ESV-SOP and multi-resource cooperative power supply recovery method considering road network-power grid coupling
By constructing a mathematical model of road network-power grid coupling, combined with ESV-SOP and the moving distance of the emergency repair team, the overall optimal emergency repair path and dispatching path are obtained, which solves the problem of poor resource allocation in the existing technology and achieves rapid , effective power system fault recovery.
Patent Information
- Application Number
- CN202410747051.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2024-10-11
AI Technical Summary
Existing power supply restoration technology cannot obtain the optimal results of resource allocation, and the model is complex and not very applicable. Especially when considering the road network-grid coupling, it is difficult to achieve rapid fault recovery.
This paper proposes a method of ESV-SOP and multi-resource collaborative power supply restoration that considers road network-grid coupling. By constructing the road network model matrix, the feasible region of ESV-SOP and the distribution network model, the manual repair team path model and the objective function, we use The solver solves the model to obtain optimal configuration and scheduling paths.
The model calculation is simplified, the configuration capacity of ESV-SOP is determined, the fastest and largest range of load power supply recovery is ensured, and the level of systemic emergency power supply is improved.
Smart Images

Figure CN118761641A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of electric power grid control, and relates to an ESV-SOP and multi-resource collaborative power supply restoration method considering road network-grid coupling. Background Art
[0002] With the development of the economy, my country's society has put forward new requirements for the quality and reliability of power supply in the power system, that is, to ensure power supply "all-weather and all-year-round". At present, under normal working conditions, the operation of the distribution network is already very reliable, but in the face of inevitable extreme natural disasters, the distribution network in mountainous areas and rural areas with relatively weak resources or structures still has the phenomenon of "small power restoration range and long restoration time", which seriously affects the life and production of residents. Therefore, how to make full use of the existing resources in the system, formulate a reasonable fault repair sequence, efficiently restore the power-lost load, and reduce the regional power outage losses is a problem that needs to be solved urgently.
[0003] To this end, domestic and foreign scholars have carried out some research on post-disaster emergency power supply of distribution networks. Regarding the post-disaster emergency recovery scenarios of distribution networks, domestic and foreign scholars have relatively consistent research ideas, mainly using the existing resources of the system (such as energy storage, photovoltaics, wind power, emergency vehicles and other controllable objects) to improve the power supply recovery capability. However, limited by the spatial distribution of resources, energy storage, photovoltaics and wind power are difficult to be efficiently applied to emergency scenarios with a long distance from the fault. In contrast, emergency vehicles are suitable for more emergency scenarios due to their flexible mobility and safe and reliable characteristics. However, in terms of emergency vehicle power restoration, existing domestic and foreign research is mostly limited to energy storage emergency vehicles (or electric vehicles), and generally adopts a two-layer optimization structure for solution, that is, island division is performed in the upper layer, the network structure is optimized by remote switches, and the capacity of emergency vehicles is configured; in the lower layer, simulation operation is performed according to the upper layer network structure or resource configuration. In the collaborative network, multiple types of controllable resources such as emergency vehicles, photovoltaics, and repair teams restore power supply. However, in practice, the decision factors of the upper and lower layers are often coupled with each other. The above structure divides the optimization problem into two stages, making it difficult to obtain the overall optimal solution. In terms of road network-grid coupling, existing studies often use intelligent algorithms to find optimal paths, which is difficult to model and calculate, and is not conducive to the rapid deployment of resources and fault recovery. In the development of new emergency vehicle architectures, a study proposed a design that combines intelligent soft switches with energy storage emergency vehicles. The new emergency vehicle architecture has the function of multi-point interconnection and power transmission, but does not consider fault repair and road network coupling, and its persuasiveness in terms of practical application is relatively weak.
[0004] Therefore, there is an urgent need for a simple and effective power supply restoration method to improve the systematic emergency power supply level of the power system. Summary of the invention
[0005] The purpose of the present invention is to propose an ESV-SOP and multi-resource collaborative power supply restoration method considering road network-grid coupling, which effectively solves the problems in existing power supply restoration technology that the optimal result of resource allocation cannot be obtained, the model is complex, and the applicability is not strong.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is to consider the ESV-SOP and multi-resource coordinated power supply restoration method of road network-grid coupling, including the following steps:
[0007] S1: Construct road network model matrix;
[0008] S2: Construct the feasible domain and distribution network model of ESV-SOP, and construct the fault line maintenance identification matrix;
[0009] S3: Construct ESV-SOP scheduling model;
[0010] S4: Constructing the path model of the manual repair team;
[0011] S5: Construct the objective function, solve the model and the objective function, and obtain the ESV-SOP collaborative power supply restoration method.
