System for treating excess BOG (boil-off gas) of LNG (liquefied natural gas
By designing the BOG supply, utilization, energy storage and energy release system on the LNG ship, excess BOG energy is converted into flue gas pressure energy, which solves the problem of energy waste during low-load navigation and realizes energy reuse and environmental protection. Reduces inerting costs.
Patent Information
- Application Number
- CN202410822009.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-06-25
AI Technical Summary
The excess BOG generated by LNG ships when sailing at low loads or anchoring cannot be effectively utilized, resulting in a waste of energy, and direct combustion will cause environmental pollution.
A system for handling excess BOG on LNG ships is designed, including a BOG supply system, excess BOG utilization system, flue gas energy storage system, flue gas energy release system and inerting system. The energy of BOG is converted into flue gas through boilers and compressors. The pressure energy of the gas is released for power use when the ship is sailing under high load or unloading. The flue gas is stored in the energy storage tank for later use.
It effectively avoids BOG energy waste, realizes energy reuse, reduces environmental pollution, reduces costs during the inerting process, and saves space in the flue gas energy storage tank.
Smart Images

Figure CN118775753A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of ships, and in particular relates to a system for treating excess BOG in an LNG ship. Background Art
[0002] In recent years, with the booming development of liquefied natural gas (LNG) in the global energy market, the demand for LNG has been increasing day by day around the world, and the number of LNG carriers (LNG ships) has also been growing. In addition, LNG as a marine fuel can greatly reduce the emission of harmful gases such as sulfur oxides, nitrogen oxides and greenhouse gases, and is also an ideal alternative fuel for ships. Therefore, LNG ships mainly use LNG carried by the ship itself as fuel.
[0003] LNG is usually stored in a liquid state at -163℃ in a LNG cargo tank. During the voyage of a ship, there is a temperature difference of about 200℃ between LNG and the external environment. Even if the thermal insulation performance of the LNG cargo tank is good, it is inevitable that external heat will penetrate into the LNG cargo tank, thereby generating LNG boil-off gas (BOG, mainly methane). In addition, during the voyage, LNG ships are affected by wind, waves, etc., and produce violent shaking movements. The mechanical energy contained in the LNG during the shaking process will be converted into heat energy, which to a certain extent exacerbates the generation of BOG.
[0004] The daily evaporation rate of cargo on LNG ships is about 0.1% to 0.15%. 3 LNG can be vaporized into about 625m 3 methane (BOG), such as a 174,000 cubic meter LNG ship, about 250m3 per day 3 LNG is vaporized into BOG. The volume of BOG produced by ships every day is about 150,000 m 3 LNG’s density is usually 430kg / m 3 ~470kg / m 3Therefore, the weight of BOG produced by LNG ships every day is about 100 tons. Usually, most LNG ships are not equipped with BOG reliquefaction equipment. Since ships produce a large amount of BOG every day, and the main component of BOG is methane, the greenhouse effect of methane is about 25 times that of CO2. If BOG is directly released into the atmosphere, it will not only seriously damage the atmospheric environment and cause the greenhouse effect, but also cause a waste of clean energy. At present, the main way for LNG ships to deal with BOG is to use BOG as fuel for the main power unit of the ship, or to burn the BOG in the LNG cargo tank through a gas combustion unit (GCU for short). When the ship is sailing at a high speed, the ship's main engine can generally consume the BOG generated in the LNG cargo tank. When the BOG cannot meet the ship's fuel demand, a portion of the liquid LNG needs to be vaporized and supplied to the ship's main engine. However, when the ship is sailing at a low load, maneuvering or anchored, the propulsion power required by the ship is small, and the ship's main engine cannot completely consume the BOG generated in the LNG cargo tank. At this time, the excess BOG generated in the LNG cargo tank usually needs to be sent to the GCU for combustion treatment, which will inevitably cause serious energy waste of BOG.
