Bridge construction risk early warning method and system
Through node feature extraction, feature aggregation and risk propagation network construction during bridge construction, the risk management strategy is optimized, which solves the deficiencies in timeliness and accuracy of risk warning information in traditional methods and significantly improves the accuracy and efficiency of construction risk warning. .
Patent Information
- Application Number
- CN202411005009.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional bridge construction risk early warning methods are insufficient in fine-grained data processing and dynamic risk assessment, resulting in insufficient timeliness and accuracy of early warning information and inability to effectively identify key nodes and aggregation patterns of risk propagation, resulting in safety hazards and delays during the construction process, affecting Engineering quality and cost control.
Through node feature extraction and adjacent node feature aggregation based on bridge structure and construction environment data, the node feature representation is dynamically adjusted to generate a set of structural feature vectors; then the key node representation is optimized through the weight distribution and update of the feature vectors; and then the spatiotemporal data Carry out segmentation and reconstruction to predict the future state of the structure; build a risk propagation network to identify nodes and risk clusters with high propagation capabilities; finally, optimize risk management strategies through simulation testing of intervention measures.
Significantly improves the accuracy and efficiency of bridge construction risk early warning, achieves accurate determination and prediction of construction risk factors, reveals the aggregation pattern of risk factors, provides scientific basis for formulating highly targeted intervention measures, and reduces risk spread and improved resource utilization efficiency.
Smart Images

Figure CN118798478A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of risk early warning, and in particular to a bridge construction risk early warning method and system. Background Art
[0002] The field of risk early warning technology is a field that focuses on identifying and managing risks and threats that may arise during the construction process in advance. In the specific application of bridge construction, this includes but is not limited to natural disasters (such as floods, earthquakes), human errors, equipment failures, and material defects. The development of risk early warning technology aims to reduce the possibility of accidents by detecting potential problems in advance, ensuring worker safety, protecting construction quality, and reducing economic losses.
[0003] Among them, the bridge construction risk early warning method is a preventive mechanism that aims to monitor and analyze various risk factors in the construction process in real time so as to issue timely alarms and take measures to prevent potential accidents and problems. Its main purpose is to improve the safety and efficiency of bridge construction, reduce casualties and economic losses, and ensure construction quality and project progress. Through the early warning system, project managers can better control the construction environment and prevent and mitigate the occurrence of catastrophic events.
[0004] The deficiencies of traditional risk warning methods in fine-grained data processing and dynamic risk assessment have become particularly evident. The lack of highly refined data analysis capabilities and dynamically adjusted risk assessment mechanisms makes it difficult for traditional methods to accurately identify and predict potential risks in complex construction environments, resulting in insufficient timeliness and accuracy of warning information. In addition, the failure to effectively identify the key nodes and aggregation patterns of risk propagation has made intervention measures lacking in specificity and unable to effectively control the spread of risks. These limitations have led to delayed responses to potential risks during the construction process, increased safety hazards and construction delays, affected project quality and cost control, and may even cause major accidents, resulting in serious casualties and economic losses. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings existing in the prior art and to propose a bridge construction risk early warning method and system.
[0006] In order to achieve the above object, the present invention adopts the following technical solution: a bridge construction risk early warning method, comprising the following steps: S1: Based on the bridge structure and construction environment data, node feature extraction and adjacent node feature aggregation are performed, and a structural feature vector set is generated by calculating the fitting degree between nodes and dynamically adjusting the node feature representation; S2: Based on the structural feature vector set, perform weight allocation and update of feature vectors, highlight key nodes by evaluating the interaction strength between nodes and optimizing the weight adjustment mechanism, and generate a weighted set of key nodes; S3: Based on the weighted set of key nodes, the spatiotemporal data is segmented and reconstructed, and the behavior of the structure in the future state is predicted by identifying data pattern changes and matching historical behavior patterns, thereby generating a future risk prediction model; S4: Based on the bridge construction risk factors, the network nodes are constructed and the edges are defined. By analyzing the interactions of the nodes and evaluating their positions in the network, the nodes with high propagation ability are identified to generate the risk propagation network. S5: Based on the risk propagation network, perform community division and association strength analysis, identify node groups in the network and analyze their internal structures through cluster analysis, analyze the aggregation pattern of risk factors, and generate a risk cluster distribution map; S6: Based on the future risk prediction model and risk cluster distribution map, perform simulation tests of intervention measures, optimize risk management strategies by analyzing the impact of measures on risk transmission paths and intensity, and generate risk management optimization plans.
[0007] As a further solution of the present invention, the structural feature vector set includes the location coordinates, connection strength, and material properties of the nodes; the key node weighted set specifically includes the importance rating, influence score, and risk sensitivity index of the nodes; the future risk prediction model includes the predicted damage type, damage degree estimation, and risk level classification; the risk propagation network includes nodes in the network representing risk factors, edges representing risk interactions, and weights of interactions between nodes; the risk cluster distribution map specifically includes the concentration of risk points within the group, the mutual influence between groups, and the contribution assessment to construction risks; the risk management optimization plan includes construction process adjustment measures, monitoring frequency modification plan, and re-setting of warning thresholds.
[0008] As a further solution of the present invention, based on the bridge structure and construction environment data, node feature extraction and adjacent node feature aggregation are performed, and the steps of generating a structural feature vector set are specifically as follows by calculating the degree of fit between nodes and dynamically adjusting the node feature representation: S101: Based on the bridge structure and construction environment data, identify the spatial position, connection type, and environmental influencing factors of each node, and draw a preliminary node feature map; S102: Based on the preliminary node feature graph, calculate the degree of fit between each pair of adjacent nodes, enter the degree of fit value, and establish a degree of fit record table; S103: Based on the fitness record table, re-evaluate and adjust the feature representation of each node until the fitness between nodes is maximized, optimize the feature expression of the overall bridge structure, and generate a set of structural feature vectors.
