Supporting and positioning device for grounding electrode construction under moderately-weathered powder sandstone geology
By using down-the-hole machines and support positioning devices for ground electrode construction in weathered siltstone areas, the problems of low construction efficiency and ground electrode deflection were solved, and an efficient and stable ground electrode installation and welding process was achieved.
Patent Information
- Application Number
- CN202410872491.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-10-11
AI Technical Summary
Under the weathered siltstone geology, it is difficult to ram the ground electrode into the ground for construction. Conventional construction methods consume a lot of manpower and material resources, and the construction efficiency is low. Moreover, the ground electrode is easy to deflect during the drilling, affecting later welding construction.
Design a grounding electrode construction support and positioning device including a backfill hopper, connecting block, positioning drill, support horizontal plate and clamping plate. Use a down-the-hole machine to drill vertical, horizontal and inclined holes, and set up a supporting positioning device at the drilling location. Fixed ground electrode simplifies the welding process.
It improves construction efficiency, shortens the construction period, reduces costs, ensures that the ground electrode is fixed vertically, simplifies later welding operations, and avoids the problem of ground electrode deflection.
Smart Images

Figure CN118763474A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a support positioning device, in particular to a support positioning device and a construction method for a grounding electrode under moderately weathered siltstone geology, belonging to the technical field of power grid construction. Background Art
[0002] The grounding grid is composed of vertical grounding electrodes and horizontal grounding bodies. It plays an important role in the safe operation of the substation system, providing working grounding, protective grounding, repeated grounding and zero grounding. As a hidden project, it is easy to be overlooked. With the increase of voltage level and capacity of power system, accidents caused by poor grounding have occurred frequently, and the grounding problem has received more and more attention.
[0003] Most areas during construction are bare soil, and grounding electrodes are very easy to be rammed into the ground. However, in the moderately weathered siltstone area, the rock is hard and cannot be rammed into the ground. If conventional construction methods are used, the amount of earth excavation and backfilling is large, which brings great difficulty to the construction, consumes a lot of manpower and material resources, and has low construction efficiency, resulting in a large waste of economy and construction period. In addition, when the grounding electrode is lowered, due to the large inner diameter of the borehole compared to the grounding electrode, the grounding electrode often appears skewed in the borehole, which is not conducive to the later welding construction with the power grid. Summary of the invention
[0004] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a grounding electrode construction support and positioning device and a construction method under moderately weathered siltstone geology, which is convenient for workers to carry out grounding electrode construction in siltstone areas and at the same time, is conducive to workers to carry out welding construction to connect to the power grid.
[0005] The technical solution adopted by the present invention to solve the technical problem is: A supporting and positioning device for ground electrode construction under moderately weathered siltstone geology comprises a backfilling hopper, a feeding barrel is arranged at the bottom of the backfilling hopper, four connecting blocks are evenly arranged on the outer wall of the backfilling hopper, positioning drills are arranged on the connecting blocks, a supporting cross plate is arranged above the backfilling hopper, and a clamping plate is arranged on the supporting cross plate.
[0006] The supporting cross plate spans across the upper port of the backfilling hopper, and screws are respectively provided at both ends of the bottom of the supporting cross plate, and a through hole is dug on the outer extension plate corresponding to the upper port of the backfilling hopper. The screw passes through the through hole and is fixed by a matching nut. The supporting cross plate is located at the center of the upper port of the backfilling hopper.
[0007] A through hole is dug on the connecting block, and a sleeve is arranged above the through hole. The positioning drill penetrates the connecting plate and is fixed by a tightening bolt outside the sleeve.
[0008] The card board is clamped on the supporting horizontal plate and fixed by the jacking bolts on the back of the card board. A U-shaped plug-in is inserted into the middle and lower part of the card board, and a matching nut is connected to the end of the U-shaped plug-in through a thread.
[0009] The outer diameter of the discharge barrel is smaller than the inner diameter of the discharge hole.
