Path planning method and system for realizing intention-driven network, electronic equipment and storage medium
Through the path planning method of the intent-driven network, combined with the BFS and DP algorithms, the problem of low quality of path planning in the existing technology is solved, and end-to-end path planning under efficient and multi-constraint conditions is realized, improving the services of the core network network. ability.
Patent Information
- Application Number
- CN202411072221.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-10-15
AI Technical Summary
The existing intent-driven network has low path planning quality and weak QoS control capabilities in the core network environment. It is difficult to provide fine-grained control of individual applications or services, and cannot effectively handle dynamic environment changes.
Using the path planning method of intent-driven network, the SDN controller receives and parses path calculation requests, obtains the global topology matrix diagram, and combines BFS and DP algorithms to calculate available paths that meet multiple constraints, including service quality, reachability, and recommendability. Intent, to achieve high-quality end-to-end path planning.
It improves the quality and efficiency of path planning, can calculate 100,000+ paths within 200ms, meets multiple constraints such as bandwidth and delay, provides high-quality dedicated line services, is suitable for diverse business scenarios, and reduces operation and maintenance complexity.
Smart Images

Figure CN118784552A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of computer technology, and in particular to a path planning method, system, electronic device and storage medium for implementing an intent-driven network. Background Art
[0002] "A set of operational goals that the network should meet and the results that the network should deliver, defined in a declarative way without specifying how to achieve or implement them", where intent is "an abstract high-level strategy for operating a network", which is the IETF's definition of intent-driven networking. We generally believe that with the implementation and application of SDN (software-defined network) technology, intent-driven networking, as a more advanced form of network orchestration, has a foundation for implementation. Many network equipment providers and network operators have proposed solutions for intent-driven networking, which can be roughly divided into four parts from the perspective of architecture:
[0003] 1. Translation and verification: The system obtains the QoE (Quality of Experience) policy from the user side, converts it into a QoS (Quality of Service) policy and verifies its correctness.
[0004] 2. Automated implementation: The system can configure the user's network changes on the existing network infrastructure, usually automatically orchestrated using an SDN controller.
[0005] 3. Network status perception: The system obtains the real-time network status under its management state and dynamically adjusts user configuration according to the network status.
[0006] 4. Assurance and automated optimization / remediation: The system continuously verifies that the original business intent is being achieved and can take corrective action when the desired intent cannot be achieved.
[0007] However, the existing discussion on "intent-driven networking" mainly has the following problems:
[0008] 1. Weak QoS control capability. Simply translating the user's QoE strategy into a routing strategy and relying on the IP protocol to provide QoS capabilities has some defects. For example, it is impossible to provide QoS control at the lower data link layer or the higher application layer, and it is difficult to provide fine-grained control of a single application or service; it is difficult to handle dynamic environments. When the network status changes, such as traffic bursts or topology changes, IP-based QoS will fail; the complexity of configuration and management, complex configuration may lead to errors, increasing the difficulty of operation and maintenance.
[0009] 2. Failure to distinguish the definition and role of intent in different scenarios. Focusing on technical solutions while ignoring the importance of intent itself. Different scenarios, industries, and customer needs have different understandings of intent, so solutions are naturally different. A unified solution cannot solve the needs of various scenarios, and they should be discussed separately. For example, core network users are mainly concerned about network latency, packet loss rate, and availability; while data center networks are mainly concerned about bandwidth, network topology, and high availability.
[0010] The role of intent in path planning algorithms is not clear. Most discussions generally state that AI algorithms are used to parse intent, calculate end-to-end available paths, and monitor network topology status, but there is no clear explanation of which AI algorithm is used, how to parse intent, and how to calculate end-to-end paths. Summary of the invention
[0011] In order to solve the problem of low path planning quality in the relevant intent-driven core network environment, the present invention provides a path planning method, system, electronic device and storage medium for implementing intent-driven network. The method applies intent to the path planning algorithm to calculate the end-to-end available path, improves the quality of path planning, and is highly efficient.
