Computing node recommendation method and device, electronic equipment and storage medium
By comparing user business data and computing node data, the most suitable computing node is selected for recommendation, which solves the problem of poor user experience in the existing technology and achieves higher user satisfaction and matching of business needs.
Patent Information
- Application Number
- CN202311142835.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-05
- Publication Date
- 2024-10-18
AI Technical Summary
The computing node scheduling method in the existing computing power network only considers resource utilization and fails to meet the actual business needs of users, resulting in poor user experience.
By obtaining the business data of the user to be recommended and the node data of each computing node in the computing power network, the suitability of each computing node and the user is determined after comparison, and the most suitable computing node is selected for recommendation.
It improves user experience and satisfaction, ensures that recommended computing nodes are more in line with users' actual business needs, and improves the user experience of the computing network.
Smart Images

Figure CN118802906A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of cloud computing technology, and in particular to a computing node recommendation method, device, electronic device and storage medium. Background Art
[0002] With the rapid development of computing power networks, the number of computing nodes in computing power networks is increasing. Due to the differences between computing nodes in computing power networks, for example, due to different construction periods and construction standards of computing nodes, the computing speeds, computing power resources, etc. of computing nodes in the same computing power network vary greatly, which in turn leads to different user experiences. Therefore, it is particularly important to recommend a suitable and balanced computing node as the user's computing power source.
[0003] At present, the target computing node for scheduling is determined based on the load of each computing node in the computing network, and the target computing node is scheduled and allocated to the user. However, the above computing power scheduling method only considers the resource utilization of each computing node in the computing network, and does not consider whether it is suitable for the current user. It only allows users to passively accept the allocation of computing nodes, resulting in the target computing node for scheduling may not meet the actual business needs of users, which may cause various problems that affect user experience, thereby reducing user experience. Summary of the invention
[0004] The present invention provides a computing node recommendation method, device, electronic device and storage medium, which are used to solve the defect in the prior art that computing power scheduling affects user experience and realize computing node recommendation with high user experience.
[0005] The present invention provides a computing node recommendation method, comprising:
[0006] Acquire business data of the user to be recommended, wherein the business data includes business situation data and business demand data;
[0007] Based on the business data, obtaining node data of each computing node in the computing power network, wherein the node data is data corresponding to the business data;
[0008] Based on the comparison results of each of the node data and the business data, determining the compatibility of each of the computing nodes and the to-be-recommended user;
[0009] Based on the fitness degrees, a target computing node having the greatest fitness degree with the to-be-recommended user is determined from among the computing nodes, and the target computing node is determined as a recommended computing node recommended to the to-be-recommended user.
[0010] According to a computing node recommendation method provided by the present invention, the node data includes node business situation data corresponding to the business situation data, and node business demand data corresponding to the business demand data;
[0011] The determining, based on the comparison results of each of the node data and the business data, the degree of compatibility between each of the computing nodes and the to-be-recommended user, includes:
[0012] Based on the comparison results of the business situation data of each node and the business situation data, determining the adaptability of each computing node to the business situation of the user to be recommended;
[0013] Based on the comparison results of the business demand data of each node and the business demand data, determining the adaptability of each computing node to the business demand of the user to be recommended;
[0014] Based on the adaptability of each business situation and the adaptability of each business demand, the adaptability of each computing node and the user to be recommended is determined, and any one of the adaptability is determined based on the weighted aggregation result of the adaptability of the business situation corresponding to the same computing node and the adaptability of the business demand corresponding to the same computing node.
[0015] According to a computing node recommendation method provided by the present invention, the adaptability of any business situation is determined based on the following steps:
[0016] In a case where the node service situation data includes the service situation data, determining that the service situation adaptation degree is a high adaptation degree;
[0017] In a case where the node service situation data does not include the service situation data, determining that the service situation adaptability is a low adaptability;
[0018] The high degree of adaptation is greater than the low degree of adaptation.
[0019] According to a computing node recommendation method provided by the present invention, determining that the business situation adaptability is low adaptability includes:
[0020] When the amount of situation data of the node business situation data is greater than a preset amount threshold, determining that the business situation adaptability is a first low adaptability;
[0021] When the amount of situation data of the node business situation data is less than or equal to a preset amount threshold, determining that the business situation adaptability is a second low adaptability;
[0022] The first low degree of adaptation is greater than the second low degree of adaptation.
[0023] According to a computing node recommendation method provided by the present invention, any of the business demand adaptability is determined based on the following steps:
[0024] Determining a difference between the node service demand data and the service demand data;
[0025] The service demand adaptability is determined based on a ratio of the difference to the node service demand data.
[0026] According to a computing node recommendation method provided by the present invention, any of the fitness levels is determined based on the following steps:
[0027] Determine each sub-adaptability based on the comparison results of each data in the node data and each data in the business data;
[0028] Based on the weight coefficient corresponding to each data in the business data, weighted aggregation processing is performed on each sub-fitness degree to obtain an aggregation result;
[0029] Based on the aggregation result, the degree of fitness is determined.
[0030] According to a computing node recommendation method provided by the present invention, the calculation formula of the fitness degree is as follows:
[0031]
[0032] In the formula, y represents the fitness, e represents the natural constant, b represents the constant term, n represents the number of each sub-fitness, x i represents the i-th sub-fitness among the sub-fitnesses, a i represents the i-th child fitness x i The corresponding weight coefficient.
[0033] According to a computing node recommendation method provided by the present invention, each of the weight coefficients and the constant term is determined based on the following steps:
[0034] Acquire sample business data, and determine a computing node label corresponding to the sample business data from each computing node;
[0035] Determine the sample fitness of each computing node with the sample service data, and determine, based on each of the sample fitness, a sample recommendation computing node with the greatest fitness with the sample service data from among the computing nodes;
[0036] Determining a target sample fitness between the sample recommendation computing node and the sample business data from each of the sample fitnesses;
[0037] Determine the log-likelihood loss based on the comparison result between the sample recommendation computing node and the computing node label, and the target sample fitness;
[0038] Based on the log-likelihood loss, the weight coefficients and the constant term are optimized and updated.
[0039] According to a computing node recommendation method provided by the present invention, the business situation data includes at least one of a business system type, an operation and maintenance access method, a business system architecture, an AI algorithm involved in the business, a computing power technology stack manufacturer, a business database, and a business system manufacturer;
[0040] The business demand data includes at least one of business data storage capacity, maximum business concurrency, business service population area, business data interaction area, node-to-user delay, business central processing unit CPU computing power demand, and business graphics processing unit GPU computing power demand.
