Power distribution network multi-time scale state estimation method considering intelligent electric meter

By obtaining and updating the measurement data of the distribution network, judging whether it is synchronous or asynchronous, and establishing a state estimation model based on the measurement weight, it solves the problem of difficulty in accurately estimating voltage and phase angle by smart meters and SCADA systems in the distribution network, and achieves More accurate and stable state estimation.

CN118777729APending Publication Date: 2024-10-15HOHAI UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410750265.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

In the existing distribution network, smart meters and SCADA systems are difficult to accurately estimate voltage and phase angle, mainly due to data asynchrony and uncertainty in measurement data.

Method used

By obtaining the distribution network parameter data and the latest measurement data, it is judged whether the data is synchronous or asynchronous, and updated according to the measurement weight, a distribution network state estimation model is established, and the voltage and phase angle are calculated.

Benefits of technology

It effectively solves the problem that asynchronous measurement data cannot estimate the state of the distribution network, improves the accuracy and stability of state estimation, reduces errors, and significantly improves the voltage and phase angle tracking effects of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118777729A_ABST
    Figure CN118777729A_ABST
Patent Text Reader

Abstract

The invention relates to a power distribution network multi-time scale state estimation method considering an intelligent electric meter, and belongs to the technical field of power systems, and the method comprises the following steps: S1, obtaining parameter data of a power distribution network; s2, acquiring latest measurement data of the SCADA system and the intelligent electric meter at each branch or node; s3, obtaining the updating time of each branch and node in the power distribution network, and judging whether the data is synchronous data or asynchronous data; s4, for any SCADA system or intelligent electric meter, if the data is asynchronous data, updating the measurement weight; if the data are synchronous data, the measurement weight is not updated; and S5, establishing a power distribution network state estimation model, and calculating the state of the power distribution network according to the measurement weight in the step S4. According to the estimation method, the voltage amplitude and the voltage phase angle of the power distribution network can be calculated when the updating moments of the SCADA system and the intelligent electric meter are not synchronous.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power systems, and in particular relates to a multi-time scale state estimation method for a distribution network taking smart meters into account. Background Art

[0002] In recent years, with the widespread application of new energy, the penetration rate of distributed power sources has continued to increase, which has brought great uncertainty to the safe and stable operation of the distribution network. Therefore, it is necessary to be able to fully and accurately calculate the various electrical quantities of the distribution network.

[0003] The existing distribution network mainly includes SCADA system (SCADA system is a data acquisition and monitoring system) and smart meters. It is difficult to calculate the voltage and phase angle of the distribution network by relying on smart meters and SCADA system. The reasons are:

[0004] 1. The data uploaded by smart meters and SCADA systems are not synchronized;

[0005] Second, it is difficult to determine the accurate measurement data at a certain moment. Summary of the invention

[0006] The present invention provides a multi-time scale state estimation method for a distribution network taking into account smart meters to overcome the above disadvantages.

[0007] In order to achieve the above object, a multi-time scale state estimation method for a distribution network taking into account smart meters of the present invention comprises the following steps:

[0008] S1: Obtain parameter data of the distribution network;

[0009] S2: Obtain the latest measurement data from the SCADA system and smart meters at each branch or node;

[0010] S3: Obtain the update time of each branch and node in the distribution network, and determine whether it is synchronous data or asynchronous data;

[0011] S4: For any SCADA system or smart meter, if it is asynchronous data, update the measurement weight; if it is synchronous data, do not update the measurement weight;

[0012] S5: Establish a distribution network state estimation model and calculate the state of the distribution network according to the measurement weights in S4.

[0013] Furthermore, step S3 includes the following steps:

[0014] S2.1: Assume that the update time of the measurement data of the SCADA system on a distribution network branch is t1;

[0015] S2.2: Calculate the difference between other branches or nodes and the update time t1;

[0016] The formula is: Δt = t1-tp; tp is the update time of other branches or nodes;

[0017] S2.3: Determine whether it is synchronous data or asynchronous data;

[0018] If |Δt|≤R holds, it is synchronous data; otherwise, it is asynchronous data.