[0012] The embodiment of the present application provides a path planning method for implementing an intent-driven network, which is applied to an SDN controller, including:
[0013] Receive and parse the path calculation request, the parsing result includes the start node, the end node and the constraint set;
[0014] Obtain a global topology matrix diagram, which includes all links and node information of the core network;
[0015] Calculate and obtain available paths based on the starting node, the ending node, the constraint set, and the global topology matrix;
[0016] Returns the available paths.
[0017] The above technical solution is used to provide users with high-quality end-to-end dedicated line services in an intent-driven manner, meet the needs of multi-constraint business scenarios, and provide the optimal path that meets multiple constraints such as bandwidth, latency range, link utilization, number of hops, and link / node must-go. It provides possibilities and imagination space for the expansion of the company's business boundaries and provides a technical foundation for the better implementation of traffic engineering. At the same time, the calculation time of 10w+ available paths between any two points is controlled within 200ms.
[0018] In some embodiments, the constraint set includes at least one of a quality of service intent set, a reachability intent set, and a recommendation intent set; wherein,
[0019] The service quality intention set includes at least one of a bandwidth constraint, a delay constraint, a delay range constraint, a packet loss rate constraint, a link jitter constraint, a link hop count constraint, and a cost constraint;
[0020] The reachability intention set includes at least one of a bandwidth utilization constraint, a must-pass link constraint, a must-pass link constraint, a must-pass node constraint, a must-pass node constraint, a must-pass city constraint, a must-pass city constraint, a must-pass area constraint, a must-pass area constraint, a link disjoint constraint, a node disjoint constraint, a city disjoint constraint, and an area disjoint constraint;
[0021] The recommended intent set includes at least one of a sorting constraint and a top N path constraint.
[0022] In some embodiments, the available paths are calculated based on the start node, the end node, the constraint set, and the global topology matrix, including:
[0023] Pruning step: Generate a pruner based on the constraint set and apply the global topology matrix to the pruner to generate a usable topology;
[0024] Calculation steps: Use the BFS algorithm and DP algorithm to calculate all paths in the available topology that meet the constraint set, and record the paths as candidate paths;
[0025] Verification step: Verify all candidate paths according to the constraint set and discard the candidate paths that do not satisfy the constraint set;
[0026] Sorting and filtering step: Filter and sort all candidate paths obtained in the verification step according to the constraint set to obtain available paths.
[0027] In some embodiments, the BFS algorithm and the DP algorithm are used to calculate all paths in the available topology that satisfy the constraint set, and the paths are recorded as candidate paths, including:
[0028] Based on the location of network element devices in geographic space, the available topology is divided into three levels: region, city, and node. Multiple nodes form a city, multiple cities form a region, and multiple regions form an available topology.
[0029] Apply the BFS algorithm in each level and finally concatenate all candidate paths; and,
[0030] While applying the BFS algorithm, the current path is judged according to the constraint set whether it meets the requirements. If not, it is discarded; if it meets the requirements, the calculation continues.
[0031] By adopting the above technical solution, the available topology levels are divided, and the paths are calculated at each level and the final concatenated paths are calculated, which reduces the amount of algorithm calculation and improves the computing performance. More than 100,000 paths can be calculated within 1 second, meeting the real-time requirements. In addition, by discarding unsatisfied paths in time according to the constraint set while calculating the paths, the amount of algorithm calculation is further reduced, and candidate paths can be calculated faster and better.
[0032] In some embodiments, the sorting and filtering steps include:
[0033] If the constraint set includes a recommended intent set, and the recommended intent set includes a sorting constraint and a top N path constraint; then,
[0034] Sort all candidate paths obtained in the verification step according to the sorting constraints;
[0035] According to the constraint set, all the sorted candidate paths are filtered one by one according to the sorting, and then the first N available paths that meet the conditions are screened out according to the constraint of taking the first N paths, and recorded as available paths.
[0036] The above technical solution takes into account both the computational efficiency and the satisfaction of the constraint set by the final computational result.
[0037] In some embodiments, the available paths are calculated based on the start node, the end node, the constraint set, and the global topology matrix, including:
[0038] Each constraint in the constraint set is classified and / or polled.
