Intelligent building equipment monitoring and early warning system and method

Through the design of the intelligent building equipment monitoring and early warning system, the data collection and preprocessing module is used, combined with the anomaly detection and prediction module, to solve the problem of insufficient adaptability of the early warning system in the existing technology to environmental interference and dynamic changes, and improve the safety of the equipment. performance and maintenance efficiency.

CN118760013AInactive Publication Date: 2024-10-11SUQIAN XUANMING INTELLIGENT EQUIPMENT CO LTD
View PDF 0 Cites 20 Cited by

Patent Information

Application Number
CN202411110880.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing intelligent building equipment monitoring and early warning systems have reduced warning accuracy under the interference of environmental factors, are difficult to adapt to the dynamic changes of different equipment under different working conditions, and lack adaptive capabilities and response speed.

Method used

An intelligent building equipment monitoring and early warning system is designed, including a data acquisition module, a data preprocessing module, anomaly detection module, anomaly prediction module and an early warning trigger module. It collects equipment operating parameters and environmental parameters through sensors and cameras, and performs data preprocessing and Analyze abnormal conditions, classify early warning levels and trigger early warning mechanisms.

Benefits of technology

Significantly improves the safety and reliability of equipment, reduces the probability of unexpected shutdowns and accidents, enables preventive maintenance, and reduces maintenance costs and downtime.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118760013A_ABST
    Figure CN118760013A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent building equipment monitoring and early warning system and method, and relates to the technical field of intelligent building equipment monitoring, the system comprises a monitoring and early warning platform, the monitoring and early warning platform is in communication connection with a data acquisition module, a data preprocessing module, an anomaly detection module, an anomaly prediction module and an early warning trigger module, the modules are in electric signal connection; the data acquisition module is used for acquiring original data of operating parameters and environmental parameters of various devices in a building through a sensor and a camera. According to the invention, the operation parameters and environmental parameters of the equipment are monitored in real time, potential faults and risks are timely discovered and early warned, and the equipment state is deeply analyzed, so that the potential faults and risks are predicted, the safety and reliability of the building equipment are remarkably improved, the probability of accidental shutdown and accidents is reduced, and the safety of the building equipment is improved. And long-term stable operation of building equipment is ensured, and reliable guarantee is provided for various activities in a building.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent building equipment monitoring, and in particular to an intelligent building equipment monitoring and early warning system and method. Background Art

[0002] With the acceleration of urbanization and the increase in building scale and complexity, the security risks inside and outside buildings are also rising. Safety hazards such as fire, theft, and equipment failure pose a threat to the safety of residents' lives and property. Based on the current operation requirements of smart buildings, it is necessary to monitor the operating status of equipment in each link to improve the safety of buildings and ensure the management efficiency of building-related equipment.

[0003] For example, a smart building equipment monitoring and early warning system and method with Chinese patent publication number CN115542825A belongs to the field of monitoring of smart building equipment. The system includes: a processing unit and a control unit; the node operation status of the equipment can be determined by collecting the node signals of the equipment; and based on the operation status, it can be determined whether to issue an early warning and whether the control unit needs to perform braking control.

[0004] In the prior art, the early warning system judges the equipment status by simulating the transformation of node signals and comparing them with the threshold. However, it is easily interfered by environmental factors, which leads to a decrease in the accuracy of the early warning. In addition, it is difficult to make adaptive adjustments according to the dynamic changes of different equipment under different working conditions. The lack of a certain degree of early warning flexibility limits the response capability. Therefore, how to improve the adaptability and response speed of the early warning system under different factors is a problem we need to solve. To this end, an intelligent building equipment monitoring and early warning system and method are proposed. Summary of the invention

[0005] The purpose of the present invention is to provide an intelligent building equipment monitoring and early warning system and method to solve the problems raised in the above background technology.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0007] In a first aspect, a monitoring and early warning system for intelligent building equipment includes a monitoring and early warning platform, wherein the monitoring and early warning platform is communicatively connected to a data acquisition module, a data preprocessing module, an anomaly detection module, an anomaly prediction module, and an early warning triggering module, wherein electrical signals are connected between the modules;

[0008] The data acquisition module is used to collect the raw data of the operating parameters and environmental parameters of various equipment in the building through sensors and cameras, including temperature, humidity, pressure, vibration, current, voltage, and mark various data categories of the raw data, wherein the raw data includes historical data and real-time data;

[0009] The data preprocessing module is used to store the collected raw data in the data warehouse and preprocess the raw data, including data cleaning, filtering, denoising, etc., to improve the accuracy and reliability of subsequent data analysis, receive the raw data of operating parameters and environmental parameters of various equipment in the building from the data acquisition module, and store the received data in the data warehouse for subsequent processing and analysis; preprocess the raw data, including data cleaning, filtering, denoising, etc. The specific process of data cleaning includes deleting data columns or rows that are not related to the data analysis subject, identifying and processing missing values ​​and abnormal values ​​in the data set, normalizing the column names in the data set to avoid duplication of column names or ambiguity, and then sorting the data for subsequent analysis and processing; filtering is used to eliminate noise in the data, making the data smoother and more reliable, suitable for subsequent analysis and modeling, and denoising is used to remove random noise or interference in the data, so as to more accurately reflect the actual status and environmental conditions of the equipment;

[0010] The anomaly detection module is used to extract the abnormal state characteristics of the construction equipment, divide the abnormal warning level, and combine the abnormal state characteristics with the pre-processed raw data to obtain the abnormal state alarm coefficient and analyze the raw data of the construction equipment;

[0011] The anomaly prediction module combines the real-time data and the abnormal state alarm coefficient of the anomaly detection module to identify potential risks in the operation of construction equipment, conducts real-time monitoring and comparison with the operating parameters of the construction equipment, and decides whether to trigger the early warning mechanism based on the anomaly detection results;

[0012] The warning trigger module determines the specific abnormal warning level that triggers the warning mechanism according to the monitoring and analysis results of the abnormal prediction module, and controls and manages according to the corresponding abnormal warning level to generate a warning report.

