System work order additional recording method and device and electronic equipment

By analyzing keywords and timing exceptions in the work order logs of the operation and maintenance process system, abnormal work orders are automatically recorded, which solves the problem of inconsistent work orders between systems, improves the efficiency of the operation and maintenance process, and reduces maintenance costs.

CN118798609APending Publication Date: 2024-10-18XINYANG BRANCH HENAN CO LTD OF CHINA MOBILE COMM CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410243865.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-03-04
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

In the operation and maintenance process system, when the third-party system creates a work order through the process interface, it fails to create the order successfully due to specific reasons, resulting in inconsistent work orders between systems, and maintenance personnel need to manually make up the entries, which is inefficient and costly.

Method used

By obtaining the work order log of the target system of the work order to be filled in, abnormal keyword analysis and timing anomaly analysis are performed to determine the abnormal work order and carry out supplementary recording to avoid the loss of work orders and reduce the workload of maintenance personnel.

Benefits of technology

Automated work order replenishment is realized, reducing work order losses and maintenance costs, and improving the efficiency of the operation and maintenance process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798609A_ABST
    Figure CN118798609A_ABST
Patent Text Reader

Abstract

The invention provides a system work order additional recording method and device and electronic equipment, and relates to the technical field of business support, and the method comprises the steps: obtaining a work order log of a target system to be subjected to additional recording of a work order; performing abnormal keyword analysis on the work order log to determine a first abnormal work order and a candidate normal work order in the work order log; performing time sequence anomaly analysis on the candidate normal work orders to determine a second abnormal work order from the candidate normal work orders; and work order additional recording is carried out on the first abnormal work order and the second abnormal work order. Therefore, by sequentially carrying out keyword analysis and time sequence anomaly analysis on the work order log, the abnormal work order can be determined from two dimensions of content and time sequence, so that subsequent additional recording of the work order is realized, the situation of loss of the work order can be avoided as far as possible, the workload of maintenance personnel is reduced, and the maintenance cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of business support technology, and in particular to a method, device and electronic equipment for supplementing system work orders. Background Art

[0002] At present, the operation and maintenance process system has the following problems in a series of processes such as manual creation of work orders, interface creation of work orders, work order approval flow and work order archiving: When a third-party system creates a process work order through a process interface, it often fails to create the order successfully due to some specific reasons. This will cause inconsistencies in the work orders of the two systems, and maintenance personnel will need to manually re-enter the failed work orders. When creating work orders within the process system or creating work orders on a scheduled basis, the creation of work orders may fail due to system upgrades and other reasons, resulting in the loss of work orders. In some cases, for some work order creation failures, maintenance personnel need to manually analyze the failure to create the order through logs, and then manually re-enter the work order, which is very inefficient and has high labor costs. Summary of the invention

[0003] The present disclosure aims to solve one of the technical problems in the related art at least to some extent.

[0004] To this end, an object of the present disclosure is to propose a method for supplementing system work orders.

[0005] The second objective of the present disclosure is to provide a system work order supplementary recording device.

[0006] A third objective of the present disclosure is to provide an electronic device.

[0007] A fourth object of the present disclosure is to provide a non-transitory computer-readable storage medium.

[0008] A fifth object of the present disclosure is to provide a computer program product.

[0009] To achieve the above-mentioned purpose, the first aspect of the present disclosure proposes a method for supplementing system work orders, including: obtaining a work order log of a target system for supplementing work orders; performing abnormal keyword analysis on the work order log to determine a first abnormal work order and candidate normal work orders in the work order log; performing a timing abnormality analysis on the candidate normal work orders to determine a second abnormal work order from the candidate normal work orders; and supplementing the first abnormal work order and the second abnormal work order.

[0010] According to one embodiment of the present disclosure, the abnormal keyword analysis of the work order log to determine the first abnormal work order and the candidate normal work order in the work order log includes: obtaining a preset abnormal field mapping; matching the abnormal field identifier in the abnormal field mapping with the work order log; and determining that the work order that has been successfully matched is the first abnormal work order, and the work order that has not been successfully matched is the candidate normal work order.

[0011] According to one embodiment of the present disclosure, the candidate normal work order includes multiple processes to be judged, and the timing anomaly analysis of the candidate normal work order to determine the second abnormal work order from the candidate normal work order includes: for any process to be judged of any candidate normal work order, respectively obtaining the first execution result and the first time consumption of the process to be judged, the second execution result and the second time consumption of the predecessor judgment process of the process to be judged, and the third execution result and the third time consumption of the successor judgment process of the process to be judged; based on the first time consumption, the second time consumption, the third time consumption, the first execution result, the second execution result and the third execution result, determining whether the process to be judged is an abnormal process; in response to the process to be judged being an abnormal process, determining that the candidate normal work order is the second abnormal work order.