[0041] According to a computing node recommendation method provided by the present invention, the target computing node is determined as a recommended computing node recommended to the user to be recommended, and then further includes:
[0042] If the existing computing node of the user to be recommended is different from the recommended computing node, outputting node switching information for the user to be recommended to determine whether to trigger a user switching instruction, the node switching information indicating the recommended computing node;
[0043] If a user switching instruction is received, a node switching operation is performed based on the user switching instruction, so that the computing node of the user to be recommended is switched to the recommended computing node.
[0044] The present invention also provides a computing node recommendation device, comprising:
[0045] A first acquisition module is used to acquire business data of the user to be recommended, wherein the business data includes business situation data and business demand data;
[0046] A second acquisition module is used to acquire node data of each computing node in the computing power network based on the business data, wherein the node data is data corresponding to the business data;
[0047] A compatibility determination module, used to determine the compatibility of each computing node with the user to be recommended based on the comparison results of each node data with the business data;
[0048] The node recommendation module is used to determine, based on the fitness degrees, from the computing nodes a target computing node with the greatest fitness degree with the user to be recommended, and determine the target computing node as a recommended computing node recommended to the user to be recommended.
[0049] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, any one of the computing node recommendation methods described above is implemented.
[0050] The present invention also provides a non-transitory computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the computing node recommendation method described in any one of the above is implemented.
[0051] The computing node recommendation method, device, electronic device and storage medium provided by the present invention obtain node data of each computing node in the computing power network based on the business data of the user to be recommended, and the node data is data corresponding to the business data, so as to determine the fitness of each computing node and the user to be recommended based on the comparison results of each node data with the business data, thereby realizing active evaluation of the fitness of each computing node and the user to be recommended, and determining the recommended computing node with the greatest fitness with the user to be recommended from each computing node, so as to actively select the computing node that is most suitable for the user to be recommended, instead of passively accepting the scheduling of the computing power network, thereby improving the user experience of the computing power network; and the business data includes business situation data and business demand data, so as to take the business situation and business demand of the user to be recommended as the core consideration factors, so as to more accurately determine the fitness of each computing node and the user to be recommended, that is, to improve the recommendation accuracy of the computing node, so as to make the recommended computing node more in line with the actual business needs of the user, thereby improving the user satisfaction and ultimately improving the user experience of the computing power network. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0053] Figure 1 One of the flowcharts of the computing node recommendation method provided by the present invention;
[0054] Figure 2 The second flowchart of the computing node recommendation method provided by the present invention;
[0055] Figure 3 The third flowchart of the computing node recommendation method provided by the present invention;
[0056] Figure 4 A schematic diagram of the structure of a computing node recommendation device provided by the present invention;
[0057] Figure 5 This is a schematic structural diagram of an electronic device provided by the present invention. DETAILED DESCRIPTION
[0058] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0059] With the rapid development of computing power networks, the number of computing nodes in computing power networks is increasing. Due to the differences between computing nodes in computing power networks, for example, due to different construction periods and construction standards of computing nodes, the computing speeds, computing power resources, etc. of computing nodes in the same computing power network vary greatly, which in turn leads to different user experiences. Therefore, it is particularly important to recommend a suitable and balanced computing node as the user's computing power source.
[0060] At present, the target computing node for scheduling is determined based on the load of each computing node in the computing network, and the target computing node is scheduled and allocated to the user. However, the above computing power scheduling method only considers the resource utilization of each computing node in the computing network, and does not consider whether it is suitable for the current user. It only allows users to passively accept the allocation of computing nodes, and does not actively select the computing node that is most suitable for their business for the user. That is, the users corresponding to the computing network lack subjective initiative, resulting in the target computing node for scheduling may not meet the actual business needs of users, which may cause various problems that affect user experience. For example, switching to the scheduled target computing node will increase business access delay, reduce business operation speed, increase operation and maintenance risks, etc., thereby reducing user experience; and the user experience is even worse than before the computing node scheduling, resulting in a significant reduction in the actual significance of computing power scheduling.
[0061] For example, the gateway device is connected to the computing power network scheduling and management platform, the computing power network scheduling and management platform is connected to the computing power service node, and the computing power network scheduling and management platform sends the computing power service node list to the gateway device; the gateway device updates the computing power service node list based on the computing power service information of the computing power service node, and sends the updated computing power service node list to the computing power network scheduling and management platform. For details, see CN114157667A-A computing power network service system and method for gateway devices. However, this solution schedules computing power by passively obtaining the system status of each computing power network node, and does not actively adjust according to the actual business of users on the computing power network, lacking subjective initiative.
[0062] For example, the scattered edge computing nodes are connected into a network, and the computing resources of the distributed edge computing nodes are used to improve the computing resource utilization of the edge computing nodes; by perceiving the network status and computing power of the edge computing nodes, the computing tasks can be distributed to the optimal edge computing nodes through the optimal network path, thereby optimizing the performance of the edge computing network and improving the distribution efficiency of computing tasks. For details, see CN113079218A-A service-oriented computing power network system, working method and storage medium. This invention can optimize the performance of the edge computing network, but ignores the customer's own business optimization needs for computing power network nodes, so there are certain limitations.
[0063] Even if at least one first computing power node that meets the user's computing power needs and the computing power resources to be scheduled for each first computing power node are determined through the node information of the computing node, the computing power resources to be scheduled for each first computing power node are allocated to the user, as shown in CN114500521A-A computing power scheduling method, device, scheduling equipment, system and storage medium. However, this solution still mainly determines the allocation of computing power nodes unilaterally by the computing power network manufacturer, and the only factors affecting the allocation are the computing power type, computing power resources and network information, which cannot bring effective experience improvement to customers in terms of customer business optimization.
[0064] In view of the above problems, the present invention proposes the following embodiments. Figure 1 One of the flowcharts of the computing node recommendation method provided by the present invention is as follows: Figure 1 As shown, the computing node recommendation method includes:
[0065] Step 110: Acquire business data of the user to be recommended, wherein the business data includes business situation data and business demand data.
[0066] Here, the user to be recommended is the user of the computing node to be recommended, including the existing network users and potential users of the computing network.
[0067] Here, the business situation data is used to characterize the basic situation information (business parameters) of the business. The business situation data may include but is not limited to at least one of the following: business system type, operation and maintenance access method, business system architecture, business-related AI algorithms, computing power technology stack manufacturers, business databases, business system manufacturers, etc.
[0068] Here, the business demand data is used to characterize the demand information required by the business. The business demand data may include but is not limited to at least one of the following: business data storage capacity, maximum business concurrency, business service population area, business data interaction area, node to user delay, business CPU (Central Processing Unit) computing power demand, business GPU (Graphics Processing Unit) computing power demand, etc.