[0013] A further improvement of the technical solution of the present invention is that: the anomaly detection module includes a data analysis unit, a feature extraction unit and an anomaly analysis unit;

[0014] Wherein, the data analysis unit is used to analyze the pre-processed raw data, and analyze the abnormal state types of the building equipment in the historical data and the severity of each abnormal state type;

[0015] The feature extraction unit is used to extract abnormal state features from historical data and real-time data, divide abnormal warning levels according to the severity of each abnormal state type, and integrate the extracted abnormal state feature data to obtain a data set;

[0016] The abnormality analysis unit obtains the abnormality alarm coefficient based on the extracted abnormality characteristics and the relevant data in the data set, and sets the corresponding abnormality alarm threshold in combination with the abnormality alarm coefficient and the abnormality warning level to evaluate the future operation status and fault type of the building equipment.

[0017] A further improvement of the technical solution of the present invention is that in the data acquisition module, the acquisition process of the original data is:

[0018] Deploy different types of sensors and cameras on related equipment in the building to monitor the operating parameters and environmental parameters of the building equipment, and obtain the original data of the operating parameters and environmental parameters of various equipment in the building. The operating parameters include current, voltage, and vibration, and the environmental parameters include temperature, humidity, and pressure. The original data includes historical data and real-time data.

[0019] Collect real-time data of operating parameters and environmental parameters collected by sensors and cameras, and extract historical data of operating parameters and environmental parameters of various equipment in the building from the historical database;

[0020] Add a timestamp to each data point of historical data and real-time data, and classify and label the data according to data type, data source, and data status to distinguish different data sources and types. The data type refers to operating parameters or environmental parameters, the data source refers to the sensor or camera from which it comes, and the data status refers to real-time data or historical data, which helps to correctly interpret the data during management and analysis.

[0021] A further improvement of the technical solution of the present invention is that in the anomaly detection module, the process of dividing the anomaly warning level is as follows:

[0022] Obtaining preprocessed raw data from the data warehouse, analyzing historical data to determine the abnormal state types associated with operating parameters and environmental parameters, and extracting abnormal state features, namely, equipment operation abnormality features and environmental abnormality features, wherein equipment operation abnormality features include abnormal current features, abnormal voltage features, and abnormal vibration features, and environmental abnormality features include abnormal temperature features, abnormal humidity features, and abnormal pressure features;

[0023] Evaluate the severity of each abnormal state type based on the impact of each abnormal state characteristic on the performance, safety and operating efficiency of building equipment;

[0024] Based on the severity of each abnormal state type and the distribution of feature data, the features are matched with the severity of each abnormal state type, and different abnormal warning levels are divided, and the feature data is mapped to the corresponding abnormal warning levels, where the abnormal warning levels are level 1 abnormal warning level, level 2 abnormal warning level and level 3 abnormal warning level, and the severity of the abnormal warning levels increases from level 1 to level 3;

[0025] The extracted abnormal state feature data and the corresponding abnormal warning level information are integrated to construct a data set for subsequent analysis.

[0026] A further improvement of the technical solution of the present invention is that the process of obtaining the abnormal state alarm coefficient is:

[0027] Combine the extracted abnormal state features and analyze the data set to obtain the current, voltage, vibration data of the building equipment as well as the ambient temperature, humidity, and pressure data;

[0028] For abnormal current features, the associated data of maximum current value, current fluctuation range, current frequency and current duration are extracted; for abnormal voltage features, the associated data of voltage fluctuation frequency and voltage intermittent time are extracted; for abnormal vibration features, the associated data of vibration amplitude, vibration frequency and vibration waveform are extracted, and the equipment abnormal operation evaluation index is obtained through comprehensive analysis;

[0029] For abnormal temperature features, the associated data of temperature fluctuation range, temperature change rate and temperature gradient are extracted; for abnormal humidity features, the associated data of humidity change rate, maximum humidity value and minimum humidity value are extracted; for abnormal pressure features, the associated data of pressure peak value and pressure fluctuation frequency are extracted, and the abnormal environment assessment index is obtained through comprehensive analysis;

[0030] Comprehensively analyze the equipment abnormal operation evaluation index and the abnormal environment evaluation index, and determine the abnormal state alarm coefficient in combination with the building equipment operation frequency and building equipment operation power to evaluate the abnormal degree of equipment operation status;

[0031] Combined with the abnormal state alarm coefficient and the abnormal warning level, set the abnormal alarm threshold corresponding to different abnormal warning levels as the basis for determining whether to trigger the warning.

