Calculation power scheduling method and device, equipment and storage medium
By determining the computing power service equipment and transmission path according to the data volume and time requirements in the computing power network, collaborative processing of multiple computing power centers is realized, which solves the problem of insufficient large data volume transmission efficiency and collaborative processing capabilities in the existing technology, and improves the efficiency of Resource utilization and data transmission efficiency of computing power network.
Patent Information
- Application Number
- CN202311760216.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-20
- Publication Date
- 2024-10-18
AI Technical Summary
Existing computing power network technology cannot meet the high security requirements for large-volume data transmission in supercomputing centers, intelligent computing centers, etc., and the transmission efficiency and collaborative processing capabilities are insufficient.
By determining the appropriate computing service equipment and transmission path based on the data volume and time requirements of the data to be processed, efficient data flow and processing are achieved, and multi-computing centers are used for collaborative processing to optimize network bandwidth and traffic matrix calculations to select the optimal transmission path.
It improves the efficiency and accuracy of data transmission, realizes collaborative processing of multiple computing power centers, meets the needs for efficient transmission and processing of large amounts of data, and improves the resource utilization of the computing power network.
Smart Images

Figure CN118796426A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to computing power network technology, and specifically to a computing power scheduling method, device, equipment and storage medium. Background Art
[0002] In related technologies, various computing centers (i.e., computing service equipment) are connected to the grid to realize resource calls to the computing centers. The current grid connection is mainly limited to the connection of computing resources, and the calls are mainly based on resource calls and network scheduling. However, the above technologies can no longer meet some emerging needs. For example, the data sources of supercomputing centers and intelligent computing centers generally have large amounts of data. These data transmissions cannot be transmitted with high security or coordinated transmission between computing networks according to the existing architecture system design. Summary of the invention
[0003] In view of this, the embodiments of the present application provide a computing power scheduling method, device, equipment and storage medium, which aim to better meet the user needs of the computing power network, more reasonably plan the use of resources, and achieve efficient flow of data.
[0004] The technical solution of the embodiment of the present application is implemented as follows:
[0005] The present application provides a computing power scheduling method, which is applied to a computing power scheduling device. The method includes:
[0006] Based on the data volume demand data of the data to be processed, determining at least one first computing power service device; the first computing power service device represents a computing power center that at least meets the storage demand of the data to be processed;
[0007] In response to the first selection instruction, determining a second computing power service device in the at least one first computing power service device;
[0008] Determining a first target path between the computing power scheduling device and the second computing power service device according to the time demand data of the data to be processed;
[0009] Based on the first target path, the data to be processed is sent to the second computing power service device; the second computing power service device is used to process the data to be processed to obtain first result data.
[0010] In the above solution, after sending the to-be-processed data to the second computing power service device based on the first target path, the method further includes:
[0011] Checking the mirror data corresponding to the data to be processed to obtain a check result;
[0012] The mirror data is sent to the second computing power service device based on the inspection result, and the second computing power service device is used to process the data to be processed based on the mirror data to obtain the first result data.
[0013] In the above solution, determining the first target path between the computing power scheduling device and the second computing power service device according to the time demand data of the data to be processed includes:
[0014] Determine at least one first path between the computing power scheduling device and the second computing power service device;
[0015] Determining target flow data corresponding to the data to be processed according to the time demand data;
[0016] Determine first bandwidth data of the first path based on utilization data of at least one of the first paths, bandwidth matrix data of the computing power scheduling device, and the target traffic data;
[0017] Based on the first bandwidth data, the first target path and a first target bandwidth corresponding to the first target path are determined in the at least one first path.
[0018] In the above solution, the first path is a path between the computing power scheduling device and the second computing power service device; the determining the first bandwidth data of the first path based on at least one utilization data of the first path, the bandwidth matrix data of the computing power scheduling device and the target traffic data includes:
[0019] Based on the first utilization between the computing power scheduling device and the second computing power service device in the utilization data, the bandwidth matrix data of the computing power scheduling device and the target traffic data, the first bandwidth data of the first path is determined.
[0020] In the above solution, the first path includes a first sub-path between the computing power scheduling device and the third computing power service device, and a second sub-path between the third computing power service device and the second computing power service device; the determining the first bandwidth data of the first path based on at least one utilization data of the first path, the bandwidth matrix data of the computing power scheduling device and the target traffic data includes:
[0021] Determine a first sub-bandwidth of the first sub-path based on a first sub-utilization of the first sub-path in the utilization data, bandwidth matrix data of the computing power scheduling device, and the target traffic data;
[0022] Determine a second sub-bandwidth of the second sub-path based on a second sub-utilization of the second sub-path in the utilization data, bandwidth matrix data of the computing power scheduling device, and the target traffic data;
[0023] Comparing the first sub-bandwidth and the second sub-bandwidth to obtain a first comparison result;
[0024] The smaller sub-bandwidth in the first comparison result is determined as the first bandwidth data of the first path.
[0025] In the above solution, the first path also includes a third sub-path between two adjacent third computing service devices of at least two third computing service devices; the determining the first bandwidth data of the first path based on the utilization data of at least one of the first paths, the bandwidth matrix data of the computing power scheduling device and the target flow data also includes:
[0026] Determine a third sub-bandwidth of the third sub-path based on the third sub-utilization rate of the third sub-path, the bandwidth matrix data of the computing power scheduling device, and the target traffic data;
[0027] Comparing the first sub-bandwidth, the second sub-bandwidth, and at least one of the third sub-bandwidths to obtain a second comparison result;
[0028] The smaller sub-bandwidth in the second comparison result is determined as the first bandwidth data of the first path.
[0029] In the above solution, determining the first target path and the first target bandwidth corresponding to the first target path in the at least one first path based on the first bandwidth data includes:
[0030] Sorting at least two of the first paths in descending order of the first bandwidth data to obtain a sorting result;
[0031] The first paths ranked in the top N in the sorting result are determined as the first target paths, and the first bandwidth data of the first paths ranked in the top N in the sorting result are determined as the first target bandwidth; N is a positive integer greater than or equal to 1.
[0032] In the above solution, after determining the first target path between the computing power scheduling device and the second computing power service device according to the time demand data of the data to be processed, the method further includes:
[0033] A first transmission duration between the computing power scheduling device and the second computing power service device is determined based on the data volume demand data and the first target bandwidth.
[0034] In the above solution, after sending the to-be-processed data to the second computing power service device based on the first target path, the method further includes:
[0035] Obtaining first result data obtained by the second computing power service device processing the data to be processed;
[0036] Based on the data volume demand data of the first result data, determining at least one fourth computing power service device corresponding to the first result data in at least one of the first computing power service devices; the fourth computing power service device represents a computing power center that meets the storage demand of the first result data;
[0037] In response to the second selection instruction, determining a fifth computing power service device in the at least one fourth computing power service device;
[0038] Determine a second target path between the second computing power service device and the fifth computing power service device;
[0039] Based on the second target path, a scheduling instruction for the first result data is generated; the scheduling instruction is used to instruct the first result data to be sent from the second computing power service device to the fifth computing power service device; the fifth computing power service device is used to process the first result data to obtain the second result data.
