Geological disaster monitoring, forecasting and early warning system and method based on interference radar

Through the combination of Beidou GNSS, D-InSAR and SBAS-InSAR, combined with the electrical system and microseismic monitoring, joint monitoring of goaf deformation above and below the mine is achieved, solving the problems of low surface deformation monitoring accuracy and early warning complexity in the existing technology. problem, achieving high-precision collaborative dynamic coupling monitoring and early warning of the deformation process of the goaf.

CN118794484AInactive Publication Date: 2024-10-18YULIN SHENHUA ENERGY CO LTD +1

Patent Information

Application Number
CN202410760936.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing surface deformation monitoring technology has low accuracy and cannot meet high concurrency requirements. Moreover, the types of geological disaster monitoring equipment are diverse, resulting in complex early warning judgments and the inability to achieve real-time complex logic monitoring of multiple sensors and multiple devices.

Method used

Mining area subsidence monitoring based on Beidou GNSS and D-InSAR is used, and mining area deformation monitoring is combined with SBAS-InSAR and GNSS. Electrical method systems and microseismic monitoring systems are respectively deployed to achieve joint monitoring of above and below ground deformation and complete the coordination of the deformation process in the goaf. Dynamic coupling monitoring.

Benefits of technology

It improves the accuracy of geological disaster monitoring and early warning, achieves high-precision collaborative dynamic coupling monitoring of the deformation processes of the three upper zones in the goaf, reduces equipment power consumption, and avoids duplication of work and high usage costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118794484A_ABST
    Figure CN118794484A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of coal mine goaf deformation dynamic coupling monitoring, and discloses a geological disaster monitoring, forecasting and early warning system and method based on an interference radar. According to the method, combined monitoring is carried out on deformation of a goaf on the ground based on mining area settlement monitoring based on Beidou GNSS and D-InSAR fusion and mining area deformation monitoring based on SBAS-InSAR and GNSS coupling of a logarithmic logic model; respectively deploying an electrical method system and a micro-seismic monitoring system to monitor underground resistivity and micro-seismic combined stress change so as to delineate an underground abnormal body; combined monitoring of deformation of a goaf on the ground and monitoring of underground resistivity and micro-seismic combined stress change are combined, and collaborative dynamic coupling monitoring of the deformation process of the goaf in a certain area is completed. And performing early warning and forecasting based on a monitoring result. According to the method, space-time complementarity and process collaboration of multiple means are brought into play, and dynamic coupling monitoring of ground and underground deformation of the coal mine goaf is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of dynamic coupling monitoring of coal mine goaf deformation, and in particular relates to a geological disaster monitoring, forecasting and early warning system and method based on interferometric radar. Background Art

[0002] In order to understand the influence of coal mining activities on the movement and deformation of the ground surface, it is necessary to monitor it. The existing surface deformation monitoring technology mainly uses traditional network RTK for monitoring. The problem with this monitoring technology is that the user concurrent scale is only tens to hundreds of concurrent requests, which cannot meet thousands or even tens of thousands of concurrent monitoring requests. In addition, the coal mine goaf is generally large in area, with many monitoring devices, and most of the goaf is located in mountainous areas, where communication is difficult, making it even more difficult to monitor thousands or even tens of thousands of concurrent requests.

[0003] Furthermore, geological disasters mainly come from catastrophic damage to the geological environment caused by natural and human actions, mainly including: collapse, landslide, mudslide, ground subsidence and ground fissures. However, geological disasters in my country are frequent and complex and diverse. Therefore, by monitoring and warning geological disasters in advance, other economic losses caused by geological disasters can be reduced. However, due to the complexity of geological disasters, there are many types of existing geological monitoring equipment, and the monitoring types between different equipment manufacturers are different, resulting in the complexity of early warning judgments. It is difficult to implement a universal early warning judgment solution, which will cause users to have a lot of repetitive work and increase the user's cost of use. In addition, some platforms that have implemented universal early warning judgments can only support simple early warning judgments of single-sensor real-time data, and cannot achieve complex early warning logic of real-time recording of historical data of multiple sensors and multiple devices.

[0004] Traditional geological disaster monitoring methods mainly use near-real-time monitoring methods to capture changes in disaster bodies by deploying data acquisition equipment and sensors, and the adjustment of monitoring equipment operating parameters can only be achieved manually through the software system issuing control instructions, such as data collection, reporting and additional reporting control instructions. This monitoring method has the following shortcomings: Failure to reduce equipment power consumption in a scientific and reasonable way: Before the equipment adjusts its operating parameters, it is necessary to manually judge the current state of the disaster body through other means, and then adjust the equipment data collection, reporting and other frequency parameters according to the actual situation; Failure to combine the influencing factors of geological disasters: There are many influencing factors for the formation of geological disasters, and the equipment fails to flexibly combine its influencing factors to dynamically adjust the equipment data collection, reporting and other monitoring frequency parameters.

[0005] Through the above analysis, the problems and defects of the existing technology are as follows: the surface deformation monitoring method in the existing technology has low accuracy, and the underground abnormal body cannot be delineated in the underground resistivity and microseismic combined stress change monitoring, and the existing technology has poor effect on the coordinated dynamic coupling monitoring of the deformation process of the three zones above the goaf (curved subsidence zone, fracture zone and caving zone). Summary of the invention

[0006] In order to overcome the problems existing in the related technologies, a geological disaster monitoring, forecasting and early warning method based on interferometric radar is proposed, which includes:

[0007] S1, mining area subsidence monitoring based on the fusion of Beidou GNSS and D-InSAR, and mining area deformation monitoring based on the coupling of SBAS-InSAR and GNSS based on the logarithmic logic model, and joint monitoring of deformation of goaf areas above the well;

[0008] S2, deploy electrical method system and microseismic monitoring system to monitor the underground resistivity and microseismic combined stress change, and realize the delineation of underground abnormal bodies;

[0009] S3, combines the joint monitoring of deformation of goaf areas above the well with the joint monitoring of stress changes of resistivity and microseismicity underground, completes the coordinated dynamic coupling monitoring of the deformation process of the bending and sinking zone, fracture zone and caving zone above the goaf; based on the monitoring results, early warning and forecast are carried out.

