Emergency bus route connection model construction and scheme generation method, device and equipment

By constructing a subway network database and a bus line connection model, combining direct and full-line connection bus lines, and optimizing vehicle allocation, the problem of emergency bus connection plan design when the subway network is interrupted is solved, and efficient and flexible connection plan generation is achieved. , improving the efficiency of subway emergency management.

CN118761891APending Publication Date: 2024-10-11WUHAN UNIV OF TECH
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410915896.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing technology is difficult to design a universal and efficient emergency bus connection scheme in the scenario of subway network interruption. It lacks systematicness and flexibility and cannot effectively match passenger transportation needs, resulting in passenger delays and transportation network overload.

Method used

By establishing a database of subway network, emergency bus and passenger flow data, a bus line connection model is constructed, combining two-point direct and full-line connecting bus lines to optimize vehicle allocation and line design. The goal is the shortest total transportation time, taking into account the number of vehicles, The number of cycles and connection efficiency, the genetic algorithm is used to solve the model to generate the connection plan.

Benefits of technology

It achieves more accurate matching of passenger transportation needs, reduces the passenger transfer rate, shortens the connecting transportation time, improves the connecting efficiency and convenience, and solves the problem of the difficulty in balancing the versatility and versatility in emergency bus connecting line planning in the existing technology. A question of high efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761891A_ABST
    Figure CN118761891A_ABST
Patent Text Reader

Abstract

The invention relates to an emergency bus route connection model construction method, an emergency bus route connection scheme generation method, an emergency bus route connection scheme generation device and emergency bus route connection equipment, and belongs to the technical field of subway emergency management. The emergency bus route connection model construction method comprises the following steps: establishing a database in which metro line network data, emergency bus data, passenger flow condition data and urban road traffic indexes of a target city are stored; an emergency bus line connection scheme is provided, and the emergency bus line connection scheme comprises the steps that a two-point direct-through quick connection line is arranged between subway interruption stations, and a whole line connection line which stops station by station is arranged on a subway interruption line; building a bus route connection model based on the database and the emergency bus route connection scheme; the invention provides a quick connection and whole line connection combined connection method, and effectively solves the technical problem that an emergency bus connection line planning scheme provided in the prior art is difficult to consider both universality and high efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of subway emergency management, and in particular to a method, device and equipment for constructing an emergency bus line connection model and generating a plan. Background Art

[0002] With the rapid development of my country's social economy, the rapid advancement of urbanization and motorization, the development of subways and other public transportation in megacities has become an important way to solve the problem of traffic congestion. However, the subway system itself is very complex and its transportation capacity is almost irreplaceable. Once a failure occurs and the operation is interrupted, it is easy to cause crowding and traffic paralysis. Especially when the interruption occurs at the network level, it will further aggravate the negative impact. The emergency bus shuttle service currently used has alleviated the traffic pressure after the subway operation is interrupted to a certain extent, but it lacks a deep theoretical basis and often has little effect in practical applications. It still causes many passengers to travel delays, the traffic network is overloaded, and the contradiction between supply and demand is prominent. Therefore, designing an efficient emergency bus shuttle route plan for the subway network interruption scenario is of great significance for emergency management after subway accidents, and it is also an important topic that needs to be studied urgently.

[0003] At present, the research in this field at home and abroad mainly uses the knowledge of probability statistics, optimization theory, graph theory, intelligent optimization algorithms and other disciplines to abstractly process the problem and achieve quantitative analysis. The research goal generally focuses on reducing passenger delay time, and some considers the restrictions on the use of public transportation. Since the optimization of bus connecting lines faces problems such as large scale and dimension, many scholars deal with the problem step by step or improve the algorithm. However, the existing research still has the following shortcomings, such as the lack of systematic consideration of factors, the goal is mostly to minimize passenger delay time, and it does not consider the overall transportation of bus vehicles and subway passengers; the line design and vehicle allocation lack flexibility, and are generally divided into two stages, which reduces the flexibility of the line and vehicle combination, sacrifices the arbitrariness of the problem, and does not optimize from the overall perspective; it is applicable to the interruption network structure but lacks universality, and the network interruption scenarios involved are mostly special forms. Due to the existence of transfer station nodes in the network, and the more transfer lines and transfer stations are included, the complexity of the problem will increase sharply, and it is difficult to build a general network model.