[0012] Furthermore, the S1 includes:
[0013] S11: Construct the road network model matrix D, expressed as:
[0014]
[0015] There are n nodes in total, d ij is the distance from the i-th node to the j-th node in the actual road network, and there are (n-1) routes in total; i represents the node number, i=1,2,…,n; j represents the node number, j=1,2,…,n;
[0016] S12: Assign values to the matrix D according to the distances between nodes in the actual traffic network.
[0017] Further, the S2 includes:
[0018] S21: Encode the (n-1) lines of the distribution network and determine the initial state matrix of the line as the feasible domain of ESV-SOP according to the fault situation; where Z is used m Indicates the initial disconnection state of line m, Z m =1 means the line is initially closed, Z m =0 means the initial state of the line is disconnected, and line m is any line in the line;
[0019] S22: construct a distribution network model, including a branch flow model and a virtual network model;
[0020] Obtain power prediction data of distributed power sources and loads, and obtain power prediction curves of distributed power sources and loads;
[0021] The branch flow model includes the constraints of the flow equation, safety condition, and second-order cone relaxation.
[0022] 1) Any node in the distribution network model must satisfy the power flow constraints, as shown in the following formula:
[0023]
[0024] Among them, P i,dis represents the active power output of distributed power generation at node i, P i,1 represents the active load of node i; Q i,dis represents the reactive power output by the distributed generation at node i, Q i,1 represents the reactive load of node i, P i,net , Q i,net They represent the active power and reactive power output from the upper power grid to node i respectively; P i,e , Q i,e Respectively represent the active and reactive power input from node ESV-SOP to node i; Ω k→i represents the set of branches flowing into node i, Σ Ωk→i (PI·r) represents the sum of active power flowing into node i from upstream branches; Σ Ωk→i (QI·x) represents the sum of reactive power flowing into node i from the upstream branch; Ω i→j represents the branch set out of node i; ∑ Ωi→j P represents the active power sum of node i flowing to the downstream branch, ∑ Ωi→j Q represents the sum of reactive power flowing from node i to the downstream branch; P represents the active power flowing through the branch, Q represents the reactive power flowing through the branch; I represents the square of the branch current; r and x represent the resistance and reactance of the line respectively; i represents the node number, and j represents the sub-node number connected to the i node;
[0025] 2) Any node and branch of the distribution network model must meet the safety operating condition constraints, as shown in the following formula:
[0026]
[0027] Where V represents the square of the node voltage, P represents the branch active power, Q represents the branch reactive power, I represents the square of the node current; V represents the lower limit of the square of the node voltage; represents the upper limit of the square of node voltage; I Represents the lower limit of the square of the node current; represents the upper limit of the square of the node current; P represents the lower limit of the branch active power; Indicates the upper limit of the rate of branch active power; Q Indicates the lower limit of branch reactive power; Indicates the upper limit of branch reactive power;
[0028] 3) The distribution network model needs to satisfy the second-order cone relaxation constraint, as shown in the following formula:
[0029]
[0030] in, is a two-norm form,
[0031]
[0032] 4) The virtual network model needs to satisfy the virtual power flow constraints, as shown in the following formula:
[0033]
[0034] Where F represents the flow in the virtual network; Ω dg represents the node set containing distributed power sources, Ω represents the entire node set, and Ω 1 represents the set of nodes without distributed generation, Ω 1 =Ω-Ω dg ; W i represents the distributed power output of node i in the virtual network; i represents the node number, j refers to the sub-node number connected to node i; ∑ Ωi→j F refers to the sum of virtual power flowing out of node i; ∑ Ωk→i F refers to the sum of virtual power flowing into node i; Z m represents the disconnection state of line m; ε represents the distribution network branch set; K represents a constant;
[0035] S23: Obtain the locations of X faulty lines, estimate the post-disaster repair time T, and construct the faulty line maintenance identification matrix R, which is expressed as follows:
[0036]
[0037] The elements in the matrix R represent the maintenance status of X faulty lines T hours after the disaster. The element value of the unmaintained element is 0, and the element value of the repaired element is 1. T represents the total length of the fault time, and X represents the number of faulty lines.