[0005] Based on this, if a system is designed for LNG ships to handle excess BOG, the excess BOG can be sent to the boiler for combustion, and the thermal energy of the boiler steam can be converted into mechanical energy using the steam turbine, which in turn drives the compressor to compress and store the flue gas generated during the ship's navigation. When the ship's speed is high or when it docks to unload, the energy can be released for the ship's power unit or other purposes. This will effectively solve the problem of waste when there is excess BOG. Summary of the invention
[0006] The purpose of the present invention is to address the above-mentioned problems and propose a system for treating excess BOG on an LNG ship, the system comprising a BOG supply system, an excess BOG utilization system, a flue gas energy storage system, a flue gas energy release system, and an inerting system.
[0007] The BOG supply system includes: LNG liquid cargo tank, BOG exhaust valve, compressor, BOG three-way valve, refrigerant heat exchanger, cylinder jacket water heater, circulation pump, diesel engine intake valve, diesel engine, generator, propulsion motor and propeller.
[0008] The excess BOG utilization system includes: a boiler, a steam turbine, and a compressor.
[0009] The flue gas energy storage system includes a flue gas energy storage tank, a flue gas four-way valve, a seawater cooling unit, a filtering and separation unit, and a check valve.
[0010] The flue gas energy release system comprises: a three-stream heat exchanger, an expander, and an expansion generator.
[0011] The inerting system comprises: an inerting unit.
[0012] In the BOG supply system, LNG is loaded in the LNG cargo tank, an exhaust pipe is arranged above the LNG cargo tank and is connected with the BOG exhaust valve, a compressor, a BOG three-way valve and a refrigerant heat exchanger in sequence, the refrigerant heat exchanger is connected with the diesel engine intake valve and the diesel engine in sequence through a pipe, the diesel engine and the generator are connected with a transmission shaft to form a diesel generator set, and a plurality of diesel generator sets are arranged on the ship; the generator is connected with the ship power grid through a line, the ship main engine is connected with the propulsion motor through a line, and the propulsion motor is connected with the propeller through a transmission shaft.
[0013] The refrigerant heat exchanger, the cylinder jacket water heater and the circulation pump are connected in sequence through pipelines to form a circulation pipeline.
[0014] In the excess BOG utilization system, a pipeline is provided below the boiler and connected to an outlet of the BOG three-way valve, and a pipeline is provided above the boiler and connected to the steam turbine. The steam turbine is connected to the compressor through a transmission shaft.
[0015] In the flue gas energy storage system, the diesel engine is connected to the flue gas four-way valve through a pipeline, the three outlets of the flue gas four-way valve are respectively connected to the seawater cooling unit, the three-stream heat exchanger, and the atmosphere, the smoke exhaust port above the boiler is connected to the check valve through a pipeline, the check valve is connected to the pipeline between the flue gas four-way valve and the seawater cooling unit through a pipeline, and the seawater cooling unit is connected to the filtering and separation unit, the compressor, and the flue gas energy storage tank in sequence through a pipeline.
[0016] In the flue gas energy release system, the flue gas energy storage tank is connected to the three-stream heat exchanger and the expander in sequence through pipelines, the expander is connected to the expansion generator through a transmission shaft, and the expansion generator is connected to the ship power grid through a signal. The two inlets of the three-stream heat exchanger are respectively connected to the flue gas four-way valve and the steam generated by the boiler.
[0017] In the inerting unit, the inerting unit is connected to the flue gas energy storage tank through a pipeline. The inerting unit is a low-temperature piping system and equipment on the ship that needs to be inerted at normal temperature or a temperature between 0°C and -60°C.
[0018] When the ship is sailing at normal speed, the BOG in the LNG cargo tank reaches the compressor through the BOG exhaust valve. The BOG is pressurized under the action of the compressor. At this time, the outlet of the BOG three-way valve connected to the boiler is closed, and the outlet connected to the refrigerant heat exchanger is opened. The pressurized BOG enters the refrigerant heat exchanger. At the same time, the cylinder jacket heating water enters the cylinder jacket water heater to exchange heat with the refrigerant. The refrigerant circulates under the action of the circulating pump. The refrigerant absorbs the heat of the cylinder jacket water to heat the BOG entering the refrigerant heat exchanger. At this time, the diesel engine intake valve is opened, and the heated BOG is sent to the diesel engine for combustion. Then the diesel engine drives the generator to generate electricity, and the generated electricity is sent to the ship's power grid. The ship's power grid supplies power to the propulsion motor, and then the propulsion motor drives the propeller to rotate to provide power for the ship.