[0032] A further improvement of the technical solution of the present invention is that the calculation formula of the equipment abnormal operation evaluation index is:

[0033] ;

[0034] ;

[0035] ;

[0036] ;

[0037] ;

[0038] in, It is the equipment abnormal operation evaluation index. is the current stability deviation index, which represents the average value of the sum of squares of the deviations between the maximum current value and the standard current value during all observation periods. For the The maximum current value within an observation period is is the standard current value, representing the current level under normal operating conditions. It is the voltage fluctuation amplitude index, which indicates the ratio of the difference between the maximum and minimum voltage fluctuation to the standard voltage fluctuation. For the The voltage fluctuation within an observation period is is the standard voltage value, is the vibration intensity index, which represents the sum of the vibration amplitudes in all observation periods divided by the square root of the number of observation periods. For the The vibration amplitude within an observation period is is the vibration frequency variation index, which indicates the ratio of the maximum value to the minimum value of the vibration frequency. For the The vibration frequency within an observation period is is the total number of observation periods;

[0039] The calculation formula of the abnormal environment assessment index is:

[0040] ;

[0041] ;

[0042] ;

[0043] ;

[0044] in, is the abnormal environment assessment index, is the temperature variation index, which represents the sum of the temperature fluctuation ranges in all observation periods. For the The temperature fluctuation range within an observation period is is the humidity change rate deviation index, which represents the sum of the absolute values ​​of the ratios of the humidity change rate to the standard humidity change rate in all observation periods. For the The humidity change rate within an observation period is is the standard humidity change rate, representing the humidity change rate under normal environmental change conditions. is the relative height index of peak pressure, which represents the sum of the ratios of peak pressure to standard pressure value in all observation periods. For the The peak pressure during the observation period is is the standard pressure value, representing the pressure level under normal operating conditions. is the total number of observation periods.

[0045] A further improvement of the technical solution of the present invention is that the abnormal state alarm coefficient is obtained based on the equipment abnormal operation evaluation index, the abnormal environment evaluation index, the building equipment operation frequency and the building equipment operation power, and its calculation formula is:

[0046] ;

[0047] in, is the abnormal state alarm coefficient, It is the equipment abnormal operation evaluation index. is the abnormal environment assessment index, is the operating frequency of building equipment, For building equipment operating power, is an exponential function, is the natural logarithm function;

[0048] A plurality of abnormal warning levels correspond to a plurality of abnormal alarm thresholds, wherein the abnormal alarm thresholds include an upper threshold and a lower threshold;

[0049] The multiple abnormal warning levels and the multiple abnormal alarm thresholds satisfy the following relationship:

[0050] Level 1 abnormal warning level ; Indicates that the equipment operating status is close to normal or there are slight deviations. The equipment operating status is basically normal, but there may be some small deviations or minor operating problems. Perform routine inspections and maintenance, monitor the equipment status, and ensure that the problem does not worsen;

[0051] Second level abnormal warning level ; Indicates that there is a moderate degree of abnormality in the equipment operation status. There is a moderate degree of abnormality in the equipment operation status, which may affect the performance and efficiency of the equipment. A detailed inspection may be required, and it may be necessary to adjust the equipment operation parameters or perform partial repairs;

[0052] Level 3 abnormal warning level ; Indicates that there is a serious abnormality in the operation status of the equipment, which requires immediate attention. There is a serious abnormality in the operation status of the equipment, which may have a significant impact on the safety and performance of the equipment. Take immediate measures, such as stopping for inspection, emergency repair or replacing faulty parts, to avoid potential serious consequences;

[0053] in, is the abnormal state alarm coefficient, is the lower threshold corresponding to the second-level abnormal warning level and the upper threshold corresponding to the first-level abnormal warning level, It is the lower threshold corresponding to the third level abnormal warning level and the upper threshold corresponding to the second level abnormal warning level.

[0054] A further improvement of the technical solution of the present invention is that in the abnormality prediction module, the process of identifying potential risks in the operation of construction equipment is:

[0055] Based on the acquired real-time monitoring data of the building equipment, including operating parameters and environmental parameter data, the value of the current abnormal state alarm coefficient is calculated;

[0056] Compare the calculated abnormal state alarm coefficient result with the preset abnormal alarm threshold to determine whether the current equipment operation state reaches the abnormal warning level;

[0057] Compare the real-time monitoring data of the building equipment with the preset normal range to identify the operating status-related parameters of the building equipment that deviate from the normal range;

[0058] Based on the abnormal state alarm coefficient and the real-time monitoring data comparison results, locate the construction equipment in a potential risk state and analyze the abnormal degree of the current operation of the construction equipment;

[0059] Based on the anomaly detection results and risk analysis, decide whether to trigger the early warning mechanism.

[0060] A further improvement of the technical solution of the present invention is that in the warning trigger module, the process of generating the warning report is:

[0061] Receive real-time monitoring data and calculation results of abnormal state alarm coefficient from the abnormal prediction module, and evaluate the current abnormal warning level according to the comparison result of abnormal state alarm coefficient and abnormal alarm threshold;

[0062] After confirming the current abnormal warning level, the corresponding level of warning mechanism is immediately triggered, and a warning notification and signal are sent to the system. The warning notification content includes the abnormal warning level, time, affected equipment, possible causes and recommended response measures;

[0063] According to the abnormal warning level, the preset control measures are implemented, including adjusting equipment operating parameters, reducing load, starting the backup system, and recording the detailed information of the abnormal warning event in the system, including time, abnormal warning level, affected equipment, and measures taken;

[0064] Update the status information of the affected devices and generate an early warning report.

