5G-based electric power communication cable state monitoring system and monitoring method

Through the 5G-based power communication cable status monitoring system, the traveling part and the driving part are used to drive the sleeve to rotate, and combined with water spray and air jet technology, the problem of poor cable monitoring and corrosion is solved, and efficient cleaning and drying are achieved. The long-term stability and monitoring effect of the cable are ensured.

CN118788656AInactive Publication Date: 2024-10-18GLADIOLUS TECH (CHONGQING) CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411018517.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing technology, the cable monitoring effect is not good, and the cables are susceptible to corrosion.

Method used

A 5G-based power communication cable status monitoring system is adopted, including a first shell, a second shell and a sleeve, a walking part and a driving part provided on the inner wall of the shell, used for walking on the cable and cleaning and drying, driven by a motor The running wheel rotates, driving the sleeve to rotate, and the water spray head and air jet head are used to clean and dry the cable surface to reduce damage to the cable by the scraper.

Benefits of technology

It achieves effective cleaning and drying of the cable surface, improves the service life and monitoring effect of the cable, reduces the adsorption of bird droppings and dust on the cable, avoids cable corrosion, and ensures the reliability and reliability of the power communication system. Security.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118788656A_ABST
    Figure CN118788656A_ABST
Patent Text Reader

Abstract

The invention discloses a 5G-based electric power communication cable state monitoring system and monitoring method, and belongs to the field of cable monitoring. The 5G-based electric power communication cable state monitoring system comprises a first shell, a second shell and a sleeve, and further comprises multiple groups of walking parts arranged on the inner walls of the first shell and the second shell and used for walking on a cable; the driving part is arranged between the inner wall of the first shell and the outer wall of the sleeve and can drive the sleeve to rotate in the first shell and the second shell through the walking part; the cleaning and drying part is arranged on the first shell and the second shell and is used for cleaning and drying the surface of the cable; the push plates are fixedly connected to the outer wall of the sleeve, transmission pieces are arranged on the inner walls of the first shell and the second shell, the transmission pieces communicate with the cleaning and drying part through hoses, and the transmission pieces can continuously convey gas to the cleaning and drying part through the push plates; according to the invention, the problems that the monitoring effect of the cable is poor and the cable is easy to corrode can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of cable monitoring technology, and in particular to a 5G-based power communication cable status monitoring system and a monitoring method. Background Art

[0002] Cable is a general term for optical cables, electrical cables and other items. Cables have many uses, mainly used for control installation, connecting equipment, transmitting electricity and other multiple functions. They are common and indispensable in daily life. In order to prevent failures and improve the reliability and safety of power communication systems, it is usually necessary to monitor the status of cables. By monitoring a series of parameters such as cable temperature, partial discharge, sheath circulation, etc., the safety level of cables can be evaluated, the current carrying capacity of cables can be intelligently analyzed, and cable fault information can be warned in advance to avoid power communication system accidents caused by cable failures.

[0003] At present, cables are generally installed at high places, and monitoring robots are usually used to move on the cables for monitoring. However, since the cables are in the external environment for a long time, the surface of the cables usually absorbs a lot of bird droppings, dust, etc., which not only easily corrodes the surface of the cables and affects the service life of the cables, but also affects the monitoring effect of the cables. Summary of the invention

[0004] The purpose of the present invention is to solve the problem that the cable monitoring effect is poor and the cable is susceptible to corrosion in the prior art, and to propose a 5G-based power communication cable status monitoring system and monitoring method.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions: The 5G-based power communication cable status monitoring system includes a first shell, a second shell and a sleeve, and also includes: multiple groups of walking parts arranged on the inner walls of the first shell and the second shell, used for walking on the cable; a driving part arranged between the inner wall of the first shell and the outer wall of the sleeve, and the driving part can drive the sleeve to rotate in the first shell and the second shell through the walking part; a cleaning and drying part arranged on the first shell and the second shell, used for cleaning and drying the cable surface; multiple groups of push plates fixedly connected to the outer wall of the sleeve, and a transmission part is arranged on the inner walls of the first shell and the second shell, and the transmission part is connected to the cleaning and drying part through a hose, and the transmission part can continuously transport gas to the cleaning and drying part through the push plate.

