Intelligent scheduling system for transfer robot based on path planning
Through the collaboration of path planning, handling target analysis and intelligent scheduling modules, combined with robotic arm and lidar technology, the deficiencies of path planning and scheduling of handling robots in complex environments are solved, and efficient, flexible and safe handling task execution is achieved, improving level of automation.
Patent Information
- Application Number
- CN202410815724.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing handling robot systems cannot effectively cope with complex and changeable working environments in terms of path planning and task scheduling, resulting in insufficient work efficiency and flexibility.
An intelligent scheduling system based on path planning is adopted, including a path planning module, a transportation target analysis module and an intelligent scheduling module. It is connected through a wireless network and calculated using sub-modules such as task reception, starting position calibration, destination input, matrix projection, and route planning. The optimal path is combined with robotic arm scanning, three-dimensional imaging, lidar scanning and other technologies for obstacle avoidance and path optimization.
It realizes intelligent and efficient scheduling of handling tasks, improves execution efficiency and system performance, adapts to complex and changeable working environments, and improves the automation level in the warehousing and logistics fields.
Smart Images

Figure CN118760075A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of transport robots, and in particular to an intelligent dispatching system for transport robots based on path planning. Background Art
[0002] With the improvement of industrial automation, handling robots have been widely used in warehousing, manufacturing, logistics and other fields. However, existing handling robot systems often have deficiencies in path planning and task scheduling, and cannot effectively cope with complex and changing working environments. In this case, how to improve the working efficiency and flexibility of handling robots has become an urgent problem to be solved. Summary of the invention
[0003] The purpose of the present invention is to provide an intelligent scheduling system for a handling robot based on path planning to solve the problems raised in the above-mentioned background technology.
[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: an intelligent scheduling system for a handling robot based on path planning, comprising a path planning module, a handling target analysis module, and an intelligent scheduling module. The path planning module is used to calculate the optimal path based on the received task information in combination with the warehouse map and obstacle information. The handling target analysis module is used to analyze the target goods to be handled by the current task. The intelligent scheduling module is used to retrieve and confirm the final handling route based on the path planning, handling target and obstacle analysis results. The path planning module, the handling target analysis module and the intelligent scheduling module are all connected to each other via a wireless network.
[0005] According to the above technical solution, the path planning module includes a task receiving submodule, a starting position calibration submodule, a destination input submodule, a matrix projection submodule, a route planning submodule and a preliminary route database. The task receiving submodule is used to accept the handling task request information of the warehouse management system, the starting position calibration submodule is used to calibrate the starting position of the handling robot task, the destination input submodule is electrically connected to the starting position calibration submodule, the destination input submodule is used to lock the destination position in the handling task, the matrix projection submodule is used to establish a global projection matrix in combination with the warehouse map, the route planning submodule is electrically connected to the matrix projection submodule, the route planning submodule is used to plan the optimal route from the task starting position to the destination position of the handling robot, the preliminary route database is electrically connected to the route planning submodule, and the preliminary route database is used to store all alternative routes for route planning.
[0006] According to the above technical solution, the operation method of the path planning module is:
[0007] S1. The system receives a transport task and uses the task receiving submodule to obtain the transport task request information, wherein the transport task request information includes: the task starting point and the task end point;
[0008] S2. Combine the warehouse map and establish a rectangular coordinate system on the map plane with the task starting position as the origin O;
[0009] S3. Determine the location of the destination in the rectangular coordinate system of the map plane and mark it as the end point P, and mark the distance from the origin O to the end point P as L;
[0010] S4. With the origin O as the center and the length of L as the radius, an equal-length projection matrix is established in combination with the warehouse map. All projection matrices are arranged adjacent to each other in the warehouse, and the side length of the projection matrix is 0.5 meters.
[0011] S5. Retrieve the real-time signal feedback of the global projection matrix arranged in the warehouse. When there are shelves, equipment or obstacles at the location of the matrix, the projection matrix signal feedback is transmitted in real time to the established map plane rectangular coordinate system;
[0012] S6. When there is obstacle signal feedback for a single projection matrix block, the projection matrix block is marked in red in the rectangular coordinate system of the map plane, and this step is repeated until all red marks are completed;
[0013] S7. Connect all adjacent projection matrix blocks that are not marked in red between point O and point P through the route planning submodule. After successful connection, mark all adjacent projection matrix blocks on the entire route in green and mark x / y at the same time, where x represents the route number and y represents the number of green marked blocks used in the corresponding route, to form several groups of route planning solutions;
[0014] S8. Storing several groups of route planning scheme information in the preliminary route database.
