Resource distribution method and device, electronic equipment and storage medium

By predicting and determining the appropriate resource deduction rate, the problem of low resource allocation efficiency and success rate in the existing technology is solved, and the efficiency of resource allocation and user satisfaction are improved.

CN118798968APending Publication Date: 2024-10-18TENCENT TECHNOLOGY (SHENZHEN) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310416351.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-11
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

When the existing resource distribution platform distributes resources to users, it relies on the personal experience of business personnel, resulting in unsatisfactory deduction rates and reducing resource distribution efficiency and success rate.

Method used

By obtaining multiple resource deduction rates, predict the usage probability value of each deduction rate based on the attribute information of the target account, determine the appropriate target deduction rate, and send it to the target account together with the issued resources to improve user understanding. Satisfaction with resource deduction rate and efficiency and success rate of resource distribution.

Benefits of technology

It improves the efficiency and success rate of resource issuance, balances the benefits of resource providers and target accounts in the resource exchange process, and enhances users' enthusiasm for resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798968A_ABST
    Figure CN118798968A_ABST
Patent Text Reader

Abstract

The invention discloses a resource distribution method and device, electronic equipment and a storage medium, and the method comprises the steps: obtaining a plurality of resource deduction rates when a resource is distributed to a target account; each resource deduction rate in the plurality of resource deduction rates is used for deducting a preset proportion of returned resources when the target account returns the resources to the resource provider; different resource deduction rates in the plurality of resource deduction rates correspond to different preset proportions; based on the attribute information of the target account, predicting the probability of using each resource deduction rate by the target account to obtain a use probability value corresponding to each resource deduction rate; the attribute information is related to the current resource condition of the target account; determining a resource deduction rate corresponding to the use probability value meeting a preset condition as a target deduction rate; and sending the distribution resource and the target deduction rate to the target account. Therefore, the satisfaction degree of the target account on the deduction rate of the distributed resources can be improved, and the efficiency and success rate of resource distribution can be further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of Internet technology, and in particular to a resource distribution method, device, electronic device and storage medium. Background Art

[0002] With the development of Internet technology, many resource distribution platforms can distribute resources to users through the Internet. Users can quickly and conveniently obtain the required resources through the resource distribution platform to solve the current problem of resource shortage. Afterwards, users can return the lent resources to the resource distribution platform. For example, credit card related business.

[0003] Usually, when a resource distribution platform distributes resources to users, it will also provide users with preferential policies on deductions for returned resources. Currently, different deduction rates are mainly provided to different users by business personnel. The deduction rate can offset part of the returned resources, but this is highly dependent on the personal experience of the business personnel. Most users are not satisfied with the deduction rate provided by the business personnel, which results in the current resource distribution efficiency and success rate being very low. Summary of the invention

[0004] In order to improve the efficiency and success rate of resource distribution, the present application provides a resource distribution method, device, electronic device and storage medium:

[0005] According to a first aspect of the present application, a resource distribution method is provided, comprising:

[0006] When distributing resources to a target account, multiple resource deduction rates are obtained; each of the multiple resource deduction rates is used to deduct a preset proportion of the returned resources when the target account returns resources to a resource provider; different resource deduction rates among the multiple resource deduction rates correspond to different preset proportions;

[0007] Based on the attribute information of the target account, the probability of the target account using each resource deduction rate is predicted to obtain a usage probability value corresponding to each resource deduction rate; the attribute information is related to the current resource status of the target account;

[0008] The resource deduction rate corresponding to the usage probability value that meets the preset conditions is determined as the target deduction rate;

[0009] The issued resources and the target deduction rate are sent to the target account.

[0010] According to a second aspect of the present application, a resource distribution device is provided, including:

[0011] An acquisition module, used to acquire multiple resource deduction rates when issuing resources to a target account; each of the multiple resource deduction rates is used to deduct a preset proportion of returned resources when the target account returns resources to a resource provider; different resource deduction rates among the multiple resource deduction rates correspond to different preset proportions;

[0012] A prediction module, configured to predict the probability of the target account using each resource deduction rate based on the attribute information of the target account, and obtain a usage probability value corresponding to each resource deduction rate; the attribute information is related to the current resource status of the target account;

[0013] A determination module, used to determine the resource deduction rate corresponding to the probability value that meets the preset conditions as the target deduction rate;

[0014] The sending module is used to send the issued resources and the target deduction rate to the target account.

[0015] According to the third aspect of the present application, an electronic device is provided, comprising a processor and a memory, wherein the memory stores at least one instruction or at least one program, and the at least one instruction or the at least one program is loaded and executed by the processor to implement the resource distribution method as described in the first aspect.

[0016] According to a fourth aspect of the present application, a computer-readable storage medium is provided, in which at least one instruction or at least one program is stored, and the at least one instruction or the at least one program is loaded and executed by a processor to implement the resource distribution method as described in the first aspect.

[0017] According to a fifth aspect of the present application, a computer program is provided, and when the computer program is executed by a processor, the resource distribution method as described in the first aspect is implemented.

