Base station construction evaluation method, device, equipment, storage medium and program product

By comprehensively evaluating the existing network problems and investment returns of base stations, the problem of insufficient practicality of base station construction evaluation solutions in the existing technology is solved, and the effect of saving investment and improving investment returns while ensuring network quality and user experience is achieved.

CN118798704APending Publication Date: 2024-10-18CHINA MOBILE GROUP DESIGN INST +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410356560.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing base station construction evaluation solutions fail to fully consider other practical factors besides coverage and ground object models, resulting in weak evaluation practicability and inability to save investment costs and increase investment returns while maintaining network quality and user experience.

Method used

By obtaining the construction data of each community, judging the construction type, merging site sites, calculating the existing network problem score and investment income score of the target base station, comprehensively evaluating the scores to evaluate the base station construction plan, achieving two dimensions: existing network problems and investment income assessment.

Benefits of technology

It improves the practicality of the base station construction evaluation plan, achieves a balance between investment efficiency and network issues, accurately conducts construction evaluation, and ensures a balance between network quality and investment returns.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798704A_ABST
    Figure CN118798704A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of artificial intelligence, and provides a base station construction evaluation method and device, equipment, a storage medium and a program product, and the method comprises the steps: obtaining construction data of each cell for base station construction, and judging the construction type of each cell according to the construction data; carrying out site merging on each cell according to the construction type to obtain a plurality of target base stations, and obtaining income data of each target base station; calculating a first target score of each target base station for the current network problem according to the construction data of the cell in each target base station, and calculating a second target score of each target base station for the investment income according to the income data of each target base station; and calculating a construction evaluation score of each target base station according to the first target score and the second target score, and evaluating each target base station according to the construction evaluation score. According to the technical scheme, the target base station is evaluated based on the two dimensions of the current network problem and the investment income, so that the practicability of the evaluation scheme is relatively high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of artificial intelligence technology, and in particular to a base station construction evaluation method, device, equipment, storage medium and program product. Background Art

[0002] As of now, the total number of base stations in my country has exceeded 2 million, and continuous coverage of administrative areas above rural areas has been basically achieved. The built base stations have been online and have accumulated a certain amount of business data. After multiple phases of network construction, the current base station construction has transitioned from the stage of comprehensive deployment and large-scale construction in major cities in the early stage of construction to a stage of more refined construction, and the construction strategy has gradually shifted from problem-oriented to benefit-oriented. Considering the high construction and operation costs of base stations and the current situation that user business needs need to be further stimulated, base station construction needs to be implemented accurately in order to save investment costs and increase investment returns while maintaining network quality and user experience. Therefore, an evaluation is required before base station construction, but the existing evaluation scheme only considers base station coverage and terrain models, and fails to fully consider other practical factors, resulting in weak practicality of the scheme. Summary of the invention

[0003] The present invention provides a base station construction evaluation method, device, equipment, storage medium and program product, which are used to solve the defect of poor practicability of the evaluation scheme for base station construction in the prior art, and to improve the practicability of the base station construction evaluation scheme.

[0004] The present invention provides a base station construction evaluation method, comprising:

[0005] Acquire construction data of base stations in each cell, and determine the construction type of each cell according to the construction data;

[0006] Merging the sites of the cells according to the construction type to obtain multiple target base stations, and acquiring revenue data of each target base station;

[0007] Calculating a first target score for existing network problems of each target base station according to the construction data of the cell in each target base station, and calculating a second target score for investment return of each target base station according to the revenue data of each target base station;

[0008] A construction evaluation score of each of the target base stations is calculated according to the first target score and the second target score, and each of the target base stations is evaluated according to the construction evaluation score.

[0009] According to a base station construction evaluation method provided by the present invention, the site merging of each cell according to the construction type to obtain multiple target base stations includes:

[0010] The cell whose construction type is indoor type is used as the first cell, and the cell whose construction type is macro type is used as the second cell;

[0011] Grouping each of the first cells according to the base station ID and the base station name in the construction data of each of the first cells to obtain a plurality of first cell groups; and

[0012] According to the frequency band in the construction data of each second cell, each second cell is grouped to obtain a plurality of second cell groups, a plurality of base station groups are formed according to the base stations corresponding to the second cell groups, and a corresponding extended base station is determined for each base station in the base station group based on the location information of the base station, and the base station and the corresponding extended base station are combined into a physical base station;

[0013] The base station corresponding to the first cell group and the physical base station are used as the target base station.

[0014] According to a base station construction evaluation method provided by the present invention, the first target score of each target base station for existing network problems is calculated according to the construction data of the cell in each target base station, including:

[0015] According to the construction data, at least one of a first score for existing network services, a second score for scenario value, a third score for network quality, and a fourth score for user terminals is calculated for each of the target base stations;

[0016] The first target score of each target base station is calculated according to at least one of the first score, the second score, the third score, and the fourth score.

[0017] According to a base station construction evaluation method provided by the present invention, the calculation of at least one of a first score for existing network services, a second score for scenario value, a third score for network quality, and a fourth score for user terminals for each of the target base stations based on the construction data includes:

[0018] Calculate a first score for each of the target base stations according to at least one of the 4G traffic, the 5G traffic, and the 5G reverse 4G traffic in the construction data; and

[0019] Calculating a second score for each of the target base stations according to at least one of the key area data, the word-of-mouth scenario data, and the special protection scenario data in the construction data; and

[0020] Calculating a third score for each of the target base stations according to at least one of the weak coverage and the network complaint data in the construction data; and

[0021] A fourth score of each of the target base stations is calculated according to at least one of the APRU and the DOU in the construction data.

[0022] According to a base station construction evaluation method provided by the present invention, the second target score for investment income of each target base station is calculated according to the income data of each target base station, including:

[0023] According to the revenue data, calculating, for each of the target base stations, a fifth score for the expected revenue of the base station, a sixth score for the investment in base station construction, a seventh score for the energy consumption cost of base station operation, and an eighth score for the maintenance cost of the base station;

[0024] The second target score of each target base station is calculated according to the fifth score, the sixth score, the seventh score and the eighth score.

[0025] According to a base station construction evaluation method provided by the present invention, the fifth score for the expected income of the base station, the sixth score for the base station construction investment, the seventh score for the base station operation energy consumption cost and the eighth score for the base station maintenance cost of each target base station are calculated according to the revenue data, including:

[0026] Calculating a fifth score for each of the target base stations according to the predicted base station traffic and the comprehensive price per unit traffic in the revenue data; and

[0027] Calculating a sixth score of each of the target base stations according to the base station construction method in the revenue data and the construction cost corresponding to the base station construction method; and

[0028] Calculating a seventh score of each of the target base stations according to the average energy consumption and operation time in the revenue data; and

[0029] An eighth score of each of the target base stations is calculated according to the station type and labor cost in the revenue data.