[0038] Further, the S3 includes:
[0039] S31: Construct the access position state matrix J. The matrix J is the scheduling feasible domain of ESV-SOP, and the expression is as follows:
[0040]
[0041] The matrix J satisfies the feasible region constraints:
[0042] ∑J t =1
[0043] Among them, the element value of the matrix J whose state is that ESV-SOP is connected to the fault position is 1, and the element value of the state that ESV-SOP is not connected to the fault position is 0; T represents the total length of the fault time, and X represents the number of faulty lines;
[0044] J t represents the state matrix of time period t, t represents the sequence number of the fault time period, t=1, 2, ...T; when t=T, J t =J T ;
[0045] S32: The transmission power of ESV-SOP after accessing the fault location satisfies the working state constraints:
[0046]
[0047] Among them, P n,sop Indicates the active power output by the nth port of ESV-SOP, Q n,sop They represent the reactive power output from the nth port of ESV-SOP; S N n,sop Indicates the rated apparent power of the nth port; P bat Represents the output power of the energy storage battery; Z represents the set of all ports of ESV-SOP; Z dc Represents the DC-DC port set of ESV-SOP; n represents the number of ports of ESV-SOP;
[0048] S33: Construct ESV-SOP dispatch path model;
[0049] The calculation formula of the moving distance of ESV-SOP is:
[0050]
[0051] Among them, L car represents the moving distance of ESV-SOP; D represents the road network model matrix; J t represents the access location state matrix of time period t, J t-1 The last fault time period t-1 The access position state matrix, J' t-1 Indicates J t-1 The transposed matrix of .
[0052] Further, the S4 includes:
[0053] S41: Construct the line disconnection identification matrix Z, which is expressed as follows:
[0054]
[0055] Among them, the element z in the matrix Z mt,m Indicates the disconnection status of the line numbered m in the time period t after the disaster, t represents the sequence number of the fault time period, and m represents the sequence number of the fault line; t=2,3…,T; m=1,2,…,n-1; T represents the total length of the fault time, and n-1 represents the total number of lines;
[0056] The corresponding relationship between the artificial repair team and this line during the period t after the disaster r tx The calculation formula is:
[0057] r tx =z mt,m -z m(t-1),m ,t∈[2,T],m∈[1,n-1]
[0058] Among them, r tx represents the corresponding relationship between the manual repair team and this line during the period t after the disaster, r tx =0 means that the manual maintenance team did not carry out emergency repairs on this route during this period, r tx =1 means that the manual maintenance team is carrying out maintenance on this route during this period;
[0059] Z mt,m Indicates the disconnection status of the line numbered m in period t after the disaster; Z m(t-1),m Indicates the disconnection status of the line numbered m in the period t-1 after the disaster;
[0060] S42: Manual repair team constraints;
[0061] When t = 1, we have:
[0062] R 1 =[r 1,1 ,r 1,2 ,...,r 1,X ]=[0,0,...,0]
[0063] Among them, R 1 Indicates the maintenance status of all faulty routes during the first fault time period, when all faults have not been repaired;
[0064] The manual repair team can repair h faulty lines per unit time. The expression of the manual repair team constraint is as follows:
[0065]
[0066] Among them, R t represents the maintenance status of all routes during the tth fault period, R t-1represents the maintenance status of all routes during the t-1th fault period;
[0067] The path model of the manual repair team is expressed as follows:
[0068]
[0069] Among them, L peo represents the driving path distance of the manual repair team, D represents the road network model matrix, R' t-1 Represents R t-1 The transposed matrix of .
[0070] Further, the S5 includes:
[0071] S51: The objective function calculation formula is as follows:
[0072]
[0073] Among them, ω α ,ω β ,ω γ They represent ESV-SOP configuration cost coefficient, power failure cost coefficient, and mobility cost coefficient respectively; H c represents the load of the load forecast curve; H represents the actual load borne by the distribution network in the emergency scenario, and f represents the objective function;
[0074] t represents the serial number of the fault time period, T represents the total length of the fault time, n represents the nth port of SOP, and Z represents the set of all ports of a single ESV-SOP; S n,sop Refers to the apparent power actually running at the nth port; L peo represents the driving distance of the manual repair team, L car Indicates the moving distance of ESV-SOP;
[0075] S52: Use the solver to solve the model and objective function f constructed in S1~S4, and obtain the optimal configuration of ESV-SOP, the optimal scheduling path of ESV-SOP, the power instruction of ESV-SOP in each time period, the optimal repair path of the manual repair team, and the maximum load level that can be supported in the network.
[0076] Compared with the existing methods, the method of the present invention has many advantages and positive effects.
[0077] First, the model calculation of the method of the present invention is simple and does not require complex algorithms;
[0078] At the same time, with the goal of system economy, the configuration capacity of ESV-SOP was determined to ensure the fastest and largest range of load power restoration. BRIEF DESCRIPTION OF THE DRAWINGS
[0079] Figure 1 This is an emergency scenario in which 6 lines are disconnected in this embodiment.
[0080] Figure 2 It is a photovoltaic output and total load prediction curve diagram selected in this embodiment as time changes.
[0081] Figure 3 It is a comparison chart of the active loads that can be supported by the three scenarios in different time periods in this embodiment. DETAILED DESCRIPTION
[0082] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0083] The complete steps of the method of the present invention are as follows:
[0084] S1: Construct a road network model of the traffic-coupled distribution network and determine the feasible movement path of the ESV-SOP.