[0019] When the ship is sailing at low load, maneuvering or anchoring, the BOG in the LNG cargo tank reaches the compressor through the BOG exhaust valve, and the BOG is pressurized under the action of the compressor. At this time, the propulsion power required by the ship is small, and the two outlets of the BOG three-way valve are opened. A part of the BOG is sent to the diesel engine for combustion through the refrigerant heat exchanger and the diesel engine intake valve, and then the diesel engine drives the generator to generate electricity, and the generated electricity is sent to the ship's power grid. The ship's power grid supplies power to the propulsion motor, and then the propulsion motor drives the propeller to rotate and provide power for the ship; the other part of the remaining BOG is sent to the boiler for combustion, and the flue gas generated by the boiler enters the seawater cooling unit through the check valve. At the same time, the outlet connected to the seawater cooling unit by the flue gas four-way valve is opened, and the other two outlets are closed. The flue gas generated by the diesel engine is combined with the flue gas from the boiler through the flue gas four-way valve and enters the seawater cooling unit for cooling and cooling, and most of the water vapor contained in the flue gas is removed. Then the flue gas enters the filtration and separation unit, where impurities in the flue gas are filtered out and a small amount of water vapor and dust still contained in the flue gas are separated. After being cooled, filtered, and separated, the flue gas enters the compressor and is compressed into a high-pressure state. It is then cooled and de-watered by a seawater cooling unit and finally stored in a flue gas energy storage tank. In the above flue gas compression process, the compressor is driven by a steam turbine, and the steam generated by the boiler enters the steam turbine. The steam turbine converts the thermal energy of the steam into rotational mechanical energy, which directly drives the compressor to compress the flue gas.
[0020] In the flue gas energy release system, the high-pressure flue gas in the flue gas energy storage tank enters the three-stream heat exchanger for heating, and then the gaseous high-temperature flue gas expands in the expander to do work. The expander drives the expansion generator through the transmission shaft to do work and generate electricity. The generated electric energy is incorporated into the ship's power grid. The electric energy output by the ship's power grid can then be used for the ship's electric propulsion when the ship is sailing at high load or for the operation of the unloading pump when the ship arrives at the unloading port to unload.
[0021] When the normal temperature or low-temperature piping and equipment on the ship with a temperature between 0℃ and -60℃ need to be inerted, the inerting system is used, and the flue gas in the flue gas energy storage tank is sent to the inerting unit to participate in the inerting of various normal temperature or low-temperature piping and equipment.
[0022] Beneficial effects of the present invention:
[0023] 1. When the ship is sailing at low load, anchored or maneuvering, the present invention uses boilers, compressors, flue gas energy storage tanks and other devices to convert the energy of excess BOG into the pressure energy of flue gas, thereby avoiding the serious waste of excess BOG under conditions such as low load of the ship.
[0024] 2. The present invention releases the stored flue gas energy when the ship is sailing at high load or arriving at the unloading port to unload, and then uses it for the operation of the ship's electric propulsion system or unloading pump, thereby realizing the energy reuse of BOG. At the same time, after the energy of the flue gas is released, the flue gas energy storage tank can be recycled when the ship stores flue gas energy again, thereby saving space for setting up the flue gas energy storage tank on the ship.
[0025] 3. The flue gas in the flue gas energy storage tank of the present invention can also be used for the inerting of normal temperature or low temperature piping and equipment, which greatly reduces the inerting cost of the ship. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 is a system diagram of the present invention;
[0027] In the attached figure: 1. LNG cargo tank; 2. BOG exhaust valve; 3. compressor; 4. BOG three-way valve; 5. refrigerant heat exchanger; 6. cylinder jacket water heater; 7. circulating pump; 8. diesel engine intake valve; 9. diesel engine; 10. generator; 11. propulsion motor; 12. propeller; 13. boiler; 14. steam turbine; 15. compressor; 16. flue gas energy storage tank; 17. flue gas four-way valve; 18. seawater cooling unit; 19. filtration and separation unit; 20. three-stream heat exchanger; 21. expander; 22. expansion generator; 23. check valve; 24. inerting unit. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0029] like Figure 1 As shown, a system for processing excess BOG on an LNG ship includes a BOG supply system, an excess BOG utilization system, a flue gas energy storage system, a flue gas energy release system, and an inerting system.