[0018] The resource distribution, device, electronic device and storage medium provided by the present application have the following technical effects:

[0019] When issuing resources to a target account, the present application first obtains multiple resource discount rates. Different resource discount rates can reduce the amount of resources that the target account needs to return to different degrees, which can not only promote the enthusiasm of the target account to receive the issued resources, but also balance the benefits of the resource provider and the target account in the resource exchange process; then, based on the attribute information of the target account, the target account's usage probability value for each resource discount rate is predicted, and based on the usage probability value of each resource discount rate, a suitable target discount rate is selected from multiple resource discount rates and sent to the target account together with the issued resources. In this way, the target account's satisfaction with the issued resource discount rate can be improved, and the efficiency and success rate of resource issuance can be further improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present application or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0021] Figure 1 is a schematic diagram of an application environment provided by an embodiment of the present application;

[0022] Figure 2 It is a flowchart of a resource distribution method provided in an embodiment of the present application;

[0023] Figure 3 This is a flow chart of determining the usage probability value corresponding to each resource deduction rate provided in an embodiment of the present application;

[0024] Figure 4 It is a flow chart of a method for generating a deduction rate prediction model provided in an embodiment of the present application;

[0025] Figure 5 It is a schematic diagram of the model training process provided in the embodiment of the present application;

[0026] Figure 6 This is another flow chart of determining the usage probability value corresponding to each resource deduction rate provided in an embodiment of the present application;

[0027] Figure 7 It is a structural diagram of a deduction rate usage prediction model provided in an embodiment of the present application;

[0028] Figure 8 This is a flow chart of adjusting the usage probability value corresponding to each resource deduction rate provided in an embodiment of the present application;

[0029] Fig. 9 It is a schematic diagram of the resource distribution process provided in an embodiment of the present application;

[0030] Fig.10 It is a block diagram of a resource distribution device provided in an embodiment of the present application;

[0031] Fig.11 It is a structural schematic diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0033] It should be noted that the terms "including" and "having" and any variations thereof in the specification and claims of this application and the above-mentioned drawings are intended to cover non-exclusive inclusions. For example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0034] See also Figure 1 , Figure 1 1 is a schematic diagram of an application environment provided by an embodiment of the present application, and the application environment may include a client 110 and a server 120. The server 120 and the client 110 may be directly or indirectly connected via wired or wireless communication. It should be noted that: Figure 1 The application scenario is just an example.

[0035] The client 110 can obtain and return resources through the server 120, and the server 120 can issue resources to the client 110 or receive returned resources from the client 110. Here, the server 120 can be a resource provider or a resource transfer party between the resource provider and the client 110.

[0036] Specifically, client software such as an application (Application, referred to as App) with resource receiving and resource returning functions is installed in the client 110. The application can be an independent application or a subprogram in the application. Exemplarily, the application can be a social application, a payment application, etc. The server 120 can provide background services for the application, including resource distribution services, resource return services, etc.

[0037] The user of the client 110 can log in to the application through the registered account, and then the server 120 can provide the resource issuance service for the user. Specifically, when issuing resources to the client 110, the server 120 obtains multiple resource deduction rates, and the resource deduction rates can be used to deduct a preset proportion of the returned resources when the client 110 returns resources to the resource provider later; taking the resource provider as a bank as an example, the corresponding resource can be a credit line issued by the bank, and the server 120 can issue a certain amount of credit lines to the client 110. Later, the client 110 needs to return a larger amount of credit lines than the issued amount to the bank through the server 120 to restore the original credit line, and the resource deduction rate can reduce the amount of credit lines that the client 110 needs to return.

[0038] Here, different resource deduction rates among the multiple resource deduction rates correspond to different preset ratios, that is, different resource deduction rates reduce the amount of credit that the client 110 needs to return to different degrees; in the embodiment of the present application, in order to ensure the fairness of resource exchange between the resource provider and the client 110 and improve the circulation rate and utilization rate of resources, it is necessary to improve the efficiency and success rate of resource issuance. Therefore, the server 120 predicts the probability of the client 110 using different resource deduction rates based on the attribute information of the client 110's account to determine the client 110's usage probability value for each resource deduction rate; wherein the attribute information is information related to the current resource status of the account; then, the server 120 sends the resource deduction rate corresponding to the usage probability value that meets the preset conditions to the client 110 together with the issued resources. In this way, by predicting the probability of client 110 using different resource discount rates, screening the resource discount rates based on the usage probability, and then sending the resource discount rates that meet certain conditions to client 110 together with the issued resources, the problem of blind issuance resulting in the client 110 having a low willingness to receive the issued resources, thereby affecting the efficiency and success rate of resource issuance, can be solved.

[0039] Optionally, the client 110 may be a physical device such as a smart phone, a computer (such as a desktop computer, a tablet computer, a laptop computer), an augmented reality (AR) / virtual reality (VR) device, a digital assistant, an intelligent voice interaction device (such as an intelligent speaker), an intelligent wearable device, an intelligent home appliance, a vehicle-mounted terminal, etc., or may be software running in a physical device, such as a computer program. The operating system corresponding to the client 110 may be an Android system (Android system), an iOS system (a mobile operating system developed by Apple), a Linux system (an operating system), a Microsoft Windows system (Microsoft Windows operating system), etc.

[0040] Optionally, the server 20 may be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN (Content Delivery Network), and big data and artificial intelligence platforms. The server may include a network communication unit, a processor, a memory, and the like.

[0041] It should be noted that for operational data involving user information, etc. in the embodiments of this application, when the embodiments of this application are applied to specific products or technologies, user permission or consent is required, and the collection, use and processing of relevant data need to comply with relevant laws, regulations and standards of relevant countries and regions.

