Sponge facility runoff regulation and control capability optimization method

Through methods based on outdoor experiments and numerical models, a SWMM model is constructed and coupled with a multi-objective optimization algorithm to identify key parameters of sponge facilities, solve the problem of difficulty in accurately quantifying the runoff control capabilities of sponge facilities, achieve scientific evaluation and optimization, and provide Effective runoff reduction programs alleviate urban flooding and recharge groundwater resources.

CN118761273APending Publication Date: 2024-10-11BEIJING NORMAL UNIVERSITY
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410859374.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

It is difficult to accurately quantify the runoff control capabilities of sponge facilities. Existing physical model parameter values ​​are somewhat subjective, and there is a lack of actual monitoring data, resulting in uncertain simulation results.

Method used

Methods based on outdoor experiments and numerical models were used to collect data through the urban underlying surface rainfall runoff simulation test system, construct a SWMM model and couple it with a multi-objective optimization algorithm to identify key parameters and optimize the infiltration and outflow targets of sponge facilities.

Benefits of technology

It has achieved scientific evaluation and optimization of the runoff control capabilities of sponge facilities, accurately reflected the actual runoff reduction effect, and provided a pavement solution that can reduce the total and peak volume of regional runoff and recover the most rainwater resources, alleviating urban waterlogging and replenishing groundwater resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761273A_ABST
    Figure CN118761273A_ABST
Patent Text Reader

Abstract

The invention discloses a sponge facility runoff regulation and control capability optimization method, which comprises the following steps of collecting and recording rainfall, infiltration, overflow and outflow process data of different sponge measures based on an urban underlying surface rainfall runoff simulation test system; constructing an SWMM model based on actual measurement data and test monitoring data of a sponge transformation area and the sponge facility structure parameters, and calibrating and verifying the model by utilizing the actual measurement and test data; on the basis of the SWMM model, under different rainfall and LID parameter scenes, simulating and identifying sponge facility runoff regulation and control key influence parameters; and coupling the SWMM model with a multi-objective optimization algorithm, and simulating to obtain a sponge facility parameter optimal solution set meeting the underlying surface outflow and infiltration targets under the sponge measures. According to the method, effective optimization of the internal structure of the sponge facility is achieved through the method of combining test monitoring and numerical simulation, the runoff reduction capacity of the sponge facility can be fundamentally improved, and important technical support can be provided for urban flood control and disaster reduction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of sponge city simulation and test technology, and in particular to a method for optimizing the runoff regulation capacity of a sponge facility. Background Art

[0002] The actual runoff control capacity of sponge facilities is usually difficult to accurately quantify. At present, in addition to the deployment of instruments for field monitoring, indoor and outdoor rainfall runoff test methods and numerical simulation methods are mostly used for evaluation. Due to the constraints of test sites, test equipment, construction costs, time costs, etc., it is difficult to carry out indoor and outdoor rainfall runoff tests. With a large amount of money and time invested, only a limited number of design scenario tests can be carried out. At the same time, the test results are affected by the on-site environmental conditions and have a large degree of uncertainty. When using numerical simulation methods, existing physical models (such as SWMM models) usually determine the LID parameter values ​​of sponge facilities based on literature data, which is somewhat subjective; however, according to the general physical model construction process, most sponge facilities lack actual monitoring data such as infiltration and outflow, and it is impossible to calibrate and verify the model, making it difficult to accurately reflect the actual runoff reduction effect of sponge facilities.

[0003] Therefore, how to accurately quantify and improve the runoff regulation capacity of sponge facilities is a technical problem that needs to be urgently solved by technical personnel in this field. Summary of the invention

[0004] In view of the above research status and existing problems, the present invention provides a method for optimizing the runoff regulation capacity of sponge facilities based on outdoor experiments and numerical models, thereby realizing scientific evaluation and effective optimization of the runoff regulation capacity of sponge facilities.

[0005] The present invention provides a method for optimizing the runoff regulation capacity of a sponge facility, comprising the following steps:

[0006] Based on the urban underlying surface rainfall runoff simulation test system, the test monitoring data is collected and recorded, including: rainfall, infiltration, overflow, and outflow process data of different sponge facilities;

[0007] Building a SWMM model based on measured data of the sponge transformation area and structural parameters of the underlying surface of the sponge facility, calibrating and verifying the SWMM model using the measured data of the sponge transformation area and the test monitoring data, wherein the measured data includes items corresponding to the process data;

[0008] The SWMM model is used to simulate various rainfall and LID scenarios to identify key parameters that affect the runoff regulation effect of sponge facilities. The SWMM model is coupled with a multi-objective optimization algorithm to simulate and calculate the optimal parameter solution set of the sponge facility that meets the outflow and infiltration targets of the underlying surface of the sponge measures.