[0019] Furthermore, in step S4, the update formula of the measurement weight is:

[0020]

[0021] Among them, w μ is the measurement weight of other branches or nodes after adjustment, that is, is the measurement weight of other branches or nodes after μth update; w μ-1 is the measurement weight of other branches or nodes before adjustment, that is, the measurement weight of other branches or nodes after μ-1th update; λ is the proportional coefficient;

[0022] Among them, the initial weight is:

[0023] w 0 =1 / σ p 2 ;

[0024] In the formula, σ p 2 These are instrument parameters of other branches or nodes, which are known values.

[0025] Furthermore, in step S5, the objective function of the distribution network state estimation model is:

[0026]

[0027] The constraints are:

[0028] zi,sm=h(x)+ri,sm;

[0029] zj,scada=h(x)+rj,scada;

[0030] Where x is an n-dimensional vector consisting of the voltage amplitude and phase angle of each node in the distribution network.

[0031] w i,sm is the weight of the i-th smart meter measurement data in state estimation;

[0032] r i,sm is the difference between the measured value and the calculated value of the i-th smart meter measurement data;

[0033] w j,scadais the measurement weight of the j-th SCADA system measurement data in state estimation;

[0034] r j,scada is the difference between the measured value and the calculated value of the jth SCADA measurement data;

[0035] h(x) is the calculated value of the measured data;

[0036] Z i,sm is the measured value of the i-th smart meter measurement data; Z j,scada is the measurement value of the jth SCADA measurement data.

[0037] Further, in step S3, R=1 second.

[0038] Beneficial effects:

[0039] This method incorporates asynchronous measurement data into the distribution network state estimation model after updating the weights, solving the problem that the asynchronous measurement data cannot estimate the distribution network state. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 is a flow chart of this application;

[0041] Figure 2 This is the structural diagram of a simple distribution network;

[0042] Figure 3 This is the IEEE13 node example diagram;

[0043] Figure 4 is the system voltage amplitude tracking curve under different weight coefficients; Figure 4 (a) is the error distribution when the time section is 15 minutes and the weight coefficient is 1; Figure 4 (b) is the error distribution when the time section is 15 minutes and the weight coefficient is 1 / 4; Figure 4 (c) is the error distribution when the time section is 15 minutes and the weight coefficient is 1 / 3; Figure 4 (d) is the error distribution when the time section is 15 minutes and the weight coefficient is 1 / 5;

[0044] Figure 5 is the average absolute error of the voltage amplitude and voltage phase angle at each time section; Figure 5 (a) is the time section curve of phase A voltage increase over time section when the time section is 0-3min; Figure 5 (b) is the time section curve of phase B voltage increase over time section when the time section is 0-3min; Figure 5 (c) is the time section curve of phase C voltage increase over time section when the time section is 0-3min; Figure 5(d) is the multi-time section curve of the voltage phase angle of phase A during the time section 0-3min; Figure 5 (e) is the multi-time section curve of the voltage phase angle of phase B during the time section 0-3min; Figure 5 (f) is the multi-time section curve of phase angle of phase C voltage when the time section is 0-3min;

[0045] Figure 6 is the average absolute error of the voltage amplitude and voltage phase angle of each section; Figure 6 (a) is the mean absolute error of the voltage amplitude at each time section; Figure 6 (b) Average absolute error of voltage phase angle at each time section;

[0046] Figure 7 is the node example diagram;

[0047] Figure 8 This is a comparison diagram of the voltage amplitude and phase angle mean absolute error distribution between this method and the WLS method; Figure 8 (a) is a comparison diagram of the mean absolute error distribution of voltage amplitude; Figure 8 (b) is a comparison diagram of the mean absolute error distribution of voltage phase angle. DETAILED DESCRIPTION

[0048] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] Embodiment 1:

[0050] See Figure 1 , a multi-time scale state estimation method for a distribution network taking into account smart meters, comprising the following steps:

[0051] S1: Obtain parameter data of the distribution network.

[0052] The parameter data includes: how many nodes there are in the distribution network; how many branches there are in the distribution network; the impedance of each branch; the impedance angle of each branch, etc.