[0039] The embodiment of the present application also provides a path planning system for implementing an intent-driven network, which adopts any of the above methods and includes:
[0040] A receiving module, used for receiving a path calculation request sent by a user;
[0041] A parsing module, used for parsing a path calculation request, and the parsing result includes a start node, an end node and a constraint set;
[0042] A topology module is used to obtain a global topology matrix diagram, and the global topology matrix diagram includes all link and node information of the core network;
[0043] A calculation module is used to calculate and obtain available paths according to the starting node, the ending node, the constraint set and the global topology matrix diagram;
[0044] The return module is used to return the available paths to the user.
[0045] An embodiment of the present application also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein any of the above methods is implemented when the processor executes the program.
[0046] An embodiment of the present application also provides a computer-readable storage medium, characterized in that the computer-readable storage medium stores a computer program for executing any of the above methods.
[0047] Other features and corresponding beneficial effects of the present application are described in the latter part of the specification, and it should be understood that at least some of the beneficial effects become obvious from the records in the specification of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] Figure 1 It is a schematic diagram of the method flow of the present invention. DETAILED DESCRIPTION
[0049] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0050] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.
[0051] Embodiment 1:
[0052] like Figure 1 As shown, an embodiment of the present application provides a path planning method for implementing an intent-driven network, which is applied to an SDN controller and can achieve user-level QoS control capabilities. In combination with SR-TE, the path is configured in the form of a label stack, which is easy to control and operate. At the same time, it can realize real-time perception and real-time path scheduling when the network topology state changes.
[0053] The method includes:
[0054] Receive and parse the path calculation request, and the parsing result includes the start node, the end node, and the constraint set. The constraint set refers to the set of user intentions.
[0055] Obtain a global topology matrix diagram, which includes all links and node information of the core network. The global topology matrix diagram can be obtained from the SDN controller. The core network is preferably hierarchical and managed using SR-TE technology.
[0056] The available paths are calculated based on the starting node, the ending node, the constraint set, and the global topology matrix.
[0057] Returns the available paths.
[0058] This method realizes the provision of high-quality end-to-end dedicated line services to users in an intent-driven manner, meets the needs of multi-constraint business scenarios, and provides the optimal path that meets multiple constraints such as bandwidth, latency range, link utilization, number of hops, and link / node must-go. It provides possibilities and imagination space for the expansion of the company's business boundaries and provides a technical foundation for the better implementation of traffic engineering. At the same time, the calculation time of 10w+ available paths between any two points is controlled within 200ms.
[0059] In one embodiment, the constraint set includes at least one of a quality of service intent set, a reachability intent set, and a recommendation intent set.
[0060] 1. Service quality intent, which represents the quality of network transmission performance. The service quality specifically includes parameters such as guaranteed bandwidth, delay / delay range, packet loss rate, jitter, and hop count of the end-to-end path, which are usually input into the system in the form of numerical values.
[0061] 2. Accessibility intention, which represents the user's expectation of the end-to-end path direction. This intention includes the characteristics of the path's necessity and detour as well as its intersection. Specifically, the necessity intention includes that the path must pass through certain links, nodes, cities, and regions; the detour intention includes that the path must bypass certain links, nodes, cities, and regions; and the intersection is reflected in whether different available paths can intersect at the levels of links, nodes, cities, regions, and planes.
[0062] 3. Recommendation intent, which represents the recommendation rules for available paths. The recommendation rules mainly include the sorting rules for available paths and taking the top N available paths.
[0063] Specifically, see Table 1:
[0064] The service quality intention set includes at least one of a bandwidth constraint, a delay constraint, a delay range constraint, a packet loss rate constraint, a link jitter constraint, a link hop count constraint, and a cost constraint.
[0065] The reachability intention set includes at least one of bandwidth utilization constraints, must-pass link constraints, must-circumvent link constraints, must-pass node constraints, must-circumvent node constraints, must-pass city constraints, must-circumvent city constraints, must-pass area constraints, must-circumvent area constraints, link non-intersection constraints, node non-intersection constraints, city non-intersection constraints and area non-intersection constraints.
[0066] The recommended intent set includes at least one of a sorting constraint and a top N path constraint.