[0015] According to the above technical solution, the transport target analysis module includes a robotic arm scanning unit, a stereoscopic imaging submodule and a comparison and judgment submodule. The robotic arm scanning unit is used to control the robotic arm of the transport robot to emit a dot matrix projection and surround the global scan of the goods after the transport robot completes loading the goods. The stereoscopic imaging submodule is electrically connected to the robotic arm scanning unit. The stereoscopic imaging submodule is used to perform stereoscopic imaging processing on the goods scanning signal. The comparison and judgment submodule is used to compare, screen and judge the transported goods with the narrowest passable distance behind the obstacle image in the preliminary route data.
[0016] According to the above technical solution, the operation method of the transport target analysis module is:
[0017] A. After receiving the signal that the cargo loading is completed, the robotic arm unit is started to control the robotic arm of the handling robot to scan the cargo around the entire body and emit a dot matrix projection laser;
[0018] B. The real-time feedback signal of the dot matrix projection laser is transmitted to the stereoscopic imaging submodule. The size of the cargo affects the amount of occlusion of the photosensitive digital signal, thereby reflecting the size of the scanned cargo imaging;
[0019] C. The stereo imaging submodule performs dot matrix space simulation and finds the longest straight-line distance l between two points in the space simulation through fitting and comparison;
[0020] D. When l is greater than 0.5 meters, retrieve the preliminary route database, conduct a secondary comparison and judgment on all preliminary routes, and conduct a detailed analysis of the situation where both sides of the green-marked projection matrix block in the route are red-marked projection matrix blocks. Specifically outline the edge of the red-marked projection matrix block at that location to determine the narrowest distance l on both sides of that location. min , when there is a detailed analysis in the selected route, l≥l min When , it is determined that the corresponding route is screened out;
[0021] E. Repeat step D to retain the remaining routes and their information after screening in the preliminary route database.
[0022] According to the above technical solution, the intelligent scheduling module includes an obstacle avoidance submodule, an avoidance time calculation submodule, a judgment submodule, and a route scheduling submodule. The obstacle avoidance submodule is used to monitor obstacles and adjust the handling posture and handling speed to effectively avoid obstacles. The avoidance time calculation submodule is used to analyze and calculate the time spent by the handling robot on avoiding obstacles during the handling process. The judgment submodule is used to judge and schedule the best handling route. The route scheduling submodule and the avoidance time calculation submodule are both electrically connected to the judgment submodule. The route scheduling submodule is used to control the handling robot to execute the route scheduling task output by the judgment.
[0023] According to the above technical solution, the obstacle avoidance submodule further includes a laser radar scanning unit and a feature extraction unit. The laser radar scanning unit is used to scan obstacles on the transportation route on site during the transportation process. The laser radar scanning unit is electrically connected to the feature extraction unit. The feature extraction unit is used to extract and determine the size and shape characteristics of the obstacles on the transportation route.
[0024] According to the above technical solution, the operation method of the intelligent scheduling module is:
[0025] r. Obtain the remaining routes and their information after screening in the preliminary route database, and use the formula to calculate the time T for each route;
[0026] s. Sort all the calculation results and output the route number x corresponding to the minimum value 0 ;
[0027] t. The intelligent scheduling module sends an execution signal to control the handling robot to execute the route number x 0 transportation routes;
[0028] u. During the handling process of the handling robot, a diffuse laser dot matrix attenuated light signal is emitted forward with the handling robot as the center;
[0029] v. When a temporary obstacle appears in front of the path, the feature extraction submodule converts the diffuse laser dot matrix attenuated optical signal fed back to the temporary obstacle into a digital electrical signal D;
[0030] w.Through the formula The digital electrical signal D value is obtained, and the judgment unit compares the D value with the maximum value T of the foreign object, where n is the number of foreign object optical signals detected, Umin is the minimum attenuation of the optical signal, and K is the fixed coefficient of the radar scanning unit optical signal to the feature extraction submodule electrical signal;
[0031] x. When D>T, it is impossible to pass through, and the current position is taken as the origin 0, and the system operation steps are repeated to re-plan the route. Otherwise, the chassis posture of the transport robot is adjusted to cross the temporary obstacle.
