Resource construction method for complex equipment development process based on MBSE
Through the resource construction method based on MBSE, a unified resource multi-dimensional model is constructed and a resource management cloud platform is built, which solves the problems of resource allocation and utilization efficiency in the development process of complex equipment, and realizes collaborative management and rational utilization of resources across units.
Patent Information
- Application Number
- CN202410837181.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-10-11
AI Technical Summary
Existing resource construction methods have limitations in the overall construction and dynamic allocation of resources during the development of complex equipment, and cannot effectively evaluate the reasonable allocation and utilization efficiency of resources.
Adopt a resource construction method based on MBSE for the complex equipment development process, and build a resource management cloud platform by building a unified resource multi-dimensional model, including basic information, capabilities, status, ownership, history and dimensional attributes, to achieve dynamic management of resources and cross-unit Collaborative development.
It improves resource management efficiency, resource usage efficiency and rapid response capabilities of complex equipment, ensuring the rationality and overall planning of resource utilization.
Smart Images

Figure CN118761580A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of model-based system engineering, and in particular to a resource construction method for a complex equipment development process based on MBSE. Background Art
[0002] The rational allocation and efficient use of resources are the key to the digital development of complex equipment products and an important foundation for the high-quality development of enterprises. The development of complex equipment development shows trends such as customization and rapid response, efficient collaboration across multiple entities, and deep integration of information technology. The cloud manufacturing service platform provides a wider range of resource linking capabilities for the complex equipment industry chain and related enterprises, thereby solving the problem of optimal resource allocation in the cross-enterprise equipment development process.
[0003] The patent with publication number CN113344393A proposes a resource construction method based on the V-model product development process, which stores the resource model instance as a static data in the database table as the basic data for product development. However, this solution cannot evaluate whether the coordination, allocation and utilization of resources are reasonable, efficient and economical during the product development process.
[0004] The model-based complex equipment development process can be divided into project feasibility study stage, scheme stage, prototype stage, test stage and finalization stage, which mainly include model-based demand engineering, model-based design engineering, model-based manufacturing engineering and model-based delivery engineering. Each stage and link needs to consider the resources and capabilities of factors such as people, machines, materials, methods and environment and their functional relationships. These collectively constitute a development system for the complex equipment development process.
[0005] Under this research and development system, equipment, resources and capabilities have been integrated. However, the resource construction methods that have been applied in the industry have certain limitations in terms of the coordinated construction and dynamic and rapid configuration of resources for forward planning of the research and development system among related enterprises in the industrial chain. Summary of the invention
[0006] In view of this, the embodiments of the present application propose a resource construction method for the complex equipment development process based on MBSE (Model Based System Engineering), which can solve the limitations of the current resource construction method in the coordinated construction and dynamic and rapid configuration of resources for forward planning of the development system, and realize the collaborative development of complex equipment in a unified resource pool across units, effectively improving resource management efficiency, resource utilization efficiency, rapid response capability of complex equipment and rationality of resource utilization.
[0007] To achieve the above purpose, the embodiment of the present application proposes a resource construction method based on MBSE for the complex equipment development process, which is applied to the cloud server and includes the following steps: constructing a unified resource multidimensional model according to the business process characteristics of the complex equipment industry chain; wherein the unified resource multidimensional model includes six types of attributes, namely basic information attributes, capability attributes, status attributes, attribution attributes, historical attributes and dimension attributes, and the dimension attributes include industry chain organization dimension, resource function dimension and development process dimension; according to the unified resource multidimensional model, building a resource management cloud platform, developing resource coding, resource modeling, resource access, resource use, resource retrieval, resource statistics, resource management and resource instance maintenance functions, allowing different resources to be managed The system models, manages, retrieves, uses and counts resources; obtains the resources of each unit in the complex equipment industry chain defined in accordance with the unified resource multidimensional model, as well as the resource pools of each unit in the complex equipment industry chain established in the resource management cloud platform, and integrates all defined resources and established resource pools into the collaborative development cloud platform as basic data for complex equipment development; obtains the model-based complex equipment development work and the modeling work of the development system carried out by each unit in the complex equipment industry chain in the collaborative development cloud platform, and transmits the resources used by the complex equipment development work and the development system to the resource management cloud platform through data exchange to maintain the resource instance status.