[0040] The present application provides a computing power scheduling device, which is applied to a computing power scheduling device. The device includes:
[0041] A first determination module is used to determine at least one first computing power service device based on data volume demand data of the data to be processed; the first computing power service device represents a computing power center that at least meets the storage demand of the data to be processed;
[0042] A second determining module, configured to determine a second computing power service device in the at least one first computing power service device in response to the first selection instruction;
[0043] A third determination module, configured to determine a first target path between the computing power scheduling device and the second computing power service device according to the time demand data of the data to be processed;
[0044] A sending module is used to send the data to be processed to the second computing power service device based on the first target path; the second computing power service device is used to process the data to be processed to obtain first result data.
[0045] The embodiment of the present application provides a computing power scheduling device, including: a processor and a memory for storing a computer program that can be run on the processor, wherein:
[0046] The processor is used to execute the steps of the above-mentioned computing power scheduling method when running a computer program.
[0047] An embodiment of the present application provides a storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned computing power scheduling method are implemented.
[0048] The embodiment of the present application provides a computing power scheduling method, device, equipment and storage medium, which are applied to computing power scheduling equipment, and the method includes: determining at least one first computing power service device based on the data volume demand data of the data to be processed; the first computing power service device represents a computing power center that at least meets the storage demand of the data to be processed; in response to a first selection instruction, determining a second computing power service device in the at least one first computing power service device; determining a first target path between the computing power scheduling device and the second computing power service device according to the time demand data of the data to be processed; based on the first target path, sending the data to be processed to the second computing power service device; the second computing power service device is used to process the data to be processed to obtain the first result data. The technical solution of the embodiment of the present application is adopted, and multiple suitable first computing power service devices are determined in combination with the data volume demand data of the data to be processed; and the transmission path planning is performed for the second computing power service device selected in the first computing power service device in combination with the time demand data of the data to be processed; it can better meet the user needs of the computing power network, more reasonably plan the use of resources, and realize the efficient flow of data. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 A schematic diagram of the business instantiation process in the relevant technology;
[0050] Figure 2 It is a schematic diagram of the image uploading process in the related technology;
[0051] Figure 3 This is a schematic diagram of the implementation process of the computing power scheduling method of the embodiment of the present application;
[0052] Figure 4 A schematic diagram of a scheduling implementation architecture of a computing power scheduling method according to an embodiment of the present application;
[0053] Figure 5 This is a schematic diagram of the business instantiation process of the computing power scheduling method in the application example of the first embodiment of the present application;
[0054] Figure 6 This is a schematic diagram of a business instantiation process of a computing power scheduling method in another application example of an embodiment of the present application;
[0055] Figure 7 This is a schematic diagram of the structure of the computing power scheduling device according to an embodiment of the present application;
[0056] Figure 8 This is a schematic diagram of the structure of the computing power scheduling device according to an embodiment of the present application. DETAILED DESCRIPTION
[0057] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application.
[0058] In related technologies, the scale of computing power continues to expand, but the computing power is unevenly distributed and the supply and demand are unbalanced, resulting in low utilization of computing power centers and a large number of resources cannot be complemented. By connecting third-party computing power to the computing power grid, unified operation and sales of multiple types of resources and services can be achieved. Efficient integration of existing computing power is achieved. Computing power centers include but are not limited to: cloud computing centers, intelligent computing centers, supercomputing centers (high-performance computing centers), etc. The computing power service center and the computing power center are logically controlled and linked through a common network.
[0059] Related technology 1: A computing-network resource collaborative scheduling method and system for storage-computing separation is disclosed. The system is oriented to the storage-computing separation scenario. First, the storage alternative center group and the computing power alternative center group are calculated according to the resource requirements. Then, the transmission quality of the computing power center and the storage center is calculated according to the real-time data transmitted over the network between the two centers. Finally, the computing power center and the storage center with the largest matching value are given.
[0060] However, the above-mentioned related technology 1 has the following defects in application:
[0061] 1) Related technology 1 is aimed at the scenario of storage and computing separation, that is, the storage center and the computing center are separated, and the storage and computing power are in different data centers. There is no coordinated scheduling for the scenario of storage and computing integration (that is, storage and computing are in the same data center);
[0062] 2) When selecting the storage candidate center group and the computing power candidate center group in the related technology 1, the calculation based on the resource demand and the remaining available resources of the storage center and the computing power center is a commonly used calculation scheme in the related technology, and there is still the problem of low utilization rate of the computing power center;
[0063] 3) When calculating the matching degree data between the computing power center and the storage center, the real-time transmission parameters between the two are used as the basis, such as delay, bandwidth, packet loss rate, jitter and other parameters. The network is not guided for data matching and related parameters obtained under other constraints. Real-time traffic statistics, bandwidth measurement of different paths, and different bandwidth measurement are not used, and data is not guided to be transmitted from a more optimal path.
[0064] Related technology 2: A method for collaborative scheduling of wide-area resources in a computing network is disclosed, which belongs to the field of computing resource scheduling. The core idea is to use a storage-computing integration strategy when resources are sufficient, and to separate computing and storage to a certain extent when resources are insufficient, and adopt a wide-area storage-computing separation strategy to maximize resource utilization. When performing storage-computing separation calculations, the network bandwidth and latency parameters (parameters are calculated in real time) will be involved.
[0065] However, the above-mentioned related technology 2 has the following defects in application:
[0066] 1) Related technology 2 scenario is to use relevant network parameters to calculate whether the storage and computing separation capability is met when performing storage and computing separation, and to perform collaborative scheduling for the storage and computing integration scenario (i.e., storage and computing are in the same data center);
[0067] 2) Although related technology 2 uses some network bandwidth parameters, it does not calculate the available remaining bandwidth through real-time traffic, and does not use the available bandwidth to calculate the optimal bandwidth path. It is also impossible to achieve a higher bandwidth for the optimal path in data transmission, and does not further optimize the bandwidth parameters.
[0068] like Figure 1 As shown, the business instantiation process in the related technology includes:
[0069] 1) The user sends a computing request to the computing power service center;
[0070] 2) The computing power service center calculates the matching computing power center, computing power specifications, etc.;
[0071] 3) The computing power service center returns a list of computing power centers to be selected to the user;
[0072] 4) The user selects computing center X;
[0073] 5) The computing service center executes the image upload process to computing center X (one or more computing centers can be selected);
[0074] 6) The user can freely transmit the data to be processed according to the network without any special scheduling, for example, the transmission will be completed after several days;
[0075] 7) The computing center receives all the data and responds to the user;
[0076] 8) The user initiates an instantiation request to the computing power service center;
[0077] 9) The computing power service center starts instantiation;
[0078] 10) The computing center instantiates according to the image and processes and analyzes the existing data;
[0079] 11) The computing power center returns the calculation results to the computing power service center.
