High-power grid-following type energy storage converter voltage fault ride-through detection method
By adopting the voltage fault ride-through detection method of high-power and grid-type energy storage converters in large and medium-sized energy storage systems, and using Clark transformation and filtering technology to quickly latch the voltage amplitude of the grid connection point, fault diagnosis under abnormal grid voltage conditions is solved. The problem of long time and low reliability is achieved by fast and accurate voltage fault detection and current limit control.
Patent Information
- Application Number
- CN202410790580.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-10-18
AI Technical Summary
Fault diagnosis of large and medium-sized energy storage systems takes a long time when the grid voltage is abnormal, and the detection reliability is low. It is difficult to quickly and accurately identify voltage ride-through faults, which affects current limiting control and fault ride-through processing.
The high-power and grid-type energy storage converter voltage fault ride-through detection method is used to collect the three-phase grid-connected point voltage for Clark transformation and filtering processing to obtain the standard sinusoidal voltage component, combined with sliding window filtering and signal delay technology, to quickly latch For the grid-connected point voltage amplitude, edge detection is used to determine the occurrence and recovery time of voltage ride-through faults, and flag bits are used to avoid false detection.
It achieves fast, accurate and reliable voltage fault detection, shortens fault diagnosis time, improves the response speed and reliability of the system, and ensures stable operation under abnormal grid voltage conditions.
Smart Images

Figure CN118795210A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power grid energy storage, and in particular relates to a voltage fault ride-through detection method for a high-power grid-following energy storage converter. Background Art
[0002] The low voltage ride through requirements for high voltage energy storage inverter systems in the "Technical Specifications for Energy Storage Inverters of Electrochemical Energy Storage Systems" are as follows: Large and medium-sized energy storage power stations should have a certain ability to withstand voltage anomalies to avoid disconnection when the grid voltage is abnormal, causing loss of grid power supply.
[0003] Traditionally, voltage fault detection of energy storage converters is generally confirmed as high voltage ride-through fault, low voltage ride-through fault or even zero voltage ride-through fault by the amplitude of three-phase grid-connected voltage. This method needs a power frequency cycle (20ms) to detect the fault type and the jump of grid-connected voltage will affect the jump of fault state. With the steady advancement of national environmental protection policies, the industry and technology have been further developed. At present, the more mature phase-locked loop (PLL) technology is mainly divided into positive and negative sequence dual dq rotating coordinate system phase-locked loop (DDSRF-PLL) and dual second-order integrator phase-locked loop (DSOGI-PLL). By adjusting the control parameters, the two can be equivalent. The phase-locked loop technology can complete the positive and negative sequence decoupling control of the grid-connected point voltage, and perform directional control on the positive sequence of the grid-connected point. The physical meaning of the variable ud+ is the amplitude of the positive sequence voltage, and the negative sequence of the grid-connected point is directional control. The physical meaning of the variable ud- is the amplitude of the negative sequence voltage. When the three-phase voltage of the grid connection point is balanced, the positive sequence voltage amplitude ud+ is the voltage amplitude of the grid connection point, and the negative sequence voltage amplitude ud- is zero. Under high and low voltage ride-through faults and zero voltage ride-through faults, the three-phase voltage may drop or rise symmetrically or drop asymmetrically. The fault can be diagnosed by comparing the variable ud+- and the subsequent control strategy can be completed. Voltage fault diagnosis based on the phase-locked loop can effectively determine the voltage ride-through fault, but due to the large inertia control characteristics of the proportional integral controller (PI) in the phase-locked loop, the diagnosis time is about 15ms to 50ms. Summary of the invention
[0004] In view of the shortcomings existing in the relevant technologies, in order to overcome the problem that large and medium-sized energy storage systems are restricted in the speed and reliability of handling abnormal grid voltage conditions, shorten the fault diagnosis time, and improve the reliability of fault diagnosis, a voltage fault ride-through detection method for a high-power grid-following energy storage converter is proposed, which is convenient for carrying out current limiting control and positive and negative sequence control during fault ride-through as soon as possible, and reliably completing the fault ride-through.
[0005] According to one aspect of the present application, a method for detecting voltage fault ride-through of a high-power grid-connected energy storage converter is provided, comprising the following steps:
[0006] S1, collect the three-phase grid connection point voltages Uab, Ubc, and Uca, and perform Clark transformation to obtain the Ualpha and Ubeta voltage components;
[0007] Band-pass filtering is performed on the Ualpha and Ubeta voltage components to remove high-frequency components and obtain standard sinusoidal Ualpha and Ubeta voltage components;
[0008] S2, calculate the grid connection point voltage amplitude gridSQ, and process it through a notch filter and a low-pass filter to obtain the filtered grid connection point voltage amplitude notchAmp;
[0009] S3, perform sliding window filtering on the grid connection point voltage amplitude gridSQ, perform amplitude limiting processing, and output the filtered signal with a delay of 20ms, and the signal is defined as gridSQd20ms;
[0010] Define the variable vrtudLatch to follow gridSQd20ms in the absence of voltage ride-through fault. At the time of voltage ride-through fault, the current gridSQd20ms value is latched as the grid-connected point voltage amplitude latch value vrtudLatch.