[0004] Therefore, there is currently a lack of an emergency bus shuttle route planning method in subway network interruption scenarios that systematically considers the supply and demand relationship, flexibly generates shuttle routes and allocates vehicles, and is suitable for a general network structure and has high shuttle efficiency. Summary of the invention

[0005] In view of this, it is necessary to provide a method, device and equipment for constructing an emergency bus line connection model and generating a connection plan, so as to solve the problem that the emergency bus connection line planning method provided by the prior art is difficult to take into account both universality and high efficiency.

[0006] In order to solve the above problems, the present invention provides a method for constructing an emergency bus line connection model, comprising: Establish a database that stores the target city's subway network data, emergency bus data, passenger flow data, and urban road traffic indicators; Determine the emergency bus line connection method, which is: lay out a two-point direct rapid connection line between the subway interrupted stations, and lay out a full-line connection line that stops at each station on the subway interrupted line; Construct a bus route connection model based on the database and emergency bus route connection plan; Among them, the bus line connection model includes: an objective function with the shortest total transportation time as the goal, and comprehensive consideration of the constraints of the number of buses, vehicle cycle times, passenger flow distribution and connection efficiency.

[0007] In a possible implementation, the objective function includes: a full-line connecting bus transportation time function and a fast connecting bus transportation time function The transit time functions for all-line feeder buses include:

[0008] Rapid bus transit time functions include:

[0009] in, Indicates the transportation time of the connecting bus on the entire line. Indicates the time for rapid transit bus transportation. Indicates Subway Line No. The number of buses that arrive at each station and participate in the entire line of the route, Indicates Subway Line No. The number of full-line connection cycles of the bus that arrives at each station, Indicates Subway Line No. The destination station of the bus is the Line No. The number of rapid shuttle buses at each station, Indicates Subway Line No. The destination station of the bus is the Line No. The number of rapid connection cycles per station ( , , ), For the subway line interruption collection, For the A collection of interrupted stations for the interrupted subway lines.

[0010] In a possible implementation, the objective function further includes: an auxiliary correction term; The auxiliary correction items include:

[0011] Indicates auxiliary correction time, In order to optimize the auxiliary correction coefficient of the target, its value is a small enough positive number, so that the influence of the auxiliary correction term on the value of the objective function can be ignored. To remove the first The first subway line to be interrupted You need to go to the first Line No. The number of remaining subway passengers stranded at each station is used as an auxiliary variable.

[0012] In a possible implementation, the constraint condition includes: Constraints on the total number of buses departing from interruption stations:

[0013] in, For the The set of interrupted transfer stations for the interrupted subway lines (consisting of all different transfer station subnodes on the same line) composition), The sub-nodes of the transfer stations of the interrupted lines together form the parent set of subway interrupted transfer stations. The subway interruption transfer station subset (a transfer station in the actual network) is formed by storing all associated child nodes in the form of a set, and satisfies , For the Subway line interrupted The number of vehicles that depart from the interruption station, Same meaning as above and indicates that the station is a transfer station. for The smallest line subscript of the neutron node element, function Get child nodes The corresponding sub-set Remove child nodes The remaining part of the collection is the child node The set of all other associated child nodes; Vehicle quantity value range constraints:

[0014] .

[0015] In a possible implementation, the constraint condition includes: Constraints on the number of remaining passengers at the rapid connection interruption station:

[0016] in, is the rated passenger capacity of the bus, For the The first subway line to be interrupted You need to go to the first Line No. The initial number of stranded subway passengers at each station; Passenger flow distribution constraints for the entire line connection section:

[0017]

[0018]

[0019] in, For the The collection of sections of the subway interrupted lines. For the Line No. The first The cross section between the interruption sites and meets ,function Indicates that the The first subway line to be interrupted You need to go to the first Line No. After the passenger flow of each station participating in the full-line connection is distributed to the corresponding line sections, the passenger flow increment set of all line sections of the network is interrupted. Indicates that the node passenger flow After cross-sectional passenger flow distribution The increase in passenger flow in the section, For the first The first subway line to be interrupted Section passenger flow: The full line connection meets the remaining passenger transportation demand constraints: .

[0020] In a possible implementation, the constraint condition further includes: Connection efficiency constraints:

[0021]

[0022]

[0023] .