[0006] In order to facilitate the installation of the equipment and the movement of the equipment on the cable, preferably, the walking part includes a plurality of groups of mounting seats fixedly connected to the inner walls of the first shell and the second shell, one of the mounting seats is fixedly connected to a motor, a walking wheel is rotatably connected to the mounting seat, the shaft of the walking wheel is connected to the output end of the motor, a driving bevel gear is fixedly connected to the side of the walking wheel away from the motor, and the two ends of the first shell and the second shell close to each other are respectively rotatably connected and fixedly connected by bolts.

[0007] In order to facilitate the rotation of the driving sleeve, the driving part further includes a gear ring fixedly connected to the outer wall of the sleeve, a fixing seat is fixedly connected to the inner wall of the first shell, a rotating shaft is rotatably connected to the fixing seat, a driven bevel gear is fixedly connected to one end of the rotating shaft close to the walking wheel, the driven bevel gear and the driving bevel gear are meshed with each other, and a driving gear meshed with the gear ring is fixedly connected to one end of the rotating shaft away from the driven bevel gear.

[0008] In order to improve the cleaning effect of the cable and reduce the damage of the scraper to the cable, preferably, the cleaning and drying part includes a water tank fixedly connected to the first shell, and multiple groups of water spray heads are fixedly connected to the inner walls of the first shell and the second shell, and the water inlet end of the water spray head is connected to the water outlet end of the water tank, and multiple groups of jet heads are fixedly connected to the inner walls of the first shell and the second shell, and multiple groups of scrapers are fixedly connected to the inner wall of the sleeve, and the scrapers are spiral.

[0009] In order to ensure the continuity of water spraying and air jetting, the transmission part further includes multiple groups of first cylinders and second cylinders fixedly connected to the inner walls of the first outer shell and the second outer shell, wherein the first cylinder is slidably connected to the inside of the first cylinder, the second cylinder is slidably connected to the inside of the second cylinder, a connecting rod is fixedly connected between the first piston and the second piston, a first spring is fixedly connected between the first piston and the inner wall of the first cylinder, and a baffle matching the push plate is fixedly connected to the connecting rod.

[0010] In order to ensure stable delivery of gas, further, the exhaust ends of the first cylinder and the second cylinder close to the water spray head are connected to the water tank through a hose, and the exhaust ends of the first cylinder and the second cylinder close to the spray head are connected to the spray head through a hose.

[0011] In order to ensure stable rotation of the sleeve, preferably, it also includes a fixing rod fixedly connected to the inner walls of the first shell and the second shell, and one end of the fixing rod away from the first shell and the second shell is fixedly connected to a limiting ring, and a limiting strip slidably connected to the limiting ring is fixedly connected to the outer wall of the sleeve.

[0012] In order to facilitate the discharge of dirt and the automatic resetting of the sleeve, preferably, it also includes a sewage outlet opened on the side of the second shell close to the end of the sleeve, and a counterweight block is fixedly connected to the side of the sleeve close to the second shell.

[0013] In order to facilitate the monitoring of the cable, preferably, it further includes a mounting plate fixedly connected to the first shell, and a monitoring board is fixedly connected to one end of the mounting plate away from the first shell for monitoring the cable.

[0014] The 5G-based power communication cable status monitoring method also includes the following steps: Step 1: Separate one end of the first housing and the second housing by rotating the bolt, rotate the first housing upward, open the first housing and the sleeve, put the sleeve on the cable, and finally close the first housing and the sleeve; Step 2: Start the motor to drive the walking wheel to rotate, so that the device moves along the cable; Step 3: The driving part drives the sleeve to rotate while the equipment is moving, and the stains on the cable surface are cleaned by the scraper; Step 4: The push plate drives the transmission part to compress the gas, and the compressed gas is continuously passed into the water tank and the jet head; Step 5: Under the action of air pressure, the water in the water tank is sprayed onto the cable through the water spray head, and the gas is also sprayed through the air spray head to the side of the cable away from the water spray head, so as to clean and dry the cable respectively; Step 6: Use the monitoring board to monitor the cables after cleaning and drying.