[0030] The BOG supply system includes: an LNG cargo tank 1, a BOG exhaust valve 2, a compressor 3, a BOG three-way valve 4, a refrigerant heat exchanger 5, a cylinder jacket water heater 6, a circulating pump 7, a diesel engine intake valve 8, a diesel engine 9, a generator 10, a propulsion motor 11, and a propeller 12.
[0031] The excess BOG utilization system includes: a boiler 13 , a steam turbine 14 , and a compressor 15 .
[0032] The flue gas energy storage system includes a flue gas energy storage tank 16 , a flue gas four-way valve 17 , a seawater cooling unit 18 , a filtering and separation unit 19 , and a check valve 23 .
[0033] The flue gas energy release system comprises: a three-stream heat exchanger 20 , an expander 21 , and an expansion generator 22 .
[0034] The inerting system comprises an inerting unit 24 .
[0035] In the BOG supply system, LNG is contained in the LNG cargo tank 1. An exhaust pipe is provided above the LNG cargo tank 1 and is connected to the BOG exhaust valve 2, the compressor 3, the BOG three-way valve 4, and the refrigerant heat exchanger 5 in sequence. The refrigerant heat exchanger 5 is connected to the diesel engine intake valve 8 and the diesel engine 9 in sequence through a pipe. The diesel engine 9 and the generator 10 are connected through a transmission shaft to form a diesel generator set. A plurality of diesel generator sets are provided on the ship. The generator 10 is connected to the ship power grid through a line, the ship main engine is connected to the propulsion motor 11 through a line, and the propulsion motor 11 is connected to the propeller 12 through a transmission shaft.
[0036] The refrigerant heat exchanger 5, the cylinder jacket water heater 6, and the circulation pump 7 are sequentially connected through pipelines to form a circulation pipeline.
[0037] In the excess BOG utilization system, a pipeline is provided below the boiler 13 and connected to an outlet of the BOG three-way valve 4 , and a pipeline is provided above the boiler 13 and connected to the steam turbine 14 . The steam turbine 14 is connected to the compressor 15 via a transmission shaft.
[0038] In the flue gas energy storage system, the diesel engine 9 is connected to the flue gas four-way valve 17 through a pipeline, and the three outlets of the flue gas four-way valve 17 are respectively connected to the seawater cooling unit 18, the three-stream heat exchanger 20, and the atmosphere. The smoke exhaust port above the boiler 13 is connected to the check valve 23 through a pipeline, and the check valve 23 is connected to the pipeline between the flue gas four-way valve 17 and the seawater cooling unit 18 through a pipeline. The function of the seawater cooling unit 18 is to use seawater to cool the high-temperature flue gas and remove most of the water vapor contained in the flue gas. The seawater cooling unit 18 is connected to the filtering and separation unit 19, the compressor 15, and the flue gas energy storage tank 16 through a pipeline in sequence, wherein the function of the filtering and separation unit 19 is to filter out impurities in the flue gas and separate a small amount of water vapor and dust still contained in the flue gas. The flue gas energy storage tank 16 is a high-pressure resistant tank.
[0039] In the flue gas energy release system, the flue gas energy storage tank 16 is connected to the three-stream heat exchanger 20 and the expander 21 in sequence through pipelines, the expander 21 is connected to the expansion generator 22 through a transmission shaft, and the expansion generator 22 is connected to the ship power grid through a signal. The two inlets of the three-stream heat exchanger 20 are respectively connected to the flue gas four-way valve 17 and the steam generated by the boiler 13, wherein the function of the three-stream heat exchanger 20 is to heat the flue gas, so that the inlet flue gas temperature of the expander 21 is increased, thereby increasing the output power of the expander 21. The heating source of the three-stream heat exchanger 20 comes from the flue gas of the diesel engine 9 of the flue gas four-way valve 17 or the steam generated by the boiler 13. Generally, the two heating sources are not used at the same time.