[0085] S11: Taking the IEEE33-node distribution network with 6 line faults as an example, the line fault location and information are as follows: Figure 1 As shown. Introducing the 33×33 road network coupling matrix D, it is expressed as:
[0086]
[0087] Among them, d ij is the distance from the i-th node (i=1,2,…,33) to the j-th node (j=1,2,…,33) in the actual road network, i represents the node number, i=1,2,…,33; j represents the node number, j=1,2,…,33; It can be seen from the expression that the proposed road network coupling matrix is a symmetric constant matrix.
[0088] S12: Assign values to the matrix according to the distances between nodes in the actual traffic network. If there is no actual traffic route between the i-th node and the j-th node, then element d ij Indicated by INF.
[0089] S2: Construct a structural model of the distribution network, collect and process the post-disaster distribution network line fault information, obtain the location and number of line breaks, and determine the scheduling feasible domain of the ESV-SOP.
[0090] S21: Use natural numbers 1 to 32 to encode all lines in the distribution network, and determine the initial state matrix of the line as the feasible domain of ESV-SOP according to the fault situation.m Indicates the disconnection status of the line coded as m, "closed" is 1, "open" is 0; the line with a tie switch can only be opened after a fault occurs. The tie switch refers to an electric power device with a fixed grid-connected position that can transfer the load of a faulty power source to another power source.
[0091] S22: Construct a distribution network model, including a branch flow model for power flow calculation and a virtual network model for network reconstruction. Based on the forecast data of distributed power sources and loads, the source-load level of the distribution network is obtained to form a source-load power matrix. Distributed power sources refer to independent power sources such as photovoltaic, wind power, and hydropower that are compatible with the actual environment.
[0092] Taking the fault duration of 8:00-11:59 (including four time periods: 8:00-8:59; 9:00-9:59; 10:00-10:59; 11:00-11:59) as an example, the distributed power access point and each load node are regarded as PQ nodes, and both are represented by active power variables and reactive power variables. Read the power prediction data of the two, and refer to the positive direction as the outflow node. The power prediction curves of the two are as follows: Figure 2 shown.
[0093] The branch flow model includes power flow equation constraints, safety condition constraints and second-order cone relaxation constraints.
[0094] 1) The power flow equation constraint requires that any node in the distribution network must satisfy the power balance constraint, as shown in the following formula:
[0095]
[0096] Among them, P i,dis represents the active power output of distributed power generation at node i, P i,1 Indicates the active load of the node; Q i,dis Indicates the reactive power output of the distributed power supply at the node, Q i,1 Represents the reactive load of the node, P i,net , Q i,net Indicates the active power and reactive power output from the upper power grid to the node; P i,e , Q i,e Indicates the active and reactive power input to the node by the ESV-SOP of the node; Ω k→i represents the set of branches flowing into the node, ∑ Ωk→i (PI·r) represents the sum of active power flowing into the node from the upstream branches; ∑ Ωk→i (QI·x) represents the sum of reactive power flowing into the node from the upstream branch; Ω i→j Represents the branch set out of the node; ∑ Ωi→j P represents the active power flowing from the node to the downstream branch, ∑Ωi→j Q represents the sum of reactive power flowing from the node to the downstream branch; P represents the active power flowing through the branch, Q represents the reactive power flowing through the branch; I represents the square of the branch current; r and x represent the resistance and reactance of the line respectively; i represents the node number, and j refers to the sub-node number connected to the i node.
[0097] 2) Safety condition constraints require that any node and any branch of the distribution network should meet the safety standards, as shown in the following formula:
[0098]
[0099] Among them, V represents the square of the node voltage, P represents the branch active power, Q represents the branch reactive power, and I represents the square of the node current; V Represents the lower limit of the square of the node voltage; represents the upper limit of the square of node voltage; I Represents the lower limit of the square of the node current; Represents the upper limit of the square of the node current; P Indicates the lower limit of branch active power; Indicates the upper limit of the rate of branch active power; Q Indicates the lower limit of branch reactive power; Represents the upper limit of branch reactive power. The above constraint formula indicates that the above variables shall not exceed their own upper and lower limits.
[0100] 3) Introduce the second-order cone relaxation constraint to reduce the difficulty of solving the branch flow model in the computer, as shown in the following formula:
[0101]
[0102] in, is a two-norm form,
[0103]
[0104] 4) To realize network reconstruction (the process of connecting the line to the grid after maintenance and the operation of the tie switch), a virtual network that is completely consistent with the actual network structure needs to be introduced. The constraints used to calculate the power flow of the virtual network are called virtual power flow constraints, which mainly include:
[0105]
[0106] Where F represents the flow in the virtual network; Ω dg represents the node set containing distributed power sources, Ω represents the entire node set, and Ω 1 Indicates no distributed power node, Ω 1 =Ω-Ω dg; Distributed power sources refer to independent power sources such as photovoltaic, wind, and hydropower that are compatible with the actual environment; W i represents the distributed power output of node i in the virtual network; i represents the node number, j refers to the sub-node number connected to node i; ∑ Ωi→j F refers to the sum of virtual power flowing out of node i; ∑ Ωk→i F refers to the sum of virtual power flowing into node i; K = 100; Z m Indicates the breaking variable of line m. When line m is connected to the grid, Z m 1, when offline, Z m is 0; ε represents the distribution network branch set.