[0053] See Figure 2 In this embodiment, in a certain simple distribution network, there are three nodes: node A, node B, and node C; and two branches: branch AB and branch BC.

[0054] Node A, Node B, and Node C are each equipped with a smart meter as a measurement point;

[0055] Branch AB and branch BC are each equipped with a SCADA system as a measurement point.

[0056] S2: Obtain the latest measurement data from the SCADA system and smart meters at each branch or node.

[0057] The measured data include: the active power and reactive power of the branch where the SCADA system is located; the active power and reactive power of the node where the smart meter is located.

[0058] In this embodiment, the latest measurement data uploaded by the smart meters at nodes A, B, and C are: [P1, Q1], [P2, Q2], [P3, Q3] respectively;

[0059] The latest measurement data uploaded by the SCADA system at branch AB and branch BC are: [P11, Q11], [P22, Q22] respectively.

[0060] S3: Obtain the update time of each branch and node in the distribution network, and determine whether it is synchronous data or asynchronous data;

[0061] Because the SCADA system uploads data every 2-5 minutes and the smart meter uploads data every 15-60 minutes, the update time of the SCADA system and the smart meter (ie, the time when the latest measurement data is uploaded in S2) is often different.

[0062] See Figure 2 , assuming that the update time of the measurement data of the SCADA system on the distribution network branch AB is t1;

[0063] Assume that the measurement data update times of other branches and nodes of the distribution network are t2-t5 respectively;

[0064] The update time tp (t2≤tp≤t5) of other branches and nodes is compared with the update time t1 of the measurement data of the SCADA system on branch AB. If the difference is within the threshold R, the measurement data of the SCADA system or the smart meter is considered to be synchronous data with the measurement data of the SCADA system on branch AB; otherwise, the measurement data of the SCADA system or the smart meter is considered to be asynchronous data with the measurement data of the SCADA system on branch AB.

[0065] In this embodiment, the threshold value R is 1 second.

[0066] The formula is: Δt = t1-tp. If |Δt|≤R holds, it is synchronous data; otherwise, it is asynchronous data.

[0067] S4: For any SCADA system or smart meter, if it is asynchronous data, update the measurement weight; if it is synchronous data, do not update the measurement weight;

[0068] The calculation formula of measurement weight is:

[0069]

[0070] Among them, w μ The measurement weights of other branches or nodes after adjustment; w μ-1 The measurement weights before adjustment for other branches or nodes;

[0071] Among them, the initial weight is:

[0072] w 0 =1 / σ p 2 ;

[0073] In the formula, σ p 2 is the instrument parameter of other branches or nodes, which is a known value. The instrument parameters of each branch or node are different. The weight is updated once it is calculated. μ-1 The weights of other branches or nodes after iteration μ-1 times are considered as known values.

[0074] λ is the proportionality coefficient, which is obtained from the test before the system operation and is a known constant; Δt is the difference between the measurement data update time tp of a branch or node and the measurement data update time t1 of the SCADA system on branch AB.

[0075] S5: Establish a distribution network state estimation model and calculate the state of the distribution network according to the measurement weights in S4.

[0076] The objective function of the state estimation model is:

[0077]

[0078] The constraints are:

[0079] z i,sm =h(x)+r i,sm ;

[0080] z j,scada =h(x)+r j,scada ;

[0081] Where x is an n-dimensional vector consisting of the voltage amplitude and phase angle of each node in the distribution network.

[0082] w i,sm is the measurement weight of the i-th smart meter measurement data in state estimation;

[0083] r i,sm is the difference between the measured value and the calculated value of the i-th smart meter measurement data;

[0084] w j,scada is the measurement weight of the j-th SCADA system measurement data in state estimation;

[0085] r j,scada is the difference between the measured value and the calculated value of the jth SCADA measurement data;

[0086] h(x) is the calculated value of the measured data;

[0087] Z i,sm is the measured value of the i-th smart meter measurement data; Z j,scada is the measurement value of the jth SCADA measurement data.