[0009] Preferably, the method further includes the steps of constructing a rainfall runoff simulation test system for the underlying surface of the sponge facility:

[0010] The rainfall runoff simulation test system for the underlying surface of the sponge facility includes: a rainfall simulation module, an underlying surface module and a water supply module; among them,

[0011] The rainfall simulation module includes: a support frame, a rainfall pipeline and a rainfall nozzle built on the top of the underlying surface module; a plurality of rainfall nozzles are distributedly installed on the support frame to form N rainfall partitions, N≥2;

[0012] The underlying surface module includes N mobile variable slope test troughs correspondingly distributed in N rainfall zones and a sponge facility underlying surface pavement layer arranged in the mobile variable slope test trough; a hydraulic lifting device is provided on one side of the bottom of the trough body of the mobile variable slope test trough, an overflow port is provided on the side of the trough body near the top position, a lower seepage port is provided on the trough body near the bottom position, and a water inlet is provided on the side of the trough body provided with the hydraulic lifting device; N different types of sponge facility underlying surface pavement layers are arranged in the corresponding mobile variable slope test troughs;

[0013] The water supply module includes a water supply pipeline, a booster water pump and a water supply pool; the booster water pump transports the water in the water supply pool to the rainfall pipeline and rainfall nozzle through the water supply pipeline.

[0014] Preferably, constructing a SWMM model based on the data required for modeling the sponge transformation area and the structural parameters of the underlying surface of the sponge facility includes: constructing a SWMM model framework for the sponge transformation area based on the land use, DEM, drainage network, remote sensing image, and rainfall flow data of the sponge transformation area, and setting the SWMM model LID module parameters based on the specifications of the variable slope test trough, the underlying surface structure of the sponge facility, and the material properties.

[0015] Preferably, constructing a SWMM model based on measured data and experimental monitoring data of the sponge transformation area includes: using the measured rainfall data of the sponge transformation area and the corresponding outflow data to calibrate and verify the SWMM model, and determine the values ​​of the main process parameters of the model runoff generation and confluence module. The minute-by-minute rainfall data with different return periods under a fixed duration of experimental monitoring is input into the SWMM model, and the minute-by-minute infiltration, overflow, and deep seepage data of the sponge facilities monitored in the experiment are used to calibrate the LID module parameters of the SWMM model.

[0016] Preferably, the SWMM model is used to calculate surface runoff, surface runoff and pipe network runoff:

[0017] The surface runoff calculation includes: calculating the surface runoff of the sub-catchment area using a runoff model; the runoff model includes a Horton model;

[0018] Surface runoff calculation includes: using nonlinear reservoir model to simulate the surface runoff process in subcatchment areas;

[0019] The pipe network confluence calculation includes: using the pipe channel confluence calculation method to simulate the confluence process of water flow in the underground drainage pipe network, and dynamically calculating the pipeline flow and node water depth; the pipe channel confluence calculation method includes the dynamic wave method.

[0020] Preferably, the SWMM model is used to simulate and solve the LID module flow generation process: including calculating the infiltration rate of the sponge facility surface layer and soil layer, the drainage pipe flow of the drainage layer, the overflow of the surface layer and the deep seepage of the storage / drainage layer.

[0021] Preferably, set the Nash efficiency coefficient NSE and the peak flow relative error RE p Sum peak time absolute error AE T Three indicators are used as SWMM model accuracy evaluation indicators.

[0022] Preferably, the multi-objective optimization problem of sponge facility parameters is defined as follows:

[0023] The structural and material property parameters of the underlying surface of the sponge facility are used as decision variables;

[0024] The optimization objectives are to minimize the total outflow of the sponge facility, minimize the outflow peak, and maximize the infiltration volume;

[0025] The maximum and minimum ranges of characteristic parameters of the underlying surface of the sponge facility are taken as constraints.

[0026] Preferably, the decision variables are determined based on the key parameters of the LID facility identified by multiple sponge facility rainfall scenario simulations. The decision variables include any combination of the following: aquifer thickness, vegetation coverage, soil layer thickness, soil layer hydraulic conductivity, drainage layer thickness, drainage layer infiltration rate, etc. of the sponge facility.

[0027] Preferably, the multi-objective optimization algorithm includes:

[0028] Through crossover, mutation and sorting, multiple groups of decision variable samples are generated within the constraints, and a group of decision variable data is randomly selected as the initial value of the LID module parameters of the SWMM model (such as the underlying surface sponge facility design parameters described in the experiment), and the surface runoff, surface runoff and pipe network runoff data calculated by the SWMM model are obtained;

[0029] Determine whether the set maximum number of iterations has been reached. If not, the multi-objective optimization algorithm will cross, mutate, sort, and merge again to generate new sets of decision variables, and randomly select one set to input into the SWMM model to obtain new surface runoff, surface runoff, and pipe network runoff data;

[0030] By comparison and judgment, the sample values ​​of the decision variables that are closer to the optimization objective function are retained. The decision variable parameter values ​​are replaced repeatedly until the maximum number of iterations is reached and the calculation is stopped to generate the Pareto optimal solution set.

[0031] The method for optimizing the runoff regulation capacity of sponge facilities proposed in the present invention has the following beneficial effects compared with the prior art:

[0032] The present invention constructs a SWMM model using actual rainfall runoff monitoring data in the sponge transformation area and rainfall runoff data of the sponge facility obtained from the experiment. The model is calibrated and verified from the overall study area and the local sponge facility. The model has high simulation accuracy for the sponge facility and can accurately reflect the actual runoff reduction effect of the sponge facility.