[0030] According to a base station construction evaluation method provided by the present invention, evaluating each target base station according to the construction evaluation score includes:

[0031] Generate a construction list according to the construction evaluation score of each of the target base stations;

[0032] Obtain a construction target, and detect whether the construction list meets the construction target; wherein the construction target includes at least one of coverage achievement rate, number of base stations and investment scale.

[0033] The present invention also provides a base station construction evaluation device, comprising:

[0034] A first acquisition module is configured to acquire construction data of each cell for base station construction, and determine the construction type of each cell according to the construction data;

[0035] A second acquisition module is configured to merge the sites of the cells according to the construction type to obtain multiple target base stations, and obtain revenue data of each of the target base stations;

[0036] A calculation module, configured to calculate a first target score for each of the target base stations for existing network problems according to construction data of cells in each of the target base stations, and to calculate a second target score for investment returns according to revenue data of each of the target base stations;

[0037] An evaluation module is configured to calculate a construction evaluation score of each of the target base stations according to the first target score and the second target score, and evaluate each of the target base stations according to the construction evaluation score.

[0038] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, any of the above-mentioned base station construction evaluation methods is implemented.

[0039] The present invention also provides a non-transitory computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the base station construction evaluation method described in any one of the above is implemented.

[0040] The present invention also provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the computer program implements any of the above-mentioned base station construction evaluation methods.

[0041] The present invention provides a base station construction evaluation method, device, equipment, storage medium and program product, which determines the construction type of each cell according to the construction data of the cell, and then merges the site of each cell according to the construction type, divides the cell into corresponding base stations, obtains multiple target base stations, and obtains the revenue data of each target base station at the same time. According to the construction data, the first target score of each target base station for the existing network problem is calculated, and at the same time, according to the revenue data of each target base station, the second target score of each target base station for the investment income is calculated, and the construction evaluation score of each target base station is calculated according to the first target score and the second target score, and each target base station is evaluated according to the construction evaluation score. In the technical solution provided by the present invention, the target base station is evaluated from the two dimensions of the existing network problem and the investment income, so as to achieve a balance between investment efficiency and network problem solving, improve the practicality of the evaluation scheme, and accurately perform construction evaluation. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0043] Figure 1 It is a flow chart of the base station construction evaluation method provided by the present invention;

[0044] Figure 2 is a flow chart of step 120 in an embodiment provided by the present invention;

[0045] Figure 3 It is one of the flowchart diagrams of step 130 in the embodiment provided by the present invention;

[0046] Figure 4 is a flow chart of step 310 in the embodiment provided by the present invention;

[0047] Figure 5 This is the second flow chart of step 130 in the embodiment provided by the present invention;

[0048] Figure 6 is a flow chart of step 510 in the embodiment provided by the present invention;

[0049] Figure 7 is a flow chart of step 140 in the embodiment provided by the present invention;

[0050] Figure 8 It is a structural schematic diagram of a base station construction evaluation device provided by the present invention;

[0051] Fig. 9 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0052] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0053] Combine the following Figure 1-Figure 7 The base station construction evaluation method of the present invention is described.

[0054] Figure 1 FIG. 1 is a flow chart of a base station construction evaluation method according to an exemplary embodiment. Figure 1 As shown, in an exemplary embodiment, the base station construction evaluation method includes steps 110 to 140, which are described in detail as follows:

[0055] Step 110, obtaining construction data of base stations in each cell, and determining the construction type of each cell according to the construction data.

[0056] In the embodiment of the present invention, each cell has corresponding construction data for base station construction, and the construction data is mainly obtained from the original data directly collected online and manually imported. Among them, the original data directly collected online includes B domain data (Business Support System, business domain), comprehensive capital data, PM data, MR data, O domain data (Operation Support System, operation domain) and M domain data (Management Support System, management domain), covering 5G services, terminals, coverage, scene categories and other indicators, the granularity of the data is cell level, and the collection time is once a month; the original data manually imported includes macro station and indoor planning scheme, construction network complaints, important areas and word-of-mouth scene lists, building data lists, grid and regional layers and other data, covering coverage area types, key scenes, complaints and other information. These data are stored in the basic database for backup. The B domain contains user data and business data, such as user consumption habits, terminal information, ARPU (Average Revenue Per User, average revenue per user) grouping, business content, business audience population, etc. The M domain contains location information, such as crowd flow trajectory, map information, etc. The O domain contains network data, such as signaling, alarms, faults, network resources, etc.

[0057] After obtaining the original data online and offline, data verification is required to identify duplicate and missing data as well as data with incorrect range and type. The original data collected online is collected in units of cells, and deduplication is performed based on the unique identifier of the cell (such as ECGI or CGI), that is, the duplicate data is deleted. For the original data with missing data and incorrect range and type, it is usually not stored in the database and fed back to the data source for verification and correction. Some fields can also be automatically backfilled according to the actual situation.

[0058] Based on the CGI (Cell Global Identifier), ECGI (E-UTRAN Cell Global Identifier) ​​and cell name fields in the comprehensive information data, cross-domain correlation matching is performed on the B domain data, O domain data and M domain data collected online. That is, based on the CGI and ECGI fields, traversal is performed to find data in different domains that match the CGI and ECGI for correlation, and then for the uncorrelated data, a second traversal is performed based on the cell name field to find data in different domains that match the cell name for correlation. For data that fails to match, it is usually not stored in the database and fed back to the data source for verification and correction.

[0059] The acquired original data is processed as described above to obtain the construction data of each community. After obtaining the construction data, the construction type of each community is then determined.

[0060] Specifically, a judgment is made based on the base station attribute field in the comprehensive resource data of each cell. If the base station attribute field is "indoor", the construction type of the cell is judged to be a room-based type. If the base station attribute field is "outdoor", the construction type of the cell is judged to be a macro station type. If the base station attribute field is "indoor and outdoor", a judgment is made based on the equipment type field in the comprehensive resource data. If the equipment type field is not "micro base station" or "other" and the frequency band is one of "GSM900, DCS1800, E, D, FDD900, FDD1800, 2.6G, 4.9G", the construction type of the cell is judged to be a room-based type. If the equipment type field is "macro base station" and the frequency band is one of "GSM900, DCS1800, F, A, D, FDD900, FDD1800, 2.6G, 4.9G", and any of the three fields of antenna height field, direction angle field, and downtilt angle field has a value, the construction type of the cell is judged to be a macro station type.

[0061] The above fields and enumeration values ​​involved in the judgment can be replaced or expanded into fields and values ​​with different names but the same meaning according to actual conditions.

[0062] Step 120: Merge the sites of the cells according to the construction type to obtain multiple target base stations, and acquire revenue data of each target base station.