[0065] In a second aspect, a smart building equipment monitoring and early warning method is implemented based on a smart building equipment monitoring and early warning system, comprising the following steps:

[0066] Step 1: deploy and use sensors and cameras to collect raw data of operating parameters and environmental parameters of building equipment, classify and mark the raw data, and perform preprocessing operations on the raw data, wherein the raw data includes historical data and real-time data;

[0067] Step 2: extract abnormal state features from the preprocessed data, including abnormal equipment operation features and abnormal environment features, analyze historical data, determine the abnormal state type and its severity, divide the abnormal warning level, and construct a data set;

[0068] Step 3, calculating the equipment abnormal operation evaluation index and the abnormal environment evaluation index based on the extracted abnormal state characteristics, and determining the abnormal state alarm coefficient in combination with the equipment operation parameters and the environmental parameters to evaluate the abnormal degree of the equipment operation state;

[0069] Step 4: monitor the operating status of building equipment in real time, identify potential risks by combining real-time data and abnormal status alarm coefficients, and compare the real-time monitoring data with the preset normal range to evaluate the degree of deviation of the operating status;

[0070] Step 5: Determine whether to trigger the early warning mechanism based on the abnormal prediction results, trigger the early warning of the corresponding abnormal warning level, and execute the preset control and management measures. According to the early warning response results, make system feedback adjustments and optimizations.

[0071] Due to the adoption of the above technical solution, the present invention has the following technical advances compared with the prior art:

[0072] 1. The present invention provides an intelligent building equipment monitoring and early warning system and method, which can timely discover and warn of potential faults and risks by real-time monitoring of the operating parameters and environmental parameters of the equipment, conduct in-depth analysis of the equipment status, and thus predict potential faults and risks, thereby significantly improving the safety and reliability of building equipment, reducing the probability of unexpected downtime and accidents, ensuring the long-term and stable operation of building equipment, and providing reliable protection for various activities inside the building.

[0073] 2. The present invention provides an intelligent building equipment monitoring and early warning system and method, which predicts the maintenance needs of building equipment through real-time monitoring and data analysis, realizes preventive maintenance, and performs necessary maintenance and care before serious equipment failure occurs. It not only reduces the need for emergency repairs, but also reduces maintenance costs and equipment downtime through planned maintenance, thereby avoiding maintenance costs and downtime losses caused by equipment failure. BRIEF DESCRIPTION OF THE DRAWINGS

[0074] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0075] Figure 1 It is a module diagram of the present invention;

[0076] Figure 2 This is a flow chart of the classification of abnormal warning levels of the present invention;

[0077] Figure 3 The flowchart of obtaining the abnormal state alarm coefficient of the present invention;

[0078] Figure 4 The figure is a flow chart of the method of the present invention. DETAILED DESCRIPTION

[0079] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0080] Embodiment 1, as Figure 1-3 As shown, the present invention provides an intelligent building equipment monitoring and early warning system, including a monitoring and early warning platform, the monitoring and early warning platform is communicatively connected with a data acquisition module, a data preprocessing module, an anomaly detection module, an anomaly prediction module and an early warning trigger module, wherein the modules are connected by electrical signals;

[0081] A data acquisition module is used to collect the raw data of the operating parameters and environmental parameters of various equipment in the building through sensors and cameras, including temperature, humidity, pressure, vibration, current, and voltage, and mark various data categories of the raw data, wherein the raw data includes historical data and real-time data, deploy different types of sensors and cameras on related equipment in the building, monitor the operating parameters and environmental parameters of the building equipment, and obtain the raw data of the operating parameters and environmental parameters of various equipment in the building, wherein the operating parameters include current, voltage, and vibration, and the environmental parameters include temperature, humidity, and pressure, and the raw data includes historical data and real-time data, collect the real-time data of the operating parameters and environmental parameters collected by sensors and cameras, and extract the historical data of the operating parameters and environmental parameters of various equipment in the building from the historical database, add a timestamp to each data point of the historical data and real-time data, and classify and mark the data according to the data type, data source, and data status, and distinguish different data sources and types, wherein the data type refers to the operating parameters or environmental parameters, the data source refers to the sensor or camera from which it comes, and the data status refers to the real-time data or historical data, which is helpful for the correct interpretation in the process of data management and analysis;

[0082] The data preprocessing module is used to store the collected raw data in the data warehouse and preprocess the raw data, including data cleaning, filtering, denoising, etc., to improve the accuracy and reliability of subsequent data analysis, receive the raw data of operating parameters and environmental parameters of various equipment in the building from the data acquisition module, and store the received data in the data warehouse for subsequent processing and analysis; preprocess the raw data, including data cleaning, filtering, denoising, etc. The specific process of data cleaning includes deleting data columns or rows that are not related to the data analysis subject, identifying and processing missing values ​​and outliers in the data set, normalizing the column names in the data set to avoid duplication of column names or ambiguity, and then sorting the data for subsequent analysis and processing; filtering is used to eliminate noise in the data, making the data smoother and more reliable, suitable for subsequent analysis and modeling, and denoising is used to remove random noise or interference in the data, so as to more accurately reflect the actual status and environmental conditions of the equipment;

[0083] The abnormality detection module is used to extract the abnormal state characteristics of the building equipment, divide the abnormal warning level, and obtain the abnormal state alarm coefficient by combining the abnormal state characteristics and the pre-processed raw data, and analyze the raw data of the building equipment. The abnormality detection module includes a data analysis unit, a feature extraction unit and an abnormality analysis unit;

[0084] The data analysis unit is used to analyze the pre-processed raw data, and analyze the abnormal state types of the building equipment in the historical data and the severity of each abnormal state type;

[0085] A feature extraction unit is used to extract abnormal state features from historical data and real-time data, divide abnormal warning levels according to the severity of each abnormal state type, and integrate the extracted abnormal state feature data to obtain a data set;