[0080] like Figure 2 As shown, the image upload process involved in the business instantiation in the related technology includes:
[0081] 1) The user uploads the image package and specifies one or more computing centers;
[0082] 2) The computing power service center checks and verifies the uploaded image package;
[0083] 3) Notify the administrator that a new image package has been uploaded;
[0084] 4) The computing power service center sends the image package to the designated computing power center through the grid-connected interface;
[0085] 5) Check the subscription relationship and mark the computing power center according to the delivery situation.
[0086] The above technical solutions can no longer meet some emerging needs. For example, high-performance computing scenarios such as artificial intelligence, genetic analysis, geological exploration, and weather forecasting often require large amounts of data transmission and real-time processing, and transmit petabyte (PB) or exabyte (EB) level data. The grid connection method and technical means of the above technical solutions cannot provide dynamic on-demand network data scheduling for data at a larger data level. The shortcomings of the above technical solutions are as follows:
[0087] 1. The network scheduling scheme of the above technical solution is mainly based on the scheduling of the network itself, and does not achieve unified scheduling of the computing network; data can only be freely transmitted and scheduled according to the existing basic network, and it is impossible to provide link guarantee for the newly added large-scale data transmission, the transmission completion time and transmission quality cannot be guaranteed, and the transmission time is long;
[0088] 2. The transmission takes a long time, resulting in poor data liquidity. Most data stays in a single computing center, and the data can only be processed in a single computing center. It is impossible to achieve collaborative processing by multiple computing centers.
[0089] In order to solve the problems existing in the above technical solutions, the embodiments of the present application provide a computing power scheduling method, device, equipment and storage medium, which aim to better meet the user needs of the computing power network, more reasonably plan the use of resources, and realize efficient flow of data.
[0090] The present application embodiment provides a computing power scheduling method, which is applied to a computing power scheduling device, such as Figure 3 As shown, the method includes:
[0091] Step 301: Based on the data volume demand data of the data to be processed, determine at least one first computing power service device; the first computing power service device represents a computing power center that at least meets the storage demand of the data to be processed.
[0092] Exemplarily, the computing power scheduling device may be a computing power service center that manages and schedules at least one computing power service device. The computing power service device may be a computing power center that instantiates the data to be processed. Specifically, the computing power service center needs to be logically linked with the computing power center, the storage of the computing power center also needs to be logically linked with the computing power service center (the logical link between the computing power service center and the computing power center can be reused), and the computing power centers are interconnected according to actual conditions. The data to be processed may be data that a user or user needs to instantiate, specifically file data or data to be circulated.
[0093] It can be understood that at least one first computing power service device can be determined based on the data volume demand data and computing requirement data of the data to be processed, that is, the first computing power service device at least meets the data volume demand and computing requirement of the data to be processed. It should be noted that the first computing power service device should also meet other requirements of the data to be processed, which are not limited here; the computing requirements can be determined based on actual conditions and are not limited here.
[0094] Exemplarily, based on the data volume demand data of the data to be processed, at least one first computing power service device is determined, and the data volume demand data of the data to be processed and the computing power specifications of at least one computing power service device can be matched to obtain a first matching result; when the first matching result indicates that the computing power specifications of the computing power service device can match the data volume demand data of the data to be processed, the computing power service device is determined as the first computing power service device.
[0095] In some embodiments, a first candidate list can be generated based on at least one first computing power service device, the first candidate list includes at least one first computing power service device, and the computing power scheduling device sends the first candidate list to the user terminal for the user to select a computing power service device.
[0096] Step 302: In response to the first selection instruction, determine a second computing power service device in at least one first computing power service device.
[0097] Exemplarily, the first selection instruction may be an instruction sent by a user to a computing power scheduling device, and the first selection instruction carries at least information for selecting a second computing power service device from at least one first computing power service device. The number of second computing power service devices may be determined based on actual conditions, and as an example, the number of second computing power service devices may be at least one.
[0098] Step 303: Determine a first target path between the computing power scheduling device and the second computing power service device based on the time requirement data of the data to be processed.
[0099] It is understandable that the data transmission path between the computing power scheduling device and the second computing power service device can be determined first, and then the available bandwidth data of each data transmission path under the time period requirement can be determined according to the time period requirement data in the time requirement data, and the first target path can be determined according to the available bandwidth data. The first target path can be the optimal transmission route for the data to be processed.
[0100] In an application example, determining a first target path between a computing power scheduling device and a second computing power service device according to time demand data of data to be processed includes:
[0101] Determine at least one first path between the computing power scheduling device and the second computing power service device;
[0102] According to the time demand data, determine the target flow data corresponding to the data to be processed;
[0103] Determine first bandwidth data of the first path based on utilization data of at least one first path, bandwidth matrix data of the computing power scheduling device, and target flow data;
[0104] Based on the first bandwidth data, a first target path and a first target bandwidth corresponding to the first target path are determined in at least one first path.
[0105] Exemplarily, determining at least one first path between the computing power scheduling device and the second computing power service device can be to determine a transmission path that can transmit data from the computing power scheduling device to the second computing power service device, and determine the transmission path as the first path. Among them, the first path can be a data link. It should be noted that the transmission path can be a path for data to be transmitted directly from the computing power scheduling device to the second computing power service device; it can also be a path for data to be first transmitted from the computing power scheduling device to other computing power service devices, and then transmitted to the second computing power service device through other computing power service devices. The following embodiments explain two different transmission paths respectively.
[0106] Exemplarily, according to the time demand data, the target flow data corresponding to the data to be processed is determined, and at least one time period flow data can be matched according to the time period demand data in the time demand data to obtain a second matching result; when the second matching result indicates that the time period demand data matches the time period flow data, the time period flow data is determined as the target flow data; wherein the time period flow data can be a flow matrix, and can include at least one of real-time flow data, average flow data of flat and valley time segments, and average flow of peak and valley time segments.
[0107] Exemplarily, the utilization data of at least one first path may be utilization matrix data, which includes the utilization of each first path; the utilization of the first path includes the utilization between the computing power scheduling device and the computing power service device on the first path, and the utilization between adjacent computing power service devices; and the utilization between the computing power scheduling device and the computing power service device, and the utilization between adjacent computing power service devices are each a point value in the utilization matrix data; the bandwidth matrix data of the computing power scheduling device may be a network bandwidth matrix; the real-time traffic data of the computing power scheduling device may be a real-time traffic matrix; the first bandwidth data may be available bandwidth data.
[0108] Exemplarily, based on utilization data of at least one first path, bandwidth matrix data of a computing power scheduling device, real-time traffic data and target traffic data of the computing power scheduling device, the first bandwidth data of the first path is determined. The first product of the first path can be obtained by performing matrix dot multiplication on the utilization data and the bandwidth matrix data, wherein the dimensions of the two matrices to be multiplied in the matrix dot multiplication method are consistent, and element-by-element multiplication is performed to obtain the Hadamard product of the matrices. Specifically, the utilization of the first path in the utilization data and the bandwidth of the first path in the bandwidth matrix data can be multiplied, that is, the utilization data and the corresponding positions of the first path in the bandwidth matrix data are multiplied to obtain the first product of the first path; the first product and the target traffic data are subtracted to obtain the first bandwidth data of the first path.