[0009] As a further solution of the present invention, based on the structural feature vector set, the weight allocation and update of the feature vector are performed, and the key nodes are highlighted by evaluating the interaction strength between nodes and optimizing the weight adjustment mechanism. The steps of generating the weighted set of key nodes are specifically as follows: S201: Based on the structural feature vector set, using a distance measurement method to calculate the difference between vectors, using the difference measurement to reflect the potential connection between nodes, and generating a correlation evaluation matrix; S202: Based on the correlation evaluation matrix, a fuzzy clustering algorithm is used to gradually adjust the multi-vector weights using a dynamic adjustment strategy, referring to the dynamic changes of the interactions between nodes, reflecting the changes in the importance of the nodes, and generating a weight adjustment vector set; The formula of the fuzzy clustering algorithm is as follows: , in, For data points For cluster centers The membership degree of is the number of cluster centers, is the fuzzy coefficient, For data points The local density influence factor is For data points The weight of and The weighted data points To cluster center and The Euclidean distance of S203: Based on the weight adjustment vector set, weights are optimized and updated, and features of key nodes are highlighted by regulating weight distribution, key node representations are refined, and a key node weighted set is generated.
[0010] As a further solution of the present invention, based on the weighted set of key nodes, the spatiotemporal data is segmented and reconstructed, and the behavior of the structure in the future state is predicted by identifying data pattern changes and matching historical behavior patterns. The steps of generating a future risk prediction model are specifically as follows: S301: traverse each data point in the spatiotemporal data, apply the key node weighted set to each data point using an element-level multiplication algorithm, calculate its importance score, and if the score of a single data point exceeds a predetermined threshold, it is regarded as a key turning point, and data segmentation is performed to generate a data segment segmentation table; S302: for each data segment in the data segment segmentation table, analyzing its internal data pattern and the difference between the change and the adjacent data segment, scoring each change point, screening the changes with scores higher than the target threshold for historical behavior pattern matching, using dynamic threshold adjustment, and generating a behavior pattern recognition table; S303: using the information in the behavior pattern recognition table, assigning a prediction model to each identified behavior pattern, comparing the future performance of similar behavior patterns in historical data, referring to the prediction results of multiple models for weighted average, adjusting the prediction parameters to optimize the model performance, and generating a future risk prediction model; The element-wise multiplication algorithm uses the formula , in, is the importance score, is the jth eigenvalue of the ith data point, is the weight of the jth feature, is the dynamic adjustment coefficient of the feature, is the local influence of the data point, The global impact.
[0011] As a further solution of the present invention, based on the bridge construction risk factors, the construction of network nodes and the definition of edges are performed, and nodes with high propagation capabilities are identified by analyzing the interaction of nodes and evaluating their positions in the network. The steps of generating the risk propagation network are specifically as follows: S401: Based on the bridge construction risk factors, an independent node is assigned to each risk factor, and for pairs of risk factors that have mutual influence, the weight and direction of the edge are set according to the intensity and direction of the influence, so as to generate a risk relationship network; S402: Based on the risk relationship network, traverse each node, use weighted node degree analysis, calculate the number of directly connected nodes, and if the number exceeds the target threshold, mark the node as a high-propagation node, identify the nodes that play a key role in risk propagation, and generate a key node set; S403: Based on the key node set, the coordinate position of the node in the network is captured, and by analyzing the interaction intensity between the nodes, the promotion path of risk diffusion is analyzed in detail, the network structure is adjusted and optimized, and a risk propagation network is generated; The weighted node degree analysis uses the formula , in, is the number of directly connected nodes, Representatives and connected nodes, It is the edge The weight represents the strength or importance of the connection between two nodes. Representative Node The structural hole index, Representative Node The clustering coefficient, Representative Node The betweenness centrality of are adjustment coefficients, which respectively measure the importance of the structural hole index, clustering coefficient, and betweenness centrality in the calculation of the total degree.
[0012] As a further solution of the present invention, based on the risk propagation network, community division and association strength analysis are performed, and through cluster analysis, node groups in the network are identified and their internal structures are analyzed, and the aggregation pattern of risk factors is analyzed. The steps of generating a risk cluster distribution map are specifically as follows: S501: traverse the risk propagation network, record the interaction frequency and interaction intensity of each node with surrounding nodes, capture the interaction of each node in the network, and generate interaction frequency and intensity records; S502: using the interaction frequency and intensity records, identifying a set of nodes with high interaction, determining them as potential communities, and providing basic information for community division by distinguishing clusters of strong interactions between nodes, thereby generating a potential community list; S503: Analyze each community in the potential community list, evaluate the compactness of its internal structure, identify the core nodes and edge nodes within the multiple communities, reveal the organizational characteristics of differentiated communities by analyzing the internal structure of the communities, and generate community structure characteristic results; S504: Based on the community structure feature results, a clustering method is used to identify multiple risk clusters, the distribution and association strength of the risk clusters in the network are analyzed, the distribution pattern of risk factors in the community is analyzed, and a risk cluster distribution map is generated; The formula of the clustering method is as follows: , in, is the normalization coefficient, is the identity matrix The weighting coefficient of is the adjacency matrix The weighting coefficient of is the kernel matrix The weighting coefficient of represents the Laplacian matrix.
[0013] As a further solution of the present invention, based on the future risk prediction model and the risk cluster distribution map, a simulation test of intervention measures is performed, and the risk management strategy is optimized by analyzing the impact of the measures on the risk transmission path and intensity. The steps of generating a risk management optimization plan are specifically as follows: S601: Based on the future risk prediction model, perform simulations of multiple predetermined intervention measures, compare the probability changes of risk occurrence and the degree differences of potential impacts before and after implementation, analyze the mitigation effects of the measures, and generate comparative analysis of intervention effects; S602: Based on the comparative analysis of the intervention effects, evaluate the impact of each measure on the risk transmission path and its intensity, identify the intervention strategy with the greatest impact on risk transmission by ranking the impact of the measures, and generate a list of key intervention strategies; S603: Based on the key intervention strategy list, simulate the implementation of key intervention measures in the risk cluster distribution map, observe the adjustment effect of the measures on the risk cluster, record the change of risk distribution after the intervention, and generate a post-intervention risk adjustment map; S604: Based on the post-intervention risk adjustment mapping, analyze the comprehensive effect of the implementation of measures, refine and optimize risk management strategies, reduce risk transmission and improve resource utilization efficiency, and generate risk management optimization plans.