[0086] The abnormality analysis unit obtains the abnormality alarm coefficient based on the extracted abnormality characteristics and the relevant data in the data set, and sets the corresponding abnormality alarm threshold in combination with the abnormality alarm coefficient and the abnormality warning level to evaluate the future operation status and fault type of the building equipment;

[0087] Furthermore, the abnormal warning level classification process is as follows:

[0088] Obtain preprocessed raw data from the data warehouse, analyze historical data to determine the abnormal state types associated with operating parameters and environmental parameters, and extract abnormal state features, which are equipment operation abnormality features and environmental abnormality features, respectively. The equipment operation abnormality features include abnormal current features, abnormal voltage features, and abnormal vibration features, and the environmental abnormality features include abnormal temperature features, abnormal humidity features, and abnormal pressure features. According to the degree of influence of each abnormal state feature on the performance, safety, and operating efficiency of building equipment, evaluate the severity of each abnormal state type. Based on the severity of each abnormal state type and the distribution of feature data, correspond the features to the severity of each abnormal state type, divide different abnormal warning levels, and map the feature data to the corresponding abnormal warning level. The abnormal warning levels are level one, level two, and level three, respectively. The severity of the abnormal warning level increases from level one to level three. Integrate the extracted abnormal state feature data and the corresponding abnormal warning level information to construct a data set for subsequent analysis.

[0089] Furthermore, the process of obtaining the abnormal state alarm coefficient is as follows:

[0090] Combine the extracted abnormal state features and analyze the data set to obtain the current, voltage, vibration data and environmental temperature, humidity and pressure data of the building equipment. For the abnormal current feature, extract the associated data of the maximum current value, current fluctuation range, current frequency and current duration. For the abnormal voltage feature, extract the associated data of the voltage fluctuation frequency and the voltage intermittent time. For the abnormal vibration feature, extract the associated data of the vibration amplitude, vibration frequency and vibration waveform. Comprehensive analysis is performed to obtain the equipment abnormal operation evaluation index. For the abnormal temperature feature, extract the associated data of the temperature fluctuation range, temperature change rate and temperature gradient. For the abnormal humidity feature, extract the associated data of the humidity change rate, the maximum and minimum humidity values. For the abnormal pressure feature, extract the associated data of the pressure peak and the pressure fluctuation frequency. Comprehensive analysis is performed to obtain the abnormal environment evaluation index. Comprehensive analysis is performed on the equipment abnormal operation evaluation index and the abnormal environment evaluation index. Combine the building equipment operation frequency and the building equipment operation power to determine the abnormal state alarm coefficient, evaluate the abnormal degree of the equipment operation state, and combine the abnormal state alarm coefficient and the abnormal warning level to set the abnormal alarm threshold corresponding to the different abnormal warning levels as the basis for judging whether to trigger the warning.

[0091] Furthermore, the calculation formula of the equipment abnormal operation evaluation index is:

[0092] ;

[0093] ;

[0094] ;

[0095] ;

[0096] ;

[0097] in, It is the equipment abnormal operation evaluation index. is the current stability deviation index, which represents the average value of the sum of squares of the deviations between the maximum current value and the standard current value during all observation periods. For the The maximum current value within an observation period is is the standard current value, representing the current level under normal operating conditions. It is the voltage fluctuation amplitude index, which indicates the ratio of the difference between the maximum and minimum voltage fluctuation to the standard voltage fluctuation. For the The voltage fluctuation within an observation period is is the standard voltage value, is the vibration intensity index, which represents the sum of the vibration amplitudes in all observation periods divided by the square root of the number of observation periods. For the The vibration amplitude within an observation period is is the vibration frequency variation index, which indicates the ratio of the maximum value to the minimum value of the vibration frequency. For the The vibration frequency within an observation period is is the total number of observation cycles. It should be noted that The higher the value, the greater the abnormality of the operating status of the building equipment. The value trend of is to increase as the operating status of the building equipment deviates from the normal range;

[0098] The calculation formula of abnormal environment assessment index is:

[0099] ;

[0100] ;

[0101] ;

[0102] ;

[0103] in, is the abnormal environment assessment index, is the temperature variation index, which represents the sum of the temperature fluctuation ranges in all observation periods. For the The temperature fluctuation range within an observation period is is the humidity change rate deviation index, which represents the sum of the absolute values ​​of the ratios of the humidity change rate to the standard humidity change rate in all observation periods. For the The humidity change rate within an observation period is is the standard humidity change rate, representing the humidity change rate under normal environmental change conditions. is the relative height index of peak pressure, which represents the sum of the ratios of peak pressure to standard pressure value in all observation periods. For the The peak pressure during the observation period is is the standard pressure value, representing the pressure level under normal operating conditions. is the total number of observation cycles. It should be noted that Used to assess the degree of abnormality of environmental conditions, The value range of is also relative. The higher the value, the greater the abnormality of the environmental conditions. The value trend is to increase as the environmental parameters deviate from the preset standard value or safety range;

[0104] Furthermore, the abnormal state alarm coefficient is obtained based on the equipment abnormal operation evaluation index, the abnormal environment evaluation index, the building equipment operation frequency and the building equipment operation power, and its calculation formula is:

[0105] ;