[0109] It can be understood that, based on the first bandwidth data, determining the first target path and the first target bandwidth corresponding to the first target path in at least one first path can be to determine the first path corresponding to the first bandwidth data that meets the bandwidth condition as the first target path; wherein the bandwidth condition can be to select the first path corresponding to the largest first bandwidth data as the first target path.
[0110] The embodiments of the present application can better provide users with better quality and more matching resources and experience by collecting the user's time demand data and scheduling the computing service equipment based on the user's time demand data. In view of the original simple computing center resource instantiation scheduling, the network scheduling derived from computing is expanded and added, and the scheduling reference values such as network bandwidth (real-time / statistical), data timeliness requirements (for example, time period requirements), data links, and data volume are incorporated into the network scheduling. A unified scheduling algorithm is designed for several types of reference values to achieve unified scheduling of computing power and data.
[0111] In an application example, the first path is a path between a computing power scheduling device and a second computing power service device; based on utilization data of at least one first path, bandwidth matrix data of the computing power scheduling device, and target flow data, determining first bandwidth data of the first path includes:
[0112] Based on the first utilization between the computing power scheduling device and the second computing power service device in the utilization data, the bandwidth matrix data of the computing power scheduling device and the target flow data, the first bandwidth data of the first path is determined.
[0113] Exemplarily, the first utilization rate between the computing power scheduling device and the second computing power service device in the utilization data and the bandwidth between the computing power scheduling device and the second computing power service device in the bandwidth matrix data can be multiplied, that is, the utilization data and the corresponding positions between the computing power scheduling device and the second computing power service device in the bandwidth matrix data are multiplied to obtain the first product of the first path; the first product and the target traffic data are subtracted to obtain the first bandwidth data of the first path.
[0114] Exemplarily, the first path represents the path for data to be directly transmitted from the computing power scheduling device to the second computing power service device. It is understandable that there is no other computing power service device between the data link between the computing power scheduling device and the second computing power service device. The utilization data between the computing power scheduling device and the second computing power service device may be the maximum utilization between the computing power scheduling device and the second computing power service device.
[0115] The embodiment of the present application can perform bandwidth data calculation on the data link that transmits data directly from the computing power scheduling device to the second computing power service device, and can better provide users with higher quality and more matching resources and experience.
[0116] In an application example, the first path includes a first sub-path between a computing power scheduling device and a third computing power service device, and a second sub-path between the third computing power service device and a second computing power service device; based on utilization data of at least one first path, bandwidth matrix data of the computing power scheduling device, and target flow data, determining first bandwidth data of the first path includes:
[0117] Determine a first sub-bandwidth of the first sub-path based on a first sub-utilization of the first sub-path in the utilization data, bandwidth matrix data of the computing power scheduling device, and target flow data;
[0118] Determine a second sub-bandwidth of the second sub-path based on the second sub-utilization of the second sub-path in the utilization data, the bandwidth matrix data of the computing power scheduling device, and the target flow data;
[0119] Compare the first sub-bandwidth and the second sub-bandwidth to obtain a first comparison result;
[0120] The smaller sub-bandwidth in the first comparison result is determined as the first bandwidth data of the first path.
[0121] It should be noted that the process of determining the first sub-bandwidth of the first sub-path and the second sub-bandwidth of the second sub-path may refer to the process of determining the first bandwidth data of the first path in the above embodiment, which will not be described in detail herein.
[0122] Exemplarily, the first path represents the path where data is first transmitted from the computing power scheduling device to the third computing power service device, and then transmitted to the second computing power service device through the third computing power service device. It can be understood that the data link between the computing power scheduling device and the second computing power service device includes another computing power service device. The first sub-utilization of the first sub-path can be the maximum utilization between the computing power scheduling device and the third computing power service device; the second sub-utilization of the second sub-path can be the maximum utilization between the third computing power service device and the second computing power service device.
[0123] In an application example, the first path also includes a third sub-path between two adjacent third computing service devices of at least two third computing service devices; based on utilization data of at least one first path, bandwidth matrix data of the computing power scheduling device and target flow data, determining first bandwidth data of the first path also includes:
[0124] Determine a third sub-bandwidth of the third sub-path based on the third sub-utilization rate of the third sub-path, the bandwidth matrix data of the computing power scheduling device, and the target flow data;
[0125] Comparing the first sub-bandwidth, the second sub-bandwidth, and at least one third sub-bandwidth to obtain a second comparison result;
[0126] The smaller sub-bandwidth in the second comparison result is determined as the first bandwidth data of the first path.
[0127] It should be noted that the process of determining the third sub-bandwidth of the third sub-path may refer to the process of determining the first bandwidth data of the first path in the above embodiment, which will not be described in detail herein.
[0128] Exemplarily, the first path represents a path where data is first transmitted from the computing power scheduling device to one of the third computing power service devices, then transmitted to at least one other third computing power service device through one of the third computing power service devices, and then transmitted to the second computing power service device through at least one other third computing power service device. It can be understood that the data link between the computing power scheduling device and the second computing power service device includes at least one other computing power service device. The third sub-utilization of the third sub-path can be the maximum utilization between one of the third computing power service devices and the other third computing power service devices.
[0129] The embodiment of the present application can perform bandwidth data calculation on the data link in which data is first transmitted from the computing power scheduling device to the third computing power service device, and then transmitted to the second computing power service device through the third computing power service device, thereby better providing users with better quality and more matched resources and experience.
[0130] In an application example, determining a first target path and a first target bandwidth corresponding to the first target path in at least one first path based on the first bandwidth data includes:
[0131] Sorting the at least two first paths in descending order of the first bandwidth data to obtain a sorting result;
[0132] The first N paths ranked in the sorting result are determined as the first target paths, and the first bandwidth data of the first paths ranked in the sorting result are determined as the first target bandwidth; N is a positive integer greater than or equal to 1.
[0133] Exemplarily, N may be 1, and the first path ranked first may be determined as the first target path, and the first bandwidth data of the first path ranked first in the sorting result may be determined as the first target bandwidth.
[0134] In an application example, after determining the first target path between the computing power scheduling device and the second computing power service device according to the time demand data of the data to be processed, the method further includes:
[0135] A first transmission duration between the computing power scheduling device and the second computing power service device is determined based on the data volume demand data and the first target bandwidth.
[0136] Exemplarily, the data volume demand data and the first target bandwidth may be divided to obtain a first transmission duration between the computing power scheduling device and the second computing power service device. The first transmission duration may be an estimated transmission completion time for the first target path to transmit the data to be processed. In some embodiments, the first transmission duration and the first target path may be sent to the user terminal at the same time.
