Ventilation method for building process of ro-ro passenger ship and ro-ro passenger ship

By setting up structural air ducts and ramp openings in the cargo hold, and using blowers and exhaust fans for ventilation, the problem of heat sources and smoke dust in the cabin during ship construction is solved, the construction efficiency and ventilation effect are improved, and the opening of temporary work holes is avoided. .

CN118770523APending Publication Date: 2024-10-15SHANGHAI WAIGAOQIAO SHIP BUILDING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411134030.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

During the ship construction process, heat sources and smoke in the cabin cause safety hazards. Existing ventilation methods require the opening of temporary working holes, which increases construction work and reduces efficiency. The ventilation effect needs to be improved.

Method used

The ventilation method used during the construction of the ro-ro passenger ship is adopted. By setting up structural air ducts and ramp openings in the cargo hold, and using air supply fans and exhaust fans for ventilation, it avoids opening temporary working holes and improves ventilation efficiency and effect.

Benefits of technology

It effectively avoids the opening of temporary working holes, improves the construction efficiency and ventilation effect of the ro-ro passenger ship, and enhances the safety of the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118770523A_ABST
    Figure CN118770523A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of ships, and discloses a ventilation method for the building process of a ro-ro passenger ship and the ro-ro passenger ship. The ventilation method for the ro-ro passenger ship building process comprises the steps that after a first-area cargo hold is built, all first cargo hold cabins of the first-area cargo hold communicate with a first structure air duct through first air pipes; a first air feeder is arranged at an opening of a first ramp at the top of the first-area cargo hold, and air is supplied to each first cargo hold cabin through the first air feeder; a first exhaust fan is detachably fixed to the height position, flush with the top of the first-area cargo hold, of the first structure air duct, and air is exhausted to the outside through the first exhaust fan. When the first-area cargo hold is ventilated, the problem that in the prior art, temporary working holes need to be formed can be effectively solved, and therefore the building efficiency of the ro-ro passenger ship can be effectively improved; and secondly, the ventilation effect of the multiple first cargo hold cabins of the first-area cargo hold can be effectively improved, and therefore the ventilation effect in the ro-ro passenger ship building process is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of ships, and in particular to a ventilation method used in the construction process of a ro-ro passenger ship and a ro-ro passenger ship. Background Art

[0002] During the shipbuilding process, there are multiple types of work at the construction site, and there are frequent cross-operations between the multiple types of work. When a large number of hot work (such as welding and cutting, etc.) is concentrated in the built cabin, a huge heat source will be formed, and a large amount of smoke and dust will be generated, causing turbid air in the cabin, which is prone to safety accidents such as suffocation or poisoning. Therefore, the cabin needs to be ventilated during the shipbuilding process.

[0003] At present, the ventilation method used in the construction process of the ro-ro passenger ship in the prior art is to open temporary working holes on the deck and the outer plate of the bottom of the ship, and then use the air supply fan to supply air from the temporary working holes on the outer plate of the bottom of the ship to the interior of the cabin of the ro-ro passenger ship, and use the exhaust fan to extract the air in the cabin of the ro-ro passenger ship from the temporary working holes on the garage deck to the outside through the bow door and stern door opened at the bow and stern of the garage to discharge the extracted air to the outside, so as to realize the ventilation and dust removal of the cabin inside the ro-ro passenger ship. However, opening the temporary working hole will increase the construction work of the ro-ro passenger ship, and the temporary working hole needs to be blocked after the construction of the ro-ro passenger ship is completed, resulting in low construction efficiency of the ro-ro passenger ship, and the ventilation effect of the ro-ro passenger ship needs to be improved. Summary of the invention

[0004] The purpose of the present invention is to provide a method to solve the problem.

[0005] To achieve this object, the present invention adopts the following technical solutions:

[0006] The object of the present invention is to provide a ventilation method for a ro-ro passenger ship construction process and a ro-ro passenger ship, so as to solve the above-mentioned problems existing in the ventilation method for a ro-ro passenger ship construction process in the prior art.

[0007] To achieve this object, the present invention adopts the following technical solutions:

[0008] A ventilation method for a ro-ro passenger ship construction process, the ro-ro passenger ship includes a cargo hold, the cargo hold includes a first zone cargo hold, the first zone cargo hold includes multiple first decks sequentially spaced along the height direction of the ro-ro passenger ship, a first cargo hold cabin is formed between any two adjacent first decks, and the first deck located above any two adjacent first decks is formed with a first ramp opening communicating with the first cargo hold cabin distributed below; a first structural air duct is formed on the periphery of the first zone cargo hold, the first structural air duct extends upward along the height direction of the ro-ro passenger ship and is connected to the outside; the ventilation method for a ro-ro passenger ship construction process includes a cargo hold ventilation method, and the cargo hold ventilation method includes:

[0009] When the first zone cargo hold is completed, each first cargo hold compartment of the first zone cargo hold is connected to the first structural air duct through the first air duct respectively;

[0010] A first air blower is arranged at a first ramp opening on the top of the cargo hold in the first zone, and air is supplied to each of the first cargo hold compartments through the first air blower;

[0011] The first exhaust fan is detachably fixed to the first structural air duct at a height level with the top of the first zone cargo hold, and air is extracted to the outside through the first exhaust fan.

[0012] As a preferred solution of the ventilation method for the above-mentioned ro-ro passenger ship construction process, the cargo hold also includes a second zone cargo hold, the first zone cargo hold and the second zone cargo hold are sequentially distributed from bottom to top along the height direction of the ro-ro passenger ship; the second zone cargo hold includes multiple layers of second decks sequentially distributed along the height direction of the ro-ro passenger ship, a second cargo hold cabin is formed between any two adjacent layers of the second decks, and a second cargo hold cabin is also formed between the second zone cargo hold and the first zone cargo hold; each layer of the second deck is formed with a second ramp opening, and each of the second ramp openings is connected to the second cargo hold cabin distributed below along the height direction of the ro-ro passenger ship; a second structural air duct is formed on the periphery of the second zone cargo hold, and the second structural air duct extends upward along the height direction of the ro-ro passenger ship and is connected to the outside; the cargo hold ventilation method also includes:

[0013] After the second-zone cargo hold is built on the first-zone cargo hold, each second cargo hold compartment of the second-zone cargo hold is connected to the second structural air duct through a second air duct;

[0014] A second blower is arranged at a second ramp opening on the top of the second zone cargo hold, and air is supplied to each of the second cargo hold compartments through the second blower;

[0015] The second exhaust fan is detachably fixed on the second structural air duct at a height level with the top of the second zone cargo hold, and air is extracted to the outside through the second exhaust fan;

[0016] The first exhaust fan is removed from the first structural air duct to a height position flush with the top of the first zone cargo hold; the first exhaust fan is detachably fixed to the first structural air duct to a height position flush with the top of the second zone cargo hold, and air is extracted to the outside through the first exhaust fan.

[0017] As a preferred solution of the ventilation method used in the construction process of the above-mentioned passenger and vehicle ferry, the passenger and vehicle ferry also includes a tail door opening and a side door opening distributed along the height direction between the first area cargo hold and the second area cargo hold, and the tail door opening and the side door opening are both connected to the air supply cabin, and the air supply cabin is a second cargo hold cabin formed between the second area cargo hold and the first area cargo hold.

[0018] As a preferred solution of the ventilation method for the above-mentioned ro-ro passenger ship construction process, the cargo hold also includes a plurality of third-area cargo holds, which are sequentially distributed along the height direction of the ro-ro passenger ship and are all located above the second-area cargo holds; the third-area cargo hold includes multiple third decks sequentially distributed along the height direction of the ro-ro passenger ship; a third cargo hold chamber is formed between any two adjacent third decks, a third cargo hold chamber is also formed between the lowest one of the plurality of third-area cargo holds and the second-area cargo hold, and a third cargo hold chamber is also formed between any two adjacent third-area cargo holds; a third ramp opening is formed on each third deck, and each third ramp opening is connected to the third cargo hold chamber distributed below along the height direction of the ro-ro passenger ship; a third structural air duct is formed on the periphery of each third-area cargo hold, and the third structural air duct extends upward along the height direction of the ro-ro passenger ship and is connected to the outside; the cargo hold ventilation method also includes:

[0019] When any of the third-zone cargo holds is built on the second-zone cargo hold, each third cargo hold compartment of the third-zone cargo hold is connected to the corresponding third structural air duct through the third air duct;

[0020] A third air blower is arranged at a third ramp opening on the top of the third zone cargo hold, and air is supplied to each third cargo hold compartment of the third zone cargo hold through the third air blower;

[0021] A plurality of third exhaust fans are detachably fixed one by one on the plurality of third structural air ducts at a height level with the top of the third zone cargo hold, and air is extracted to the outside through the plurality of third exhaust fans;

[0022] The first exhaust fan is detachably fixed to the first structural air duct at a height level with the top of the third zone cargo hold, and air is extracted to the outside through the first exhaust fan;

[0023] The second exhaust fan is detachably fixed on the second structural air duct at a height level with the top of the third zone cargo hold, and air is extracted to the outside through the second exhaust fan.