[0015] Compared with the prior art, the present invention provides a 5G-based power communication cable status monitoring system and monitoring method, which has the following beneficial effects: 1. The 5G-based power communication cable status monitoring system can realize the movement of the equipment on the cable by driving the walking wheels to rotate through the motor. At the same time, the driving part can drive the sleeve to rotate in the first shell and the second shell during the movement of the equipment, so as to facilitate the cleaning of the cable surface.

[0016] 2. The 5G-based power communication cable status monitoring system drives the push plate to rotate through the sleeve, so that the transmission parts compress the gas and continuously enter the water tank and the nozzle, thereby continuously spraying water and drying the cable surface. It can soften the bird droppings, dust, etc. on the cable surface to facilitate the scraper to clean the bird droppings, dust, etc., while reducing the damage of the scraper to the cable surface. It can also ensure that the cable is dry after cleaning, which is convenient for cable monitoring and reduces the adsorption of bird droppings, dust, etc. on the cable.

[0017] 3. The 5G-based power communication cable status monitoring system can not only clean the bird droppings, dust, etc. on the cable surface by rotating the spiral scraper on the cable surface, but also transport the cleaned bird droppings, dust, etc. to avoid the accumulation of bird droppings, dust, etc. in the equipment, further improving the cleaning effect of the cable.

[0018] The parts not involved in the device are the same as the existing technology or can be implemented by using the existing technology. The present invention can solve the problems of poor monitoring effect of cables and easy corrosion of cables. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the structure of the 5G-based power communication cable status monitoring system proposed in the present invention.

[0020] Figure 2 This is a schematic diagram of the main structure of the 5G-based power communication cable status monitoring system proposed in the present invention.

[0021] Figure 3 This is a side cross-sectional structural schematic diagram of the 5G-based power communication cable status monitoring system proposed in the present invention.

[0022] Figure 4 Schematic diagram of the partial structure of the 5G-based power communication cable status monitoring system proposed in this invention Figure 1 .

[0023] Figure 5 Schematic diagram of the partial structure of the 5G-based power communication cable status monitoring system proposed in this invention Figure 2 .

[0024] Figure 6 This is a schematic diagram of the structure of the limit ring and limit bar in the 5G-based power communication cable status monitoring system proposed in the present invention.

[0025] Figure 7 Schematic diagram of the partial structure of the 5G-based power communication cable status monitoring system proposed in this invention Figure 3 .

[0026] Figure 8 This is a schematic diagram of the cross-sectional structure of the transmission parts in the 5G-based power communication cable status monitoring system proposed in the present invention.

[0027] Fig. 9 This is a schematic diagram of the cross-sectional structure of the transmission parts in the 5G-based power communication cable status monitoring system proposed in the present invention.

[0028] In the figure: 1, first shell; 2, second shell; 3, mounting seat; 4, motor; 5, walking wheel; 6, driving bevel gear; 7, fixing rod; 8, limiting ring; 9, sleeve; 10, limiting strip; 11, push plate; 12, gear ring; 13, fixing seat; 14, rotating shaft; 15, driven bevel gear; 16, driving gear; 17, counterweight; 18, water tank; 19, sprinkler head; 20, spray head; 21, sewage outlet; 22, transmission member; 221, first cylinder; 222, second cylinder; 223, first piston; 224, second piston; 225, first spring; 226, connecting rod; 227, baffle; 23, mounting plate; 24, monitoring plate; 25, scraper; 26, resistor; 27, slide cylinder; 28, second spring; 29, push rod; 30, first terminal; 31, second terminal. DETAILED DESCRIPTION

[0029] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0030] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. Example