[0063] In the embodiment of the present invention, corresponding methods are used to merge sites for cells of different construction types, and each cell is divided into a corresponding target base station. After the target base station is obtained, the revenue data of each target base station is obtained.

[0064] Step 130, calculating the first target score of each target base station for existing network problems based on the construction data of the cells in each target base station, and calculating the second target score of each target base station for investment return based on the revenue data of each target base station.

[0065] In an embodiment of the present invention, a first target score of a corresponding target base station for existing network problems is calculated based on construction data of cells in each target base station, and then a second target score of the corresponding target base station for investment returns is calculated based on revenue data of each target base station, so that each target base station has a first target score and a second target score.

[0066] Step 140: Calculate a construction evaluation score of each of the target base stations according to the first target score and the second target score, and evaluate each of the target base stations according to the construction evaluation score.

[0067] In the embodiment of the present invention, the first target score and the second target score of each target base station are weighted and summed to obtain a corresponding construction evaluation score. The weights of the first target score and the second target score can be set as needed and are not limited here. After each target base station obtains the corresponding construction evaluation score, a construction evaluation is performed directly based on the construction evaluation score to determine whether to build a new base station at the target base station.

[0068] In an embodiment of the present invention, the construction type of each cell is determined according to the construction data of the cell, and then the site of each cell is merged according to the construction type, and the cell is divided into corresponding base stations to obtain multiple target base stations, and the revenue data of each target base station is obtained at the same time. According to the construction data, the first target score of each target base station for the existing network problem is calculated, and at the same time, according to the revenue data of each target base station, the second target score of each target base station for the investment income is calculated, and the construction evaluation score of each target base station is calculated according to the first target score and the second target score, and each target base station is evaluated according to the construction evaluation score. In the technical solution provided by the present invention, the target base station is evaluated from two dimensions of the existing network problem and the investment income, so as to achieve a balance between investment efficiency and network problem solving, improve the practicality of the evaluation scheme, and accurately perform construction evaluation.

[0069] In an exemplary embodiment of the present invention, the target base station may be an existing base station, and the evaluation is whether to build a new base station based on the existing base station. The target base station may also be a base station to be built, that is, there is no existing base station at that location.

[0070] In an exemplary embodiment of the present invention, see Figure 2In step 120, the sites of the cells are merged according to the construction type to obtain multiple target base stations, including steps 210 to 240, which are described in detail as follows:

[0071] Step 210: The cell whose construction type is the indoor type is taken as the first cell, and the cell whose construction type is the macro station type is taken as the second cell.

[0072] In the embodiment of the present invention, a cell whose construction type is the indoor type is taken as the first cell, and a cell whose construction type is the macro base station type is taken as the second cell.

[0073] Step 220: group each of the first cells according to the base station ID and the base station name in the construction data of each of the first cells to obtain a plurality of first cell groups.

[0074] In an embodiment of the present invention, for the first cell of the indoor type, considering that the frequency band used by the 4G indoor type is relatively single compared to the macro base station, the analysis dimension of the target base station corresponding to the first cell is the logical base station. The first cell is merged into the logical base station by using the cell base station ID + base station name in the comprehensive resource data for joint judgment. Specifically, the first cell is traversed for the first time according to the base station ID in the comprehensive resource data, and the first cells with the same base station ID are found and merged to obtain multiple first groups; then the first cell is traversed for the second time according to the base station name in the comprehensive resource data, and the first cells with the same base station name are found and merged to obtain the second group; finally, the results of the two traversals are taken as the union, that is, the first group and the second group corresponding to the same base station are taken as the union, and the first cell group is obtained. For the cells that do not find the same base station ID and base station name, they are used as single-sector logical base stations to form corresponding first cell groups.

[0075] Step 230, grouping each of the second cells according to the frequency bands in the construction data of each of the second cells to obtain multiple second cell groups, forming multiple base station groups according to the base stations corresponding to the second cell groups, and determining a corresponding extended base station for each base station in the base station group based on the location information of the base station, and combining the base station and the corresponding extended base station into a physical base station.

[0076] In the embodiment of the present invention, for the second cell of the macro station type, considering that the frequency bands used by 4G macro stations are relatively diverse, including D band, 3DMIMO band, F band, A band, FDD1800M band and other frequency bands, the analysis dimension of the target base station corresponding to the second cell is the physical base station. Logical station merging is achieved based on the joint judgment of the cell base station ID + base station name, and then the distance between base stations is calculated according to the longitude and latitude, and the logical base stations with a distance less than 50 meters are merged into one physical base station.

[0077] Specifically, the second cell is divided into corresponding logical base stations based on the base station ID and base station name consistent with the aforementioned first cell. Then all logical base stations are grouped according to the frequency bands corresponding to each logical base station, and logical base stations of the same frequency band are divided into the same base station group. The logical base stations in each base station group are sorted according to longitude and latitude. Then, the priority order of D / 3D MIMO>F / A>FDD 1800M is traversed, that is, the priority of the D band and the 3DMIMO band is at the same level, but the priority of the D band and the 3DMIMO band is higher than the priority of the F band, the A band, and the FDD1800M band, and the priority of the F band and the A band is at the same level, but the priority of the F band and the A band is higher than the priority of the FDD1800M band. When traversing, the base station groups of the frequency bands with the same priority can be traversed at the same time, or any base station group can be traversed first.

[0078] During the traversal, each time a logical base station is selected from the currently traversed base station group as the basic logical base station, all logical base stations that are less than 50 meters away from the basic logical base station are found out according to the longitude and latitude, except for the currently traversed base station group, and these logical base stations are used as extended base stations of the basic logical base station, and the basic logical base station and the corresponding extended base station are combined into a physical base station. After completing once, continue to select the next logical base station in the currently traversed base station group to repeat the above operation, until all logical base stations in the currently traversed base station group have determined the corresponding extended base station, and then traverse the next traversed base station group until all logical base stations correspond to at least one basic logical base station.

[0079] If the number of basic logical base stations corresponding to a logical base station is greater than 1, the basic logical base station with a closer distance is preferentially selected as the final basic logical base station. If the distances of multiple associated basic logical base stations are the same, the basic logical base station with a closer name is selected as the final basic logical base station based on the base station name. If it is still impossible to determine, manual field survey is required to determine the basic logical base station of the logical base station. In short, ensure that a logical base station belongs to only one physical base station.

[0080] When calculating the distance between two base stations based on longitude and latitude, the following formula is used for calculation:

[0081]

[0082] a=Lat1-Lat2, b=Lng1-Lng2 (2)

[0083] Among them, S represents the distance between logical base station 1 and logical base station 2, R represents the radius of the earth, Lng1 and Lat1 represent the longitude and latitude of logical base station 1, and Lng2 and Lat2 represent the longitude and latitude of logical base station 2.