[0040] In the inerting unit 24, the inerting unit 24 is connected to the flue gas energy storage tank 16 through a pipeline. The inerting unit 24 is a low-temperature pipe system and equipment on the ship that needs to be inerted at normal temperature or a temperature between 0°C and -60°C.
[0041] When the ship is sailing at a normal speed, the BOG in the LNG cargo tank 1 reaches the compressor 3 through the BOG exhaust valve 2. The BOG is pressurized under the action of the compressor 3. At this time, the outlet of the BOG three-way valve 4 connected to the boiler 13 is closed, and the outlet connected to the refrigerant heat exchanger 5 is opened. The pressurized BOG enters the refrigerant heat exchanger 5. At the same time, the cylinder jacket heating water enters the cylinder jacket water heater 6 to exchange heat with the refrigerant. The refrigerant circulates under the action of the circulating pump 7. The refrigerant absorbs the heat of the cylinder jacket water to heat the BOG entering the refrigerant heat exchanger 5. At this time, the diesel engine intake valve 8 is opened, and the heated BOG is sent to the diesel engine 9 for combustion. Then the diesel engine 9 drives the generator 10 to generate electricity, and the generated electricity is sent to the ship's power grid. The ship's power grid supplies power to the propulsion motor 11, and then the propulsion motor 11 drives the propeller 12 to rotate to provide power for the ship.
[0042] When the ship is sailing at low load, maneuvering or anchoring, the BOG in the LNG cargo tank 1 reaches the compressor 3 through the BOG exhaust valve 2, and the BOG is pressurized under the action of the compressor 3. At this time, the propulsion power required by the ship is small, and the two outlets of the BOG three-way valve 4 are both opened. A part of the BOG is sent to the diesel engine 9 for combustion through the refrigerant heat exchanger 5 and the diesel engine intake valve 8, and then the diesel engine 9 drives the generator 10 to generate electricity, and the generated electric energy is sent to the ship power grid. The ship power grid supplies power to the propulsion motor 11, and then the propulsion motor 11 drives the propeller 12 to rotate to provide power for the ship; the other part of the remaining BOG is sent to the boiler 13 for combustion, and the flue gas generated by the boiler 13 enters the seawater cooling unit 18 through the check valve 23. At the same time, the outlet of the flue gas four-way valve 17 connected to the seawater cooling unit 18 is opened, and the other two outlets are closed. The flue gas generated by the diesel engine 9 is merged with the flue gas from the boiler 13 through the flue gas four-way valve 17 and enters the seawater cooling unit 18 for cooling and removal of most of the water vapor contained in the flue gas. Then the flue gas enters the filtering and separation unit 19, where impurities in the flue gas are filtered out and a small amount of water vapor and dust still contained in the flue gas are separated. After the flue gas is cooled, filtered and separated, its main component is CO2. Then the flue gas enters the compressor 15 and is compressed into a high-pressure state. The compressor 15 is driven by the steam turbine 14. The steam generated by the boiler 13 enters the steam turbine 14. The steam turbine 14 converts the thermal energy of the steam into rotational mechanical energy, which directly drives the compressor 15 to compress the flue gas. After the flue gas is compressed in the compressor 15, it will not only generate heat to cause the temperature to rise, but also generate some water vapor. Therefore, the seawater cooling unit 18 is used to cool the compressed flue gas again and remove water vapor. Finally, the flue gas is stored in the flue gas energy storage tank 16. The present invention utilizes the boiler 13, the compressor 15, the flue gas energy storage tank 16 and other devices to convert the energy of the excess BOG into the pressure energy of the flue gas, thereby avoiding the serious waste of energy caused by treating the excess BOG in a simple manner such as GCU combustion or direct discharge under the working conditions of low load of the ship.
[0043] The flue gas stored in the flue gas energy storage tank 16 of the present invention can be used in various working conditions, for example: to power the ship's power plant when the ship is sailing at high load, to power the unloading system when the ship arrives at the unloading port to unload, and as an inert gas for the ship's inerting system.