[0031] Reference Figure 1-Figure 8 , a 5G-based power communication cable status monitoring system includes a first shell 1, a second shell 2 and a sleeve 9, wherein the overall shape of the first shell 1 and the second shell 2 is a regular hexagon, and the sleeve 9 is circular, and also includes: multiple groups of walking parts arranged on the inner walls of the first shell 1 and the second shell 2, the walking parts are provided with six groups and are symmetrically at both ends of the inner walls of the first shell 1 and the second shell 2, and the walking parts are located in the middle position of the inner walls of the first shell 1 and the second shell 2, and are used to walk on the cable; a driving part arranged between the inner wall of the first shell 1 and the outer wall of the sleeve 9, and the driving part can drive the sleeve 9 to rotate in the first shell 1 and the second shell 2 through the walking part; a cleaning and drying part arranged on the first shell 1 and the second shell 2, and is used to clean and dry the cable surface; multiple groups of push plates 11 fixedly connected to the outer wall of the sleeve 9, and a transmission member 22 is arranged on the inner wall of the first shell 1 and the second shell 2, and the transmission member 22 is connected to the cleaning and drying part through a hose, and the transmission member 22 can continuously transport gas to the cleaning and drying part through the push plate 11.

[0032] Reference Figure 1 , Figure 2 and Figure 4 The walking part includes multiple groups of mounting seats 3 fixedly connected to the inner walls of the first shell 1 and the second shell 2, one of the mounting seats 3 is fixedly connected to a motor 4, and a walking wheel 5 is rotatably connected to the mounting seat 3. The shaft of the walking wheel 5 is connected to the output end of the motor 4, and a driving bevel gear 6 is fixedly connected to the side of the walking wheel 5 away from the motor 4. The two ends of the first shell 1 and the second shell 2 close to each other are respectively rotatably connected and fixedly connected by bolts. The surface of the walking wheel 5 is arc-shaped, which matches the cable. This not only ensures that the equipment can walk on the cable, but also reduces the wear between the walking wheel 5 and the cable.

[0033] When it is necessary to monitor the cables at high altitudes, the device is first transported to the cables, and the first shell 1 and the second shell 2 are separated by rotating the bolts. The device can be opened by pulling the first shell 1 upwards, and then the device is placed on the cables, and the cables are located in the sleeve 9. The first shell 1 is then closed and the bolts are rotated to close it. At this time, the running wheels 5 are tightly fitted to the cables, and one set of the running wheels 5 can be driven to rotate by starting the motor 4. At this time, under the action of the friction between the running wheels 5 and the cables, the device can be made to walk on the cables to facilitate monitoring of the cables.

[0034] Reference Figure 2 , Figure 5 and Figure 7 The driving part includes a gear ring 12 fixedly connected to the outer wall of the sleeve 9, a fixing seat 13 is fixedly connected to the inner wall of the first shell 1, and a rotating shaft 14 is rotatably connected to the fixing seat 13. A driven bevel gear 15 is fixedly connected to the end of the rotating shaft 14 close to the walking wheel 5, and the driven bevel gear 15 and the driving bevel gear 6 are meshed with each other. A driving gear 16 meshing with the gear ring 12 is fixedly connected to the end of the rotating shaft 14 away from the driven bevel gear 15. The specific structure of the driving bevel gear 6 and the driven bevel gear 15 can refer to the technical solutions in the prior art. Those skilled in the art can know that it will not be elaborated here. The synchronous rotation of the driving bevel gear 6 and the driven bevel gear 15 can be achieved through the meshing between the driving bevel gear 6 and the driven bevel gear 15.

[0035] When the device moves on the cable, the driving bevel gear 6 will drive the driven bevel gear 15 to rotate, and the driving gear 16 will rotate synchronously through the rotating shaft 14. Through the engagement between the driving gear 16 and the gear ring 12, the sleeve 9 is driven to rotate in the first shell 1 and the second shell 2. It should be explained that the gaps between the first shell 1 and the second shell 2 and the sleeve 9 are small and will not affect the engagement between the driving gear 16 and the gear ring 12, so as to facilitate the cleaning of the cable surface.