[0010] The construction method of the ground electrode construction support and positioning device under moderately weathered siltstone geology comprises the following steps: S1. Construction preparation Prepare the drilling rigs, welding machines, drilling tools and drill rods required for construction, and use manual or mechanical methods to level the area to be constructed; S2. Measurement and layout According to the construction requirements, use the theodolite to establish the grounding control network, and use white lime to draw the control network and the location of the grounding electrode; S3, Down-the-hole machine in place and leveling After the DTH machine is transported to the site, the movable diagonal brace and chassis are opened to fix it, and the surrounding base soil is leveled. Uneven parts can be adjusted by using wooden blocks to ensure that the screw is vertical to the ground. Then, the various components of the device are connected and a test drill is carried out. Drilling can only be carried out after the test machine is fault-free. S4. Drilling: Drill holes at the grounding electrode location to ensure that the drilling depth meets the construction requirements; S5. Install the grounding electrode construction support and positioning device at the drill hole, wherein: place the backfill bucket at the drill hole, penetrate the positioning rod on the connecting block, and then use a hammer to hit the positioning rod until the positioning rod is inserted into the soil; press the backfill bucket down with force, and tighten the positioning bolts outside the sleeve to fix the backfill bucket and the positioning rod; S6. According to the lowering position of the grounding electrode, adjust the position of the card plate on the supporting horizontal plate. After the adjustment is completed, fix the supporting horizontal plate by adjusting the tightening bolts on the back of the card plate; S7. Perform welding processing on the ground electrode according to the depth of the drilling hole, then put the processed ground electrode into the drilled hole, and fix the ground electrode through the plug-in; S8. Weld the grounding electrode to the horizontal grounding grid. The welding must be firm and without any voids. The lap length must meet the requirements. All welding parts should be painted with anti-corrosion paint after welding. S9. After acceptance, the original drill slag is used for backfilling. During the backfilling process, the grounding electrode construction support and positioning device is not removed. When the drill hole filling material is 5 cm away from the top of the drill hole, the grounding electrode construction support and positioning device is removed.
[0011] The positive beneficial effects of the present invention are: 1. The present invention utilizes a down-the-hole drill to drill holes. The construction method has three operating functions: vertical, horizontal, and inclined. The hole-making speed is fast, which solves the problems of large earthwork excavation, inflexible operation, and unsatisfactory effect in the existing construction method. It improves work efficiency, shortens the construction period, reduces construction costs, and is easy to promote.
[0012] 2. The present invention provides a supporting positioning device at the drill hole, which is conducive to fixing the grounding electrode and avoiding the grounding electrode from being tilted in the drill hole, thereby causing difficulty in welding with the grounding grid in the later stage. The present invention is easy to use, simple to operate, and easy to disassemble and assemble. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 It is a usage state diagram of the present invention; Figure 3 It is a structural schematic diagram of the card board of the present invention; Among them: 1-backfilling hopper, 2-discharging barrel, 3-connecting block, 4-positioning drill, 5-supporting cross plate, 6-clamping plate, 7-U-shaped plug-in, A-drilling hole. DETAILED DESCRIPTION
[0014] The present invention will be further explained and illustrated below in conjunction with the accompanying drawings: Example 1, see Figure 1-Figure 3 A supporting and positioning device for grounding electrode construction under moderately weathered siltstone geology comprises a backfilling hopper 1, a feeding barrel 2 is arranged at the bottom of the backfilling hopper 1, four connecting blocks 3 are evenly arranged on the outer wall of the backfilling hopper 1, a positioning drill 4 is arranged on the connecting blocks 3, a supporting cross plate 5 is arranged above the backfilling hopper 1, and a clamping plate 6 is arranged on the supporting cross plate 5.
[0015] The supporting cross plate 5 spans across the upper port of the backfilling hopper 1, and screws are respectively provided at both ends of the bottom of the supporting cross plate 5, and a through hole is dug on the outer extension plate corresponding to the upper port of the backfilling hopper 1. The screw passes through the through hole and is fixed by a matching nut. The supporting cross plate 5 is located at the center of the upper port of the backfilling hopper 1.