[0033] According to the multi-objective simulation results, the present invention can obtain multiple groups of sponge facility paving plans that can maximize the reduction of regional runoff volume and runoff peak and recover the most rainwater resources. The research results have important practical significance for alleviating urban waterlogging and replenishing groundwater resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on the provided drawings without creative work.

[0035] Figure 1 is a flow chart of a method for optimizing the runoff regulation capacity of a sponge facility provided in an embodiment of the present invention;

[0036] Figure 2 is a schematic diagram of a nonlinear reservoir model provided by an embodiment of the present invention;

[0037] Figure 3 is a schematic diagram of the structure of the LID module provided in an embodiment of the present invention;

[0038] Figure 4 It is a three-dimensional graph of the Pareto optimal solution set provided by an embodiment of the present invention;

[0039] Figure 5 It is a flow chart of a rainwater flood model provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] like Figure 1 As shown, a method for optimizing the runoff regulation capacity of a sponge facility provided by an embodiment of the present invention comprises the following steps:

[0042] Based on the urban surface rainfall runoff simulation test system, the rainfall, infiltration, overflow and outflow process data of the underlying surfaces of different sponge measures are collected and recorded; the SWMM model is constructed based on the measured rainfall outflow data of the sponge transformation area, the test monitoring data of the sponge facilities and the structural parameters of the sponge facilities, and the model is calibrated and verified using the measured and experimental monitoring data; the SWMM model is used to simulate the runoff changes under various rainfall and LID scenarios, and the key parameters affecting the runoff regulation effect of the sponge facilities are identified; the SWMM model is coupled with the multi-objective optimization algorithm, and the simulation and judgment are continuously performed until the optimal parameter solution set of the sponge facilities that meets the outflow and infiltration targets of the underlying surface of the sponge facilities is obtained, which provides a reference for the material selection, paving and design of the sponge facilities, thereby more efficiently achieving the goal of sponge city construction.

[0043] In one embodiment, the step of constructing a rainfall runoff simulation test system for the underlying surface of the sponge facility is also included:

[0044] The rainfall runoff simulation test system for the underlying surface of the sponge facility includes: a rainfall simulation module, an underlying surface module and a water supply module; among them,

[0045] The rainfall simulation module includes: a support frame, a rainfall pipeline and a rainfall sprinkler built on the top of the underlying surface module; multiple rainfall sprinklers are distributedly installed on the support frame to form N rainfall partitions, N ≥ 2;

[0046] The underlying surface module includes N mobile variable slope test troughs correspondingly distributed in N rainfall zones and underlying surface pavement layers arranged in the mobile variable slope test troughs; a hydraulic lifting device is provided on one side of the bottom of the trough body of the mobile variable slope test trough, an overflow port is provided near the top of the trough body side, and a seepage port is provided near the bottom of the trough body; N underlying surface pavement layers of different types are arranged in the corresponding mobile variable slope test troughs;

[0047] The water supply module includes a water supply pipeline, a booster pump and a water supply tank; the booster pump transports the water in the water supply tank to the rainfall pipeline and rainfall sprinkler through the water supply pipeline.

[0048] In this embodiment, the rainfall simulation module also includes: the rainfall nozzle is connected to the water supply tank through a water supply pipeline and a booster pump, and a pressure gauge and a solenoid valve are arranged on the water supply pipeline; N rain gauges are installed on the support frame, each rain gauge is located below the corresponding rainfall partition, and the distance from the center position of the rainfall partition is less than the set distance range, which is used for real-time feedback of the rainfall intensity and rainfall amount of the rainfall partition.

[0049] In this embodiment, the plurality of rainfall nozzles include rainfall nozzles with different apertures.

[0050] In this embodiment, a push-pull waterproof cloth canopy is arranged around the outer periphery of the support frame.

[0051] In this embodiment, the tank body includes a slope-changing frame and a panel assembled on the side and bottom of the slope-changing frame;

[0052] The hydraulic lifting device is installed on one side of the bottom of the slope changing frame;

[0053] An overflow port is arranged at a position where the distance from the top of the enclosure plate on one side of the tank body is less than the specified height range, and the overflow port is connected to the tipping bucket flow meter through an overflow collection pipe;

[0054] A lower seepage outlet is arranged at a position where the enclosure on one side of the trough body is less than a specified height range from the bottom end. The lower seepage outlet is connected to the water collecting trough through a lower seepage flow collection pipe, and the water collecting trough is connected to the drainage ditch.

[0055] In this embodiment, a triangular weir is arranged inside one end of the water collecting trough which is connected to the downward seepage flow collection pipe, and a drainage pipe is arranged on one side of the triangular weir outflow of the water collecting trough, and the drainage pipe is connected to the drainage ditch.

[0056] In this embodiment, a water level gauge is installed on the inner surface of one side of the water collecting tank.

[0057] In this embodiment, the N underlying surface pavement layers include any N groups of the following:

[0058] The underlying pavement layer of the green roof includes a drainage layer, a permeable geotextile, a matrix layer and a vegetation layer arranged in sequence from bottom to top. The overflow port is located at the height of the vegetation layer, and the lower seepage outlet is located at the height of the drainage layer.