[0036] Reference Figure 1 , Figure 2 , Figure 3 and Figure 5 The cleaning and drying part includes a water tank 18 fixedly connected to the first shell 1, and multiple groups of water spray heads 19 are fixedly connected to the inner walls of the first shell 1 and the second shell 2. The water inlet end of the water spray head 19 is connected to the water outlet end of the water tank 18. Multiple groups of jet heads 20 are fixedly connected to the inner walls of the first shell 1 and the second shell 2. Multiple groups of scrapers 25 are fixedly connected to the inner wall of the sleeve 9, and the scraper 25 is spiral. It also includes a sewage outlet 21 opened on the side of the second shell 2 close to the end of the sleeve 9, and a counterweight 17 is fixedly connected to the side of the sleeve 9 close to the second shell 2. A water inlet is provided on the surface of the water tank 18, and when the water inlet is closed, the water tank 18 is in a sealed state. When the air pressure in the water tank 18 increases, the water in the water tank 18 will be transported to the water spray head 19 and sprayed to the cable through the water spray head 19, wherein the water spray head 19 and the jet head 20 are both located at the center of the inner walls of the first shell 1 and the second shell 2, so that it can ensure that water or air is sprayed on the cable surface in all directions to avoid dead corners.

[0037] When the sleeve 9 rotates, it drives the scraper 25 to rotate on the cable surface to clean the bird droppings, dust, etc. on the cable surface. Before cleaning, the water spray head 19 will flush the cable surface with the water tank 18 in a high-pressure manner. On the one hand, it can soften the bird droppings, dust, etc. and reduce the difficulty of cleaning the cable surface. On the other hand, it can reduce the damage of the scraper 25 to the cable surface during cleaning. After the scraper 25 cleans the bird droppings, dust, etc. on the cable surface, it can also transport them so that the bird droppings, dust, etc. finally fall into the first shell 1 through the sleeve 9 and are then discharged through the sewage outlet 21. This can prevent the bird droppings, dust, etc. from being deposited in the sleeve 9. Internal accumulation further improves the cleaning effect of the cable surface, reduces the corrosion of bird droppings, dust, etc. to the cable, and ensures the subsequent detection effect of the cable. After cleaning, high-pressure gas is sprayed on the cable surface through the nozzle 20. On the one hand, the residual dust can be cleaned to ensure the cleaning effect of the cable surface. On the other hand, the cable surface can be dried for subsequent cable monitoring. When the equipment is not working, under the action of the counterweight 17, the sleeve 9 can be rotated to the initial position no matter what position it is in at this time, so that the gap between the sleeve 9 matches the gap between the first shell 1 and the second shell 2, so as to facilitate the subsequent work of the equipment.

[0038] Reference Figure 2 , Figure 3 , Figure 5 and Figure 8The transmission member 22 includes a plurality of first cylinders 221 and second cylinders 222 fixedly connected to the inner walls of the first shell 1 and the second shell 2, wherein a first piston 223 is slidably connected inside the first cylinder 221, and a second piston 224 is slidably connected inside the second cylinder 222, a connecting rod 226 is fixedly connected between the first piston 223 and the second piston 224, a first spring 225 is fixedly connected between the first piston 223 and the inner wall of the first cylinder 221, the exhaust ends of the first cylinder 221 and the second cylinder 222 near the sprinkler head 19 are connected to the water tank 18 through a hose, and the exhaust ends of the first cylinder 221 and the second cylinder 222 near the spray head 20 are connected to the spray head 20 through a hose, a baffle 227 matching the push plate 11 is fixedly connected to the connecting rod 226, and air inlets and exhaust ports are provided at the ends of the first cylinder 221 and the second cylinder 222, and both the air inlets and the exhaust ports are guide channels, which is a conventional means in the prior art and is not described in detail.

[0039] When the sleeve 9 rotates, it drives the push plate 11 to rotate. When the push plate 11 rotates to the baffle 227, it drives the baffle 227 to move in the direction of the first cylinder 221 and the second cylinder 222, so that the first piston 223 compresses the gas in the first cylinder 221 and allows the gas to enter the water tank 18 or the nozzle 20. At this time, the second piston 224 will pump air into the second cylinder 222. As the push plate 11 rotates, the overlap between the push plate 11 and the baffle 227 decreases until the push plate 11 is separated from the baffle 227. At this time, the first piston 223 compresses the gas in the first cylinder 221 and allows the gas to enter the water tank 18 or the nozzle 20. At this time, the second piston 224 will pump air into the second cylinder 222. The plug 223 will return to the initial position under the action of the first spring 225. During this process, the second piston 224 will be driven by the connecting rod 226 to compress the gas inside the second cylinder 222 to supply pressure to the water tank 18 or the nozzle 20. When the second piston 224 moves to the initial position, the push plate 11 just cooperates with the next baffle 227, and then the above process is repeated to achieve continuous water spraying and air jetting by the water spray head 19 and the nozzle head 20, thereby ensuring the cleaning and drying effects of the cable surface and further improving the monitoring effect of the cable.