[0069] In one embodiment, the business data is collected by the account manager. Furthermore, the business data is obtained by further data preprocessing of the initial data collected by the account manager, that is, the data preprocessing obtains the actual business data required. For example, the actual business parameters and business requirements of the recommended users are collected through various forms such as home visits, telephone communications, and questionnaires by the account manager; that is, according to the demand description of the recommended user, or through the collection of the user's actual needs, the user's actual business parameters and computing power requirements are uploaded and summarized.
[0070] Step 120, based on the business data, obtain node data of each computing node in the computing power network, and the node data is data corresponding to the business data.
[0071] Here, the computing power network is the current target computing power network, which includes multiple computing nodes for determining the computing node to be recommended from each computing node in the computing power network.
[0072] It should be noted that the subsequent node data needs to be compared with the business data, so the corresponding node data needs to be obtained based on the business data. Correspondingly, the node data also includes node business situation data and node business demand data.
[0073] For example, if the business situation data includes the business system type, then the node business situation data includes at least one business system type that the node has historically carried; if the business situation data includes the operation and maintenance access method, then the node business situation data includes at least one operation and maintenance access method that the node has supported; if the business situation data includes the business system architecture, then the node business situation data includes at least one business system architecture that the node has historically carried; if the business situation data includes the business-related AI algorithm, then the node business situation data includes at least one AI algorithm that the node can provide; if the business situation data includes the computing power technology stack manufacturer, then the node business situation data includes the computing power technology stack manufacturer of the node; if the business situation data includes the business database, then the node business situation data includes at least one database that the node can provide; if the business situation data includes the business system manufacturer, then the node business situation data includes the business system manufacturer with which the node has cooperated.
[0074] For example, if the business demand data includes the business data storage capacity, the node business demand data includes the remaining data storage capacity of the node; if the business demand data includes the maximum business concurrency, the node business demand data includes the maximum business concurrency supported by the node; if the business demand data includes the business service population area, the node business demand data includes the node low-latency covered area; if the business demand data includes the business data interaction area, the node business demand data includes the node low-latency covered area; if the business demand data includes the delay from the node to the user, the node business demand data includes the delay from the node to the user; if the business demand data includes the business CPU computing power demand, the node business demand data includes the node CPU remaining capacity; if the business demand data includes the business GPU computing power demand, the node business demand data includes the node GPU remaining capacity (the node's memory remaining capacity).
[0075] In one embodiment, node data of each computing node in the computing power network is obtained from a computing power network management platform corresponding to the computing power network.
[0076] Step 130: Determine the degree of compatibility between each of the computing nodes and the user to be recommended based on the comparison results between each of the node data and the business data.
[0077] Here, the adaptability is used to characterize the matching degree between the computing node and the user to be recommended, that is, to characterize the matching degree between the computing node and the service data of the user to be recommended. The adaptability can be characterized by a score, and the higher the score, the more adaptable it is.
[0078] For the node data of any computing node, the compatibility between the computing node and the user to be recommended is determined based on the comparison result between the node data and the business data, that is, one computing node corresponds to one compatibility.
[0079] Considering that the greater the difference between the node data and the business data, the smaller the corresponding degree of adaptation, therefore, the degree of adaptation can be determined based on the comparison results between the two.
[0080] Specifically, based on the comparison results of the business situation data of each node with the business situation data, the adaptability of each computing node to the business situation of the user to be recommended is determined; based on the comparison results of the business demand data of each node with the business demand data, the adaptability of each computing node to the business demand of the user to be recommended is determined; based on the adaptability of each business situation and the adaptability of each business demand, the adaptability of each computing node to the user to be recommended is determined.
[0081] In one embodiment, any fitness degree is determined based on a weighted aggregation result of a business situation fitness degree corresponding to the same computing node and a business demand fitness degree corresponding to the same computing node.
[0082] In another embodiment, any degree of fitness is determined based on the aggregated result of the business situation fitness corresponding to the same computing node and the business demand fitness corresponding to the same computing node. The aggregated result can be obtained by addition processing. Of course, the total degree of fitness can also be obtained by combining the two in other ways.
[0083] Step 140: Based on the fitness degrees, determine a target computing node with the greatest fitness degree with the to-be-recommended user from among the computing nodes, and determine the target computing node as a recommended computing node recommended to the to-be-recommended user.
[0084] Here, the target computing node is the computing node with the greatest degree of adaptation to the user to be recommended among all computing nodes. The target computing node is the computing node that is currently most suitable for the user to be recommended among all computing nodes, so the adaptation result between the target computing node and the user to be recommended can be determined as adaptation.
[0085] Specifically, the maximum fitness degree among the fitness degrees is determined, and the target computing node corresponding to the maximum fitness degree is determined. More specifically, the fitness degrees are sorted in descending order to determine the maximum fitness degree.
[0086] In one embodiment, if the user to be recommended is an existing user of the computing network (i.e., the current user of the computing network), the existing computing nodes (existing nodes in use) of the user to be recommended in the computing network are compared. If the two are inconsistent, the recommended computing node is output to the user to be recommended, or a node switching operation is directly performed to switch the computing node of the user to be recommended to the recommended computing node. The method of outputting the recommended computing node to the user to be recommended may include, but is not limited to: telephone, email, text message, etc.
[0087] In one embodiment, if the user to be recommended is a potential user of the computing network (i.e., not a current user of the computing network), the recommended computing node can be output to the potential user, or the recommended computing node can be output to the account manager corresponding to the potential user, so that the account manager can initiate precision marketing, such as making a phone call or visiting the customer to recommend the node. The output method of the recommended computing node can include but is not limited to: phone, email, text message, etc.
[0088] Furthermore, considering that the computing nodes of the computing power network will continue to increase and the user's business data will continue to change, that is, the user's business situation and business needs will continue to change, resulting in the inability to keep up with the actual development of business needs. Based on this, the computing node recommendation method is periodically executed to further improve the user experience of the computing power network; and ensure that the business prevents various problem risks before major changes or problems occur in the computing nodes of the computing power network, making it more intelligent and automated.
[0089] The computing node recommendation method provided by the embodiment of the present invention obtains the node data of each computing node in the computing power network based on the business data of the user to be recommended, and the node data is data corresponding to the business data, so as to determine the fitness of each computing node and the user to be recommended based on the comparison results of each node data with the business data, thereby realizing active evaluation of the fitness of each computing node and the user to be recommended, and determining the recommended computing node with the greatest fitness with the user to be recommended from each computing node, so as to actively select the computing node that is most suitable for the user to be recommended, instead of passively accepting the scheduling of the computing power network, thereby improving the user experience of the computing power network; and the business data includes business situation data and business demand data, so as to take the business situation and business demand of the user to be recommended as the core consideration factors, so as to more accurately determine the fitness of each computing node and the user to be recommended, that is, to improve the recommendation accuracy of the computing node, and then make the recommended computing node more in line with the actual business needs of the user, thereby improving the user satisfaction and ultimately improving the user experience of the computing power network.