[0032] According to the above technical solution, in step r, the calculation formula for the time T of each route is:
[0033]
[0034] Where y is the number of green blocks used in the corresponding route, that is, the route distance, α is the control parameter, that is, αy represents the unique transport time value corresponding to the proportional transport speed under the route distance; p is the total number of green blocks in the route with detailed analysis. min -lThe average redundant distance β through obstacles is its control parameter, and n means that there are n places corresponding to the route where detailed analysis exists.
[0035] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention realizes intelligent and efficient scheduling of handling tasks through the mutual cooperation of the path planning module, the handling target analysis module and the intelligent scheduling module. It has high efficiency, flexibility, safety and reliability, and ensures obstacle avoidance and path optimization during the handling process through real-time signal feedback and laser radar scanning functions, significantly improving the execution efficiency of handling tasks and the overall performance of the system, adapting to complex and changeable working environments, and improving the automation level in warehousing and logistics. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0037] Figure 1 It is a schematic diagram of the system module composition of the present invention. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] See also Figure 1 The present invention provides a technical solution: an intelligent scheduling system for a handling robot based on path planning, including a path planning module, a handling target analysis module, and an intelligent scheduling module. The path planning module is used to calculate the optimal path based on the received task information, combined with the warehouse map and obstacle information. The handling target analysis module is used to analyze the target goods to be handled by the current task. The intelligent scheduling module is used to retrieve according to the path planning and handling target and obstacle analysis results to confirm the final handling route. The path planning module, the handling target analysis module, and the intelligent scheduling module are all connected to each other through a wireless network; through the mutual cooperation of the path planning module, the handling target analysis module, and the intelligent scheduling module, the intelligent and efficient scheduling of the handling task is realized. It has high efficiency, flexibility, safety and reliability. Through real-time signal feedback and laser radar scanning functions, it ensures obstacle avoidance and path optimization during the handling process, significantly improves the execution efficiency of the handling task and the overall performance of the system, adapts to complex and changeable working environments, and improves the automation level in warehousing and logistics.
[0040] The path planning module includes a task receiving submodule, a starting position calibration submodule, a destination input submodule, a matrix projection submodule, a route planning submodule and a preliminary route database. The task receiving submodule is used to receive the handling task request information of the warehouse management system. The starting position calibration submodule is used to calibrate the starting position of the handling robot task. The destination input submodule is electrically connected to the starting position calibration submodule. The destination input submodule is used to lock the destination position in the handling task. The matrix projection submodule is used to establish a global projection matrix in combination with the warehouse map. The route planning submodule is electrically connected to the matrix projection submodule. The route planning submodule is used to plan the optimal route from the task starting position to the destination position of the handling robot. The preliminary route database is electrically connected to the route planning submodule. The preliminary route database is used to store all alternative routes for route planning.
[0041] The operation method of the path planning module is:
[0042] S1. The system receives a transport task and uses the task receiving submodule to obtain the transport task request information, wherein the transport task request information includes: the task starting point and the task end point;
[0043] S2. Combine the warehouse map and establish a rectangular coordinate system on the map plane with the task starting position as the origin O;
[0044] S3. Determine the location of the destination in the rectangular coordinate system of the map plane and mark it as the end point P, and mark the distance from the origin O to the end point P as L;
[0045] S4. With the origin O as the center and the length of L as the radius, an equal-length projection matrix is established in combination with the warehouse map. All projection matrices are arranged adjacent to each other in the warehouse, and the side length of the projection matrix is 0.5 meters.