[0024] As a preferred solution of the ventilation method for the above-mentioned ro-ro passenger ship construction process, the specific steps of connecting each first cargo hold compartment of the first zone cargo hold with the first structural air duct through the first air duct respectively include:

[0025] Each first cargo hold compartment of the first zone cargo hold is connected to the input end of the corresponding first air duct through a first axial flow fan; and the output end of each first air duct is connected to the first structural air duct.

[0026] As a preferred solution for the ventilation method used in the above-mentioned passenger and vehicle ferry construction process, there are multiple first structural air ducts, and the multiple first structural air ducts are distributed at intervals along the circumference of the passenger and vehicle ferry; each of the first cargo hold compartments is connected to at least part of the first structural air ducts through multiple first air ducts.

[0027] As a preferred solution of the ventilation method for the above-mentioned passenger and vehicle ferry construction process, there are multiple first exhaust fans, the multiple first exhaust fans include multiple first exhaust fan groups, and the multiple first structural air ducts are arranged in one-to-one correspondence with the multiple first exhaust fan groups.

[0028] As a preferred solution of the ventilation method for the construction process of the above-mentioned ro-ro passenger ship, the ro-ro passenger ship also includes a cabin, and a fourth structural air duct and a fifth structural air duct are formed on the outer periphery of the cabin, and the fourth structural air duct and the fifth structural air duct are respectively located on both sides of the cabin along the width direction; the fourth structural air duct and the fifth structural air duct both extend upward along the height direction of the ro-ro passenger ship and are connected to the outside; the ventilation method for the construction process of the ro-ro passenger ship also includes a cabin ventilation method, and the cabin ventilation method includes:

[0029] When the first zone cargo hold is completed, the cabin is connected to the fourth structural air duct through a fourth air duct, and the cabin is connected to the fifth structural air duct through a fifth air duct;

[0030] Move the fourth blower and detachably fix the fourth blower to the fourth structural air duct so as to be flush with the height of the top of the cargo hold currently constructed, and supply air to the cabin through the fourth blower;

[0031] Move the fourth exhaust fan and detachably fix the fourth exhaust fan on the fifth structural air duct so as to be flush with the height position of the top of the currently constructed cargo hold, and exhaust air through the fourth exhaust fan.

[0032] As a preferred solution of the ventilation method for the construction process of the above-mentioned ro-ro passenger ship, the ro-ro passenger ship also includes a liquid tank tank, the liquid tank tank is provided with an air inlet at the bottom of the front end along the length direction of the ro-ro passenger ship, and the air inlet is connected to a plurality of the first cargo hold compartments; the liquid tank tank is formed with a sixth structural air duct on the outer periphery of the rear end along the length direction of the ro-ro passenger ship, and the sixth structural air duct extends upward along the height direction of the ro-ro passenger ship and is connected to the outside; the ventilation method for the construction process of the ro-ro passenger ship also includes a liquid tank tank ventilation method, and the liquid tank tank ventilation method includes:

[0033] When the first zone cargo hold is completed, the liquid tank hold is connected to the sixth structural air duct through the sixth air duct;

[0034] Move the fifth exhaust fan and fix the fifth exhaust fan on the sixth structural air duct at the same height as the top of the currently constructed cargo hold, and exhaust air through the fifth exhaust fan.

[0035] During the construction process of the ro-ro passenger ferry, ventilation is carried out using the ventilation method used in the construction process of the ro-ro passenger ferry.

[0036] Beneficial effects of the present invention:

[0037] The present invention provides a ventilation method for the construction process of a ro-ro passenger ship and a ro-ro passenger ship. The ventilation method for the construction process of a ro-ro passenger ship comprises: after the construction of the first zone cargo hold is completed, each first cargo hold compartment of the first zone cargo hold is connected to the first structural air duct through a first air duct; a first air supply fan is arranged at a first ramp opening on the top of the first zone cargo hold, and air is supplied to each first cargo hold compartment through the first air supply fan; a first exhaust fan is detachably fixed on the first structural air duct at a height position flush with the top of the first zone cargo hold, and air is extracted to the outside through the first exhaust fan.

[0038] When ventilating the first-zone cargo hold, the problem of needing to open temporary working holes in the prior art can be effectively avoided, thereby effectively improving the construction efficiency of the passenger and vehicle ferry; secondly, the ventilation effect of the multiple first cargo hold compartments in the first-zone cargo hold can be effectively improved, thereby effectively improving the ventilation effect during the construction of the passenger and vehicle ferry. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 It is a partial structural schematic diagram of a cargo hold of a ro-ro passenger ship provided by a specific embodiment of the present invention;

[0040] Figure 2 The top view of the ro-ro passenger ship provided by the specific embodiment of the present invention is Figure 1 ;

[0041] Figure 3 The top view of the ro-ro passenger ship provided by the specific embodiment of the present invention is Figure 2 ;

[0042] Figure 4 The top view of the ro-ro passenger ship provided by the specific embodiment of the present invention is Figure 3 ;

[0043] Figure 5 The top view of the ro-ro passenger ship provided by the specific embodiment of the present invention is Figure 4 ;

[0044] Figure 6The top view of the ro-ro passenger ship provided by the specific embodiment of the present invention is Figure 5 ;

[0045] Figure 7 A partial top view of a ro-ro passenger ship provided by a specific embodiment of the present invention Figure 1 ;

[0046] Figure 8 A partial top view of a ro-ro passenger ship provided by a specific embodiment of the present invention Figure 2 ;

[0047] Fig. 9 The process of the ventilation method used in the construction process of the ro-ro passenger ship provided by the specific embodiment of the present invention is Figure 1 ;

[0048] Fig.10 The process of the ventilation method used in the construction process of the ro-ro passenger ship provided by the specific embodiment of the present invention is Figure 2 ;

[0049] Fig.11 The process of the ventilation method used in the construction process of the ro-ro passenger ship provided by the specific embodiment of the present invention is Figure 3 .

[0050] In the figure:

[0051] 1. Cargo hold;

[0052] 11. First area cargo hold; 111. First deck; 112. First cargo hold compartment; 113. First ramp opening; 114. First ramp;

[0053] 12. Second area cargo hold; 121. Second deck; 122. Second cargo hold compartment; 123. Second ramp opening; 124. Second ramp;

[0054] 13. Third area cargo hold; 131. Third deck; 132. Third cargo hold compartment; 133. Third ramp opening; 134. Third ramp;

[0055] 21. First structural air duct; 22. Second structural air duct; 23. Third structural air duct; 24. Fourth structural air duct; 25. Fifth structural air duct; 26. Sixth structural air duct;

[0056] 31. Side door; 32. Tail door;

[0057] 4. Engine room;

[0058] 5. Liquid tank compartment;

[0059] 61. first exhaust fan; 62. second exhaust fan; 63. third exhaust fan; 64. fourth supply fan; 65. fourth exhaust fan; 66. seventh axial flow fan;

[0060] 7. Stairway. DETAILED DESCRIPTION

[0061] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0062] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0063] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0064] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0065] Figure 1 The ab direction is the height direction of the ro-ro passenger ship. Figure 1-8 The cd direction is the length direction of the ro-ro passenger ship. Figure 2-8The ef direction in the figure is the width direction of the ro-ro passenger ship. It can be understood that the length direction of the cargo hold 1, the length direction of the engine room 4, and the length direction of the liquid tank tank 5 are all parallel to the length direction of the ro-ro passenger ship. The width direction of the cargo hold 1, the width direction of the engine room 4, and the width direction of the liquid tank tank 5 are all parallel to the width direction of the ro-ro passenger ship. The height direction of the cargo hold 1, the height direction of the engine room 4, and the height direction of the liquid tank tank 5 are all parallel to the length direction of the ro-ro passenger ship.

[0066] Figure 2 The first deck 111, Figure 3 The first deck of 111 and Figure 4 The first deck 111 is distributed in sequence from bottom to top along the height direction of the ro-ro passenger ship, and Figure 4 The first deck 111 is a first deck 111 located at the top in the first zone cargo hold 11 . Figure 5 The second deck 121 is one of the second decks 121 of the second zone cargo hold 12. Figure 6 The third deck 131 is the third deck 131 at the top of the cargo hold 1. Figure 7 The second deck 121 in the figure is another second deck 121 of the second zone cargo hold 12.

[0067] The present invention provides a passenger ro-ro ship. Figure 1 As shown, the ro-ro passenger ship includes a cargo hold 1, which includes a first area cargo hold 11, a second area cargo hold 12 and a plurality of third area cargo holds 13. The first area cargo hold 11, the second area cargo hold 12 and the plurality of third area cargo holds 13 are sequentially distributed from bottom to top along the height direction of the ro-ro passenger ship. It can be understood that the first area cargo hold 11 is distributed at the bottom of the cargo hold 1.