[0011] S4. Determine whether the grid connection point voltage notchAmp is less than 0.85 times the grid connection point voltage amplitude latch value vrtudLatch, and whether the grid connection point voltage amplitude gridSQ is less than 850V; if so, capture the moment when the low voltage ride-through fault occurs, and set the rising edge capture flag lvrtEdgeS to 1; if not, set the rising edge capture flag lvrtEdgeS to 0;
[0012] S5. Confirm the validity of rising edge capture, define the rising edge capture bit lvrtEdgeSPrev of the previous sampling cycle when the low voltage fault ride-through occurs, and judge that the status of lvrtEdgeSPrev and the current rising edge capture bit lvrtEdgeS is (0 1). Then, it is determined that the low voltage ride-through rising edge trigger is valid, and lvrtS is set to 1; otherwise, it is determined that the low voltage ride-through rising edge trigger is invalid, and lvrtS is set to 0.
[0013] In a possible implementation manner, determining whether the low voltage ride through fault is recovered includes:
[0014] S6, synchronous with step S4, if the grid voltage notchAmp is greater than or equal to 0.85 times the grid voltage amplitude latch value vrtudLatch, and the grid voltage amplitude gridSQ is greater than or equal to 920V, and the low voltage fault register (lvrtRSREG) is always 1; capture the rising edge of the low voltage fault ride-through recovery, and set lvrtEdgeR to 1; otherwise, set lvrtEdgeR to 0;
[0015] S7. Define the rising edge capture bit lvrtEdgeRPrev of the previous sampling cycle at the time of low voltage fault ride-through recovery, and determine whether the states of lvrtEdgeRPrev and the current rising edge capture bit lvrtEdgeR are (0 1); if so, determine that the rising edge trigger at the time of low voltage ride-through fault recovery is valid, and set lvrtR to 1; if not, determine that the rising edge trigger at the time of low voltage ride-through fault recovery is invalid, and set lvrtS to 0;
[0016] S8. If the rising edge trigger bit (lvrtS) is always 1 when the low voltage ride-through fault occurs and the rising edge trigger bit (lvrtR) is always 0 when the low voltage ride-through fault is recovered, then the low voltage fault register (lvrtRSREG) is set to 1 to determine that a low voltage ride-through fault has occurred; if the rising edge trigger bit (lvrtS) is always 0 when the low voltage ride-through fault occurs and the rising edge trigger bit (lvrtR) is always 1 when the low voltage ride-through fault is recovered, that is, the low voltage fault register (lvrtRSREG) is 0, then it is determined that the low voltage ride-through fault has ended and the grid connection point has returned to normal.
[0017] In a possible implementation manner, determining a zero voltage ride-through fault includes:
[0018] S9. Calculate the fall depth according to the following formula:
[0019]
[0020] If the low voltage fault register (lvrtRSREG) is 1 and the drop depth D is always less than 0.1, it is determined that a zero voltage drop fault occurs at the grid connection point; and the fault flag zvrtFlag is set to 1; if lvrtRSREG is 1 and the drop depth D is always greater than 0.1, it is a low voltage ride-through fault, and the fault flag zvrtFlag is set to 0.
[0021] In a possible implementation manner, the step further includes determining a high voltage ride through fault, including:
[0022] S10. If the grid connection point voltage notchAmp is greater than or equal to 1.1 times the grid connection point voltage amplitude latch value vrtudLatch, and the grid connection point voltage amplitude gridSQ is greater than or equal to 1550V, then capture the rising edge of the high voltage fault ride-through occurrence moment and set hvrtEdgeS to 1, otherwise set hvrtEdgeS to 0;
[0023] S11. Define the rising edge capture bit hvrtEdgeSPrev of the previous sampling cycle when the high voltage fault ride-through occurs, and judge that the status of hvrtEdgeSPrev and the current rising edge capture bit hvrtEdgeS are (0 1), then determine that the high voltage ride-through rising edge trigger is valid, and set hvrtS to 1; otherwise, determine that the high voltage ride-through rising edge trigger is invalid, and set hvrtS to 0.
[0024] In a possible implementation manner, determining whether the high voltage ride through fault is restored includes:
[0025] S12, at the same time as S10, determine whether the grid connection point voltage notchAmp is less than or equal to 1.1 times the grid connection point voltage amplitude latch value vrtudLatch, and the grid connection point voltage amplitude gridSQ is less than or equal to 1110V, and the high voltage ride-through fault register (hvrtRSREG) is always 1; if so, capture the rising edge of the high voltage fault ride-through recovery and set hvrtEdgeR to 1; if not, set hvrtEdgeR to 0;
[0026] S13, define the rising edge capture bit hvrtEdgeRPrev of the previous sampling cycle at the time of high voltage fault ride through recovery, judge that the states of hvrtEdgeRPrev and the current rising edge capture bit hvrtEdgeR are (01), then determine that the rising edge trigger at the time of high voltage ride through fault recovery is valid, and set hvrtR to 1; otherwise, determine that the rising edge trigger at the time of high voltage ride through fault recovery is invalid, and set hvrtR to 0;
[0027] S14. If the rising edge trigger bit (hvrtS) is always 1 when the high voltage fault occurs, and the rising edge trigger bit (hvrtR) is always 0 when the high voltage fault is recovered, the high voltage fault register (hvrtRSREG) can be set to 1, and it is determined that a high voltage fault has occurred; if the rising edge trigger bit (hvrtS) is always 0 when the high voltage fault occurs, and the rising edge trigger bit (hvrtR) is always 1 when the high voltage fault is recovered, that is, the high voltage fault register (hvrtRSREG) is 0, it is determined that the high voltage fault has been recovered.