[0024] In a possible implementation, the constraint condition further includes: Vehicle effective cycle constraints:

[0025]

[0026]

[0027]

[0028] in, is the auxiliary correction coefficient of the constraint condition, and its value is a sufficiently large positive number; Constraints on the range of loop times:

[0029] .

[0030] The present invention also provides a method for generating an emergency bus line connection plan, comprising: Design model solving algorithm: sequentially execute the steps of encoding, generating initial population, establishing fitness function, selection operation, crossover operation, mutation operation, and judging termination conditions, and write the above steps into the bus line connection model through computer programming; Solving the model: calling the database of the target city's subway network, emergency buses, passenger flow conditions, and urban road traffic indicators, and bringing the database into the bus line connection model to solve the connection line combination plan between each subway station, as well as the number and cycle times of the originating rapid connection buses and the full-line connection buses; Among them, the bus line connection model is obtained according to the emergency bus line connection model construction method described in any one of the above method items.

[0031] The present invention also provides a bus line connection device, comprising: The algorithm design module is used to sequentially execute the steps of encoding, generating an initial population, establishing a fitness function, performing a selection operation, a crossover operation, a mutation operation, and judging a termination condition, and write the above steps into a bus line connection model through computer programming; The model solving module is used to call the database of the subway network, emergency buses, passenger flow and urban road traffic indicators of the target city, and bring the database into the bus line connection model to solve the connection line combination plan between each subway station, as well as the number and cycle number of the starting rapid connection buses and the full-line connection buses; Among them, the bus line connection model is obtained according to the emergency bus line connection model construction method described in any one of the above method items.

[0032] The present invention also provides a device comprising: Memory, used to store programs; A processor is coupled to the memory and is used to execute the program stored in the memory to implement the emergency bus line connection model construction method described in any one of the above method items, or the steps in the emergency bus line connection plan generation method described in any one of the above method items.

[0033] The beneficial effects of the present invention are as follows: the present invention provides a method for constructing an emergency bus line connection model, firstly, a two-point direct rapid connection line is introduced to more accurately match the passenger transportation demand, and at the same time, in order to ensure the overall transportation capacity of the network, some full-line connection buses are retained, and the shortest total vehicle transportation time is taken as the goal, and the connection line generation and vehicle quantity allocation are optimized as a whole to ensure the flexibility of line and vehicle combination, thereby reducing the passenger transfer rate, reducing the connection bus transportation time, and improving the connection efficiency and convenience; the present invention also comprehensively considers the subway system and the bus system, takes into account the bus vehicle restrictions and the passenger connection time for system optimization, improves the comprehensive benefits of the emergency bus connection service, and effectively solves the problem that the emergency bus connection line planning scheme provided by the prior art is difficult to take into account both universality and high efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 A method flow chart of an embodiment of a method for constructing an emergency bus line connection model provided by the present invention; Figure 2 A method flow chart of an embodiment of a method for generating an emergency bus line connection plan provided by the present invention Figure 3 A schematic diagram of the structure of an embodiment of a device for generating an emergency bus line connection plan provided by the present invention; Figure 4 A schematic structural diagram of an embodiment of a device provided by the present invention. DETAILED DESCRIPTION

[0035] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings, wherein the accompanying drawings constitute a part of this application and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not used to limit the scope of the present invention.

[0036] In the description of the embodiments of the present invention, unless otherwise specified, "multiple" means two or more than two. "And / or" describes the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" may mean: A exists alone, A and B exist at the same time, and B exists alone.

[0037] The descriptions of "first", "second", etc. involved in the embodiments of the present invention are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the technical features defined as "first" and "second" may explicitly or implicitly include at least one of the features.

[0038] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0039] In order to solve the above problems, Figure 1 As shown, the present invention provides a method for constructing an emergency bus line connection model, comprising: S101, establishing a database storing subway network data, emergency bus data, passenger flow data and urban road traffic indicators of the target city; Specifically, the urban subway network data includes the structure of the city's subway network, the names of all line stations, the relative position coordinates of line stations, the actual travel distance between stations, and the train schedule. Emergency bus data includes the rated passenger capacity of buses, vehicle operating speed, and station travel time. Passenger flow data includes the average daily passenger flow of specific subway lines, cross-sectional passenger flow, and passenger flow distribution between stations. Urban road traffic indicators include urban road network vector data, traffic volume at specific roads during different time periods, and traffic congestion; the data comes from the city statistical yearbook, subway operating companies, transportation management bureaus, official news and accounts, etc.