[0084] The frequency band sequence and the 50-meter threshold of the distance between base stations described above are set based on an urban area as an example and can be flexibly adjusted according to actual needs.

[0085] Step 240: Use the base station corresponding to the first cell group and the physical base station as the target base station.

[0086] In an embodiment of the present invention, the base station and the physical base station corresponding to the first cell group are directly used as the target base station. When the cell-level construction data is aggregated to the target base station, the corresponding aggregation method is determined according to the specific meaning of the data. For indicators that do not need to be calculated (such as traffic, number of RRC connections, etc.) obtained directly from the original data, a direct addition method is adopted. For indicators that need to be calculated (such as wireless utilization, etc.), the original data involved in the calculation are added, and then the indicator calculation is performed. The engineering parameter data of the base station (such as tilt angle, azimuth angle, station height, etc.) are not aggregated, and only the collection and sorting from the cell to the target base station is performed.

[0087] In an exemplary embodiment of the present invention, see Figure 3 In step 130, according to the construction data of the cells in each of the target base stations, the first target score of each of the target base stations for the existing network problem is calculated, including steps 310 to 320, which are described in detail as follows:

[0088] Step 310: Calculate at least one of a first score for existing network services, a second score for scenario value, a third score for network quality, and a fourth score for user terminals for each of the target base stations based on the construction data.

[0089] In the embodiment of the present invention, at least one of the first score for existing network services, the second score for scenario value, the third score for network quality, and the fourth score for user terminals is calculated for each target base station based on the construction data of each target base station. Specifically, when the target base station is an existing base station, at least one of the first score, the second score, the third score, and the fourth score can be calculated to calculate the first target score. When the target base station is a base station to be built, due to the lack of existing network services and user terminals, this type of target base station calculates at least one of the second score and the third score to calculate the first target score.

[0090] In the embodiment of the present invention, the analysis of the existing network services includes three indicators: 4G traffic, 5G traffic, and 5G reverse 4G traffic, and the data comes from the BOM domain data; the analysis of the scenario value includes three indicators: key area data, word-of-mouth scenario data, and special protection scenario data, and the data comes from manually imported data; the analysis of network quality includes two indicators: weak coverage and complaints, and the data comes from the BOM domain and manually imported data; the analysis of user terminals includes two indicators: DOU (Minutes Of Usage, average monthly talk time per user) and APRU, and the data comes from BOM domain data. The target base station of the macro station type involves indicators of all dimensions, and the target base station of the indoor distribution type involves indicators of some dimensions. The detailed information is shown in Table 1 below:

[0091] Table 1

[0092]

[0093] Step 320: Calculate the first target score of each target base station according to at least one of the first score, the second score, the third score, and the fourth score.

[0094] In the embodiment of the present invention, the first target score of each target base station is calculated according to at least one of the first score, the second score, the third score and the fourth score of each target base station. Further, corresponding weights may be set for the first score, the second score, the third score and the fourth score, respectively, and a weighted sum calculation is performed on at least one of the calculated first score, the second score, the third score and the fourth score based on the weight to obtain the first target score of the corresponding target base station.

[0095] In an exemplary embodiment of the present invention, see Figure 4 In step 310, according to the construction data, at least one of a first score for the existing network service, a second score for the scenario value, a third score for the network quality, and a fourth score for the user terminal is calculated for each of the target base stations, including steps 410 to 440, which are described in detail as follows:

[0096] Step 410: Calculate a first score for each of the target base stations based on at least one of the 4G traffic, 5G traffic, and 5G reverse 4G traffic in the construction data.

[0097] In the embodiment of the present invention, facing the existing network problems, the idea of ​​N-level classification is adopted to analyze the indicators of each dimension of the base station, and the indicator classification threshold is determined by the custom absolute value method, the average value multiple definition method and the normalization method.

[0098] The custom absolute value method is to flexibly select the absolute value of the indicator to be analyzed as the indicator classification threshold according to the actual situation of the local network.

[0099] The rule for defining the mean value multiple is to first calculate the mean of all indicators to be analyzed, and then flexibly select the multiple of the mean as the indicator classification threshold based on the actual situation of the local network.

[0100] The normalization method is to sort all base stations according to the size of the indicators to be analyzed, from high to low, TOP0%-TOP100%, and then select the expected interval ratio value (0-100) as the indicator classification threshold according to the actual situation of the local network.

[0101] Taking the five-level classification as an example, for the custom absolute value method and the average value multiple definition method, the first-level classification interval is greater than the first-level indicator threshold, the second to fourth-level classification interval is less than or equal to the indicator threshold of the previous level and greater than the indicator threshold of this level, and the fifth-level classification interval is less than or equal to the fifth-level indicator threshold; for the normalization method, the first-level classification interval is less than the first-level indicator threshold, the second to fourth-level classification interval is greater than or equal to the indicator threshold of the previous level and less than the indicator threshold of this level, and the fifth-level classification interval is greater than or equal to the fifth-level indicator threshold.

[0102] After determining the classification interval to which each target base station belongs, first assign the corresponding basic score to the target base stations in each classification interval. Taking the five-level classification as an example, the basic score of the first-level classification interval is 80 points, the basic score of the fifth-level classification interval is 0 points, and the basic scores of the intermediate second to fourth-level classification intervals are 60 points, 40 points, and 20 points, respectively. Then, in order to enhance the differentiation of the value of base stations in each classification interval, the Sigmoid function is used to recalculate the value scores of the target base stations in each classification interval. The calculation formula is shown below:

[0103]

[0104]

[0105] Among them, Z represents the base station value score, z0 represents the basic score, Δ z Represents the basic score difference of the grading interval, that is, the difference between the maximum and minimum values ​​in the same grading interval, z orignal Represents the original value of the indicator to be analyzed, z min Represents the minimum value of the original values ​​of all indicators to be analyzed in the same classification interval, z max Represents the maximum value of the original values ​​of all indicators to be analyzed in the same classification interval, and z represents the normalized value of the original value of the indicator to be analyzed. When normalizing, based on the characteristics of the Sigmoid function, when the input value is in the interval (-6, 6), the output value is in the interval (0, 1) and the distinction is more obvious, so when normalizing the original values ​​of the indicators to be analyzed, the value range is limited to (-6, 6).

[0106] For indicators purchased directly online (except for weak coverage, DOU and ARPU), you can choose a graded interval solution, divide the indicators into N categories according to the rules from high to low values, and then calculate the corresponding scores according to the above formula to ensure that the base station value ranking flexibly meets the needs of network planning and construction.

