Data center low-carbon control method and system and storage medium
By analyzing the information data of the data center in different periods, the energy consumption control period is determined and the energy consumption control method is optimized, which solves the problem of insufficient reliability in energy consumption control in the existing technology and achieves dual optimization of energy consumption and reliability.
Patent Information
- Application Number
- CN202410766439.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-06-14
AI Technical Summary
The existing technology fails to consider the reliability requirements of data processing when controlling data center energy consumption, making it difficult to ensure the reliability of energy consumption control during periods of large data volume.
By obtaining the information data of the data center in different periods, analyzing the historical processing conditions and data processing fluctuation probability, the energy consumption control period is determined, and the minimum operating quantity and temperature control interval are used as constraints, and the energy consumption control method is determined with the goal of lowest carbon emissions. .
It achieves accurate control of energy consumption in different periods, ensures the reliability of data processing, and reduces carbon emissions.
Smart Images

Figure CN118819271A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of data centers, and in particular, relates to a low-carbon control method, system and storage medium for a data center. Background Art
[0002] With the rapid development of informatization and digitalization, data centers, as central nodes for data transmission and analysis, play a key role in the entire information system. However, at the same time, due to the high power consumption of data centers, how to achieve low-carbon and energy-saving control of data centers has become a technical problem that needs to be solved urgently.
[0003] In order to solve the above technical problems, in the invention patent application CN202111443556.4 "A data center energy consumption prediction optimization method, system, medium and computing device", the overall energy consumption of the data center is minimized, and the data center energy consumption optimization model is solved to obtain the optimization execution strategy, so as to realize the lean control of data center energy consumption based on the joint regulation of the refrigeration system, server and its load. However, it is not difficult to find the following technical problems through analysis:
[0004] When performing energy consumption control in the existing technical solutions, the determination of differentiated energy consumption control modes based on the reliability requirements of the data processed by the data center is not considered. In different time periods, the amount of data processed by the data center varies greatly. If the same energy consumption control mode is used, it is impossible to ensure the reliability of data processing during the time periods when the amount of data processed is large.
[0005] In response to the above technical problems, the present invention provides a data center low-carbon control method, system and storage medium. Summary of the invention
[0006] To achieve the purpose of the present invention, the present invention adopts the following technical solutions:
[0007] According to one aspect of the present invention, a low-carbon control method for a data center is provided.
[0008] A low-carbon control method for a data center, characterized by comprising:
[0009] S1 obtains the historical processing of information data in different time periods of the data center, and determines the possibility of energy consumption control in different time periods and the energy consumption control period according to the historical processing situation. When the time period is the energy consumption control period, proceed to the next step;
[0010] S2 determines the deviation between different adjacent operating time periods and historical processing conditions through the processing conditions of the information data of the adjacent operating time periods, and when it is determined based on the deviation conditions that the data processing fluctuation probability of the time period meets the requirements, proceeds to the next step;
[0011] S3: When it is determined that the energy consumption of the time period can be controlled through the energy consumption control possibilities of different future adjacent time periods and the time interval between the time period and the time period, the next step is entered;
[0012] S4 determines the minimum number of operating servers in the time period based on the probability of data processing fluctuations and the possibility of energy consumption control in the time period, determines the temperature control range of the matching data center through the processing of information data of different servers, and uses the minimum number of operating servers and temperature control range as constraints to determine the energy consumption control method for the time period with the goal of minimizing carbon emissions.
[0013] The beneficial effects of the present invention are:
[0014] 1. The possibility of energy consumption control in different time periods and the determination of energy consumption control time periods are carried out according to the historical processing conditions, thereby realizing the evaluation of the possibility of energy consumption control in different time periods from the perspective of the historical processing data volume, avoiding the technical problem that the reliability of data processing cannot meet the requirements due to energy consumption control in time periods with a large amount of processing data, and realizing accurate control of energy consumption in different time periods.