[0028] In a possible implementation, it further includes:
[0029] S16, set the three flags lvrtDelay100ms, hvrtDelay100ms, and zvrtDelay100ms, and initialize them to 0;
[0030] S17, in the next sampling cycle after the low voltage fault ride-through is completed, the flag bit lvrtDelay100ms is set to 1 and the timing is started. After a delay of 100ms, the flag bit lvrtDelay100ms is cleared to 0. During the 100ms period when the flag bit lvrtDelay100ms is 1, the system does not respond to the detection of the high voltage fault ride-through;
[0031] S18: When the flag bit hvrtDelay100ms is 1, the system does not respond to the low voltage fault ride-through detection within 100ms.
[0032] In a possible implementation, in step S2, the grid connection point voltage amplitude gridSQ is calculated according to the following formula:
[0033] In a possible implementation, in step S3, sliding window filtering is performed on the grid connection point voltage amplitude gridSQ, and a limiting process is performed, and the limiting voltage is 200-1300V.
[0034] Based on the above scheme, the voltage ride-through fault detection method of the high-power grid-connected energy storage converter of the present invention acquires the voltage component by collecting the three-phase grid-connected point voltage and performing Clark transformation, and obtains the standard sinusoidal voltage component after filtering, thereby effectively detecting and determining the occurrence and recovery of low voltage and high voltage ride-through faults, and has the following beneficial effects:
[0035] (I) The detection method is simple, fast, accurate and reliable: The present invention uses the basic coordinate transformation technology, namely Clark transformation, and filtering technology to quickly obtain the positive sequence voltage amplitude of the grid connection point; compared with the traditional three-phase grid-connected voltage amplitude high and low detection method, the detection process is simplified, and the occurrence and recovery of voltage ride-through faults can be accurately located and detected in a very short time, thereby improving the response speed and reliability of the system.
[0036] (ii) Real-time update of voltage drop depth D: Through sliding window filtering and signal delay output, an amplitude signal with a 20ms lag behind the positive sequence voltage amplitude at the grid connection point is constructed, and the signal is latched at the fault time, providing reliable data support for the calculation of the drop depth; the drop depth can be quickly identified and updated in real time to ensure that the control strategy during the fault period is timely and accurate.
[0037] (III) Edge detection is used to quickly confirm the occurrence and recovery time of faults, avoiding misjudgment caused by voltage fluctuations at the grid connection point; it effectively overcomes the detection time lag problem caused by its large inertia control, making fault detection more agile.
[0038] (iv) Use relevant flags to avoid system misdetection during low voltage, zero voltage fault recovery and high voltage fault recovery, thus improving the reliability of fault detection.
[0039] In summary, the voltage fault ride-through detection method for a high-power grid-connected energy storage converter of the present invention improves the efficiency and accuracy of fault detection, ensuring that the system can respond to various abnormal conditions of the grid-connected voltage in a timely manner and maintain stable operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0041] Figure 1 Energy storage converter circuit topology diagram;
[0042] Figure 2 A low voltage ride-through fault detection flow chart of a voltage fault ride-through detection method for a high-power grid-connected energy storage converter according to an embodiment of the present invention;
[0043] Figure 3 Corresponding detection signal state when low voltage ride-through fault occurs in a voltage fault ride-through detection method of a high-power grid-type energy storage converter according to an embodiment of the present invention
[0044] Figure 4 A schematic diagram of the corresponding detection signal state when a low voltage ride-through fault is recovered in a voltage fault ride-through detection method for a high-power grid-connected energy storage converter according to an embodiment of the present invention;
[0045] Figure 5 A schematic diagram of state logic judgment when a low voltage ride-through fault occurs in a voltage fault ride-through detection method for a high-power grid-type energy storage converter according to an embodiment of the present invention;
[0046] Figure 6 A schematic diagram of state logic judgment during low voltage ride-through fault recovery of a voltage fault ride-through detection method for a high-power grid-connected energy storage converter according to an embodiment of the present invention. DETAILED DESCRIPTION
[0047] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0048] In the description of the present invention, it should be understood that the terms "center", "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0049] The terms "first", "second", and "third" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the technical features indicated. Thus, a feature defined as "first", "second", and "third" may explicitly or implicitly include one or more of the features.
[0050] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0051] In order to solve the problem of slow response speed and low detection reliability of fault occurrence detection and fault recovery detection in traditional voltage fault detection methods in the prior art when the grid voltage is abnormal in large and medium-sized energy storage systems.
[0052] According to one aspect of the present application, a method for detecting voltage fault ride-through of a high-power grid-connected energy storage converter is provided, comprising the following steps:
[0053] S1, collect the three-phase grid connection point voltages Uab, Ubc, and Uca, and perform Clark transformation to obtain the Ualpha and Ubeta voltage components;
[0054] Band-pass filtering is performed on the Ualpha and Ubeta voltage components to remove high-frequency components and obtain standard sinusoidal Ualpha and Ubeta voltage components;
[0055] S2, calculate the grid connection point voltage amplitude gridSQ, and process it through a notch filter and a low-pass filter to obtain the filtered grid connection point voltage amplitude notchAmp;
[0056] S3, perform sliding window filtering on the grid connection point voltage amplitude gridSQ, perform amplitude limiting processing, and output the filtered signal with a delay of 20ms, and the signal is defined as gridSQd20ms;
[0057] Define the variable vrtudLatch to follow gridSQd20ms in the absence of voltage ride-through fault. At the time of voltage ride-through fault, the current gridSQd20ms value is latched as the grid-connected point voltage amplitude latch value vrtudLatch.