[0016] A through hole is dug on the connecting block 3, and a sleeve is arranged above the through hole. The positioning drill 4 penetrates the connecting plate 3 and is fixed by a tightening bolt outside the sleeve.
[0017] The clamping plate 6 is clamped on the supporting horizontal plate 5 and fixed by the jacking bolts on the back of the clamping plate 6. A U-shaped plug-in 7 is inserted in the middle and lower part of the clamping plate 6, and a matching nut is connected to the end of the U-shaped plug-in 7 through a thread.
[0018] The outer diameter of the discharge barrel 2 is smaller than the inner diameter of the discharge hole 2 .
[0019] In the above description, the length of the supporting cross plate is greater than the width of the upper port of the backfilling hopper.
[0020] In the above description, the length of the card board depends on the situation, but the length of the card board is sufficient so that the upper end of the grounding electrode can be stuck in the position between the plug-in and the card board.
[0021] In the above description, the card plate can move horizontally along the supporting cross plate.
[0022] In the above description, when the positioning drill penetrates into the soil through the connecting block, the backfill bucket can be stably set in the drill hole through the tightening bolts outside the sleeve.
[0023] In the above description, the outer diameter of the lower barrel is smaller than the inner diameter of the drilled hole.
[0024] Embodiment 2, the construction method of the above-mentioned ground electrode construction support and positioning device under moderately weathered siltstone geology comprises the following steps: S1. Construction preparation Prepare the drilling rigs, welding machines, drilling tools and drill rods required for construction, and use manual or mechanical methods to level the area to be constructed; S2. Measurement and layout According to the construction requirements, use the theodolite to establish the grounding control network, and use white lime to draw the control network and the location of the grounding electrode; S3, Down-the-hole machine in place and leveling After the DTH machine is transported to the site, the movable diagonal brace and chassis are opened to fix it, and the surrounding base soil is leveled. Uneven parts can be adjusted by using wooden blocks to ensure that the screw is vertical to the ground. Then, the various components of the device are connected and a test drill is carried out. Drilling can only be carried out after the test machine is fault-free. S4. Drilling: Drill holes at the grounding electrode location to ensure that the drilling depth meets the construction requirements; S5. Install the grounding electrode construction support and positioning device at the borehole A, wherein: place the backfill bucket 1 at the borehole A, penetrate the positioning drill 4 on the connecting block 3, and then use a hammer to hit the positioning drill 4 until the positioning drill 4 is inserted into the soil; press the backfill bucket down with force, and tighten the positioning bolts outside the sleeve to fix the backfill bucket 1 and the positioning drill 4; S6. According to the lowering position of the grounding electrode, adjust the position of the clamping plate 6 on the supporting horizontal plate 5. After the adjustment is completed, fix the supporting horizontal plate 5 by adjusting the tightening bolts on the back of the clamping plate 6; S7, welding the ground electrode on the ground according to the depth of the drilled hole, then placing the processed ground electrode into the drilled hole, and fixing the ground electrode through the plug-in 7; S8. Weld the grounding electrode to the horizontal grounding grid. The welding must be firm and without any voids. The lap length must meet the requirements. All welding parts should be painted with anti-corrosion paint after welding. S9. After acceptance, the original drill slag is used for backfilling. During the backfilling process, the grounding electrode construction support and positioning device is not removed. When the drill hole filling material is 5 cm away from the top of the drill hole, the grounding electrode construction support and positioning device is removed.
[0025] The present invention utilizes a down-the-hole drill to drill holes. The construction method has three operating functions of vertical, horizontal and inclined, and has a fast hole-making speed. It solves the problems of large earth excavation, inflexible operation, and unsatisfactory effect in the existing construction method, improves work efficiency, and shortens the construction period. By arranging a support positioning device at the drilling hole, it is beneficial to the subsequent grounding grid welding construction. It is easy to use, simple to operate, and easy to promote.
