Electric power material zero-carbon storage construction model

Through the zero-carbon warehousing construction model of electric power materials, combined with the green microgrid power supply and energy-carbon dual control platform, the problem that the traditional warehousing model cannot quantify carbon emissions and evaluate the emission reduction effect has been solved, and the zero-carbon goal and efficient resources of electric power material warehousing have been achieved. manage.

CN118797775APending Publication Date: 2024-10-18STATE GRID JIBEI ELECTRIC POWER COMPANY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410871170.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

The traditional single green warehousing model is difficult to effectively quantify carbon emissions and evaluate emission reduction effects, and cannot meet the needs of green supply chain management of power materials.

Method used

A zero-carbon warehousing construction model for electric power materials is designed, including a design and construction unit, an operation management unit and a dismantling and recycling unit. It adopts storage attribute classification modules, green microgrid power supplies, energy-carbon dual control platforms and communication gateways and other components to achieve a comprehensive Life cycle carbon management and resource optimization.

Benefits of technology

This model can systematically manage power material warehousing, achieve zero-carbon goals, improve energy utilization efficiency, monitor and dispatch operating tools in real time, track carbon emission data, evaluate emission reduction effects, and adapt to the needs of new power system construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118797775A_ABST
    Figure CN118797775A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of electric power materials, and discloses an electric power material zero-carbon storage construction model, which comprises a design construction unit, an operation management unit and a dismantling and recycling unit, and is characterized in that the output end of the design construction unit is electrically connected with the input end of the operation management unit; and the output end of the operation management unit is electrically connected with the input end of the dismantling and recycling unit. The electric power material zero-carbon storage construction model is designed in detail from two aspects of green energy supply and green energy consumption, and is also a core for realizing electric power material zero-carbon storage. On the energy supply level, effective resources are fully utilized and are fully combined with new energy construction, the wind and light storage and charging integrated green micro-grid is promoted, and a solid foundation is laid for zero-carbon operation management. And on the energy consumption level, the adjustable characteristic is highlighted, the utilization efficiency of the source network load storage energy can be effectively improved, the matching of the green energy supply capability and the green energy consumption demand is ensured, and the zero-carbon target is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power materials, and in particular to a zero-carbon storage construction model for electric power materials. Background Art

[0002] As the main functional hub of economic and social activities, the supply chain consumes most of the world's energy and is the main contributor to global greenhouse gas emissions. At the same time, because the supply chain is a high-density cluster of resources, infrastructure and industries, it will suffer greater losses from climate change and has extremely strong environmental sensitivity and vulnerability. Therefore, green supply chain management has become an important part of the global response to climate change and the promotion of the "dual carbon" goals. As an innovative environmental management method, green supply chain management incorporates the concept of the entire life cycle into the traditional supply chain. Green warehousing is a key link in the entire life cycle. Especially for the electric power materials industry, green warehousing is often the core platform for green supply chain construction, assuming multiple roles such as distribution hub, material supply, and stable operation of the power grid. With the continuous advancement of my country's new power system construction, the characteristics of clean, low-carbon, safe and controllable are becoming increasingly prominent, and the demand for new energy construction and stable operation of the power grid is increasing, which puts higher requirements on the green supply chain management of electric power materials.

[0003] For example, an electric power material storage visualization model and system with authorization announcement number CN201610556781.1 and publication date 20161214 is composed of a data acquisition module, a data compilation and transmission module, a data sorting and analysis module, a visualization processing module, and a system display module connected in sequence; the beneficial effect of the present invention is that the electric power material storage visualization model and system, due to the adoption of the above-mentioned technical scheme, achieves warehouse transparency, reduces warehouse safety hazards, innovates the warehouse management model, improves the efficiency of warehouse management, reduces warehouse management costs, and realizes visual management of warehouse management.

[0004] The traditional, single green storage model only focuses on a certain link of green storage or the technology under a certain link, and fails to establish a comprehensive understanding and a perfect construction mechanism, making it difficult to effectively achieve carbon emission quantification and emission reduction effect evaluation. This also means that the traditional, single green storage model can no longer meet the urgent needs of the current green supply chain management of power materials. Therefore, it is urgent to design a zero-carbon storage construction model for power materials to solve the above problems. Summary of the invention

[0005] In view of the shortcomings of the existing technology, the present invention provides a zero-carbon storage construction model for electric power materials, which solves the problems of difficulty in effectively quantifying carbon emissions and evaluating emission reduction effects.