[0068] Among them, Figure 1-4 As shown, the first-area cargo hold 11 includes multiple first decks 111 sequentially spaced along the height direction of the ro-ro passenger ship, and a first cargo hold chamber 112 is formed between any two adjacent first decks 111, and the first deck 111 located at the upper layer of any two adjacent first decks 111 is formed with a first ramp opening 113 communicating with the first cargo hold chamber 112 distributed below. It can be understood that, along the height direction of the ro-ro passenger ship, the first deck 111 located at the bottom is not provided with the first ramp opening 113. Along the height direction of the ro-ro passenger ship, the first ramp opening 113 on the first deck 111 located at the top is communicated with the first cargo hold chamber 112 and the second cargo hold chamber 122 on both sides. Along the height direction of the ro-ro passenger ship, the first ramp openings 113 on the remaining first decks 111 between the first deck 111 located at the top and the first deck 111 located at the bottom are communicated with the two first cargo hold chambers 112 distributed on both sides. Thereby, the plurality of first cargo hold chambers 112 are connected in sequence.

[0069] It can be understood that the bottommost first deck 111 on the first zone cargo hold 11 is the bottom plate of the cargo hold 1 .

[0070] Specifically, a first structural air duct 21 is formed on the periphery of the first zone cargo hold 11, and the first structural air duct 21 extends upward along the height direction of the ro-ro passenger ship and is connected to the outside world. Specifically, along the height direction of the ro-ro passenger ship, when the first zone cargo hold 11 is completed, the first structural air duct 21 only forms a partial structural air duct that is flush with the top of the first zone cargo hold 11 and is connected to the outside world. When the second zone cargo hold 12 is completed, the first structural air duct 21 only forms a partial structural air duct that is flush with the top of the second zone cargo hold 12 and is connected to the outside world. When the bottom third zone cargo hold 13 is completed, the first structural air duct 21 only forms a partial structural air duct that is flush with the top of the bottom third zone cargo hold 13 and is connected to the outside world. By analogy, when the entire cargo hold 1 is completed, the first structural air duct 21 extends upward along the height direction of the ro-ro passenger ship to the top of the cargo hold 1 and is connected to the outside world.

[0071] Specifically, Figure 1-4 As shown, a first ramp 114 is formed at each first ramp opening 113, and the first ramp 114 extends downwardly and obliquely to a first deck 111 below. In any two adjacent first decks 111, the goods or vehicles on the upper first deck 111 can be moved to the lower first deck 111 through the first ramp 114. The specific structure of the first zone cargo hold 11 belongs to the prior art and will not be described in detail here.

[0072] Among them, Figure 1 and Figure 5 As shown, the second area cargo hold 12 includes multiple second decks 121 sequentially spaced and distributed along the height direction of the ro-ro passenger ship, and a second cargo hold cabin 122 is formed between any two adjacent second decks 121, and a second cargo hold cabin 122 is also formed between the second area cargo hold 12 and the first area cargo hold 11. A second ramp opening 123 is formed on each second deck 121, and each second ramp opening 123 is connected to the second cargo hold cabin 122 distributed below along the height direction of the ro-ro passenger ship. Thus, multiple second cargo hold cabins 122 are sequentially connected, and multiple second cargo hold cabins 122 are sequentially connected to multiple first cargo hold cabins 112.

[0073] Specifically, Figure 1 and Figure 5 As shown, a second structural air duct 22 is formed on the outer periphery of the second zone cargo hold 12. The second structural air duct 22 extends upward along the height direction of the passenger and vehicle ferry and is in communication with the outside.

[0074] Specifically, along the height direction of the ro-ro passenger ship, when the second zone cargo hold 12 is completed, the second structural air duct 22 only forms a partial structural air duct that is flush with the top of the second zone cargo hold 12 and is connected to the outside. When the third zone cargo hold 13 at the bottom is completed, the second structural air duct 22 only forms a partial structural air duct that is flush with the top of the third zone cargo hold 13 at the bottom and is connected to the outside. By analogy, when the entire cargo hold 1 is completed, the second structural air duct 22 extends upward along the height direction of the ro-ro passenger ship to the top of the cargo hold 1 and is connected to the outside.

[0075] Specifically, Figure 1 and Figure 5 As shown, a second ramp 124 is formed at each second ramp opening 123. For the second ramp opening 123 on the second deck 121 of the bottom layer, the corresponding second ramp 124 extends downwardly to a first deck 111 below. For the remaining second decks 121 above the second deck 121 of the bottom layer, the second ramp 124 extends downwardly to a second deck 121 below. The specific structure of the second zone cargo hold 12 belongs to the prior art and will not be repeated here.

[0076] Among them, Figure 1 and Figure 6 As shown, the third area cargo hold 13 includes multiple third decks 131 sequentially spaced along the height direction of the ro-ro passenger ship; a third cargo hold cabin 132 is formed between any two adjacent third decks 131, a third cargo hold cabin 132 is also formed between the lowest one of the multiple third area cargo holds 13 and the second area cargo hold 12, and a third cargo hold cabin 132 is also formed between any two adjacent third area cargo holds 13; a third ramp opening 133 is formed on each third deck 131, and each third ramp opening 133 is connected to the third cargo hold cabin 132 distributed below along the height direction of the ro-ro passenger ship. Thus, the multiple third cargo hold cabins 132 of each third area cargo hold 13 are connected. The third cargo hold cabins 132 of the multiple third area cargo holds 13 are also sequentially connected. The third cargo hold cabins 132 of the multiple third area cargo holds 13, the multiple second cargo hold cabins 122 and the multiple first cargo hold cabins 112 are sequentially connected.

[0077] It is understandable that the plurality of third-area cargo holds 13 are sequentially built from bottom to top along the height direction of the ro-ro passenger ship. Each third-area cargo hold 13 includes a plurality of third cargo hold chambers 132. And the third structural air ducts 23 corresponding to each third-area cargo hold 13 are different.

[0078] Specifically, Figure 1 and Figure 6 As shown, a third structural air duct 23 is formed on the outer periphery of each third zone cargo hold 13. The third structural air duct 23 extends upward along the height direction of the passenger and vehicle ferry and is connected to the outside.

[0079] Specifically, along the height direction of the ro-ro passenger ship, when any third-zone cargo hold 13 is completed, the corresponding third structural air duct 23 only forms a partial structural air duct that is flush with the height position of the top of the currently completed cargo hold 1 and is connected to the outside world. That is, when the third-zone cargo hold 13 at the bottom is completed, the corresponding third structural air duct 23 only forms a partial structural air duct that is flush with the top of the third-zone cargo hold 13 at the bottom and is connected to the outside world. When the third-zone cargo hold 13 at the second bottom is completed, the corresponding third structural air duct 23 only forms a partial structural air duct that is flush with the top of the third-zone cargo hold 13 at the second bottom and is connected to the outside world. By analogy, when the entire cargo hold 1 is completed, the corresponding third structural air duct 23 extends upward along the height direction of the ro-ro passenger ship to the top of the cargo hold 1 and is connected to the outside world.

[0080] It can be understood that since multiple third-zone cargo holds 13 are arranged in sequence along the height direction of the passenger and vehicle ferry, when the cargo hold 1 is completed, the extension lengths of the third structural air duct 23 corresponding to each third-zone cargo hold 13 along the height direction of the passenger and vehicle ferry are different.

[0081] Specifically, Figure 1 and Figure 6 As shown, a third ramp 134 is formed at each third ramp opening 133. For one of the third zone cargo holds 13 located at the lowest part, the third ramp 134 corresponding to the third ramp opening 133 on the third deck 131 of the bottom layer thereof extends downwardly and tilts to the second deck 121 below. For the remaining third decks 131 of the third zone cargo holds 13, the third ramp 134 extends downwardly and tilts to the third deck 131 below. The specific structure of the third zone cargo hold 13 belongs to the prior art and will not be described in detail here.

[0082] It is understandable that the number of third decks 131 of the plurality of third-area cargo holds 13 may be the same or different, that is, the heights of the plurality of third-area cargo holds 13 may be the same or different.

[0083] The ro-ro passenger ship further includes a tail door opening and a side door opening distributed between the first zone cargo hold 11 and the second zone cargo hold 12 in the height direction, and the tail door opening and the side door opening are both connected to the air supply cabin, which is the second cargo hold cabin 122 formed between the second zone cargo hold 12 and the first zone cargo hold 11. In this way, the tail door opening and the side door opening are both connected to the second cargo hold cabin 122 formed between the second zone cargo hold 12 and the first zone cargo hold 11. During the construction of the cargo hold 1, the tail door opening and the side door opening can be used as air supply ports for ventilation to improve the passing effect of the ro-ro passenger ship construction process.

[0084] Specifically, Figure 4As shown, a side door 31 is provided at the side door opening, which can close or open the side door opening. A tailgate 32 is provided at the tailgate opening, which can close or open the tailgate opening.

[0085] Among them, Figure 3 and Figure 7 As shown, the ro-ro passenger ship also includes a cabin 4, and a fourth structural air duct 24 and a fifth structural air duct 25 are formed on the outer periphery of the cabin 4. The fourth structural air duct 24 and the fifth structural air duct 25 are respectively located on both sides of the cabin 4 along the width direction; the fourth structural air duct 24 and the fifth structural air duct 25 both extend upward along the height direction of the ro-ro passenger ship and are connected to the outside.