[0059] The permeable pavement lower surface pavement layer includes a permeable geotextile layer 1, a cushion layer, a base layer, a permeable geotextile layer 2, a leveling layer and a surface layer arranged in sequence from bottom to top, the overflow port is located at a height above the surface layer, and the lower seepage outlet is located at a height of the cushion layer;

[0060] The bioretention cushion surface pavement layer includes a permeable geotextile layer 1, a gravel layer, a permeable geotextile layer 2, a filler layer and an aquifer arranged in sequence from bottom to top, the overflow port is located at the height of the aquifer, and the lower seepage outlet is located at the height of the gravel layer.

[0061] In this embodiment, a soil moisture sensor is buried inside the underlying surface pavement layer.

[0062] In this embodiment, a drainage module is also included, which includes: N drainage partitions arranged on the ground, the drainage partitions correspond to the positions of the rainfall partitions, and the underlying surface module is located inside the drainage partitions; drainage grooves are arranged around the inner edges of the drainage partitions, the surfaces of the drainage grooves are covered with drainage grates, and the drainage grooves are connected to the external environment.

[0063] Before collecting and recording the rainfall, infiltration, overflow and outflow process data of the underlying surfaces of different sponge measures, turn on the water supply device and data acquisition system power supply based on the urban underlying surface rainfall runoff simulation test system, and check the online status of each monitoring device on the data acquisition cloud platform.

[0064] In one embodiment, the SWMM model uses the measured rainfall data and outflow data of the sponge transformation area and the overflow, infiltration, and outflow data monitored by the sponge facility test to calibrate the model. The measured data of the sponge transformation area is used to calibrate the process parameters of the SWMM model, as shown in Table 1; the sponge facility test monitoring data is used to calibrate the LID module parameters of the SWMM model, as shown in Table 2. Input the measured rainfall data, change the parameters that need to be calibrated in the model, until the measured outflow process line is basically consistent with the model simulation outflow process line, and the Nash efficiency coefficient NSE and the peak flow relative error RE p Sum peak time absolute error AE T Within the permitted range of model accuracy, the model is considered to meet the accuracy requirements.

[0065] In this embodiment, constructing a SWMM model based on the measured data of the sponge transformation area includes: dividing the sub-catchment area according to DEM, roads, and drainage pipe networks, generalizing the drainage pipe network, setting the physical parameters of the underlying surface of the sub-catchment area, selecting the calculation method and setting parameters for surface runoff, surface runoff, and pipe network runoff, inputting the measured rainfall data into the model, calibrating the model process parameters according to the measured outflow data, and verifying the model accuracy.

[0066] In one embodiment, the SWMM model mainly consists of five parts: rainfall input module, surface runoff simulation module, surface confluence simulation module, pipe network confluence simulation module, and LID module, which can dynamically simulate the urban area rainfall runoff process or long sequence. The SWMM model also includes a pollutant transport simulation module in the water body, a meteorological simulation module such as temperature, evapotranspiration, and snowmelt, a sluice pump weir water conservancy project facility module, and a groundwater simulation module, but none of them are involved in this example.

[0067] The SWMM model can output dozens of data such as subcatchment outflow, water depth, infiltration, evaporation, runoff coefficient, pipe node overflow, etc. The main output data involved in this example are subcatchment outflow and sponge facility infiltration, overflow, and deep leakage.

[0068] Parameter setting is a key step in building a SWMM model. The basic parameters of the SWMM model can be divided into two categories: physical parameters and process parameters according to the differences in the acquisition methods. The physical parameters are calculated through measured data or software such as ArcGIS, while the process parameters need to be obtained through model parameter calibration. Table 1 shows the basic parameters of the SWMM model.

[0069] Table 1 Basic parameters of SWMM model

[0070]

[0071] The SWMM model in this embodiment is used to calculate surface runoff, surface runoff and pipe network runoff:

[0072] Surface runoff calculation: Estimate the infiltration rate based on the Horton model. The execution process is as follows:

[0073] The SWMM model provides a variety of runoff simulation methods, including the Horton model, the Green-Ampt model, and the SCS-CN method. The runoff mechanism in urban areas is mainly based on the over-infiltration runoff of the Horton runoff theory, and the Horton model requires fewer parameters to be calibrated, and has higher calculation accuracy. This embodiment selects the widely used Horton model to simulate surface infiltration, and the Horton infiltration equation is:

[0074] f t =f c +(f0-f c ) -kt (1)

[0075] In the formula, f t is the infiltration rate at time t; f0 is the initial soil infiltration force; f c is the stable infiltration rate of soil, and its unit is mm / h; k is the infiltration attenuation coefficient; t is the infiltration time, h.

[0076] Surface runoff calculation: Calculate the surface runoff of the subcatchment area using a nonlinear reservoir model. The execution process is as follows:

[0077] like Figure 2 As shown in the figure, the SWMM model generalizes each subcatchment area as a nonlinear reservoir to simulate the surface runoff process, that is, it is solved by simultaneously solving the continuity equation and the Manning formula. The model assumes that the surface runoff of each subcatchment area is regarded as a rectangular uniform flow with a characteristic width of W, a water depth of d, a depression depth of ds, a water depth of d-ds (all in meters), and a slope of S.