[0008] To achieve the above-mentioned purpose, an embodiment of the present application also proposes an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the above-mentioned MBSE-based resource construction method for the complex equipment development process.
[0009] To achieve the above objectives, an embodiment of the present application further proposes a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the above-mentioned MBSE-based resource construction method for complex equipment development processes.
[0010] The MBSE-based resource construction method for the complex equipment development process proposed in the embodiment of the present application takes the dynamic configuration of resources in the cross-unit product collaborative development process under the complex equipment industry chain as the research object, and takes the complex equipment development process based on MBSE as the main line. By analyzing the business process of the complex equipment industry chain, a unified resource multidimensional model is constructed, including six types of attributes: basic information attributes, capability attributes, status attributes, belonging attributes, historical attributes and dimension attributes. Modeling work is carried out on the model-based complex equipment development and development system, and resource instances of the development process are dynamically managed to ensure the coordination, dynamism and rationality of resource management in the complex equipment development process. Under the services of the unified resource multidimensional model, resource management cloud platform and collaborative development cloud platform, the collaborative development of complex equipment in a unified resource pool across units is realized, which effectively improves the resource management efficiency, resource utilization efficiency, rapid response capability of complex equipment and rationality of resource utilization.
[0011] In some optional embodiments, after obtaining the model-based complex equipment development work and the modeling work of the development system carried out by each unit in the complex equipment industry chain in the collaborative development cloud platform, the method further includes: traversing the model-based complex equipment development work and the modeling work of the development system carried out by each unit in the complex equipment industry chain in the collaborative development cloud platform, and reviewing and confirming the current work; wherein the current work is the complex equipment development work or the modeling work, and the review and confirmation is to review whether there is a cross-unit resource call in the current work; if there is a cross-unit resource call in the current work, then the cross-unit resource call is called and confirmed in the resource management cloud platform; if the call application is confirmed, the resources corresponding to the cross-unit resource call are automatically transferred to the resource pool corresponding to the unit that initiated the cross-unit resource call. Reviewing and confirming the model-based complex equipment development work and the modeling work of the development system, and confirming the call application for the cross-unit resource call can further ensure the correct use of resources and the effective use of resources in data exchange.
[0012] In some optional embodiments, the basic information attributes include coding, name and category; the capability attributes include power, range and speed of different categories of resources; the status attributes include idle, in use and planned; the ownership attributes include purchased and borrowed; the historical attributes include service records, repair and maintenance records and log files; the industrial chain organization dimension includes overall units, supporting units, assembly units, test bases, government units, suppliers and users; the resource function dimension includes technical resources, software resources, material resources, human resources, logistics resources, equipment resources, site resources, user information resources and other related resources; the development process dimension includes business cooperation, technical research, project demonstration, demand definition, product development, production and manufacturing, procurement, supply, delivery and operation and maintenance guarantee.
[0013] In some optional embodiments, the attributes of the unified resource multidimensional model are extensible and support dynamic configuration and maintenance; when defining resources through the unified resource multidimensional model, codes are automatically generated according to preset coding rules, and the generated codes are used to uniquely identify the resources to be defined, and then according to the six types of attributes, the key elements and contents of the resources to be defined are defined by setting keywords and modifying attribute values. The design that the attributes of the unified resource multidimensional model are extensible and support dynamic configuration and maintenance greatly improves the universality and generalization ability of the resource construction method based on MBSE for complex equipment development process proposed in this application.