[0058] S4. Determine whether the grid connection point voltage notchAmp is less than 0.85 times the grid connection point voltage amplitude latch value vrtudLatch, and whether the grid connection point voltage amplitude gridSQ is less than 850V; if so, capture the moment when the low voltage ride-through fault occurs, and set the rising edge capture flag lvrtEdgeS to 1; if not, set the rising edge capture flag lvrtEdgeS to 0;
[0059] S5. Confirm the validity of rising edge capture, define the rising edge capture bit lvrtEdgeSPrev of the previous sampling cycle when the low voltage fault ride-through occurs, and judge that the status of lvrtEdgeSPrev and the current rising edge capture bit lvrtEdgeS is (0 1). Then, it is determined that the low voltage ride-through rising edge trigger is valid, and lvrtS is set to 1; otherwise, it is determined that the low voltage ride-through rising edge trigger is invalid, and lvrtS is set to 0.
[0060] In a possible implementation manner, determining whether the low voltage ride through fault is recovered includes:
[0061] S6, synchronous with step S4, if the grid voltage notchAmp is greater than or equal to 0.85 times the grid voltage amplitude latch value vrtudLatch, and the grid voltage amplitude gridSQ is greater than or equal to 920V, and the low voltage fault register (lvrtRSREG) is always 1; capture the rising edge of the low voltage fault ride-through recovery, and set lvrtEdgeR to 1; otherwise, set lvrtEdgeR to 0;
[0062] S7. Define the rising edge capture bit lvrtEdgeRPrev of the previous sampling cycle at the time of low voltage fault ride-through recovery, and determine whether the states of lvrtEdgeRPrev and the current rising edge capture bit lvrtEdgeR are (0 1); if so, determine that the rising edge trigger at the time of low voltage ride-through fault recovery is valid, and set lvrtR to 1; if not, determine that the rising edge trigger at the time of low voltage ride-through fault recovery is invalid, and set lvrtS to 0;
[0063] S8. If the rising edge trigger bit (lvrtS) is always 1 when the low voltage ride-through fault occurs and the rising edge trigger bit (lvrtR) is always 0 when the low voltage ride-through fault is recovered, then the low voltage fault register (lvrtRSREG) is set to 1 to determine that a low voltage ride-through fault has occurred; if the rising edge trigger bit (lvrtS) is always 0 when the low voltage ride-through fault occurs and the rising edge trigger bit (lvrtR) is always 1 when the low voltage ride-through fault is recovered, that is, the low voltage fault register (lvrtRSREG) is 0, then it is determined that the low voltage ride-through fault has ended and the grid connection point has returned to normal.
[0064] In a possible implementation manner, determining a zero voltage ride-through fault includes:
[0065] S9. Calculate the fall depth according to the following formula:
[0066]
[0067] If the low voltage fault register (lvrtRSREG) is 1 and the drop depth D is always less than 0.1, it is determined that a zero voltage drop fault occurs at the grid connection point; and the fault flag zvrtFlag is set to 1; if lvrtRSREG is 1 and the drop depth D is always greater than 0.1, it is a low voltage ride-through fault, and the fault flag zvrtFlag is set to 0.
[0068] In a possible implementation manner, the step further includes determining a high voltage ride through fault, including:
[0069] S10. If the grid connection point voltage notchAmp is greater than or equal to 1.1 times the grid connection point voltage amplitude latch value vrtudLatch, and the grid connection point voltage amplitude gridSQ is greater than or equal to 1550V, then capture the rising edge of the high voltage fault ride-through occurrence moment and set hvrtEdgeS to 1, otherwise set hvrtEdgeS to 0;
[0070] S11. Define the rising edge capture bit hvrtEdgeSPrev of the previous sampling cycle when the high voltage fault ride-through occurs, and judge that the status of hvrtEdgeSPrev and the current rising edge capture bit hvrtEdgeS are (0 1), then determine that the high voltage ride-through rising edge trigger is valid, and set hvrtS to 1; otherwise, determine that the high voltage ride-through rising edge trigger is invalid, and set hvrtS to 0.
[0071] In a possible implementation manner, determining whether the high voltage ride through fault is restored includes:
[0072] S12, at the same time as S10, determine whether the grid connection point voltage notchAmp is less than or equal to 1.1 times the grid connection point voltage amplitude latch value vrtudLatch, and the grid connection point voltage amplitude gridSQ is less than or equal to 1110V, and the high voltage ride-through fault register (hvrtRSREG) is always 1; if so, capture the rising edge of the high voltage fault ride-through recovery and set hvrtEdgeR to 1; if not, set hvrtEdgeR to 0;
[0073] S13, define the rising edge capture bit hvrtEdgeRPrev of the previous sampling cycle at the time of high voltage fault ride through recovery, judge that the states of hvrtEdgeRPrev and the current rising edge capture bit hvrtEdgeR are (01), then determine that the rising edge trigger at the time of high voltage ride through fault recovery is valid, and set hvrtR to 1; otherwise, determine that the rising edge trigger at the time of high voltage ride through fault recovery is invalid, and set hvrtR to 0;
[0074] S14. If the rising edge trigger bit (hvrtS) is always 1 when the high voltage fault occurs, and the rising edge trigger bit (hvrtR) is always 0 when the high voltage fault is recovered, the high voltage fault register (hvrtRSREG) can be set to 1, and it is determined that a high voltage fault has occurred; if the rising edge trigger bit (hvrtS) is always 0 when the high voltage fault occurs, and the rising edge trigger bit (hvrtR) is always 1 when the high voltage fault is recovered, that is, the high voltage fault register (hvrtRSREG) is 0, it is determined that the high voltage fault has been recovered.