[0067] Table 1:
[0068]
[0069]
[0070] In a specific implementation, the constraints are provided to the user in the form of constraint options, and the constraints are derived from end users, operation and maintenance personnel, and system default values.
[0071] In one embodiment, the available paths are calculated based on the start node, the end node, the constraint set, and the global topology matrix, including:
[0072] Pruning step: Generate a pruner based on the constraint set and apply the global topology matrix to the pruner to generate a usable topology.
[0073] For example, if a user wants to open a 10 Gb dedicated line, the constraint BandwidthConstraint(10 Gb) will be converted into the pruner BandwidthClipper(10 Gb) to prune the links with available bandwidth less than 10 Gb.
[0074] Calculation steps: Use the BFS algorithm and DP algorithm (breadth-first search algorithm of dynamic programming) to calculate all paths that meet the constraint set in the available topology, and record the paths as candidate paths.
[0075] Verification step: Verify all candidate paths according to the constraint set and discard the candidate paths that do not satisfy the constraint set.
[0076] For example, taking the must-pass link constraint as an example, check the links that all candidate paths pass through, and discard the paths that do not pass through this / these links.
[0077] The order of all candidate paths obtained in the verification step is out of order, and the constraints between the paths are not verified, so the final filtering and sorting output is performed in the sorting and filtering step.
[0078] Sorting and filtering step: Filter and sort all candidate paths obtained in the verification step according to the constraint set to obtain available paths.
[0079] In one embodiment, the BFS algorithm and the DP algorithm are used to calculate all paths in the available topology that satisfy the constraint set, and the paths are recorded as candidate paths, including:
[0080] According to the location of network element devices in geographic space, the available topology is divided into three levels: region, city, and node. Multiple nodes form a city, multiple cities form a region, and multiple regions form an available topology. For example, it can be divided into three levels: region (for example, CN represents China, US represents the United States, and AP represents the Asia-Pacific region), city (for example, SHA represents Shanghai, SIN represents Singapore), and node (for example, PEK1 represents Beijing 1 computer room), which conforms to the operation and maintenance habits of operation and maintenance personnel, and uses geographic space to divide the levels, which can effectively improve the performance of the DP-BFS algorithm, guide the direction of the business forwarding path, and is especially conducive to the operation and maintenance personnel to plan the traffic in advance.
[0081] The BFS algorithm is applied in each layer and all candidate paths are finally spliced together, thus avoiding the disadvantages of low performance of the BFS algorithm and inability to meet real-time requirements, reducing the amount of algorithm calculation, and improving computing performance. It can calculate more than 100,000 paths within 1 second, meeting real-time requirements.
[0082] Moreover, while applying the BFS algorithm, the current path is judged according to the constraint set whether it meets the requirements. If not, it is discarded; if it meets the requirements, the calculation continues.
[0083] For example, if a user has latency requirements for a dedicated line, the algorithm will dynamically determine whether the current path meets the latency requirements and promptly discard unsatisfactory paths. This can also reduce the amount of computation required by the algorithm and calculate candidate paths faster and better.
[0084] In one embodiment, the sorting and filtering steps include:
[0085] If the constraint set includes a recommended intent set, and the recommended intent set includes a sorting constraint and a top N path constraint; then,
[0086] All candidate paths obtained in the verification step are sorted according to the sorting constraints.
[0087] According to the constraint set, all the sorted candidate paths are filtered one by one according to the sorting, and then the first N available paths that meet the conditions are screened out according to the constraint of taking the first N paths, and recorded as available paths.
[0088] For example, taking ascending order of path delay as an example, the delays of all paths are calculated. In the output candidate path result set, the first path has the smallest delay and the last path has the largest delay. They are arranged in ascending order of path delay.
[0089] Taking the link disjoint constraint as an example, temporarily store all the links that the candidate path passes through into a list, take out a candidate path, and determine whether the links it passes through are in the list. If yes, discard the candidate path; otherwise, add the links of the candidate path to the list.
[0090] Filter out the first N available paths that meet the conditions from the list.
[0091] The above technical solution takes into account both the computational efficiency and the satisfaction of the constraint set by the final computational result.