[0006] The present invention provides the following technical solution: a zero-carbon storage construction model for electric power materials, comprising a design and construction unit, an operation and management unit, and a dismantling and recycling unit, wherein the output end of the design and construction unit is electrically connected to the input end of the operation and management unit, and the output end of the operation and management unit is electrically connected to the input end of the dismantling and recycling unit;

[0007] The design and construction unit includes a storage property classification module and a green microgrid power supply. The output end of the green microgrid power supply is electrically connected to the energy storage module. The output end of the energy storage module is electrically connected to the input end of the storage property classification module. The output end of the storage property classification module is electrically connected to the input end of the warehouse management system. The warehouse management system includes a spare parts warehouse storage management module, a material shed warehouse storage management module, an outdoor yard storage management module and a hazardous waste storage room storage management module. The output end signal of the warehouse management system is connected to the input end of the operating tool. The output signal of the industrial tool is connected to the input of the energy-carbon dual-control platform, the output of the energy-carbon dual-control platform is electrically connected to the input of the detection module, the output of the detection module is signal-connected to the input of the energy storage module, the output of the detection module is signal-connected to the input of the energy storage module, the output of the detection module is signal-connected to the input of the energy storage module, the output of the energy-carbon dual-control platform is electrically connected to the input of the meteorological collection module, the output of the energy-carbon dual-control platform is electrically connected to the input of the communication gateway, the Ethernet interface of the communication gateway is connected to a router or switch device through a network cable, and is connected to the public network to achieve connection with the cloud platform.

[0008] Preferably, the design and construction unit includes an energy-saving module, a water-saving module and a material-saving module.

[0009] Preferably, the demolition recovery unit includes a waste treatment system and a rainwater recovery system.

[0010] Preferably, the waste treatment system comprises a waste removal module, a waste classification module and a waste processing module, the output end of the waste removal module is electrically connected to the input end of the waste classification module, the output end of the classification module is electrically connected to the input end of the waste processing module, and the output end of the waste treatment system is signal-connected to the input end of the working tool.

[0011] Preferably, the warehouse management system implements the following functions through programming:

[0012] (1) Storage quantity statistics;

[0013] (2) Warehouse storage balance alarm;

[0014] (3) Classification of storage types;

[0015] (4) Warehouse space planning.

[0016] Preferably, the working tools include air conditioners, lighting fixtures, logistics vehicles, lifting equipment, waste removal tools and waste processing tools in the warehouse area.

[0017] Preferably, the energy-carbon dual control platform realizes the following functions through programming:

[0018] (1) Through the customized IoT protocol communication specification, control of a single working tool or a group of multiple working tools can be realized. Each working tool has a grouping function. Configuration parameters are sent through the protocol to configure the lamps in any group;

[0019] (2) Realize the switching of any working tool through a custom IoT protocol;

[0020] (3) The output of the green microgrid power supply is predicted through the meteorological collection module, and based on this, the storage, charging and electricity consumption of the storage area are dispatched and managed, providing support for storage path optimization, inspection task scheduling and operation tool optimization control.

[0021] Preferably, the communication gateway has hardware that realizes 12V DC power supply DC / DC to low voltage, RJ45 Ethernet interface, RF433 wireless communication, RS485 expansion interface, and factory reset button;

[0022] Through the internal high-performance MCU embedded in the operating system, programming can achieve the following functions:

[0023] (1) The working tool inspection function is to inspect the working tools in the wireless network at a fixed time or upon receiving inspection commands to determine whether the equipment is operating normally. The inspected faulty equipment will be reported to the cloud platform to realize the record maintenance of the faulty equipment.

[0024] (2) Based on the LWIP network protocol stack, the HTTP protocol is extended to realize the file upload gateway function, and the configuration file is uploaded to the gateway remotely using the HTTP protocol to realize the gateway parameter configuration;

[0025] (3) The gateway is connected to the cloud platform through the UDP protocol and reports heartbeat packets regularly to ensure that the cloud platform checks the gateway connection status;

[0026] (4) The gateway detects the network of operating tools and dismantling and recycling units, and tracks the status of operating tools and dismantling and recycling units in real time;

[0027] (5) The system has a unique device number to realize device location control in the wireless network.

[0028] Compared with the prior art, the present invention provides a zero-carbon storage construction model for electric power materials, which has the following beneficial effects:

[0029] (1) The zero-carbon storage construction model for electric power materials is a reasonable zero-carbon storage construction model for electric power materials. The construction process and technical requirements are clear, and it can serve all aspects of electric power material storage well. At the same time, as an important link in the electric power material supply chain, the invented zero-carbon storage construction model is of great significance for adapting to the construction needs of new power systems under the background of the "dual carbon" goal and promoting the green supply chain management of electric power materials. It changes the dilemma that the traditional and single green storage model cannot meet the current green supply chain management needs of electric power materials, systematically sorts out the three important nodes of design and construction, operation and management, demolition and reuse, and proposes a zero-carbon storage construction model for electric power materials.