[0075] In a possible implementation, it further includes:
[0076] S15. During high voltage fault ride-through, the grid connection point drop depth D is determined according to the following formula:
[0077]
[0078] The drop depth D is used for reactive power compensation calculation in the subsequent ride-through strategy, and this key data needs to be provided during voltage ride-through detection.
[0079] S16, set the three flags lvrtDelay100ms, hvrtDelay100ms, and zvrtDelay100ms, and initialize them to 0;
[0080] S17, in the next sampling cycle after the low voltage fault ride-through is completed, the flag bit lvrtDelay100ms is set to 1 and the timing is started. After a delay of 100ms, the flag bit lvrtDelay100ms is cleared to 0. During the 100ms period when the flag bit lvrtDelay100ms is 1, the system does not respond to the detection of the high voltage fault ride-through;
[0081] S18: When the flag bit hvrtDelay100ms is 1, the system does not respond to the low voltage fault ride-through detection within 100ms.
[0082] In a possible implementation, in step S2, the grid connection point voltage amplitude gridSQ is calculated according to the following formula:
[0083] In a possible implementation, in step S3, sliding window filtering is performed on the grid connection point voltage amplitude gridSQ, and a limiting process is performed, and the limiting voltage is 200-1300V.
[0084] A method for detecting voltage fault ride-through of a high-power grid-type energy storage converter according to an embodiment of the present invention is specifically described as follows:
[0085] In order to overcome the problem that large and medium-sized energy storage systems are restricted in the speed and reliability of handling abnormal grid voltage conditions, shorten the fault diagnosis time and improve the reliability of fault diagnosis, a fast and accurate determination method for voltage fault ride-through of a high-power energy storage converter is proposed, which facilitates the implementation of current limiting control and positive and negative sequence control during fault ride-through as soon as possible, and reliably completes the fault ride-through.
[0086] Energy storage converter system Figure 1 As shown, it is mainly composed of AC / DC switches, filter circuits and main power inverter units, which can complete functions such as bidirectional grid connection and DC side charging and discharging.
[0087] Based on the summary of existing engineering applications, the present invention proposes a method for quickly and accurately determining the voltage fault ride-through of a high-power energy storage converter. After the voltage ride-through fault is detected, the voltage drop depth D is updated in real time, so as to carry out current limiting control and positive and negative sequence control during the fault ride-through as soon as possible, and reliably complete the fault ride-through.
[0088] The voltage drop depth D is defined as follows: the ratio of the drop phase voltage to the rated grid phase voltage.
[0089] The grid connection point voltage of large and medium energy storage converter systems is about 690Vac (effective value of line voltage). To facilitate the subsequent description of the method of the present invention, the grid connection point voltage is assumed to be 690Vac in the following text.
[0090] The specific implementation plan is as follows:
[0091] S1: Collect the three-phase grid-connected point voltages Uab, Ubc, and Uca, and perform Clark transformation on the three-phase grid-connected point voltages to obtain Ualpha and Ubeta voltage components. Use a 50 Hz bandpass filter (BPF) to filter out the high-frequency components of Ualpha and Ubeta to obtain standard sinusoidal Ualpha and Ubeta voltage components.
[0092] Figure 1 The UVW three-phase voltage is the phase voltage, and the above Uab, Ubc, and Uca are the line voltages, all of which are obtained from this position;
[0093] S2: Calculate the grid voltage amplitude gridSQ for the standard sinusoidal voltage components Ualpha and Ubeta in S1:
[0094]
[0095] Taking into account the existence of double frequency (100 Hz) oscillation in the grid connection point voltage amplitude gridSQ during high and low voltage faults and zero voltage fault ride-through, the double frequency oscillation in the voltage component of the grid connection point voltage amplitude gridSQ is filtered out by a notch filter, and the grid connection point voltage amplitude is further defined as notchAmp after passing through a first-order low-pass filter (LPF). The grid connection point voltage notchAmp is used as the basis for judging voltage fault ride-through.
[0096] S3: Further, the grid voltage amplitude gridSQ is subjected to sliding window filtering and limiting (200-1300V), and the filtered signal is output with a delay of 20ms. The signal is defined as gridSQd20ms. The variable vrtudLatch is synchronously defined to follow gridSQd20ms in the absence of voltage ride-through fault. The current gridSQd20ms value is latched at the time of voltage ride-through fault. Figure 3 , Figure 4 shown.
[0097] For low voltage and zero voltage fault ride-through judgment, please refer to Figure 2 To understand:
[0098] S4: When the grid-connected point voltage notchAmp is less than or equal to 0.85 times the grid-connected point voltage amplitude latch value vrtudLatch and the grid-connected point voltage amplitude gridSQ is less than or equal to 850V, the system captures the rising edge of the low voltage fault ride-through by default and sets lvrtEdgeS to 1, otherwise it is 0.
[0099] S5: Further, define the rising edge capture bit lvrtEdgeSPrev of the previous sampling cycle when the low voltage fault ride-through occurs, and judge that the states of lvrtEdgeSPrev and the current rising edge capture bit lvrtEdgeS are (0 1). Then the system defaults to the low voltage ride-through rising edge trigger being valid, and sets lvrtS to 1, otherwise it is invalid and is 0.