[0086] Specifically, along the height direction of the ro-ro passenger ship, the engine room 4 and the first area cargo hold 11 are distributed in the same height area. When the first area cargo hold 11 is completed, the engine room 4 is also completed. Among them, the specific structure of the engine room 4 belongs to the existing technology and will not be repeated here.

[0087] Specifically, along the height direction of the ro-ro passenger ship, when the first zone cargo hold 11 is completed, the fourth structural air duct 24 only forms a partial structural air duct that is flush with the top of the first zone cargo hold 11 and is connected to the outside world, and the fifth structural air duct 25 also only forms a partial structural air duct that is flush with the top of the first zone cargo hold 11 and is connected to the outside world. When the second zone cargo hold 12 is completed, the fourth structural air duct 24 only forms a partial structural air duct that is flush with the top of the second zone cargo hold 12 and is connected to the outside world, and the fifth structural air duct 25 only forms a partial structural air duct that is flush with the top of the second zone cargo hold 12 and is connected to the outside world. When the bottom third zone cargo hold 13 is completed, the fourth structural air duct 24 only forms a partial structural air duct that is flush with the top of the bottom third zone cargo hold 13 and is connected to the outside world, and the fifth structural air duct 25 only forms a partial structural air duct that is flush with the top of the bottom third zone cargo hold 13 and is connected to the outside world. By analogy, when the entire cargo hold 1 is constructed, the fourth structural air duct 24 extends upward along the height direction of the passenger and vehicle ferry to the top of the cargo hold 1 and is connected to the outside world, and the fifth structural air duct 25 extends upward along the height direction of the passenger and vehicle ferry to the top of the cargo hold 1 and is connected to the outside world.

[0088] Among them, Figure 2 , Figure 3 and Figure 8 As shown, the ro-ro passenger ship further includes a liquid tank tank 5, and an air inlet is provided at the bottom of the front end of the liquid tank tank 5 along the length direction of the ro-ro passenger ship, and the air inlet is connected to a plurality of first cargo hold chambers 112. A sixth structural air duct 26 is formed at the outer periphery of the rear end of the liquid tank tank 5 along the length direction of the ro-ro passenger ship, and the sixth structural air duct 26 extends upward along the height direction of the ro-ro passenger ship and is connected to the outside.

[0089] Specifically, along the height direction of the ro-ro passenger ship, the liquid tank tank 5 is also distributed in the same height area as the first area cargo hold 11. When the first area cargo hold 11 is completed, the liquid tank tank 5 is also completed. Among them, the specific structure of the liquid tank tank 5 belongs to the prior art and will not be repeated here.

[0090] Specifically, along the length direction of the ro-ro passenger ship, the liquid tank compartment 5 is located in front of the engine room 4 .

[0091] Specifically, along the height direction of the ro-ro passenger ship, when the first zone cargo hold 11 is completed, the sixth structural air duct 26 only forms a partial structural air duct that is flush with the top of the first zone cargo hold 11 and is connected to the outside world. When the second zone cargo hold 12 is completed, the sixth structural air duct 26 only forms a partial structural air duct that is flush with the top of the second zone cargo hold 12 and is connected to the outside world. When the bottom third zone cargo hold 13 is completed, the sixth structural air duct 26 only forms a partial structural air duct that is flush with the top of the bottom third zone cargo hold 13 and is connected to the outside world. By analogy, when the entire cargo hold 1 is completed, the sixth structural air duct 26 extends upward along the height direction of the ro-ro passenger ship to the top of the cargo hold 1 and is connected to the outside world.

[0092] Specifically, in this embodiment, along the height direction of the ro-ro passenger ship, the air inlet of the liquid tank tank 5 is connected with a first cargo hold chamber 112 distributed at the bottom in the first zone cargo hold 11, so that the outside air can flow into the liquid tank tank 5 through the plurality of third ramp openings 133, the plurality of second ramp openings 123, the plurality of first ramp openings 113, and the first cargo hold chamber 112 distributed at the bottom in sequence, so that air can be supplied into the liquid tank tank 5.

[0093] It can be understood that the outside air can flow through the plurality of third ramp openings 133, the plurality of second ramp openings 123, and the plurality of first ramp openings 113 in sequence, so as to supply air to the plurality of first cargo hold compartments 112. The outside air can flow through the plurality of third ramp openings 133 and the plurality of second ramp openings 123 in sequence, so as to supply air to the plurality of second cargo hold compartments 122. The outside air can flow through the plurality of third ramp openings 133 in sequence, so as to supply air to the plurality of third cargo hold compartments 132 of each third zone cargo hold 13.

[0094] In addition, outside air can also flow into a second cargo hold chamber 122 formed between the second cargo hold 12 and the first cargo hold 11 through the side door opening and the tail door opening. Then, the second cargo hold chamber 122 flows through the plurality of first ramp openings 113 in sequence, so that air can be supplied to the plurality of first cargo hold chambers 112.

[0095] The present invention also provides a ventilation method for the construction process of a ro-ro passenger ship. By adopting the ventilation method for the construction process of a ro-ro passenger ship in the process of building a ro-ro passenger ship, the problem of needing to open a temporary working hole in the prior art can be effectively avoided, and the construction efficiency of the ro-ro passenger ship can be effectively improved. Secondly, by adopting the ventilation method for the construction process of a ro-ro passenger ship, the ventilation effect of the cargo hold 1, the engine room 4 and the liquid tank hold 5 can be effectively improved in the process of building a ro-ro passenger ship, thereby effectively improving the ventilation effect in the construction process of the ro-ro passenger ship.

[0096] Among them, Figure 9-11 As shown, the ventilation methods used in the construction process of the ro-ro passenger ship include a cargo hold ventilation method, an engine room ventilation method and a liquid tank hold ventilation method.

[0097] Specifically, Fig. 9 As shown, cargo hold ventilation methods include:

[0098] S110, when the first zone cargo hold 11 is constructed, each first cargo hold chamber 112 of the first zone cargo hold 11 is connected to the first structural air duct 21 through the first air duct.

[0099] Each of the first cargo hold compartments 112 is connected to the outside and can be ventilated.

[0100] S120. A first air blower is disposed at a first ramp opening 113 at the top of the first zone cargo hold 11, and air is supplied to each first cargo hold compartment 112 through the first air blower.

[0101] It can be understood that when the first blower supplies air, the wind is blown toward each first cargo hold compartment 112 through multiple first ramp openings 113, and each first cargo hold compartment 112 is connected to the first structural air duct 21 through the first air duct, so that the dust and the like in each first cargo hold compartment 112 can be blown toward the first air duct and the first structural air duct 21 under the action of the wind.

[0102] S130, detachably fix the first exhaust fan 61 on the first structural air duct 21 at a height level with the top of the first zone cargo hold 11, and exhaust air to the outside through the first exhaust fan 61.

[0103] It is understandable that when the first exhaust fan 61 exhausts air, the wind and dust entering the first air duct and the first structural air duct 21 are exhausted to the outside.

[0104] Therefore, when ventilating the first zone cargo hold 11, the problem of needing to open a temporary working hole in the prior art can be effectively avoided, thereby effectively improving the construction efficiency of the passenger and vehicle ferry; secondly, the ventilation effect of the multiple first cargo hold chambers 112 of the first zone cargo hold 11 can be effectively improved.

[0105] Preferably, when the first blower starts blowing, the first exhaust fan 61 is controlled to start exhausting, so as to further improve the efficiency of ventilating the first zone cargo hold 11.

[0106] As an alternative, after the first air supply fan starts blowing for a first set time, the first exhaust fan 61 is controlled to start exhausting. The first set time is a theoretical time required for the wind to blow to the first structural air duct 21. The first set time is an empirical value obtained from a large number of previous tests. This setting can reduce the energy consumption of the first exhaust fan 61.

[0107] Preferably, the specific steps of connecting each first cargo hold chamber 112 of the first zone cargo hold 11 to the first structural air duct 21 through the first air duct include:

[0108] S111, connect each first cargo hold chamber 112 of the first zone cargo hold 11 to the input end of the corresponding first air duct through a first axial flow fan.

[0109] S112, connecting the output ends of the first air ducts to the first structural air duct 21.

[0110] The dust and the like in the first air duct are blown toward the first structural air duct 21 by the first axial flow fan, and then the dust and the like in the first structural air duct 21 are extracted to the outside by the first exhaust fan 61. The ventilation effect of the multiple first cargo hold chambers 112 of the first zone cargo hold 11 can be further improved, and the efficiency of the ventilation of the multiple first cargo hold chambers 112 of the first zone cargo hold 11 can be further improved.

[0111] As an alternative, each first cargo hold chamber 112 of the first zone cargo hold 11 is directly connected to the first structural air duct 21 through a first air duct.