[0014] In some optional embodiments, the model-based complex equipment development work, through MBSE and MBD (Model Based Definition), can be divided into model-based demand engineering, model-based design engineering, model-based manufacturing engineering, and model-based delivery engineering around the project demonstration stage, scheme stage, prototype stage, test stage and finalization stage of the complex equipment.
[0015] In some optional embodiments, the model-based demand engineering includes carrying out development mission demand analysis and modeling work, equipment mission demand analysis and modeling work, equipment capability demand analysis and modeling work, equipment system demand analysis and modeling work, development mission demand model verification work, equipment mission demand model verification work, equipment capability demand model verification work, equipment system demand model verification work, and equipment demand definition work; the model-based design engineering includes carrying out scheme design and engineering design work, specifically including model-based architecture design work, model-based architecture verification work, system architecture definition work, model-based development system demand analysis and definition work, model-based engineering design work, and model-based design engineering. The model-based manufacturing engineering includes design and process collaboration, model-based process design, model-based process simulation, process manufacturing collaboration, product processing, assembly and inspection, and model-based detailed design of the development system; the model-based delivery engineering includes virtual integration, virtual experiment, system testing and verification, subsystem testing and verification, integration testing and verification, usage and operation verification, and delivery, operation and guarantee.
[0016] In some optional embodiments, when each unit in the complex equipment industry chain carries out the modeling work of the development system in the collaborative development cloud platform, it uses the nine types of diagrams provided by MBSE, including package diagrams, requirement diagrams, activity diagrams, sequence diagrams, state machine diagrams, use case diagrams, block definition diagrams, internal block diagrams, and parameter diagrams. The nine types of diagrams can vividly and intuitively complete the modeling work of the development system, further improving the speed, efficiency, and quality of complex equipment development.
[0017] In some optional embodiments, the resources used by the complex equipment development work and the development system are transmitted to the resource management cloud platform through data exchange to maintain the resource instance status, including: using various sensors, 5G communication networks, data buses, and project task information records to collect status information of the resources used by the complex equipment development work and the development system, passing the collected status information to the resource instance of the complex equipment development work and the development system modeling application, and transmitting it to the resource management cloud platform in real time via XML (Extensible Markup Language) to maintain the resource instance status. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1It is a flow chart of a resource construction method for a complex equipment development process based on MBSE provided in an embodiment of the present application;
[0019] Figure 2 It is a schematic diagram of the main business of the complex equipment industry chain provided in one embodiment of the present application;
[0020] Figure 3 It is a schematic diagram of dimensional attributes of a unified resource multidimensional model provided in one embodiment of the present application;
[0021] Figure 4 It is a schematic diagram of model-based complex equipment development work and development system modeling work carried out by various units in a collaborative development cloud platform, provided in one embodiment of the present application;
[0022] Figure 5 It is a flowchart provided in one embodiment of the present application for reviewing and confirming the acquired model-based complex equipment development work and the modeling work of the development system;
[0023] Figure 6 It is a schematic diagram of the structure of an electronic device provided in another embodiment of the present application. DETAILED DESCRIPTION
[0024] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the embodiments of the present application will be described in detail below in conjunction with the accompanying drawings. However, it will be appreciated by those skilled in the art that in the present application, many technical details are proposed in order to enable the reader to better understand the present application. However, even without these technical details and various changes and modifications based on the following embodiments, the technical scheme claimed in the present application can also be implemented. The division of the following embodiments is for the convenience of description, and the specific implementation of the present application should not be construed as any limitation, and the various embodiments can be combined and referenced with each other under the premise of no contradiction.
[0025] An embodiment of the present application proposes a resource construction method for a complex equipment development process based on MBSE, which is applied to a cloud server. The implementation details of the resource construction method for a complex equipment development process based on MBSE proposed in this embodiment are described in detail below. The following content is only the implementation details provided for the convenience of understanding and is not necessary for the implementation of this solution.