[0014] A bridge construction risk early warning system, the bridge construction risk early warning system is used to execute the above bridge construction risk early warning method, the system comprises: The structural feature analysis module extracts node characteristics and aggregates adjacent node characteristics based on bridge structure and construction environment data, calculates the degree of fit between nodes, adjusts the representation of node characteristics according to the degree of fit, and obtains a set of structural feature vectors; The key node weighting module uses the structural feature vector set to perform weight allocation, update feature vector weights, evaluate the interaction between nodes, adjust weights and highlight key nodes, and obtain key node priority data; The spatiotemporal data processing module processes the spatiotemporal data in segments through the key node priority data, reconstructs the data stream, matches the historical behavior pattern and predicts the behavior of the structure in the future time period, and obtains a future risk prediction model; The risk propagation network construction module constructs network nodes through bridge construction risk factors according to the future risk prediction model, defines network edges, analyzes interactions between nodes, identifies nodes with high propagation capabilities, and obtains a risk interaction network diagram; The risk management optimization module performs community division and association strength analysis based on the risk interaction network diagram, identifies risk clusters in the network, analyzes the internal structure of the clusters, optimizes risk management strategies, and obtains risk mitigation operation guidelines.
[0015] Compared with the prior art, the advantages and positive effects of the present invention are: In this invention, the accuracy and efficiency of bridge construction risk warning are significantly improved through deep data analysis and intelligent algorithm optimization. The introduced node feature extraction and feature aggregation mechanism, combined with dynamic weight allocation and update, realizes the accurate determination and prediction of construction risk factors. In addition, by constructing a risk propagation network and performing community division and correlation strength analysis, the aggregation pattern of risk factors is revealed, providing a scientific basis for formulating targeted intervention measures. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the workflow of the present invention; Figure 2 This is a detailed flow chart of S1 of the present invention; Figure 3 This is a detailed flow chart of S2 of the present invention; Figure 4 This is a detailed flow chart of S3 of the present invention; Figure 5 This is a detailed flow chart of S4 of the present invention; Figure 6 This is a detailed flow chart of S5 of the present invention; Figure 7 This is a detailed flow chart of S6 of the present invention; Figure 8 It is a system flow chart of the present invention. DETAILED DESCRIPTION
[0017] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0018] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.
[0019] Embodiment 1
[0020] See also Figure 1 The present invention provides a technical solution: a bridge construction risk early warning method, comprising the following steps: S1: Based on the bridge structure and construction environment data, node feature extraction and adjacent node feature aggregation are performed, and a structural feature vector set is generated by calculating the fitting degree between nodes and dynamically adjusting the node feature representation; S2: Based on the structural feature vector set, perform feature vector weight allocation and update, evaluate the interaction strength between nodes and optimize the weight adjustment mechanism, highlight the key nodes, and generate a weighted set of key nodes; S3: Based on the weighted set of key nodes, the spatiotemporal data is segmented and reconstructed, and the behavior of the structure in the future state is predicted by identifying the changes in data patterns and matching historical behavior patterns, generating a future risk prediction model; S4: Based on the bridge construction risk factors, the network nodes are constructed and the edges are defined. By analyzing the interactions of the nodes and evaluating their positions in the network, the nodes with high propagation ability are identified to generate the risk propagation network. S5: Based on the risk propagation network, perform community division and association strength analysis, identify node groups in the network and analyze their internal structure through cluster analysis, analyze the aggregation pattern of risk factors, and generate a risk cluster distribution map; S6: Based on the future risk prediction model and risk cluster distribution map, perform simulation tests of intervention measures, optimize risk management strategies by analyzing the impact of measures on risk transmission paths and intensity, and generate risk management optimization plans.
[0021] The structural feature vector set includes the location coordinates, connection strength, and material properties of the nodes. The key node weighted set specifically includes the importance rating, influence score, and risk sensitivity index of the nodes. The future risk prediction model includes the predicted damage type, damage degree estimation, and risk level classification. The risk propagation network includes the nodes in the network representing risk factors, the edges representing risk interactions, and the weights of the interactions between nodes. The risk cluster distribution map specifically includes the concentration of risk points within the group, the mutual influence between groups, and the contribution assessment to construction risks. The risk management optimization plan includes construction process adjustment measures, monitoring frequency modification plan, and re-setting of the warning threshold.
[0022] See also Figure 2 ,Based on the bridge structure and construction environment data, node feature extraction and adjacent node feature aggregation are performed.,The steps of generating the structural feature vector set are as follows: S101: Based on the bridge structure and construction environment data, identify the spatial position, connection type, and environmental influencing factors of each node, and draw a preliminary node feature map; First, the physical coordinates and associated structural information of each node are obtained through the design data of the bridge and the environmental parameters of the construction site. The specific position of the node in space, including lateral, longitudinal and height information, is analyzed using the Geographic Information System (GIS) and 3D modeling software. In addition, the connection type of the node - whether it is an articulated, fixed or movable connection - is classified and identified through structural analysis software, and the degree of influence of environmental factors is analyzed through environmental monitoring data, such as temperature, humidity and wind speed records. Based on this information, a preliminary feature map of each node is drawn using drawing software. This map details the spatial position of the node and the level of environmental adaptability.
[0023] The improved formula is the characteristic map calculation formula: , in, Represents the spatial coordinate set of the node, A logical matrix representing the connection types, Represents the impact matrix of environmental factors, are the weight coefficients regulating the importance of spatial location, connection type and environmental factors respectively.