[0137] In some embodiments, the time requirement data also includes duration requirement data; when the first transmission duration is greater than the duration requirement data, a prompt message is generated; the prompt message is sent to the user terminal; and a first transmission instruction sent by the user terminal based on the prompt message is received; wherein the prompt message is used to instruct the user to choose whether to transmit data according to the first target path; and the first transmission instruction is used to instruct the computing power scheduling device whether to transmit data.
[0138] Step 304: Based on the first target path, the data to be processed is sent to the second computing power service device; the second computing power service device is used to process the data to be processed to obtain first result data.
[0139] Exemplarily, based on the first target path, sending the data to be processed to the second computing power service device can be by sending the first target path to the user terminal; the first target path can instruct the user terminal to send the data to be processed to the computing power scheduling device; after the computing power scheduling device receives the data to be processed sent by the user terminal, the data to be processed is sent to the second computing power service device according to the first target path, wherein the embodiment of the present application assumes that the user terminal is closest to the computing power scheduling device.
[0140] It can be understood that if the user terminal is closest to a computing power service device, the first target path can be the transmission path between the above-mentioned computing power service device and the second computing power service device. The first target path can instruct the user terminal to send the data to be processed to the above-mentioned computing power service device. After the above-mentioned computing power service device receives the data to be processed sent by the user terminal, it sends the data to be processed to the second computing power service device according to the first target path.
[0141] In some embodiments, the user terminal can receive a transmission completion message sent by the second computing power service device; the computing power scheduling device can also receive a transmission completion message sent by the second computing power service device; wherein the transmission completion message indicates that the second computing power service device has received the data to be processed sent by the user terminal.
[0142] In some embodiments, after sending the data to be processed to the second computing power service device based on the first target path, the method also includes: generating an execution instruction based on the transmission completion message sent by the second computing power service device; sending the execution instruction to the second computing power service device; wherein the execution instruction is used to instruct the second computing power service device to execute an instantiated process on the data to be processed.
[0143] In an application example, after sending the data to be processed to the second computing power service device based on the first target path, the method further includes:
[0144] Check the mirror data corresponding to the data to be processed to obtain the inspection result;
[0145] The mirror data is sent to the second computing power service device based on the inspection result, and the second computing power service device is used to process the data to be processed based on the mirror data to obtain the first result data.
[0146] Exemplarily, the mirror data may be a mirror package; the computing power scheduling device may receive the mirror data corresponding to the data to be processed sent by the user terminal. Checking the mirror data corresponding to the data to be processed may be checking and verifying the mirror data to determine whether the mirror data is wrong or complete.
[0147] Exemplarily, the mirror data is sent to the second computing service device based on the inspection result, and when the inspection result indicates that the mirror data is correct and complete, the mirror data is sent to the second computing service device through the network interface. After the mirror data is sent to the second computing service device, the method further includes: checking the subscription relationship between the mirror data and the second computing service device; marking the second computing service device according to the sending status of the mirror data; the marking includes at least a not sent status, a sending status, or a sending completion status.
[0148] The embodiment of the present application adjusts the image upload process to after the data is sent, so as to meet the high frequency of image modification by users.
[0149] In an application example, after sending the data to be processed to the second computing power service device based on the first target path, the method further includes:
[0150] Obtaining first result data obtained by processing the data to be processed by the second computing power service device;
[0151] Based on the data volume demand data of the first result data, determining at least one fourth computing power service device corresponding to the first result data in at least one of the first computing power service devices; the fourth computing power service device represents a computing power center that meets the storage demand of the first result data;
[0152] In response to the second selection instruction, determining a fifth computing power service device in at least one fourth computing power service device;
[0153] Determine a second target path between the second computing power service device and the fifth computing power service device;
[0154] Based on the second target path, a scheduling instruction for the first result data is generated; the scheduling instruction is used to instruct the first result data to be sent from the second computing power service device to the fifth computing power service device; the fifth computing power service device is used to process the first result data to obtain the second result data.
[0155] Exemplarily, the first result data can be sent to a computing power scheduling device and a user terminal; the user terminal can determine the corresponding data volume demand data and time demand data, etc. based on the first result data, and send it to the computing power scheduling device, so that the computing power scheduling device obtains the data volume demand data and time demand data, etc. of the first result data.
[0156] Exemplarily, at least one fourth computing power service device can be determined based on the data volume requirement data of the first result data. Specifically, the data volume requirement data of the first result data and the computing power specifications of at least one computing power service device can be matched to obtain a third matching result. When the third matching result indicates that the computing power specifications of the computing power service device can match the data volume requirement data of the first result data, the computing power service device is determined to be the fourth computing power service device.
[0157] It is understandable that at least one fourth computing power service device can also be determined based on the data volume demand data and computing requirement data of the first result data, that is, the fourth computing power service device at least meets the data volume demand and computing requirement of the first result data; the computing requirements can be determined based on actual conditions and are not limited here.
[0158] In some embodiments, a second candidate list can be generated based on at least one fourth computing power service device, the second candidate list includes at least one fourth computing power service device, and the computing power scheduling device sends the second candidate list to the user terminal for the user to select the computing power service device.
[0159] Exemplarily, the second selection instruction may be an instruction sent by a user to the computing power scheduling device, and the second selection instruction carries at least information for selecting a fifth computing power service device from at least one fourth computing power service device.
[0160] It can be understood that the step of determining the second target path between the second computing power service device and the fifth computing power service device in this embodiment can refer to the description in step 303 in the aforementioned embodiment, and will not be repeated here.
[0161] Exemplarily, the scheduling instruction may be a transmission strategy generated by a computing power scheduling device based on a second target path; based on the second target path, a scheduling instruction for generating first result data may be sending the second target path to a user terminal; receiving a second transmission instruction sent by the user terminal based on the second target path; the second transmission instruction may indicate that the user terminal agrees to use the second target path to transmit the first result data; and a scheduling instruction for generating the first result data based on the second transmission instruction.
[0162] It should be noted that if the amount of first result data processed by the second computing power service device is large, the first result data can be sent directly from the second computing power service device to the fifth computing power service device without passing through the computing power scheduling device, which can efficiently transmit the data to be processed for the user.
[0163] It can be understood that after sending the first result data from the second computing power service device to the fifth computing power service device, the method further includes: checking the mirror data corresponding to the first result data to obtain the inspection result; sending the mirror data to the fifth computing power service device based on the inspection result, and the fifth computing power service device is used to process the first result data based on the mirror data to obtain the second result data. The steps in this embodiment can refer to the description of checking the mirror data corresponding to the data to be processed to obtain the inspection result; sending the mirror data to the second computing power service device based on the inspection result in the previous embodiment, which will not be repeated here.
[0164] The computing power scheduling method of the embodiment of the present application is illustrated below with reference to an application example.
[0165] like Figure 4 As shown in the figure, the scheduling implementation architecture diagram describes the method of optimizing the scheduling of computing power network resources. The computing power service center needs to be able to uniformly schedule and manage multiple computing power centers. The task / business scheduling module of the computing power service center can select suitable computing power centers, and the data scheduling module (with network scheduling function) can realize the flow of data to be flowed in the network in a more reasonable way. The task / business scheduling module and the data scheduling module need to be used in coordination and managed and coordinated by the computing power service center.