[0030] (2) The zero-carbon storage construction model of electric power materials is designed in detail from the two aspects of green energy supply and green energy use, aiming at the important link of energy use. It is also the core of realizing zero-carbon storage of electric power materials. At the energy supply level, it makes full use of effective resources, fully combines with the construction of new energy, promotes the integration of wind, solar, storage and charging green microgrids, and lays a solid foundation for achieving zero-carbon operation and management. At the energy use level, it highlights the adjustable characteristics, which can effectively improve the utilization efficiency of source, grid, load and storage energy, ensure that the green energy supply capacity matches the green energy demand, and achieve the zero-carbon goal.

[0031] (3) The energy-carbon dual control platform designed for the zero-carbon storage construction model of electric power materials can realize the control of a single operating tool or a group of multiple operating tools through customized Internet of Things protocol communication specifications. Each operating tool has a grouping function, and the configuration parameters are issued through the protocol to configure the lamps into any group. The operating tools and dismantling and recycling units can be detected through the communication gateway network, and the status of the operating tools and dismantling and recycling units can be tracked in real time, so as to understand the working status of each operating tool in real time, which is convenient for the energy-carbon dual control platform to plan reasonable work arrangements.

[0032] (4) The zero-carbon storage construction model of electric power materials is closely integrated with the "dual carbon" target requirements, focusing on the important issue of carbon emissions, designing an energy-carbon dual control platform for digital management, fully combining the actual situation of new energy construction, reasonably predicting the output of new energy, and conducting effective power dispatching, so that the carbon emission data in the storage link can be checked and the carbon emission reduction effect can be evaluated. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a structural schematic diagram of the present invention;

[0034] Figure 2 It is a schematic block diagram of the construction unit structure of the present invention;

[0035] Figure 3 It is a schematic block diagram of the operation management unit structure of the present invention;

[0036] Figure 4 It is a schematic block diagram of the warehouse management system structure of the present invention;

[0037] Figure 5 It is a schematic block diagram of the dismantling and recycling unit structure of the present invention. DETAILED DESCRIPTION

[0038] See also Figure 1-5 , a zero-carbon storage construction model for electric power materials, comprising a design and construction unit, an operation and management unit and a dismantling and recycling unit, wherein the output end of the design and construction unit is electrically connected to the input end of the operation and management unit, and the output end of the operation and management unit is electrically connected to the input end of the dismantling and recycling unit;

[0039] The design and construction unit includes a storage property classification module and a green microgrid power supply. When deploying green energy supply, the roof space resources are fully utilized to build a wind, solar, storage and charging integrated green microgrid. The output end of the green microgrid power supply is electrically connected to the energy storage module, and a micro wind turbine and an energy storage system are configured to achieve green energy use. The output end of the energy storage module is electrically connected to the input end of the storage property classification module.

[0040] The output end of the storage property classification module is electrically connected to the input end of the warehouse management system, and the warehouse management system includes a spare parts warehouse storage management module, a material shed warehouse storage management module, an outdoor yard warehouse management module and a hazardous waste storage room warehouse management module. The output end signal of the warehouse management system is connected to the input end of the operating tool, and the output end signal of the operating tool is connected to the input end of the energy-carbon dual-control platform. The output end of the energy-carbon dual-control platform is electrically connected to the input end of the detection module, and the output end of the detection module is signal-connected to the input end of the energy storage module. The output end of the detection module is signal-connected to the input end of the energy storage module. The output end of the energy-carbon dual-control platform is electrically connected to the input end of the meteorological collection module, and the output end of the energy-carbon dual-control platform is electrically connected to the input end of the communication gateway. The Ethernet interface of the communication gateway is connected to a router or switch device through a network cable, and is connected to the public network to achieve connection with the cloud platform.

[0041] Staff can centrally control air conditioning, lighting, production and office energy consumption in the reservoir area, predict new energy output through meteorological data collection devices, and adjust the energy storage system to participate in peak shaving and valley filling, thereby promoting green and efficient use of source, grid, load and storage energy.

[0042] Preferably, the design and construction unit includes an energy-saving module, a water-saving module and a material-saving module.

[0043] The design and construction unit constructs a green warehouse through the three modules of energy saving, water saving and material saving; the design and construction unit constructs a warehouse by effectively solving the four important indicators of resources, reducing energy consumption, reducing pollutant emissions and improving logistics efficiency.

[0044] Preferably, the demolition recovery unit includes a waste treatment system and a rainwater recovery system.