[0090] Based on the above embodiment, the node data includes node service situation data corresponding to the service situation data, and node service demand data corresponding to the service demand data. Figure 2 The second flowchart of the computing node recommendation method provided by the present invention is as follows: Figure 2 As shown, the above step 130 includes:
[0091] Step 131 : determining the degree of compatibility between the business situation of each computing node and the user to be recommended based on the comparison results between the business situation data of each node and the business situation data.
[0092] For the node business situation data of any computing node, the business situation suitability between the computing node and the user to be recommended is determined based on the comparison result between the node business situation data and the business situation data. One node business situation data corresponds to one business situation suitability. If there are multiple node business situation data, there are also multiple corresponding business situation suitability.
[0093] Considering that the greater the difference between the node business situation data and the business situation data, the smaller the corresponding business situation adaptation degree, therefore, based on the comparison results of the two, the business situation adaptation degree can be determined.
[0094] Step 132 : determining the degree of compatibility between each of the computing nodes and the business demand of the to-be-recommended user based on the comparison results between the business demand data of each of the nodes and the business demand data.
[0095] For the node business demand data of any computing node, the business demand adaptability between the computing node and the user to be recommended is determined based on the comparison result between the node business demand data and the business demand data. Specifically, the business demand adaptability is determined based on the difference between the node business demand data and the business demand data. One node business demand data corresponds to one business demand adaptability. If there are multiple node business demand data, the corresponding business demand adaptability is also multiple.
[0096] Considering that the greater the difference between the node business demand data and the business demand data, the smaller the corresponding business demand adaptation degree, therefore, based on the comparison results of the two, the business demand adaptation degree can be determined.
[0097] Step 133, based on the adaptability of each business situation and the adaptability of each business demand, determine the adaptability of each computing node with the user to be recommended, wherein any adaptability is determined based on the weighted aggregation result of the adaptability of the business situation corresponding to the same computing node and the adaptability of the business demand corresponding to the same computing node.
[0098] For any computing node, based on the weight coefficient corresponding to each data in the business data, weighted aggregation processing is performed on the business situation adaptability of the computing node to the user to be recommended and the business demand adaptability of the computing node to the user to be recommended to obtain a weighted aggregation result, and the adaptability of the computing node to the user to be recommended is determined based on the weighted aggregation result. The weighted aggregation result can be further processed to obtain the adaptability, or the weighted aggregation result can be directly determined as the adaptability.
[0099] Furthermore, sample business data is obtained, and a computing node label corresponding to the sample business data is determined from each computing node, so as to optimize and update the weight coefficient corresponding to each data in the business data based on the sample business data and the computing node label.
[0100] Exemplarily, the fitness of each business situation and the fitness of each business requirement are input into the fitness calculation model to obtain the fitness output by the fitness calculation model. Further, the fitness calculation model can be optimized and updated based on the sample business data and the computing node label to update the weight coefficient and other coefficients corresponding to each data in the business data.
[0101] The computing node recommendation method provided by the embodiment of the present invention determines the fitness based on the weighted aggregation result of the business situation fitness corresponding to the computing node and the business demand fitness corresponding to the computing node. That is, while taking the business situation and business demand of the user to be recommended as the core consideration factors, the different degrees of influence of the business situation and business demand on the fitness are considered, so as to more accurately determine the fitness of each computing node and the user to be recommended, that is, further improve the recommendation accuracy of the computing node, and ultimately further improve the user experience of the computing power network.
[0102] Based on any of the above embodiments, in the method, any of the business situation adaptability is determined based on the following steps:
[0103] In a case where the node service situation data includes the service situation data, determining that the service situation adaptation degree is a high adaptation degree;
[0104] In a case where the node service situation data does not include the service situation data, determining that the service situation adaptability is a low adaptability;
[0105] The high degree of adaptation is greater than the low degree of adaptation.
[0106] It should be noted that the single item adaptability of the business situation data (business situation adaptability) can be directly obtained. There can be multiple types of business situation data, and accordingly, there can also be multiple business situation adaptability.
[0107] For example, the business situation data includes the business system type, and the node business situation data includes at least one business system type that the node has historically carried. If at least one business system type that the node has historically carried includes the business system type of the user to be recommended, the business situation adaptability is determined to be high, such as setting the business situation adaptability to 1, otherwise the business situation adaptability is determined to be low.
[0108] For example, the business situation data includes an operation and maintenance access method, and the node business situation data includes at least one operation and maintenance access method that the node already supports. Then, when at least one operation and maintenance access method that the node already supports includes the operation and maintenance access method of the user to be recommended, the business situation adaptability is determined to be a high adaptability, such as setting the business situation adaptability to a value of 1, otherwise the business situation adaptability is determined to be a low adaptability.
[0109] For example, the business situation data includes the business system architecture, and the node business situation data includes at least one business system architecture that the node has historically carried. If at least one business system architecture that the node has historically carried includes the business system architecture of the user to be recommended, the business situation adaptability is determined to be high, such as setting the business situation adaptability to 1, otherwise the business situation adaptability is determined to be low.
[0110] For example, the business situation data includes an AI algorithm involved in the business, and the node business situation data includes at least one AI algorithm that the node can provide. Then, when the at least one AI algorithm that the node can provide includes an AI algorithm involved in the business of the recommended user, the business situation adaptability is determined to be high, such as setting the business situation adaptability to 1, otherwise the business situation adaptability is determined to be low.
[0111] For example, the business situation data includes the computing power technology stack manufacturer, and the node business situation data includes the node's computing power technology stack manufacturer. If the node's computing power technology stack manufacturer includes the computing power technology stack manufacturer of the user to be recommended, the business situation adaptability is determined to be high adaptability, such as setting the business situation adaptability value to 1, otherwise the business situation adaptability is determined to be low adaptability.
[0112] For example, the business situation data includes a business database, and the node business situation data includes at least one database that the node can provide. If the at least one database that the node can provide includes the business database of the user to be recommended, the business situation adaptability is determined to be high, such as setting the business situation adaptability to 1, otherwise the business situation adaptability is determined to be low.