[0166] like Figure 5 As shown, the basic process of the computing power scheduling method in the application example of the first embodiment of the present application is as follows:
[0167] 1) Users send computing requirements and data needs to the computing service center;
[0168] 2) The computing center, computing power specifications, and other contents that the computing power service center calculates and matches must meet the data storage requirements;
[0169] 3) The computing power service center returns a list of computing power centers to be selected to the user;
[0170] 4) The user selects computing center X from the list of computing centers to be selected and informs the computing service center;
[0171] 5) The computing power service center calculates the transmission route of the matching computing power center X;
[0172] 6) The computing power service center informs users of the optimal transmission path and the estimated transmission completion time;
[0173] 7) The user selects the optimal path to transmit data and sends the file to the destination (computing center X);
[0174] 8) Computing center X replies that it has received the data to the user and the computing service center;
[0175] 9) The computing power service center executes the image upload process to computing power center X;
[0176] 10) The computing power service center starts the instantiation process;
[0177] 11) The computing center instantiates according to the image and processes and analyzes the existing data;
[0178] 12) Computing center X returns the calculation results to the computing service center and presents them to the user.
[0179] Among them, the main parameters, calculation premises, and calculation methods of the optimal transmission route and the estimated transmission completion time involved in this application are as follows:
[0180] Main parameters: time requirement m, time period requirement, data volume f, traffic matrix T (only records the links with links, and the value of non-adjacent nodes is 0), T ij is the traffic value from node i to j, i is the source node, j is the destination node. α represents the maximum utilization of the link, bandwidth matrix C.
[0181] Calculation premise: When selecting the transmission link, security parameters such as network attacks and network packet loss are not considered. It is assumed that the network components have no buffer and the delay of the network components is not considered. The path transmission loss is considered to be small and can be ignored. Among them, the central node is the computing power service center node, and the other nodes are computing power nodes. All nodes have logical links with the computing power service center.
[0182] Calculation method:
[0183] 1) Perform matrix modeling on the bandwidth to obtain the matrix C, and set the bandwidth without path to zero;
[0184] 2) Matrix modeling of real-time flow T and time segment average flow is performed to obtain the Pinggu time segment average flow T average1 , Peak-valley time segment average flow T average2 , which can be obtained based on the real-time traffic statistics in recent days (such as the past week / month);
[0185] 3) Based on the real-time traffic and bandwidth matrix, the calculation method for calculating the available bandwidth is shown in the following formula: A(i, j) = α*CT(T / T average1 / T average2 ), where (T / T average1 / T average2 ) Select according to the user's requirement for the time period during which the data to be processed is to be transmitted;
[0186] 4) The calculation method of the path matrix and the transmission bandwidth matrix obtained by calculating the available bandwidth is shown in the following formula:
[0187] The shortest path algorithm is optimized and improved to the maximum bandwidth shortest path algorithm.
[0188] if(min(A(i,k),A(k,j))>A(i,j));
[0189] A(i,j)=min(A(i,k),A(k,j);
[0190] Path(i, j) = k;
[0191] For example, the first path is that the computing power service center directly transfers the file to the computing power center X, and the available bandwidth of the first path is 3; the second path includes a first sub-path and a second sub-path, the first sub-path is that the computing power service center first transfers the file to the computing power center Y, and the available bandwidth of the first sub-path is 4, and the second sub-path is that the computing power center Y then transfers the file to the computing power center X, and the available bandwidth of the second sub-path is 5. The minimum value of the available bandwidth of 4 in the two sub-paths is taken as the available bandwidth of the second path; the second path with the largest available bandwidth in the two paths is determined as the optimal transmission path, and the available bandwidth of 4 of the second path is taken as the available bandwidth of the optimal transmission path.
[0192] 5) Based on the calculated path matrix and bandwidth transmission matrix, the optimal path is recommended to the user and the transmission completion time and billing are calculated: the path parameters can be obtained based on Path (i, j), the specific transmission bandwidth parameters A (i, j) can be obtained based on the bandwidth transmission matrix, and the estimated transmission completion time is informed to the user based on f / A (i, j) = t. If t>m, the estimated transmission completion time is informed to the user, and the user is asked to choose whether to transmit in this way.
[0193] If the amount of data in the calculation result is large, it can be sent to the user, who can choose to perform the data transmission line screening function, recommend the optimal route, and transmit it to the destination. For example, after cloud computing performs simple processing on the data, it will be transmitted to the supercomputing center for further processing. In similar cases, the algorithm for the best data transmission route can be reused, and the data can be directly calculated from the computing center A to the computing center B without passing through the computing service center during the transmission process. Figure 6 As shown in the figure, the basic process of the computing power scheduling method in another application example is as follows:
[0194] 1) The computing power service center and the user receive the returned calculation results. At this time, the data of the calculation results is still stored in the computing power center A;
[0195] 2) The user processes the calculation results again and sends the calculation requirements and data requirements to the computing service center;
[0196] 3) The computing power service center calculates the matching computing power center and computing power specifications;
[0197] 4) The computing power service center returns the calculated computing power center list to the user;
[0198] 5) The user selects computing center B according to the computing center list;
[0199] 6) The computing service center calculates the matching data transmission route (the best transmission route from computing center A to computing center B);
[0200] 7) The computing power service center informs users of the optimal transmission path and the estimated transmission completion time;
[0201] 8) The user selects the optimal transmission path for file transfer, and the computing service center sends the file transfer strategy to computing center A. Computing center A transfers the file to the destination (computing center B) according to the transmission strategy;
[0202] 9) Computing center B replies to the computing service center and the user that the data has been received;
[0203] 10) Execute the image upload process to computing center B;
[0204] 11) The computing power service center sends a start instantiation instruction to computing power center B;
[0205] 12) Computing center B instantiates according to the image and processes and analyzes the received data;
[0206] 13) Computing center B returns the calculation results to the computing service center.
[0207] In view of the original simple computing center resource instantiation scheduling, we expand and add computing-derived network scheduling, incorporate scheduling reference values such as network bandwidth (real-time / statistical), data timeliness requirements (time requirements, time period requirements), data links, and data volume into network scheduling, and design a unified scheduling algorithm for several types of reference values to achieve unified scheduling of computing power and data. The computing-derived network scheduling requirements are sent to the network, and the upper-level system (computing service center) performs unified coordination and scheduling of computing networks.
[0208] The present application embodiment provides a computing power scheduling device, which is applied to computing power scheduling equipment, such as Figure 7 As shown, the computing power scheduling device 700 includes:
[0209] The first determination module 701 is used to determine at least one first computing power service device based on the data volume demand data of the data to be processed; the first computing power service device represents a computing power center that at least meets the storage demand of the data to be processed;
[0210] A second determining module 702, configured to determine a second computing power service device in at least one first computing power service device in response to the first selection instruction;
[0211] The third determination module 703 is used to determine the first target path between the computing power scheduling device and the second computing power service device according to the time demand data of the data to be processed;
[0212] The sending module 704 is used to send the data to be processed to the second computing power service device based on the first target path; the second computing power service device is used to process the data to be processed to obtain the first result data.