[0045] The demolition and recycling unit reuses building materials in order to save resources, and can realize the recycling of waste materials. The demolition and recycling module collects rainwater resources by establishing a rainwater recycling system.

[0046] Preferably, the waste treatment system includes a waste removal module, a waste classification module and a waste processing module, the output end of the waste removal module is electrically connected to the input end of the waste classification module, the output end of the classification module is electrically connected to the input end of the waste processing module, and the output end of the waste treatment system is signal-connected to the input end of the working tool.

[0047] Preferably, the warehouse management system implements the following functions through programming:

[0048] (1) Storage quantity statistics;

[0049] (2) Warehouse storage balance alarm;

[0050] (3) Classification of storage types;

[0051] (4) Warehouse space planning.

[0052] Preferably, the working tools include air conditioners, lighting fixtures, logistics vehicles, lifting equipment, waste removal tools and waste processing tools in the warehouse area.

[0053] Preferably, the energy-carbon dual control platform realizes the following functions through programming:

[0054] (1) Through the customized IoT protocol communication specification, control of a single working tool or a group of multiple working tools can be realized. Each working tool has a grouping function. Configuration parameters are sent through the protocol to configure the lamps in any group;

[0055] (2) Realize the switching of any working tool through a custom IoT protocol;

[0056] (3) The output of the green microgrid power supply is predicted through the meteorological collection module, and based on this, the storage, charging and electricity consumption of the storage area are dispatched and managed, providing support for storage path optimization, inspection task scheduling and operation tool optimization control.

[0057] Preferably, the communication gateway has hardware that realizes 12V DC power supply DC / DC to low voltage, RJ45 Ethernet interface, RF433 wireless communication, RS485 expansion interface, and factory reset button;

[0058] Through the internal high-performance MCU embedded in the operating system, programming can achieve the following functions:

[0059] (1) The working tool inspection function is to inspect the working tools in the wireless network at a fixed time or upon receiving inspection commands to determine whether the equipment is operating normally. The inspected faulty equipment will be reported to the cloud platform to realize the record maintenance of the faulty equipment.

[0060] (2) Based on the LWIP network protocol stack, the HTTP protocol is extended to realize the file upload gateway function, and the configuration file is uploaded to the gateway remotely using the HTTP protocol to realize the gateway parameter configuration;

[0061] (3) The gateway is connected to the cloud platform through the UDP protocol and reports heartbeat packets regularly to ensure that the cloud platform checks the gateway connection status;

[0062] (4) The gateway detects the network of operating tools and dismantling and recycling units, and tracks the status of operating tools and dismantling and recycling units in real time;

[0063] (5) The system has a unique device number to realize device location control in the wireless network.

[0064] To sum up, the zero-carbon storage construction model for electric power materials is a reasonable zero-carbon storage construction model for electric power materials, with clear construction process and technical requirements, and can serve all aspects of electric power material storage well. At the same time, as an important link in the electric power material supply chain, the invented zero-carbon storage construction model is of great significance for adapting to the construction needs of new power systems under the background of "dual carbon" goals and promoting the green supply chain management of electric power materials. It changes the dilemma that the traditional and single green storage model cannot meet the current green supply chain management needs of electric power materials, systematically sorts out the three important nodes of design and construction, operation and management, demolition and reuse, and proposes a zero-carbon storage construction model for electric power materials.

[0065] The storage construction model designed by the present invention is designed in detail from two aspects: green energy supply and green energy use, aiming at the important link of energy use. It is also the core of realizing zero-carbon storage of electric power materials. At the energy supply level, it makes full use of effective resources, fully combines with new energy construction, promotes the integration of wind, solar, storage and charging green microgrids, and lays a solid foundation for realizing zero-carbon operation and management. At the energy use level, it highlights the adjustable characteristics, which can effectively improve the utilization efficiency of source, grid, load and storage energy, ensure that the green energy supply capacity matches the green energy demand, and achieve the zero-carbon goal.

[0066] The energy-carbon dual-control platform designed by the present invention realizes the control of a single working tool or a group of multiple working tools through customized Internet of Things protocol communication specifications. Each working tool has a grouping function, and the configuration parameters are issued through the protocol to configure the lamps into arbitrary groups. The working tools and dismantling and recycling units can be detected through the communication gateway network, and the status of the working tools and dismantling and recycling units can be tracked in real time, so as to understand the working status of each working tool in real time, which is convenient for the energy-carbon dual-control platform to plan reasonable work arrangements.