[0042] The following describes a specific embodiment of a resource distribution method of the present application. Figure 2 It is a flow chart of a resource distribution method provided by an embodiment of the present application. The present application provides method operation steps as described in the embodiment or flow chart, but more or fewer operation steps may be included based on conventional or non-creative labor. The order of steps listed in the embodiment is only one way of executing the order of many steps and does not represent the only execution order. When the system or product in practice is executed, it can be executed in sequence or in parallel according to the method shown in the embodiment or the accompanying drawings (for example, in a parallel processor or multi-threaded processing environment).

[0043] Specific as Figure 2 As shown, the method may include:

[0044] S201: When issuing resources to a target account, multiple resource deduction rates are obtained; each of the multiple resource deduction rates is used to deduct a preset proportion of the returned resources when the target account returns resources to the resource provider; different resource deduction rates among the multiple resource deduction rates correspond to different preset proportions.

[0045] The resource distribution method of the embodiment of the present application can be implemented on a server, which can be a server of a resource provider or a server acting as a resource transfer party between a resource provider and a target account. The target account is an account registered by a user through a client, and the server can provide users with background services such as resource distribution and resource return through the client.

[0046] In the embodiment of the present application, the server can respond to the request of the target account or actively release resources to the target account. The target account and the resource provider will exchange resources only when the target account clearly indicates its willingness to receive them. The resource release is considered successful only after the resource exchange is completed. Accordingly, the target account needs to return a corresponding amount of resources to the resource provider through the server. Usually, the amount of resources returned by the target account is greater than the amount of resources released by the resource provider.

[0047] If the target account does not clearly indicate its willingness to receive the resource, or if it clearly indicates that it has no willingness to receive the resource, the resource exchange between the target account and the resource provider will not be performed, and the server will regard the resource distribution as a failure.

[0048] In order to promote resource circulation and improve the success rate of resource issuance, the server can provide the target account with a resource deduction rate. The resource deduction rate can deduct a preset proportion of the returned resources when the target account returns resources later. This can reduce the amount of resources that the target account needs to return to a certain extent, promote the target account's enthusiasm for resource acquisition, and increase the target account's willingness to receive the issued resources, thereby improving the success rate of resource issuance.

[0049] In a specific application scenario, such as a credit card business scenario, the resource provider is a bank, and the resource can be a credit line issued by the bank. When the server issues a certain amount of credit line to the target account, it can give a corresponding resource deduction rate to reduce the amount of credit line that the target account needs to return when returning the credit line. For example, the server issues a credit line of 1,000 to the target account, and the target account should return a credit line of 1,100 later. After using a resource deduction rate with a preset ratio of 0.1, the target account only needs to return a credit line of 1,090. Among them, the resource deduction rate with a preset ratio of 0.1 can be understood as deducting 10% of the returned resources and only returning 90% of the returned resources.

[0050] In the embodiment of the present application, there can be multiple resource deduction rates, and different resource deduction rates among the multiple resource deduction rates correspond to different preset ratios, that is, the amount of resources that the target account needs to return is reduced to varying degrees. When the server distributes resources to the target account, it obtains multiple resource deduction rates and then selects a suitable resource deduction rate from them. The suitable resource deduction rate can balance the benefits of both the resource provider and the target account in the resource exchange process.

[0051] In the embodiment of the present application, the sum of the resource discount rate and its corresponding preset ratio is 1. In practical applications, when the resource discount rate is used to deduct the initial returned resources, the corresponding amount of the initial returned resources can be reduced according to the corresponding preset ratio. For example, if the preset ratio is 0.1, the corresponding resource discount rate is 0.9, and the initial returned resources can be reduced by 10% according to 0.1, or the resource discount rate of 0.9 can be directly multiplied by the number of initial returned resources, and the multiplication result is the number of resources that need to be returned after the reduction.

[0052] S203: Based on the attribute information of the target account, the probability of the target account using each resource deduction rate is predicted to obtain a usage probability value corresponding to each resource deduction rate; the attribute information is related to the current resource status of the target account.

[0053] In an embodiment of the present application, in order to select a suitable resource deduction rate from multiple resource deduction rates, the server can obtain attribute information of the target account, which is related to the current resource status of the target account; then, the server predicts the probability of the target account using each resource deduction rate, and obtains the target account's usage probability value for each resource deduction rate.

[0054] Generally, the appropriate resource deduction rate can be selected by random distribution or manual method. In order to improve the efficiency and success rate of resource distribution, this application trains a prediction model and uses the prediction model to predict the probability of different target accounts using different resource deduction rates.

[0055] In some possible embodiments, the above-mentioned prediction of the probability of the target account using each resource deduction rate based on the attribute information of the target account to obtain the usage probability value corresponding to each resource deduction rate may include: Figure 3 The following steps are shown:

[0056] S301: Acquire multiple deduction rate usage prediction models; the multiple deduction rate usage prediction models correspond one-to-one to multiple resource deduction rates.

[0057] In this step, the server can pre-train multiple discount rate usage prediction models, and the multiple discount rate usage prediction models correspond to multiple resource discount rates one by one; that is, the server trains a prediction model specifically used to predict the resource discount rate for each different resource discount rate. In actual application, each discount rate usage prediction model is obtained and predicted separately.

[0058] For example, the first resource discount rate among multiple resource discount rates is 0.9, and the second resource discount rate among multiple resource discount rates is 0.8; then, the server trains at least one first discount rate usage prediction model to predict the probability of the target account using the first resource discount rate, and also trains at least one second discount rate usage prediction model to predict the probability of the target account using the second resource discount rate.