[0100] S6: Further, synchronously determine whether the low voltage ride-through fault is restored. If the grid-connected point voltage notchAmp is greater than or equal to 0.85 times the grid-connected point voltage amplitude latch value vrtudLatch and the grid-connected point voltage amplitude gridSQ is greater than or equal to 920V and the low voltage fault register (lvrtRSREG) is always 1, the system captures the rising edge of the low voltage fault ride-through recovery by default and sets lvrtEdgeR to 1, otherwise it is 0.
[0101] S7: Further, define the rising edge capture bit lvrtEdgeRPrev of the previous sampling cycle at the time of low voltage fault ride-through recovery, and judge that the states of lvrtEdgeRPrev and the current rising edge capture bit lvrtEdgeR are (0 1). Then the system defaults to the rising edge trigger being valid at the time of low voltage ride-through fault recovery, and sets lvrtR to 1, otherwise it is invalid and is 0.
[0102] S8: Further, if the rising edge trigger bit (lvrtS) is always 1 when the low voltage fault occurs and the rising edge trigger bit (lvrtR) is always 0 when the low voltage fault is recovered, the low voltage fault register (lvrtRSREG) can be set to 1, that is, a low voltage fault occurs; if the rising edge trigger bit (lvrtS) is always 0 when the low voltage fault occurs and the rising edge trigger bit (lvrtR) is always 1 when the low voltage fault is recovered, that is, the low voltage fault register (lvrtRSREG) is 0, the system defaults to the end of the low voltage fault, and the grid connection point is restored to normal.
[0103] S9: According to the above definition of the drop depth during voltage fault ride-through, it can be known that the drop depth is
[0104]
[0105] The moment when zero voltage fault ride-through occurs must be the transition from low voltage ride-through fault to zero voltage ride-through state. If the low voltage fault register (lvrtRSREG) is 1 and the drop depth D is always less than 0.1, the system defaults to a zero voltage drop fault at the grid connection point and sets the fault flag zvrtFlag to 1; if lvrtRSREG is 1 and the drop depth D is always greater than 0.1, it is a low voltage ride-through fault and zvrtFlag is 0.
[0106] High voltage fault ride-through judgment, and Figure 2 Similar, you can refer to understand:
[0107] S10: When the grid connection point voltage notchAmp is greater than or equal to 1.1 times the grid connection point voltage amplitude latch value vrtudLatch and the grid connection point voltage amplitude gridSQ is greater than or equal to 1550V, the system captures the rising edge of the high voltage fault ride-through by default and sets hvrtEdgeS to 1, otherwise it is 0.
[0108] S11: Further, define the rising edge capture bit hvrtEdgeSPrev of the previous sampling cycle when the high voltage fault ride-through occurs, and judge that the status of hvrtEdgeSPrev and the current rising edge capture bit hvrtEdgeS are (0 1). Then the system defaults to the high voltage ride-through rising edge trigger being valid, and sets hvrtS to 1, otherwise it is invalid and is 0.
[0109] S12: Further, synchronously determine whether the high voltage ride-through fault has recovered. If the grid-connected point voltage notchAmp is less than or equal to 1.1 times the grid-connected point voltage amplitude latch value vrtudLatch and the grid-connected point voltage amplitude gridSQ is less than or equal to 1110V and the high voltage ride-through fault register (hvrtRSREG) is always 1, the system captures the rising edge of the high voltage fault ride-through recovery by default and sets hvrtEdgeR to 1, otherwise it is 0.
[0110] S13: Further, define the rising edge capture bit hvrtEdgeRPrev of the previous sampling cycle at the time of high voltage fault ride-through recovery, and judge that the status of hvrtEdgeRPrev and the current rising edge capture bit hvrtEdgeR are (01). Then the system defaults to the rising edge trigger being valid at the time of high voltage fault ride-through recovery, and defines hvrtR as 1, otherwise it is invalid as 0.
[0111] S14: Further, if the rising edge trigger bit (hvrtS) is always 1 when the high voltage fault occurs and the rising edge trigger bit (hvrtR) is always 0 when the high voltage fault is recovered, the high voltage fault register (hvrtRSREG) can be set to 1, and a high voltage fault occurs; if the rising edge trigger bit (hvrtS) is always 0 when the high voltage fault occurs and the rising edge trigger bit (hvrtR) is always 1 when the high voltage fault is recovered, that is, the high voltage fault register (hvrtRSREG) is 0, the system defaults to the end of the high voltage fault, and the grid connection point is restored to normal.
[0112] S15: During high voltage fault ride-through, the grid connection point drop depth D is the same as above
[0113]
[0114] S16: At the time of low voltage and zero voltage fault ride-through recovery, the system mistakenly detects the occurrence of high voltage fault ride-through due to over-recovery of the grid connection point voltage; at the time of high voltage fault ride-through recovery, the grid connection point voltage fluctuation causes the system to mistakenly detect the occurrence of low voltage fault ride-through. To avoid system misdetection, the three flags lvrtDelay100ms, hvrtDelay100ms, and zvrtDelay100ms are set and initialized to 0.
[0115] S17: Further, in the next sampling cycle after the low voltage fault ride-through ends, the flag bit lvrtDelay100ms is set to 1 and timing starts. After a delay of 100ms, the flag bit lvrtDelay100ms is cleared to 0. During the 100ms period when the flag bit lvrtDelay100ms is 1, the system does not respond to the detection of high voltage fault ride-through, thereby avoiding system misdetection.
[0116] S18: Similarly, when the flag bit hvrtDelay100ms is 1, the system does not respond to the detection of low voltage fault ride-through within 100ms.