[0024] S102: Based on the preliminary node feature graph, calculate the degree of fit between each pair of adjacent nodes, enter the degree of fit value, and establish a degree of fit record table; Next, based on the node feature graph, the degree of fit between each pair of adjacent nodes is calculated. The calculation of the degree of fit is based on the inverse of the spatial distance between nodes, the matching degree of connection types, and the similarity of environmental factors. Specifically, the spatial distance is determined by the straight-line distance between nodes, the matching of connection types is performed by comparing connection characteristics (such as hinged or fixed), and the similarity of environmental factors is obtained through statistical correlation analysis of environmental parameters. The calculation results of the degree of fit for each pair of nodes are entered into the system to form a detailed degree of fit record table.
[0025] The improved formula is the fitting calculation formula: , in, represents the distance between nodes, is the matching score of the connection type, is the similarity of environmental factors, It is the weight coefficient of each item, which adjusts the influence of spatial distance, connection matching and environmental similarity.
[0026] S103: Based on the fit record table, re-evaluate and adjust the feature representation of each node until the fit between the nodes is maximized, optimize the feature expression of the overall bridge structure, and generate a structural feature vector set.
[0027] Finally, the feature representation of each node is re-evaluated and adjusted based on the fit record table, and the spatial position and environmental adaptation parameters of each node are adjusted through an iterative algorithm to ensure that the fit between nodes in the overall bridge structure is maximized. In this process, the node features are continuously adjusted and the fit changes between different iterations are compared until the optimal node feature representation configuration is found. Finally, these optimized node features are used to generate a set of structural feature vectors to provide a quantitative evaluation of the stability and adaptability of the bridge structure.
[0028] The improved formula is the eigenvector update formula: , in, is the previous node feature vector, is the data in the fit record table, It is the weight coefficient for adjusting the influence of the fit, and the function form uses square root and square to enhance the nonlinear characteristics of the model.
[0029] See also Figure 3 , based on the structural feature vector set, the weight allocation and update of the feature vector are performed. By evaluating the interaction strength between nodes and optimizing the weight adjustment mechanism, the key nodes are highlighted. The steps to generate the weighted set of key nodes are as follows: S201: Based on the structural feature vector set, the distance measurement method is used to calculate the difference between the vectors, and the difference measurement is used to reflect the potential connection between the nodes to generate a correlation evaluation matrix; First, the vector of each node is extracted from the set of structural feature vectors, and the weighted Euclidean distance is used to calculate the difference between the vectors of each node. This distance metric not only considers the direct numerical difference of the vector, but also increases the sensitivity of the model to different feature dimensions by introducing weight factors. When calculating the distance between the feature vectors and of two nodes, the difference in each dimension will be strengthened or weakened by the corresponding weight to reflect the importance of different features.
[0030] The improved formula is the distance measurement formula: , in, and They are vectors In the The weight of the dimension, It is The weight of the dimension, is the dimension of the vector. Through this formula, the differences between nodes can be effectively calculated and the correlation evaluation matrix can be generated based on these differences.
[0031] S202: Based on the correlation evaluation matrix, a fuzzy clustering algorithm is used to gradually adjust the weights of multiple vectors using a dynamic adjustment strategy, referring to the dynamic changes of the interactions between nodes, reflecting the changes in the importance of nodes, and generating a weight adjustment vector set; Based on the correlation evaluation matrix, we start by setting an initial set of weights, which includes the initial importance score of each node. In the process of setting the initial weights, we analyze the basic data of each node in detail, such as activity, number of connections, and historical influence. Subsequently, we set the basic properties of each vector and its adjustment range in the multi-vector weight adjustment process, and adjust it according to the dynamic behavior characteristics of the node, such as interaction frequency and the number of newly added connections. The dynamic adjustment strategy gradually adjusts the weight of each vector according to the preset rules, and continuously monitors the interaction between nodes, especially those nodes with significant changes in influence. For example, a significant increase in the frequency of node interaction will lead to an increase in the weight of the node, while a decrease in the number of connections or a decrease in activity will reduce its weight accordingly. Finally, based on the dynamic changes in the interaction between nodes, a set of weight adjustment vectors reflecting the importance of the nodes after a series of adjustments is generated. This method ensures the optimal adjustment of network structure and function, can reflect important changes in network status in real time, and improves the response efficiency and accuracy of the entire network.
[0032] The formula of the fuzzy clustering algorithm is as follows: , in, For data points For cluster centers The membership degree of is the number of cluster centers, is the fuzzy coefficient, For data points The local density influence factor is For data points The weight of and The weighted data points To cluster center and The Euclidean distance.
[0033] The execution process is as follows: Calculate the weight of each data point and local density factor , the factors are dynamically determined based on the prior information of the data points or the characteristics of the data set, and the weighted distance from the data point to each cluster center is calculated, using the weighted distance and the adjusted fuzzy coefficient Calculate the membership of each data point to each cluster center, all memberships are updated to the membership matrix, and the weight coefficient is confirmed The specific value of may be determined by analyzing the frequency, importance, or other characteristics of the data points.
[0034] S203: Based on the weight adjustment vector set, the weights are optimized and updated, and the features of the key nodes are highlighted by adjusting the weight distribution, the key node representation is refined, and a key node weighted set is generated.
[0035] Finally, the updated weight vector set is used for the final optimization and update of the weights. This step ensures that the characteristics of key nodes are effectively highlighted by further refining the weight distribution. During the optimization process, special attention is paid to regulating the weight of each node to ensure that it matches its structural and functional importance. In this way, the model's responsiveness to key nodes can be effectively improved, and the prediction accuracy and adaptability of the overall model can be enhanced.
[0036] The improved formula is the weight optimization formula: , in, is the adjusted weight vector, It is a coefficient vector assigned according to the importance of nodes. This formula ensures the reasonable distribution of weights through normalization and especially strengthens the influence of key nodes.