[0012] According to one embodiment of the present disclosure, determining whether the process to be judged is an abnormal process based on the first time consumption, the second time consumption, the third time consumption, the first execution result, the second execution result and the third execution result includes: calculating a first similarity value of the process to be judged based on the first time consumption, the second time consumption, the first execution result and the second execution result; and calculating a second similarity value of the process to be judged based on the first time consumption, the third time consumption, the first execution result and the third execution result; determining whether the process to be judged is an abnormal process based on the first similarity value and the second similarity value.

[0013] According to one embodiment of the present disclosure, the first similarity value of the process to be judged is calculated based on the first time consumption, the second time consumption, the first execution result and the second execution result, including: calculating the first predicted execution result of the process to be judged based on the first time consumption, the second time consumption and the second execution result; calculating the first similarity value of the process to be judged based on the first predicted execution result and the first execution result.

[0014] According to an embodiment of the present disclosure, the formula for calculating the first predicted execution result of the process to be judged based on the first time consumption, the second time consumption and the second execution result is: Among them, the t 1is the first time consumption, the t 2 For the second time consuming, the is the first prediction execution result, the is the second execution result, and ε is the abnormal tolerance factor.

[0015] According to one embodiment of the present disclosure, the second similarity value of the process to be judged is calculated based on the first time consumption, the third time consumption, the first execution result and the third execution result, including: calculating the second predicted execution result of the process to be judged based on the first time consumption, the third time consumption and the third execution result; calculating the second similarity value of the process to be judged based on the second predicted execution result and the first execution result.

[0016] According to an embodiment of the present disclosure, the formula for calculating the second predicted execution result of the process to be judged based on the first time consumption, the third time consumption and the third execution result is: Among them, the t 1 is the first time consumption, the t 3 For the second time consuming, the is the first prediction execution result, the is the second execution result, and ε is the abnormal tolerance factor.

[0017] According to one embodiment of the present disclosure, calculating the first similarity value of the process to be judged based on the first predicted execution result and the first execution result includes: generating a first vector based on the first execution result, and generating a second vector based on the first predicted execution result; calculating the cosine value of the first vector and the second vector as the first similarity value.

[0018] According to one embodiment of the present disclosure, calculating the second similarity value of the process to be judged based on the second predicted execution result and the first execution result includes: generating a first vector based on the first execution result, and generating a third vector based on the second predicted execution result; calculating the cosine value of the first vector and the third vector as the second similarity value.

[0019] According to one embodiment of the present disclosure, determining whether the process to be judged is an abnormal process based on the first similarity value and the second similarity value includes: calculating the target similarity based on the first similarity and the second similarity; comparing the target similarity with a similarity threshold; and in response to the target similarity being less than the similarity threshold, determining that the process to be judged is an abnormal process.

[0020] According to one embodiment of the present disclosure, calculating the first similarity value and calculating the second similarity value include: calculating target similarity based on the first similarity and the second similarity; comparing the target similarity with a similarity threshold; and in response to the target similarity being less than the similarity threshold, determining that the process to be judged is an abnormal process.

[0021] According to one embodiment of the present disclosure, before performing abnormal keyword analysis on the work order log, it also includes: obtaining a preset date and obtaining the configuration date of each sub-work order in the work order log; filtering the sub-work orders based on the preset date to filter out the sub-work orders that meet the preset date as the target work orders for subsequent abnormal keyword analysis.

[0022] To achieve the above-mentioned purpose, the second aspect embodiment of the present disclosure proposes a system work order supplementary recording device, including: an acquisition module, used to obtain the work order log of the target system of the work order to be supplemented; a first analysis module, used to perform abnormal keyword analysis on the work order log to determine the first abnormal work order and the candidate normal work order in the work order log; a second analysis module, used to perform time series abnormality analysis on the candidate normal work order to determine the second abnormal work order from the candidate normal work order; a supplementary recording module, used to perform work order supplementary recording on the first abnormal work order and the second abnormal work order.

[0023] To achieve the above-mentioned purpose, the third aspect embodiment of the present disclosure proposes an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor to implement the system work order supplement method as described in the first aspect embodiment of the present disclosure.

[0024] To achieve the above-mentioned purpose, the fourth aspect embodiment of the present disclosure proposes a non-transitory computer-readable storage medium storing computer instructions, wherein the computer instructions are used to implement the system work order supplement method as described in the first aspect embodiment of the present disclosure.

[0025] To achieve the above-mentioned purpose, the fifth aspect of the present disclosure proposes a computer program product, including a computer program, which, when executed by a processor, is used to implement the system work order supplementary recording method as described in the first aspect of the present disclosure.