[0010] In step S1, mining area subsidence monitoring based on the fusion of Beidou GNSS and D-InSAR includes:

[0011] S101, establish a GNSS continuous observation station network in the mining area, build a regional water vapor model and an atmospheric delay error correction model, and complete the fusion processing of the time domain and the space domain;

[0012] S102, the double-interpolation and double-estimation DIDP algorithm is used to encrypt the GNSS and D-InSAR monitoring data to reduce the impact of various error factors on deformation monitoring.

[0013] In step S101, a regional water vapor model is constructed, including:

[0014] (1) Calculate the water vapor correlation coefficient matrix of the mining area subsidence area, the expression is:

[0015]

[0016] Where G is the water vapor correlation coefficient set of the mining area subsidence area, g to is the sample of the goaf in the well in the time domain g t With spatial domain g o The subset of water vapor correlation coefficients in the mining area subsidence area, t is time, o is space, g toThe expression is:

[0017]

[0018] Where z is a certain GNSS continuous observation station network, p is the total GNSS continuous observation station network, g zt is the water vapor correlation coefficient set of a mining area settlement area in the time domain of a certain observation station network point, g zo is the water vapor correlation coefficient set of a certain observation station network point in the mining area subsidence area in the spatial domain, is the average value in the time domain, is the average value in the spatial domain;

[0019] (2) Calculate the water vapor weight value and the water vapor weight vector of the mining area subsidence area. First, solve the weight equation |aI-G|=0 to obtain the water vapor weight value a of the mining area subsidence area. t ,t=1,2…n, and arrange them in order of size, that is, a1≥a2≥…≥a n ≥0; then calculate the water vapor weight vector b of the mining area settlement area corresponding to the water vapor weight value at of the mining area settlement area t ,t=1,2…n; where a is the water vapor weight value of a mining area settlement area, and I is the water vapor weight coefficient of the mining area settlement area;

[0020] (3) Calculate the water vapor presentation rate in the mining area subsidence area and the water vapor aggregation presentation rate in the mining area subsidence area, which are expressed as follows:

[0021] Water vapor presentation rate in the subsidence area of ​​the mining area f t for:

[0022]

[0023] In the formula, a z is the water vapor weight value of the mining area subsidence area at a certain GNSS continuous observation station network point;

[0024] The water vapor accumulation rate in the mining area subsidence area is:

[0025]

[0026] Take the water vapor weight values ​​a1, a2…a of the mining area subsidence area where the water vapor concentration rate reaches 65-85% m The corresponding first, second, ... mth mining area subsidence area;

[0027] (4) Calculate the water vapor load in the mining area subsidence area, the expression is:

[0028]

[0029] In the formula, u tois the water vapor load in the mining area subsidence area, y o is the observed value in each spatial domain, b to is the weight vector of water vapor in the mining area subsidence region in the spatial domain in the time domain;

[0030] Calculate the water vapor load in the mining area subsidence area and calculate the observation value y in each spatial domain o ,o=1,2…p, the corresponding spatial domain f of each mining area settlement area ot ,t=1,2…m, we get:

[0031]

[0032] Where F is the spatial domain set of the settlement areas in each mining area, f pm It is the spatial domain subset of the mining area subsidence area under the value p in the spatial domain and the value m in the time domain;

[0033] (5) Using the calculated water vapor load of each mining area subsidence area, the water vapor load of the mining area in the first multiple mining areas of the observation spectrum of the observation station is calculated. The expression is:

[0034]

[0035] In the formula, f1, f2…f m are the original variable space domains y1, y2…y m The first, second,…,mth mining area subsidence area.

[0036] In step S101, the atmospheric delay error correction model includes:

[0037] The gas layer delay error correction factor is as follows:

[0038]

[0039] in,

[0040]

[0041]

[0042] Where α is the atmospheric delay error correction factor, N is the atmospheric thickness, s is the time, and θ is the M is the movement distance of the gas layer at a certain thickness, θ R is the movement distance deviation of the atmosphere at a certain thickness, K is the movement distance of the atmosphere under height constraint, and h is the height of the atmosphere; ω M is the rate of change of atmospheric water vapor density, is the friction coefficient of atmospheric water vapor motion, is the atmospheric water vapor charge change rate coefficient, σ Kis the atmospheric water vapor pressure change, σ b is the atmospheric water vapor distance change rate, is the rate of change of atmospheric water vapor saturation pressure, is the coefficient of variation of atmospheric water vapor mass, is the parameter error of the atmospheric water vapor volume change rate coefficient, Calculate the variance for the atmospheric water vapor loading, Estimate the variance for the atmospheric water vapor loading, Estimated variance of the mining area subsidence in the time domain, is the observed variance in the spatial domain of the mining area subsidence;

[0043] In step S101, a regional water vapor model and an atmospheric delay error correction model are constructed as the input of the observation station network, and the fusion processing of the time domain and the space domain is used as the output of the observation station network to achieve rapid monitoring and inversion of the goaf area shape on the well based on the mining area subsidence regional analysis and the observation station network error correction conditions.

[0044] In step S102, the GNSS and D-InSAR monitoring data are encrypted using a dual interpolation dual estimation DIDP algorithm, including:

[0045] S11, taking out the e-bit set of the original GNSS and D-InSAR monitoring image W as X;

[0046] S12, randomly select a random set Y of e bits;

[0047] S13, perform XOR operation on X and Y to obtain a new set Y1;

[0048] S14, then perform an XOR operation on the random set Y1 itself to obtain the value Y2;

[0049] S15, XOR Y1 and Y2 to obtain a multi-encryption set Z;

[0050] S16, concatenate the set Y and the set W up and down to obtain a final set W1 of size 2e;

[0051] S17, extract the e bit of the image W again, and re-execute steps 2 to 6 until all bits of the image W are extracted, completing the image encryption process.

[0052] In step S1, the mining area deformation monitoring based on SBAS-InSAR coupled with GNSS based on the logarithmic logistic model includes:

[0053] S201, using the empirical Bayesian Kriging EBK interpolation method, integrates GNSS and SBAS-InSAR data in a consistent time interval, and obtains the large-gradient deformation pattern of the entire mining area based on the collapse characteristics of the mining area;

[0054] S202, combining the log-logistic model with a single InSAR pair to calculate the deformation information generated by mining activities at any time.