[0040] S102, determine the emergency bus line connection method, the emergency bus line connection method is: lay out a two-point direct fast connection line between the subway interrupted stations, and lay out a full-line connection line that stops at each station on the subway interrupted line; It should be noted that the application scenario of this embodiment is subway network interruption, and the subway network interruption situation is: the subway interruption involves stations including at least one transfer station and the number of lines directly connected to the transfer station interrupted is at least two.

[0041] S103, constructing a bus line connection model based on the database and the emergency bus line connection plan; It should be noted that this embodiment can be implemented by obtaining a topological graph of a city subway network based on a topological node splitting method. The topological node splitting method refers to: firstly, abstracting the subway network into a connected graph , represents the set of nodes (sites) of the network, Represents a set of edges (lines) in a network, and assigns the required travel time parameter to each edge of the network as a weight , the edge weight set of the network , and then all transfer stations in the subway interruption network are split according to the number of lines involved, and the sub-nodes obtained by the split belong to the lines involved respectively, so that all stations belong to the only line, and the stations on the same line form a complete series relationship. The corresponding sub-nodes of the same transfer station are connected by virtual lines and the corresponding edge weight is 0, thereby solving the transfer station ownership problem and laying the foundation for establishing a mathematical model.

[0042] Furthermore, the process of constructing the bus line connection model includes: establishing model assumptions, determining the decision variables of the model, establishing the objective function, and determining the constraints; The model assumes that all buses are homogeneous, the number of bus cycles is an integer, the running time of each cycle is the same, the number of cycles of vehicles starting from the same station is the same, there are no fast connection lines between adjacent stations to reduce redundancy, when passengers cannot be matched to fast connection buses, they will participate in full-line connection, the full-line connection will distribute passenger flow according to the shortest path in the subway network, and the individual differences of passengers are not considered.

[0043] The decision variables of the model are Subway Line No. The number of buses dispatched to arrive at each station and connected to the entire line With the number of cycles , and Subway Line No. The destination station of the bus is the Line No. Number of express buses at each station With the number of cycles ( , , ),in, For the subway line interruption collection, For the A collection of interrupted stations for the interrupted subway lines.

[0044] Among them, the bus line connection model includes: an objective function with the shortest total transportation time as the goal, and comprehensive consideration of the constraints of the number of buses, vehicle cycle times, passenger flow distribution and connection efficiency.

[0045] Compared with the prior art, the present invention provides a method for constructing an emergency bus line connection model. First, the data of a city's subway network, emergency buses, passenger flow and urban road traffic indicators are obtained; then an emergency bus combination line connection method combining fast connecting buses with full-line connecting buses is proposed. From a system perspective, the emergency bus combination connecting line planning model is established with the goal of minimizing the total vehicle transportation time. The present invention is conducive to making full use of emergency bus resources, shortening bus connection transportation time, optimizing passenger connection convenience, and improving connection efficiency, thereby ensuring the efficient implementation of subway emergency management. It effectively solves the technical problem that the emergency bus connection line planning scheme provided by the prior art is difficult to take into account both universality and high efficiency.

[0046] In a possible implementation, the objective function includes: a full-line connecting bus transportation time function and a fast connecting bus transportation time function; The transit time functions for all-line feeder buses include: (1) Rapid bus transit time functions include: (2) in, Indicates the transportation time of the connecting bus on the entire line. Indicates the time for rapid transit bus transportation. Indicates Subway Line No. The number of buses that arrive at each station and participate in the entire line of the route, Indicates Subway Line No. The number of full-line connection cycles of the bus that arrives at each station, Indicates Subway Line No. The destination station of the bus is the Line No. The number of rapid shuttle buses at each station, Indicates Subway Line No. The destination station of the bus is the Line No. The number of rapid connection cycles per station ( , , ), For the subway line interruption collection, For the A collection of interrupted stations for the interrupted subway lines.