[0026] The specific process of the resource construction method based on MBSE for complex equipment development process proposed in this embodiment can be as follows: Figure 1 As shown, including:
[0027] Step 101, according to the business process characteristics of the complex equipment industry chain, a unified resource multidimensional model is constructed. The unified resource multidimensional model includes six types of attributes, namely basic information attributes, capability attributes, status attributes, ownership attributes, historical attributes and dimension attributes. The dimension attributes include the industry chain organization dimension, resource function dimension and development process dimension.
[0028] In the specific implementation, the cloud server combines the system engineering methodology to define the model-based complex equipment development process from the perspective of complex equipment development and its development system construction, in order to sort out and analyze the resources used in the entire life cycle of the product, and according to the business process characteristics of the complex equipment industry chain, plan the characteristics and uses of resources in the complex equipment development process from the top level, and build a unified resource multidimensional model. The constructed unified resource multidimensional model contains a total of six types of attributes, namely basic information attributes, capability attributes, status attributes, attribution attributes, historical attributes and dimension attributes. The dimension attributes include the industry chain organization dimension, resource function dimension and development process dimension.
[0029] In one example, the main businesses of the complex equipment industry chain can be Figure 2 As shown in the figure, the units in the complex equipment industry chain include overall units, supporting units, final assembly units, test bases, government units, suppliers and users. This also corresponds to the industry chain organization dimension in the dimensional attributes, that is, the industry chain organization dimension includes overall units, supporting units, final assembly units, test bases, government units, suppliers and users. The resource function dimension includes technical resources, software resources, material resources, human resources, logistics resources, equipment resources, site resources, user information resources and other related resources. Resources that do not belong to the first eight categories can be classified as other related resources. The development process dimension can include business cooperation, technical research, demonstration and project establishment, demand definition, product development, production and manufacturing, procurement, supply, delivery and operation and maintenance guarantee. The dimensional attributes of the unified resource multidimensional model can be as follows Figure 3 shown.
[0030] In an example, the basic information attributes of the unified resource multidimensional model include code, name and category, etc., capability attributes include power, range and speed of different categories of resources, status attributes include idle, used and planned, etc., ownership attributes include purchased and borrowed, etc., and history attributes include service records, maintenance records and log files, etc.
[0031] In one example, the attributes of the unified resource multidimensional model are extensible and support dynamic configuration and maintenance. The design that the attributes of the unified resource multidimensional model are extensible and support dynamic configuration and maintenance greatly improves the universality and generalization ability of the resource construction method based on MBSE for complex equipment development process proposed in this application.
[0032] In one example, when defining resources through the unified resource multidimensional model, codes are automatically generated according to preset coding rules, and the generated codes are used to uniquely identify the resources to be defined, and then the key elements and contents of the resources to be defined are defined by setting keywords and modifying attribute values according to six types of attributes. The preset coding rules can be set by technicians in this field according to actual needs.
[0033] Step 102, build a resource management cloud platform according to the unified resource multi-dimensional model, develop resource coding, resource modeling, resource access, resource use, resource retrieval, resource statistics, resource management and resource instance maintenance functions, and allow modeling, management, retrieval, use and statistics of different resources.
[0034] In the specific implementation, after constructing a unified resource multi-dimensional model, the cloud server can build a resource management cloud platform according to the unified resource multi-dimensional model, and develop resource coding, resource modeling, resource access, resource use, resource retrieval, resource statistics, resource management and resource instance maintenance functions, allowing various units in the complex equipment industry chain to model, manage, retrieve, use and count different resources.
[0035] Step 103, obtain the resources of each unit in the complex equipment industry chain defined in accordance with the unified resource multidimensional model, as well as the resource pool of each unit established in the resource management cloud platform in the complex equipment industry chain, and integrate all defined resources and established resource pools into the collaborative development cloud platform as basic data for complex equipment development.