[0213] In some embodiments, the computing power scheduling device 700 further includes:
[0214] An inspection module is used to inspect the mirror data corresponding to the data to be processed and obtain an inspection result;
[0215] The sending module is used to send the mirror data to the second computing power service device based on the inspection result, and the second computing power service device is used to process the data to be processed based on the mirror data to obtain the first result data.
[0216] In some embodiments, the third determination module 703 is also used to determine at least one first path between the computing power scheduling device and the second computing power service device; determine the target traffic data corresponding to the data to be processed based on the time demand data; determine the first bandwidth data of the first path based on the utilization data of at least one first path, the bandwidth matrix data of the computing power scheduling device and the target traffic data; based on the first bandwidth data, determine the first target path and the first target bandwidth corresponding to the first target path in at least one first path.
[0217] In some embodiments, the first path is a path between a computing power scheduling device and a second computing power service device; the third determination module 703 is also used to determine the first bandwidth data of the first path based on the first utilization between the computing power scheduling device and the second computing power service device in the utilization data, the bandwidth matrix data of the computing power scheduling device, and the target traffic data.
[0218] In some embodiments, the first path includes a first sub-path between the computing power scheduling device and the third computing power service device, and a second sub-path between the third computing power service device and the second computing power service device; the third determination module 703 is also used to determine the first sub-bandwidth of the first sub-path based on the first sub-utilization of the first sub-path in the utilization data, the bandwidth matrix data of the computing power scheduling device, and the target flow data; determine the second sub-bandwidth of the second sub-path based on the second sub-utilization of the second sub-path in the utilization data, the bandwidth matrix data of the computing power scheduling device, and the target flow data; compare the first sub-bandwidth and the second sub-bandwidth to obtain a first comparison result; determine the smaller sub-bandwidth in the first comparison result as the first bandwidth data of the first path.
[0219] In some embodiments, the first path also includes a third sub-path between two adjacent third computing power service devices among at least two third computing power service devices; the third determination module 703 is also used to determine the third sub-bandwidth of the third sub-path based on the third sub-utilization of the third sub-path, the bandwidth matrix data of the computing power scheduling device and the target traffic data; compare the first sub-bandwidth, the second sub-bandwidth and at least one third sub-bandwidth to obtain a second comparison result; and determine the smaller sub-bandwidth in the second comparison result as the first bandwidth data of the first path.
[0220] In some embodiments, the third determination module 703 is further used to sort at least two first paths in descending order of the first bandwidth data to obtain a sorting result; determine the first paths ranked in the top N in the sorting result as the first target paths, and determine the first bandwidth data of the first paths ranked in the top N in the sorting result as the first target bandwidth; N is a positive integer greater than or equal to 1.
[0221] In some embodiments, the computing power scheduling apparatus 700 further includes: a fourth determination module, configured to determine a first transmission duration between the computing power scheduling device and the second computing power service device based on data volume demand data and the first target bandwidth.
[0222] In some embodiments, the computing power scheduling device 700 further includes:
[0223] An acquisition module, used for acquiring first result data obtained by the second computing power service device from processing the data to be processed;
[0224] A fifth determination module is used to determine at least one fourth computing power service device corresponding to the first result data in at least one first computing power service device based on the data volume requirement data of the first result data; the fourth computing power service device represents a computing power center that meets the storage requirements of the first result data;
[0225] a sixth determining module, configured to determine a fifth computing power service device from at least one fourth computing power service device in response to the second selection instruction;
[0226] A seventh determination module, used to determine a second target path between the second computing power service device and the fifth computing power service device;
[0227] A generation module is used to generate a scheduling instruction for the data to be processed based on the second target path; the scheduling instruction is used to instruct the first result data to be sent from the second computing power service device to the fifth computing power service device; the fifth computing power service device is used to process the first result data to obtain the second result data.
[0228] It should be noted that: the computing power scheduling device provided in the above embodiment only uses the division of the above program modules as an example when performing control. In actual applications, the above processing can be assigned to different program modules as needed, that is, the internal structure of the device can be divided into different program modules to complete all or part of the processing described above. In addition, the computing power scheduling device provided in the above embodiment and the aforementioned computing power scheduling method embodiment belong to the same concept. The specific implementation process is detailed in the method embodiment and will not be repeated here.
[0229] Based on the hardware implementation of the above-mentioned program modules, and in order to implement the method of the embodiment of the present application, the embodiment of the present application also provides a computing power scheduling device. Figure 8 Only an exemplary structure of the computing power scheduling device is shown, not the entire structure, and it can be implemented as needed. Figure 8 Partial or complete structure shown.
[0230] like Figure 8 As shown, the computing power scheduling device 800 provided in the embodiment of the present application includes: at least one processor 801, a memory 802 and a user interface 803. The various components in the computing power scheduling device 800 are coupled together through a bus system 804. It can be understood that the bus system 804 is used to realize the connection and communication between these components. In addition to the data bus, the bus system 804 also includes a power bus, a control bus and a status signal bus. However, for the sake of clarity, Figure 8 Various buses are labeled as bus system 804 .
[0231] The user interface 803 may include a display, a keyboard, a mouse, a trackball, a click wheel, keys, buttons, a touch pad or a touch screen.
[0232] The memory 802 in the embodiment of the present application is used to store various types of data to support the operation of the control device. Examples of such data include: any computer program used to operate on the control device.
[0233] The computing power scheduling method disclosed in the embodiment of the present application can be applied to the processor 801, or implemented by the processor 801. The processor 801 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the computing power scheduling method can be completed by the hardware integrated logic circuit or software instructions in the processor 801. The above-mentioned processor 801 may be a general-purpose processor, a digital signal processor (DSP, Digital Signal Processor), or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. The processor 801 can implement or execute the various methods, steps and logic block diagrams disclosed in the embodiment of the present application. The general-purpose processor may be a microprocessor or any conventional processor, etc. In combination with the steps of the method disclosed in the embodiment of the present application, it can be directly embodied as a hardware decoding processor to execute, or it can be executed by a combination of hardware and software modules in the decoding processor. The software module may be located in a storage medium, which is located in the memory 802, and the processor 801 reads the information in the memory 802, and completes the steps of the computing power scheduling method provided in the embodiment of the present application in combination with its hardware.
[0234] In an exemplary embodiment, the computing power scheduling device can be implemented by one or more application-specific integrated circuits (ASIC), DSP, programmable logic device (PLD), complex programmable logic device (CPLD), field programmable gate array (FPGA), general-purpose processor, controller, microcontroller (MCU), microprocessor, or other electronic components to execute the aforementioned method.