[0107] S23: Obtain the locations of all six faulty lines, estimate the post-disaster repair time T based on historical data or experience, and construct a T×X faulty line maintenance identification matrix R, which is expressed as follows:
[0108]
[0109] The matrix represents the maintenance status of X faulty lines T hours after a disaster, where T represents the total length of the fault time, and X represents the number of faulty lines. T and X are determined by the actual situation. In this embodiment, T=4 and X=6.
[0110] The status is "Not repaired" ij r whose element value is 0 and whose status is "maintenance completed" ij The element value is 1. Line maintenance is done manually (independent of ESV-SOP).
[0111] S3: Construct an ESV-SOP dispatch model under traffic coupling, including the dispatch feasible domain, feasible domain constraints, working state constraints, and dispatch path model of ESV-SOP. The dispatch path model is used to characterize its moving distance and pave the way for solving the optimal dispatch path.
[0112] S31: Determine the scheduling feasible domain of ESV-SOP. The fault line maintenance identification matrix R determined by S2 is regarded as the feasible domain of ESV-SOP, and a 4×6 access position binary variable matrix J is introduced. Matrix J is the scheduling feasible domain of ESV-SOP, where the j state of "access fault position" T,X The element value is 1, and the status is "not connected to the fault location" T,X The element value is 0, and the expression is as follows:
[0113]
[0114] Since each ESV-SOP can only access one fault location, there are feasible domain constraints:
[0115] ∑J t=1 (8)
[0116] Wherein, t represents the sequence number of the four time periods of the fault time periods 8:00-8:59; 9:00-9:59; 10:00-10:59; 11:00-11:59, t=1, 2, ... T; J t Represents the state matrix of time period t. When t = T, J t =J T .
[0117] S32: Setting relevant constraints of the mobile multi-port interconnection equipment.
[0118] After the ESV-SOP is connected to the fault location, the transmission power is subject to working state constraints:
[0119]
[0120] Among them, P n,sop Indicates the active power output by the nth port of ESV-SOP, Q n,sop They represent the reactive power output from the nth port of ESV-SOP; S N n,sop Indicates the rated apparent power of the nth port; P bat Represents the output power of the energy storage battery; Z represents the set of all ports of a single ESV-SOP; Z dc Indicates the DC-DC port set of SOP. n indicates the nth port of SOP; taking 3 ports as an example, a single ESV-SOP includes 2 AC-DC ports and 1 port is a DC-DC port.
[0121] S33: Establish an ESV-SOP scheduling path model.
[0122] Combined with the road network model established by S1, the moving distance of a single ESV-SOP in the four unit time periods of 8:00-8:59; 9:00-9:59; 10:00-10:59; 11:00-11:59 is:
[0123]
[0124] Among them, L car Indicates the moving distance of ESV-SOP; J t represents the state matrix of time period t, J t-1 The last fault time period t-1 The state matrix, J' t-1 Indicates J t-1 The transposed matrix of .
[0125] S4: Construct a path model for the manual repair team under traffic coupling to characterize its movement distance, laying the foundation for solving the optimal repair route.
[0126] S41: The disconnection status of the distribution network line is determined by z m Indicates that a 4×32 line disconnection identification variable matrix is further formed, and the expression is as follows:
[0127]
[0128] Among them, z mt,j It represents the disconnection status of the line numbered j (j = 1, 2, ..., 32) in the time period t (t = 1, 2, ..., T) after the disaster. Assuming that the emergency repair time is 1 time period, it is easy to know that:
[0129] r tx =z mt,x -z m(t-1),x ,t∈[2,4],x∈[1,6] (12)
[0130] Among them, r tx represents the corresponding relationship between the manual repair team and this line during the period t after the disaster, r tx =0 means that the manual maintenance team did not carry out emergency repairs on this route during this period, r tx =1 means that the manual maintenance team is carrying out maintenance on this route during this period; Z mt,x Indicates the disconnection status of the line numbered x in period t after the disaster; Z m(t-1),x Indicates the disconnection status of the line numbered x in the period t-1 after the disaster.
[0131] S42: Set relevant constraints for the manual maintenance team.