[0040] Reference Figure 3 , Figure 5 and Figure 6 , and also includes a fixing rod 7 fixedly connected to the inner walls of the first shell 1 and the second shell 2, and one end of the fixing rod 7 away from the first shell 1 and the second shell 2 is fixedly connected to a limiting ring 8, and a limiting strip 10 slidably connected to the limiting ring 8 is fixedly connected to the outer wall of the sleeve 9. The shapes of the limiting strip 10 and the limiting ring 8 are not limited here, as long as the sleeve 9 can ensure stable rotation in the first shell 1 and the second shell 2, a T-shaped structure is best.

[0041] When the sleeve 9 rotates, the limiting strip 10 on the outer wall of the sleeve 9 will rotate along the limiting ring 8. It should be explained that although the sleeve 9 is a split structure, when one part of the sleeve 9 rotates, the sleeve 9 can be limited by the limiting ring 8, so that the rotation trajectories of the two parts of the sleeve 9 are the same. Under the action of thrust, the two parts of the sleeve 9 can rotate synchronously.

[0042] Reference Figure 1-Figure 3 , and also includes a mounting plate 23 fixedly connected to the first shell 1. A monitoring board 24 is fixedly connected to one end of the mounting plate 23 away from the first shell 1 for monitoring the cable. A series of monitoring equipment such as temperature or partial discharge, sheath circulation, etc. are arranged on the side of the monitoring board 24 close to the cable. The operator can adjust it according to the actual situation. This is a conventional method in the prior art, so it will not be elaborated on. Example

[0043] Reference Figure 3 and Fig. 9 , a 5G-based power communication cable status monitoring system, further, a plurality of groups of resistors 26 are fixedly connected to one side of the sleeve 9 close to the scraper 25, a slide 27 is fixedly connected to the inside of the resistor 26, a second spring 28 is fixedly connected between the slide 27 and the inner wall of the resistor 26, a push rod 29 is fixedly connected to the side of the slide 27 away from the second spring 28, a first terminal 30 is fixedly connected to the side of the slide 27 away from the push rod 29, and a second terminal 31 is fixedly connected to the side of the outer wall of the resistor 26 close to the push rod 29, where it needs to be explained that the outer wall of the slide 27 is tightly fitted with the inner wall of the resistor 26, and the slide 27 is made of conductive material, the push rod 29 at least partially extends to the outside of the resistor 26, and one end of the push rod 29 away from the second spring 28 is fitted with the scraper 25, the scraper 25 has a certain elasticity, the first terminal 30 is sleeved inside the second spring 28, and the first terminal 30 and the second terminal 31 are electrically connected to the motor 4.

[0044] During operation, when the motor 4 drives the sleeve 9 to rotate, first, the scraper 25 inside the sleeve 9 will clean the bird droppings, dust, etc. on the surface of the cable. If the bird droppings, dust, etc. on the surface of the cable are less and the adhesion is loose, that is, the resistance encountered by the scraper 25 when cleaning the bird droppings, dust, etc. on the surface of the cable is small, and the thrust of the scraper 25 on the push rod 29 is small. At this time, the rotation speed of the motor 4 is not affected or is less affected; when the bird droppings, dust, etc. on the surface of the cable are more and the adhesion is tighter, the scraper 25 will encounter greater resistance when cleaning the bird droppings, dust, etc. on the surface of the cable, that is, the scraper 25 will deform at this time, pushing the push rod 29 to move toward the inside of the resistor 26, at this time, the resistance between the first terminal 30 and the second terminal 31 increases, that is, the resistance of the motor 4 increases, and then the rotation speed of the motor 4 will decrease, so that the speed of the device passing through this place is reduced, which can prevent the damage to the device and the cable caused by excessive movement speed on the one hand, and on the other hand, the bird droppings, dust, etc. on the surface of the cable can be cleaned more thoroughly. Example