[0037] See also Figure 4 , based on the weighted set of key nodes, the spatiotemporal data is segmented and reconstructed, and the behavior of the structure in the future state is predicted by identifying the changes in data patterns and matching historical behavior patterns. The specific steps for generating a future risk prediction model are as follows: S301: traverse each data point in the spatiotemporal data, apply the key node weighted set to each data point, use the element-level multiplication algorithm to calculate its importance score, and if the score of a single data point exceeds a predetermined threshold, it is regarded as a key turning point, and the data is segmented to generate a data segment segmentation table; The element-wise multiplication algorithm uses the formula , in, is the importance score, is the jth eigenvalue of the ith data point, is the weight of the jth feature, is the dynamic adjustment coefficient of the feature, is the local influence of the data point, The global impact.
[0038] First, determine the dynamic adjustment coefficient for each feature , which can be achieved by analyzing the rate of change of features in different time windows. Secondly, calculate the local influence of data points and time correlation factor , which can be estimated based on the spatiotemporal distribution and historical importance of the data points. Finally, the global influence is added, which is a constant determined based on statistical analysis of the entire dataset.
[0039] S302: for each data segment in the data segmentation table, analyze its internal data pattern and the difference between the change and the adjacent data segment, score each change point, select the changes with scores higher than the target threshold for historical behavior pattern matching, use dynamic threshold adjustment, and generate a behavior pattern recognition table; First, extract each data segment from the data segmentation table and analyze the data pattern within each segment, as well as the difference between the data segment and the adjacent data segments before and after. This analysis includes calculating the statistical characteristics within the data segment, such as the mean, standard deviation, trend line, etc., and calculating the difference indicators between adjacent data segments, such as difference, coefficient of variation, etc. Each difference point is scored according to the degree of difference between it and the adjacent segment, and the following formula is used for dynamic scoring: , in, Represents the internal statistical characteristics of the current data segment, Represent the statistical characteristics of the previous and next paragraphs respectively, is the weight coefficient that adjusts the importance of these differences. This scoring mechanism ensures that the scores can be dynamically calculated based on the degree of change in the data itself, and important change points can be selected.
[0040] S303: Using the information in the behavior pattern recognition table, a prediction model is assigned to each identified behavior pattern. By comparing the future performance of similar behavior patterns in historical data, weighted averaging is performed with reference to the prediction results of multiple models, and the prediction parameters are adjusted to optimize the model performance, thereby generating a future risk prediction model.
[0041] Using the information in the behavior pattern recognition table, we first analyze the characteristics of each behavior pattern, such as behavior frequency, duration, number of subjects involved, and environmental conditions, so as to accurately reveal typical behavior paths such as user shopping patterns or login habits, and assign a prediction model to each identified behavior pattern. These models are built based on historical data and use statistical or machine learning methods to predict the future performance of the behavior. The model framework selection and parameter setting are optimized for specific behavior patterns. By comparing the future performance of similar behavior patterns in historical data, the accuracy and reliability of the prediction model are verified. The weighted average is taken according to the historical performance of each model to optimize the accuracy of the overall prediction. The model performance is optimized by adjusting model parameters, such as weights and bias terms. The process includes fine-tuning parameters using algorithms such as gradient descent to reduce prediction errors. The generated future risk prediction model provides decision makers with quantitative potential risk assessments, enhances the foresight and accuracy of risk management, and transforms complex data into actionable insights to help organizations make wise decisions.
[0042] See also Figure 5 ,Based on the bridge construction risk factors, the construction of network nodes and the definition of edges are performed.,By analyzing the interaction of nodes and evaluating their positions in the network, nodes with high,propagation capabilities are identified.,The specific steps for generating the risk propagation network are: S401: Based on the bridge construction risk factors, an independent node is assigned to each risk factor, and for pairs of risk factors that have mutual influence, the weight and direction of the edge are set according to the intensity and direction of the influence, so as to generate a risk relationship network; First, each bridge construction risk factor is identified and assigned as an independent node in the network. Then, the mutual influence between different risk factors is analyzed, including their influence intensity and direction. These influences are quantified and used to set the weight and direction of the edges in the network. For the risk impact relationship between two nodes, the weight of the edge is calculated using the following formula: , in, Represent the risk levels of node i and node j respectively, is a coefficient adjusted according to the intensity of the impact, The normalization constant α enhances the model's sensitivity to differences in risk levels.
[0043] S402: Based on the risk relationship network, traverse each node, use weighted node degree analysis, calculate the number of directly connected nodes, and if the number exceeds the target threshold, mark the node as a high-propagation node, identify the nodes that play a key role in risk propagation, and generate a key node set; Weighted node degree analysis uses the formula , in, is the number of directly connected nodes, Representatives and connected nodes, It is the edge The weight represents the strength or importance of the connection between two nodes. Representative Node The structural hole index, Representative Node The clustering coefficient, Representative Node The betweenness centrality of are adjustment coefficients, which respectively measure the importance of the structural hole index, clustering coefficient, and betweenness centrality in the calculation of the total degree.
[0044] S403: Based on the key node set, capture the coordinate position of the node in the network, analyze the interaction intensity between the nodes, focus on analyzing the promotion path of risk diffusion, adjust and optimize the network structure, and generate a risk propagation network.
[0045] Based on the key node set, the system captures the coordinate position of each key node in the network and analyzes the interaction intensity between these nodes. In order to further promote the effectiveness of risk management, it specifically analyzes those paths that may promote risk diffusion and adjusts and optimizes the network structure through the following formula: , in, is the original network structure, is the adjusted network structure, is the set of key nodes, are all the nodes in the network, is the adjustment step size, is a small amount to avoid the denominator being zero, Represents the weights between nodes. This formula introduces fractional and square root operations to make the adjustment of the network structure more detailed and sensitive.