[0106] in, is the abnormal state alarm coefficient, It is the equipment abnormal operation evaluation index. is the abnormal environment assessment index, is the operating frequency of building equipment, For building equipment operating power, is an exponential function, is a natural logarithmic function. It should be noted that Represents the combined effects of building equipment and environmental anomalies, Represents the combined impact of building equipment operating frequency and building equipment operating power. The denominator The Sigmoid function is used, which is a function that gradually saturates when the abnormal evaluation index increases, which helps to limit the abnormal evaluation index when it is very high. The growth rate, Representing the logarithm of the building equipment operating frequency and the building equipment operating power helps to provide a nonlinear effect when the building equipment operating frequency and the building equipment operating power change. When abnormalities in building equipment and / or environment increase, its value will also increase. , , or When any one or more values ​​deviate from the normal range, will rise, indicating an increase in the severity of the abnormal state;

[0107] Multiple abnormal warning levels correspond to multiple abnormal alarm thresholds, where the abnormal alarm threshold includes an upper threshold and a lower threshold;

[0108] Multiple abnormal warning levels and multiple abnormal alarm thresholds satisfy the following relationship:

[0109] Level 1 abnormal warning level ; Indicates that the equipment operating status is close to normal or there are slight deviations. The equipment operating status is basically normal, but there may be some small deviations or minor operating problems. Perform routine inspections and maintenance, monitor the equipment status, and ensure that the problem does not worsen;

[0110] Second level abnormal warning level ; Indicates that there is a moderate degree of abnormality in the equipment operation status. There is a moderate degree of abnormality in the equipment operation status, which may affect the performance and efficiency of the equipment. A detailed inspection may be required, and it may be necessary to adjust the equipment operation parameters or perform partial repairs;

[0111] Level 3 abnormal warning level ; Indicates that there is a serious abnormality in the operation status of the equipment, which requires immediate attention. There is a serious abnormality in the operation status of the equipment, which may have a significant impact on the safety and performance of the equipment. Take immediate measures, such as stopping for inspection, emergency repair or replacing faulty parts, to avoid potential serious consequences;

[0112] in, is the abnormal state alarm coefficient, is the lower threshold corresponding to the second-level abnormal warning level and the upper threshold corresponding to the first-level abnormal warning level, The lower threshold corresponding to the third level abnormal warning level and the upper threshold corresponding to the second level abnormal warning level;

[0113] The abnormality prediction module combines the real-time data and the abnormal state alarm coefficient of the abnormality detection module to identify the potential risks in the operation of the building equipment, conducts real-time monitoring and comparison with the operating parameters of the building equipment, and decides whether to trigger the early warning mechanism based on the abnormality detection results. Based on the acquired real-time monitoring data of the building equipment, including the operating parameters and environmental parameter data, the value of the current abnormal state alarm coefficient is calculated, and the calculated abnormal state alarm coefficient result is compared with the preset abnormal alarm threshold to determine whether the current equipment operation state reaches the abnormal warning level. The real-time monitoring data of the building equipment is compared with the preset normal range to identify the operating state-related parameters of the building equipment that deviates from the normal state. According to the comparison results of the abnormal state alarm coefficient and the real-time monitoring data, the building equipment in a potential risk state is located, and the abnormal degree of the current operation of the building equipment is analyzed. According to the abnormality detection results and risk analysis, it is decided whether the early warning mechanism needs to be triggered;

[0114] The early warning trigger module determines the specific abnormal warning level that triggers the early warning mechanism based on the monitoring and analysis results of the abnormal prediction module, and controls and manages it according to the corresponding abnormal warning level, generates an early warning report, receives real-time monitoring data and the calculation results of the abnormal state alarm coefficient from the abnormal prediction module, and evaluates the current abnormal warning level based on the comparison result of the abnormal state alarm coefficient and the abnormal alarm threshold. After confirming the current abnormal warning level, it immediately triggers the early warning mechanism of the corresponding level and sends an early warning notification and signal to the system. The early warning notification content includes the abnormal warning level, time, affected equipment, possible causes and recommended response measures. According to the abnormal warning level, the preset control measures are executed, including adjusting equipment operating parameters, reducing load, and starting the backup system, and the detailed information of the abnormal warning event is recorded in the system, including time, abnormal warning level, affected equipment, and measures taken, and the status information of the affected equipment is updated, and an early warning report is generated.

[0115] Embodiment 2, as Figure 4 As shown, based on Example 1, the present invention further provides an intelligent building equipment monitoring and early warning method, which is implemented based on an intelligent building equipment monitoring and early warning system, and includes the following steps:

[0116] Step 1: deploy and use sensors and cameras to collect raw data of operating parameters and environmental parameters of building equipment, classify and mark the raw data, and perform preprocessing operations on the raw data, wherein the raw data includes historical data and real-time data;

[0117] Step 2: extract abnormal state features from the preprocessed data, including abnormal equipment operation features and abnormal environment features, analyze historical data, determine the abnormal state type and its severity, divide the abnormal warning level, and construct a data set;

[0118] Step 3, calculating the equipment abnormal operation evaluation index and the abnormal environment evaluation index based on the extracted abnormal state characteristics, and determining the abnormal state alarm coefficient in combination with the equipment operation parameters and the environmental parameters to evaluate the abnormal degree of the equipment operation state;

[0119] Step 4: monitor the operating status of building equipment in real time, identify potential risks by combining real-time data and abnormal status alarm coefficients, and compare the real-time monitoring data with the preset normal range to evaluate the degree of deviation of the operating status;

[0120] Step 5: Determine whether to trigger the early warning mechanism based on the abnormal prediction results, trigger the early warning of the corresponding abnormal warning level, and execute the preset control and management measures. According to the early warning response results, make system feedback adjustments and optimizations.