[0044] The first case: when the ship is sailing at a high load, after the BOG in the LNG liquid cargo tank 1 is consumed, the flue gas energy release system is turned on, and the flue gas energy release system continues to provide power for the ship. The specific working process is: the high-pressure flue gas in the flue gas energy storage tank 16 enters the three-stream heat exchanger 20 for heating. At this time, the heat source of the three-stream heat exchanger 20 uses the flue gas of the diesel engine 9, the outlet of the flue gas four-way valve 17 connected to the three-stream heat exchanger 20 is opened, and the other two outlets are closed. The high-temperature flue gas of the diesel engine 9 enters the three-stream heat exchanger 20 to heat the high-pressure flue gas coming out of the flue gas energy storage tank 16, and then the high-temperature flue gas expands and works in the expander 21. The expander 21 drives the expansion generator 22 through the transmission shaft to work and generate electricity. The generated electric energy is incorporated into the ship's power grid, and then the ship's power grid supplies power to the propulsion motor 11, and the propulsion motor 11 drives the propeller 12 to rotate to provide power for the ship.
[0045] LNG ships generally have a high speed during normal navigation, that is, LNG ships are in a high-load navigation state most of the time during normal navigation. Under this operating condition, the BOG in the LNG cargo tank 1 can usually be completely consumed by the diesel engine 9. However, ships often have to navigate in various operating conditions, such as encountering extreme weather such as wind and waves, fog, passing through narrow channels or shallow waters, entering and leaving ports through channels, loading and unloading at ports, etc. Therefore, it is impossible for ships to continue to maintain a high-load navigation state. Under such operating conditions, ships must navigate at low load, maneuver or anchor. The present invention compresses and stores the flue gas emitted by the diesel engine 9 and the boiler 13 when the ship is navigating at low load, anchoring or maneuvering, thereby realizing the energy storage of the flue gas. When the ship is navigating at high load and the BOG cannot meet the fuel demand of the ship, the high-pressure flue gas stored in the flue gas energy storage tank 16 is preferentially released to generate electricity, thereby realizing the energy release of the flue gas, thereby supplementing the electricity demand for the ship's electric propulsion. In addition, since the navigation conditions of the ship are very complicated and the speed of the ship may change frequently, the smoke energy storage tank 16 plays a regulating role in the complicated navigation conditions. The present invention collects the energy of the smoke when the ship is sailing at a low speed, and releases the energy when the ship is sailing at a high speed. In this process, the smoke energy storage tank 16 can be recycled. Therefore, the number and volume of the smoke energy storage tank 16 do not need to be set too large, thereby saving the space for setting the smoke energy storage tank 16 on the ship, so the present invention has very good engineering value.
[0046] The second situation: when the ship arrives at the unloading port to unload, the flue gas energy release system is turned on, and the high-pressure flue gas in the flue gas energy storage tank 16 enters the three-stream heat exchanger 20 for heating. At this time, the heat source of the three-stream heat exchanger 20 uses the steam of the boiler 13, and then the flue gas expands in the expander 21 to do work. The expander 21 drives the expansion generator 22 through the transmission shaft to do work and generate electricity. The generated electric energy is incorporated into the ship's power grid, and then provides power for the unloading pump.
[0047] This system stores flue gas energy when the ship is sailing at low load, anchored or maneuvering, and uses the boiler 13, compressor 15, flue gas energy storage tank 16 and other devices to convert the excess BOG energy into the pressure energy of the flue gas. When the ship arrives at the unloading port to unload or sails at high load, the flue gas energy is released, which actually realizes the energy reuse of BOG.