[0088] For an example of S5, see Figure 2 In this embodiment,

[0089] The known measurement data are:

[0090] The quantity to be determined (i.e. the calculated value in S5) is:

[0091] Based on Kirchhoff's law, the above formula (1) is expanded to calculate Figure 2 The active power and reactive power of each branch where the SCADA system is located; the active power and reactive power of each node where the smart meter is located;

[0092] That is, the following measurement data values ​​are calculated:

[0093]

[0094] From this, the difference can be calculated:

[0095]

[0096] In the formula, r(x) includes the difference between the measured and calculated values ​​of all SCADA systems and smart meters. Substitute formula (2) into the objective function. There are ten equations in formula (2), which can solve the six unknowns in formula (1), so the objective function must have a solution.

[0097] Therefore, x can be solved; x includes the voltage amplitude and voltage phase angle, that is, the most reasonable voltage amplitude and voltage phase angle are solved.

[0098] Embodiment 2:

[0099] In this embodiment, the performance of the algorithm of the present application is tested in a three-phase asymmetric IEEE13 system and an actual 57-node distribution network in a certain area.

[0100] The measured data is generated by adding Gaussian noise to the true value of the power flow.

[0101] The error of the branch active power-reactive power measurement information uploaded by the SCADA system is Gaussian noise with a mean of 0 and a standard deviation of 0.005.

[0102] The error of the node-injected active power and reactive power measurement information uploaded by the smart meter is: Gaussian noise with a mean of 0 and a standard deviation of 0.01.

[0103] See Figure 3 , assume that all load nodes are equipped with smart meters; branch 1-2, branch 2-7, and branch 7-12 are equipped with SCADA systems. Set the measurement weight to the inverse of the square of the measurement standard deviation, that is:

[0104] w i =1 / σ i 2 ;

[0105] In the formula, w i is the measurement weight of the SCADA system or smart meter, i=1 or i=2. 1 is the measurement weight of the SCADA system; w 2 is the measurement weight of the smart meter. i is the standard deviation of the SCADA system or smart meter, σ=1 or σ=2; σ 1 is the standard deviation of the SCADA system; 2 is the standard deviation of the smart meter.

[0106] x can be calculated by the method of Example 1; to verify the accuracy of the method proposed in this application, the average absolute error of the node voltage amplitude and voltage phase angle in x and the maximum average absolute error under multiple time sections are used to measure the effect of the method proposed in this application in state perception.

[0107] First, the IEEE13 node system test is carried out.

[0108] In order to demonstrate the accuracy of the algorithm proposed in this application, the tracking of the voltage amplitude and phase angle at the time of updating the smart meter with a 15-minute time section update cycle is shown. In order to reflect the superiority of the method of this application, the WLS (weighted least squares) state estimation is used as a comparison algorithm, and the historical measurement weights are not adjusted.

[0109] Figure 4 The voltage amplitude tracking curves of multiple time sections under different weight ratio coefficients of the method proposed in this application are shown. Figure 4 (a) Figure 4(c) It can be seen that when the weight coefficient is 1 and 1 / 3, the estimation error of some time sections is larger than that of the true value curve. Figure 4 (b) Figure 4 (d) It can be seen that as the weight coefficient decreases, the error of the method of the present application decreases and the stability is improved.

[0110] To demonstrate the stability of the algorithm proposed in this application, this section tests the tracking performance of the algorithm in this application on the system state under 1057 measurement update time sections in one day. In order to ensure the estimation accuracy, the weight coefficient is determined to be 1 / 5.

[0111] Figure 5 The three-phase voltage amplitude and phase angle multi-time section tracking at node 2 are shown. Figure 5 It can be seen that the algorithm proposed in this application has a good tracking effect on the system voltage amplitude and phase angle in 1057 time sections in one day, which means that the algorithm proposed in this application can effectively integrate asynchronous measurement data and effectively shorten the state estimation cycle.

[0112] In order to verify the robustness of the method proposed in this application, the estimation effect of the measured data under bad data conditions is tested. The bad data scenario is: the noise of the active and reactive power measurement of node 2 is Gaussian noise with a mean of 0 and a variance of 3%.