[0026] Therefore, by performing keyword analysis and timing anomaly analysis on the work order log in turn, abnormal work orders can be identified from both the content and timing dimensions, so that subsequent work order re-recording can be achieved, which can avoid the loss of work orders as much as possible, reduce the workload of maintenance personnel, and reduce maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of a method for supplementing a system work order according to an embodiment of the present disclosure;

[0028] Figure 2 It is a schematic diagram of another method for supplementing a system work order according to an embodiment of the present disclosure;

[0029] Figure 3 It is a schematic diagram of another method for supplementing a system work order according to an embodiment of the present disclosure;

[0030] Figure 4 It is a schematic diagram of another method for supplementing a system work order according to an embodiment of the present disclosure;

[0031] Figure 5 This is a schematic diagram of the overall process of a method for supplementing a system work order according to an embodiment of the present disclosure;

[0032] Figure 6 It is a schematic diagram of a system work order supplementary recording device according to one embodiment of the present disclosure;

[0033] Figure 7 is a schematic diagram of an electronic device according to an embodiment of the present disclosure. DETAILED DESCRIPTION

[0034] Embodiments of the present disclosure are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present disclosure, and should not be construed as limiting the present disclosure.

[0035] The acquisition, storage, use, and processing of data in the technical solution disclosed in this disclosure are in compliance with the relevant provisions of relevant laws and regulations.

[0036] Usually, when judging whether each process has abnormal information, conventional technology mainly configures corresponding behavior rules for the indicators of each process based on preliminary knowledge, and then determines whether the process has abnormal information by monitoring the important indicators in each process. Since existing technologies need to rely on manual and professional reserve knowledge to set rule sets for each indicator, and the number of indicators of large mobile operators can easily reach millions, the workload of manual configuration may be huge. Secondly, the corresponding behavior rules may change over time, which requires continuous manual adjustment, otherwise the abnormal information may not be accurately identified. Finally, some anomalies in actual applications are too complex to be defined by manual rules and therefore cannot be detected.

[0037] In order to solve the above problems, this solution considers providing a method for setting anomaly detection rules without manual intervention, thereby realizing anomaly detection. Figure 1 is a schematic diagram of a method for supplementing a system work order according to an embodiment of the present disclosure, such as Figure 1 As shown, the system work order supplementary recording method includes the following steps:

[0038] S101, obtaining the work order log of the target system of the work order to be supplemented.

[0039] The system work order supplement-recording method of the embodiment of the present application can be applied to the scenario of automatic processing of digital work orders by operators. The executor of the system work order supplement-recording of the embodiment of the present application can be the system work order supplement-recording device of the embodiment of the present application, and the system work order supplement-recording device can be set on an electronic device.

[0040] It should be noted that the work order log is a collection of logs of work orders in the target system. The work order log in the present disclosure can be manually input or obtained by scanning the running background log of the system.

[0041] In an embodiment of the present disclosure, if the acquired work order log occupies a large space, the acquired work order log is segmented to generate multiple files for reading or processing.

[0042] S102: Perform abnormal keyword analysis on the work order log to determine a first abnormal work order and candidate normal work orders in the work order log.

[0043] In the embodiment of the present disclosure, performing abnormal keyword analysis on the work order log refers to determining whether there are abnormal keywords in the work order log.

[0044] It should be noted that the abnormal keywords are designed in advance and can be changed according to actual design needs. No limitation is made here.

[0045] In actual operation, the work order log may include many different types of work orders, and the specific type can be determined according to the actual situation. For example, it may include process work orders generated by third-party system call interfaces, process work orders created by scheduled tasks, and process work orders created manually.

[0046] In the embodiments of the present disclosure, the abnormal keywords corresponding to different types of work orders may be different, and specific requirements need to be defined according to actual design needs.

[0047] It should be noted that before generating the first abnormal work order and the candidate normal work order, it is necessary to generate the work order first. In the embodiment of the present disclosure, the work order can be generated by extracting the key data in the work order log. The key data can be multiple, and no limitation is made here. For example, the key data can be shown in the following table:

[0048]

[0049] S103: Perform time series abnormality analysis on the candidate normal work orders to determine a second abnormal work order from the candidate normal work orders.

[0050] In actual operation, there may be abnormalities caused by delays in the candidate normal work orders. Such work orders will appear normal in the work order system, but they are abnormal work orders in actual operation, which will affect the normal process execution. Therefore, it is necessary to filter out these work orders from the candidate normal work orders.

[0051] The inventors found that in the automated processing of work orders of the system, the time consumed by each node in the same process is slightly different, but the overall difference is within a certain range.

[0052] Therefore, by comparing the timing of each processing node of the candidate normal work order, it can be determined whether it is at an abnormal node, thereby determining whether the candidate normal work order is an abnormal work order.

[0053] S104, re-enter the first abnormal work order and the second abnormal work order.

[0054] After obtaining the first abnormal work order and the second abnormal work order, the work order that needs to be supplemented for the corresponding abnormality can be determined according to the work order identifier.

[0055] It should be noted that different work orders have different corresponding work order identifiers, so different work orders can be distinguished by the work order identifiers.