[0046] See also Figure 6 ,Based on the risk propagation network, we perform community division and association strength analysis,,identify the node groups in the network and analyze their internal structure through cluster analysis,,analyze the clustering pattern of risk factors, and generate the risk cluster distribution map,specifically: S501: traverse the risk propagation network, record the interaction frequency and interaction intensity of each node with surrounding nodes, capture the interaction of each node in the network, and generate interaction frequency and intensity records; In the risk propagation network, each node is traversed and the interaction frequency and interaction intensity with the surrounding nodes are recorded. These data reflect the interaction between nodes, and the specific calculation formula is as follows: , in, A composite index representing the interaction intensity and frequency between nodes i and j, The number of interactions between is the average strength of the interaction, is the sensitivity parameter, are the internal activity indexes of nodes i and j, respectively. This formula not only takes into account the frequency and intensity of interaction, but also adjusts the influence of the internal activity of the node through a logical function.
[0047] S502: Using the interaction frequency and intensity records, identify a set of nodes with high interaction and determine them as potential communities. By distinguishing clusters of strong interactions between nodes, basic information is provided for community division and a potential community list is generated. Based on the interaction frequency and intensity records, we identify sets of nodes with particularly frequent and strong interactions. These sets of nodes are considered potential communities. We use the following formula to identify these clusters: , in, is the cluster score of nodes i and j, and is the relationship between nodes i and j and other nodes The intensity and frequency of interaction, is the set of nodes in the network, is the total number of nodes. This formula determines whether nodes belong to the same community by the average interaction strength and frequency.
[0048] S503: Analyze each community in the potential community list, evaluate the compactness of its internal structure, identify the core nodes and edge nodes within the multi-community, reveal the organizational characteristics of differentiated communities by analyzing the internal structure of the community, and generate community structure characteristic results; Each community in the potential community list is analyzed. First, the compactness of its internal structure is evaluated by calculating the average path length and clustering coefficient between nodes within the community. The indicators help quantify the cohesion of the community and identify the core and edge nodes within the community. Through network centrality analysis, such as degree centrality and betweenness centrality, the nodes located at the center and edge of the network are distinguished. In-depth analysis of the internal structure of the community reveals differentiated organizational characteristics, including the role distribution of nodes, interaction patterns, and the hierarchical structure of the community. For example, some communities show hierarchical differentiation, with core nodes playing a key role in controlling the flow of information, while edge nodes are mainly responsible for information reception and dissemination. The final community structure feature results comprehensively reflect the internal structure and organizational characteristics of each community, providing a compactness score for each community, a clear list of core and edge nodes, and a description of the community hierarchy and function. The detailed feature results provide basic data for further network analysis and community management, helping decision makers understand community dynamics and formulate targeted strategies.
[0049] S504: Based on the community structure characteristics, use clustering methods to identify multiple risk clusters, analyze the distribution and association strength of risk clusters in the network, analyze the distribution pattern of risk factors in the community, and generate a risk cluster distribution map.
[0050] Using the community structure characteristics results, clustering methods were used to further identify and classify risk clusters. Cluster analysis was performed using the following formula: , in, It is The cohesion index of the risk clusters, Is a cluster Risk indicators of midpoints, and The risk indicators are This formula evaluates the cohesion and stability of risk clusters by calculating the standardized sum of squares of risk indicators, thereby generating a detailed risk cluster distribution map.
[0051] See also Figure 7 Based on the future risk prediction model and risk cluster distribution map, simulation tests of intervention measures are performed. By analyzing the impact of measures on risk transmission paths and intensity, risk management strategies are optimized. The specific steps for generating risk management optimization solutions are as follows: S601: Based on the future risk prediction model, perform simulations of multiple predetermined intervention measures, compare the changes in the probability of risk occurrence and the degree of potential impact before and after implementation, analyze the mitigation effects of the measures, and generate comparative analysis of intervention effects; First, the future risk prediction model is used to simulate multiple intervention measures. The probability of risk occurrence and its impact changes before and after the intervention are calculated using the following formula: , in, are the risk occurrence probabilities before and after the intervention, These two difference formulas help quantify the effects of interventions and generate detailed comparative analysis of intervention effects.
[0052] S602: Based on comparative analysis of intervention effects, evaluate the impact of each measure on the risk transmission path and its intensity, identify the intervention strategy with the greatest impact on risk transmission by ranking the measures’ influence, and generate a list of key intervention strategies; Next, the specific impact of each intervention on the risk transmission pathway and its intensity was assessed. The following formula was used to rank the effectiveness of the interventions: , in, It is The total impact of the interventions, are the probability and impact changes of the measures on the second risk path. The values were ranked, the most effective intervention strategies were identified, and a list of key intervention strategies was generated.
[0053] S603: Based on the key intervention strategy list, simulate the implementation of key intervention measures in the risk cluster distribution map, observe the adjustment effect of the measures on the risk cluster, record the changes in risk distribution after the intervention, and generate a post-intervention risk adjustment map; Based on the list of key intervention strategies, simulate the implementation of these strategies and observe their effects on the risk cluster distribution map. The following formula is used to evaluate the adjustment effect of the intervention measures: , in, represents the average risk value of the risk cluster after adjustment, Is a node in the cluster The initial risk value is Is a node The risk probability changes, is the set of nodes in the risk cluster, is the number of nodes in the cluster. A detailed post-intervention risk adjustment map is generated by calculating the adjusted mean risk value.
[0054] S604: Based on the post-intervention risk adjustment mapping, analyze the comprehensive effect of the implementation of measures, refine and optimize the risk management strategy, reduce risk transmission and improve resource utilization efficiency, and generate risk management optimization plans.
[0055] Finally, based on the risk adjustment mapping after intervention, the implementation effect of all measures is comprehensively analyzed. The risk management strategy is optimized through the following formula: , in, It is the optimization objective function, which minimizes the risk-adjusted and target risk values. The deviation between is the risk value of each node after adjustment. This formula helps to clarify the direction of optimizing risk management strategy and generate the final risk management optimization plan.