[0047] In a possible implementation, the objective function further includes: an auxiliary correction term; The auxiliary correction items include: (3) Indicates auxiliary correction time, In order to optimize the auxiliary correction coefficient of the target, its value is a small enough positive number, so that the influence of the auxiliary correction term on the value of the objective function can be ignored. To remove the first The first subway line to be interrupted You need to go to the first Line No. The number of remaining subway passengers stranded at each station is used as an auxiliary variable.

[0048] Furthermore, the above equations (1)-(3) are combined to obtain the final objective function: (4) In formula (4), t Indicates the total transit time.

[0049] In a possible implementation, the constraints include: Constraint on the total number of buses departing from interrupted stations: The initial number of emergency buses at each subway interrupted station is a fixed value. Regardless of the connection routes to which each bus is assigned, the total number of buses from the same departure station remains fixed, which can be expressed as: (5) in, For the The set of interrupted transfer stations for the interrupted subway lines (consisting of all different transfer station subnodes on the same line) composition), The sub-nodes of the transfer stations of the interrupted lines together form the parent set of subway interrupted transfer stations. The subway interruption transfer station subset (a transfer station in the actual network) is formed by storing all associated child nodes in the form of a set, and satisfies , For the Subway line interrupted The number of vehicles that depart from the interruption station, Same meaning as above and indicates that the station is a transfer station. for The smallest line subscript of the neutron node element, function Get child nodes The corresponding sub-set Remove child nodes The remaining part of the collection is the child node The set of all other associated child nodes; Vehicle quantity range constraint: The number of vehicles is a non-negative integer and can be expressed as: (6) (7) In a possible implementation, the constraint condition includes: Constraint on the number of remaining passengers at the rapid connection interruption station: After allocating some passengers to the rapid connection buses, some remaining passengers at the subway interruption station may need to participate in the full line connection process. Due to the existence of the circular transportation mode, the total capacity of each rapid connection line includes the sum of the capacity of the vehicles starting from the two ends of the line, which can be expressed as: (8) (9) In formula (8), Indicates The first subway line to be interrupted You need to go to the first Line No. The passenger flow of each station participating in the full-line connection; is the rated passenger capacity of the bus; In formula (9), For the The first subway line to be interrupted You need to go to the first Line No. The initial number of stranded subway passengers at each station; Passenger flow allocation constraint for the entire line connection section: All passengers participating in the entire line connection are allocated according to the shortest path between two points in the original subway network. The corresponding section passenger flow is increased for the sections involved in the path, and the shortest path calculation method can use the Dijkstra algorithm, which can be expressed as: (10) (11) (12) In formulas (10)-(12), For the The collection of sections of the subway interrupted lines. For the Line No. The first The cross section between the interruption sites and meets ,function Indicates that the The first subway line to be interrupted You need to go to the first Line No. After the passenger flow of each station participating in the full-line connection is distributed to the corresponding line sections, the passenger flow increment set of all line sections of the network is interrupted. Indicates that the node passenger flow After cross-sectional passenger flow distribution The increase in passenger flow in the section, For the first The first subway line to be interrupted Section passenger flow: The full-line connection satisfies the remaining passenger transportation demand constraint: The full-line connection vehicle transportation capacity of each section should not be less than the passenger flow of the corresponding section, which can be expressed as: (13) In a possible implementation, the constraint condition further includes: Connection efficiency constraint: Reduce redundant rapid connection lines, improve the efficiency of connecting buses, and stipulate that no rapid connection lines are deployed between two adjacent subway stations, which can be expressed as:

[0050] (14)

[0051] .

[0052] In a possible implementation, the constraint condition further includes: Vehicle effective cycle constraint: If a vehicle is assigned to a shuttle route, the vehicle must circulate on the shuttle route at least once; if there is no vehicle assigned to a shuttle route, there will be no corresponding number of cycles, which can be expressed as:

[0053] (15)

[0054]

[0055] in, is the auxiliary correction coefficient of the constraint condition, and its value is a sufficiently large positive number; Constraints on the range of loop times:

[0056] (16) like Figure 2 The present invention also provides a method for generating an emergency bus line connection plan, comprising: S201, designing a model solving algorithm: sequentially executing the steps of encoding, generating an initial population, establishing a fitness function, performing a selection operation, a crossover operation, a mutation operation, and determining a termination condition, and writing the above steps into a bus line connection model through computer programming; Preferably, a genetic algorithm is selected as the model solving algorithm.