[0117] The following is a specific routine to further describe the working mechanism of this method in a specific low voltage ride-through fault. It is assumed that the two phases of the grid connection point UV drop to 0.2 times the rated voltage at 0.5s, last for 400ms, and restore the three-phase balance state after 0.9s.
[0118] Figure 5 The figure shows the change process of the corresponding different flag bits when a low voltage ride-through fault occurs. It can be clearly seen that the low voltage fault register (lvrtRSREG) is quickly set to 1 within a few ms to complete the low voltage ride-through fault detection and quickly complete the fault latch without fault detection jumps due to voltage fluctuations and rising edge state jumps.
[0119] Figure 6 The figure shows the change process of the corresponding different flag bits when the low voltage ride-through fault is recovered. It can be clearly seen that the low voltage fault register (lvrtRSREG) is quickly cleared within a few ms to complete the low voltage ride-through fault recovery detection, and no false detection of the high voltage fault ride-through is triggered during the recovery stage.
[0120] The present invention is different from the traditional voltage fault ride-through detection method and eliminates the detection time lag problem caused by the large inertia of the phase-locked loop controller. The key innovations are as follows:
[0121] 1. Obtain the positive sequence voltage amplitude at the grid connection point through basic coordinate transformation technology and filtering technology.
[0122] 2. The positive-sequence voltage amplitude of the grid-connected point obtained in 1 is filtered by sliding window and the signal delayed output technology to construct an amplitude signal that lags 20ms behind the positive-sequence voltage amplitude of the grid-connected point. The signal is latched at the fault time to provide reliable data support for the calculation of the drop depth.
[0123] 3. Use reliable edge detection technology to reliably and quickly confirm the occurrence of faults and the time of recovery, avoiding misjudgment of voltage fluctuations at the grid connection point.
[0124] 4. Flexibly apply relevant flags to avoid system misdetection during low voltage and zero voltage fault recovery and high voltage fault recovery.
[0125] In order to overcome the problem of limited rapidity and reliability in handling abnormal voltage conditions in the power grid, shorten the fault diagnosis time, and improve the reliability of fault diagnosis, the present invention proposes a fast and accurate determination method for voltage fault ride-through of a high-power energy storage converter, which is convenient for carrying out current limiting control and positive and negative sequence control during fault ride-through as soon as possible, and reliably completing fault ride-through, which is mainly reflected in the following aspects:
[0126] 1. The detection method is simple, and the voltage ride-through fault can be located and detected quickly, accurately and reliably.
[0127] 2. Quickly complete the identification and update of the fall depth to provide data support for subsequent fault crossing control.
[0128] 3. Avoid the problem of false detection of voltage ride-through faults under complex working conditions.
[0129] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention is described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.
Claims
1. A voltage fault ride-through detection method for a high-power grid-type energy storage converter. It is characterized in that The following steps are involved: S1, collect the three-phase grid connection point voltages Uab, Ubc, and Uca, and perform Clark transformation to obtain the Ualpha and Ubeta voltage components; Band-pass filtering is performed on the Ualpha and Ubeta voltage components to remove high-frequency components and obtain standard sinusoidal Ualpha and Ubeta voltage components; S2, calculate the grid connection point voltage amplitude gridSQ, and process it through a notch filter and a low-pass filter to obtain the filtered grid connection point voltage amplitude notchAmp; S3, perform sliding window filtering on the grid connection point voltage amplitude gridSQ, perform amplitude limiting processing, and output the filtered signal with a delay of 20ms, and the signal is defined as gridSQd20ms; Define the variable vrtudLatch to follow gridSQd20ms in the absence of voltage ride-through fault. At the time of voltage ride-through fault, the current gridSQd20ms value is latched as the grid-connected point voltage amplitude latch value vrtudLatch. S4, determine whether the grid connection point voltage notchAmp is less than 0.85 times the grid connection point voltage amplitude latch value vrtudLatch, and whether the grid connection point voltage amplitude gridSQ is less than 855V; if so, capture the time when the low voltage ride-through fault occurs, and set the rising edge capture flag lvrtEdgeS to 1; If not, set the rising edge capture flag lvrtEdgeS to 0; S5. Confirm the validity of rising edge capture, define the rising edge capture bit lvrtEdgeSPrev of the previous sampling cycle when the low voltage fault ride-through occurs, and judge that the status of lvrtEdgeSPrev and the current rising edge capture bit lvrtEdgeS is (0 1). Then, it is determined that the low voltage ride-through rising edge trigger is valid, and lvrtS is set to 1; otherwise, it is determined that the low voltage ride-through rising edge trigger is invalid, and lvrtS is set to 0.