[0078] The continuity equation is:

[0079]

[0080] Where V is the water volume of the subcatchment (m 3 ), t is the rainfall duration (s), A is the subcatchment area (m 2 ), i is the rainfall intensity (mm / s), Q1 is the outlet flow of the subcatchment (m 3 / s).

[0081] The volume flow rate Q1 of surface runoff is expressed by the Manning formula:

[0082]

[0083] Where n is the surface Manning coefficient.

[0084] Combining equations (2) and (3), we can get the nonlinear differential equation:

[0085]

[0086] The finite difference method is used to calculate the surface water depth d of the sub-catchment area, and the outlet flow Q1 of each sub-catchment area can be obtained.

[0087] The pipe network confluence calculation includes: using the dynamic wave method to simulate the pipe network confluence process, and dynamically calculating the pipe flow and node water depth. The execution process is as follows:

[0088] Pipeline confluence is the process in which rainfall flows through the surface and then flows into rivers, lakes and other water bodies through the urban drainage network. The SWMM model pipe network confluence module provides three hydrodynamic calculation methods: steady flow, motion wave and dynamic wave. The dynamic wave method is based on the complete one-dimensional Saint-Venant equation solution, which can simulate complex water flow movement and the calculation results are the most accurate. The calculation formula is as follows:

[0089]

[0090] Where Q2 is the instantaneous flow rate of the pipe section (m 3 / s); A is the cross-sectional area of ​​water flow (m 2 ); t is time (s); H is the node head height (m); g is the gravitational acceleration (m / s 2 ); x is the length of the pipe section (m); S f is the friction drop, which can be calculated by Manning's formula:

[0091]

[0092] Where J = gn 2 ; n is the pipe roughness; R is the hydraulic radius (m); v is the average flow velocity of the section (m / s), and the absolute value indicates that the resistance is opposite to the direction of the water flow.

[0093] Substituting Q2=Av into equation (6) and equation (7), we can obtain:

[0094]

[0095] Simultaneous continuity equations:

[0096]

[0097] In the formula, Q 2i is the node flow (m 3 / s); ω is the free water surface area of ​​the node (m 2 ).

[0098] Finally, the finite difference method is used to solve equations (7) and (8), and the pipeline flow and node water depth can be dynamically calculated.

[0099] In one embodiment, the LID module mainly realizes different types of differences by constructing different layers, such as vegetation surface layer, water storage layer, soil layer, drainage layer, etc. Each layer has its own corresponding design parameters. The design parameters can be selected according to the specific project or optimized as variables.

[0100] The SWMM model is used to simulate and solve the runoff generation process of the LID module: including calculating the infiltration rate of the surface layer and soil layer of the sponge facility, the drainage pipe flow of the drainage layer, the overflow of the surface layer and the deep seepage of the storage / drainage layer.

[0101] The LID module can simulate the rainfall runoff process of sponge facilities by solving the flow continuity equations of each layer of the sponge facility. Each equation describes the change of water content in a specific layer over time. The continuity equations of different sponge facility structure layers are different. Taking the bioretention facility as an example, the basic principles and formulas of each layer are as follows:

[0102] Surface layer:

[0103]

[0104] Soil layer:

[0105]

[0106] Aquifer:

[0107]

[0108] Where: i is rainfall intensity, mm / s; θ2 is soil moisture content, %; d1 is surface water depth, mm; d2 is water depth in aquifer, mm; q0 is surface layer inflow rate, mm / s; q1 is surface layer outflow rate, mm / s; q3 is aquifer culvert outflow rate, mm / s; e1, e2, e3 are surface layer, soil layer, aquifer evaporation rates, mm / s; f1, f2, f3 are surface layer, filler layer, and aquifer infiltration rates, mm / s; is the void ratio of any surface volume, %; is the porosity of the aquifer, %; D2 is the thickness of the soil layer, mm.

[0109] The surface of the sponge facility mainly receives direct rainfall and runoff from the impermeable catchment area. When the surface is full, the rainwater runoff overflows directly and is discharged. The water in the surface layer infiltrates into the soil layer, which can be simulated by combining the Green-Ampt formula. The surface layer infiltration rate is calculated as follows:

[0110]

[0111] Where: K 2S is the saturated hydraulic conductivity of soil, mm / s; is the porosity of the soil layer, %; θ 20 is the moisture content of the soil layer, %; ψ2 is the water absorption head above the wetting front formed in the soil, mm; F ​​is the cumulative infiltration per unit area, mm.

[0112] The water volume of the aquifer comes from the infiltration of the filler layer. The penetration rate f2 of water through the soil layer into the aquifer below can be simulated using the Darcy formula. The calculation of the infiltration rate f2 is shown in the formula:

[0113]

[0114] Where: HCO is the infiltration rate attenuation constant; θ FC is the field water holding capacity of the soil, mm.