Claims
1. A support and positioning device for grounding electrode construction in medium-weathered siltstone geology, comprising a backfill hopper (1), Features: A lower barrel (2) is provided at the bottom of the backfill hopper (1), four connecting blocks (3) are evenly provided on the outer wall of the backfill hopper (1), a positioning drill (4) is provided on the connecting block (3), a supporting cross plate (5) is provided above the backfill hopper (1), and a clamping plate (6) is provided on the supporting cross plate (5).
2. According to claim 1, a ground electrode construction support and positioning device in medium-weathered siltstone geology, Features: The supporting transverse plate (5) spans the upper port of the backfilling hopper (1), and screw rods are respectively arranged at both ends of the bottom of the supporting transverse plate (5). A through hole is dug on the outer extension plate corresponding to the upper port of the backfilling hopper (1), and the screw rod passes through the through hole and is fixed by a matching nut. The supporting transverse plate (5) is located at the center of the upper port of the backfilling hopper (1).
3. A ground electrode construction support and positioning device for medium-weathered siltstone geology according to claim 1, Features: A through hole is dug on the connection block (3), and a sleeve is arranged above the through hole. The positioning drill (4) penetrates the connection plate (3) and is fixed by a tightening bolt outside the sleeve.
4. A ground electrode construction support and positioning device for medium-weathered siltstone geology according to claim 1, Features: The clamping plate (6) is clamped on the supporting horizontal plate (5) and fixed by means of a tightening bolt on the back of the clamping plate (6); a U-shaped plug-in unit (7) is inserted into the middle and lower part of the clamping plate (6), and a matching nut is threadedly connected to the end of the U-shaped plug-in unit (7).
5. The ground electrode construction support and positioning device in medium-weathered siltstone geology according to claim 1, Features: The outer diameter of the discharge barrel (2) is smaller than the inner diameter of the discharge hole (2).
6. A construction method for a ground electrode construction support and positioning device in medium-weathered siltstone geology as described in any one of claims 1 to 5, It is characterized in that The steps include: S1. Construction preparation Prepare the drilling rigs, welding machines, drilling tools and drill rods required for construction, and use manual or mechanical methods to level the area to be constructed; S2. Measurement and layout According to the construction requirements, use the theodolite to establish the grounding control network, and use white lime to draw the control network and the location of the grounding electrode; S3, Down-the-hole machine in place and leveling After the DTH machine is transported to the site, the movable diagonal brace and chassis are opened to fix it, and the surrounding base soil is leveled. Uneven parts can be adjusted by using wooden blocks to ensure that the screw is vertical to the ground. Then, the various components of the device are connected and a test drill is carried out. Drilling can only be carried out after the test machine is fault-free. S4. Drilling: Drill holes at the grounding electrode location to ensure that the drilling depth meets the construction requirements; S5. Install the grounding electrode construction support and positioning device at the drill hole (A). in: Place the backfill bucket (1) at the drill hole (A), penetrate the positioning drill (4) on the connecting block (3), and then use a hammer to hit the positioning drill (4) until the positioning drill (4) is inserted into the soil; press the backfill bucket downward with force, and tighten the positioning bolts on the outside of the sleeve to fix the backfill bucket (1) and the positioning drill (4); S6. According to the lowering position of the grounding electrode, the position of the clamping plate (6) on the supporting horizontal plate (5) is adjusted. After the adjustment is completed, the supporting horizontal plate (5) is fixed by adjusting the tightening bolts on the back of the clamping plate (6); S7, welding the grounding electrode on the ground according to the depth of the drilled hole, then placing the processed grounding electrode into the drilled hole, and fixing the grounding electrode by means of the plug-in (7); S8. Weld the grounding electrode to the horizontal grounding grid. The welding must be firm and without any voids. The lap length must meet the requirements. All welding parts should be painted with anti-corrosion paint after welding. S9. After acceptance, the original drill slag is used for backfilling. During the backfilling process, the grounding electrode construction support and positioning device is not removed. When the drill hole filling material is 5 cm away from the top of the drill hole, the grounding electrode construction support and positioning device is removed.