[0113] For example, the business situation data includes the business system manufacturer, and the node business situation data includes the business system manufacturer with which the node has cooperated. In the case that the business system manufacturer with which the node has cooperated includes the business system manufacturer of the user to be recommended, the business situation adaptability is determined to be high, such as setting the business situation adaptability value to 1, otherwise the business situation adaptability is determined to be low.
[0114] The computing node recommendation method provided by the embodiment of the present invention takes into account that when the node business situation data includes business situation data, the computing node has a higher degree of adaptability to the business situation of the user to be recommended, and when the node business situation data does not include business situation data, the computing node has a lower degree of adaptability to the business situation of the user to be recommended. Therefore, they are respectively determined as high adaptability and low adaptability, and the high adaptability is greater than the low adaptability, thereby realizing active evaluation of the adaptability of each computing node to the business situation of the user to be recommended, thereby improving the user experience of the computing power network.
[0115] Based on any of the above embodiments, in the method, determining that the service situation adaptability is low adaptability includes:
[0116] When the amount of situation data of the node business situation data is greater than a preset amount threshold, determining that the business situation adaptability is a first low adaptability;
[0117] When the amount of situation data of the node business situation data is less than or equal to a preset amount threshold, determining that the business situation adaptability is a second low adaptability;
[0118] The first low degree of adaptation is greater than the second low degree of adaptation.
[0119] Considering that in the case where the node business situation data does not include business situation data, if the number of situation data of the node business situation data is large, the business situation adaptability of the calculation node and the user to be recommended is also higher than that of the case where the number is small. Considering that the definition of more business situation data of different nodes is different, the preset number thresholds corresponding to different node business situation data can be different.
[0120] For example, the business situation data includes the business system type, and the node business situation data includes at least one business system type that the node has historically carried. If the number of at least one business system type is greater than a preset number threshold, the business situation adaptability is determined to be the first low adaptability, such as setting the business situation adaptability to 0.5; otherwise, the business situation adaptability is determined to be the second low adaptability, such as setting the business situation adaptability to 0.25.
[0121] For example, the business situation data includes an operation and maintenance access method, and the node business situation data includes at least one operation and maintenance access method supported by the node. If the number of at least one operation and maintenance access method is greater than a preset number threshold, the business situation adaptability is determined to be a first low adaptability, such as setting the business situation adaptability to 0.5; otherwise, the business situation adaptability is determined to be a second low adaptability, such as setting the business situation adaptability to 0.25.
[0122] For example, the business situation data includes a business system architecture, and the node business situation data includes at least one business system architecture that the node has historically carried. If the number of at least one business system architecture is greater than a preset number threshold, the business situation adaptability is determined to be a first low adaptability, such as setting the business situation adaptability to 0.5; otherwise, the business situation adaptability is determined to be a second low adaptability, such as setting the business situation adaptability to 0.25.
[0123] For example, the business situation data includes AI algorithms involved in the business, and the node business situation data includes at least one AI algorithm that the node can provide. If the number of at least one AI algorithm is greater than a preset number threshold, the business situation adaptability is determined to be the first low adaptability, such as setting the business situation adaptability to 0.5; otherwise, the business situation adaptability is determined to be the second low adaptability, such as setting the business situation adaptability to 0.25.
[0124] For example, the business situation data includes the computing power technology stack manufacturers, and the node business situation data includes the computing power technology stack manufacturers of the node. If the number of computing power technology stack manufacturers of the node is greater than the preset number threshold, the business situation adaptability is determined to be the first low adaptability, such as setting the business situation adaptability to 0.5; otherwise, the business situation adaptability is determined to be the second low adaptability, such as setting the business situation adaptability to 0.25.
[0125] For example, the business situation data includes a business database, and the node business situation data includes at least one database that the node can provide. If the number of at least one database is greater than a preset number threshold, the business situation adaptability is determined to be a first low adaptability, such as setting the business situation adaptability to 0.5; otherwise, the business situation adaptability is determined to be a second low adaptability, such as setting the business situation adaptability to 0.25.
[0126] For example, the business situation data includes business system manufacturers, and the node business situation data includes business system manufacturers with which the node has cooperated. If the number of business system manufacturers with which the node has cooperated is greater than a preset threshold, the business situation adaptability is determined to be the first low adaptability, such as setting the business situation adaptability to 0.5; otherwise, the business situation adaptability is determined to be the second low adaptability, such as setting the business situation adaptability to 0.25.
[0127] The computing node recommendation method provided by the embodiment of the present invention takes into account that if the amount of situation data of the node business situation data is large, the computing node has a higher degree of adaptability to the business situation of the user to be recommended, and if the amount of situation data of the node business situation data is small, the computing node has a lower degree of adaptability to the business situation of the user to be recommended. Therefore, the first low degree of adaptability and the second low degree of adaptability are respectively determined, and the first low degree of adaptability is greater than the second low degree of adaptability, so as to more accurately determine the degree of adaptability of the business situation of each computing node and the user to be recommended, thereby further improving the recommendation accuracy of the computing node, and ultimately further improving the user experience of the computing power network.
[0128] Based on any of the above embodiments, any of the business requirement adaptability is determined based on the following steps:
[0129] Determining a difference between the node service demand data and the service demand data;
[0130] The service demand adaptability is determined based on a ratio of the difference to the node service demand data.
[0131] Specifically, the ratio can be directly determined as the business demand adaptability, or the ratio can be further processed to obtain the business demand adaptability. There can be multiple types of business demand data, and accordingly, there can also be multiple business demand adaptability.
[0132] Exemplarily, the calculation formula of business demand adaptability is as follows:
[0133]
[0134] In the formula, P represents the adaptability of business requirements, d j Indicates the node business demand data, d y Represents business demand data.