[0056] See also Figure 8 A bridge construction risk early warning system is provided, and the bridge construction risk early warning system is used to execute the above-mentioned bridge construction risk early warning method, and the system comprises: The structural feature analysis module extracts node characteristics and aggregates adjacent node characteristics based on bridge structure and construction environment data, calculates the degree of fit between nodes, adjusts the representation of node characteristics according to the degree of fit, and obtains a set of structural feature vectors; The key node weighting module uses the structural feature vector set to perform weight assignment, update the feature vector weights, evaluate the interaction between nodes, adjust the weights and highlight the key nodes to obtain the key node priority data; The spatiotemporal data processing module processes spatiotemporal data in segments through key node priority data, reconstructs data streams, matches historical behavior patterns, and predicts the behavior of the structure in future time periods to obtain a future risk prediction model; The risk propagation network construction module constructs network nodes based on the future risk prediction model and bridge construction risk factors, defines network edges, analyzes the interactions between nodes, identifies nodes with high propagation capabilities, and obtains a risk interaction network diagram; The risk management optimization module performs community segmentation based on the risk interaction network diagram, conducts association strength analysis, identifies risk clusters in the network, analyzes the internal structure of the clusters, optimizes risk management strategies, and obtains risk mitigation operation guidelines.
[0057] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A bridge construction risk early warning method, characterized in that: The following steps are involved: Based on the bridge structure and construction environment data, node feature extraction and adjacent node feature aggregation are performed, and a structural feature vector set is generated by calculating the fit between nodes and dynamically adjusting the node feature representation. Based on the structural feature vector set, weight allocation and updating of feature vectors are performed, and key nodes are highlighted by evaluating the interaction strength between nodes and optimizing the weight adjustment mechanism to generate a weighted set of key nodes; Based on the weighted set of key nodes, the spatiotemporal data is segmented and reconstructed, and the behavior of the structure in the future state is predicted by identifying data pattern changes and matching historical behavior patterns, thereby generating a future risk prediction model; Based on the bridge construction risk factors, the network nodes are constructed and the edges are defined. By analyzing the interactions of the nodes and evaluating their positions in the network, the nodes with high propagation capacity are identified to generate the risk propagation network. Based on the risk propagation network, community division and association strength analysis are performed, and through cluster analysis, node groups in the network are identified and their internal structures are analyzed, the aggregation pattern of risk factors is analyzed, and a risk cluster distribution map is generated; Based on the future risk prediction model and risk cluster distribution map, simulation tests of intervention measures are performed, and by analyzing the impact of measures on risk transmission paths and intensity, risk management strategies are optimized and risk management optimization plans are generated.
2. The bridge construction risk early warning method according to claim 1 is characterized in that: Based on the bridge structure and construction environment data, node feature extraction and adjacent node feature aggregation are performed. By calculating the fitting degree between nodes and dynamically adjusting the node feature representation, the steps for generating the structural feature vector set are as follows: Based on the bridge structure and construction environment data, identify the spatial location, connection type, and environmental influencing factors of each node, and draw a preliminary node feature map; Based on the preliminary node feature graph, calculate the degree of fit between each pair of adjacent nodes, enter the degree of fit value, and establish a degree of fit record table; Based on the fitness record table, the characteristic representation of each node is re-evaluated and adjusted until the fitness between the nodes is maximized, the characteristic expression of the overall bridge structure is optimized, and a set of structural characteristic vectors is generated.
3. The bridge construction risk early warning method according to claim 1 is characterized in that: Based on the structural feature vector set, the feature vector weights are allocated and updated, and the key nodes are highlighted by evaluating the interaction strength between nodes and optimizing the weight adjustment mechanism. The steps of generating the key node weighted set are as follows: Based on the structural feature vector set, the distance measurement method is used to calculate the difference between the vectors, and the difference measurement is used to reflect the potential connection between the nodes to generate a correlation evaluation matrix; Based on the correlation evaluation matrix, a fuzzy clustering algorithm is used to gradually adjust the multi-vector weights using a dynamic adjustment strategy, referring to the dynamic changes of the interactions between nodes, reflecting the changes in the importance of nodes, and generating a weight adjustment vector set; The formula of the fuzzy clustering algorithm is as follows: , in, For data points For cluster centers The membership degree of is the number of cluster centers, is the fuzzy coefficient, For data points The local density influence factor is For data points The weight of and The weighted data points To cluster center and The Euclidean distance of Based on the weight adjustment vector set, the weights are optimized and updated, the features of the key nodes are highlighted by regulating the weight distribution, the key node representation is refined, and a key node weighted set is generated.
4. The bridge construction risk early warning method according to claim 1 is characterized in that: Based on the weighted set of key nodes, the spatiotemporal data is segmented and reconstructed, and the behavior of the structure in the future state is predicted by identifying data pattern changes and matching historical behavior patterns. The specific steps of generating a future risk prediction model are as follows: Traversing each data point in the spatiotemporal data, applying the key node weighted set to each data point using an element-level multiplication algorithm to calculate its importance score, and if the score of a single data point exceeds a predetermined threshold, it is regarded as a key turning point, and the data is segmented to generate a data segment segmentation table; For each data segment in the data segment segmentation table, analyze its internal data pattern and the difference in changes with adjacent data segments, score each change point, select changes with scores higher than the target threshold for historical behavior pattern matching, use dynamic threshold adjustment, and generate a behavior pattern recognition table; Using the information in the behavior pattern recognition table, a prediction model is assigned to each identified behavior pattern, and by comparing the future performance of similar behavior patterns in historical data, weighted averaging is performed with reference to the prediction results of multiple models, and the prediction parameters are adjusted to optimize the model performance, thereby generating a future risk prediction model; The element-wise multiplication algorithm uses the formula , in, is the importance score, is the jth eigenvalue of the ith data point, is the weight of the jth feature, is the dynamic adjustment coefficient of the feature, is the local influence of the data point, The global impact.