[0235] It can be understood that the memory 802 can be a volatile memory or a non-volatile memory, and can also include both volatile and non-volatile memories. Among them, the non-volatile memory can be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a magnetic random access memory (FRAM), a flash memory, a magnetic surface memory, an optical disk, or a compact disc read-only memory (CD-ROM); the magnetic surface memory can be a disk memory or a tape memory. The volatile memory can be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of RAM are available, such as static random access memory (SRAM), synchronous static random access memory (SSRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDRSDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM, SyncLink Dynamic Random Access Memory), and direct RAM bus random access memory (DRRAM, Direct Rambus Random Access Memory).The memories described in the embodiments of the present application are intended to include, but are not limited to, these and any other suitable types of memories.
[0236] In an exemplary embodiment, the present application also provides a storage medium, namely a computer storage medium, which can be a computer-readable storage medium, for example, a memory 802 storing a computer program, and the computer program can be executed by a processor 801 of the computing power scheduling device to complete the steps described in the method of the present application embodiment. The computer-readable storage medium can be a memory such as a ROM, a PROM, an EPROM, an EEPROM, a Flash Memory, a magnetic surface memory, an optical disk, or a CD-ROM.
[0237] It should be noted that: "first", "second", etc. are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence.
[0238] In addition, the technical solutions described in the embodiments of the present application can be combined arbitrarily without conflict.
[0239] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A computing power scheduling method, It is characterized in that Applied to computing power scheduling equipment, the method includes: Based on the data volume demand data of the data to be processed, determining at least one first computing power service device; the first computing power service device represents a computing power center that at least meets the storage demand of the data to be processed; In response to the first selection instruction, determining a second computing power service device in the at least one first computing power service device; Determining a first target path between the computing power scheduling device and the second computing power service device according to the time demand data of the data to be processed; Based on the first target path, the data to be processed is sent to the second computing power service device; the second computing power service device is used to process the data to be processed to obtain first result data.
2. The method according to claim 1, It is characterized in that After sending the to-be-processed data to the second computing power service device based on the first target path, the method further includes: Checking the mirror data corresponding to the data to be processed to obtain a check result; The mirror data is sent to the second computing power service device based on the inspection result, and the second computing power service device is used to process the data to be processed based on the mirror data to obtain the first result data.
3. The method according to claim 1, It is characterized in that The determining, according to the time demand data of the data to be processed, a first target path between the computing power scheduling device and the second computing power service device comprises: Determine at least one first path between the computing power scheduling device and the second computing power service device; Determining target flow data corresponding to the data to be processed according to the time demand data; Determine first bandwidth data of the first path based on utilization data of at least one of the first paths, bandwidth matrix data of the computing power scheduling device, and the target traffic data; Based on the first bandwidth data, the first target path and a first target bandwidth corresponding to the first target path are determined in the at least one first path.
4. The method according to claim 3, It is characterized in that The first path is a path between the computing power scheduling device and the second computing power service device; the determining the first bandwidth data of the first path based on at least one utilization data of the first path, the bandwidth matrix data of the computing power scheduling device and the target flow data includes: Based on the first utilization between the computing power scheduling device and the second computing power service device in the utilization data, the bandwidth matrix data of the computing power scheduling device and the target traffic data, the first bandwidth data of the first path is determined.
5. The method according to claim 3, It is characterized in that The first path includes a first sub-path between the computing power scheduling device and the third computing power service device, and a second sub-path between the third computing power service device and the second computing power service device; the determining the first bandwidth data of the first path based on at least one utilization data of the first path, the bandwidth matrix data of the computing power scheduling device and the target flow data includes: Determine a first sub-bandwidth of the first sub-path based on a first sub-utilization of the first sub-path in the utilization data, bandwidth matrix data of the computing power scheduling device, and the target traffic data; Determine a second sub-bandwidth of the second sub-path based on a second sub-utilization of the second sub-path in the utilization data, bandwidth matrix data of the computing power scheduling device, and the target traffic data; Comparing the first sub-bandwidth and the second sub-bandwidth to obtain a first comparison result; The smaller sub-bandwidth in the first comparison result is determined as the first bandwidth data of the first path.
6. The method according to claim 5, It is characterized in that The first path also includes a third sub-path between two adjacent third computing service devices of at least two third computing service devices; the determining the first bandwidth data of the first path based on the utilization data of at least one of the first paths, the bandwidth matrix data of the computing power scheduling device and the target flow data also includes: Determine a third sub-bandwidth of the third sub-path based on the third sub-utilization rate of the third sub-path, the bandwidth matrix data of the computing power scheduling device, and the target traffic data; Comparing the first sub-bandwidth, the second sub-bandwidth, and at least one of the third sub-bandwidths to obtain a second comparison result; The smaller sub-bandwidth in the second comparison result is determined as the first bandwidth data of the first path.
7. The method according to claim 3, It is characterized in that The determining, based on the first bandwidth data, in the at least one first path, the first target path and a first target bandwidth corresponding to the first target path includes: Sorting at least two of the first paths in descending order of the first bandwidth data to obtain a sorting result; The first paths ranked in the top N in the sorting result are determined as the first target paths, and the first bandwidth data of the first paths ranked in the top N in the sorting result are determined as the first target bandwidth; N is a positive integer greater than or equal to 1.
8. The method according to claim 3, It is characterized in that After determining the first target path between the computing power scheduling device and the second computing power service device according to the time demand data of the data to be processed, the method further includes: A first transmission duration between the computing power scheduling device and the second computing power service device is determined based on the data volume demand data and the first target bandwidth.
9. The method according to claim 1, It is characterized in that After sending the to-be-processed data to the second computing power service device based on the first target path, the method further includes: Obtaining first result data obtained by the second computing power service device processing the data to be processed; Based on the data volume demand data of the first result data, determining at least one fourth computing power service device corresponding to the first result data in at least one of the first computing power service devices; the fourth computing power service device represents a computing power center that meets the storage demand of the first result data; In response to the second selection instruction, determining a fifth computing power service device in the at least one fourth computing power service device; Determine a second target path between the second computing power service device and the fifth computing power service device; Based on the second target path, a scheduling instruction for the first result data is generated; the scheduling instruction is used to instruct the first result data to be sent from the second computing power service device to the fifth computing power service device; the fifth computing power service device is used to process the first result data to obtain the second result data.
10. A computing power scheduling device, It is characterized in that Applied to computing power scheduling equipment, the device includes: A first determination module is used to determine at least one first computing power service device based on data volume demand data of the data to be processed; the first computing power service device represents a computing power center that meets the storage demand of the data to be processed; A second determining module, configured to determine a second computing power service device in the at least one first computing power service device in response to the first selection instruction; A third determination module, configured to determine a first target path between the computing power scheduling device and the second computing power service device according to the time demand data of the data to be processed; A sending module is used to send the data to be processed to the second computing power service device based on the first target path; the second computing power service device is used to process the data to be processed to obtain first result data.
11. A computing power scheduling device, It is characterized in that include: A processor and a memory for storing a computer program that can be executed on the processor, wherein: The processor is used to execute the steps of the method according to any one of claims 1 to 9 when running a computer program.
12. A storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 9 are implemented.