[0067] The warehousing construction model designed in this invention is closely integrated with the "dual carbon" target requirements, focuses on the important issue of carbon emissions, designs an energy-carbon dual control platform for digital management, fully combines the actual situation of new energy construction, reasonably predicts the output of new energy, and conducts effective power dispatch, so that the carbon emission data in the warehousing link can be checked and the carbon emission reduction effect can be evaluated.

Claims

1. A zero-carbon storage construction model for electric power materials, including a design and construction unit, an operation and management unit, and a dismantling and recycling unit, characterized in that: The output end of the design and construction unit is electrically connected to the input end of the operation and management unit, and the output end of the operation and management unit is electrically connected to the input end of the dismantling and recycling unit; The design and construction unit includes a storage property classification module and a green microgrid power supply. The output end of the green microgrid power supply is electrically connected to the energy storage module. The output end of the energy storage module is electrically connected to the input end of the storage property classification module. The output end of the storage property classification module is electrically connected to the input end of the warehouse management system. The warehouse management system includes a spare parts warehouse storage management module, a material shed warehouse storage management module, an outdoor yard storage management module and a hazardous waste storage room storage management module. The output end signal of the warehouse management system is connected to the input end of the operating tool. The output signal of the industrial tool is connected to the input of the energy-carbon dual-control platform, the output of the energy-carbon dual-control platform is electrically connected to the input of the detection module, the output of the detection module is signal-connected to the input of the energy storage module, the output of the detection module is signal-connected to the input of the energy storage module, the output of the detection module is signal-connected to the input of the energy storage module, the output of the energy-carbon dual-control platform is electrically connected to the input of the meteorological collection module, the output of the energy-carbon dual-control platform is electrically connected to the input of the communication gateway, the Ethernet interface of the communication gateway is connected to a router or switch device through a network cable, and is connected to the public network to achieve connection with the cloud platform.

2. The zero-carbon storage construction model for electric power materials according to claim 1 is characterized by: The design and construction unit includes an energy-saving module, a water-saving module and a material-saving module.

3. The zero-carbon storage construction model for electric power materials according to claim 1 is characterized by: The demolition recycling unit includes a waste treatment system and a rainwater recycling system.

4. A zero-carbon storage construction model for electric power materials according to claim 3, characterized in that: The waste treatment system includes a waste removal module, a waste classification module and a waste processing module. The output end of the waste removal module is electrically connected to the input end of the waste classification module, the output end of the classification module is electrically connected to the input end of the waste processing module, and the output end of the waste treatment system is signal-connected to the input end of the working tool.

5. The zero-carbon storage construction model for electric power materials according to claim 1 is characterized by: The warehouse management system realizes the following functions through programming: (1) Storage quantity statistics; (2) Warehouse storage balance alarm; (3) Classification of storage types; (4) Warehouse space planning.

6. The zero-carbon storage construction model for electric power materials according to claim 1 is characterized by: The operating tools include air conditioners, lighting fixtures, logistics vehicles, lifting equipment, waste removal tools and waste processing tools in the warehouse area.

7. The zero-carbon storage construction model for electric power materials according to claim 1 is characterized by: The energy-carbon dual control platform realizes the following functions through programming: (1) Through the customized IoT protocol communication specification, control of a single working tool or a group of multiple working tools can be realized. Each working tool has a grouping function. Configuration parameters are sent through the protocol to configure the lamps in any group; (2) Realize the switching of any working tool through a custom IoT protocol; (3) The output of the green microgrid power supply is predicted through the meteorological collection module, and based on this, the storage, charging and electricity consumption of the storage area are dispatched and managed, providing support for storage path optimization, inspection task scheduling and operation tool optimization control.

8. The zero-carbon storage construction model for electric power materials according to claim 1 is characterized by: The communication gateway hardware realizes 12V DC power supply DC / DC to low voltage, RJ45 Ethernet interface, RF433 wireless communication, RS485 expansion interface, and factory reset button; Through the internal high-performance MCU embedded in the operating system, programming can achieve the following functions: (1) The working tool inspection function is to inspect the working tools in the wireless network at regular intervals or upon receiving inspection commands to determine whether the equipment is operating normally. The inspected faulty equipment will be reported to the cloud platform to realize the record maintenance of the faulty equipment; (2) Based on the LWIP network protocol stack, the HTTP protocol is extended to realize the file upload gateway function, and the configuration file is uploaded to the gateway remotely using the HTTP protocol to realize the gateway parameter configuration; (3) The gateway is connected to the cloud platform through the UDP protocol and reports heartbeat packets regularly to ensure that the cloud platform checks the gateway connection status; (4) The gateway detects the network of operating tools and dismantling and recycling units, and tracks the status of operating tools and dismantling and recycling units in real time; (5) The system has a unique device number to realize device location control in the wireless network.