[0135] For example, the business demand data includes the business data storage capacity, and the node business demand data includes the remaining data storage capacity of the node. The corresponding business demand adaptability calculation formula is as follows:
[0136]
[0137] For example, the business demand data includes the maximum concurrent business volume, and the node business demand data includes the maximum concurrent business volume supported by the node. The calculation formula for the corresponding business demand adaptability is as follows:
[0138]
[0139] For example, the business demand data includes the business service population area, and the node business demand data includes the node low latency coverage area. The calculation formula for the corresponding business demand adaptability is as follows:
[0140]
[0141] For example, the business demand data includes the business data interaction area, and the node business demand data includes the node low latency coverage area. The calculation formula for the corresponding business demand adaptability is as follows:
[0142]
[0143] For example, if the service demand data includes the delay from the node to the user, and the node service demand data includes the delay from the node to the user, the calculation formula for the corresponding service demand adaptability is as follows:
[0144]
[0145] For example, the business demand data includes the business CPU computing power demand, and the node business demand data includes the node's CPU surplus. The corresponding business demand adaptability calculation formula is as follows:
[0146]
[0147] For example, the business demand data includes the business GPU computing power demand, and the node business demand data includes the node's GPU remaining capacity. The corresponding business demand adaptation degree calculation formula is as follows:
[0148]
[0149] The computing node recommendation method provided by the embodiment of the present invention takes into account that when the node business demand data is greatly different from the business demand data, and the node business demand data is greater than the business demand data, the computing node can better meet the business demand of the user to be recommended, that is, the computing node has a high business demand adaptability to the user to be recommended. When the node business demand data is less different from the business demand data, or the node business demand data is less than the business demand data, it is difficult for the computing node to meet the business demand of the user to be recommended, that is, the computing node has a low business demand adaptability to the user to be recommended. Therefore, determining the difference between the node business demand data and the business demand data can more accurately determine the business demand adaptability of each computing node to the user to be recommended, thereby further improving the recommendation accuracy of the computing nodes, and ultimately further improving the user experience of the computing power network; and in order to better normalize the business demand adaptability, the business demand adaptability is determined based on the ratio of the difference to the node business demand data.
[0150] Based on any of the above embodiments, Figure 3 The third flowchart of the computing node recommendation method provided by the present invention is as follows: Figure 3 As shown, any of the fitness is determined based on the following steps:
[0151] Step 310: Determine each sub-adaptability based on the comparison result between each data in the node data and each data in the business data.
[0152] Here, the number of sub-adaptability (single-item adaptability) is the same as the number of service data. The determination method of the sub-adaptability can refer to the above embodiments, which will not be described here one by one.
[0153] For example, business data includes business system type, operation and maintenance access method, business system architecture, business-related AI algorithms, computing power technology stack manufacturers, business databases, business system manufacturers, business data storage capacity, maximum business concurrency, business service population area, business data interaction area, node to user delay, business CPU computing power demand, business GPU computing power demand, then the number of sub-adaptability is 14.
[0154] Step 320: Perform weighted aggregation processing on the sub-fitness degrees based on the weight coefficients corresponding to the data in the business data to obtain an aggregation result.
[0155] Taking into account that each data in the business data has different influences on the fitness, each sub-fitness is weighted and aggregated based on the weight coefficient corresponding to each data in the business data to more accurately determine the fitness between the computing node and the user to be recommended.
[0156] Exemplarily, the calculation formula of the aggregation result is as follows:
[0157]
[0158] In the formula, n represents the number of sub-fitness, x i represents the i-th sub-fitness among all sub-fitnesses, a i represents the i-th child fitness x i The corresponding weight coefficient (the weight coefficient corresponding to the i-th data in the business data).
[0159] Step 330: Determine the degree of adaptation based on the aggregation result.
[0160] Specifically, the aggregation result may be directly determined as the fitness degree, or the aggregation result may be further processed to obtain the fitness degree.
[0161] In one embodiment, the calculation formula of the fitness degree is as follows:
[0162]
[0163] In the formula, y represents the fitness, e represents the natural constant (Euler number), b represents the constant term, n represents the number of each sub-fitness, and x i represents the i-th sub-fitness among the sub-fitnesses, a i represents the i-th child fitness x i The corresponding weight coefficient.
[0164] In an alternative embodiment, each sub-fitness degree is input into a fitness degree calculation model to obtain a fitness degree output by the fitness degree calculation model. That is, the fitness degree calculation model is used to perform weighted aggregation processing on each sub-fitness degree based on the weight coefficient corresponding to each data in the business data to obtain an aggregation result, and determine the fitness degree based on the aggregation result.
[0165] In one embodiment, considering that the adaptation results of the business data of the user to be recommended to the computing node have only two results, suitable and unsuitable, the fitness calculation model can be constructed based on a binary logistic regression function. The binary logistic regression function is a machine learning algorithm for solving binary classification problems, so it can be used to calculate the possibility of suitability, that is, the calculation result can be output in the form of probability, so that the fitness can be well determined. For example, the adaptation results of the computing node and the user to be recommended are yes (1, suitable) and no (0, unsuitable), and the factors affecting the adaptation results are the sub-fitness degrees. At this time, the possibility that the adaptation result is yes (1, suitable) is determined as the fitness degree.
[0166] Exemplarily, the logistic regression relationship between the fitness degree and each sub-fitness degree is as follows:
[0167]
[0168] In the formula, y represents the fitness, b represents the constant term, n represents the number of sub-fitness, x i represents the i-th sub-fitness among all sub-fitnesses, a i represents the i-th child fitness x i The corresponding weight coefficient.
[0169] The computing node recommendation method provided in the embodiment of the present invention takes into account the different degrees of influence of various data in the business data on the fitness, and therefore performs weighted aggregation processing on each sub-fitness based on the weight coefficient corresponding to each data in the business data, so as to more accurately determine the fitness of the computing node and the user to be recommended, thereby further improving the recommendation accuracy of the computing node, and ultimately further improving the user experience of the computing power network.
[0170] Based on any of the above embodiments, in the method, each of the weight coefficients and the constant term is determined based on the following steps:
[0171] Acquire sample business data, and determine a computing node label corresponding to the sample business data from each computing node;
[0172] Determine the sample fitness of each computing node with the sample service data, and determine, based on each of the sample fitness, a sample recommendation computing node with the greatest fitness with the sample service data from among the computing nodes;
[0173] Determining a target sample fitness between the sample recommendation computing node and the sample business data from each of the sample fitnesses;
[0174] Determine the log-likelihood loss based on the comparison result between the sample recommendation computing node and the computing node label, and the target sample fitness;
[0175] Based on the log-likelihood loss, the weight coefficients and the constant term are optimized and updated.
[0176] Here, the sample business data is the business data of the user, which is used as training data. The computing node label is the computing node with the greatest adaptability to the sample business data, that is, the computing node label is the computing node with the greatest adaptability to the user corresponding to the sample business data. The number of the sample business data is multiple, for example, 500, that is, the business data of 500 users is used as training samples.
[0177] In one embodiment, sample service data is determined from historical service data of the computing power network. For example, sample service data with the highest user satisfaction is determined from historical service data of the computing power network.
[0178] Here, the method for determining the sample fitness is basically the same as the method for determining the fitness described above, and will not be described in detail here.
[0179] Here, the comparison result includes a result in which the sample recommended computing node and the computing node label are the same, and a result in which the sample recommended computing node and the computing node label are different.
[0180] It should be noted that one sample business data corresponds to one log-likelihood loss, that is, if there are multiple sample business data, there are also multiple log-likelihood losses.