[0056] In one possible implementation, the work order can be re-created by calling the create work order method to complete the work order information supplement. Specifically, the work order identifier of the first abnormal work order and / or the second abnormal work order can be used to determine whether the first abnormal work order and / or the second abnormal work order has been supplemented. If not, the automatic supplement process is entered.

[0057] In the disclosed embodiment, the work order log of the target system of the work order to be supplemented is first obtained, and then the work order log is subjected to abnormal keyword analysis to determine the first abnormal work order and the candidate normal work order in the work order log, and then the candidate normal work order is subjected to timing abnormal analysis to determine the second abnormal work order from the candidate normal work order, and finally the first abnormal work order and the second abnormal work order are supplemented. Thus, by sequentially performing keyword analysis and timing abnormal analysis on the work order log, the abnormal work order can be determined from the two dimensions of content and timing, thereby realizing the subsequent supplementary recording of the work order, which can avoid the loss of the work order as much as possible, reduce the workload of the maintenance personnel, and reduce the maintenance cost.

[0058] It should be noted that after completing the re-entry of the work order information, the process ID, error ID, process name, process form information, the time of re-entering the work order and other information are saved in a copy of the database and logged so that the next time the work order is re-entered, it can be determined whether the work order has been re-entered based on the error ID.

[0059] In the disclosed embodiment, the supplementary recording record can be recorded in the supplementary recording record table, so that when the next scheduled program is trained to check the work order, this table can be used to check whether the abnormal work order has been supplemented, and it is also convenient for people to check the status of the supplementary work order. The supplementary recording record table is designed in advance and can be changed according to actual design needs, and no limitation is made here. For example, it can be shown in the following table:

[0060]

[0061] By establishing a re-entry record table, repeated re-entry can be avoided, and it is also convenient for subsequent operators to monitor the re-entry flow of work orders.

[0062] In the above embodiment, the work order log is analyzed for abnormal keywords to determine the first abnormal work order and the candidate normal work order in the work order log. Figure 2 Explaining further, the method includes:

[0063] S201, obtaining a preset abnormal field mapping.

[0064] In the embodiment of the present disclosure, the abnormal field is mapped to a mapping relationship between different work orders and abnormal fields.

[0065] It should be noted that the exception fields corresponding to different types of work orders may be different, and no limitation is made here. The exception field mapping is designed in advance and can be changed according to actual design needs, and no limitation is made here.

[0066] S202: Match the abnormal field identifier in the abnormal field mapping with the work order log.

[0067] In the embodiments of the present disclosure, there may be multiple methods for matching the abnormal field identifier with the work order log, which are not limited here.

[0068] In one possible implementation, the abnormal field identifier can be matched with the work order log through a matching algorithm or a matching model to obtain a matching result. The matching algorithm or the matching model is trained or set in advance and stored in the storage space of the electronic device for easy retrieval when needed.

[0069] In another possible implementation manner, the abnormal field identifier may be matched with the work order log input into a matching application.

[0070] S203: Determine that the successfully matched work order is the first abnormal work order, and the unsuccessfully matched work order is a candidate normal work order.

[0071] In the disclosed embodiment, a preset abnormal field mapping is first obtained, and then the abnormal field identifier in the abnormal field mapping is matched with the work order log, and finally the work order that successfully matches is determined to be the first abnormal work order, and the work order that failed to match is determined to be a candidate normal work order. Thus, by presetting the abnormal field mapping, the first abnormal work order can be quickly and accurately determined from the work order log, thereby improving the efficiency and accuracy of screening.

[0072] In the above embodiment, the candidate normal work order includes multiple processes to be judged, and the candidate normal work order is subjected to time sequence abnormality analysis to determine the second abnormal work order from the candidate normal work order. Figure 3 Explaining further, the method includes:

[0073] S301, for any to-be-judged process of any candidate normal work order, obtain the first execution result and the first time consumption of the to-be-judged process, the second execution result and the second time consumption of the predecessor judgment process of the to-be-judged process, and the third execution result and the third time consumption of the successor judgment process of the to-be-judged process.

[0074] It should be noted that the execution results corresponding to different types of judgment processes may be different, and no limitation is made here. For example, the execution result may be 0 or 1, where 0 is the first result and 1 is the second result. Optionally, the execution result may also be a specific value, for example, the execution result may be that the number of participants is 60, or the number of participants is 100, etc.

[0075] In the embodiment of the present disclosure, the first execution result, the first time consumption, the second execution result, the second time consumption, the third execution result and the third time consumption can be obtained by parsing the work order log.

[0076] In a possible implementation, if the process to be determined is the last node process, the third execution result and the third time consumption of the subsequent determination process are not obtained. If the process to be determined is the first node process, the second execution result and the second time consumption of the previous determination process are not obtained.

[0077] S302, based on the first time consumption, the second time consumption, the third time consumption, the first execution result, the second execution result and the third execution result, determine whether the process to be determined is an abnormal process.