[0107] In the embodiment of the present invention, taking the 4G traffic indicator as an example, the aforementioned scheme is adopted to determine the classification interval corresponding to the 4G traffic indicator, match the 4G traffic of all target base stations with the classification interval corresponding to the indicator, determine the classification interval corresponding to each target base station, and then obtain the basic score of the classification interval to which each target base station belongs, and then use the aforementioned formula (3) and formula (4) to calculate the score corresponding to the 4G traffic indicator.

[0108] The scores corresponding to the two indicators, 5G traffic and 5G reverse 4G traffic, are calculated using a solution consistent with the 4G traffic indicator, and then the scores corresponding to the three indicators are weighted and summed to obtain the first score.

[0109] Step 420, calculating a second score for each of the target base stations based on at least one of the key area data, word-of-mouth scenario data, and special protection scenario data in the construction data.

[0110] In the embodiment of the present invention, for the three indicators of manually reported key area data, word-of-mouth scenario data, and special protection scenario data, the filling method is different according to the subjectivity and policy strength of the reported data. For scenario analysis indicators with strong subjectivity and policy, when filling in the data, you can refer to the actual situation and construction strategy of the area where the base station is located to directly fill in the score (0-100 points) corresponding to the reported base station without calculation, so as to achieve accurate evaluation of the value of base stations by province, city, region, and scenario, and meet the base station construction needs in different geographical scenarios in a differentiated manner. The scores corresponding to the key area data, word-of-mouth scenario data, and special protection scenario data of the target base station are directly weighted and summed to obtain the corresponding second score.

[0111] Step 430: Calculate a third score for each of the target base stations according to at least one of the weak coverage and network complaint data in the construction data.

[0112] In the embodiment of the present invention, for the number of network complaints, a scheme consistent with the 4G traffic indicator is used to calculate the corresponding score. For the weak coverage indicator, the collected original data is the number of sampling points in different RSRP intervals. When calculating the score of the weak coverage indicator, first calculate the proportion of sampling points in each RSRP interval, and then determine the RSRP threshold and the proportion of each grading interval according to the actual and issued coverage target of the existing network. For example, the standard of the first-level grading interval is that the proportion of the RSRP interval is less than the proportion of -108dBm, which is less than 10%, and the standard of the second-level grading interval is that the proportion of the RSRP interval is less than the proportion of -108dBm, which is greater than or equal to 10% and less than 20%. By analogy, the standard of the fifth-level grading interval is that the proportion of the RSRP interval is less than the proportion of -108dBm, which is greater than or equal to 40%; after determining the grading interval corresponding to the weak coverage indicator, finally calculate the score of the base station in the weak coverage indicator according to formula (3) and formula (4). Then perform weighted sum calculation on the scores of the weak coverage indicator and the number of network complaints indicator to obtain the third score of each target base station.

[0113] Step 440: Calculate a fourth score of each of the target base stations according to at least one of APRU and DOU in the construction data.

[0114] In the embodiment of the present invention, for the two indicators of DOU and ARPU, the original data collected is the number of users in different DOU or ARPU intervals. The calculation process of the scores of the DOU and ARPU indicators is the same as that of the weak coverage indicator, so it is not repeated. After obtaining the scores corresponding to the two indicators of DOU and ARPU, the two scores are weighted and summed to obtain the fourth score of each target base station.

[0115] In an exemplary embodiment of the present invention, see Figure 5 In step 130, according to the revenue data of each target base station, a second target score for investment revenue of each target base station is calculated, including steps 510 to 520, which are described in detail as follows:

[0116] Step 510, based on the revenue data, calculate for each of the target base stations a fifth score for expected base station revenue, a sixth score for base station construction investment, a seventh score for base station operating energy consumption cost, and an eighth score for base station maintenance cost.

[0117] In the embodiment of the present invention, based on the revenue data, a fifth score for the expected revenue of the base station, a sixth score for the investment in base station construction, a seventh score for the energy consumption cost of base station operation, and an eighth score for the maintenance cost of the base station are calculated for each target base station.

[0118] Step 520: Calculate the second target score of each target base station according to the fifth score, the sixth score, the seventh score and the eighth score.

[0119] In the embodiment of the present invention, the second target score of each target base station is calculated according to the fifth score, the sixth score, the seventh score and the eighth score of each target base station. Further, the second target score is calculated by formula 5, wherein W represents the second target score, I i represents the fifth score of target base station i for expected revenue, B i represents the sixth score of the target base station i for construction investment, E i represents the seventh score of the target base station i for the operating energy consumption cost, C i represents the eighth score of the target base station i with respect to the maintenance cost.

[0120] W=∑(I i -B i -E i -C i ) (5)

[0121] In an exemplary embodiment of the present invention, see Figure 6 In step 510, according to the revenue data, a fifth score for the expected revenue of the base station, a sixth score for the investment in base station construction, a seventh score for the energy consumption cost of base station operation, and an eighth score for the maintenance cost of the base station are calculated for each of the target base stations, including steps 610 to 640, which are described in detail as follows:

[0122] Step 610: Calculate a fifth score of each of the target base stations according to the predicted base station traffic and the comprehensive price per unit traffic in the revenue data.

[0123] In the embodiment of the present invention, the expected income of the base station is calculated by the predicted flow rate of the base station and the comprehensive unit price of the unit flow rate. The calculation formula is shown in Formula 6, where T i represents the predicted traffic of target base station i, P i Indicates the comprehensive unit price of the target base station i.

[0124] I i =T i ×P i (6)

[0125] Among them, the base station predicted traffic is obtained based on the historical business development of the base station. The base station's diversion capacity is predicted based on a preset timing prediction model, and then the predicted total traffic of the entire network in a certain area is used to obtain the predicted traffic of each base station.

[0126] Specifically, first summarize the base station-level data on a monthly basis, extract the required feature value fields, and sort the data according to the data collection time and base station ID. Then make a judgment on missing data values. If a target base station has missing data for two consecutive months or more, resulting in the inability to effectively fill the missing data, it is not recommended to fill the missing data for the target base station. For target base stations with missing data for non-consecutive months, the missing data is supplemented by sliding filling, averaging other months, etc. according to the data missing situation.

[0127] The time series prediction model needs historical data of a certain time length as input, otherwise the prediction accuracy cannot be guaranteed. Therefore, before prediction, the time length of the historical data of each target base station is compared with the time series length threshold. If the time length is greater than or equal to the time series length threshold, the requirement for prediction using the time series prediction model is met, otherwise it does not meet the requirement. The time series length threshold can be set to 6 months. For target base stations that do not meet the time series length threshold, the total traffic can be distributed based on the traffic of the latest month.

[0128] Finally, the data set is divided according to cities, and target base stations in the same city are divided into the same data set.