[0045] The 5G-based power communication cable status monitoring method also includes the following steps: Step 1: Separate one end of the first housing 1 from the second housing 2 by rotating the bolt, rotate the first housing 1 upward, open the first housing 1 and the sleeve 9, and then put the sleeve 9 on the cable, and finally close the first housing 1 and the sleeve 9. During this process, the other ends of the first housing 1 and the second housing 2 can be rotated, which ensures that the device is placed stably and is convenient for the operator to operate; Step 2: Start the motor 4 to drive the running wheel 5 to rotate, so that the device moves along the cable. After the device is placed, there is a certain friction between the cable and the running wheel 5. When the running wheel 5 rotates, the friction between them can realize the walking of the device on the cable. Step 3: The driving unit drives the sleeve 9 to rotate while the device is moving, and the scraper 25 is used to clean the stains on the cable surface. When the sleeve 9 rotates, the scraper 25 rotates on the cable surface, thereby cleaning the cable surface in all directions, and can also transport and discharge the cleaned bird droppings, dust, etc. to avoid their accumulation in the sleeve 9; Step 4: The push plate 11 drives the transmission member 22 to compress the gas, and the compressed gas is continuously passed into the water tank 18 and the nozzle 20. When the push plate 11 contacts the transmission member 22, the first cylinder 221 is compressed to discharge the gas, and the second cylinder 222 is in the suction state. When the push plate 11 is separated from the transmission member 22, the first cylinder 221 can be suctioned and the second cylinder 222 can be exhausted under the action of the first spring 225, thereby continuously supplying pressure to the water tank 18 and the nozzle 20. Step 5: Under the action of air pressure, the water in the water tank 18 is sprayed onto the cable through the water spray head 19, and the gas is sprayed to the side of the cable away from the water spray head 19 through the air spray head 20, so as to clean and dry the cable respectively; Step 6: The cables after cleaning and drying are monitored by the monitoring board 24 .

[0046] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A 5G-based power communication cable status monitoring system, comprising a first housing (1), a second housing (2) and a sleeve (9), characterized in that: Also includes: A plurality of groups of walking parts arranged on the inner walls of the first outer shell (1) and the second outer shell (2), and used for walking on the cables; A driving portion disposed between the inner wall of the first shell (1) and the outer wall of the sleeve (9), the driving portion being capable of driving the sleeve (9) to rotate within the first shell (1) and the second shell (2) via the walking portion; A cleaning and drying portion provided on the first housing (1) and the second housing (2), used for cleaning and drying the surface of the cable; A plurality of push plates (11) are fixedly connected to the outer wall of the sleeve (9); a transmission member (22) is provided on the inner wall of the first shell (1) and the second shell (2); the transmission member (22) is connected to the clean drying part via a hose; and the transmission member (22) can continuously deliver gas to the clean drying part via the push plates (11).

2. The 5G-based power communication cable status monitoring system according to claim 1 is characterized in that: The walking portion comprises a plurality of mounting seats (3) fixedly connected to the inner walls of the first shell (1) and the second shell (2), wherein a motor (4) is fixedly connected to one of the mounting seats (3), a walking wheel (5) is rotatably connected to the mounting seat (3), the shaft of the walking wheel (5) is connected to the output end of the motor (4), a driving bevel gear (6) is fixedly connected to the side of the walking wheel (5) away from the motor (4), and the first shell (1) and the second shell (2) are respectively rotatably connected and fixedly connected by bolts at two ends close to each other.