[0036] In the specific implementation, after the cloud server constructs a unified resource multi-dimensional model, each unit in the complex equipment industry chain defines its own resources according to the unified resource multi-dimensional model. After the cloud server builds the resource management cloud platform, each unit in the complex equipment industry chain can establish its own resource pool in the resource management cloud platform. The cloud server obtains the resources of each unit in the complex equipment industry chain defined by the unified resource multi-dimensional model, as well as the resource pools of each unit in the complex equipment industry chain established in the resource management cloud platform, and integrates all defined resources and established resource pools into the collaborative development cloud platform as basic data for complex equipment development.
[0037] In one example, each unit in the complex equipment industry chain can use distributed storage and cloud storage to establish its own resource pool in the resource management cloud platform.
[0038] Step 104, obtain the model-based complex equipment development work and modeling work of the development system carried out by each unit in the complex equipment industry chain in the collaborative development cloud platform, and transmit the resources used by the complex equipment development work and the development system to the resource management cloud platform through data exchange to maintain the resource instance status.
[0039] In the specific implementation, after the cloud server builds the collaborative development cloud platform and integrates all defined resources and established resource pools into the collaborative development cloud platform, each unit in the complex equipment industry chain can carry out model-based complex equipment development work and modeling of the development system in the collaborative development cloud platform. The cloud server perceives and monitors the model-based complex equipment development work and modeling of the development system carried out by each unit in the complex equipment industry chain in the collaborative development cloud platform in real time, and transmits the resources used by the complex equipment development work and the development system to the resource management cloud platform through data exchange to maintain the resource instance status.
[0040] In one example, the model-based complex equipment development work can be divided into model-based demand engineering, model-based design engineering, model-based manufacturing engineering, and model-based delivery engineering through MBSE and MBD, focusing on the project demonstration stage, scheme stage, prototype stage, sample stage, and finalization stage of complex equipment. Among them, model-based demand engineering, model-based design engineering, and model-based manufacturing engineering are related to MBSE, while model-based design engineering, model-based manufacturing engineering, and model-based delivery engineering are related to MBD.
[0041] In an example, model-based requirements engineering includes conducting development mission requirements analysis and modeling, equipment mission requirements analysis and modeling, equipment capability requirements analysis and modeling, equipment system requirements analysis and modeling, development mission requirements model verification, equipment mission requirements model verification, equipment capability requirements model verification, equipment system requirements model verification, and equipment requirements definition work.
[0042] In an example, model-based design engineering includes carrying out scheme design and engineering design work, including model-based architecture design, model-based architecture verification, system architecture definition, model-based development system requirement analysis and definition, model-based engineering design, model-based general and subsystem detailed design, multi-level discipline prototype simulation, model-based multidisciplinary engineering simulation and verification, product design definition, and model-based development system architecture analysis and design.
[0043] In an example, model-based manufacturing engineering includes design-process collaboration, model-based process design, model-based process simulation, process-manufacturing collaboration, product processing, assembly and inspection and testing, and model-based development system detailed design.
[0044] In one example, the model-based delivery project includes virtual integration work, virtual experiment work, system testing and verification work, subsystem testing and verification work, integration testing and verification work, usage and operation verification work, and delivery operation and support work.
[0045] In one example, when various units in the complex equipment industry chain carry out modeling work on the development system in the collaborative development cloud platform, they can use the nine types of diagrams provided by MBSE, including package diagrams, requirement diagrams, activity diagrams, sequence diagrams, state machine diagrams, use case diagrams, block definition diagrams, internal block diagrams, and parameter diagrams. The nine types of diagrams can vividly and intuitively complete the modeling work of the development system, further improving the speed, efficiency, and quality of complex equipment development.