[0092] In one embodiment, the available paths are calculated based on the start node, the end node, the constraint set, and the global topology matrix, including:
[0093] A combination of classification and polling is used for each constraint in the constraint set. That is, each constraint logically implements multiple interfaces, which are used to generate pruners (for pruning steps) and verifiers (for verification steps) corresponding to the constraint type; in the calculation step, the constraint set is polled to calculate the parameters required by the BFS algorithm, and in the sorting and filtering steps, the constraint set is also polled to find the sorting rules and filtering rules. The combination of classification and polling can improve the accuracy of path planning, avoid the omission of constraints in key steps (such as calculation, sorting, and filtering), and improve the efficiency of path planning by reducing constraint queries in the pruning and verification steps.
[0094] In other alternative embodiments, it also includes:
[0095] Each constraint in the constraint set is assigned to one or more of a pruning rule set, a calculation rule set, a verification rule set, a sorting rule set and a filtering rule set according to preset rules.
[0096] In the pruning step, a pruner is generated according to a set of pruning rules.
[0097] In the calculation step, all paths in the available topology that satisfy the calculation rule set are calculated.
[0098] In the verification step, the validity of all candidate paths is verified according to the verification rule set.
[0099] In the sorting and filtering steps, sorting is performed according to a sorting rule set, and filtering is performed according to a filtering rule set.
[0100] The preset rule may be to set a mapping table for reference table 1 (constraint type) and perform allocation by looking up the table.
[0101] That is, each constraint in the constraint set is classified, thereby greatly improving the efficiency of path planning.
[0102] In other alternative implementations, the method further includes: polling the constraint set during the pruning, calculation, verification, sorting, and filtering steps.
[0103] In one embodiment, the method further includes a conflict detection mechanism, which is used to detect conflicts in real time when external users (end users, operation and maintenance personnel) configure constraint options, and to remind users of conflicts in the form of pop-up windows to guide modifications. For example, the city SHA may appear in both CityIncludeConstraint (the path must pass through Shanghai) and CityExcludeConstraint (the path must bypass Shanghai), resulting in a constraint conflict.
[0104] Embodiment 2:
[0105] On the basis of Example 1, the embodiment of the present application further provides a path planning system for implementing an intent-driven network, which adopts the method of the above Example 1 and includes:
[0106] The receiving module is used to receive the path calculation request sent by the user.
[0107] The parsing module is used to parse the path calculation request, and the parsing result includes a start node, an end node and a constraint set.
[0108] The topology module is used to obtain a global topology matrix diagram, and the global topology matrix diagram includes all link and node information of the core network.
[0109] The calculation module is used to calculate and obtain available paths according to the starting node, the ending node, the constraint set and the global topology matrix diagram.
[0110] The return module is used to return the available paths to the user.
[0111] Embodiment 3:
[0112] An embodiment of the present application also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the method of embodiment 1 is implemented when the processor executes the program.
[0113] Embodiment 4:
[0114] The embodiment of the present application also provides a computer-readable storage medium, characterized in that the computer-readable storage medium stores a computer program for executing the method of embodiment 1.
[0115] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are only schematic. For example, the division of units is only a logical function division. There may be other division methods in actual implementation, such as: multiple units or components can be combined, or can be integrated into another system, or some features can be ignored or not executed. In addition, the coupling, direct coupling, or communication connection between the components shown or discussed can be through some interfaces, and the indirect coupling or communication connection of devices or units can be electrical, mechanical or other forms.
[0116] The units described above as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units; they may be located in one place or distributed on multiple network units; some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0117] In addition, all functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may be separately used as a unit, or two or more units may be integrated into one unit; the above-mentioned integrated units may be implemented in the form of hardware or in the form of hardware plus software functional units.
[0118] Those skilled in the art can understand that: all or part of the steps of implementing the above method embodiments can be completed by hardware related to program instructions, and the aforementioned program can be stored in a computer-readable storage medium. When the program is executed, it executes the steps of the above method embodiments; and the aforementioned storage medium includes: mobile storage devices, read-only memories (ROM, Read-Only Memory), random access memories (RAM, Random Access Memory), disks or optical disks, and other media that can store program codes.