[0129] The Neural Prophet model is selected to obtain a time series prediction model, and then the future traffic development of the target base station is predicted. The Neural Prophet model is a time series prediction model implemented based on the Pytorch deep learning framework. The Neural Prophet model is a decomposable time series model, consisting of six modules, as shown in Formula 7, where T(t) represents the trend of time t, S(t) represents the seasonal effect of time t, E(t) represents the event and holiday effect of time t, F(t) represents the regression effect of future known exogenous variables at time t, A(t) represents the autoregressive effect of time t based on past observations, and L(t) represents the regression effect of the lagged observation of the exogenous variable at time t. Since the data used for prediction is obtained by averaging after accumulating for 7 days, the event and holiday effects are weak, and there are no base station-level external variables with known future values, the four modules of T(t), S(t), A(t), and L(t) are retained in the present invention, and the remaining two modules are removed to reduce the complexity of the model.

[0130] Y(t)=T(t)+S(t)+E(t)+F(t)+A(t)+L(t) (7)

[0131] First, the data of the target base station in the input data set is transformed into the fixed input format of the Neural Prophet model, as shown in List 2. Among them, ds represents the data collection time, y represents the service flow, bs_id represents the base station ID, and rrc_conn_mean_dc and prb_utili represent other characteristic variables such as the number of RRC connections and wireless utilization.

[0132] Table 2

[0133] ds y bs_id rrc_conn_mean_dc prb_utili ... 2023-01-01 xx xx xx xx ... 2023-02-01 xx xx xx xx ... 2023-03-01 xx xx xx xx ... ... ... ... ... ... ...

[0134] Set parameters such as autoregression, season, number of neural network layers, number of nodes in each layer, training rounds, learning rate, and future prediction time. Introduce lagged regression variables and use N months of historical data to train a time series prediction model for predicting business traffic in the next 1-M months.

[0135] The time series prediction model predicts the predicted value of future traffic at the city level and allocates the predicted value of traffic at the city level to the corresponding target base station. The allocation scheme is shown in Formula 8, where T i represents the predicted traffic of target base station i, T represents the predicted value of future traffic at the prefecture-level corresponding to target base station i, N represents the number of base stations expected to be built at the end of the planning period, and T ave represents the average diversion flow of the base stations built at the end of the planning period, t i represents the predicted traffic of target base station i, and ∑t represents the sum of the predicted traffic of all target base stations in the city.

[0136]

[0137] The comprehensive price per unit of traffic is calculated based on the base station ARPU value. The calculation scheme is shown in Formula 9, where P i represents the comprehensive unit price of the target base station i, p j represents the user fee level j, which can be 50 yuan / month, 80 yuan / month, 100 yuan / month, etc. j represents the number of users of cost level j, and U represents the number of all users of target base station i.

[0138]

[0139] Step 620: Calculate a sixth score of each of the target base stations according to the base station construction method in the revenue data and the construction cost corresponding to the base station construction method.

[0140] In the embodiment of the present invention, the construction investment of the base station is jointly determined by the base station construction method and the construction cost corresponding to each construction method. The construction cost can be flexibly determined according to the actual situation of each province and city, and no unified regulations are made here. Base stations of different station types have their own construction method selection methods and processes.

[0141] In the construction method of macro base stations, the base station frequency band is first determined. For 700M and 4.9G target base stations, 4T4R (i.e., the base station has 4 transmitting antennas and 4 receiving antennas) and 64T64R are directly recommended. For 2.6G target base stations, the judgment is based on the traffic of the base station. The base station traffic threshold corresponding to the construction method can be set from large to small according to 64T>32T>8T. If the traffic is greater than the base station traffic threshold, the corresponding construction method is adopted. The type and order of construction methods can be flexibly adjusted according to the equipment situation.

[0142] In the construction method of indoor base stations, first determine whether the target base station has built 4G. For the target base stations with built 4G, first make a judgment based on the traffic of the base station and the actual situation of the existing network, and then determine the construction method of the 5G base station according to the construction method of the 4G base station. For the target base stations without 4G (i.e., newly built indoor base stations), directly select the construction method based on the traffic planned by the base station and the actual situation of the existing network, and the traffic threshold corresponding to the construction method is set from large to small according to 4T4R distributed pico base station>4T4R extended pico base station>2T2R distributed pico base station>2T2R extended pico base station>single-channel DAS. If the traffic is greater than the construction method threshold, the corresponding construction method is adopted. The type and order of construction methods can be flexibly adjusted according to the equipment situation.

[0143] Step 630: Calculate a seventh score of each of the target base stations according to the average energy consumption and operation time in the revenue data.

[0144] In the embodiment of the present invention, the calculation formula of the energy consumption operating cost of the base station is shown in formula (10), where E i represents the seventh score of the target base station i for the operating energy consumption cost, e i It represents the average energy consumption (monthly power consumption) corresponding to the construction mode of the target base station i, which can be obtained from relevant materials such as equipment energy consumption standards. Period represents the operating time from the current time to the end of the planning period (in months).

[0145] E i =e i ×period (10)

[0146] Step 640: Calculate an eighth score of each of the target base stations according to the station type and labor cost in the revenue data.

[0147] In the embodiment of the present invention, the base station maintenance cost can determine the maintenance cost of different types of base stations according to the station type and labor cost, and the calculated maintenance cost is directly used as the eighth score.

[0148] In the embodiment of the present invention, four indicators are proposed, namely, expected base station income, base station construction investment, base station operating energy consumption cost and base station maintenance cost, and the calculation score scheme of each indicator is described in detail, so that the technical solution provided by the present invention is more practical.

[0149] In an embodiment of the present invention, a time series prediction model is trained on the basis of Neural Prophet to predict base station traffic. Based on the analysis of the prediction problem and input data, the model structure is optimized and the model complexity is reduced. At the same time, a time series length threshold is introduced into the model, which effectively avoids the impact of long-term expectations due to insufficient historical data length and improves the prediction accuracy.

[0150] In an exemplary embodiment of the present invention, see Figure 7 In step 140, each target base station is evaluated according to the construction evaluation score, including steps 710 to 720, which are described in detail as follows:

[0151] Step 710: Generate a construction list according to the construction evaluation score of each target base station.

[0152] In the embodiment of the present invention, a base station construction value threshold is preset, each target base station is arranged in descending order according to the construction evaluation score, and the target base stations with construction evaluation scores greater than or equal to the base station construction value threshold are included in the construction list.

[0153] Step 720, obtaining a construction target, and detecting whether the construction list meets the construction target; wherein the construction target includes at least one of coverage achievement rate, number of base stations and investment scale.

[0154] In an embodiment of the present invention, after the construction list is generated, the construction target is obtained, and the construction list is reviewed according to the construction target. The construction target may be one or more of the coverage achievement rate, the number of base stations, and the investment scale. If the construction list and the construction target do not meet the requirements, a new construction list is regenerated until the output construction list meets the construction target.