[0112] Preferably, there are multiple first structural air ducts 21, which are spaced apart along the circumference of the ro-ro passenger ship; each first cargo hold compartment 112 is connected to at least part of the first structural air ducts 21 through multiple first air ducts. Such an arrangement can further improve the ventilation effect of ventilating the multiple first cargo hold compartments 112 of the first zone cargo hold 11, and can further improve the ventilation efficiency of the multiple first cargo hold compartments 112 of the first zone cargo hold 11.

[0113] Specifically, the multiple first air ducts of each first cargo hold compartment 112 are a first air duct group. The multiple first air duct groups are arranged in a one-to-one correspondence with the multiple first cargo hold compartments 112. The multiple first air ducts of each first air duct group correspond to multiple first axial flow fans, and the multiple first air ducts are arranged in a one-to-one correspondence with the multiple first axial flow fans.

[0114] It is understandable that, for different first cargo hold compartments 112, the selected multiple first structural air ducts 21 may all be the same. For different first cargo hold compartments 112, the selected multiple first structural air ducts 21 may also be different.

[0115] Preferably, there are multiple first exhaust fans 61, the multiple first exhaust fans 61 include multiple first exhaust fan groups, and the multiple first structural air ducts 21 are arranged one by one with the multiple first exhaust fan groups. Such an arrangement can further improve the ventilation effect of ventilating the first zone cargo hold 11, and can further improve the ventilation efficiency of the first zone cargo hold 11.

[0116] Preferably, the first air duct is a flexible air duct, which facilitates the arrangement of the first air duct.

[0117] Specifically, Fig.10 As shown, the cargo hold ventilation method also includes:

[0118] S210. After the second-zone cargo hold 12 is built on the first-zone cargo hold 11, each second cargo hold chamber 122 of the second-zone cargo hold 12 is connected to the second structural air duct 22 through a second air duct.

[0119] Each second cargo hold compartment 122 is connected to the outside and can be ventilated.

[0120] S220. A second air blower is disposed at a second ramp opening 123 at the top of the second zone cargo hold 12, and air is supplied to each second cargo hold compartment 122 through the second air blower.

[0121] It can be understood that when the second blower blows air, the wind is blown toward each second cargo hold compartment 122 through the plurality of second ramp openings 123, and each second cargo hold compartment 122 is connected to the second structural air duct 22 through the second air duct, so that the dust and the like in each second cargo hold compartment 122 can be blown toward the second air duct and the second structural air duct 22 under the action of the wind. Among them, part of the wind blown toward the second cargo hold compartment 122 at the bottom enters the second cargo hold compartment 122, and the remaining part of the wind is sent into the first cargo hold compartment 112 at the top by the first blower at the first ramp opening 113 at the top, thereby blowing toward each first cargo hold compartment 112.

[0122] S230, detachably fix the second exhaust fan 62 on the second structural air duct 22 at a height level with the top of the second zone cargo hold 12, and exhaust air to the outside through the second exhaust fan 62.

[0123] S240, remove the first exhaust fan 61 from the first structural air duct 21 to a height position flush with the top of the first zone cargo hold 11; detachably fix the first exhaust fan 61 to the first structural air duct 21 to a height position flush with the top of the second zone cargo hold 12, and extract air to the outside through the first exhaust fan 61.

[0124] Preferably, step S230 and step S240 are performed simultaneously. In other embodiments, step S230 and step S240 may be performed sequentially. Alternatively, step S240 and step S230 may be performed sequentially.

[0125] It is understandable that when the second exhaust fan 62 exhausts air, the wind and dust entering the second air duct and the second structural air duct 22 are exhausted to the outside. When the first exhaust fan 61 exhausts air, the wind and dust entering the first air duct and the first structural air duct 21 are exhausted to the outside.

[0126] Therefore, when the first area cargo hold 11 and the second area cargo hold 12 are both built, the multiple first cargo hold compartments 112 and the multiple second cargo hold compartments 122 can be effectively and synchronously ventilated, and the ventilation effect of the multiple first cargo hold compartments 112 and the multiple second cargo hold compartments 122 can be effectively improved. Secondly, when ventilating the multiple second cargo hold compartments 122 of the second area cargo hold 12, the problem of needing to open a temporary working hole in the prior art can be effectively avoided, thereby further improving the construction efficiency of the ro-ro passenger ship.

[0127] Preferably, when the first blower starts blowing, the second blower starts blowing synchronously. When the first exhaust fan 61 starts exhausting, the second exhaust fan 62 starts exhausting synchronously.

[0128] Preferably, the specific steps of connecting each second cargo hold chamber 122 of the second zone cargo hold 12 to the second structural air duct 22 through the second air duct include:

[0129] S211, connect each second cargo hold chamber 122 of the second zone cargo hold 12 to the input end of the corresponding second air duct through a second axial flow fan.

[0130] S212, connecting the output ends of the second air ducts to the second structural air duct 22.

[0131] The dust and the like in the second air duct are blown toward the second structural air duct 22 by the second axial flow fan, and then the dust and the like in the second structural air duct 22 are extracted to the outside by the second exhaust fan 62. The ventilation effect of ventilating the multiple second cargo hold chambers 122 of the second zone cargo hold 12 can be further improved, and the ventilation efficiency of the multiple second cargo hold chambers 122 of the second zone cargo hold 12 can be further improved.

[0132] As an alternative, each second cargo hold chamber 122 of the second zone cargo hold 12 is directly connected to the second structural air duct 22 via a second air duct.

[0133] Preferably, there are multiple second structural air ducts 22, which are spaced apart along the circumference of the ro-ro passenger ship; each second cargo hold compartment 122 is connected to at least part of the second structural air ducts 22 through multiple second air ducts. Such an arrangement can further improve the ventilation effect of ventilating the multiple second cargo hold compartments 122 of the second zone cargo hold 12, and can further improve the ventilation efficiency of the multiple second cargo hold compartments 122 of the second zone cargo hold 12.

[0134] Specifically, the multiple second air ducts of each second cargo hold compartment 122 constitute a second air duct group. The multiple second air duct groups are arranged in a one-to-one correspondence with the multiple second cargo hold compartments 122. The multiple second air ducts of each second air duct group correspond to multiple second axial flow fans, and the multiple second air ducts are arranged in a one-to-one correspondence with the multiple second axial flow fans.

[0135] It is understandable that, for different second cargo hold compartments 122, the selected plurality of second structural air ducts 22 may all be the same. For different second cargo hold compartments 122, the selected plurality of second structural air ducts 22 may also be different.

[0136] Preferably, there are multiple second exhaust fans 62, the multiple second exhaust fans 62 include multiple second exhaust fan groups, and the multiple second structural air ducts 22 are arranged one by one with the multiple second exhaust fan groups. Such an arrangement can further improve the ventilation effect of ventilating the second area cargo hold 12, and can further improve the ventilation efficiency of the second area cargo hold 12.

[0137] Preferably, the second air duct is a flexible air duct, which facilitates the arrangement of the second air duct.

[0138] Specifically, the cargo hold ventilation method further includes:

[0139] When the second cargo hold 12 is built on the first cargo hold 11, the tail door opening and the side door opening serve as air supply ports to supply air to the multiple first cargo hold compartments 112. This can further improve the ventilation effect of the first cargo hold 11 and the efficiency of ventilation of the first cargo hold 11.

[0140] Specifically, Fig.11 As shown, the cargo hold ventilation method also includes:

[0141] S310. When any third-zone cargo hold 13 is built on the second-zone cargo hold 12, each third cargo hold chamber 132 of the third-zone cargo hold 13 is connected to the corresponding third structural air duct 23 through the third air duct.

[0142] The multiple third cargo hold chambers 132 of each third zone cargo hold 13 are connected to the outside and can be ventilated.

[0143] The third zone cargo hold 13 refers to a third zone cargo hold 13 that has been completed and is located at the top.

[0144] S320. A third air blower is disposed at a third ramp opening 133 at the top of the third zone cargo hold 13, and air is supplied to each third cargo hold compartment 132 of the third zone cargo hold 13 through the third air blower.

[0145] It can be understood that when the third blower on the top of the third zone cargo hold 13 supplies air, the wind is blown toward each third cargo hold chamber 132 of the third zone cargo hold 13 through the multiple third ramp openings 133 of the third zone cargo hold 13, and each third cargo hold chamber 132 of the third zone cargo hold 13 is connected with the third structural air duct 23 corresponding to the third zone cargo hold 13 through the third air duct corresponding to the third zone cargo hold 13, so that the dust and the like in each third cargo hold chamber 132 of the third zone cargo hold 13 can be blown toward the third air duct and the corresponding third structural air duct 23 of the third zone cargo hold 13 under the action of wind.

[0146] Specifically, part of the wind blowing toward the third cargo hold chamber 132 at the bottom of the third zone cargo hold 13 enters the third cargo hold chamber 132 at the bottom of the third zone cargo hold 13. If the third zone cargo hold 13 is the third zone cargo hold 13 at the bottom, the remaining part of the wind blows into the second cargo hold chamber 122 at the top through the second ramp opening 123 at the top, and then blows toward each second cargo hold chamber 122 and each first cargo hold chamber 112 through the plurality of second ramp openings 123 and the plurality of first ramp openings 113. If the third zone cargo hold 13 is not the third zone cargo hold 13 at the bottom, the remaining part of the wind blows toward each third cargo hold chamber 132, each second cargo hold chamber 122, and each first cargo hold chamber 112 below it through the third ramp opening 133 at the top of the third zone cargo hold 13 located below.