[0113] Figure 6 The mean absolute error of voltage amplitude and phase angle of the algorithm proposed in this paper and the WLS comparison algorithm at each time section in a cycle of smart meter update is shown. The measurement weight of the WLS comparison algorithm remains unchanged in each estimation. Figure 6 It can be seen that when there is bad data measurement, the error histogram of the method proposed in this application is smaller than the histogram based on the WLS comparison algorithm, so it has a better estimation effect on the system status at each SCADA measurement update moment.

[0114] Secondly, a 57-node system test was conducted in a certain area.

[0115] It is assumed that all load nodes are equipped with smart meters, which can collect active power and reactive power measurements of all load nodes, and 30% of the branches are equipped with SCADA measurement equipment, which can collect active power and reactive power measurements of the branches. Figure 7 As shown. The weight ratio coefficient is set to 1 / 7 to ensure the accuracy of the estimation. In order to reflect the superiority of the method proposed in this application, the state estimation algorithm based on WLS, which is performed every 15 minutes, is used as a comparison algorithm.

[0116] Figure 8The box plots of the voltage amplitude and phase angle mean absolute error distribution of the present invention and the WLS-based comparison algorithm at the time of smart meter measurement update within one day are shown. Figure 8 It can be seen that the error distribution range of the algorithm of the present application is significantly smaller than that of the comparison algorithm based on WLS, which indicates that the algorithm proposed in the present application can effectively combine historical measurement information at the time of state estimation to ensure the ability to perceive the system state.

[0117] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A multi-time scale state estimation method for a distribution network taking into account smart meters, characterized in that: The following steps are involved: S1: Obtain parameter data of the distribution network; S2: Obtain the latest measurement data from the SCADA system and smart meters at each branch or node; S3: Obtain the update time of each branch and node in the distribution network, and determine whether it is synchronous data or asynchronous data; S4: For any SCADA system or smart meter, if it is asynchronous data, update the measurement weight; If the data is synchronized, the measurement weight is not updated; S5: Establish a distribution network state estimation model and calculate the state of the distribution network according to the measurement weights in S4.

2. A method for multi-time scale state estimation of a distribution network taking into account smart meters according to claim 1, characterized in that: Step S3 includes the following steps: S2.1: Assume that the update time of the measurement data of the SCADA system on a distribution network branch is t1; S2.2: Calculate the difference between other branches or nodes and the update time t1; The formula is: Δt = t1-tp; tp is the update time of other branches or nodes; S2.3: Determine whether it is synchronous data or asynchronous data; If |Δt|≤R holds, it is synchronous data; otherwise, it is asynchronous data.

3. A method for multi-time scale state estimation of a distribution network taking into account smart meters according to claim 2, characterized in that: In step S4, the update formula of the measurement weight is: Among them, w μ is the measurement weight of other branches or nodes after adjustment, that is, is the measurement weight of other branches or nodes after μth update; w μ-1 is the measurement weight of other branches or nodes before adjustment, that is, the measurement weight of other branches or nodes after μ-1th update; λ is the proportional coefficient; Among them, the initial weight is: w0=1 / σ p 2 ; In the formula, σ p 2 These are instrument parameters of other branches or nodes, which are known values.

4. A method for multi-time scale state estimation of a distribution network taking into account smart meters according to claim 3, characterized in that: In step S5, the objective function of the distribution network state estimation model is: The constraints are: z i,sm =h(x)+r i,sm ; z j,scada =h(x)+r j,scada ; Where x is an n-dimensional vector consisting of the voltage amplitude and phase angle of each node in the distribution network. w i,sm is the weight of the i-th smart meter measurement data in state estimation; r i,sm is the difference between the measured value and the calculated value of the i-th smart meter measurement data; w j,scada is the measurement weight of the j-th SCADA system measurement data in state estimation; r j,scada is the difference between the measured value and the calculated value of the jth SCADA measurement data; h(x) is the calculated value of the measured data; Z i,sm is the measured value of the i-th smart meter measurement data; Z j,scada is the measurement value of the jth SCADA measurement data.

5. The method for multi-time scale state estimation of a distribution network taking into account smart meters according to claim 2, characterized in that: In step S3, R=1 second.