[0132] When t = 1, we have:
[0133] R 1 =[r 11 ,r 12 ,...,r 1x ]=[0,0,...,0] (13)
[0134] Among them, R 1 Indicates the maintenance status of all routes during the first fault time period, when all faults have not been repaired.
[0135] If the manual repair team can repair h faulty lines per unit time, there is a repair strategy constraint, which is expressed as follows:
[0136]
[0137] Among them, R t represents the maintenance status of all routes during the tth fault period, Rt-1 represents the maintenance status of all routes during the t-1th fault period;
[0138] Here, in this embodiment, h=2.
[0139] The repair route distance is expressed by the following formula:
[0140]
[0141] Among them, L pe o represents the driving path for manual repair, R' t -1 means R t-1 The transposed matrix of .
[0142] S5: Construct a collaborative power supply restoration method for ESV-SOP under traffic coupling.
[0143] S51: Setting the objective function.
[0144] Since the network reconstruction during the repair process is time-coupled, in order to achieve the optimal overall system performance, the entire period of the post-disaster failure should be considered as a decision factor to avoid the optimal result in a single period. The objective function should include ESV-SOP configuration costs, load loss costs, scheduling costs, and repair mobility costs.
[0145]
[0146] Among them, ω α ,ω β ,ω γ They represent ESV-SOP configuration cost coefficient, power failure cost coefficient, and mobility cost coefficient respectively; H c represents the load of the load forecast curve; H represents the actual load borne by the distribution network in the emergency scenario, and f represents the objective function;
[0147] t represents the serial number of the fault time period, T represents the total length of the fault time, n represents the nth port of SOP, and Z represents the set of all ports of a single ESV-SOP; S n,sop Refers to the actual operating apparent power of the nth port.
[0148] S52: Solve the model.
[0149] The GUROBI commercial solver is used to solve the model constructed in steps S1 to S4 and the objective function of S51, and the optimal configuration of ESV-SOP, the optimal scheduling path of ESV-SOP, the power instructions of ESV-SOP in each period (three-phase power instructions of each port), the optimal repair path of the manual repair team and the load level that can be supported in the network are obtained.
[0150] The invention of the method of the present invention:
[0151] Firstly, based on the new emergency vehicle architecture, the method of the present invention proposes a collaborative power supply restoration strategy under the road network-grid coupling, that is, combining the contact switch action with the emergency repair of the manual team, and characterizing the moving distance of the ESV-SOP and the repair team by constructing a mathematical model of the road network-grid coupling, and obtaining the overall optimal repair path, emergency vehicle dispatch path, and emergency vehicle power transmission instruction, thereby ensuring the fastest and largest range of load power supply restoration.
[0152] At the same time, the method of the present invention solves the double-layer optimization problem at one time, converts the objectives in the traditional double-layer optimization structure into economic indicators, and then takes the system economy as the goal to obtain the optimization results for the entire time period, economically determines the configuration capacity of the ESV-SOP, thereby effectively improving the mobile support efficiency of emergency vehicles and manual teams, and providing technical support for emergency repair and management and recovery of the distribution network.
[0153] In addition, the model in the method of the present invention does not require an intelligent algorithm and can be solved using only common commercial solvers.
[0154] Beneficial effects of the method of the present invention:
[0155] In order to verify the effectiveness and superiority of the method of the present invention, the following three scenarios are set in this embodiment and verified on an IEEE33 node network containing a tie switch:
[0156] Scenario 1: Using the method proposed in this paper, three ESV-SOPs are deployed to work with the repair team to restore power supply;
[0157] Scenario 2: Three energy storage emergency vehicles are deployed to work with the repair team to restore power supply;
[0158] Scenario 3: Only the emergency repair team restores power supply.
[0159] Compare the dispatch paths and load-supporting capabilities of the three scenarios:
[0160] Table 1 is a comparison table of dispatching paths between energy storage emergency vehicles and ESV-SOP. It can be seen that compared with energy storage emergency vehicles, ESV-SOP has the function of multi-point interconnection and can transmit power concentratedly at the fault line location.
[0161] Figure 3 This is a comparison chart of the active load that can be supported by the three scenarios in different time periods in this embodiment. It can be seen that in time period 7, the disaster has not occurred yet, and in time period 8, 6 lines of the distribution network have faults. At this time, the repair team repairs 2 lines in each time period, and the repair is completed in time period 11. Therefore, the fault has not been cleared in time periods 8 to 10, and the distribution network is difficult to meet the needs of the load forecast curve, and the maximum load supply is very limited.
[0162] Table 1 and Figure 3 It can be concluded that, compared with scenarios 2 and 3, scenario 1 (the method of the present invention) significantly increases the amount of load that can be supplied, reduces the load loss caused by scheduling time, and thus reduces the economic losses caused by power outages; at the same time, it shows that the load level that can be supported within the grid of the ESV-SOP method of the present invention is significantly better than that of the energy storage emergency vehicle.