[0147] Thereby, air can be supplied to each third cargo hold compartment 132, a plurality of second cargo hold compartments 122 and a plurality of first cargo hold compartments 112 of the cargo hold 1 which has been constructed so far.

[0148] S330, detachably fix the plurality of third exhaust fans 63 on the plurality of third structural air ducts 23 in a one-to-one correspondence at a height level with the top of the third zone cargo hold 13, and exhaust air to the outside through the plurality of third exhaust fans 63.

[0149] S340, detachably fix the first exhaust fan 61 on the first structural air duct 21 at a height level with the top of the third zone cargo hold 13, and exhaust air to the outside through the first exhaust fan 61.

[0150] S350, detachably fix the second exhaust fan 62 on the second structural air duct 22 at a height level with the top of the third zone cargo hold 13, and exhaust air to the outside through the second exhaust fan 62.

[0151] Preferably, step S330 to step S350 are performed synchronously. In other embodiments, step S330 to step S350 may also be performed sequentially or in other order.

[0152] For step S330, it can be understood that when the construction of the bottom third zone cargo hold 13 is completed, the third exhaust fan 63 corresponding to the bottom third zone cargo hold 13 can be removably fixed on the third structural air duct 23 corresponding to the bottom third zone cargo hold 13 at the same height as the top of the bottom third zone cargo hold 13.

[0153] For step S330, when a third-zone cargo hold 13 at the second bottom is built, the third exhaust fan 63 corresponding to a third-zone cargo hold 13 at the very bottom can be removably fixed on the third structural air duct 23 corresponding to a third-zone cargo hold 13 at the very bottom, at a height position flush with the top of a third-zone cargo hold 13 at the second bottom; the third exhaust fan 63 corresponding to a third-zone cargo hold 13 at the second bottom can be removably fixed on the third structural air duct 23 corresponding to a third-zone cargo hold 13 at the second bottom, at a height position flush with the top of a third-zone cargo hold 13 at the second bottom.

[0154] By analogy, when the third zone cargo hold 13 at the top is completed, that is, when the cargo hold 1 is completed, each third exhaust fan 63 is detachably fixed to the top of each third structural air duct 23. Each second exhaust fan 62 is fixed to the top of each second structural air duct 22. Each first exhaust fan 61 is fixed to the top of each first structural air duct 21. It can be understood that the top of the third structural air duct 23, the top of the second structural air duct 22, and the top of the first structural air duct 21 are all part of the top of the cargo hold 1.

[0155] Therefore, it can be understood that each first exhaust fan 61, each second exhaust fan 62 and each third exhaust fan 63 changes with the change of the height of the cargo hold 1. The first exhaust fan 61 is always located on the first structural air duct 21 at a height position flush with the top of the currently built cargo hold 1. So that the first exhaust fan 61 can always effectively extract the dust and the like in the first cargo hold compartment 112 to the outside. The second exhaust fan 62 is always located on the second structural air duct 22 at a height position flush with the top of the currently built cargo hold 1. So that the second exhaust fan 62 can always effectively extract the dust and the like in the second cargo hold compartment 122 to the outside. The third exhaust fan 63 is always located on the third structural air duct 23 at a height position flush with the top of the currently built cargo hold 1. So that the third exhaust fan 63 can always effectively extract the dust and the like in the third cargo hold compartment 132 to the outside.

[0156] Thus, when the first zone cargo hold 11, the second zone cargo hold 12 and the plurality of third zone cargo holds 13 are all constructed, the plurality of first cargo hold cabins 112, the plurality of second cargo hold cabins 122 and the third cargo hold cabins 132 of the plurality of third zone cargo holds 13 can be effectively and synchronously ventilated, and the ventilation effect of the plurality of first cargo hold cabins 112, the plurality of second cargo hold cabins 122 and the third cargo hold cabins 132 of the plurality of third zone cargo holds 13 can be effectively improved. Secondly, when ventilating the third cargo hold cabins 132 of the plurality of third zone cargo holds 13, the problem of needing to open a temporary working hole in the prior art can be effectively avoided, thereby further improving the construction efficiency of the ro-ro passenger ship.

[0157] Preferably, when the first blower starts blowing, the second blower and the third blower start blowing synchronously. When the first exhaust fan 61 starts exhausting, the second exhaust fan 62 and the third exhaust fan 63 start exhausting synchronously.

[0158] Preferably, the specific steps of connecting each third cargo hold chamber 132 of the third zone cargo hold 13 with the corresponding third structural air duct 23 through the third air duct include:

[0159] S311, connect each third cargo hold chamber 132 of the third zone cargo hold 13 to the input end of the corresponding third air duct through the third axial flow fan.

[0160] S312, connecting the output ends of the third air ducts to the third structural air duct 23.

[0161] The dust and the like in the third air duct are blown toward the third structural air duct 23 by the third axial flow fan, and then the dust and the like in the third structural air duct 23 are extracted to the outside by the third exhaust fan 63. The ventilation effect of ventilating each third cargo hold compartment 132 of the third zone cargo hold 13 can be further improved, and the ventilation efficiency of each third cargo hold compartment 132 of the third zone cargo hold 13 can be further improved.

[0162] As an alternative, each third cargo hold chamber 132 of the third zone cargo hold 13 is connected to a third structural air duct 23 directly corresponding to the third air duct.

[0163] Preferably, the number of the third structural air ducts 23 corresponding to each third zone cargo hold 13 is multiple, and the multiple third structural air ducts 23 of each third zone cargo hold 13 are distributed at intervals along the circumference of the ro-ro passenger ship. For a single third zone cargo hold 13, each third cargo hold compartment 132 is connected to at least part of the corresponding third structural air ducts 23 through multiple third air ducts. Such an arrangement can further improve the ventilation effect of ventilating each third cargo hold compartment 132 of a single third zone cargo hold 13, and can further improve the efficiency of ventilating each third cargo hold compartment 132 of a single third zone cargo hold 13.

[0164] Specifically, the multiple third air ducts of each third cargo hold compartment 132 are a third air duct group. The multiple third air duct groups of a single third zone cargo hold 13 are arranged in one-to-one correspondence with the multiple third cargo hold compartments 132. The multiple third air ducts of each third air duct group correspond to multiple third axial flow fans, and the multiple third air ducts are arranged in one-to-one correspondence with the multiple third axial flow fans.

[0165] It is understandable that, in a single third zone cargo hold 131, for different third cargo hold compartments 132, the selected multiple third structural air ducts 23 may all be the same. In a single third zone cargo hold 13, for different third cargo hold compartments 132, the selected multiple third structural air ducts 23 may also be different.

[0166] Preferably, the number of the second exhaust fans 62 in each third-area cargo hold 13 is multiple, the multiple third exhaust fans 63 in each third-area cargo hold 13 include multiple third exhaust fan units, and the multiple third structural air ducts 23 in each third-area cargo hold 13 are arranged in one-to-one correspondence with the multiple third exhaust fan units. Such an arrangement can further improve the ventilation effect of ventilating each third cargo hold compartment 132 in each third-area cargo hold 13, and can further improve the ventilation efficiency of each third cargo hold compartment 132 in each third-area cargo hold 13.

[0167] Preferably, the third air duct is a flexible air duct, which facilitates the arrangement of the third air duct.

[0168] Therefore, in the process of building the cargo hold 1, the problem of needing to open a temporary working hole in the prior art can be effectively avoided, the construction efficiency of the cargo hold 1 can be effectively improved, and the ventilation effect of the cargo hold 1 can be effectively improved.

[0169] Specifically, the cabin ventilation method includes:

[0170] S410, when the first zone cargo hold 11 is built, the cabin 4 is connected to the fourth structural air duct 24 through the fourth air duct, and the cabin 4 is connected to the fifth structural air duct 25 through the fifth air duct.

[0171] The cabin 4 is connected to the outside world and can be ventilated.

[0172] S420, move the fourth air blower 64, and detachably fix the fourth air blower 64 on the fourth structural air duct 24 to be flush with the height position of the top of the currently constructed cargo hold 1, and supply air to the cabin 4 through the fourth air blower 64.

[0173] S430, move the fourth exhaust fan 65, and detachably fix the fourth exhaust fan 65 on the fifth structural air duct 25 to be flush with the height position of the top of the currently constructed cargo hold 1, and exhaust air through the fourth exhaust fan 65.

[0174] It can be understood that when the first zone cargo hold 11 is completed, the fourth supply fan 64 can be detachably fixed on the fourth structural air duct 24 at a height position flush with the top of the first zone cargo hold 11, and the fourth exhaust fan 65 can be detachably fixed on the fifth structural air duct 25 at a height position flush with the top of the first zone cargo hold 11.