[0121] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. An intelligent building equipment monitoring and early warning system, including a monitoring and early warning platform, characterized in that: The monitoring and early warning platform is communicatively connected with a data acquisition module, a data preprocessing module, an anomaly detection module, an anomaly prediction module and an early warning trigger module, wherein the modules are electrically connected with each other; The data acquisition module is used to collect the raw data of the operating parameters and environmental parameters of various equipment in the building through sensors and cameras, including temperature, humidity, pressure, vibration, current, voltage, and mark various data categories of the raw data, wherein the raw data includes historical data and real-time data; The data preprocessing module is used to store the collected raw data in the data warehouse and preprocess the raw data; The anomaly detection module is used to extract the abnormal state characteristics of the construction equipment, divide the abnormal warning level, and combine the abnormal state characteristics with the pre-processed raw data to obtain the abnormal state alarm coefficient and analyze the raw data of the construction equipment; The anomaly prediction module combines the real-time data and the abnormal state alarm coefficient of the anomaly detection module to identify potential risks in the operation of construction equipment, conducts real-time monitoring and comparison with the operating parameters of the construction equipment, and decides whether to trigger the early warning mechanism based on the anomaly detection results; The warning trigger module determines the specific abnormal warning level that triggers the warning mechanism according to the monitoring and analysis results of the abnormal prediction module, and controls and manages according to the corresponding abnormal warning level to generate a warning report.

2. The intelligent building equipment monitoring and early warning system according to claim 1 is characterized in that: The anomaly detection module includes a data analysis unit, a feature extraction unit and an anomaly analysis unit; Wherein, the data analysis unit is used to analyze the pre-processed raw data, and analyze the abnormal state types of the building equipment in the historical data and the severity of each abnormal state type; The feature extraction unit is used to extract abnormal state features from historical data and real-time data, divide abnormal warning levels according to the severity of each abnormal state type, and integrate the extracted abnormal state feature data to obtain a data set; The abnormality analysis unit obtains the abnormality alarm coefficient based on the extracted abnormality characteristics and the relevant data in the data set, and sets the corresponding abnormality alarm threshold in combination with the abnormality alarm coefficient and the abnormality warning level to evaluate the future operation status and fault type of the building equipment.

3. The intelligent building equipment monitoring and early warning system according to claim 2 is characterized in that: In the data acquisition module, the original data acquisition process is as follows: Deploy different types of sensors and cameras on related equipment in the building to monitor the operating parameters and environmental parameters of the building equipment, and obtain the original data of the operating parameters and environmental parameters of various equipment in the building. The operating parameters include current, voltage, and vibration, and the environmental parameters include temperature, humidity, and pressure. The original data includes historical data and real-time data. Collect real-time data of operating parameters and environmental parameters collected by sensors and cameras, and extract historical data of operating parameters and environmental parameters of various equipment in the building from the historical database; Add timestamps to each data point of historical and real-time data, and classify and label data according to data type, data source, and data status to distinguish different data sources and types.

4. The intelligent building equipment monitoring and early warning system according to claim 3 is characterized in that: In the anomaly detection module, the process of dividing the anomaly warning level is as follows: Obtaining preprocessed raw data from the data warehouse, analyzing historical data to determine the abnormal state types associated with operating parameters and environmental parameters, and extracting abnormal state features, namely, equipment operation abnormality features and environmental abnormality features, wherein equipment operation abnormality features include abnormal current features, abnormal voltage features, and abnormal vibration features, and environmental abnormality features include abnormal temperature features, abnormal humidity features, and abnormal pressure features; Evaluate the severity of each abnormal state type based on the impact of each abnormal state characteristic on the performance, safety and operating efficiency of building equipment; Based on the severity of each abnormal state type and the distribution of feature data, the features are matched with the severity of each abnormal state type, and different abnormal warning levels are divided, and the feature data is mapped to the corresponding abnormal warning levels, where the abnormal warning levels are level 1 abnormal warning level, level 2 abnormal warning level and level 3 abnormal warning level, and the severity of the abnormal warning levels increases from level 1 to level 3; The extracted abnormal state feature data and the corresponding abnormal warning level information are integrated to construct a data set.

5. The intelligent building equipment monitoring and early warning system according to claim 4 is characterized in that: The acquisition process of the abnormal state alarm coefficient is: Combine the extracted abnormal state features and analyze the data set to obtain the current, voltage, vibration data of the building equipment as well as the ambient temperature, humidity, and pressure data; For abnormal current features, the associated data of maximum current value, current fluctuation range, current frequency and current duration are extracted; for abnormal voltage features, the associated data of voltage fluctuation frequency and voltage intermittent time are extracted; for abnormal vibration features, the associated data of vibration amplitude, vibration frequency and vibration waveform are extracted, and the equipment abnormal operation evaluation index is obtained through comprehensive analysis; For abnormal temperature features, the associated data of temperature fluctuation range, temperature change rate and temperature gradient are extracted; for abnormal humidity features, the associated data of humidity change rate, maximum humidity value and minimum humidity value are extracted; for abnormal pressure features, the associated data of pressure peak value and pressure fluctuation frequency are extracted, and the abnormal environment assessment index is obtained through comprehensive analysis; Comprehensively analyze the equipment abnormal operation evaluation index and the abnormal environment evaluation index, and determine the abnormal state alarm coefficient in combination with the building equipment operation frequency and building equipment operation power to evaluate the abnormal degree of equipment operation status; Combined with the abnormal state alarm coefficient and the abnormal warning level, set the abnormal alarm threshold corresponding to different abnormal warning levels.