[0078] In the embodiments of the present disclosure, a first similarity value of the process to be judged can be calculated based on the first time consumption, the second time consumption, the first execution result and the second execution result, and a second similarity value of the process to be judged can be calculated based on the first time consumption, the third time consumption, the first execution result and the third execution result. Finally, based on the first similarity value and the second similarity value, it is determined whether the process to be judged is an abnormal process.

[0079] It should be noted that, based on the first time consumption, the second time consumption, the first execution result and the second execution result, the first similarity value of the process to be judged is calculated. First, the first predicted execution result of the process to be judged can be calculated based on the first time consumption, the second time consumption and the second execution result, and then the first similarity value of the process to be judged can be calculated based on the first predicted execution result and the first execution result.

[0080] Based on the first time consumption, the second time consumption and the second execution result, the formula for calculating the first predicted execution result of the process to be judged is:

[0081]

[0082] Among them, t 1 is the first time consumption, t 2 For the second time, is the first prediction execution result, is the second execution result, and ε is the abnormal tolerance factor.

[0083] Based on the first predicted execution result and the first execution result, the first similarity value of the process to be judged is calculated. First, a first vector is generated based on the first execution result, and a second vector is generated based on the first predicted execution result. Then, the cosine value of the first vector and the second vector is calculated as the first similarity value.

[0084] In the embodiment of the present disclosure, the formula for calculating the first similarity value is:

[0085]

[0086] Based on the first time consumption, the third time consumption, the first execution result and the third execution result, the second similarity value of the process to be judged is calculated. First, based on the first time consumption, the third time consumption and the third execution result, the second predicted execution result of the process to be judged is calculated, and then based on the second predicted execution result and the first execution result, the second similarity value of the process to be judged is calculated.

[0087] It should be noted that, based on the first time consumption, the third time consumption and the third execution result, the formula for calculating the second predicted execution result of the process to be determined is:

[0088]

[0089] Among them, t1 is the first time consumption, t 3 For the second time, is the first prediction execution result, is the second execution result, and ε is the abnormal tolerance factor.

[0090] Based on the second predicted execution result and the first execution result, the second similarity value of the process to be judged is calculated. First, a first vector is generated based on the first execution result, and a third vector is generated based on the second predicted execution result. Then, the cosine value of the first vector and the third vector is calculated as the second similarity value.

[0091] It should be noted that the first vector is generated based on the first execution result here, which is the same generation method as the first vector generated based on the first execution result in the first similarity value in the above embodiment, and the generated first vector is also the same vector, thereby ensuring that the subsequently generated first similarity value and second similarity value meet the comparison conditions.

[0092] In the embodiment of the present disclosure, the formula for calculating the second similarity value is:

[0093]

[0094] It should be noted that when calculating consistency, if the execution result of the subsequent judgment process is obtained directly, the predicted execution result of the subsequent judgment process involved in the above calculation of similarity is replaced with the value corresponding to the actual execution result of the subsequent judgment process obtained.

[0095] S303: In response to the process to be determined being an abnormal process, determining that the candidate normal work order is a second abnormal work order.

[0096] In an embodiment of the present disclosure, whether the process to be judged is an abnormal process is determined based on the first similarity value and the second similarity value. First, the target similarity is calculated based on the first similarity and the second similarity, and then the target similarity is compared with the similarity threshold. Finally, in response to the target similarity being less than the similarity threshold, it is determined that the process to be judged is an abnormal process.

[0097] In the embodiment of the present disclosure, the formula for calculating the target similarity value is:

[0098]

[0099] It should be noted that the similarity threshold is a critical value for determining whether the process to be determined is an abnormal process. It is designed in advance and can be changed according to actual design needs. No limitation is made here.

[0100] In the disclosed embodiment, first, for any to-be-judged process of any candidate normal work order, the first execution result and the first time consumption of the to-be-judged process, the second execution result and the second time consumption of the previous judgment process of the to-be-judged process, and the third execution result and the third time consumption of the subsequent judgment process of the to-be-judged process are obtained respectively, and then based on the first time consumption, the second time consumption, the third time consumption, the first execution result, the second execution result and the third execution result, it is determined whether the to-be-judged process is an abnormal process, and in response to the to-be-judged process being an abnormal process, the candidate normal work order is determined to be the second abnormal work order. Thus, by performing a time consumption analysis on each to-be-judged process of the candidate normal work order, it is determined whether there is a second abnormal work order with abnormal time consumption, thereby achieving the purpose of secondary screening of the candidate normal work orders, so that abnormal work orders can be more comprehensively determined from the work order log, and the accuracy of work order supplementation is improved.

[0101] In the above embodiment, before analyzing the abnormal keywords of the work order log, Figure 4 Explaining further, the method includes:

[0102] S401, obtaining a preset date, and obtaining a configuration date of each sub-work order in the work order log.