[0175] When the second zone cargo hold 12 is completed, the fourth supply fan 64 can be detachably fixed on the fourth structural air duct 24 at a height position flush with the top of the second zone cargo hold 12, and the fourth exhaust fan 65 can be detachably fixed on the fifth structural air duct 25 at a height position flush with the top of the second zone cargo hold 12.

[0176] When the construction of the third-zone cargo hold 13 at the bottom is completed, the fourth supply fan 64 can be detachably fixed on the fourth structural air duct 24 at a height position flush with the top of the third-zone cargo hold 13 at the bottom, and the fourth exhaust fan 65 can be detachably fixed on the fifth structural air duct 25 at a height position flush with the top of the third-zone cargo hold 13 at the bottom.

[0177] By analogy, when the top third zone cargo hold 13 is completed, that is, the cargo hold 1 is completed, the fourth air supply fan 64 is detachably fixed to the top of the fourth structural air duct 24, and the fourth exhaust fan 65 is detachably fixed to the top of the fifth structural air duct 25. It can be understood that the top of the fourth structural air duct 24 and the top of the fifth structural air duct 25 are both part of the top of the cargo hold 1.

[0178] Therefore, it can be understood that the setting positions of the fourth blower 64 and the fourth exhaust fan 65 also change with the change of the height of the cargo hold 1. The fourth blower 64 is always located on the fourth structural air duct 24 at a height position flush with the top of the currently built cargo hold 1. So that the fourth blower 64 can always effectively send outside air into the cabin 4. The fourth exhaust fan 65 is always located on the fifth structural air duct 25 at a height position flush with the top of the currently built cargo hold 1. So that the fourth exhaust fan 65 can always effectively extract dust and the like in the cabin 4 to the outside.

[0179] It is understandable that the side door openings and the tail door opening can also be used as air intakes for the cabin 4.

[0180] Therefore, in the process of building the cabin 4, the problem of needing to open a temporary working hole in the prior art can be effectively avoided, the construction efficiency of the cabin 4 can be effectively improved, and the ventilation effect of the cabin 4 can be effectively improved.

[0181] Preferably, when the first blower starts blowing, the fourth blower 64 starts blowing synchronously. When the first exhaust fan 61 starts exhausting, the fourth exhaust fan 65 starts exhausting synchronously.

[0182] Preferably, the specific steps of connecting the cabin 4 to the fourth structural air duct 24 through the fourth air duct include: connecting the cabin 4 to the input end of the fourth air duct through the fourth axial flow fan. Connecting the output end of the fourth air duct to the fourth structural air duct 24. The ventilation effect and efficiency of ventilating the cabin 4 can be further improved. As an alternative, the cabin 4 is directly connected to the fourth structural air duct 24 through the fourth air duct.

[0183] Preferably, the specific step of connecting the cabin 4 to the fifth structural air duct 25 through the fifth air duct includes: connecting the cabin 4 to the input end of the fifth air duct through the fifth axial flow fan. Connecting the output end of the fifth air duct to the fifth structural air duct 25. The ventilation effect and efficiency of ventilating the cabin 4 can be further improved. As an alternative, the cabin 4 is directly connected to the fifth structural air duct 25 through the fifth air duct.

[0184] Preferably, the number of the fourth air duct and the fourth structural air duct 24 are both multiple, and the multiple fourth air ducts and the multiple fourth structural air ducts 24 are arranged in a one-to-one correspondence. The number of the fifth air duct and the fifth structural air duct 25 are both multiple, and the multiple fifth air ducts and the multiple fifth structural air ducts 25 are arranged in a one-to-one correspondence. The ventilation effect and efficiency of ventilating the cabin 4 can be further improved.

[0185] Preferably, the fourth air duct and the fifth air duct are both flexible air ducts, so as to facilitate the arrangement of the fourth air duct and the fifth air duct.

[0186] Specifically, the tank tank ventilation methods include:

[0187] S510, when the first zone cargo hold 11 is built, the liquid tank hold 5 is connected to the sixth structural air duct 26 through the sixth air duct, so that the liquid tank is connected to the outside and can be ventilated.

[0188] S520, move the fifth exhaust fan, and fix the fifth exhaust fan on the sixth structural air duct 26 at the same height as the top of the currently constructed cargo hold 1, and exhaust air through the fifth exhaust fan.

[0189] It can be understood that when the first zone cargo hold 11 is constructed, the fifth exhaust fan can be detachably fixed on the sixth structural air duct 26 at a height level with the top of the first zone cargo hold 11 .

[0190] When the second-zone cargo hold 12 is completed, the fifth exhaust fan is detachably fixed to the sixth structural air duct 26 at a height level with the top of the second-zone cargo hold 12 .

[0191] When the third-zone cargo hold 13 at the bottom is completed, the fifth exhaust fan is detachably fixed on the sixth structural air duct 26 at a height level with the top of the third-zone cargo hold 13 at the bottom.

[0192] By analogy, when the top third zone cargo hold 13 is completed, that is, the cargo hold 1 is completed, the fifth exhaust fan is detachably fixed to the top of the sixth structural air duct 26. It can be understood that the top of the sixth structural air duct 26 is a part of the top of the cargo hold 1.

[0193] Therefore, it can be understood that the setting position of the fifth exhaust fan also changes with the change of the construction height of the cargo hold 1. The fifth exhaust fan is always located on the sixth structural air duct 26 at a height position flush with the top of the currently constructed cargo hold 1. In this way, the fifth supply fan can always effectively extract dust and the like in the liquid tank hold 5 to the outside.

[0194] Therefore, in the process of building the liquid tank cabin 5, the problem of needing to open a temporary working hole in the prior art can be effectively avoided, the construction efficiency of the liquid tank cabin 5 can be effectively improved, and the ventilation effect of ventilating the liquid tank cabin 5 can be effectively improved.

[0195] Preferably, when the first exhaust fan 61 starts to exhaust air, the fifth exhaust fan starts to exhaust air synchronously.

[0196] Preferably, the specific steps of connecting the liquid tank compartment 5 to the sixth structural air duct 26 through the sixth air duct include: connecting the liquid tank compartment 5 to the input end of the sixth air duct through the sixth axial flow fan. Connecting the output end of the sixth air duct to the sixth structural air duct 26. The ventilation effect and efficiency of ventilating the liquid tank compartment 5 can be further improved. As an alternative, the liquid tank compartment 5 is directly connected to the sixth structural air duct 26 through the sixth air duct.

[0197] Preferably, the number of the sixth air duct and the sixth structural air duct 26 are both multiple, and the multiple sixth air ducts and the multiple sixth structural air ducts 26 are arranged in a one-to-one correspondence. The number of the sixth air duct and the sixth structural air duct 26 are both multiple, and the multiple sixth air ducts and the multiple sixth structural air ducts 26 are arranged in a one-to-one correspondence. The ventilation effect and efficiency of ventilating the liquid tank compartment 5 can be further improved.

[0198] Preferably, the sixth air duct is a flexible air duct, which facilitates the arrangement of the sixth air duct.

[0199] Optionally, the input end of the seventh axial flow fan 66 is connected to the liquid tank compartment 5, the output end of the seventh axial flow fan 66 is connected to one end of the seventh air duct, and the other end of the seventh air duct is connected to the air supply compartment through the stairway 7 of the first zone cargo compartment 11. The side door opening and the tail door opening are both connected to the seventh air duct, and the dust and the like extracted from the liquid tank compartment 5 are discharged to the outside through the side door opening and the tail door opening.

[0200] Therefore, by adopting the ventilation method for the construction process of the ro-ro passenger ship, the problem of needing to open a temporary working hole in the prior art can be effectively avoided, and the construction efficiency of the ro-ro passenger ship can be effectively improved. Secondly, by adopting the ventilation method for the construction process of the ro-ro passenger ship, the ventilation effect of the cargo hold 1, the engine room 4 and the liquid tank hold 5 can be effectively improved during the construction of the ro-ro passenger ship, thereby effectively improving the ventilation effect during the construction of the ro-ro passenger ship.

[0201] Among them, the number and specifications of the first supply fan, the second supply fan, the third supply fan, the fourth supply fan 64, the first exhaust fan 61, the second exhaust fan 62, the third exhaust fan 63, the fourth exhaust fan 65, the fifth exhaust fan, the first axial flow fan, the second axial flow fan, the third axial flow fan, the fourth axial flow fan, the fifth axial flow fan, the sixth axial flow fan and the seventh axial flow fan 66 can be adaptively adjusted according to actual working conditions.

[0202] In this embodiment, the first exhaust fan 61, the second exhaust fan 62, the third exhaust fan 63, the fourth exhaust fan 65 and the fifth exhaust fan are all anti-aircraft blowers. The specific structure of the anti-aircraft blower belongs to the prior art and will not be described here.