[0046] S5. Retrieve the real-time signal feedback of the global projection matrix arranged in the warehouse. When there are shelves, equipment or obstacles at the location of the matrix, the projection matrix signal feedback is transmitted in real time to the established map plane rectangular coordinate system;
[0047] S6. When there is obstacle signal feedback for a single projection matrix block, the projection matrix block is marked in red in the rectangular coordinate system of the map plane, and this step is repeated until all red marks are completed;
[0048] S7. Connect all adjacent projection matrix blocks that are not marked in red between point O and point P through the route planning submodule. After successful connection, mark all adjacent projection matrix blocks on the entire route in green and mark x / y at the same time, where x represents the route number and y represents the number of green marked blocks used in the corresponding route, to form several groups of route planning solutions;
[0049] S8. Storing several groups of route planning scheme information in the preliminary route database.
[0050] The transport target analysis module includes a robotic arm scanning unit, a stereo imaging submodule and a comparison and judgment submodule. The robotic arm scanning unit is used to control the robotic arm of the transport robot to emit a dot matrix projection and surround the global scan of the goods after the transport robot has loaded the goods. The stereo imaging submodule is electrically connected to the robotic arm scanning unit. The stereo imaging submodule is used to perform stereo imaging processing on the goods scanning signal. The comparison and judgment submodule is used to compare, screen and judge the transported goods with the narrowest passable distance after the obstacle image in the preliminary route data.
[0051] The operation method of the transport target analysis module is:
[0052] A. After receiving the signal that the cargo loading is completed, the robotic arm unit is started to control the robotic arm of the handling robot to scan the cargo around the entire body and emit a dot matrix projection laser;
[0053] B. The real-time feedback signal of the dot matrix projection laser is transmitted to the stereoscopic imaging submodule. The size of the cargo affects the amount of occlusion of the photosensitive digital signal, thereby reflecting the size of the scanned cargo imaging;
[0054] C. The stereo imaging submodule performs dot matrix space simulation and finds the longest straight-line distance l between two points in the space simulation through fitting and comparison;
[0055] D. When l is greater than 0.5 meters, retrieve the preliminary route database, conduct a secondary comparison and judgment on all preliminary routes, and conduct a detailed analysis of the situation where both sides of the green-marked projection matrix block in the route are red-marked projection matrix blocks. Specifically outline the edge of the red-marked projection matrix block at that location to determine the narrowest distance l on both sides of that location. min , when there is a detailed analysis in the selected route, l≥l min When , it is determined that the corresponding route is screened out;
[0056] E. Repeat step D to retain the remaining routes and their information after screening in the preliminary route database.
[0057] The intelligent scheduling module includes an obstacle avoidance submodule, an avoidance time calculation submodule, a judgment submodule, and a route scheduling submodule. The obstacle avoidance submodule is used to monitor obstacles and adjust the handling posture and handling speed to effectively avoid obstacles. The avoidance time calculation submodule is used to analyze and calculate the time spent by the handling robot on avoiding obstacles during the handling process. The judgment submodule is used to judge and schedule the best handling route. The route scheduling submodule and the avoidance time calculation submodule are both electrically connected to the judgment submodule. The route scheduling submodule is used to control the handling robot to execute the route scheduling task output by the judgment.
[0058] The obstacle avoidance submodule further includes a laser radar scanning unit and a feature extraction unit. The laser radar scanning unit is used to scan obstacles on the transport route on site during the transport process. The laser radar scanning unit is electrically connected to the feature extraction unit. The feature extraction unit is used to extract and determine the size and shape characteristics of the obstacles on the transport route.
[0059] The operation method of the intelligent scheduling module is:
[0060] r. Obtain the remaining routes and their information after screening in the preliminary route database, and use the formula to calculate the time T for each route;
[0061] s. Sort all the calculation results and output the route number x corresponding to the minimum value 0 ;
[0062] t. The intelligent scheduling module sends an execution signal to control the handling robot to execute the route number x 0 transportation routes;
[0063] u. During the handling process of the handling robot, a diffuse laser dot matrix attenuated light signal is emitted forward with the handling robot as the center;
[0064] v. When a temporary obstacle appears in front of the path, the feature extraction submodule converts the diffuse laser dot matrix attenuated optical signal fed back to the temporary obstacle into a digital electrical signal D;
[0065] w.Through the formula The digital electrical signal D value is obtained, and the judgment unit compares the D value with the maximum value T of the foreign object, where n is the number of foreign object optical signals detected, Umin is the minimum attenuation of the optical signal, and K is the fixed coefficient of the radar scanning unit optical signal to the feature extraction submodule electrical signal;
[0066] x. When D>T, it is impossible to pass through, and the current position is taken as the origin 0, and the system operation steps are repeated to re-plan the route. Otherwise, the chassis posture of the transport robot is adjusted to cross the temporary obstacle.