[0059] S303: Predict the attribute information according to each of the multiple deduction rate usage prediction models to obtain a usage probability value of each resource deduction rate for the target account.

[0060] In this step, the server inputs the attribute information of the target account into each discount rate usage prediction model, and each discount rate usage prediction model outputs the usage probability value of the target account with respect to the corresponding resource discount rate. The specific content of the attribute information can be determined according to the actual application scenario. Generally, the attribute information should have a good ability to distinguish whether the resource discount rate is used or not. For example, in the above-mentioned credit card business scenario, the attribute information may include but is not limited to the current credit limit of the target account, the total credit limit accepted historically, and the total credit limit returned historically.

[0061] In the above embodiment, multiple prediction models are trained to predict the usage probability values ​​of the target account for different resource deduction rates respectively, and subsequent resource distribution is performed based on the usage probability values, which can greatly improve the efficiency of resource distribution; and due to the independence of each prediction model, only one or several prediction models can be called under different application requirements, which has high flexibility in use.

[0062] Furthermore, each of the above-mentioned deduction rate usage prediction models is trained using a supervised learning method. Multiple deduction rate usage prediction models can be built based on the same model structure and then trained separately based on different label information. The following takes one of the deduction rate usage prediction models as an example to introduce the training method of the deduction rate usage prediction model.

[0063] In some possible embodiments, for each deduction rate prediction model, the resource distribution method of the embodiment of the present application also includes a method for generating a deduction rate prediction model, specifically including the following: Figure 4 The following steps are shown:

[0064] S401: Acquire training data; the training data includes attribute information of historical accounts and label information corresponding to the historical accounts.

[0065] In this step, the server obtains training data; the training data includes attribute information of historical accounts and label information corresponding to the historical accounts, wherein the historical accounts are accounts to which the server has issued resource deduction rates in the past, and the label information represents the usage of the resource deduction rate by the historical accounts, that is, whether the historical accounts have used the resource deduction rate; here, the resource deduction rate is the resource deduction rate corresponding to the deduction rate usage prediction model to be trained currently.

[0066] The tag information can be manually or automatically labeled. Usually, the tag information is either "1" or "0". When the tag information is "1", it can indicate that the historical account has used the corresponding resource deduction rate; when the tag information is "0", it can indicate that the historical account has not used the corresponding resource deduction rate.

[0067] For example, when the server is training the above-mentioned first deduction rate usage prediction model, if the label information corresponding to a historical account obtained is "1", it means that the historical account has used the first resource deduction rate; if the label information corresponding to a historical account obtained is "0", it means that the historical account has not used the first resource deduction rate.

[0068] S403: Obtain an initial machine learning model.

[0069] In this step, the server can build an initial machine learning model based on algorithms such as the nearest neighbor algorithm (KNN), logistic regression, linear regression, decision tree, random forest, and extreme gradient boosting tree (Xgboost).

[0070] S405: Predict the attribute information of the historical account according to the initial machine learning model to obtain the predicted usage probability value of the historical account regarding the resource deduction rate.

[0071] In this step, the server inputs the attribute information of the historical account into the initial machine learning model, predicts the probability value of the resource deduction rate of the historical account, and obtains the predicted usage probability value.

[0072] S407: Train the initial machine learning model based on the predicted probability value and label information.

[0073] In this step, the server can determine the loss value between the predicted probability value and the label information through the loss function, and then perform back propagation based on the loss value to iteratively update the parameters of the initial machine learning model; wherein the loss function can be a cross entropy loss function.

[0074] S409: until the preset training end condition is met, a trained deduction rate prediction model is obtained.

[0075] In this step, the server sets a preset end training condition. After each iteration, it determines whether the current machine learning model meets the preset end training condition. If it meets the condition, the current machine learning model after iteration is used as the trained discount rate prediction model. The preset end training condition can be to end the training when the iteration round meets the maximum number of iterations, or to end the training when the loss value meets the maximum allowable loss value.

[0076] In the embodiment of the present application, the server trains multiple discount rate usage prediction models according to the above steps S401 to S409. Figure 5 As shown, during training, for different deduction rate usage prediction models (first deduction rate usage prediction model, second deduction rate usage prediction model, etc.), the obtained training data are respectively the first historical account set for issuing the first resource deduction rate, the first historical account set for issuing the second resource deduction rate, etc. Each historical account set is divided into two categories of historical accounts based on label information. Taking the first historical account set as an example, the first historical account set includes historical accounts with label information of "1" that have used the first resource deduction rate, and historical accounts with label information of "0" that have not used the first resource deduction rate; in the training process of each deduction rate usage prediction model, the label information is used as the dependent variable Y, and the attribute information of the historical account is used as the independent variable X, the mapping relationship between the independent variable and the dependent variable is learned, and the probability value of the historical account resource deduction rate predicted by the model is continuously corrected, and the model parameters are updated at the same time, so that the predicted value finally matches the label information, and the trained deduction rate usage prediction model is obtained.

[0077] A possible application and training method of the deduction rate usage prediction model is introduced above. Another possible implementation example of applying the deduction rate usage prediction model to implement step S203 is introduced below.

[0078] In some possible embodiments, the above-mentioned prediction of the probability of the target account using each resource deduction rate based on the attribute information of the target account to obtain the usage probability value corresponding to each resource deduction rate may include: Figure 6 The following steps are shown:

[0079] S601: Obtain a deduction rate usage prediction model; the deduction rate usage prediction model includes a feature extraction module and multiple prediction modules; the multiple prediction modules correspond one-to-one to multiple resource deduction rates.