[0055] In step S202, the log-logistic model is combined with a single InSAR pair to calculate the deformation information generated by mining activities at any time, including:

[0056] Step 1: Given a set of two-dimensional discrete points (x, y, z) deformed at any time during mining activities, number them in the order of reading [1, 2…m], and determine the maximum rectangular area where the discrete points are distributed: [X min ,X max ],[Y min ,Y max ], the two-dimensional discrete point set deformed at any moment of mining activity is used to generate a deformed triangular network of unstructured mining areas;

[0057] Step 2: number all the mining area deformed triangles in sequence [1, 2…n], and record the three vertex numbers corresponding to each mining area deformed triangle and the numbers of the mining area deformed triangles adjacent to its three sides; calculate and save the linear interpolation weight coefficients of all mining area deformed triangles at one time through the improved regression method of the log-logistic model; set the mining area deformation grid spacing in the x and y directions to obtain the nodes to be interpolated in the mining area deformation grid;

[0058] Step 3, select a mining area deformed grid node to be inserted, and use a mining area deformed triangle in the mining area deformed triangle network as a seed mining area deformed triangle, and use the vector product of the point to be inserted and the two vertices of the seed mining area deformed triangle to determine the relative position relationship between the point to be inserted and the edge of the mining area deformed triangle;

[0059] Step 4, repeatedly judging the relationship between the point to be inserted and the edge of the deformed triangle of the mining area, quickly approximating and locating the deformed triangle of the mining area where the node to be inserted is located; if the deformed triangle of the mining area where the node to be inserted is located can be found in the deformed triangle network of the mining area, the node is interpolated using the linear interpolation weight coefficient of the deformed triangle of the mining area; if it is not found, it means that the point to be inserted is not inside the deformed triangle network of the mining area, and no interpolation is performed;

[0060] Step 5, repeat step 4 until the interpolation of all mining area deformed grid nodes is completed, and the mining area deformed gridding results are output to a file in *.grd format;

[0061] Step 6, by combining the log-logistic model with a single InSAR pair, the output to the file is further iterated and regressed to obtain the mining area deformation gridding results at different mining area deformation grid scales.

[0062] In step 2, the linear interpolation weight coefficients of all the deformed triangles in the mining area are calculated and saved at one time through the improved regression method of the log-logistic model, including:

[0063] Calculate and regress the interpolation weight coefficients a, b, c of all the deformed triangles in the mining area at one time, and the expression is:

[0064] If y1-y3≠0, then:

[0065]

[0066] If y1-y3=0, then:

[0067]

[0068] In the formula, A(x1,y1z1), B(x2,y2z2), and C(x3,y3z3) are the coordinates of the three vertices of the deformed triangle in the mining area; ax+by+c=z is the plane equation.

[0069] Another object of the present invention is to provide a geological disaster monitoring, forecasting and early warning system based on interferometric radar, which implements the geological disaster monitoring, forecasting and early warning method based on interferometric radar, and the system comprises:

[0070] The joint monitoring module for deformation of goaf in the well is used for mining area settlement monitoring based on the fusion of Beidou GNSS and D-InSAR, and mining area deformation monitoring based on the coupling of SBAS-InSAR and GNSS based on the logarithmic logic model, and joint monitoring of deformation of goaf in the well;

[0071] The underground anomaly delineation module is used to deploy the electrical method system and the microseismic monitoring system to monitor the underground resistivity and microseismic combined stress changes, so as to delineate the underground anomaly.

[0072] The collaborative dynamic coupling monitoring module is used to combine the joint monitoring of the goaf deformation above the well with the joint monitoring of resistivity and microseismic stress changes underground, to complete the collaborative dynamic coupling monitoring of the deformation process of the bending and sinking zone, fracture zone and caving zone above the goaf; and to make early warning and forecast based on the monitoring results.

[0073] Combined with all the above technical solutions, the beneficial effects of the present invention are as follows: for the goaf area of ​​the 5-20303 working face of a coal mine, the underground resistivity and microseismic joint monitoring is planned to be adopted within the range of 350m wide and 1000m long, combined with the surface GNSS and radar satellite InSAR technology above the goaf, the deformation process of the three zones (bend sinking zone, fracture zone and caving zone) above the goaf is collaboratively and dynamically coupled to monitor. The spatiotemporal complementarity and process synergy of multiple means are brought into play to realize the dynamic coupling monitoring of the deformation above and below the goaf area of ​​the coal mine.

[0074] The present invention uses ALOS-2, RADARSAT-2, and Sentinel-1SAR data to perform InSAR goaf surface deformation inversion processing for four consecutive months in a coal mine goaf. In addition, Beidou GNSS is deployed at appropriate locations on site to eliminate the influence of atmospheric delay errors, and realize high-precision joint monitoring of goaf deformation by two means on the well. In order to supplement the deficiencies of surface deformation monitoring methods, electrical systems and microseismic monitoring systems are deployed respectively to monitor underground resistivity and microseismic combined stress changes to achieve the delineation of underground abnormal bodies. Combined with the coordinated monitoring of four methods on the well and underground, the coordinated dynamic coupling monitoring of the deformation process of the upper three zones (curved subsidence zone, fracture zone, and caving zone) of a goaf in a certain area is completed.

[0075] The present invention monitors the mining area settlement based on the fusion of Beidou GNSS and D-InSAR, and the mining area deformation monitoring based on the coupling of SBAS-InSAR and GNSS based on the logarithmic logic model, and monitors the deformation of the goaf area above the well jointly, thus realizing the accurate prediction and early warning of geological disaster monitoring. The present invention avoids the repeated calculation of the interpolation weight coefficient and improves the gridding efficiency; the present invention uses the boundary of the triangulated network to limit the range of gridding, realizes the deformation simulation of the actual shape of the survey area network, and can simulate the irregular shape of the survey area network. The present invention can realize fast and accurate data inversion. BRIEF DESCRIPTION OF THE DRAWINGS

[0076] The accompanying drawings herein are incorporated in and constitute a part of the specification, illustrate embodiments consistent with the present disclosure, and together with the description, serve to explain the principles of the present disclosure;

[0077] Figure 1 It is a flow chart of a geological disaster monitoring, forecasting and early warning method based on interferometric radar provided by an embodiment of the present invention;

[0078] Figure 2 It is a flow chart of encrypting GNSS and D-InSAR monitoring data using a dual-interpolation dual-estimation DIDP algorithm provided by an embodiment of the present invention;

[0079] Figure 3 Schematic diagram of a geological disaster monitoring, forecasting and early warning system based on interferometric radar provided in an embodiment of the present invention;

[0080] In the figure: 1. Joint monitoring module for deformation of goaf area on the surface; 2. Module for delineating abnormal bodies underground; 3. Collaborative dynamic coupling monitoring module. DETAILED DESCRIPTION

[0081] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present invention, so the present invention is not limited by the specific implementation disclosed below.