[0067] In step r, the calculation formula for the time T of each route is:
[0068]
[0069] Where y is the number of green blocks used in the corresponding route, that is, the route distance, α is the control parameter, that is, αy represents the unique transport time value corresponding to the proportional transport speed under the route distance; p is the total number of green blocks in the route with detailed analysis. min -lThe average redundant distance β through obstacles is its control parameter, and n means that there are n places corresponding to the route where detailed analysis exists.
[0070] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0071] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An intelligent dispatching system for a handling robot based on path planning, characterized in that: The system includes a path planning module, a handling target analysis module, and an intelligent scheduling module. The path planning module is used to calculate the optimal path based on the received task information, combined with the warehouse map and obstacle information. The handling target analysis module is used to analyze the target goods to be transported by the current task. The intelligent scheduling module is used to retrieve and confirm the final transportation route based on the path planning, handling target and obstacle analysis results. The path planning module, handling target analysis module and intelligent scheduling module are all connected to each other via a wireless network.
2. The intelligent dispatching system for a handling robot based on path planning according to claim 1, characterized in that: The path planning module includes a task receiving submodule, a starting position calibration submodule, a destination input submodule, a matrix projection submodule, a route planning submodule and a preliminary route database. The task receiving submodule is used to receive the handling task request information of the warehouse management system. The starting position calibration submodule is used to calibrate the starting position of the handling robot task. The destination input submodule is electrically connected to the starting position calibration submodule. The destination input submodule is used to lock the destination position in the handling task. The matrix projection submodule is used to establish a global projection matrix in combination with the warehouse map. The route planning submodule is electrically connected to the matrix projection submodule. The route planning submodule is used to plan the optimal route from the task starting position to the destination position of the handling robot. The preliminary route database is electrically connected to the route planning submodule. The preliminary route database is used to store all alternative routes for route planning.
3. The intelligent dispatching system for a handling robot based on path planning according to claim 2, characterized in that: The operation method of the path planning module is: S1. The system receives a transport task and uses the task receiving submodule to obtain the transport task request information, wherein the transport task request information includes: the task starting point and the task end point; S2. Combine the warehouse map and establish a rectangular coordinate system on the map plane with the task starting position as the origin O; S3. Determine the location of the destination in the rectangular coordinate system of the map plane and mark it as the end point P, and mark the distance from the origin O to the end point P as L; S4. With the origin O as the center and the length of L as the radius, an equal-length projection matrix is established in combination with the warehouse map. All projection matrices are arranged adjacent to each other in the warehouse, and the side length of the projection matrix is 0.5 meters. S5. Retrieve the real-time signal feedback of the global projection matrix arranged in the warehouse. When there are shelves, equipment or obstacles at the location of the matrix, the projection matrix signal feedback is transmitted in real time to the established map plane rectangular coordinate system; S6. When there is obstacle signal feedback for a single projection matrix block, the projection matrix block is marked in red in the rectangular coordinate system of the map plane, and this step is repeated until all red marks are completed; S7. Connect all adjacent projection matrix blocks that are not marked in red between point O and point P through the route planning submodule. After successful connection, mark all adjacent projection matrix blocks on the entire route in green and mark x / y at the same time, where x represents the route number and y represents the number of green marked blocks used in the corresponding route, to form several groups of route planning solutions; S8. Storing several groups of route planning scheme information in the preliminary route database.
4. The intelligent dispatching system for a handling robot based on path planning according to claim 3 is characterized in that: The transport target analysis module includes a robotic arm scanning unit, a stereo imaging submodule and a comparison and judgment submodule. The robotic arm scanning unit is used to control the robotic arm of the transport robot to emit a dot matrix projection and globally scan the goods after the transport robot has loaded the goods. The stereo imaging submodule is electrically connected to the robotic arm scanning unit. The stereo imaging submodule is used to perform stereo imaging processing on the goods scanning signal. The comparison and judgment submodule is used to compare, screen and judge the transported goods with the narrowest passable distance behind the obstacle image in the preliminary route data.