2. According to the high-power grid-type energy storage converter voltage fault ride-through detection method of claim 1, It is characterized in that It also includes determining whether the low voltage ride-through fault is restored, including: S6, synchronous with step S4, if the grid voltage notchAmp is greater than or equal to 0.85 times the grid voltage amplitude latch value vrtudLatch, and the grid voltage amplitude gridSQ is greater than or equal to 922V, and the low voltage fault register (lvrtRSREG) is always 1; capture the rising edge of the low voltage fault ride-through recovery, and set lvrtEdgeR to 1; otherwise, set lvrtEdgeR to 0; S7, define the rising edge capture bit lvrtEdgeRPrev of the previous sampling cycle at the low voltage fault ride-through recovery moment, and determine whether the states of lvrtEdgeRPrev and the current rising edge capture bit lvrtEdgeR are (0 1); if so, determine that the rising edge trigger at the low voltage ride-through fault recovery moment is valid, and set lvrtR to 1; if not, determine that the rising edge trigger at the low voltage ride-through fault recovery moment is invalid, and set lvrtR to 0; S8. If the rising edge trigger bit (lvrtS) is always 1 when the low voltage ride-through fault occurs and the rising edge trigger bit (lvrtR) is always 0 when the low voltage ride-through fault is recovered, then the low voltage fault register (lvrtRSREG) is set to 1 to determine that a low voltage ride-through fault has occurred; if the rising edge trigger bit (lvrtS) is always 0 when the low voltage ride-through fault occurs and the rising edge trigger bit (lvrtR) is always 1 when the low voltage ride-through fault is recovered, that is, the low voltage fault register (lvrtRSREG) is 0, then it is determined that the low voltage ride-through fault has ended and the grid connection point has returned to normal.
3. A voltage fault ride-through detection method for a high-power grid-connected energy storage converter according to claim 1 or 2, It is characterized in that Also included is the determination of zero voltage ride-through faults, including: S9. Calculate the fall depth according to the following formula: If the low voltage fault register (lvrtRSREG) is 1 and the drop depth D is always less than 0.1, it is determined that a zero voltage drop fault occurs at the grid connection point; and the fault flag zvrtFlag is set to 1; if lvrtRSREG is 1 and the drop depth D is always greater than 0.1, it is a low voltage ride-through fault, and the fault flag zvrtFlag is set to 0.
4. According to the high-power grid-type energy storage converter voltage fault ride-through detection method of claim 3, It is characterized in that Also included is the determination of high voltage ride through faults, including: S10. If the grid connection point voltage notchAmp is greater than or equal to 1.1 times the grid connection point voltage amplitude latch value vrtudLatch, and the grid connection point voltage amplitude gridSQ is greater than or equal to 1550V, then capture the rising edge of the high voltage fault ride-through occurrence moment and set hvrtEdgeS to 1, otherwise set hvrtEdgeS to 0; S11. Define the rising edge capture bit hvrtEdgeSPrev of the previous sampling cycle when the high voltage fault ride-through occurs, and judge that the status of hvrtEdgeSPrev and the current rising edge capture bit hvrtEdgeS are (0 1), then determine that the high voltage ride-through rising edge trigger is valid, and set hvrtS to 1; otherwise, determine that the high voltage ride-through rising edge trigger is invalid, and set hvrtS to 0.
5. The voltage fault ride-through detection method for a high-power grid-connected energy storage converter according to claim 4, It is characterized in that It also includes determining whether the high voltage ride through fault is restored, including: S12, at the same time as S10, determine whether the grid connection point voltage notchAmp is less than or equal to 1.1 times the grid connection point voltage amplitude latch value vrtudLatch, and the grid connection point voltage amplitude gridSQ is less than or equal to 1110V, and the high voltage ride-through fault register (hvrtRSREG) is always 1; if so, capture the rising edge of the high voltage fault ride-through recovery and set hvrtEdgeR to 1; if not, set hvrtEdgeR to 0; S13, define the rising edge capture bit hvrtEdgeRPrev of the previous sampling cycle at the time of high voltage fault ride through recovery, judge that the states of hvrtEdgeRPrev and the current rising edge capture bit hvrtEdgeR are (01), then determine that the rising edge trigger at the time of high voltage ride through fault recovery is valid, and set hvrtR to 1; otherwise, determine that the rising edge trigger at the time of high voltage ride through fault recovery is invalid, and set hvrtR to 0; S14. If the rising edge trigger bit (hvrtS) is always 1 when the high voltage fault occurs, and the rising edge trigger bit (hvrtR) is always 0 when the high voltage fault is recovered, the high voltage fault register (hvrtRSREG) can be set to 1, and it is determined that a high voltage fault has occurred; if the rising edge trigger bit (hvrtS) is always 0 when the high voltage fault occurs, and the rising edge trigger bit (hvrtR) is always 1 when the high voltage fault is recovered, that is, the high voltage fault register (hvrtRSREG) is 0, it is determined that the high voltage fault has been recovered.
6. The voltage fault ride-through detection method for a high-power grid-connected energy storage converter according to claim 5, It is characterized in that Also includes, S16, set the three flags lvrtDelay100ms, hvrtDelay100ms, and zvrtDelay100ms, and initialize them to 0; S17, in the next sampling cycle after the low voltage fault ride-through is completed, the flag bit lvrtDelay100ms is set to 1 and the timing is started. After a delay of 100ms, the flag bit lvrtDelay100ms is cleared to 0. During the 100ms period when the flag bit lvrtDelay100ms is 1, the system does not respond to the detection of the high voltage fault ride-through; S18: When the flag bit hvrtDelay100ms is 1, the system does not respond to the low voltage fault ride-through detection within 100ms.
7. The voltage fault ride-through detection method for a high-power grid-connected energy storage converter according to claim 5, It is characterized in that In step S2, the grid connection point voltage amplitude gridSQ is calculated according to the following formula:
8. The voltage fault ride-through detection method for a high-power grid-connected energy storage converter according to claim 1, It is characterized in that In step S3, the grid connection point voltage amplitude gridSQ is subjected to sliding window filtering and amplitude limiting, and the amplitude limiting voltage is 200 to 1300V.
Citation Information
Cited By
FPGA-based low-voltage ride-through power grid transient fault detection method and system
CN122150753A