[0082] Embodiment 1, as Figure 1 As shown, the geological disaster monitoring, forecasting and early warning method based on interferometric radar provided in the embodiment of the present invention includes:

[0083] S1, mining area subsidence monitoring based on the fusion of Beidou GNSS and D-InSAR, and mining area deformation monitoring based on the coupling of SBAS-InSAR and GNSS based on the logarithmic logic model, and joint monitoring of deformation of goaf areas above the well;

[0084] S2, deploy electrical method system and microseismic monitoring system to monitor the underground resistivity and microseismic combined stress change, and realize the delineation of underground abnormal bodies;

[0085] S3, combines the joint monitoring of deformation of goaf areas above the well with the joint monitoring of stress changes of resistivity and microseismicity underground, completes the coordinated dynamic coupling monitoring of the deformation process of the bending and sinking zone, fracture zone and caving zone above the goaf; based on the monitoring results, early warning and forecast are carried out.

[0086] Embodiment 2, as a preferred embodiment, in step S1, mining area subsidence monitoring is performed based on Beidou GNSS and D-InSAR fusion technology.

[0087] The atmospheric tropospheric delay is obtained by using BeiDou GNSS technology, and the atmospheric delay obtained by GNSS data is interpolated. The tropospheric delay of D-InSAR is corrected by using the double difference algorithm between stations and epochs of tropospheric delay. Specifically, a certain number of GNSS continuous observation stations are established in the mining area, a regional water vapor model and an atmospheric delay error correction model are constructed, and the fusion processing of the time domain and the space domain is completed. Then, the double interpolation and double estimation (DIDP) algorithm is used to encrypt the GNSS and D-InSAR monitoring data, weaken the influence of various error factors, and greatly improve the accuracy of deformation monitoring.

[0088] The fusion of Beidou GNSS and D-InSAR (Differential InSAR, DInSAR) data can not only correct the atmospheric delay error that is difficult to eliminate in the InSAR data itself, but also effectively unify the high temporal resolution and high planar position accuracy of GNSS technology with the high spatial resolution and elevation deformation accuracy of InSAR technology.

[0089] In an embodiment of the present invention, preferably, the mining area deformation monitoring based on the SBAS-InSAR and GNSS coupling technology of the logarithmic logic model includes:

[0090] In view of the decoherence phenomenon caused by large gradient deformation in mining areas, small baseline subset-InSAR (SBAS-InSAR) is used to monitor the deformation information of mining areas. This technology can effectively reduce the influence of spatiotemporal decoherence and atmospheric effects. The SBAS-InSAR technology is combined with the global navigation satellite system (GNSS) monitoring to obtain single-point deformation information to construct a log-logistic model. Based on the mining subsidence pattern, single-track InSAR data and limited GNSS data are integrated to achieve overall and high-gradient deformation monitoring and prediction of the mining area. First, the empirical Bayesian Kriging (EBK) interpolation method is used to integrate GNSS and SBAS-InSAR data within a consistent time interval. In this way, the large gradient deformation pattern of the mining area as a whole can be obtained according to the collapse characteristics of the mining area. Subsequently, the log-logistic model is combined with a single InSAR pair to calculate the deformation information generated by mining activities at any time.

[0091] Exemplarily, building a regional water vapor model includes:

[0092] (1) Calculate the water vapor correlation coefficient matrix of the mining area subsidence area, the expression is:

[0093]

[0094] Where G is the water vapor correlation coefficient set of the mining area subsidence area, g to is the sample of the goaf in the well in the time domain g t With spatial domain g o The subset of water vapor correlation coefficients in the mining area subsidence area, t is time, o is space, g to The expression is:

[0095]

[0096] Where z is a certain GNSS continuous observation station network, p is the total GNSS continuous observation station network, g ztis the water vapor correlation coefficient set of a mining area settlement area in the time domain of a certain observation station network point, g zo is the water vapor correlation coefficient set of a certain observation station network point in the mining area subsidence area in the spatial domain, is the average value in the time domain, is the average value in the spatial domain;

[0097] (2) Calculate the water vapor weight value and the water vapor weight vector of the mining area subsidence area. First, solve the weight equation |aI-G|=0 to obtain the water vapor weight value a of the mining area subsidence area. t ,t=1,2…n, and arrange them in order of size, that is, a1≥a2≥…≥a n ≥0; then calculate the water vapor weight vector b of the mining area settlement area corresponding to the water vapor weight value at of the mining area settlement area t ,t=1,2…n; where a is the water vapor weight value of a mining area settlement area, and I is the water vapor weight coefficient of the mining area settlement area;

[0098] (3) Calculate the water vapor presentation rate in the mining area subsidence area and the water vapor aggregation presentation rate in the mining area subsidence area, which are expressed as follows:

[0099] Water vapor presentation rate in the subsidence area of ​​the mining area f t for:

[0100]

[0101] In the formula, a z is the water vapor weight value of the mining area subsidence area at a certain GNSS continuous observation station network point;

[0102] The water vapor accumulation rate in the mining area subsidence area is:

[0103]

[0104] Take the water vapor weight values ​​a1, a2…a of the mining area subsidence area where the water vapor concentration rate reaches 65-85% m The corresponding first, second, ... mth mining area subsidence area;

[0105] (4) Calculate the water vapor load in the mining area subsidence area, the expression is:

[0106]

[0107] In the formula, u to is the water vapor load in the mining area subsidence area, y o is the observed value in each spatial domain, b to is the weight vector of water vapor in the mining area subsidence region in the spatial domain in the time domain;

[0108] Calculate the water vapor load in the mining area subsidence area and calculate the observation value y in each spatial domain o ,o=1,2…p, the corresponding spatial domain f of each mining area settlement area ot ,t=1,2…m, we get:

[0109]

[0110] Where F is the spatial domain set of the settlement areas in each mining area, f pm is a subset of the spatial domain of the mining area subsidence area under the value p in the spatial domain and the value m in the time domain;

[0111] (5) Using the calculated water vapor load of each mining area subsidence area, the water vapor load of the mining area in the first multiple mining areas of the observation spectrum of the observation station is calculated. The expression is:

[0112]

[0113] In the formula, f1, f2…f m are the original variable space domains y1, y2…y m The first, second,…,mth mining area subsidence area.