[0119] Alternatively, if the above-mentioned integrated unit of the present invention is implemented in the form of a software function module and sold or used as an independent product, it can also be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the embodiment of the present invention can be essentially or partly reflected in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute all or part of the methods of each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as mobile storage devices, ROM, RAM, magnetic disks or optical disks.
[0120] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art who is familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A path planning method for implementing an intent-driven network, applied to an SDN controller, characterized in that: include: Receive and parse the path calculation request, the parsing result includes the start node, the end node and the constraint set; Obtain a global topology matrix diagram, which includes all links and node information of the core network; Calculate and obtain available paths based on the starting node, the ending node, the constraint set, and the global topology matrix; Returns the available paths.
2. The method for implementing a path planning for an intention-driven network according to claim 1, characterized in that: The constraint set includes at least one of a quality of service intention set, a reachability intention set, and a recommendation intention set; wherein, The service quality intention set includes at least one of a bandwidth constraint, a delay constraint, a delay range constraint, a packet loss rate constraint, a link jitter constraint, a link hop count constraint, and a cost constraint; The reachability intention set includes at least one of a bandwidth utilization constraint, a must-pass link constraint, a must-pass link constraint, a must-pass node constraint, a must-pass node constraint, a must-pass city constraint, a must-pass city constraint, a must-pass area constraint, a must-pass area constraint, a link disjoint constraint, a node disjoint constraint, a city disjoint constraint, and an area disjoint constraint; The recommended intent set includes at least one of a sorting constraint and a top N path constraint.
3. The method for implementing a path planning for an intention-driven network according to claim 2, characterized in that: Based on the start node, end node, constraint set, and global topology matrix, available paths are calculated, including: Pruning step: Generate a pruner based on the constraint set and apply the global topology matrix to the pruner to generate a usable topology; Calculation steps: Use the BFS algorithm and DP algorithm to calculate all paths in the available topology that meet the constraint set, and record the paths as candidate paths; Verification step: Verify all candidate paths according to the constraint set and discard the candidate paths that do not satisfy the constraint set; Sorting and filtering step: Filter and sort all candidate paths obtained in the verification step according to the constraint set to obtain available paths.
4. The method for implementing a path planning for an intention-driven network according to claim 3, characterized in that: The BFS algorithm and DP algorithm are used to calculate all paths in the available topology that satisfy the constraint set, and the paths are recorded as candidate paths, including: Based on the location of network element devices in geographic space, the available topology is divided into three levels: region, city, and node. Multiple nodes form a city, multiple cities form a region, and multiple regions form an available topology. Apply the BFS algorithm in each level and finally concatenate all candidate paths; and, While applying the BFS algorithm, the current path is judged according to the constraint set whether it meets the requirements. If not, it is discarded; if it meets the requirements, the calculation continues.
5. The method for implementing path planning in an intention-driven network according to claim 3 or 4, characterized in that: Sorting and filtering steps, including: If the constraint set includes a recommended intent set, and the recommended intent set includes a sorting constraint and a top N path constraint; then, Sort all candidate paths obtained in the verification step according to the sorting constraints; According to the constraint set, all the sorted candidate paths are filtered one by one according to the sorting, and then the first N available paths that meet the conditions are screened out according to the constraint of taking the first N paths, and recorded as available paths.
6. A method for implementing a path planning in an intention-driven network according to any one of claims 3 to 5, characterized in that: Based on the start node, end node, constraint set, and global topology matrix, available paths are calculated, including: Each constraint in the constraint set is classified and / or polled.
7. A path planning system for implementing an intent-driven network, characterized in that: The method according to any one of claims 1 to 6 is adopted, and includes: A receiving module, used for receiving a path calculation request sent by a user; A parsing module, used for parsing a path calculation request, and the parsing result includes a start node, an end node and a constraint set; A topology module is used to obtain a global topology matrix diagram, and the global topology matrix diagram includes all link and node information of the core network; A calculation module is used to calculate and obtain available paths according to the starting node, the ending node, the constraint set and the global topology matrix diagram; The return module is used to return the available paths to the user.
8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, any method of claims 1-6 is implemented.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program for executing any one of the methods of claims 1 to 6.