[0057] S202, solving the model: calling the database of the target city's subway network, emergency buses, passenger flow conditions, and urban road traffic indicators, and bringing the database into the bus line connection model to solve and obtain the connection line combination plan between each subway station, as well as the number and cycle number of the originating rapid connection buses and the full-line connection buses; Among them, the bus line connection model is obtained according to the emergency bus line connection model construction method as described in any one of the above method items.

[0058] Specifically, the simulation cases involved in obtaining urban subway network data The location information of the lines and their corresponding interrupted stations, as well as the actual running time of trains between stations, all the stored data of the corresponding interrupted stations are obtained from the emergency bus data, the passenger flow distribution between each interrupted station is obtained from the passenger flow data, and the traffic flow information of the road network involved in the interrupted area is obtained from the urban road traffic index data.

[0059] Substitute into the combined connection line planning model: First, create an interrupt line set And process the numbers. , establish a set of interruption sites for each line and line section collection And number them, among which A collection of interrupted stations for the subway lines , No. Subway interruption line section collection .

[0060] Then, the transfer station is split into topological nodes, and the child nodes are used as elements to establish a transfer station set. , and according to the minimum line number allocation rule of the transfer station subnode involved in the combined connecting line planning model, that is, all resources involved in the transfer station subnode are allocated to the subnode , substitute the total number of buses departing from the interruption station Data, single cycle time of fast connection lines between stations Single cycle time of data and full line connection Data, passenger flow OD distribution between stations The data are shown in Table 1

[0061] Finally, the remaining scalar data are substituted into the combined connection line planning model to complete the calibration of all model parameters.

[0062] Solve to obtain the connection line combination plan between each subway station: determine the number and cycle times of the starting rapid connection bus and the full-line connection bus, as shown in Table 2 and Table 3:

[0063]

[0064] Calculate the total vehicle transportation time and the indicators reflecting passenger convenience: The total vehicle transportation time is the sum of the total transportation time of the rapid shuttle bus and the total transportation time of the full-line shuttle bus. The indicators reflecting passenger convenience include the passenger direct rate and the passenger transfer rate, as shown in Table 4:

[0065] like Figure 3 The present invention also provides an emergency bus line connection plan generating device 30, comprising: The algorithm design module 310 is used to sequentially execute the steps of encoding, generating an initial population, establishing a fitness function, performing a selection operation, a crossover operation, a mutation operation, and judging a termination condition, and write the above steps into a bus line connection model through computer programming; The model solving module 320 is used to call the database of the subway network, emergency buses, passenger flow and urban road traffic indicators of the target city, and bring the database into the bus line connection model to solve the connection line combination plan between each subway station, as well as the number and cycle number of the starting rapid connection buses and the full-line connection buses; Among them, the emergency bus line connection model is obtained according to the emergency bus line connection model construction method described in any one of the above method items.

[0066] like Figure 4As shown, the present invention further provides an electronic device 40, comprising: A memory 410, used for storing programs; The processor 420 is coupled to the memory 410 and is used to execute the program stored in the memory 410 to implement the steps in the method for building an emergency bus line connection model as described in any one of the above embodiments.

[0067] Figure 4 Only some of the components of the electronic device 40 are shown, but it should be understood that implementation of all of the components shown is not required, and more or fewer components may be implemented instead.

[0068] In some embodiments, the processor 420 may be a central processing unit (CPU), a microprocessor or other data processing chip, which is used to run the program code or process data stored in the memory 410, such as the emergency bus line connection model construction method of the present invention.

[0069] In some embodiments, the processor 420 may be a single server or a server group. The server group may be centralized or distributed. In some embodiments, the processor 420 may be local or remote. In some embodiments, the processor 420 may be implemented in a cloud platform. In one embodiment, the cloud platform may include a private cloud, a public cloud, a hybrid cloud, a community cloud, a distributed cloud, an internal cloud, a multi-cloud, etc., or any combination thereof.

[0070] In some embodiments, the memory 410 may be an internal storage unit of the electronic device 40, such as a hard disk or memory of the electronic device 40. In other embodiments, the memory 410 may also be an external storage device of the electronic device 40, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 40.