[0163] Table 1 Comparison of dispatching paths between energy storage emergency vehicles and ESV-SOP
[0164]
[0165] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.
Claims
1. ESV-SOP and multi-resource collaborative power supply restoration method considering road network-grid coupling, It is characterized in that The following steps are involved: S1: Construct road network model matrix; S2: Construct the feasible domain and distribution network model of ESV-SOP, and construct the fault line maintenance identification matrix; S3: Construct ESV-SOP scheduling model; S4: Construct a path model for the manual repair team; S5: Construct the objective function, solve the model and the objective function, and obtain the ESV-SOP collaborative power supply restoration method.
2. The ESV-SOP and multi-resource coordinated power supply restoration method considering road network-grid coupling according to claim 1, It is characterized in that The S1 includes: S11: Construct the road network model matrix D, expressed as: There are n nodes in total, d ij is the distance from the i-th node to the j-th node in the actual road network, and there are (n-1) routes in total; i represents the node number, i=1,2,…,n; j represents the node number, j=1,2,…,n; S12: Assign values to the matrix D according to the distances between nodes in the actual traffic network.
3. The ESV-SOP and multi-resource coordinated power supply restoration method considering road network-grid coupling according to claim 2, It is characterized in that The S2 includes: S21: Encode the (n-1) lines of the distribution network and determine the initial state matrix of the line as the feasible domain of ESV-SOP according to the fault situation; where Z is used m Indicates the initial disconnection state of line m, Z m =1 means the line is initially closed, Z m =0 means the initial state of the line is disconnected, and line m is any line in the line; S22: construct a distribution network model, including a branch flow model and a virtual network model; Obtain power prediction data of distributed power sources and loads, and obtain power prediction curves of distributed power sources and loads; The branch flow model includes the constraints of the flow equation, safety condition, and second-order cone relaxation. 1) Any node in the distribution network model must satisfy the power flow constraints, as shown in the following formula: Among them, P i,dis represents the active power output of distributed power generation at node i, P i,1 represents the active load of node i; Q i,dis represents the reactive power output by the distributed generation at node i, Q i,1 represents the reactive load of node i, P i,net , Q i,net They represent the active power and reactive power output from the upper power grid to node i respectively; P i,e , Q i,e Respectively represent the active and reactive power input from node ESV-SOP to node i; Ω k→i represents the set of branches flowing into node i, ∑ Ωk→i (PI·r) represents the sum of active power flowing into node i from the upstream branches; ∑ Ωk→i (QI·x) represents the sum of reactive power flowing into node i from the upstream branch; Ω i→j represents the branch set out of node i; ∑ Ωi→j P represents the active power sum of node i flowing to the downstream branch, ∑ Ωi→j Q represents the sum of reactive power flowing from node i to the downstream branch; P represents the active power flowing through the branch, Q represents the reactive power flowing through the branch; I represents the square of the branch current; r and x represent the resistance and reactance of the line respectively; i represents the node number, and j represents the sub-node number connected to the i node; 2) Any node and branch of the distribution network model must meet the safety operating condition constraints, as shown in the following formula: Among them, V represents the square of the node voltage, P represents the branch active power, Q represents the branch reactive power, and I represents the square of the node current; Represents the lower limit of the square of the node voltage; represents the upper limit of the square of node voltage; Represents the lower limit of the square of the node current; Represents the upper limit of the square of the node current; Indicates the lower limit of branch active power; Indicates the upper limit of the rate of branch active power; Indicates the lower limit of branch reactive power; Indicates the upper limit of branch reactive power; 3) The distribution network model needs to satisfy the second-order cone relaxation constraint, as shown in the following formula: in, is a two-norm form, 4) The virtual network model needs to satisfy the virtual power flow constraints, as shown in the following formula: Where F represents the flow in the virtual network; Ω dg represents the node set containing distributed power sources, Ω represents the entire node set, and Ω 1 represents the set of nodes without distributed generation, Ω 1 =Ω-Ω dg ; W i represents the distributed power output of node i in the virtual network; i represents the node number, j refers to the sub-node number connected to node i; ∑ Ωi→j F refers to the sum of virtual power flowing out of node i; ∑ Ωk→i F refers to the sum of virtual power flowing into node i; Z m represents the disconnection state of line m; ε represents the distribution network branch set; K represents a constant; S23: Obtain the locations of X faulty lines, estimate the post-disaster repair time T, and construct the faulty line maintenance identification matrix R, which is expressed as follows: The elements in the matrix R represent the maintenance status of X faulty lines T hours after the disaster. The element value of the unmaintained element is 0, and the element value of the repaired element is 1. T represents the total length of the fault time, and X represents the number of faulty lines.