3. The 5G-based power communication cable status monitoring system according to claim 2 is characterized in that: The driving part comprises a toothed ring (12) fixedly connected to the outer wall of the sleeve (9); a fixing seat (13) fixedly connected to the inner wall of the first housing (1); a rotating shaft (14) rotatably connected to the fixing seat (13); a driven bevel gear (15) fixedly connected to one end of the rotating shaft (14) close to the travel wheel (5); the driven bevel gear (15) and the driving bevel gear (6) mesh with each other; and a driving gear (16) meshing with the toothed ring (12) fixedly connected to one end of the rotating shaft (14) away from the driven bevel gear (15).

4. The 5G-based power communication cable status monitoring system according to claim 1 is characterized in that: The cleaning and drying section comprises a water tank (18) fixedly connected to the first outer shell (1), a plurality of groups of water spray heads (19) fixedly connected to the inner walls of the first outer shell (1) and the second outer shell (2), the water inlet end of the water spray head (19) being connected to the water outlet end of the water tank (18), a plurality of groups of air jet heads (20) fixedly connected to the inner walls of the first outer shell (1) and the second outer shell (2), and a plurality of groups of scrapers (25) fixedly connected to the inner wall of the sleeve (9), and the scrapers (25) are spiral-shaped.

5. The 5G-based power communication cable status monitoring system according to claim 4 is characterized in that: The transmission member (22) comprises a plurality of groups of first cylinders (221) and second cylinders (222) fixedly connected to the inner walls of the first housing (1) and the second housing (2), wherein: The first cylinder (221) is slidably connected to a first piston (223) inside, the second cylinder (222) is slidably connected to a second piston (224) inside, a connecting rod (226) is fixedly connected between the first piston (223) and the second piston (224), a first spring (225) is fixedly connected between the first piston (223) and the inner wall of the first cylinder (221), and a baffle (227) matching the push plate (11) is fixedly connected to the connecting rod (226).

6. The 5G-based power communication cable status monitoring system according to claim 5 is characterized in that: The exhaust ends of the first cylinder (221) and the second cylinder (222) close to the water spray head (19) are connected to the water tank (18) via a hose, and the exhaust ends of the first cylinder (221) and the second cylinder (222) close to the spray head (20) are connected to the spray head (20) via a hose.

7. The 5G-based power communication cable status monitoring system according to claim 1 is characterized in that: It also comprises a fixing rod (7) fixedly connected to the inner walls of the first shell (1) and the second shell (2), one end of the fixing rod (7) away from the first shell (1) and the second shell (2) is fixedly connected to a limiting ring (8), and a limiting strip (10) slidably connected to the limiting ring (8) is fixedly connected to the outer wall of the sleeve (9).

8. The 5G-based power communication cable status monitoring system according to claim 1 is characterized in that: It also comprises a sewage outlet (21) opened on one side of the second shell (2) close to the end of the sleeve (9), and a counterweight (17) is fixedly connected to one side of the sleeve (9) close to the second shell (2).

9. The 5G-based power communication cable status monitoring system according to claim 1, characterized in that: It also comprises a mounting plate (23) fixedly connected to the first housing (1), and one end of the mounting plate (23) away from the first housing (1) is fixedly connected to a monitoring plate (24) for monitoring the cable.

10. A monitoring method for a 5G-based power communication cable status monitoring system according to any one of claims 1 to 9, characterized in that: The following steps are also included: Step 1: Separate the first housing (1) and one end of the second housing (2) by rotating the bolt, rotate the first housing (1) upward, open the first housing (1) and the sleeve (9), put the sleeve (9) on the cable, and finally close the first housing (1) and the sleeve (9); Step 2: Start the motor (4) to drive the running wheel (5) to rotate, so that the device moves along the cable; Step 3: The driving unit drives the sleeve (9) to rotate while the device is moving, and the scraper (25) is used to clean the dirt on the surface of the cable; Step 4: The push plate (11) drives the transmission member 22 to compress the gas, and the compressed gas is continuously passed into the water tank (18) and the spray head (20); Step 5: Under the action of air pressure, the water in the water tank (18) is sprayed onto the cable through the water spray head (19), and the gas is sprayed onto the side of the cable away from the water spray head (19) through the air spray head (20), thereby cleaning and drying the cable respectively; Step 6: The cables are monitored by the monitoring board (24) after cleaning and drying.

Citation Information