[0203] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A ventilation method for a ro-ro passenger ship construction process, the ro-ro passenger ship comprising a cargo hold (1), the cargo hold (1) comprising a first zone cargo hold (11), the first zone cargo hold (11) comprising a plurality of first decks (111) sequentially spaced along the height direction of the ro-ro passenger ship, a first cargo hold chamber (112) being formed between any two adjacent first decks (111), and a first ramp opening (113) communicating with the first cargo hold chamber (112) distributed below is formed on the upper first deck (111) of any two adjacent first decks (111); a first structural air duct (21) is formed on the outer periphery of the first zone cargo hold (11), the first structural air duct (21) extending upward along the height direction of the ro-ro passenger ship and communicating with the outside; characterized in that: The ventilation method used in the construction process of the ro-ro passenger ship includes a cargo hold ventilation method, and the cargo hold ventilation method includes: When the first-zone cargo hold (11) is completed, each first cargo hold chamber (112) of the first-zone cargo hold (11) is connected to the first structural air duct (21) through a first air duct; A first air blower is arranged at a first ramp opening (113) at the top of the first zone cargo hold (11), and air is supplied to each of the first cargo hold compartments (112) through the first air blower; The first exhaust fan (61) is detachably fixed to the first structural air duct (21) at a height level with the top of the first zone cargo hold (11), and air is extracted to the outside through the first exhaust fan (61).

2. The ventilation method for the construction process of a ro-ro passenger ship according to claim 1, characterized in that: The cargo hold (1) further comprises a second-area cargo hold (12), wherein the first-area cargo hold (11) and the second-area cargo hold (12) are sequentially arranged from bottom to top along the height direction of the ro-ro passenger ship; the second-area cargo hold (12) comprises a plurality of second decks (121) sequentially arranged at intervals along the height direction of the ro-ro passenger ship, a second cargo hold chamber (122) is formed between any two adjacent layers of the second decks (121), and a second cargo hold chamber (122) is also formed between the second-area cargo hold (12) and the first-area cargo hold (11); each layer of the second deck (121) is formed with a second ramp opening (123), and each second ramp opening (123) is connected to a second cargo hold chamber (122) distributed below along the height direction of the ro-ro passenger ship; a second structural air duct (22) is formed on the outer periphery of the second-area cargo hold (12), and the second structural air duct (22) extends upward along the height direction of the ro-ro passenger ship and is connected to the outside; the cargo hold ventilation method further comprises: After the second-zone cargo hold (12) is built on the first-zone cargo hold (11), each second cargo hold chamber (122) of the second-zone cargo hold (12) is connected to the second structural air duct (22) through a second air duct; A second air blower is arranged at a second ramp opening (123) at the top of the second zone cargo hold (12), and air is supplied to each of the second cargo hold compartments (122) through the second air blower; The second exhaust fan (62) is detachably fixed to the second structural air duct (22) at a height level with the top of the second zone cargo hold (12), and air is extracted to the outside through the second exhaust fan (62); The first exhaust fan (61) is removed from the first structural air duct (21) to a height position flush with the top of the first zone cargo hold (11); the first exhaust fan (61) is detachably fixed to the first structural air duct (21) to a height position flush with the top of the second zone cargo hold (12), and air is extracted to the outside through the first exhaust fan (61).

3. The ventilation method for the construction process of a ro-ro passenger ship according to claim 2, characterized in that: The ro-ro passenger ferry further comprises a rear door opening and a side door opening distributed along the height direction between the first zone cargo hold (11) and the second zone cargo hold (12), wherein the rear door opening and the side door opening are both connected to an air supply chamber, and the air supply chamber is a second cargo hold chamber (122) formed between the second zone cargo hold (12) and the first zone cargo hold (11).

4. The ventilation method for the construction process of a ro-ro passenger ship according to claim 2, characterized in that: The cargo hold (1) further comprises a plurality of third-area cargo holds (13), wherein the plurality of third-area cargo holds (13) are sequentially distributed along the height direction of the ro-ro passenger ship and are all located above the second-area cargo hold (12); the third-area cargo hold (13) comprises a plurality of third decks (131) sequentially distributed along the height direction of the ro-ro passenger ship; a third cargo hold cabin (132) is formed between any two adjacent third decks (131), and a third cargo hold cabin is also formed between the lowest one of the plurality of third-area cargo holds (13) and the second-area cargo hold (12). (132), a third cargo hold chamber (132) is also formed between any two adjacent third zone cargo holds (13); a third ramp opening (133) is formed on each layer of the third deck (131), and each of the third ramp openings (133) is connected to the third cargo hold chamber (132) distributed below along the height direction of the passenger and vehicle ferry; a third structural air duct (23) is formed on the periphery of each third zone cargo hold (13), and the third structural air duct (23) extends upward along the height direction of the passenger and vehicle ferry and is connected to the outside; the cargo hold ventilation method also includes: When any of the third-zone cargo holds (13) is built on the second-zone cargo hold (12), each third cargo hold chamber (132) of the third-zone cargo hold (13) is connected to the corresponding third structural air duct (23) through a third air duct; A third air blower is arranged at a third ramp opening (133) at the top of the third zone cargo hold (13), and air is supplied to each third cargo hold compartment (132) of the third zone cargo hold (13) through the third air blower; A plurality of third exhaust fans (63) are detachably fixed one by one on the plurality of third structural air ducts (23) at a height level with the top of the third zone cargo hold (13), and air is extracted to the outside through the plurality of third exhaust fans (63); The first exhaust fan (61) is detachably fixed to the first structural air duct (21) at a height level with the top of the third zone cargo hold (13), and air is extracted to the outside through the first exhaust fan (61); The second exhaust fan (62) is detachably fixed to the second structural air duct (22) at a height level with the top of the third zone cargo hold (13), and air is extracted to the outside through the second exhaust fan (62).

5. The ventilation method for the construction process of a ro-ro passenger ship according to any one of claims 1 to 4, characterized in that: The specific steps of connecting each first cargo hold chamber (112) of the first zone cargo hold (11) to the first structural air duct (21) through the first air duct respectively include: Each first cargo hold chamber (112) of the first zone cargo hold (11) is connected to the input end of the corresponding first air duct through a first axial flow fan; and the output end of each first air duct is connected to the first structural air duct (21).

6. The ventilation method for the construction process of a ro-ro passenger ship according to any one of claims 1 to 4, characterized in that: The number of the first structural air ducts (21) is multiple, and the multiple first structural air ducts (21) are distributed at intervals along the circumference of the passenger and vehicle ferry; each of the first cargo hold compartments (112) is connected to at least part of the first structural air ducts (21) through the multiple first air ducts.

7. The ventilation method for the construction process of a ro-ro passenger ship according to claim 6, characterized in that: The number of the first exhaust fans (61) is multiple, the multiple first exhaust fans (61) include multiple first exhaust fan groups, and the multiple first structural air ducts (21) are arranged in a one-to-one correspondence with the multiple first exhaust fan groups.

8. The ventilation method for the construction process of a ro-ro passenger ship according to any one of claims 1 to 4, characterized in that: The ro-ro passenger ship further comprises a cabin (4), a fourth structural air duct (24) and a fifth structural air duct (25) are formed on the outer periphery of the cabin (4), the fourth structural air duct (24) and the fifth structural air duct (25) are respectively located on both sides of the cabin (4) along the width direction; the fourth structural air duct (24) and the fifth structural air duct (25) both extend upward along the height direction of the ro-ro passenger ship and are in communication with the outside; the ventilation method for the ro-ro passenger ship construction process further comprises a cabin ventilation method, the cabin ventilation method comprising: When the first zone cargo hold (11) is built, the cabin (4) is connected to the fourth structural air duct (24) through a fourth air duct, and the cabin (4) is connected to the fifth structural air duct (25) through a fifth air duct; Move the fourth air blower (64), and detachably fix the fourth air blower (64) on the fourth structural air duct (24) to be flush with the height of the top of the currently constructed cargo hold (1), and supply air to the cabin (4) through the fourth air blower (64); Move the fourth exhaust fan (65), and detachably fix the fourth exhaust fan (65) on the fifth structural air duct (25) at the same height as the top of the currently constructed cargo hold (1), and exhaust air through the fourth exhaust fan (65).

9. The ventilation method for the construction process of a ro-ro passenger ship according to any one of claims 1 to 4, characterized in that: The ro-ro passenger ship further comprises a tank tank (5), wherein the tank tank (5) is provided with an air inlet at the bottom of the front end along the length direction of the ro-ro passenger ship, and the air inlet is communicated with a plurality of the first cargo hold chambers (112); a sixth structural air duct (26) is formed at the outer periphery of the rear end of the tank tank (5) along the length direction of the ro-ro passenger ship, and the sixth structural air duct (26) extends upward along the height direction of the ro-ro passenger ship and is communicated with the outside; the ventilation method for the ro-ro passenger ship construction process further comprises a tank tank ventilation method, and the tank tank ventilation method comprises: When the first zone cargo hold (11) is completed, the liquid tank hold (5) is connected to the sixth structural air duct (26) via a sixth air duct; Move the fifth exhaust fan and fix the fifth exhaust fan on the sixth structural air duct (26) at the same height as the top of the currently constructed cargo hold (1), and exhaust air through the fifth exhaust fan.

10. A ro-ro passenger ship, characterized in that: During the construction process, ventilation is carried out using the ventilation method for the passenger and vehicle ferry construction process described in any one of claims 1-9.