[0103] It should be noted that since the creation of the work order log is an ongoing process, and the operator may only need to supplement a part of the work orders or a period of time, a preset date can be set.

[0104] The preset date can be set according to the actual design or supplementary recording needs. For example, the preset date can be within 24 hours, or it can be a specific date, for example, January 1st to January 5th.

[0105] S402, screening each sub-work order based on a preset date to screen out the sub-work orders that meet the preset date as target work orders for subsequent abnormal keyword analysis.

[0106] In the disclosed embodiment, the preset date is first obtained, and the configuration date of each sub-work order in the work order log is obtained, and then each sub-work order is screened based on the preset date to screen out the sub-work orders that meet the preset date as the target work order for subsequent abnormal keyword analysis. Therefore, by setting the preset date, the work order log within the preset date can be processed, the efficiency of work order log processing can be improved, and the processing volume and processing cost of the work order log can be reduced.

[0107] Figure 5 FIG. 1 is a schematic diagram of an overall flow chart of a possible implementation method of the embodiment of the present disclosure, such as Figure 5As shown, the work order log sent by the client is configured with a preset date through a timing program, and each sub-work order is screened based on the preset date to screen out the sub-work orders that meet the preset date as the target work order for subsequent abnormal keyword analysis. The work order log is subjected to abnormal keyword analysis for the target work order to determine the first abnormal work order and the candidate normal work order in the work order log, and then a time series abnormality analysis is performed on the candidate normal work order to determine the second abnormal work order from the candidate normal work order, and finally the first abnormal work order and the second abnormal work order are supplemented, and the supplementary record log is updated to the supplementary record table.

[0108] Corresponding to the system work order supplementary recording methods provided in the above-mentioned embodiments, an embodiment of the present disclosure also provides a system work order supplementary recording device. Since the system work order supplementary recording device provided in the embodiment of the present disclosure corresponds to the system work order supplementary recording methods provided in the above-mentioned embodiments, the implementation method of the above-mentioned system work order supplementary recording method is also applicable to the system work order supplementary recording device provided in the embodiment of the present disclosure, and will not be described in detail in the following embodiments.

[0109] Figure 6 is a schematic diagram of a system work order supplement recording device according to an embodiment of the present disclosure, such as Figure 6 As shown, the system work order supplementary recording device 600 includes: an acquisition module 610, a first analysis module 620, a second analysis module 630 and a supplementary recording module 640.

[0110] The acquisition module 610 is used to acquire the work order log of the target system of the work order to be supplemented.

[0111] The first analysis module 620 is used to perform abnormal keyword analysis on the work order log to determine the first abnormal work order and candidate normal work orders in the work order log.

[0112] The second analysis module 630 is used to perform time series anomaly analysis on the candidate normal work orders to determine the second abnormal work order from the candidate normal work orders.

[0113] The supplementary recording module 640 is used to supplement the first abnormal work order and the second abnormal work order.

[0114] In the embodiment of the present disclosure, the first analysis module 620 is also used to: obtain a preset abnormal field mapping; match the abnormal field identifier in the abnormal field mapping with the work order log; determine that the work order that has been successfully matched is the first abnormal work order, and the work order that has not been successfully matched is a candidate normal work order.

[0115] In the embodiment of the present disclosure, the second analysis module 630 is also used to: for any to-be-judged process of any candidate normal work order, respectively obtain the first execution result and the first time consumption of the to-be-judged process, as well as the second execution result and the second time consumption of the predecessor judgment process of the to-be-judged process, and the third execution result and the third time consumption of the successor judgment process of the to-be-judged process; determine whether the to-be-judged process is an abnormal process based on the first time consumption, the second time consumption, the third time consumption, the first execution result, the second execution result and the third execution result; in response to the to-be-judged process being an abnormal process, determine that the candidate normal work order is the second abnormal work order.

[0116] In the embodiment of the present disclosure, the second analysis module 630 is also used to: calculate a first similarity value of the process to be judged based on the first time consumption, the second time consumption, the first execution result and the second execution result; and calculate a second similarity value of the process to be judged based on the first time consumption, the third time consumption, the first execution result and the third execution result; determine whether the process to be judged is an abnormal process based on the first similarity value and the second similarity value.

[0117] In the embodiment of the present disclosure, the second analysis module 630 is further used to: calculate a first predicted execution result of the process to be judged based on the first time consumption, the second time consumption and the second execution result; and calculate a first similarity value of the process to be judged based on the first predicted execution result and the first execution result.

[0118] In the embodiment of the present disclosure, based on the first time consumption, the second time consumption and the second execution result, the formula for calculating the first predicted execution result of the process to be judged is: Among them, t 1 is the first time consumption, t 2 For the second time, is the first prediction execution result, is the second execution result, and ε is the abnormal tolerance factor.

[0119] In the embodiment of the present disclosure, the second analysis module 630 is further used to: calculate a second predicted execution result of the process to be judged based on the first time consumption, the third time consumption and the third execution result; and calculate a second similarity value of the process to be judged based on the second predicted execution result and the first execution result.