[0080] In this step, the server only builds one discount rate usage prediction model to simultaneously predict the discount rates of multiple resources. The discount rate usage prediction model includes a feature extraction module and multiple prediction modules, such as Figure 7 As shown, Figure 7It is a structural diagram of a deduction rate usage prediction model provided in an embodiment of the present application, wherein a feature extraction module is used to extract features from attribute information of a target account, multiple prediction modules correspond one-to-one to multiple resource deduction rates, and the multiple prediction modules exemplarily include a first prediction module and a second prediction module. Each prediction module is used to predict the probability of the target account using its corresponding resource deduction rate based on the output of the feature extraction module.

[0081] S603: Extract features from the attribute information according to the feature extraction module to obtain feature information of the target account.

[0082] In this step, the server inputs the attribute information of the target account into the feature extraction module, performs feature extraction on the attribute information, and obtains the feature information of the target account. For the attribute information, please refer to the description of the above embodiment, which will not be repeated here. The feature extraction module can be built based on network structures such as recurrent neural network (RNN), convolutional neural network (CNN), and translation network (transformer), and this application does not limit this.

[0083] S605: Predict the characteristic information according to each prediction module in the multiple prediction modules to obtain a usage probability value of the target account with respect to each resource deduction rate.

[0084] In this step, the server inputs the feature information of the target account output by the feature extraction module into each prediction module, and each prediction module outputs the usage probability value of each resource deduction rate of the target account. Figure 7 As shown, exemplarily, the first prediction module predicts the usage probability value of the target account with respect to the first resource deduction rate based on the feature information, and the second prediction module predicts the usage probability value of the target account with respect to the second resource deduction rate based on the feature information.

[0085] For the training of the prediction model using the deduction rate in this embodiment, reference can be made to the above embodiment. The only difference is the determination of the loss value. In this embodiment, for each prediction module, the loss of each prediction module is calculated, and then the losses of all prediction modules are integrated to calculate the total loss value, and then the back propagation training model is performed based on the total loss value.

[0086] In the above embodiment, considering that the similarity of the model structures between multiple deduction rate usage prediction models that individually predict the usage probability values ​​of the target account for different resource deduction rates is relatively high, feature extraction is usually required for the attribute information of the target account. Therefore, in order to avoid repeated operations, a feature extraction module and multiple prediction modules are designed in this embodiment. In this way, only one deduction rate usage prediction model needs to be built to achieve the simultaneous prediction of multiple resource deduction rates, which can reduce the number of models, not only reducing the training cost, but also greatly improving the prediction speed of the model in actual application.

[0087] S205: Determine the resource deduction rate corresponding to the usage probability value that meets the preset condition as the target deduction rate.

[0088] In the embodiment of the present application, after determining the usage probability value of the target account for each resource deduction rate, the server judges the usage probability value of the target account for each resource deduction rate, and judges whether each usage probability value meets the preset conditions. The server determines the resource deduction rate corresponding to the usage probability value that meets the preset conditions as the target deduction rate. Subsequently, the server can only issue the target deduction rate.

[0089] The following provides an embodiment of how to determine whether each usage probability value meets a preset condition.

[0090] In some possible embodiments, after step S203 and before step S205, the resource distribution method of the embodiment of the present application may further include: Figure 8 The following steps are shown:

[0091] S801: Using each resource deduction rate, adjusting the usage probability value corresponding to each resource deduction rate to obtain an adjusted usage probability value corresponding to each resource deduction rate.

[0092] In this step, for each resource deduction rate, the server can directly multiply the resource deduction rate by the usage probability value corresponding to the resource deduction rate, and use the multiplication result as the adjusted usage probability value; or, the server can also multiply the preset ratio corresponding to the resource deduction rate by the usage probability value corresponding to the resource deduction rate, and use the multiplication result as the adjusted usage probability value.

[0093] For example, assuming that the first resource deduction rate is 0.9, the target account's usage probability value for the first resource deduction rate is 0.9, and the server's usage probability value after adjustment using the first resource deduction rate is 0.9*0.9=0.81; the second resource deduction probability is 0.8, and the target account's usage probability value for the second resource deduction rate is also 0.9, and the usage probability value after adjustment using the second resource deduction rate is 0.8*0.9=0.72; it can be seen that before the adjustment, the target account's usage probabilities for the first resource deduction rate and the second resource deduction rate are the same. After the adjustment based on the resource deduction rate, the target account's usage probability for the first resource deduction rate is significantly higher; therefore, when the server has a small difference in the target account's usage probability values ​​for different resource deduction rates, the server adjusts the usage probability value based on the resource deduction rate, which can reduce the amount of deduction returned resources and give priority to ensuring the benefits of resource providers.

[0094] Alternatively, the server uses the preset ratio of 0.1 corresponding to the first resource deduction rate to adjust 0.9, and the adjusted usage probability value is 0.1*0.9=0.09; uses the preset ratio of 0.2 corresponding to the second resource deduction rate to adjust 0.9, and the adjusted usage probability value is 0.2*0.9=0.18; it can be seen that after the adjustment based on the preset ratio corresponding to the resource deduction rate, the target account's usage probability of the second resource deduction rate is significantly higher; thus, when the target account's usage probability values ​​for different resource deduction rates are slightly different, the server adjusts the usage probability value based on the preset ratio corresponding to the resource deduction rate, which can increase the amount of deduction returned resources and give priority to the benefits of the target account.