[0181] Exemplarily, the calculation formula of log-likelihood loss is as follows:
[0182]
[0183] Where S represents the total log-likelihood loss; m represents the number of samples of sample business data; Z i Indicates the comparison result between the sample recommended computing node and the computing node label. If the two are the same, Z i =1, if they are not the same, then Z i =0;y i Indicates the sample fitness corresponding to the i-th sample business data.
[0184] In a specific embodiment, according to the changing law of the log-likelihood loss, a gradient descent algorithm is used to reduce the value of the log-likelihood loss, and the constant term and each weight coefficient are continuously and dynamically adjusted so that the training output results continue to approach the actual situation. At the end of the training, the model accuracy can reach the preset accuracy (such as 97.52%), that is, the accuracy of practical applications is achieved.
[0185] It can be understood that in other embodiments, only the weight coefficients may be optimized and updated based on the log-likelihood loss.
[0186] In an alternative embodiment, the fitness calculation model is used to determine the fitness of each sample. Based on this, the fitness calculation model is optimized and updated based on the log-likelihood loss. The log-likelihood loss always ignores the difference between the model calculation result and the true result.
[0187] Furthermore, the constant term and / or each weight coefficient may be preliminarily determined according to the influence of each data in the business data on the adaptability, and then optimized and updated in the above manner.
[0188] It should be noted that the weight coefficients and constant terms finally obtained by optimization can be saved, and then the weighted aggregation processing of each sub-fitness can be directly performed based on the weight coefficients corresponding to each data in the business data, thereby saving time, improving the recommendation efficiency of the computing node, and improving the accuracy of determining the fitness, so as to further improve the recommendation accuracy of the computing node.
[0189] The computing node recommendation method provided in the embodiment of the present invention optimizes and updates each weight coefficient and constant term in the above manner, thereby improving the accuracy of determining the degree of adaptation, further improving the accuracy of recommending computing nodes, and ultimately further improving the user experience of the computing power network.
[0190] Based on any of the above embodiments, in the method, the business situation data includes at least one of the business system type, operation and maintenance access method, business system architecture, business-related AI algorithms, computing power technology stack manufacturers, business databases, and business system manufacturers; the business demand data includes at least one of the business data storage capacity, maximum business concurrency, business service population area, business data interaction area, node to user delay, business central processing unit CPU computing power demand, and business graphics processor GPU computing power demand.
[0191] Based on any of the above embodiments, after the above step 140, the method further includes:
[0192] If the existing computing node of the user to be recommended is different from the recommended computing node, outputting node switching information for the user to be recommended to determine whether to trigger a user switching instruction, the node switching information indicating the recommended computing node;
[0193] If a user switching instruction is received, a node switching operation is performed based on the user switching instruction, so that the computing node of the user to be recommended is switched to the recommended computing node.
[0194] Here, the existing computing node is the computing node currently used by the user to be recommended. The user to be recommended is an existing network user of the computing power network.
[0195] Specifically, if the existing computing node of the user to be recommended is different from the recommended computing node, the node switching information is output to the user to be recommended. The output method of the node switching information may include but is not limited to: phone call, email, text message, etc.
[0196] Here, if the user switching instruction is received, it means that the user to be recommended agrees to replace the existing computing node with the recommended computing node.
[0197] In a specific embodiment, the computing power network management platform switches the computing node of the user to be recommended to the recommended computing node.
[0198] The computing node recommendation method provided by the embodiment of the present invention recommends the recommended computing node to the user to be recommended, and the user determines whether to switch the computing node, that is, whether to switch is determined according to the user's wishes, rather than passively accepting the node switching, thereby further improving the user experience of the computing power network.
[0199] Based on the above embodiments, the factors considered in traditional computing network node scheduling are basically limited to computing power perception and network perception, which are not closely related to the user's real experience. On this basis, the factors taken into consideration by the present invention innovatively introduce the user's business data, which can more accurately determine the degree of adaptation of the computing node to the user, thereby helping the user to select the best computing node.
[0200] The computing node recommendation device provided by the present invention is described below. The computing node recommendation device described below and the computing node recommendation method described above can be referred to each other.
[0201] Figure 4 A schematic diagram of the structure of the computing node recommendation device provided by the present invention is shown in FIG. Figure 4 As shown, the computing node recommended device includes:
[0202] A first acquisition module 410 is used to acquire business data of the user to be recommended, wherein the business data includes business situation data and business demand data;
[0203] A second acquisition module 420 is used to acquire node data of each computing node in the computing power network based on the business data, where the node data is data corresponding to the business data;
[0204] A suitability determination module 430, configured to determine the suitability of each computing node and the user to be recommended based on the comparison results of each node data and the business data;
[0205] The node recommendation module 440 is used to determine, based on the fitness degrees, from the computing nodes, a target computing node with the greatest fitness degree with the to-be-recommended user, and determine the target computing node as a recommended computing node recommended to the to-be-recommended user.
[0206] The computing node recommendation device provided by the embodiment of the present invention obtains the node data of each computing node in the computing power network based on the business data of the user to be recommended, and the node data is data corresponding to the business data, so as to determine the fitness of each computing node and the user to be recommended based on the comparison results of each node data with the business data, thereby realizing active evaluation of the fitness of each computing node and the user to be recommended, and determining the recommended computing node with the greatest fitness with the user to be recommended from each computing node, so as to actively select the computing node that is most suitable for the user to be recommended, instead of passively accepting the scheduling of the computing power network, thereby improving the user experience of the computing power network; and the business data includes business situation data and business demand data, so as to take the business situation and business demand of the user to be recommended as the core consideration factors, so as to more accurately determine the fitness of each computing node and the user to be recommended, that is, to improve the recommendation accuracy of the computing node, and then make the recommended computing node more in line with the actual business needs of the user, thereby improving the user satisfaction and ultimately improving the user experience of the computing power network.
[0207] Figure 5 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 5 As shown, the electronic device may include: a processor 510, a communication interface 520, a memory 530 and a communication bus 540, wherein the processor 510, the communication interface 520 and the memory 530 communicate with each other through the communication bus 540. The processor 510 may call the logic instructions in the memory 530 to execute the computing node recommendation method, which includes: obtaining the business data of the user to be recommended, the business data including business situation data and business demand data; based on the business data, obtaining the node data of each computing node in the computing network, the node data being data corresponding to the business data; based on the comparison results of each node data and the business data, determining the fitness of each computing node and the user to be recommended; based on each fitness, determining the target computing node with the largest fitness with the user to be recommended from each computing node, and determining the target computing node as the recommended computing node recommended to the user to be recommended.
[0208] In addition, the logic instructions in the above-mentioned memory 530 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.