[0071] Furthermore, the memory 410 may include both an internal storage unit of the electronic device 40 and an external storage device. The memory 410 is used to store application software installed in the electronic device 40 and various data.

[0072] In one embodiment, when the processor 420 executes the emergency bus line connection model building program in the memory 410, the following steps may be implemented: Establish a database of the target city’s subway network, emergency public transportation, passenger flow, and urban road traffic indicators; Propose an emergency bus line connection method: set up a two-point direct rapid connection line between the subway interrupted stations, and set up a full-line connection line that stops at each station on the subway interrupted line; A bus route connection model is constructed based on the database and emergency bus route connection plan.

[0073] In another embodiment, when the processor 420 executes the bus connection plan generation program in the memory 410, the following steps may be implemented: Design model solving algorithm: sequentially execute the steps of encoding, generating initial population, establishing fitness function, selection operation, crossover operation, mutation operation, and judging termination conditions, and write the above steps into the bus line connection model through computer programming; Solution model: call the database of the target city's subway network, emergency buses, passenger flow conditions and urban road traffic indicators, and bring the database into the bus line connection model to solve the connection line combination plan between each subway station, as well as the number and number of cycles of the starting rapid connection buses and the full-line connection buses.

[0074] Furthermore, the embodiment of the present invention does not specifically limit the type of the electronic device 40 mentioned, and the electronic device 40 may be a portable electronic device such as a mobile phone, a tablet computer, a personal digital assistant (PDA), a wearable device, a laptop computer, etc. Exemplary embodiments of portable electronic devices include but are not limited to portable electronic devices equipped with IOS, Android, Microsoft or other operating systems. The above-mentioned portable electronic device may also be other portable electronic devices, such as a laptop computer with a touch-sensitive surface (e.g., a touch panel). It should also be understood that in some other embodiments of the present invention, the electronic device 40 may not be a portable electronic device, but a desktop computer with a touch-sensitive surface (e.g., a touch panel).

[0075] The present invention also provides a storage medium for storing a computer-readable program or instruction, which, when executed by a processor, can implement the method for constructing an emergency bus line connection model described in any one of the above-mentioned method items, or the steps in the method for generating a bus line connection plan described in any one of the above-mentioned method items.

[0076] Those skilled in the art will appreciate that all or part of the processes of the above-mentioned embodiments can be implemented by instructing related hardware (such as a processor, a controller, etc.) through a computer program, and the computer program can be stored in a computer storage medium, wherein the computer storage medium is a disk, an optical disk, a read-only storage memory, or a random access memory, etc.

[0077] The above is a detailed introduction to the construction of the emergency bus line connection model and the method, device and equipment for generating a scheme provided by the present invention. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea; at the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.

Claims

1. A method for constructing an emergency bus line connection model, applied to subway interruption scenarios, characterized in that: include: Establish a database that stores the target city's subway network data, emergency bus data, passenger flow data, and urban road traffic indicators; Determine the emergency bus line connection method, the emergency bus line connection plan is: lay out a two-point direct rapid connection line between the subway interrupted stations, and lay out a full-line connection line that stops at each station on the subway interrupted line; Construct a bus route connection model based on the database and emergency bus route connection plan; Among them, the bus line connection model includes: an objective function with the shortest total transportation time as the goal, and comprehensive consideration of the constraints of the number of buses, vehicle cycle times, passenger flow distribution and connection efficiency.

2. The method for constructing an emergency bus line connection model according to claim 1, characterized in that: The objective function includes: the full-line connecting bus transportation time function and the fast connecting bus transportation time function The transit time functions for all-line feeder buses include: Rapid transit bus transportation time functions include: in, Indicates the transportation time of the connecting bus on the entire line. Indicates the time for rapid transit bus transportation. Indicates Subway Line No. The number of buses that arrive at each station and participate in the entire line of the route, Indicates Subway Line No. The number of full-line connection cycles of the bus that arrives at each station, Indicates Subway Line No. The destination station of the bus is the Line No. The number of rapid shuttle buses at each station, Indicates Subway Line No. The destination station of the bus is the Line No. The number of rapid connection cycles per station ( , , ), For the subway line interruption collection, For the A collection of interrupted stations for the interrupted subway lines.