[0095] S803: Sorting the usage probability values ​​corresponding to each adjusted resource deduction rate, and determining the usage probability values ​​with the top preset digits in the ranking as the usage probability values ​​that meet the preset conditions.

[0096] In this step, the server sorts the usage probability values ​​corresponding to each adjusted resource deduction rate in descending order to obtain a sorting result, and determines the usage probability values ​​with the first preset digits in the sorting result as the usage probability values ​​that meet the preset conditions. Here, the preset digit can be an integer greater than or equal to 1. For example, the preset digit is 1, that is, the server only selects the resource deduction rate with the largest usage probability value.

[0097] In the above embodiment, the server adjusts the usage probability value corresponding to each resource deduction rate based on each resource deduction rate or the preset ratio corresponding to each resource deduction rate, and then selects the usage probability value that meets the conditions based on the adjusted usage probability value. In actual applications, the server can flexibly balance the benefits of both from the perspective of resource providers or users based on actual needs, thereby providing fair guarantees for the distribution of resources.

[0098] S207: Send the issued resources and the target deduction rate to the target account.

[0099] In an embodiment of the present application, after determining the target deduction rate, the server sends the issued resources together with the target deduction rate to the target account, and displays them on the client corresponding to the target account for the user to choose; the user can perform operations on the client, and if the client detects an operation indicating that the target account is willing to receive the issued resources, it sends feedback to the server, and the server can subsequently transfer the issued resources to the resource account of the target account. The resource account is an account used by the target account to store resources, and the resource account is registered by the resource provider to the target account.

[0100] In some possible embodiments, if there are multiple target discount rates, the above-mentioned sending of the issuance resources and the target discount rate to the target account may include the following steps: determining the issuance order of multiple target discount rates according to the usage probability value corresponding to each target discount rate; and sending each target discount rate and issuance resource to the target account in turn according to the issuance order.

[0101] Specifically, the server sorts the target discount rates in descending order according to the usage probability value corresponding to each target discount rate in the multiple target discount rates, and obtains the issuance order of the multiple target discount rates; then, the server sends only one target discount rate together with the issued resources to the target account at a time according to the issuance order. If the target account does not respond to the use of the target discount rate or receives a request from the target account to obtain the resource discount rate again within a period of time, the server sends the next target discount rate according to the issuance order. In this way, setting the issuance priority for multiple target discount rates based on the usage probability value can improve the target account's satisfaction with the resource discount rate and improve the success rate of resource issuance.

[0102] The following is a comprehensive description of the above steps and possible implementation examples through an example. Fig. 9 As shown, first, the server obtains the attribute information of the target account; then, the server can input the attribute information into the first deduction rate usage prediction model, the second deduction rate usage prediction model, etc., respectively, and predict the usage probability values ​​of the target account for different resource deduction rates through different deduction rate usage prediction models. For example, the first deduction rate usage prediction model is used to predict the usage probability value p1 of the target account regarding the first resource deduction rate (assuming it is 0.9), and the second deduction rate usage prediction model is used to predict the usage probability value p2 of the target account regarding the second resource deduction rate (assuming it is 0.8)... The Nth deduction rate usage prediction model is used to predict the usage probability value pn of the target account regarding the Nth resource deduction rate; alternatively, the server can also directly input the attribute information into the deduction rate usage prediction model shown on the right. Use a prediction model to simultaneously predict the target account's usage probability values ​​for multiple resource deduction rates using one model; after determining the target account's usage probability value for each resource deduction rate, the server can multiply each resource deduction rate by the corresponding usage probability value to obtain an adjusted usage probability value, for example, p1*0.9 is the adjusted usage probability value of the first resource deduction rate; alternatively, the server can also multiply the preset ratio corresponding to each resource deduction rate by the corresponding usage probability value, in which case p1*0.1 is the adjusted usage probability value of the first resource deduction rate; then, the server sorts and filters the usage probability values ​​corresponding to each adjusted resource deduction rate until the target deduction rate is obtained; finally, the server sends the target deduction rate together with the issued resources to the target account.

[0103] In summary, a resource issuance method provided in an embodiment of the present application first obtains multiple resource discount rates when issuing resources to a target account. Different resource discount rates can reduce the number of resources that the target account needs to return to different degrees, which can not only promote the enthusiasm of the target account to receive the issued resources, but also balance the benefits of the resource provider and the target account in the resource exchange process; then, based on the attribute information of the target account, the target account's usage probability value for each resource discount rate is predicted, and based on the usage probability value of each resource discount rate, a suitable target discount rate is selected from multiple resource discount rates and sent to the target account together with the issued resources. In this way, the target account's satisfaction with the issued resource discount rate can be improved, and the efficiency and success rate of resource issuance can be further improved.

[0104] The present application also provides a resource distribution device, such as Fig.10 As shown, the resource distribution device 100 includes:

[0105] The acquisition module 1001 is used to acquire multiple resource deduction rates when issuing resources to the target account; each resource deduction rate in the multiple resource deduction rates is used to deduct a preset proportion of the returned resources when the target account returns resources to the resource provider; different resource deduction rates in the multiple resource deduction rates correspond to different preset proportions;

[0106] Prediction module 1002, used to predict the probability of the target account using each resource deduction rate based on the attribute information of the target account, and obtain the usage probability value corresponding to each resource deduction rate; the attribute information is related to the current resource status of the target account;

[0107] A determination module 1003 is used to determine the resource deduction rate corresponding to the probability value that meets the preset condition as the target deduction rate;

[0108] The sending module 1004 is used to send the issued resources and the target deduction rate to the target account.