[0120] In the embodiment of the present disclosure, based on the first time consumption, the third time consumption and the third execution result, the formula for calculating the second predicted execution result of the process to be judged is: Among them, t 1 is the first time consumption, t 3 For the second time, is the first prediction execution result, is the second execution result, and ε is the abnormal tolerance factor.

[0121] In the embodiment of the present disclosure, the second analysis module 630 is further used to: generate a first vector based on the first execution result, and generate a second vector based on the first predicted execution result; and calculate the cosine value of the first vector and the second vector as the first similarity value.

[0122] In the embodiment of the present disclosure, the second analysis module 630 is further used to: generate a first vector based on the first execution result, and generate a third vector based on the second predicted execution result; and calculate the cosine value of the first vector and the third vector as the second similarity value.

[0123] In the embodiment of the present disclosure, the second analysis module 630 is further used to: calculate the target similarity based on the first similarity and the second similarity; compare the target similarity with the similarity threshold; and in response to the target similarity being less than the similarity threshold, determine that the process to be judged is an abnormal process.

[0124] In the embodiment of the present disclosure, the second analysis module 630 is further used to: calculate the target similarity based on the first similarity and the second similarity; compare the target similarity with the similarity threshold; and in response to the target similarity being less than the similarity threshold, determine that the process to be judged is an abnormal process.

[0125] In an embodiment of the present disclosure, before performing abnormal keyword analysis on the work order log, it also includes: obtaining a preset date and obtaining the configuration date of each sub-work order in the work order log; filtering each sub-work order based on the preset date to filter out the sub-work orders that meet the preset date as the target work order for subsequent abnormal keyword analysis.

[0126] Therefore, by performing keyword analysis and timing anomaly analysis on the work order log in turn, abnormal work orders can be identified from both the content and timing dimensions, so that subsequent work order re-recording can be achieved, which can avoid the loss of work orders as much as possible, reduce the workload of maintenance personnel, and reduce maintenance costs.

[0127] In order to implement the above embodiment, the present disclosure further provides an electronic device 700, Figure 7 is a schematic diagram of an electronic device according to an embodiment of the present disclosure, such as Figure 7 As shown, the electronic device 700 includes: a processor 701 and a memory 702 that is communicatively connected to the processor, the memory 702 stores instructions that can be executed by at least one processor, and the instructions are executed by at least one processor 701 to implement the present disclosure. Figure 1-Figure 5 A method for supplementing a system work order according to an embodiment.

[0128] In order to implement the above embodiments, the present disclosure also provides a non-transitory computer-readable storage medium storing computer instructions, wherein the computer instructions are used to enable the computer to implement the above embodiments. Figure 1-Figure 5 A method for supplementing a system work order according to an embodiment.

[0129] In order to implement the above embodiments, the present disclosure also provides a computer program product, including a computer program. When the computer program is executed by a processor, the computer program implements the above embodiments. Figure 1-Figure 5 A method for supplementing a system work order according to an embodiment.

[0130] It should be noted that personal information from users should be collected for legitimate and reasonable purposes and should not be shared or sold outside of these legitimate uses. In addition, such collection / sharing should be carried out after receiving the user's informed consent, including but not limited to notifying the user to read the user agreement / user notice and sign the agreement / authorization including authorization of relevant user information before the user uses the function. In addition, any necessary steps should be taken to protect and safeguard access to such personal information data and ensure that others who have access to personal information data comply with its privacy policy and procedures.

[0131] The present application is expected to provide an implementation scheme for users to selectively block the use or access of personal information data. That is, the present disclosure is expected to provide hardware and / or software to prevent or block access to such personal information data. Once the personal information data is no longer needed, the risk can be minimized by limiting data collection and deleting the data. In addition, when applicable, such personal information is de-identified to protect the privacy of the user.

[0132] In the description of the aforementioned embodiments, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0133] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0134] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.

[0135] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that contains, stores, communicates, propagates or transmits a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples (non-exhaustive list) of computer-readable media include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0136] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0137] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0138] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0139] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present application. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A method for supplementing a system work order, characterized in that: include: Obtain the work order log of the target system where the work order is to be supplemented; Performing abnormal keyword analysis on the work order log to determine a first abnormal work order and candidate normal work orders in the work order log; Performing time series abnormality analysis on the candidate normal work orders to determine a second abnormal work order from the candidate normal work orders; The first abnormal work order and the second abnormal work order are supplemented with work orders.

2. The method according to claim 1, characterized in that: The performing abnormal keyword analysis on the work order log to determine the first abnormal work order and candidate normal work orders in the work order log includes: Get the preset exception field mapping; Matching the abnormal field identifier in the abnormal field mapping with the work order log; It is determined that the work order that has been successfully matched is the first abnormal work order, and the work order that has not been successfully matched is the candidate normal work order.