3. The method for constructing an emergency bus line connection model according to claim 2, characterized in that: The objective function also includes: an auxiliary correction term; The auxiliary correction items include: Indicates auxiliary correction time, In order to optimize the auxiliary correction coefficient of the target, its value is a small enough positive number, so that the influence of the auxiliary correction term on the value of the objective function can be ignored. To remove the first The first subway line to be interrupted You need to go to the first Line No. The number of remaining subway passengers stranded at each station is used as an auxiliary variable.

4. The method for constructing an emergency bus line connection model according to claim 1, characterized in that: The constraints include: Constraints on the total number of buses departing from interruption stations: in, For the The set of interrupted transfer stations for the interrupted subway lines (consisting of all different transfer station subnodes on the same line) composition), The sub-nodes of the transfer stations of the interrupted lines together form the parent set of subway interrupted transfer stations. The subway interruption transfer station subset (a transfer station in the actual network) is formed by storing all associated child nodes in the form of a set, and satisfies , For the Subway line interrupted The number of vehicles that depart from the interruption station, Same meaning as above and indicates that the station is a transfer station. for The smallest line subscript of the neutron node element, function Get child nodes The corresponding sub-set Remove child nodes The remaining part of the collection is the child node The set of all other associated child nodes; Vehicle quantity value range constraints: 。 5. The method for constructing an emergency bus line connection model according to claim 1, characterized in that: The constraints include: Constraints on the number of remaining passengers at the rapid connection interruption station: in, is the rated passenger capacity of the bus, For the The first subway line to be interrupted You need to go to the first Line No. The initial number of stranded subway passengers at each station; Passenger flow distribution constraints for the entire line connection section: in, For the The collection of sections of the subway interrupted lines. For the Line No. The first The cross section between the interruption sites and meets ,function Indicates that the The first subway line to be interrupted You need to go to the first Line No. After the passenger flow of each station participating in the full-line connection is distributed to the corresponding line sections, the passenger flow increment set of all line sections of the network is interrupted. Indicates that the node passenger flow After cross-sectional passenger flow distribution The increase in passenger flow in the section, For the first The first subway line to be interrupted Section passenger flow: The full line connection meets the remaining passenger transportation demand constraints: 。 6. The method for constructing an emergency bus line connection model according to claim 1, characterized in that: The constraints also include: Connection efficiency constraints: 。 7. The method for constructing an emergency bus line connection model according to claim 1, characterized in that: The constraints also include: Vehicle effective cycle constraints: in, is the auxiliary correction coefficient of the constraint condition, and its value is a sufficiently large positive number; Constraints on the range of loop times: 。 8. A method for generating an emergency bus line connection plan, characterized in that: include: Design model solving algorithm: sequentially execute the steps of encoding, generating initial population, establishing fitness function, selection operation, crossover operation, mutation operation, and judging termination conditions, and write the above steps into the bus line connection model through computer programming; Solving the model: calling the database of the target city's subway network, emergency buses, passenger flow conditions, and urban road traffic indicators, and bringing the database into the bus line connection model to solve the connection line combination plan between each subway station, as well as the number and cycle times of the originating rapid connection buses and the full-line connection buses; The bus line connection model is obtained according to the emergency bus line connection model construction method according to any one of claims 1 to 7.

9. A device for generating an emergency bus line connection plan, characterized in that: include: The algorithm design module is used to sequentially execute the steps of encoding, generating an initial population, establishing a fitness function, selecting an operation, a crossover operation, a mutation operation, and judging a termination condition, and write the above steps into the emergency bus line connection model through computer programming; The model solving module is used to call the database of the subway network, emergency buses, passenger flow and urban road traffic indicators of the target city, and bring the database into the emergency bus line connection model to solve the connection line combination plan between each subway station, as well as the number and cycle number of the starting rapid connection buses and the full-line connection buses; The emergency bus line connection model is obtained according to the emergency bus line connection model construction method according to any one of claims 1 to 7.

10. A device, characterized in that: include: Memory, used to store programs; A processor, coupled to the memory, is used to execute the program stored in the memory to implement the steps in the method for constructing an emergency bus line connection model as described in any one of claims 1 to 7, or the method for generating an emergency bus line connection plan as described in any one of claim 8.

Citation Information

Cited By

  • Passenger bus connection method, device and equipment under subway operation interruption

    CN119599227A