[0155] The fields included in the generated construction list are shown in Listing 3 below:

[0156] Table 3

[0157]

[0158]

[0159] In other embodiments of the present invention, a corresponding threshold value can be flexibly determined for each dimension of the first target score and the second target score according to the network construction strategy. When determining the construction list, the target base station whose score in each dimension is greater than or equal to the corresponding threshold value can be selected into the construction list. At the same time, for particularly important dimensions, a "one-vote pass" method can be adopted, that is, the score of the target base station in this dimension meets the corresponding threshold value, and it can be directly selected into the construction list.

[0160] The technical solution provided by the embodiment of the present invention has broad market prospects in network planning and construction scenarios. In the future, as the construction of base stations increasingly pursues refinement and efficiency, it can save investment and improve construction benefits while ensuring network quality, thereby achieving a balance between network quality and investment benefits. At the same time, it can take precise site planning and construction as the guiding principle for network construction, and can create a precise value planning platform for digital wireless networks, which can widely serve network planning and construction.

[0161] The base station construction evaluation device provided by the present invention is described below. The base station construction evaluation device described below and the base station construction evaluation method described above can be referred to each other. It should be noted that the device provided in the following embodiment and the method provided in the above embodiment belong to the same concept, and the specific manner in which each module and unit performs the operation has been described in detail in the method embodiment, which will not be repeated here.

[0162] In an exemplary embodiment of the present invention, see Figure 8 , Figure 8 A base station construction evaluation device according to an exemplary embodiment includes:

[0163] The first acquisition module 810 is configured to acquire construction data of each cell for base station construction, and determine the construction type of each cell according to the construction data;

[0164] A second acquisition module 820 is configured to merge the sites of the cells according to the construction type to obtain multiple target base stations, and obtain revenue data of each of the target base stations;

[0165] The calculation module 830 is configured to calculate a first target score for each of the target base stations for existing network problems according to the construction data of the cells in each of the target base stations, and to calculate a second target score for investment returns according to the revenue data of each of the target base stations;

[0166] The evaluation module 840 is configured to calculate a construction evaluation score of each of the target base stations according to the first target score and the second target score, and evaluate each of the target base stations according to the construction evaluation score.

[0167] In an exemplary embodiment of the present invention, the second acquisition module 820 includes:

[0168] The first is a submodule configured to use the cell of the indoor type as the first cell, and the cell of the macro type as the second cell;

[0169] A first grouping submodule, configured to group each of the first cells according to the base station ID and the base station name in the construction data of each of the first cells to obtain a plurality of first cell groups; and

[0170] A second grouping submodule is configured to group each of the second cells according to the frequency band in the construction data of each of the second cells to obtain a plurality of second cell groups, form a plurality of base station groups according to the base stations corresponding to the second cell groups, and determine a corresponding extended base station for each base station in the base station group based on the location information of the base station, and form the base station and the corresponding extended base station into a physical base station;

[0171] The second submodule is configured to use the base station corresponding to the first cell group and the physical base station as the target base station.

[0172] In an exemplary embodiment of the present invention, the calculation module 830 includes:

[0173] A first calculation submodule is configured to calculate, according to the construction data, at least one of a first score for the existing network service, a second score for the scenario value, a third score for the network quality, and a fourth score for the user terminal for each of the target base stations;

[0174] The second calculation submodule is configured to calculate the first target score of each of the target base stations according to at least one of the first score, the second score, the third score, and the fourth score.

[0175] In an exemplary embodiment of the present invention, the first computing submodule includes:

[0176] A first calculation unit is configured to calculate a first score of each of the target base stations according to at least one of the 4G traffic, the 5G traffic, and the 5G reverse 4G traffic in the construction data; and

[0177] A second calculation unit is configured to calculate a second score of each of the target base stations according to at least one of the key area data, the word-of-mouth scenario data, and the special protection scenario data in the construction data; and

[0178] A third calculation unit, configured to calculate a third score for each of the target base stations according to at least one of the weak coverage and the network complaint data in the construction data; and

[0179] The fourth calculation unit is configured to calculate a fourth score of each of the target base stations according to at least one of the APRU and the DOU in the construction data.

[0180] In an exemplary embodiment of the present invention, the calculation module 830 includes:

[0181] A third calculation submodule is configured to calculate, for each of the target base stations, a fifth score for the expected revenue of the base station, a sixth score for the investment in base station construction, a seventh score for the energy consumption cost of base station operation, and an eighth score for the maintenance cost of the base station according to the revenue data;

[0182] The fourth calculation submodule is configured to calculate the second target score of each of the target base stations according to the fifth score, the sixth score, the seventh score and the eighth score.

[0183] In an exemplary embodiment of the present invention, the third computing submodule includes:

[0184] a fifth calculation unit configured to calculate a fifth score of each of the target base stations according to the predicted base station traffic and the comprehensive price per unit traffic in the revenue data; and

[0185] a sixth calculation unit, configured to calculate a sixth score of each of the target base stations according to the base station construction method in the revenue data and the construction cost corresponding to the base station construction method; and

[0186] a seventh calculation unit, configured to calculate a seventh score of each of the target base stations according to the average energy consumption and the operation time in the revenue data; and

[0187] The eighth calculation unit is configured to calculate an eighth score of each of the target base stations according to the station type and labor cost in the revenue data.

[0188] In an exemplary embodiment of the present invention, the evaluation module 840 includes:

[0189] A generating submodule, configured to generate a construction list according to the construction evaluation score of each of the target base stations;

[0190] The detection submodule is configured to obtain a construction target and detect whether the construction list meets the construction target; wherein the construction target includes at least one of the coverage achievement rate, the number of base stations and the investment scale.

[0191] Fig. 9 An example of a physical structure diagram of an electronic device is shown in FIG. Fig. 9 As shown, the electronic device may include: a processor (processor) 910, a communication interface (Communications Interface) 920, a memory (memory) 930 and a communication bus 940, wherein the processor 910, the communication interface 920, and the memory 930 communicate with each other through the communication bus 940. The processor 910 may call the logic instructions in the memory 990 to execute the base station construction evaluation method, which includes:

[0192] Acquire construction data of base stations in each cell, and determine the construction type of each cell according to the construction data;

[0193] Merging the sites of the cells according to the construction type to obtain multiple target base stations, and acquiring revenue data of each target base station;

[0194] Calculating a first target score for existing network problems of each target base station according to the construction data of the cell in each target base station, and calculating a second target score for investment return of each target base station according to the revenue data of each target base station;

[0195] A construction evaluation score of each of the target base stations is calculated according to the first target score and the second target score, and each of the target base stations is evaluated according to the construction evaluation score.