[0109] In some possible embodiments, the prediction module 1002 is also used to obtain multiple deduction rate usage prediction models; the multiple deduction rate usage prediction models correspond one-to-one to multiple resource deduction rates; the attribute information is predicted according to each deduction rate usage prediction model in the multiple deduction rate usage prediction models to obtain the usage probability value of the target account for each resource deduction rate.

[0110] In some possible embodiments, the prediction module 1002 is also used to obtain a deduction rate usage prediction model; the deduction rate usage prediction model includes a feature extraction module and multiple prediction modules; the multiple prediction modules correspond one-to-one to multiple resource deduction rates; the attribute information is extracted according to the feature extraction module to obtain the feature information of the target account; the feature information is predicted according to each prediction module in the multiple prediction modules to obtain the usage probability value of the target account for each resource deduction rate.

[0111] In some possible embodiments, the device also includes a generation module for a deduction rate usage prediction model, and for each deduction rate usage prediction model, the generation module is used to obtain training data; the training data includes attribute information of historical accounts and label information corresponding to the historical accounts; the label information represents the usage of the resource deduction rate corresponding to the deduction rate usage prediction model by the historical accounts; an initial machine learning model is obtained; the attribute information of the historical accounts is predicted based on the initial machine learning model to obtain a predicted usage probability value of the resource deduction rate of the historical accounts; the initial machine learning model is trained based on the predicted probability value and the label information; until the preset training end conditions are met to obtain a trained deduction rate usage prediction model.

[0112] In some possible embodiments, the device also includes an adjustment module for adjusting the usage probability value corresponding to each resource discount rate using each resource discount rate to obtain the adjusted usage probability value corresponding to each resource discount rate; sorting the adjusted usage probability values ​​corresponding to each resource discount rate, and determining the usage probability values ​​ranked in the top preset positions as the usage probability values ​​that meet the preset conditions.

[0113] In some possible embodiments, the sending module 1004 is also used to determine the issuance order of multiple target deduction rates according to the usage probability value corresponding to each target deduction rate; and send each target deduction rate and issuance resources to the target account in turn according to the issuance order.

[0114] It should be noted that the device in the device embodiment and the method embodiment are based on the same inventive concept.

[0115] An embodiment of the present application provides an electronic device, which includes a processor and a memory, wherein the memory stores at least one instruction or at least one program, and the at least one instruction or the at least one program is loaded and executed by the processor to implement the resource distribution method provided in the above method embodiment.

[0116] Further, Fig.11 A hardware structure diagram of an electronic device for implementing the resource distribution method provided in the embodiment of the present application is shown. The electronic device may participate in constituting or include the resource distribution device provided in the embodiment of the present application. Fig.11As shown, the electronic device 100 may include one or more (1002a, 1002b, ..., 1002n are used to illustrate) processors 1002 (the processor 1002 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA), a memory 1004 for storing data, and a transmission device 1006 for communication functions. In addition, it may also include: a display, an input / output interface (I / O interface), a universal serial bus (USB) port (which may be included as one of the ports of the I / O interface), a network interface, a power supply and / or a camera. It can be understood by those skilled in the art that Fig.11 The structure shown is only for illustration and does not limit the structure of the above electronic device. Fig.11 More or fewer components as shown, or with Fig.11 Different configurations shown.

[0117] It should be noted that the one or more processors 1002 and / or other data processing circuits described above may generally be referred to herein as "data processing circuits". The data processing circuits may be embodied in whole or in part as software, hardware, firmware, or any other combination thereof. In addition, the data processing circuit may be a single independent processing module, or may be incorporated in whole or in part into any of the other components in the electronic device 100 (or mobile device). As described in the embodiments of the present application, the data processing circuit acts as a processor control (e.g., selection of a variable resistor terminal path connected to an interface).

[0118] The memory 1004 can be used to store software programs and modules of application software, such as program instructions / data storage devices corresponding to the resource distribution method described in the embodiment of the present application. The processor 1002 executes various functional applications and data processing by running the software programs and modules stored in the memory 1004, that is, realizing the above-mentioned resource distribution method. The memory 1004 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 1004 may further include a memory remotely arranged relative to the processor 1002, and these remote memories may be connected to the electronic device 100 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0119] The transmission device 1006 is used to receive or send data via a network. The specific example of the above network may include a wireless network provided by a communication provider of the electronic device 100. In one example, the transmission device 1006 includes a network adapter (Network Interface Controller, NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one embodiment, the transmission device 1006 can be a radio frequency (Radio Frequency, RF) module, which is used to communicate with the Internet wirelessly.

[0120] The display may be, for example, a touch screen liquid crystal display (LCD) that enables a user to interact with a user interface of the electronic device 100 (or mobile device).

[0121] An embodiment of the present application also provides a computer-readable storage medium, which can be set in an electronic device to store at least one instruction or at least one program related to a resource distribution method in a method embodiment, and the at least one instruction or the at least one program is loaded and executed by the processor to implement the resource distribution method provided by the above method embodiment.