[0209] On the other hand, the present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the computing node recommendation method provided by the above methods, which method includes: obtaining business data of the user to be recommended, and the business data includes business situation data and business demand data; based on the business data, obtaining node data of each computing node in the computing power network, and the node data is data corresponding to the business data; based on the comparison results of each node data with the business data, determining the fitness of each computing node with the user to be recommended; based on each fitness, determining the target computing node with the largest fitness with the user to be recommended from each computing node, and determining the target computing node as the recommended computing node recommended to the user to be recommended.
[0210] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the computing node recommendation method provided by the above-mentioned methods, the method comprising: obtaining business data of the user to be recommended, the business data comprising business situation data and business demand data; based on the business data, obtaining node data of each computing node in the computing power network, the node data being data corresponding to the business data; based on the comparison results of each of the node data with the business data, determining the fitness of each of the computing nodes with the user to be recommended; based on each of the fitness degrees, determining from each of the computing nodes a target computing node with the greatest fitness with the user to be recommended, and determining the target computing node as the recommended computing node recommended to the user to be recommended.
[0211] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0212] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0213] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A computing node recommendation method, characterized in that: include: Acquire business data of the user to be recommended, wherein the business data includes business situation data and business demand data; Based on the business data, obtaining node data of each computing node in the computing power network, wherein the node data is data corresponding to the business data; Based on the comparison results of each of the node data and the business data, determining the compatibility of each of the computing nodes and the to-be-recommended user; Based on the fitness degrees, a target computing node having the greatest fitness degree with the to-be-recommended user is determined from among the computing nodes, and the target computing node is determined as a recommended computing node recommended to the to-be-recommended user.
2. The computing node recommendation method according to claim 1, characterized in that: The node data includes node business situation data corresponding to the business situation data, and node business demand data corresponding to the business demand data; The determining, based on the comparison results of each of the node data and the business data, the degree of compatibility between each of the computing nodes and the to-be-recommended user, includes: Based on the comparison results of the business situation data of each node and the business situation data, determining the adaptability of each computing node to the business situation of the user to be recommended; Based on the comparison results of the business demand data of each node and the business demand data, determining the adaptability of each computing node to the business demand of the user to be recommended; Based on the adaptability of each business situation and the adaptability of each business demand, the adaptability of each computing node and the user to be recommended is determined, and any one of the adaptability is determined based on the weighted aggregation result of the adaptability of the business situation corresponding to the same computing node and the adaptability of the business demand corresponding to the same computing node.
3. The computing node recommendation method according to claim 2, characterized in that: The suitability of any of the business situations is determined based on the following steps: In a case where the node service situation data includes the service situation data, determining that the service situation adaptation degree is a high adaptation degree; In a case where the node service situation data does not include the service situation data, determining that the service situation adaptability is a low adaptability; The high degree of adaptation is greater than the low degree of adaptation.
4. The computing node recommendation method according to claim 3, characterized in that: Determining that the service situation adaptability is low adaptability includes: When the amount of situation data of the node business situation data is greater than a preset amount threshold, determining that the business situation adaptability is a first low adaptability; When the amount of situation data of the node business situation data is less than or equal to a preset amount threshold, determining that the business situation adaptability is a second low adaptability; The first low degree of adaptation is greater than the second low degree of adaptation.
5. The computing node recommendation method according to claim 2, characterized in that: The suitability of any of the business requirements is determined based on the following steps: Determining a difference between the node service demand data and the service demand data; The service demand adaptability is determined based on a ratio of the difference to the node service demand data.
6. The computing node recommendation method according to claim 1, characterized in that: Any of the above mentioned fitness is determined based on the following steps: Determine each sub-adaptability based on the comparison results of each data in the node data and each data in the business data; Based on the weight coefficient corresponding to each data in the business data, weighted aggregation processing is performed on each sub-fitness degree to obtain an aggregation result; Based on the aggregation result, the degree of fitness is determined.
7. The computing node recommendation method according to claim 6, characterized in that: The calculation formula of the fitness degree is as follows: In the formula, y represents the fitness, e represents the natural constant, b represents the constant term, n represents the number of each sub-fitness, x i represents the i-th sub-fitness among the sub-fitnesses, a i represents the i-th child fitness x i The corresponding weight coefficient.
8. The computing node recommendation method according to claim 7, characterized in that: Each of the weight coefficients and the constant term is determined based on the following steps: Acquire sample business data, and determine a computing node label corresponding to the sample business data from each computing node; Determine the sample fitness of each computing node with the sample service data, and determine, based on each of the sample fitness, a sample recommendation computing node with the greatest fitness with the sample service data from among the computing nodes; Determining a target sample fitness between the sample recommendation computing node and the sample business data from each of the sample fitnesses; Determining a log-likelihood loss based on a comparison result between the sample recommendation computing node and the computing node label, and the target sample fitness; Based on the log-likelihood loss, the weight coefficients and the constant term are optimized and updated.
9. The computing node recommendation method according to any one of claims 1 to 8, characterized in that: The business situation data includes at least one of the business system type, operation and maintenance access method, business system architecture, business-related AI algorithms, computing power technology stack manufacturers, business databases, and business system manufacturers; The business demand data includes at least one of business data storage capacity, maximum business concurrency, business service population area, business data interaction area, node-to-user delay, business central processing unit CPU computing power demand, and business graphics processing unit GPU computing power demand.
10. The computing node recommendation method according to any one of claims 1 to 8, characterized in that: The step of determining the target computing node as a recommended computing node to be recommended to the user to be recommended further comprises: If the existing computing node of the user to be recommended is different from the recommended computing node, outputting node switching information for the user to be recommended to determine whether to trigger a user switching instruction, the node switching information indicating the recommended computing node; If a user switching instruction is received, a node switching operation is performed based on the user switching instruction, so that the computing node of the user to be recommended is switched to the recommended computing node.
11. A computing node recommendation device, characterized in that: include: A first acquisition module is used to acquire business data of the user to be recommended, wherein the business data includes business situation data and business demand data; A second acquisition module is used to acquire node data of each computing node in the computing power network based on the business data, wherein the node data is data corresponding to the business data; A compatibility determination module, used to determine the compatibility of each computing node with the user to be recommended based on the comparison results of each node data with the business data; The node recommendation module is used to determine, based on the fitness degrees, from the computing nodes a target computing node with the greatest fitness degree with the user to be recommended, and determine the target computing node as a recommended computing node recommended to the user to be recommended.
12. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the computing node recommendation method according to any one of claims 1 to 10 is implemented.
13. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the computing node recommendation method according to any one of claims 1 to 10 is implemented.