[0115] The water in the aquifer can infiltrate into the lower local soil layer. When a drainage pipe is set up, the water in the aquifer can be discharged through the drainage pipe. The calculation of the drainage pipe is shown in the formula:

[0116]

[0117] Where: h3 is the thickness of the saturated medium above the drainage pipe, mm; C is the drainage coefficient; η is the drainage index, and when the value is 0.5, it is equivalent to the orifice outflow.

[0118] In one embodiment, constructing a SWMM model based on the underlying surface of the sponge facility includes: setting SWMM model LID module parameters according to the specifications of the variable slope test trough and the structure and material properties of the underlying surface of the sponge facility.

[0119] During the specific implementation, the LID facilities were set up in a 1:1 ratio (1*2 meters) according to the actual size of the variable slope test trough. Based on the SWMM model framework constructed using the measured rainfall outflow data of the sponge transformation area, the 1-20 year return period design rainfall recorded in the test was input, and the infiltration, overflow and outflow data of the test record under the corresponding rainfall were used to calibrate the LID module parameter values ​​again.

[0120] Set the characteristic parameters of each layer of the underlying surface of the sponge facility and the structural parameters of the slope test trough, including:

[0121] The characteristic parameters of each layer of the underlying surface of the sponge facility are shown in Table 2, among which all parameters of the gravel involved in the pavement layer and the drainage layer are determined by soaking, drying and other methods. The soil samples of the matrix layer of different sponge measures are taken using a ring knife, and the soil water characteristic curve of the matrix of different sponge measures is obtained using a soil moisture characteristic curve measuring instrument. The soil moisture content and soil hydraulic conductivity parameter values ​​of the matrix layer of the sponge measure are derived from the curve equation. The porosity and field water holding capacity of the matrix layer mainly composed of soil are determined by the ring knife method combined with the drying method. The flow coefficient C of the culvert layer is calculated according to the time T required to discharge the water storage depth D. Visual interpretation of vegetation coverage. The initial values ​​of the Manning coefficients of each layer are determined according to the SWMM model reference manual.

[0122] The structural parameters of the variable slope test trough include measuring the thickness of each layer and the offset height with a ruler and calculating the slope value.

[0123] Table 2 Main parameters of LID facilities (the values ​​are for example only)

[0124]

[0125]

[0126] In one embodiment, the Nash efficiency coefficient NSE and the peak flow relative error RE are used. p Sum peak time absolute error AE T Three indicators are used as SWMM model accuracy evaluation indicators. The calculation method is as follows:

[0127] (1) Nash efficiency coefficient NSE

[0128]

[0129] (2) Peak flow relative error RE p

[0130]

[0131] (3) Peak time absolute error AE T

[0132]

[0133] In the formula, q t obs is the measured flow rate, q t sim is the flow simulation value, is the measured mean flow rate, q p obs is the measured value of the peak flow, q p sim is the simulated value of the flood peak flow, and the above flow units are all m 3 / s. T p obs is the measured peak time, T p sim is the simulated peak time; N is the number of measured flow data. Generally, the Nash efficiency coefficient is greater than 0.6, the relative error of the peak flow and the absolute error of the peak time are within 20%, and it can be considered that the model accuracy basically meets the requirements.

[0134] In one embodiment, the multi-objective optimization problem of sponge facility parameters is defined as follows:

[0135] The structural and material property parameters of the underlying surface of the sponge facility are used as decision variables;

[0136] The optimization objectives are to minimize the total outflow of the sponge facility, minimize the outflow peak, and maximize the infiltration volume;

[0137] The maximum and minimum ranges of characteristic parameters of the underlying surface of the sponge facility are used as constraints. The characteristic parameters include the structural and material property parameters of the underlying surface of the sponge facility.

[0138] In this embodiment, the decision variables can be determined according to the key parameters of the LID facility identified by the multi-sponge facility rainfall scenario simulation. The decision variables may include any combination of the following: aquifer thickness, vegetation coverage, soil layer thickness, soil layer hydraulic conductivity, drainage layer thickness, and drainage layer infiltration rate of the sponge facility.

[0139] In this embodiment, the multi-objective optimization algorithm includes:

[0140] Through crossover, mutation and sorting, multiple groups of decision variable samples are generated within the constraints, and a group of decision variable data is randomly selected as the initial value of the LID module parameter of the SWMM model to obtain the surface runoff, surface runoff and pipe network runoff data calculated by the SWMM model;

[0141] Determine whether the set maximum number of iterations has been reached. If not, the multi-objective optimization algorithm will cross, mutate, sort, and merge again to generate new sets of decision variables, and randomly select one set to input into the SWMM model to obtain new surface runoff, surface runoff, and pipe network runoff data;

[0142] By comparison and judgment, the sample values ​​of the decision variables that are closer to the optimization objective function are retained. The decision variable parameter values ​​are replaced repeatedly until the maximum number of iterations is reached and the calculation is stopped to generate the Pareto optimal solution set.

[0143] like Figure 5 As shown in the figure, the specific steps for multi-objective optimization of sponge facility parameters are as follows:

[0144] Determine the decision variables: Use the SWMM model multi-scenario simulation analysis to identify the key parameters of the sponge facility, and use the key parameters of the sponge facility as the decision variables. In this example, the height of the aquifer, vegetation coverage, soil layer thickness, soil layer hydraulic conductivity, drainage layer thickness, and drainage layer infiltration rate of the sponge facility are selected.