6. The intelligent building equipment monitoring and early warning system according to claim 5 is characterized in that: The calculation formula of the equipment abnormal operation evaluation index is: ; ; ; ; ; in, It is the equipment abnormal operation evaluation index. is the current stability deviation index, For the The maximum current value within an observation period is is the standard current value, is the voltage fluctuation amplitude index, For the The voltage fluctuation within an observation period is is the standard voltage value, is the vibration intensity index, For the The vibration amplitude within an observation period is is the vibration frequency variation index, For the The vibration frequency within an observation period is is the total number of observation periods; The calculation formula of the abnormal environment assessment index is: ; ; ; ; in, is the abnormal environment assessment index, is the temperature variation index, For the The temperature fluctuation range within an observation period is is the humidity change rate deviation index, For the The humidity change rate within an observation period is is the standard humidity change rate, representing the humidity change rate under normal environmental change conditions. is the relative height index of peak pressure, For the The peak pressure during the observation period is is the standard pressure value, representing the pressure level under normal operating conditions. is the total number of observation periods.

7. The intelligent building equipment monitoring and early warning system according to claim 6 is characterized by: The abnormal state alarm coefficient is obtained based on the equipment abnormal operation evaluation index, the abnormal environment evaluation index, the building equipment operation frequency and the building equipment operation power, and its calculation formula is: ; in, is the abnormal state alarm coefficient, It is the equipment abnormal operation evaluation index. is the abnormal environment assessment index, is the operating frequency of building equipment, For building equipment operating power, is an exponential function, is the natural logarithm function; A plurality of abnormal warning levels correspond to a plurality of abnormal alarm thresholds, wherein the abnormal alarm thresholds include an upper threshold and a lower threshold; The multiple abnormal warning levels and the multiple abnormal alarm thresholds satisfy the following relationship: Level 1 abnormal warning level ; Second level abnormal warning level ; Level 3 abnormal warning level ; in, is the abnormal state alarm coefficient, is the lower threshold corresponding to the second-level abnormal warning level and the upper threshold corresponding to the first-level abnormal warning level, It is the lower threshold corresponding to the third level abnormal warning level and the upper threshold corresponding to the second level abnormal warning level.

8. The intelligent building equipment monitoring and early warning system according to claim 7 is characterized in that: In the abnormal prediction module, the process of identifying potential risks in the operation of construction equipment is as follows: Based on the acquired real-time monitoring data of the building equipment, including operating parameters and environmental parameter data, the value of the current abnormal state alarm coefficient is calculated; Compare the calculated abnormal state alarm coefficient result with the preset abnormal alarm threshold to determine whether the current equipment operation state reaches the abnormal warning level; Compare the real-time monitoring data of the building equipment with the preset normal range to identify the operating status-related parameters of the building equipment that deviate from the normal range; Based on the abnormal state alarm coefficient and the real-time monitoring data comparison results, locate the construction equipment in a potential risk state and analyze the abnormal degree of the current operation of the construction equipment; Based on the anomaly detection results and risk analysis, decide whether to trigger the early warning mechanism.

9. The intelligent building equipment monitoring and early warning system according to claim 8 is characterized in that: In the early warning trigger module, the process of generating an early warning report is as follows: Receive real-time monitoring data and calculation results of abnormal state alarm coefficient from the abnormal prediction module, and evaluate the current abnormal warning level according to the comparison result of abnormal state alarm coefficient and abnormal alarm threshold; After confirming the current abnormal warning level, the warning mechanism of the corresponding level is immediately triggered, and a warning notification and signal are sent to the system; According to the abnormal warning level, the preset control measures are implemented, including adjusting equipment operating parameters, reducing load, starting the backup system, and recording the detailed information of the abnormal warning event in the system, including time, abnormal warning level, affected equipment, and measures taken; Update the status information of the affected devices and generate an early warning report.

10. A method for monitoring and early warning of intelligent building equipment, implemented based on the intelligent building equipment monitoring and early warning system according to any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1: deploy and use sensors and cameras to collect raw data of operating parameters and environmental parameters of building equipment, classify and mark the raw data, and perform preprocessing operations on the raw data, wherein the raw data includes historical data and real-time data; Step 2: extract abnormal state features from the preprocessed data, including abnormal equipment operation features and abnormal environment features, analyze historical data, determine the abnormal state type and its severity, divide the abnormal warning level, and construct a data set; Step 3, calculating the equipment abnormal operation evaluation index and the abnormal environment evaluation index based on the extracted abnormal state characteristics, and determining the abnormal state alarm coefficient in combination with the equipment operation parameters and the environmental parameters to evaluate the abnormal degree of the equipment operation state; Step 4: monitor the operating status of building equipment in real time, identify potential risks by combining real-time data and abnormal status alarm coefficients, and compare the real-time monitoring data with the preset normal range to evaluate the degree of deviation of the operating status; Step 5: Determine whether to trigger the early warning mechanism based on the abnormal prediction results, trigger the early warning of the corresponding abnormal warning level, and execute the preset control and management measures. According to the early warning response results, make system feedback adjustments and optimizations.

Citation Information

Cited By

  • Intelligent regulation and control system and method for livestock and poultry breeding environment

    CN119105596A

  • Intelligent heating and ventilation system applied to skid-mounted electric control integrated device

    CN119110563A

  • Temperature control equipment operation control method and system, electronic equipment and storage medium

    CN119164048A

  • Remote intelligent monitoring system and method for safety of town houses

    CN119207060A

  • Intelligent building full life cycle monitoring management method and system

    CN119313172A