[0048] The third situation: when the low-temperature pipe system and equipment on the ship at normal temperature or within 0℃~-60℃ need to be inerted, the flue gas in the flue gas energy storage tank 16 is sent to the inerting unit 24 for inerting. Before the LNG supply pipe system is fed with fuel, or when the equipment connected to the LNG supply pipe system is overhauled, it is usually necessary to use inert gas for inerting, but the cost of inert gas production by the inert gas generator on the ship is relatively high. Before the LNG is supplied to the diesel engine 9, it needs to be heated and vaporized to about 20℃~45℃, and the pipe system through which the vaporized LNG flows becomes a normal temperature pipe system. The main component of the flue gas in the flue gas energy storage tank 16 of the present invention is CO2, which can be used as an inert gas for the inerting of the above normal temperature pipe system. In addition, the present invention can also be applied to the inerting of low-temperature pipe systems and equipment with a temperature between 0℃~-60℃, but cannot be applied to the inerting of low-temperature pipe systems and equipment with a temperature below -60℃, so as to avoid the formation of dry ice by CO2 at too low a temperature to block the pipeline. By adopting the present invention, the cost of producing inert gas on ships can be greatly saved.
[0049] The above is only a preferred embodiment of the present invention. The specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A system for treating excess BOG on an LNG ship, characterized by: The system comprises an LNG cargo tank (1), a BOG exhaust valve (2), a compressor (3), a BOG three-way valve (4), a refrigerant heat exchanger (5), a cylinder jacket water heater (6), a circulating pump (7), a diesel engine intake valve (8), a diesel engine (9), a generator (10), a propulsion motor (11), a propeller (12), a boiler (13), a steam turbine (14), a compressor (15), a flue gas energy storage tank (16), a flue gas four-way valve (17), a seawater cooling unit (18), a filtering and separating unit (19), a three-stream heat exchanger (20), an expander (21), an expansion generator (22), a check valve (23), and an inerting unit (24). The LNG cargo tank (1), the BOG exhaust valve (2), the compressor (3), and the BOG three-way valve (4) are connected in sequence through pipelines. A pipeline is provided below the boiler (13) and is connected to an outlet of the BOG three-way valve (4). A pipeline is provided above the boiler (13) and is connected to a steam turbine (14). The steam turbine (14) is connected to a compressor (15) through a transmission shaft. The diesel engine (9), the flue gas four-way valve (17), and the seawater cooling unit (18) are sequentially connected via pipelines; the boiler (13), the check valve (23), and the seawater cooling unit (18) are sequentially connected via pipelines; the seawater cooling unit (18) is sequentially connected to the filtering and separation unit (19), the compressor (15), and the flue gas energy storage tank (16) via pipelines. The flue gas energy storage tank (16) is connected to the three-stream heat exchanger (20) and the expander (21) in sequence through pipelines; the expander (21) is connected to the expansion generator (22) through a transmission shaft; and the expansion generator (22) is connected to the ship power grid through a signal. The flue gas energy storage tank (16) is connected to the inerting unit (24) via a pipeline.
2. The system for treating excess BOG on an LNG ship according to claim 1, characterized in that: When the ship is sailing at low load, maneuvering or anchoring, the energy of BOG is converted into the pressure energy of flue gas and stored by using boiler (13), steam turbine (14), compressor (15), flue gas energy storage tank (16), flue gas four-way valve (17), seawater cooling unit (18), filtration and separation unit (19) and check valve (23). When the ship is sailing at a high load or unloading at a unloading port, the pressure energy of the flue gas in the flue gas energy storage tank (16) is released and converted into electrical energy and sent to the ship's power grid.
3. The system for treating excess BOG on an LNG ship according to claim 1, characterized in that: The inerting unit (24) is a low-temperature piping system and equipment on the ship that needs to be inerted at normal temperature or a temperature between 0°C and -60°C.
4. The system for treating excess BOG on an LNG ship according to claim 1, characterized in that: The two inlets of the three-stream heat exchanger (20) are respectively connected to the flue gas four-way valve (17) and the steam generated by the boiler (13).
5. The system for treating excess BOG on an LNG ship according to claim 1, characterized in that: The flue gas energy storage tank (16) is a high-pressure resistant storage tank.
Citation Information
Patent Citations
A new flue gas co2 capture process using the cryogenic method
CA3171526A1
BOG treatment system of LNG transport ship
CN112648530A
BOG comprehensive utilization system for LNG receiving station
CN112963732A
System for capturing CO2 to replace inert gas by LNG (Liquefied Natural Gas) power super oil tanker
CN116241793A
BOG treatment system for ship LNG fuel cabin
CN116639237A