5. The bridge construction risk early warning method according to claim 1 is characterized in that: Based on the bridge construction risk factors, the construction of network nodes and the definition of edges are performed. By analyzing the interaction of nodes and evaluating their positions in the network, nodes with high propagation capabilities are identified. The specific steps for generating the risk propagation network are as follows: Based on the risk factors of bridge construction, an independent node is assigned to each risk factor, and for pairs of risk factors that have mutual influence, the weight and direction of the edge are set according to the intensity and direction of the influence to generate a risk relationship network; Based on the risk relationship network, traverse each node, use weighted node degree analysis, calculate the number of directly connected nodes, and mark the node as a high-propagation node if the number exceeds the target threshold, identify the nodes that play a key role in risk propagation, and generate a key node set; Based on the key node set, the coordinate position of the node in the network is captured, and by analyzing the interaction intensity between the nodes, the promotion path of risk diffusion is analyzed in detail, the network structure is adjusted and optimized, and a risk propagation network is generated; The weighted node degree analysis uses the formula , in, is the number of directly connected nodes, Representatives and connected nodes, It is the edge The weight represents the strength or importance of the connection between two nodes. Representative Node The structural hole index, Representative Node The clustering coefficient, Representative Node The betweenness centrality of are adjustment coefficients, which respectively measure the importance of the structural hole index, clustering coefficient, and betweenness centrality in the calculation of the total degree.
6. The bridge construction risk early warning method according to claim 1 is characterized in that: Based on the risk propagation network, community division and association strength analysis are performed. Through cluster analysis, node groups in the network are identified and their internal structures are analyzed. The aggregation pattern of risk factors is analyzed. The specific steps of generating a risk cluster distribution map are as follows: Traversing the risk propagation network, recording the interaction frequency and interaction intensity of each node with surrounding nodes, capturing the interaction of each node in the network, and generating interaction frequency and intensity records; Using the interaction frequency and intensity records, a set of nodes with high interaction is identified and determined as a potential community. By distinguishing clusters of strong interactions between nodes, basic information is provided for community division and a potential community list is generated. Analyze each community in the potential community list, evaluate the compactness of its internal structure, identify the core nodes and edge nodes within the multi-community, reveal the organizational characteristics of differentiated communities by analyzing the internal structure of the community, and generate community structure characteristic results; Based on the community structure characteristics, clustering methods are used to identify multiple risk clusters, analyze the distribution and association strength of risk clusters in the network, analyze the distribution pattern of risk factors in the community, and generate risk cluster distribution maps; The formula of the clustering method is as follows: , in, is the normalization coefficient, is the identity matrix The weighting coefficient of is the adjacency matrix The weighting coefficient of is the kernel matrix The weighting coefficient of represents the Laplacian matrix.
7. The bridge construction risk early warning method according to claim 1 is characterized in that: Based on the future risk prediction model and risk cluster distribution map, simulation tests of intervention measures are performed, and the risk management strategy is optimized by analyzing the impact of the measures on the risk transmission path and intensity. The specific steps of generating a risk management optimization plan are as follows: Based on the future risk prediction model, perform simulations of multiple predetermined intervention measures, compare the changes in the probability of risk occurrence and the degree of potential impact before and after implementation, analyze the mitigation effects of the measures, and generate comparative analysis of intervention effects; Based on the comparative analysis of the intervention effects, evaluate the impact of each measure on the risk transmission path and its intensity, identify the intervention strategies with the greatest impact on risk transmission by ranking the measures’ influence, and generate a list of key intervention strategies; Based on the list of key intervention strategies, simulate the implementation of key intervention measures in the risk cluster distribution map, observe the adjustment effect of the measures on the risk clusters, record the changes in risk distribution after the intervention, and generate a post-intervention risk adjustment map; Based on the post-intervention risk adjustment mapping, the comprehensive effect of the implementation of measures is analyzed, the risk management strategy is refined and optimized, the risk propagation is reduced and the resource utilization efficiency is improved, and the risk management optimization plan is generated.
8. A bridge construction risk early warning system, characterized in that: According to the bridge construction risk early warning method according to any one of claims 1 to 8, the system comprises: The structural feature analysis module extracts node characteristics and aggregates adjacent node characteristics based on bridge structure and construction environment data, calculates the degree of fit between nodes, adjusts the representation of node characteristics according to the degree of fit, and obtains a set of structural feature vectors; The key node weighting module uses the structural feature vector set to perform weight allocation, update feature vector weights, evaluate the interaction between nodes, adjust weights and highlight key nodes, and obtain key node priority data; The spatiotemporal data processing module processes the spatiotemporal data in segments through the key node priority data, reconstructs the data stream, matches the historical behavior pattern and predicts the behavior of the structure in the future time period, and obtains a future risk prediction model; The risk propagation network construction module constructs network nodes through bridge construction risk factors according to the future risk prediction model, defines network edges, analyzes interactions between nodes, identifies nodes with high propagation capabilities, and obtains a risk interaction network diagram; The risk management optimization module performs community division and association strength analysis based on the risk interaction network diagram, identifies risk clusters in the network, analyzes the internal structure of the clusters, optimizes risk management strategies, and obtains risk mitigation operation guidelines.
Citation Information
Cited By
Construction operation information storage method and device, electronic equipment and computer medium
CN119473138A
Intelligent management system for building construction based on BIM (Building Information Modeling)
CN119692722A
Critical path and intermediate node identification method for implied water shortage risk transmission based on intermediary centrality algorithm
CN119807658A
A method for identifying critical paths and intermediate nodes of implicit water shortage risk transmission based on betweenness centrality algorithm
CN119807658B
Bridge construction hazard source identification and risk analysis method and system
CN120144983A