4. The ESV-SOP and multi-resource coordinated power supply restoration method considering road network-grid coupling according to claim 2, It is characterized in that The S3 includes: S31: Construct the access position state matrix J. The matrix J is the scheduling feasible domain of ESV-SOP, and the expression is as follows: The matrix J satisfies the feasible region constraints: ∑J t =1 Among them, the element value of the matrix J whose state is that ESV-SOP is connected to the fault position is 1, and the element value of the state that ESV-SOP is not connected to the fault position is 0; T represents the total length of the fault time, and X represents the number of faulty lines; J t represents the state matrix of time period t, t represents the sequence number of the fault time period, t=1, 2, ...T; when t=T, J t =J T ; S32: The transmission power of ESV-SOP after accessing the fault location satisfies the working state constraints: Among them, P n,sop Indicates the active power output by the nth port of ESV-SOP, Q n,sop They represent the reactive power output by the nth port of ESV-SOP respectively; Indicates the rated apparent power of the nth port; P bat Represents the output power of the energy storage battery; Z represents the set of all ports of ESV-SOP; Z dc Represents the DC-DC port set of ESV-SOP; n represents the number of ports of ESV-SOP; S33: Construct ESV-SOP dispatch path model; The calculation formula of the moving distance of ESV-SOP is: Among them, L car represents the moving distance of ESV-SOP; D represents the road network model matrix; J t represents the access location state matrix of time period t, J t-1 is the access position state matrix of the last fault time period t-1, J' t-1 Indicates J t-1 The transposed matrix of .
5. The ESV-SOP and multi-resource coordinated power supply restoration method considering road network-grid coupling according to claim 3, It is characterized in that The S4 includes: S41: Construct the line disconnection identification matrix Z, which is expressed as follows: Among them, the element z in the matrix Z mt,m Indicates the disconnection status of the line numbered m in the time period t after the disaster, t represents the sequence number of the fault time period, and m represents the sequence number of the fault line; t=2,3…,T; m=1,2,…,n-1; T represents the total length of the fault time, and n-1 represents the total number of lines; The corresponding relationship between the artificial repair team and this line during the period t after the disaster r tx The calculation formula is: r tx =z mt,m -z m(t-1),m ,t∈[2,T],m∈[1,n-1] Among them, r tx represents the corresponding relationship between the manual repair team and this line during the period t after the disaster, r tx =0 means that the manual maintenance team did not carry out emergency repairs on this route during this period, r tx =1 means that the manual maintenance team is carrying out maintenance on this route during this period; Z mt,m Indicates the disconnection status of the line numbered m in period t after the disaster; Z m(t-1),m Indicates the disconnection status of the line numbered m in the period t-1 after the disaster; S42: Manual repair team constraints; When t = 1, we have: R 1 =[r 1,1 ,r 1,2 ,...,r 1,X ]=[0,0,...,0] Among them, R 1 Indicates the maintenance status of all faulty routes during the first fault time period, when all faults have not been repaired; The manual repair team can repair h faulty lines per unit time. The expression of the manual repair team constraint is as follows: Among them, R t represents the maintenance status of all routes during the tth fault period, R t-1 represents the maintenance status of all routes during the t-1th fault period; The path model of the manual repair team is expressed as follows: Among them, L peo represents the driving path distance of the manual repair team, D represents the road network model matrix, R' t-1 Represents R t-1 The transposed matrix of .
6. The ESV-SOP and multi-resource coordinated power supply restoration method considering road network-grid coupling according to claim 4 or 5, It is characterized in that The S5 includes: S51: The objective function calculation formula is as follows: Among them, ω α ,ω β ,ω γ They represent ESV-SOP configuration cost coefficient, power failure cost coefficient, and mobility cost coefficient respectively; H c represents the load of the load forecast curve; H represents the actual load borne by the distribution network in the emergency scenario, and f represents the objective function; t represents the serial number of the fault time period, T represents the total length of the fault time, n represents the nth port of SOP, and Z represents the set of all ports of a single ESV-SOP; S n,sop Refers to the apparent power actually running at the nth port; L peo represents the driving distance of the manual repair team, L car Indicates the moving distance of ESV-SOP; S52: Use the solver to solve the model and objective function f constructed in S1~S4, and obtain the optimal configuration of ESV-SOP, the optimal scheduling path of ESV-SOP, the power instruction of ESV-SOP in each time period, the optimal repair path of the manual repair team, and the maximum load level that can be supported in the network.
Citation Information
Cited By
Mobile multi-terminal interconnection equipment power supply management and control method in power distribution network emergency scene
CN117748487A
Power distribution network emergency scene mobile multi-end interconnected equipment power supply management and control method
CN117748487B
Scheduling method and system for rapid repair and recovery after disaster of intelligent networked highway power supply system
CN119539400A