[0046] In one example, the model-based complex equipment development work and development system modeling work carried out by various units in the collaborative development cloud platform can be as follows: Figure 4 As shown. Each unit carries out model-based modeling of complex equipment development and development systems in the collaborative development cloud platform, completes modeling analysis of equipment requirements, equipment use cases, equipment structure, etc., associates the complex equipment MBSE model with the development system MBSE model, and uses the requirement diagram to express the management requirements of the development system resources, the development system task flow, communication requirements, interface requirements, etc. for the static and dynamic management of resources in the development system. The use case diagram is used to express the functions and interactive objects of the development system, as well as the boundaries of the development system. The block definition diagram is used to express the static structure of resources and their relationships, as well as the task flow in which the resources are located. The behavior diagram (including sequence diagrams, activity diagrams, state machine diagrams, etc.) is used to express the information transmission relationship and control logic between the various system resources when the development system performs tasks, the process and activity behavior during execution.
[0047] In one example, the cloud server transmits the resources used by complex equipment development work and development systems to the resource management cloud platform through data exchange. To maintain the resource instance status, various sensors, 5G communication networks, data buses, and project task information records can be used to collect the status information of the resources used by the complex equipment development work and development systems. The collected status information is passed to the resource instance of the complex equipment development work and development system modeling application, and transmitted to the resource management cloud platform in real time via XML to maintain the resource instance status.
[0048] In one example, after obtaining the model-based complex equipment development work and development system modeling work carried out by various units in the complex equipment industry chain in the collaborative development cloud platform, the cloud server can Figure 5 The steps shown are to review and confirm the modeling work of the acquired model-based complex equipment development work and development system, including:
[0049] Step 201, traverse the model-based complex equipment development work and development system modeling work carried out by each unit in the acquired complex equipment industry chain in the collaborative development cloud platform, and review and confirm the current work. The current work is complex equipment development work or modeling work. The review and confirmation is to review whether there is any cross-unit resource call in the current work.
[0050] In a specific implementation, the cloud server can traverse the model-based complex equipment development work and development system modeling work carried out by each unit in the complex equipment industry chain in the collaborative development cloud platform, review and confirm the current work, and record the opinions, personnel and time of each review and confirmation. The current work is one of the complex equipment development work or the modeling work. The review and confirmation is to review whether there is any cross-unit resource call in the current work. If resources not defined by the unit are used, there is a cross-unit resource call.
[0051] Step 202: If the current work involves cross-unit resource calls, a call application confirmation is performed on the resource management cloud platform.
[0052] Step 203: When the call application is confirmed to be successful, the resources corresponding to the cross-unit resource call are automatically transferred to the resource pool corresponding to the unit that initiated the cross-unit resource call.
[0053] In the specific implementation, if the cloud server determines that the current work involves cross-unit resource calls, it can confirm the cross-unit resource calls in the resource management cloud platform. If the call application is confirmed, the resources corresponding to the cross-unit resource call will be automatically transferred to the resource pool corresponding to the unit that initiated the cross-unit resource call for retrieval and use by relevant business systems or personnel. It is worth noting that reviewing and confirming the model-based complex equipment development work and the modeling work of the development system, and confirming the cross-unit resource call application, can further ensure the correct use of resources and effective use of resources in data exchange.
[0054] In one example, if the call request is not approved, the cross-unit resource call is rejected.
[0055] In one example, changes or cancellations of resources in a resource pool require submission of an application, which can only be changed or cancelled after review and confirmation.
[0056] In this embodiment, the dynamic configuration of resources in the collaborative development process of cross-unit products under the complex equipment industry chain is taken as the research object, and the complex equipment development process based on MBSE is taken as the main line. By analyzing the business process of the complex equipment industry chain, a unified resource multidimensional model is constructed, including six types of attributes: basic information attributes, capability attributes, status attributes, belonging attributes, historical attributes and dimension attributes. Modeling work is carried out on the model-based complex equipment development and development system, and resource instances in the development process are dynamically managed to ensure the coordination, dynamism and rationality of resource management in the complex equipment development process. Under the services of the unified resource multidimensional model, resource management cloud platform and collaborative development cloud platform, the collaborative development of complex equipment in a unified resource pool across units is realized, which effectively improves the resource management efficiency, resource utilization efficiency, rapid response capability of complex equipment and rationality of resource utilization.