3. The method according to claim 1, characterized in that The candidate normal work orders include a plurality of processes to be determined, and the timing abnormality analysis is performed on the candidate normal work orders to determine a second abnormal work order from the candidate normal work orders, including: For any to-be-judged process of any candidate normal work order, respectively obtain the first execution result and the first time consumption of the to-be-judged process, the second execution result and the second time consumption of the preceding judgment process of the to-be-judged process, and the third execution result and the third time consumption of the subsequent judgment process of the to-be-judged process; Determine whether the process to be determined is an abnormal process based on the first time consumption, the second time consumption, the third time consumption, the first execution result, the second execution result, and the third execution result; In response to the process to be determined being an abnormal process, the candidate normal work order is determined to be the second abnormal work order.

4. The method according to claim 3, characterized in that: The determining whether the process to be determined is an abnormal process based on the first time consumption, the second time consumption, the third time consumption, the first execution result, the second execution result, and the third execution result includes: Calculating a first similarity value of the process to be judged based on the first time consumption, the second time consumption, the first execution result, and the second execution result; and Calculating a second similarity value of the process to be judged based on the first time consumption, the third time consumption, the first execution result, and the third execution result; Determine whether the process to be determined is an abnormal process based on the first similarity value and the second similarity value.

5. The method according to claim 4, characterized in that The calculating a first similarity value of the process to be judged based on the first time consumption, the second time consumption, the first execution result, and the second execution result includes: Calculate a first predicted execution result of the process to be judged based on the first time consumption, the second time consumption and the second execution result; Based on the first predicted execution result and the first execution result, the first similarity value of the process to be judged is calculated.

6. The method according to claim 5, characterized in that The formula for calculating the first predicted execution result of the process to be judged based on the first time consumption, the second time consumption and the second execution result is: Among them, the t1 is the first time consuming, the t2 For the second time consuming, the is the first prediction execution result, the is the second execution result, and ε is the abnormal tolerance factor.

7. The method according to claim 4, characterized in that The calculating the second similarity value of the process to be judged based on the first time consumption, the third time consumption, the first execution result, and the third execution result includes: Calculate a second predicted execution result of the process to be judged based on the first time consumption, the third time consumption and the third execution result; Based on the second predicted execution result and the first execution result, the second similarity value of the process to be judged is calculated.

8. The method according to claim 7, characterized in that The formula for calculating the second predicted execution result of the process to be judged based on the first time consumption, the third time consumption and the third execution result is: Among them, the t1 is the first time consuming, the t3 For the second time consuming, the is the first prediction execution result, the is the second execution result, and ε is the abnormal tolerance factor.

9. The method according to claim 5, characterized in that The calculating the first similarity value of the process to be determined based on the first predicted execution result and the first execution result includes: generating a first vector based on the first execution result, and generating a second vector based on the first predicted execution result; A cosine value of the first vector and the second vector is calculated as the first similarity value.

10. The method according to claim 7, characterized in that The calculating the second similarity value of the process to be determined based on the second predicted execution result and the first execution result includes: generating a first vector based on the first execution result, and generating a third vector based on the second predicted execution result; A cosine value of the first vector and the third vector is calculated as the second similarity value.

11. The method according to any one of claims 4 to 10, characterized in that: The determining whether the process to be determined is an abnormal process based on the first similarity value and the second similarity value includes: Calculating a target similarity based on the first similarity and the second similarity; comparing the target similarity with a similarity threshold; In response to the target similarity being less than the similarity threshold, determining that the process to be determined is an abnormal process.

12. The method according to any one of claims 4 to 10, characterized in that: Calculating the first similarity value and calculating the second similarity value include: Calculating a target similarity based on the first similarity and the second similarity; comparing the target similarity with a similarity threshold; In response to the target similarity being less than the similarity threshold, determining that the process to be determined is an abnormal process.

13. The method according to claim 1 or 2, characterized in that: Before performing abnormal keyword analysis on the work order log, the method further includes: Obtaining a preset date and obtaining a configuration date of each sub-work order in the work order log; The sub-work orders are screened based on the preset date to screen out the sub-work orders that meet the preset date as target work orders for subsequent abnormal keyword analysis.

14. A system work order supplementary recording device, characterized in that: include: The acquisition module is used to obtain the work order log of the target system where the work order is to be supplemented; A first analysis module, configured to perform abnormal keyword analysis on the work order log to determine a first abnormal work order and candidate normal work orders in the work order log; A second analysis module, configured to perform a time series anomaly analysis on the candidate normal work orders to determine a second abnormal work order from the candidate normal work orders; A supplementary recording module is used to supplement the first abnormal work order and the second abnormal work order.

15. An electronic device, characterized in that: Including memory and processor; The processor runs a program corresponding to the executable program code by reading the executable program code stored in the memory, so as to implement the method according to any one of claims 1 to 13.