5. The intelligent dispatching system for a handling robot based on path planning according to claim 4, characterized in that: The operation method of the transport target analysis module is: A. After receiving the signal that the cargo loading is completed, the robotic arm unit is started to control the robotic arm of the handling robot to scan the cargo around the entire body and emit a dot matrix projection laser; B. The real-time feedback signal of the dot matrix projection laser is transmitted to the stereoscopic imaging submodule. The size of the cargo affects the amount of occlusion of the photosensitive digital signal, thereby reflecting the size of the scanned cargo imaging; C. The stereo imaging submodule performs dot matrix space simulation and finds the longest straight-line distance l between two points in the space simulation through fitting and comparison; D. When l is greater than 0.5 meters, retrieve the preliminary route database, conduct a secondary comparison and judgment on all preliminary routes, and conduct a detailed analysis of the situation where both sides of the green-marked projection matrix block in the route are red-marked projection matrix blocks. Specifically outline the edge of the red-marked projection matrix block at that location to determine the narrowest distance l on both sides of that location. min , when there is a detailed analysis in the selected route, l≥l min When , it is determined that the corresponding route is screened out; E. Repeat step D to retain the remaining routes and their information after screening in the preliminary route database.
6. The intelligent dispatching system for a handling robot based on path planning according to claim 5, characterized in that: The intelligent scheduling module includes an obstacle avoidance submodule, an avoidance time calculation submodule, a judgment submodule, and a route scheduling submodule. The obstacle avoidance submodule is used to monitor obstacles and adjust the handling posture and handling speed to effectively avoid obstacles. The avoidance time calculation submodule is used to analyze and calculate the time spent by the handling robot on avoiding obstacles during the handling process. The judgment submodule is used to judge and schedule the best handling route. The route scheduling submodule and the avoidance time calculation submodule are both electrically connected to the judgment submodule. The route scheduling submodule is used to control the handling robot to execute the route scheduling task output by the judgment.
7. The intelligent dispatching system for a handling robot based on path planning according to claim 6, characterized in that: The obstacle avoidance submodule further includes a laser radar scanning unit and a feature extraction unit. The laser radar scanning unit is used to scan obstacles on the transport route on site during the transport process. The laser radar scanning unit is electrically connected to the feature extraction unit. The feature extraction unit is used to extract and determine the size and shape characteristics of the obstacles on the transport route.
8. The intelligent dispatching system for a handling robot based on path planning according to claim 7, characterized in that: The operation method of the intelligent scheduling module is: r. Obtain the remaining routes and their information after screening in the preliminary route database, and use the formula to calculate the time T for each route; s. Sort all the calculation results and output the route number x0 corresponding to the minimum value; t. The intelligent scheduling module sends an execution signal to control the transport robot to execute the transport route with route number x0; u. During the handling process of the handling robot, a diffuse laser dot matrix attenuated light signal is emitted forward with the handling robot as the center; v. When a temporary obstacle appears in front of the path, the feature extraction submodule converts the diffuse laser dot matrix attenuated optical signal fed back to the temporary obstacle into a digital electrical signal D; w.Through the formula The digital electrical signal D value is obtained, and the judgment unit compares the D value with the maximum value T of the foreign object, where n is the number of foreign object optical signals detected, Umin is the minimum attenuation of the optical signal, and K is the fixed coefficient of the radar scanning unit optical signal to the feature extraction submodule electrical signal; x. When D>T, it is impossible to pass through, and the current position is taken as the origin 0, and the system operation steps are repeated to re-plan the route. Otherwise, the chassis posture of the transport robot is adjusted to cross the temporary obstacle.
9. The intelligent dispatching system for a handling robot based on path planning according to claim 8, characterized in that: In step r, the calculation formula for the time T of each route is: Where y is the number of green blocks used in the corresponding route, that is, the route distance, α is the control parameter, that is, αy represents the unique transport time value corresponding to the proportional transport speed under the route distance; p is the total number of green blocks in the route with detailed analysis. min -lThe average redundant distance β through obstacles is its control parameter, and n means that there are n places corresponding to the route where detailed analysis exists.