[0057] Another embodiment of the present application provides an electronic device, such as Figure 6 As shown, it includes: at least one processor 301; and a memory 302 that is communicatively connected to the at least one processor 301; wherein the memory 302 stores instructions that can be executed by the at least one processor 301, and the instructions are executed by the at least one processor 301 so that the at least one processor 301 can execute the MBSE-based resource construction method for the complex equipment development process described in the above embodiments.
[0058] Among them, the memory and the processor are connected in a bus manner, and the bus may include any number of interconnected buses and bridges, and the bus connects various circuits of one or more processors and memories together. The bus can also connect various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface between the bus and the transceiver. The transceiver can be one element or multiple elements, such as multiple receivers and transmitters, providing a unit for communicating with various other devices on a transmission medium. The data processed by the processor is transmitted on a wireless medium via an antenna, and further, the antenna also receives data and transmits the data to the processor.
[0059] The processor is responsible for managing the bus and general processing, and can also provide various functions, including timing, peripheral interfaces, voltage regulation, power management, and other control functions. Memory can be used to store data used by the processor when performing operations.
[0060] Another embodiment of the present application relates to a computer-readable storage medium storing a computer program, which implements the above method embodiment when executed by a processor.
[0061] That is, those skilled in the art can understand that all or part of the steps in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a program, and the program is stored in a storage medium, including a number of instructions to enable a device (which can be a single-chip microcomputer, chip, etc.) or a processor to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, ROM (Read-Only Memory), RAM (Random Access Memory), disk or optical disk and other media that can store program codes.
[0062] Those skilled in the art will appreciate that the above embodiments are specific embodiments for implementing the present application, and in actual applications, various changes may be made thereto in form and detail without departing from the spirit and scope of the present application.
Claims
1. A resource construction method for complex equipment development process based on MBSE, It is characterized in that Applied to a cloud server, the method comprises: According to the business process characteristics of the complex equipment industry chain, a unified resource multidimensional model is constructed; wherein the unified resource multidimensional model contains six types of attributes, namely basic information attributes, capability attributes, status attributes, attribution attributes, historical attributes and dimension attributes, and the dimension attributes include the industry chain organization dimension, resource function dimension and development process dimension; According to the unified resource multi-dimensional model, a resource management cloud platform is built to develop resource coding, resource modeling, resource access, resource use, resource retrieval, resource statistics, resource management and resource instance maintenance functions, allowing modeling, management, retrieval, use and statistics of different resources; Acquire the resources of each unit in the complex equipment industry chain defined in accordance with the unified resource multidimensional model, as well as the resource pools of each unit in the complex equipment industry chain established in the resource management cloud platform, and integrate all defined resources and established resource pools into the collaborative development cloud platform as basic data for complex equipment development; The model-based complex equipment development work and the modeling work of the development system carried out by each unit in the complex equipment industry chain in the collaborative development cloud platform are obtained, and the resources used by the complex equipment development work and the development system are transmitted to the resource management cloud platform through data exchange to maintain the resource instance status.
2. According to the MBSE-based resource construction method for complex equipment development process according to claim 1, It is characterized in that After obtaining the model-based complex equipment development work and the modeling work of the development system carried out by each unit in the complex equipment industry chain in the collaborative development cloud platform, the method further includes: Traversing the model-based complex equipment development work and the modeling work of the development system carried out by each unit in the complex equipment industry chain in the collaborative development cloud platform, and reviewing and confirming the current work; wherein the current work is the complex equipment development work or the modeling work, and the review and confirmation is to review whether there is cross-unit resource call in the current work; If the current work involves cross-unit resource calls, then a call application confirmation is performed on the resource management cloud platform for the cross-unit resource calls; When the call application is confirmed to be successful, the resources corresponding to the cross-unit resource call are automatically transferred to the resource pool corresponding to the unit that initiated the cross-unit resource call.