[0114] Atmospheric delay error correction model, including:

[0115] The gas layer delay error correction factor is as follows:

[0116]

[0117] in,

[0118]

[0119] Where α is the atmospheric delay error correction factor, N is the atmospheric thickness, s is the time, and θ is the M is the movement distance of the gas layer at a certain thickness, θ R is the movement distance deviation of the atmosphere at a certain thickness, K is the movement distance of the atmosphere under height constraint, and h is the height of the atmosphere; ω M is the rate of change of atmospheric water vapor density, is the friction coefficient of atmospheric water vapor motion, is the atmospheric water vapor charge change rate coefficient, σ K is the atmospheric water vapor pressure change, σ b is the atmospheric water vapor distance change rate, is the rate of change of atmospheric water vapor saturation pressure, is the coefficient of variation of atmospheric water vapor mass, is the parameter error of the atmospheric water vapor volume change rate coefficient, Calculate the variance for the atmospheric water vapor loading, Estimate the variance for the atmospheric water vapor loading, Estimated variance of the mining area subsidence in the time domain, is the observed variance in the spatial domain of the mining area subsidence;

[0120] Among them, the regional water vapor model and the atmospheric delay error correction model information are constructed as the input of the observation station network, and the fusion processing of the time domain and the space domain is used as the output of the observation station network to realize the rapid monitoring and inversion of the goaf area shape on the well based on the mining area subsidence area analysis and the observation station network error correction conditions.

[0121] like Figure 2 As shown, for example, the dual interpolation dual estimation DIDP algorithm is used to encrypt GNSS and D-InSAR monitoring data to reduce the impact of various error factors on deformation monitoring. The encryption includes:

[0122] S11, taking out the e-bit set of the original GNSS and D-InSAR monitoring image W as X;

[0123] S12, randomly select a random set Y of e bits;

[0124] S13, perform XOR operation on X and Y to obtain a new set Y1;

[0125] S14, then perform an XOR operation on the random set Y1 itself to obtain the value Y2;

[0126] S15, XOR Y1 and Y2 to obtain a multi-encryption set Z;

[0127] S16, concatenate the set Y and the set W up and down to obtain a final set W1 of size 2e;

[0128] S17, extract the e bit of the image W again, and re-execute steps 2 to 6 until all bits of the image W are extracted, completing the image encryption process.

[0129] Exemplarily, the recovery process is the inverse process of encryption, the input is an encrypted image of size 2|W|, and after a series of settings, a secret image of size |W| is finally output;

[0130] The recovery process includes:

[0131] Step 1: Take out e bits of image information of the specified image in every two rows to obtain 2e bits of image information.

[0132] Step 2: Separate the two rows of information, with the upper e bits of information as information set Y and the lower e bits as information set Z;

[0133] Step 3, XOR Y bit by bit to get Y2;

[0134] Step 4, perform bit-by-bit XOR on set Z and Y2 to obtain set Y1;

[0135] Step 5: XOR the set Y1 with the information set Y to obtain the e-bit original information set X;

[0136] Step 6: Set the remaining information in sequence until all information sets are taken out, the secret image W is obtained, and the recovery process is completed.

[0137] Embodiment 3, as a preferred embodiment, in step S1, the mining area deformation monitoring based on SBAS-InSAR and GNSS coupling based on the logarithmic logic model includes:

[0138] S201, using the empirical Bayesian Kriging EBK interpolation method, integrates GNSS and SBAS-InSAR data in a consistent time interval, and obtains the large-gradient deformation pattern of the entire mining area based on the collapse characteristics of the mining area;

[0139] S202, combining the log-logistic model with a single InSAR pair to calculate the deformation information generated by mining activities at any time.

[0140] In step S202, the log-logistic model is combined with a single InSAR pair to calculate the deformation information generated by mining activities at any time, including:

[0141] Step 1: Given a set of two-dimensional discrete points (x, y, z) deformed at any time during mining activities, number them in the order of reading [1, 2…m], and determine the maximum rectangular area where the discrete points are distributed: [X min ,X max ],[Y min ,Y max ], the two-dimensional discrete point set deformed at any moment of mining activity is used to generate a deformed triangular network of unstructured mining areas;

[0142] Step 2: number all the mining area deformed triangles in sequence [1, 2…n], and record the three vertex numbers corresponding to each mining area deformed triangle and the numbers of the mining area deformed triangles adjacent to its three sides; calculate and save the linear interpolation weight coefficients of all mining area deformed triangles at one time through the improved regression method of the log-logistic model; set the mining area deformation grid spacing in the x and y directions to obtain the nodes to be interpolated in the mining area deformation grid;

[0143] Step 3, select a mining area deformed grid node to be inserted, and use a mining area deformed triangle in the mining area deformed triangle network as a seed mining area deformed triangle, and use the vector product of the point to be inserted and the two vertices of the seed mining area deformed triangle to determine the relative position relationship between the point to be inserted and the edge of the mining area deformed triangle;

[0144] Step 4, repeatedly judging the relationship between the point to be inserted and the edge of the deformed triangle of the mining area, quickly approximating and locating the deformed triangle of the mining area where the node to be inserted is located; if the deformed triangle of the mining area where the node to be inserted is located can be found in the deformed triangle network of the mining area, the node is interpolated using the linear interpolation weight coefficient of the deformed triangle of the mining area; if it is not found, it means that the point to be inserted is not inside the deformed triangle network of the mining area, and no interpolation is performed;

[0145] Step 5, repeat step 4 until the interpolation of all mining area deformed grid nodes is completed, and the mining area deformed gridding results are output to a file in *.grd format;

[0146] Step 6, by combining the log-logistic model with a single InSAR pair, the output to the file is further iterated and regressed to obtain the mining area deformation gridding results at different mining area deformation grid scales.