[0145] Define the objective function: the total outflow of O1 in the sponge transformation area is the smallest, the peak outflow of O2 is the lowest, and the infiltration of O3 is the largest.

[0146] Optimization algorithm selection: NSGA-Ⅱ algorithm.

[0147] Setting up the optimization problem: Formulate the optimization problem by defining the decision variable ranges, constraints, and objective function.

[0148] Constraints: The maximum and minimum values ​​of each variable are determined by referring to relevant data and combining the actual situation of the sponge facility. The following is an example:

[0149] Minimum and maximum vegetation coverage for green roofs / bioretention facilities;

[0150] Green roof / bioretention facility minimum and maximum water storage heights;

[0151] Minimum and maximum thickness of soil layer for green roofs / bioretention facilities / permeable paving;

[0152] Minimum and maximum hydraulic conductivity of the soil layer matrix of the green roof / bioretention facility;

[0153] Minimum and maximum permeability of permeable pavement;

[0154] Minimum and maximum infiltration rates of the water storage (drainage) layer of the permeable pavement / bioretention facility;

[0155] Minimum and maximum thickness of water storage (drainage) layer for green roofs / permeable pavement / bioretention facilities;

[0156] The total area of ​​the sponge facilities is not larger than the area of ​​the study area.

[0157] Example of running the optimization algorithm: The rainfall input of the established SWMM model is a 1-hour rainfall with a return period of 2 years, the underlying surface type of the sponge facility is a green roof, and the initial parameters of the multi-objective optimization algorithm are set to 100 populations, 500 iterations, 0.9 crossover probability, and 0.1 mutation probability.

[0158] First, the multi-objective optimization algorithm is used to generate 100 groups of decision variable samples within the constraint range through crossover, mutation, and sorting. A group of decision variable data is randomly selected as the initial value of the LID module parameter of the SWMM model. The constructed SWMM model is called to calculate the infiltration and outflow data of the study area to determine whether the set maximum number of iterations has been reached. If not, the multi-objective optimization algorithm will crossover, mutate, sort, and merge again to generate new 100 groups of decision variables. A group is randomly selected and input into the SWMM model to obtain new infiltration and outflow data of the study area. The decision variable values ​​that are closer to the objective function are retained by comparison and judgment. The decision variable solutions with poor simulation results are eliminated. The new 100 groups of decision variables are screened out through crossover, mutation, sorting, and merging. The decision variable parameter values ​​are replaced repeatedly in this way until the calculation is stopped after 500 iterations. At this time, the Pareto optimal solution set generated by 500 simulation results is obtained. Under each rainfall condition, a Pareto optimal surface composed of an optimal solution is screened out according to the dominance level, which is called the Pareto optimal frontier, such as Figure 4 During the simulation process, when the simulation results of two groups of decision variables belong to the same Pareto optimal frontier, the decision variable samples with large crowding distance are preferentially selected to ensure population diversity.

[0159] Figure 4 In the figure is the Pareto optimal frontier of the characteristic parameters of the sponge facility (such as the thickness of the aquifer), the XZ axis is the optimal solution that satisfies the objective functions O1 and O3, the YZ axis is the optimal solution that satisfies the objective functions O2 and O3, and the XY axis is the optimal solution that satisfies the objective functions O1 and O2. From the surface in the figure, we can obtain the values ​​of the characteristic parameters of the sponge facility, such as the thickness of the aquifer, which can minimize the outflow, minimize the outflow peak, and maximize the infiltration in the study area.

[0160] The above is a detailed introduction to a method for optimizing the runoff regulation capacity of a sponge facility provided by the present invention. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea; at the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scopes. In summary, the content of this specification should not be understood as a limitation on the present invention.

[0161] In this article, relational terms such as first and second, etc. are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprise", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

Claims

1. A method for optimizing the runoff regulation capacity of a sponge facility, characterized in that: The steps include: Based on the urban underlying surface rainfall runoff simulation test system, the test monitoring data is collected and recorded, including: rainfall, infiltration, overflow, and outflow process data of the underlying surfaces of different sponge facilities; Building a SWMM model based on measured data of the sponge transformation area and structural parameters of the underlying surface of the sponge facility, calibrating and verifying the SWMM model using the measured data of the sponge transformation area and the test monitoring data, wherein the measured data includes items corresponding to the process data; The SWMM model is used to simulate various rainfall and LID scenarios to identify key parameters that affect the runoff regulation effect of sponge facilities. The SWMM model is coupled with a multi-objective optimization algorithm to simulate and calculate the optimal parameter solution set of the sponge facility that meets the outflow and infiltration targets of the underlying surface of the sponge measures.