[0196] In addition, the logic instructions in the above-mentioned memory 930 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0197] On the other hand, the present invention further provides a computer program product, the computer program product comprising a computer program, the computer program can be stored on a non-transitory computer-readable storage medium, and when the computer program is executed by a processor, the computer can execute the base station construction evaluation method provided by the above methods, the method comprising:

[0198] Acquire construction data of base stations in each cell, and determine the construction type of each cell according to the construction data;

[0199] Merging the sites of the cells according to the construction type to obtain multiple target base stations, and acquiring revenue data of each target base station;

[0200] Calculating a first target score for existing network problems of each target base station according to the construction data of the cell in each target base station, and calculating a second target score for investment return of each target base station according to the revenue data of each target base station;

[0201] A construction evaluation score of each of the target base stations is calculated according to the first target score and the second target score, and each of the target base stations is evaluated according to the construction evaluation score.

[0202] In another aspect, the present invention further provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the base station construction evaluation method provided by the above methods is implemented, and the method includes:

[0203] Acquire construction data of base stations in each cell, and determine the construction type of each cell according to the construction data;

[0204] Merging the sites of the cells according to the construction type to obtain multiple target base stations, and acquiring revenue data of each target base station;

[0205] Calculating a first target score for existing network problems of each target base station according to the construction data of the cell in each target base station, and calculating a second target score for investment return of each target base station according to the revenue data of each target base station;

[0206] A construction evaluation score of each of the target base stations is calculated according to the first target score and the second target score, and each of the target base stations is evaluated according to the construction evaluation score.

[0207] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0208] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0209] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A base station construction evaluation method, characterized in that: include: Acquire construction data of base stations in each cell, and determine the construction type of each cell according to the construction data; Merging the sites of the cells according to the construction type to obtain multiple target base stations, and acquiring revenue data of each target base station; Calculating a first target score for existing network problems of each target base station according to the construction data of the cell in each target base station, and calculating a second target score for investment return of each target base station according to the revenue data of each target base station; A construction evaluation score of each of the target base stations is calculated according to the first target score and the second target score, and each of the target base stations is evaluated according to the construction evaluation score.

2. The base station construction evaluation method according to claim 1, characterized in that: The step of merging the sites of the cells according to the construction type to obtain multiple target base stations includes: The cell whose construction type is indoor type is used as the first cell, and the cell whose construction type is macro type is used as the second cell; Grouping each of the first cells according to the base station ID and the base station name in the construction data of each of the first cells to obtain a plurality of first cell groups; and According to the frequency band in the construction data of each second cell, each second cell is grouped to obtain a plurality of second cell groups, a plurality of base station groups are formed according to the base stations corresponding to the second cell groups, and a corresponding extended base station is determined for each base station in the base station group based on the location information of the base station, and the base station and the corresponding extended base station are combined into a physical base station; The base station corresponding to the first cell group and the physical base station are used as the target base station.

3. The base station construction evaluation method according to claim 1, characterized in that: The calculating, according to the construction data of the cells in the target base stations, the first target score of each target base station for the existing network problem comprises: According to the construction data, at least one of a first score for existing network services, a second score for scenario value, a third score for network quality, and a fourth score for user terminals is calculated for each of the target base stations; The first target score of each target base station is calculated according to at least one of the first score, the second score, the third score, and the fourth score.

4. The base station construction evaluation method according to claim 3, characterized in that: The calculating, according to the construction data, at least one of a first score for the existing network service, a second score for the scenario value, a third score for the network quality, and a fourth score for the user terminal for each of the target base stations comprises: Calculate a first score for each of the target base stations according to at least one of the 4G traffic, the 5G traffic, and the 5G reverse 4G traffic in the construction data; and Calculating a second score for each of the target base stations according to at least one of the key area data, the word-of-mouth scenario data, and the special protection scenario data in the construction data; and Calculating a third score for each of the target base stations according to at least one of the weak coverage and the network complaint data in the construction data; and A fourth score of each of the target base stations is calculated according to at least one of the APRU and the DOU in the construction data.

5. The base station construction evaluation method according to claim 1, characterized in that: The calculating, according to the revenue data of each of the target base stations, a second target score for investment revenue of each of the target base stations comprises: According to the revenue data, calculating, for each of the target base stations, a fifth score for the expected revenue of the base station, a sixth score for the investment in base station construction, a seventh score for the energy consumption cost of base station operation, and an eighth score for the maintenance cost of the base station; The second target score of each target base station is calculated according to the fifth score, the sixth score, the seventh score and the eighth score.

6. The base station construction evaluation method according to claim 5, characterized in that: The calculating, based on the revenue data, a fifth score for the expected revenue of the base station, a sixth score for the base station construction investment, a seventh score for the base station operation energy consumption cost, and an eighth score for the base station maintenance cost of each of the target base stations comprises: Calculating a fifth score for each of the target base stations according to the predicted base station traffic and the comprehensive price per unit traffic in the revenue data; and Calculating a sixth score of each of the target base stations according to the base station construction method in the revenue data and the construction cost corresponding to the base station construction method; and Calculating a seventh score of each of the target base stations according to the average energy consumption and operation time in the revenue data; and An eighth score of each of the target base stations is calculated according to the station type and labor cost in the revenue data.

7. The base station construction evaluation method according to any one of claims 1 to 6, characterized in that: The evaluating each of the target base stations according to the construction evaluation score includes: Generate a construction list according to the construction evaluation score of each of the target base stations; Obtain a construction target, and detect whether the construction list meets the construction target; wherein the construction target includes at least one of coverage achievement rate, number of base stations and investment scale.

8. A base station construction evaluation method, characterized in that: include: A first acquisition module is configured to acquire construction data of each cell for base station construction, and determine the construction type of each cell according to the construction data; A second acquisition module is configured to merge the sites of the cells according to the construction type to obtain multiple target base stations, and obtain revenue data of each target base station; A calculation module, configured to calculate a first target score for each of the target base stations for existing network problems according to construction data of cells in each of the target base stations, and to calculate a second target score for investment returns according to revenue data of each of the target base stations; An evaluation module is configured to calculate a construction evaluation score of each of the target base stations according to the first target score and the second target score, and evaluate each of the target base stations according to the construction evaluation score.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the base station construction evaluation method according to any one of claims 1 to 7 is implemented.

10. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the base station construction evaluation method according to any one of claims 1 to 7 is implemented.

11. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the base station construction evaluation method according to any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Network quality evaluation method and device

    CN109246740A

  • Wireless network base station site layering method and device

    CN113068198A

  • Base station network access data processing method and device, electronic equipment and storage medium

    CN114007230A

  • Network planning priority evaluation method, device, equipment and medium

    CN116233860A

  • Base station resource integration evaluation method, device, equipment and product

    CN116801299A