[0122] Optionally, in this embodiment, the storage medium may be located in at least one of the multiple network servers of the computer network. Optionally, in this embodiment, the storage medium may include, but is not limited to, various media that can store program codes, such as a USB flash drive, a read-only memory (ROM), a random access memory (RAM), a mobile hard disk, a magnetic disk, or an optical disk.

[0123] It should be noted that the above-mentioned sequence of the embodiments of the present application is for description only and does not represent the advantages and disadvantages of the embodiments. The above-mentioned specific embodiments of the present application are described. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0124] Each embodiment in this application is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device and electronic device embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiments.

[0125] A person skilled in the art will understand that all or part of the steps to implement the above embodiments may be accomplished by hardware or by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, and the above-mentioned storage medium may be a read-only memory, a disk or an optical disk, etc.

[0126] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A resource distribution method, characterized in that: include: When distributing resources to a target account, multiple resource deduction rates are obtained; each of the multiple resource deduction rates is used to deduct a preset proportion of the returned resources when the target account returns resources to a resource provider; different resource deduction rates among the multiple resource deduction rates correspond to different preset proportions; Based on the attribute information of the target account, predict the probability of the target account using each resource deduction rate to obtain a usage probability value corresponding to each resource deduction rate; The attribute information is related to the current resource status of the target account; The resource deduction rate corresponding to the usage probability value that meets the preset conditions is determined as the target deduction rate; The issued resources and the target deduction rate are sent to the target account.

2. The resource distribution method according to claim 1, characterized in that: The predicting, based on the attribute information of the target account, the probability of the target account using each resource deduction rate to obtain a usage probability value corresponding to each resource deduction rate includes: Acquire multiple deduction rate usage prediction models; the multiple deduction rate usage prediction models correspond one-to-one to the multiple resource deduction rates; The attribute information is predicted according to each deduction rate usage prediction model of the multiple deduction rate usage prediction models to obtain a usage probability value of the target account with respect to each resource deduction rate.

3. The resource distribution method according to claim 1, characterized in that: The predicting, based on the attribute information of the target account, the probability of the target account using each resource deduction rate to obtain a usage probability value corresponding to each resource deduction rate includes: Obtaining a deduction rate usage prediction model; the deduction rate usage prediction model includes a feature extraction module and a plurality of prediction modules; the plurality of prediction modules correspond one to one with the plurality of resource deduction rates; Extracting features from the attribute information according to the feature extraction module to obtain feature information of the target account; The characteristic information is predicted according to each prediction module of the multiple prediction modules to obtain a usage probability value of the target account with respect to each resource deduction rate.

4. The resource distribution method according to claim 2, characterized in that: For each of the deduction rate usage prediction models, the method further includes a method for generating the deduction rate usage prediction model, including: Acquire training data; the training data includes attribute information of historical accounts and label information corresponding to the historical accounts; the label information represents the usage of the resource deduction rate corresponding to the deduction rate usage prediction model by the historical accounts; Get an initial machine learning model; Predicting the attribute information of the historical account according to the initial machine learning model to obtain a predicted usage probability value of the historical account with respect to the resource deduction rate; Training the initial machine learning model according to the predicted probability value and the label information; Until the preset training end conditions are met, the trained deduction rate prediction model is obtained.

5. The resource distribution method according to claim 1, characterized in that: After predicting the probability of the target account using each resource deduction rate based on the attribute information of the target account and obtaining the usage probability value corresponding to each resource deduction rate, and before determining the resource deduction rate corresponding to the usage probability value that meets the preset condition as the target deduction rate, the method further includes: Using each resource deduction rate, adjusting the usage probability value corresponding to each resource deduction rate, to obtain an adjusted usage probability value corresponding to each resource deduction rate; The usage probability values ​​corresponding to each of the adjusted resource deduction rates are sorted, and the usage probability values ​​with the top preset digits in the ranking are determined as the usage probability values ​​that meet the preset conditions.

6. The resource distribution method according to claim 1, characterized in that: The number of the target deduction rates is multiple; the sending of the issued resources and the target deduction rates to the target account includes: Determining the distribution order of the plurality of target deduction rates according to the usage probability value corresponding to each target deduction rate; According to the issuance order, each of the target deduction rates and the issuance resources are sent to the target account in turn.

7. A resource distribution device, characterized in that: include: An acquisition module, used to acquire multiple resource deduction rates when issuing resources to a target account; each of the multiple resource deduction rates is used to deduct a preset proportion of returned resources when the target account returns resources to a resource provider; different resource deduction rates among the multiple resource deduction rates correspond to different preset proportions; A prediction module, configured to predict the probability of the target account using each resource deduction rate based on the attribute information of the target account, and obtain a usage probability value corresponding to each resource deduction rate; The attribute information is related to the current resource status of the target account; A determination module, used to determine the resource deduction rate corresponding to the probability value that meets the preset conditions as the target deduction rate; The sending module is used to send the issued resources and the target deduction rate to the target account.

8. An electronic device, characterized in that: The method comprises a processor and a memory, wherein the memory stores at least one instruction or at least one program, and the at least one instruction or at least one program is loaded and executed by the processor to implement the resource distribution method according to any one of claims 1 to 6.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores at least one instruction or at least one program, and the at least one instruction or the at least one program is loaded and executed by a processor to implement the resource distribution method according to any one of claims 1 to 6.

10. A computer program, characterized in that When the computer program is executed by a processor, the resource distribution method according to any one of claims 1 to 6 is implemented.