[0147] In step 2, all the mining area deformed triangles are numbered in sequence [1, 2…n], and the numbers of the three vertices corresponding to each mining area deformed triangle and the numbers of the mining area deformed triangles adjacent to its three sides are recorded, including:

[0148] The coordinate numbers of the two-dimensional discrete point sets deformed at any time of mining activities are used as the vertex numbers of the mining area deformed triangles in the mining area deformed triangle network. For the numbers of the three adjacent mining area deformed triangles of any mining area deformed triangle, the sequence numbers of the mining area deformed triangles in the mining area deformed triangle network are used as the numbers. If the mining area deformed triangle is located at the edge of the mining area deformed triangle network and some edges have no adjacent mining area deformed triangles, the number is set to -1. The positive and negative signs of the number indicate whether the mining area deformed grid node to be inserted is located inside or outside the mining area deformed triangle network.

[0149] In step 2, the recording of the three vertex numbers corresponding to each mining area deformed triangle and the numbers of the mining area deformed triangles adjacent to its three sides includes:

[0150] If the mining area deformation triangle is located inside the mining area deformation triangle network, there are 3 adjacent mining area deformation triangles; if the mining area deformation triangle is located at the edge of the mining area deformation triangle network, there are 1 or 2 adjacent mining area deformation triangles.

[0151] In step 2, the linear interpolation weight coefficients of all the deformed triangles in the mining area are calculated and saved at one time by the regression method improved by the log-logistic model, including:

[0152] Calculate and regress the interpolation weight coefficients a, b, c of all the deformed triangles in the mining area at one time, and the expression is:

[0153] If y1-y3≠0, then:

[0154]

[0155] If y1-y3=0, then:

[0156]

[0157] In the formula, A(x1,y1z1), B(x2,y2z2), and C(x3,y3z3) are the coordinates of the three vertices of the deformed triangle in the mining area; ax+by+c=z is the plane equation.

[0158] The method of using a certain mining area deformed triangle in the mining area deformed triangle network as a seed mining area deformed triangle comprises:

[0159] When interpolating for the first time, the mining area deformed triangle numbered 1 is selected as the initial seed mining area deformed triangle;

[0160] If the mining area deformed triangle located by the current interpolation node is inside the mining area deformed triangle network, the mining area deformed triangle is used as the seed mining area deformed triangle of the next node to be interpolated;

[0161] When searching to the boundary of the mining area deformed triangle network and finding that the current node to be inserted is outside the mining area deformed triangle network, the boundary mining area deformed triangle is used as the seed mining area deformed triangle of the next node to be inserted.

[0162] In step 3, the step of using the vector product of the point to be inserted and two vertices of the deformed triangle of the seed mining area to determine the relative position relationship between the point to be inserted and the edge of the deformed triangle of the mining area includes:

[0163] If the point to be inserted is on the left side of the edge of the mining area deformed triangle, the two vertices of the mining area deformed triangle are replaced in counterclockwise order; if the point to be inserted is on the right side of the edge of the mining area deformed triangle, the mining area deformed triangle adjacent to the right side of the mining area deformed triangle is selected as the new seed mining area deformed triangle.

[0164] In step 4, the method of quickly approaching and locating the deformed triangle of the mining area where the node to be inserted is located includes:

[0165] (1) Given a node P to be inserted and a deformed triangle of a seed mining area, the three vertices of which are denoted as P1, P2, and P3;

[0166] (2) Take vertices P1 and P2 and the node to be inserted P to form a vector and When the vector product When it is established, determine whether the number of the mining area deformed triangle adjacent to the P3P1 side is -1. If it is -1, return to step (1). If it is not -1, take the mining area deformed triangle adjacent to the P3P1 side as the new seed mining area deformed triangle and repeat step (2). If the vector product If not, execute step (3);

[0167] (3) When the vector product When , take vertices P2 and P3 and the node to be inserted P to form a vector and When the vector product When the number of the mining area deformed triangle adjacent to the P3P1 side is -1, it is determined whether it is -1, if it is -1, then return to step (1); if it is not -1, then the mining area deformed triangle adjacent to the P3P1 side is used as a new seed mining area deformed triangle, and step (2) is repeated; vector product If not, proceed to step (4);

[0168] (4) When the vector product When , take vertices P3 and P1 and the node to be inserted P to form a vector and When the vector product Determine whether the number of the deformed mining area triangle adjacent to the P3P1 side is -1. If it is -1, return to step (1). If it is not -1, take the deformed mining area triangle adjacent to the P3P1 side as the new seed deformed mining area triangle and repeat step (2); vector product If not, proceed to step (5);

[0169] (5) When the vector product When , for the vector determined by the deformed triangle of the seed mining area and the node P to be inserted Cross product condition The conditions are satisfied simultaneously. At this time, point P is located inside or on one of the three sides of the deformed triangle of the seed mining area. The deformed triangle of the seed mining area is the deformed triangle of the mining area where point P is located.

[0170] Embodiment 4, as Figure 3 As shown, the geological disaster monitoring, forecasting and early warning system based on interferometric radar provided by the embodiment of the present invention includes:

[0171] The joint monitoring module 1 for deformation of goaf in the well is used for the mining area settlement monitoring based on the fusion of Beidou GNSS and D-InSAR, and the mining area deformation monitoring based on the coupling of SBAS-InSAR and GNSS based on the logarithmic logic model, and the joint monitoring of deformation of goaf in the well;

[0172] The underground abnormal body delineation module 2 is used to respectively deploy the electrical method system and the microseismic monitoring system to monitor the underground resistivity and microseismic combined stress changes, so as to delineate the underground abnormal body;

[0173] The collaborative dynamic coupling monitoring module 3 combines the joint monitoring of the deformation of the goaf area above the well with the joint monitoring of the stress change of the resistivity and microseismicity underground, completes the collaborative dynamic coupling monitoring of the deformation process of the bending and sinking zone, fracture zone and caving zone in the goaf of a certain area, and makes early warning and forecast based on the monitoring results.

[0174] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0175] Since the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present invention, their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.

[0176] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiments can be integrated in one processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment.

[0177] An embodiment of the present invention further provides a computer device, which includes: at least one processor, a memory, and a computer program stored in the memory and executable on the at least one processor, wherein the processor implements the steps in any of the above-mentioned method embodiments when executing the computer program.

[0178] An embodiment of the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.

[0179] An embodiment of the present invention further provides an information data processing terminal, which, when executed on an electronic device, provides a user input interface to implement the steps in the above method embodiments. The information data processing terminal is not limited to mobile phones, computers, and switches.

[0180] An embodiment of the present invention further provides a server, which is used to provide a user input interface to implement the steps in the above method embodiments when executed on an electronic device.