2. A method for optimizing the runoff regulation capacity of a sponge facility according to claim 1, characterized in that: It also includes the steps of constructing a rainfall runoff simulation test system for the underlying surface of the sponge facility: The rainfall runoff simulation test system for the underlying surface of the sponge facility includes: a rainfall simulation module, an underlying surface module and a water supply module; among them, The rainfall simulation module includes: a support frame, a rainfall pipeline and a rainfall nozzle built on the top of the underlying surface module; a plurality of rainfall nozzles are distributedly installed on the support frame to form N rainfall partitions, N≥2; The underlying surface module includes N mobile variable slope test troughs correspondingly distributed in N rainfall zones and a sponge facility underlying surface pavement layer arranged in the mobile variable slope test trough; a hydraulic lifting device is provided on one side of the bottom of the trough body of the mobile variable slope test trough, an overflow port is provided on the side of the trough body near the top, a lower seepage port is provided on the trough body near the bottom, and a water inlet is provided on the side of the trough body provided with the hydraulic lifting device; N different types of sponge facilities are arranged in the corresponding mobile variable slope test troughs; The water supply module includes a water supply pipeline, a booster water pump and a water supply pool; the booster water pump transports the water in the water supply pool to the rainfall pipeline and rainfall nozzle through the water supply pipeline.

3. A method for optimizing the runoff regulation capacity of a sponge facility according to claim 2, characterized in that: Constructing a SWMM model based on the data required for modeling the sponge transformation area and the structural parameters of the underlying surface of the sponge facility includes: constructing a SWMM model framework for the sponge transformation area based on the land use, DEM, drainage network, remote sensing image, and rainfall flow data of the sponge transformation area, and setting the SWMM model LID module parameters based on the specifications of the variable slope test trough, the underlying surface structure of the sponge facility, and the material properties.

4. The method for optimizing the runoff regulation capacity of a sponge facility according to claim 1, characterized in that: The construction of SWMM model based on measured data and experimental monitoring data of sponge transformation area includes: using measured rainfall data and corresponding outflow data of sponge transformation area to calibrate and verify SWMM model, and determine the values ​​of main process parameters of model runoff generation and confluence module. SWMM model inputs minute-by-minute rainfall data with different return periods under fixed time of experimental monitoring, and uses minute-by-minute infiltration, overflow and deep seepage data of sponge facilities monitored in the experiment to calibrate SWMM model LID module parameters.

5. The method for optimizing the runoff regulation capacity of a sponge facility according to claim 1, characterized in that: The SWMM model is used to calculate surface runoff, surface runoff, and pipe network runoff: The surface runoff calculation includes: calculating the surface runoff of the sub-catchment area using a runoff model; the runoff model includes a Horton model; Surface runoff calculation includes: using nonlinear reservoir model to simulate the surface runoff process in subcatchment areas; The pipe network confluence calculation includes: using the pipe channel confluence calculation method to simulate the confluence process of water flow in the underground drainage pipe network, and dynamically calculating the pipeline flow and node water depth; the pipe channel confluence calculation method includes the dynamic wave method.

6. The method for optimizing the runoff regulation capacity of a sponge facility according to claim 1, characterized in that: The SWMM model is used to simulate and solve the runoff generation process of the LID module, including calculating the infiltration rate of the surface layer and soil layer of the sponge facility, the drainage pipe flow of the drainage layer, the overflow of the surface layer and the deep seepage of the storage / drainage layer.

7. The method for optimizing the runoff regulation capacity of a sponge facility according to claim 1, characterized in that: Set the Nash efficiency coefficient NSE and peak flow relative error RE p Sum peak time absolute error AE T Three indicators are used as the accuracy evaluation indicators of the SWMM model.

8. The method for optimizing the runoff regulation capacity of a sponge facility according to claim 1, characterized in that: The multi-objective optimization problem of sponge facility parameters is defined as follows: The structural and material property parameters of the underlying surface of the sponge facility are used as decision variables; The optimization objectives are to minimize the total outflow of the sponge facility, minimize the outflow peak, and maximize the infiltration volume; The maximum and minimum ranges of the characteristic parameters of the underlying surface of the sponge facility are taken as constraints.

9. A method for optimizing the runoff regulation capacity of a sponge facility according to claim 8, characterized in that: The decision variables are determined based on key parameters of the LID facility identified by simulating rainfall scenarios of multiple sponge facilities.

10. The method for optimizing the runoff regulation capacity of a sponge facility according to claim 8, characterized in that: Multi-objective optimization algorithms include: Through crossover, mutation and sorting, multiple groups of decision variable samples are generated within the constraints, and a group of decision variable data is randomly selected as the initial value of the LID module parameter of the SWMM model to obtain the surface runoff, surface runoff and pipe network runoff data calculated by the SWMM model; Determine whether the set maximum number of iterations has been reached. If not, the multi-objective optimization algorithm will cross, mutate, sort, and merge again to generate new sets of decision variables, and randomly select one set to input into the SWMM model to obtain new surface runoff, surface runoff, and pipe network runoff data; By comparison and judgment, the sample values ​​of the decision variables that are closer to the optimization objective function are retained. The decision variable parameter values ​​are replaced repeatedly until the maximum number of iterations is reached and the calculation is stopped to generate the Pareto optimal solution set.

Citation Information

Cited By

  • Rainwater runoff regulation and control method and system for sponge city

    CN121093599A

  • Multi-pollutant pollution prediction model construction and load collaborative accounting method and device

    CN121562424A