specific embodiment, the replaced parts are the gearbox, the coupling intermediate body and the gearbox. After the oiling is completed, the generator is aligned, and then the coupling cover is installed. The reinstallation and wiring process should be reinstalled according to the records during removal to prevent equipment failure caused by wrong connection.

[0085] In step S7, after the replacement is completed, on-site debugging work is carried out. After all debugging work is completed, the entire small-size component 2 replacement operation site is cleaned, and the entire fan is checked, especially the control cabinet, the inside of the hub, etc., the high-speed and low-speed wind wheel locks are released, and the high-speed hydraulic brake is in automatic working state. Finally, according to the power-off sequence, the fan is powered on in reverse.

[0086] The crane 3 is located at the wind turbine nacelle 4, and construction can be carried out without relying on external ships, crane ships and other large construction ships. There are no special requirements for the water depth, seabed geological conditions, etc., and it does not rely on large self-elevating platform ships. The requirements for ship machinery are low, and it is convenient to control the construction time. At the same time, the construction steps are simple, avoiding the steps of inserting and removing piles, pre-pressing and stabilizing pressure of large construction ships such as self-elevating platforms, thereby improving construction efficiency and improving the repair efficiency of small-sized components 2.

[0087] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0088] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for replacing small-sized components attached to a nacelle crane, It is characterized in that The following steps are involved: Step S1, construction preparation, prepare various tools and rigging for construction; Step S2, the transport ship (1) approaches the designated position of the aircraft to be repaired according to the planned approach route; Step S3, removing components of the cabin (4); Step S4, the nacelle (4) cover and the old small-sized components (2) are removed; Step S5, installing the new small-sized component (2) and the nacelle (4) cover; Step S6, the cabin (4) components are restored; Step S7, debugging and recovery.

2. A method for replacing small-sized components attached to a nacelle crane according to claim 1, It is characterized in that The step S1 includes: Step S11, surveying the sea areas within the offshore wind farm and the required navigation channels to ensure smooth navigation and normal operation of ship equipment; Step S12, the small-sized components (2) are transferred to the transport ship (1) and fixed.

3. A method for replacing small-sized components attached to a nacelle crane according to claim 1, It is characterized in that In step S2, the machine position has an operating platform and has enough space to place the small-sized component (2), and the small-sized component (2) is hoisted onto the operating platform.

4. A method for replacing small-sized components attached to a nacelle crane according to claim 1, It is characterized in that In step S2, the machine position has no operating platform or does not have a sufficient area, and the transport ship (1) is anchored at a designated location to facilitate the lifting of the small-sized component (2).

5. A method for replacing small-sized components attached to a nacelle crane according to claim 1, It is characterized in that The step S3 includes: Step S31, safety preparation work, remotely shut down the fan, change the "remote / local" handle of the control cabinet from "remote" to "local", change the "automatic / maintenance" handle of the fire control cabinet in the engine room (4) from "automatic" to "maintenance", switch the valve of the main hydraulic station in the engine room (4) from "run" to "maintenance", and lock the mechanical lock of the high-speed shaft of the fan impeller; Step S32, removing relevant components in the cabin (4).

6. A method for replacing small-sized components attached to a nacelle crane according to claim 1, It is characterized in that The step S4 includes: Step S41, removing the fasteners related to the nacelle (4) cover; Step S42, opening the upper cover of the cabin (4); Step S43, disassembling the fasteners of the small-sized component (2); Step S44, assembling the sling; Step S45, lifting the small-sized component (2) to the deck or operating platform; When using the crane (3) on the wind turbine to lift small-sized components (2), the load should be calculated.

7. A method for replacing small-sized components attached to a nacelle crane according to claim 6, It is characterized in that When the small-sized component (2) is lifted, no less than two guy ropes (5) should be provided to prevent the small-sized component (2) from shaking or colliding with the tower. After the small-sized component (2) is lifted to the deck, fixing measures should be taken in time; after it is lifted to the wind turbine operating platform, it should be transferred to the deck and fixed in time.

8. A method for replacing small-sized components attached to a nacelle crane according to claim 1, It is characterized in that The step S5 includes: Step S51, assembling the sling; Step S52, lifting the small-sized component (2) to the cabin (4); Step S53, installing the fasteners of the small-sized component (2); Step S54, closing the upper cover of the nacelle (4); Step S55, reinstalling the relevant fasteners of the cabin (4) cover; When lifting a small-sized component (2), no less than two guy ropes (5) should be provided to prevent the small-sized component (2) from shaking or colliding with the tower.

9. A method for replacing small-sized components attached to a nacelle crane according to claim 1, It is characterized in that In step S6, The components previously removed from the cabin (4) are restored. The restoration process is carried out in reverse order of the removal steps. The small-sized components (2) are reinstalled in place. The relevant connecting bolts are tightened with a hydraulic wrench before the slings can be removed.

10. A method for replacing small-sized components attached to a nacelle crane according to claim 1, It is characterized in that In step S7, After the replacement is completed, on-site debugging work is carried out. After all debugging work is completed, the entire small-size component (2) replacement operation site is cleaned and the entire fan is inspected, especially the control cabinet, the inside of the hub, etc., the high-speed and low-speed wind wheel locks are released, and the high-speed hydraulic brake is in automatic working state. Finally, according to the power-off sequence, the fan is powered on in reverse.