[0181] An embodiment of the present invention provides a computer program product. When the computer program product runs on an electronic device, the electronic device can implement the steps in the above-mentioned method embodiments when executing the computer program product.

[0182] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to the camera / terminal device, a recording medium, a computer memory, a read-only memory (ROM), a random access memory (RAM), an electrical carrier signal, a telecommunication signal, and a software distribution medium. For example, a USB flash drive, a mobile hard disk, a disk or an optical disk.

[0183] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any modifications, equivalent substitutions and improvements made by any technician familiar with the technical field within the technical scope disclosed by the present invention and within the spirit and principles of the present invention should be covered within the protection scope of the present invention.

Claims

1. A geological disaster monitoring, forecasting and early warning method based on interferometric radar, characterized in that: The method includes: S1, mining area subsidence monitoring based on the fusion of Beidou GNSS and D-InSAR, and mining area deformation monitoring based on the coupling of SBAS-InSAR and GNSS based on the logarithmic logic model, and joint monitoring of deformation of goaf areas above the well; S2, deploy electrical method system and microseismic monitoring system to monitor the underground resistivity and microseismic stress changes, and realize the delineation of underground abnormal bodies; S3, combines the joint monitoring of deformation of goaf areas above the well with the joint monitoring of stress changes of resistivity and microseismicity underground, completes the coordinated dynamic coupling monitoring of the deformation process of the bending and sinking zone, fracture zone and caving zone above the goaf; based on the monitoring results, early warning and forecast are carried out.

2. The method for monitoring, forecasting and warning of geological disasters based on interferometric radar according to claim 1 is characterized in that: In step S1, mining area subsidence monitoring based on the fusion of Beidou GNSS and D-InSAR includes: S101, establish a GNSS continuous observation station network in the mining area, build a regional water vapor model and an atmospheric delay error correction model, and complete the fusion processing of the time domain and the space domain; S102, the double-interpolation and double-estimation DIDP algorithm is used to encrypt the GNSS and D-InSAR monitoring data to reduce the impact of various error factors on deformation monitoring.

3. The method for monitoring, forecasting and warning of geological disasters based on interferometric radar according to claim 2 is characterized in that: In step S101, a regional water vapor model is constructed, including: (1) Calculate the water vapor correlation coefficient matrix of the mining area subsidence area, the expression is: Where G is the water vapor correlation coefficient set of the mining area subsidence area, g to is the sample of the goaf in the well in the time domain g t With spatial domain g o The subset of water vapor correlation coefficients in the mining area subsidence area, t is time, o is space, g to The expression is: Where z is a certain GNSS continuous observation station network, p is the total GNSS continuous observation station network, g zt is the water vapor correlation coefficient set of a mining area settlement area in the time domain of a certain observation station network point, g zo is the water vapor correlation coefficient set of a certain observation station network point in the mining area subsidence area in the spatial domain, is the average value in the time domain, is the average value in the spatial domain; (2) Calculate the water vapor weight value and the water vapor weight vector of the mining area subsidence area. First, solve the weight equation |aI-G|=0 to obtain the water vapor weight value a of the mining area subsidence area. t ,t=1,2…n, and arrange them in order of size, that is, a1≥a2≥…≥a n ≥0; then calculate the water vapor weight vector b of the mining area settlement area corresponding to the water vapor weight value at of the mining area settlement area t ,t=1,2…n; where a is the water vapor weight value of a mining area settlement area, and I is the water vapor weight coefficient of the mining area settlement area; (3) Calculate the water vapor presentation rate in the mining area subsidence area and the water vapor aggregation presentation rate in the mining area subsidence area, which are expressed as follows: Water vapor presentation rate in the subsidence area of ​​the mining area f t for: In the formula, a z is the water vapor weight value of the mining area subsidence area at a certain GNSS continuous observation station network point; The water vapor accumulation rate in the mining area subsidence area is: Take the water vapor weight values ​​a1, a2…a of the mining area subsidence area where the water vapor concentration rate reaches 65-85% m The corresponding first, second, ... mth mining area subsidence area; (4) Calculate the water vapor load in the mining area subsidence area, the expression is: In the formula, u to is the water vapor load in the mining area subsidence area, y o is the observed value in each spatial domain, b to is the weight vector of water vapor in the mining area subsidence region in the spatial domain in the time domain; Calculate the water vapor load in the mining area subsidence area and calculate the observation value y in each spatial domain o ,o=1,2…p, the corresponding spatial domain f of each mining area settlement area ot ,t=1,2…m, we get: Where F is the spatial domain set of the settlement areas in each mining area, f pm is a subset of the spatial domain of the mining area subsidence area under the value p in the spatial domain and the value m in the time domain; (5) Using the calculated water vapor load of each mining area subsidence area, the water vapor load of the mining area in the first multiple mining areas of the observation spectrum of the observation station is calculated. The expression is: In the formula, f1, f2…f m are the original variable space domains y1, y2…y m The first, second,…,mth mining area subsidence area.

4. The method for monitoring, forecasting and warning of geological disasters based on interferometric radar according to claim 2 is characterized in that: In step S101, the atmospheric delay error correction model includes: The gas layer delay error correction factor is as follows: in, Where α is the atmospheric delay error correction factor, N is the atmospheric thickness, s is the time, and θ is the M is the movement distance of the gas layer at a certain thickness, θ R is the movement distance deviation of the atmosphere at a certain thickness, K is the movement distance of the atmosphere under height constraint, h is the height of the atmosphere, ω M is the rate of change of atmospheric water vapor density, is the friction coefficient of atmospheric water vapor motion, is the atmospheric water vapor charge change rate coefficient, σ K is the atmospheric water vapor pressure change, σ b is the atmospheric water vapor distance change rate, is the rate of change of the atmospheric water vapor saturation pressure, is the coefficient of variation of atmospheric water vapor mass, is the parameter error of the atmospheric water vapor volume change rate coefficient, Calculate the variance for the atmospheric water vapor loading, Estimate the variance for the atmospheric water vapor loading, Estimated variance of the mining area subsidence in the time domain, is the observed variance in spatial domain of mining subsidence area.

5. The method for monitoring, forecasting and warning of geological disasters based on interferometric radar according to claim 2 is characterized in that: In step S101, a regional water vapor model and an atmospheric delay error correction model are constructed as the input of the observation station network, and the fusion processing of the time domain and the space domain is used as the output of the observation station network to achieve rapid monitoring and inversion of the goaf area shape on the well based on the mining area subsidence regional analysis and the observation station network error correction conditions.