3. According to the MBSE-based resource construction method for complex equipment development process according to claim 1, It is characterized in that The basic information attributes include code, name and category; the capability attributes include power, range and speed of different categories of resources; the status attributes include idle, used and planned; the ownership attributes include purchased and borrowed; the history attributes include service records, maintenance records and log files; The organizational dimension of the industrial chain includes overall units, supporting units, assembly units, test bases, government units, suppliers and users; The resource function dimension includes technical resources, software resources, material resources, human resources, logistics resources, equipment resources, site resources, user information resources and other related resources; The development process includes business cooperation, technical research, project demonstration, demand definition, product development, production and manufacturing, procurement, supply, delivery and operation and maintenance guarantee.
4. According to the MBSE-based resource construction method for complex equipment development process according to claim 3, It is characterized in that The attributes of the unified resource multidimensional model are expandable and support dynamic configuration and maintenance; when defining resources through the unified resource multidimensional model, codes are automatically generated according to preset coding rules, and the resources to be defined are uniquely identified using the generated codes. Then, according to the six types of attributes, the key elements and contents of the resources to be defined are defined by setting keywords and modifying attribute values.
5. According to the MBSE-based resource construction method for complex equipment development process according to claim 1, It is characterized in that The model-based complex equipment development work can be divided into model-based demand engineering, model-based design engineering, model-based manufacturing engineering, and model-based delivery engineering around the project demonstration stage, scheme stage, prototype stage, test stage, and finalization stage of complex equipment through MBSE and MBD.
6. According to claim 5, the MBSE-based resource construction method for complex equipment development process, It is characterized in that The model-based demand engineering includes development mission demand analysis and modeling, equipment mission demand analysis and modeling, equipment capability demand analysis and modeling, equipment system demand analysis and modeling, development mission demand model verification, equipment mission demand model verification, equipment capability demand model verification, equipment system demand model verification, and equipment demand definition; The model-based design engineering includes carrying out scheme design and engineering design work, specifically including model-based architecture design work, model-based architecture verification work, system architecture definition work, model-based development system requirements analysis and definition work, model-based engineering design work, model-based general and subsystem detailed design work, multi-level discipline prototype simulation work, model-based multi-disciplinary engineering simulation and verification work, product design definition work, and model-based development system architecture analysis and design work; The model-based manufacturing engineering includes design and process collaboration, model-based process design, model-based process simulation, process and manufacturing collaboration, product processing, assembly and inspection, and model-based detailed design of the development system. The model-based delivery project includes virtual integration work, virtual experiment work, system testing and verification work, subsystem testing and verification work, integration testing and verification work, usage and operation verification work, and delivery operation and guarantee work.
7. According to claim 1, the MBSE-based resource construction method for complex equipment development process, It is characterized in that When each unit in the complex equipment industry chain carries out modeling work of the development system in the collaborative development cloud platform, it uses the nine types of diagrams provided by MBSE, which include package diagrams, requirement diagrams, activity diagrams, sequence diagrams, state machine diagrams, use case diagrams, block definition diagrams, internal block diagrams and parameter diagrams.
8. The resource construction method for complex equipment development process based on MBSE according to any one of claims 1 to 7, It is characterized in that The complex equipment development work and the resources used by the development system are transmitted to the resource management cloud platform by means of data exchange to maintain the resource instance status, including: Various sensors, 5G communication networks, data buses, and project task information records are used to collect status information of the complex equipment development work and the resources used by the development system. The collected status information is passed to the resource instances of the complex equipment development work and the development system modeling applications, and is transmitted to the resource management cloud platform in real time via XML to maintain the resource instance status.
9. An electronic device, It is characterized in that include: at least one processor; and, a memory communicatively coupled to the at least one processor; The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the MBSE-based resource construction method for complex equipment development process as described in any one of claims 1 to 8.
10. A computer-readable storage medium storing a computer program, It is characterized in that When the computer program is executed by a processor, the MBSE-based resource construction method for complex equipment development process as described in any one of claims 1 to 8 is implemented.