6. The method for monitoring, forecasting and warning of geological disasters based on interferometric radar according to claim 2 is characterized in that: In step S102, the GNSS and D-InSAR monitoring data are encrypted using a dual interpolation dual estimation DIDP algorithm, including: S11, taking out the e-bit set of the original GNSS and D-InSAR monitoring image W as X; S12, randomly select a random set Y of e bits; S13, perform XOR operation on X and Y to obtain a new set Y1; S14, then perform an XOR operation on the random set Y1 itself to obtain the value Y2; S15, XOR Y1 and Y2 to obtain a multi-encryption set Z; S16, concatenate the set Y and the set W up and down to obtain a final set W1 of size 2e; S17, extract the e bit of the image W again, and re-execute steps 2 to 6 until all bits of the image W are extracted, completing the image encryption process.

7. The method for monitoring, forecasting and warning of geological disasters based on interferometric radar according to claim 1 is characterized in that: In step S1, the mining area deformation monitoring based on SBAS-InSAR coupled with GNSS based on the logarithmic logistic model includes: S201, using the empirical Bayesian Kriging EBK interpolation method, integrates GNSS and SBAS-InSAR data in a consistent time interval, and obtains the large-gradient deformation pattern of the entire mining area based on the collapse characteristics of the mining area; S202, combining the log-logistic model with a single InSAR pair to calculate the deformation information generated by mining activities at any time.

8. The method for monitoring, forecasting and warning of geological disasters based on interferometric radar according to claim 7 is characterized in that: In step S202, the log-logistic model is combined with a single InSAR pair to calculate the deformation information generated by mining activities at any time, including: Step 1: Given a set of two-dimensional discrete points (x, y, z) deformed at any time during mining activities, number them in the order of reading [1, 2…m], and determine the maximum rectangular area where the discrete points are distributed: [X min ,X max ],[Y min ,Y max ], the two-dimensional discrete point set deformed at any moment of mining activity is used to generate a deformed triangular network of unstructured mining areas; Step 2: number all the mining area deformed triangles in sequence [1, 2…n], and record the three vertex numbers corresponding to each mining area deformed triangle and the numbers of the mining area deformed triangles adjacent to its three sides; calculate and save the linear interpolation weight coefficients of all mining area deformed triangles at one time through the improved regression method of the log-logistic model; set the mining area deformation grid spacing in the x and y directions to obtain the nodes to be interpolated in the mining area deformation grid; Step 3, select a mining area deformed grid node to be inserted, and use a mining area deformed triangle in the mining area deformed triangle network as a seed mining area deformed triangle, and use the vector product of the point to be inserted and the two vertices of the seed mining area deformed triangle to determine the relative position relationship between the point to be inserted and the edge of the mining area deformed triangle; Step 4, repeatedly judging the relationship between the point to be inserted and the edge of the deformed triangle of the mining area, quickly approximating and locating the deformed triangle of the mining area where the node to be inserted is located; if the deformed triangle of the mining area where the node to be inserted is located can be found in the deformed triangle network of the mining area, the node is interpolated using the linear interpolation weight coefficient of the deformed triangle of the mining area; if it is not found, it means that the point to be inserted is not inside the deformed triangle network of the mining area, and no interpolation is performed; Step 5, repeat step 4 until the interpolation of all mining area deformed grid nodes is completed, and the mining area deformed gridding results are output to a file in *.grd format; Step 6, by combining the log-logistic model with a single InSAR pair, the output to the file is further iterated and regressed to obtain the mining area deformation gridding results at different mining area deformation grid scales.

9. The method for monitoring, forecasting and warning of geological disasters based on interferometric radar according to claim 8, characterized in that: In step 2, the linear interpolation weight coefficients of all the deformed triangles in the mining area are calculated and saved at one time through the improved regression method of the log-logistic model, including: Calculate and regress the interpolation weight coefficients a, b, c of all the deformed triangles in the mining area at one time, and the expression is: If y1-y3≠0, then: If y1-y3=0, then: In the formula, A(x1,y1z1), B(x2,y2z2), and C(x3,y3z3) are the coordinates of the three vertices of the deformed triangle in the mining area; ax+by+c=z is the plane equation.

10. A geological disaster monitoring, forecasting and early warning system based on interferometric radar, characterized in that: The system implements the geological disaster monitoring, forecasting and early warning method based on interferometric radar as described in any one of claims 1 to 9, and the system includes: The joint monitoring module (1) for deformation of the goaf area above the well is used for the mining area settlement monitoring based on the fusion of Beidou GNSS and D-InSAR, and the mining area deformation monitoring based on the coupling of SBAS-InSAR and GNSS based on the logarithmic logic model, and the joint monitoring of deformation of the goaf area above the well; A downhole abnormal body delineation module (2) is used to respectively deploy an electrical method system and a microseismic monitoring system to monitor downhole resistivity and microseismic combined stress changes, thereby delineating downhole abnormal bodies; The collaborative dynamic coupling monitoring module (3) is used to combine the joint monitoring of the deformation of the goaf area above the well with the joint monitoring of the stress change of the resistivity and microseismicity in the well, so as to complete the collaborative dynamic coupling monitoring of the deformation process of the bending and sinking zone, the fracture zone and the caving zone above the goaf; and to carry out early warning and forecasting based on the monitoring results.

Citation Information

Patent Citations

  • Method for monitoring and resolving three-dimensional ground surface deformation of industrial and mining area by means of multi-source SAR image

    CN106526590A

  • Landslide early recognition method based on small baseline set time sequence InSAR

    CN107132539A

  • Ground surface deformation monitoring method integrating InSAR and GPS

    CN112050725A

  • Coal mining three-zone development characteristic detection method, device, equipment and medium

    CN117192605A

  • InSAR and GNSS weighting method for three-dimensional surface deformation estimation

    US20210011149A1

Cited By

  • Laser radar and meteorological early warning combined coal mine geological disaster monitoring method and system

    CN120491094A

  • A laser radar combined with meteorological early warning coal mine geological disaster monitoring method and system

    CN120491094B

  • Automatic geological disaster monitoring device and monitoring method

    CN120808540A

  • Coal mine area goaf geological disaster forecasting and early warning system and method

    CN122014348A