[0015] 2. Taking the minimum number of operations and the temperature control range as constraints and the lowest carbon emissions as the goal, the energy consumption control method for the time period is determined. This not only takes into account the differences in temperature control requirements due to differences in the amount of data processed by the servers, but also further combines the constraint of the minimum number of operations of the servers to ensure the reliability of data processing in the said time period while ensuring the lowest carbon emissions.
[0016] A further technical solution is that the historical processing status of the information data includes the historical processing data volume of the information data on different dates and the change in the historical processing data volume between different adjacent dates.
[0017] A further technical solution is that the method for determining the possibility of energy consumption control in the time period is:
[0018] Determine the historical data processing volume of the information data of the period on different dates according to the historical processing situation of the information data of the period, and determine the data processing difficulty of the information data of the period based on the historical data processing volume;
[0019] Obtaining a change in the amount of historical processed data in the time period between different adjacent dates, and determining a processing change in the information data in the time period based on the change in the amount of historical processed data in the time period between different adjacent dates;
[0020] The possibility of energy consumption control in the time period is determined according to the processing variation of the information data in the time period and the difficulty of data processing.
[0021] A further technical solution is that when the possibility of energy consumption control in the time period is within a set interval, the time period is determined to be an energy consumption control time period.
[0022] A further technical solution is that, when the time period does not belong to the energy consumption control time period, there is no need to perform energy consumption control processing in the time period.
[0023] A further technical solution is that the temperature control range of the matching data center is determined according to the processing data volume of the information data of the server.
[0024] A further technical solution is to determine the energy consumption control method for the time period, specifically including:
[0025] Determine the predicted processing data volume of the information data of the server in the period based on the historical processing status of the information data;
[0026] Based on the preset processing data volume and the minimum running number, determine the temperature control range of the data center under different running numbers of servers, and determine the energy consumption under different running numbers of servers in combination with the processing data volume of different servers;
[0027] Based on the energy consumption under different numbers of running servers, the carbon emissions under different numbers of running servers are determined according to the corresponding function of energy consumption and carbon emissions, and the energy consumption control method of the time period is determined with the lowest carbon emissions as the goal.
[0028] A further technical solution is that the predicted processing data volume of the information data of the server in the period is determined according to the average value of the historical processing data volume of the information data in the period on different dates.
[0029] In a second aspect, the present invention provides a computer system comprising: a memory and a processor connected in communication, and a computer program stored in the memory and capable of running on the processor, characterized in that: when the processor runs the computer program, it executes the above-mentioned low-carbon control method for a data center.
[0030] In a third aspect, the present invention provides a computer storage medium having a computer program stored thereon, which, when executed in a computer, causes the computer to execute the above-mentioned low-carbon control method for a data center.
[0031] Other features and advantages will be described in the following description. The objects and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description and drawings.
[0032] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the attached drawings.
[0034] Figure 1 It is a flow chart of a low-carbon control method for a data center;
[0035] Figure 2 is a flow chart of a method for determining the possibility of energy consumption control in a time period;
[0036] Figure 3 It is a flow chart of a method for determining the probability of data processing fluctuations during a time period meeting the requirements;
[0037] Figure 4 is a flow chart of a method for determining a time period capable of energy consumption control;
[0038] Figure 5 is a flow chart of a method for determining a minimum number of running servers for a time period;
[0039] Figure 6 It is a framework diagram of a computer storage medium. DETAILED DESCRIPTION
[0040] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on the embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this specification.
[0041] The following will further elaborate from two perspectives: method-based embodiments and system-based embodiments.
[0042] Method Example
[0043] To solve the above problems, according to one aspect of the present invention, Figure 1 As shown, a data center low-carbon control method is provided, which is characterized by specifically including:
[0044] S1 obtains the historical processing of information data in different time periods of the data center, and determines the possibility of energy consumption control in different time periods and the energy consumption control period according to the historical processing situation. When the time period is the energy consumption control period, proceed to the next step;
[0045] Furthermore, the historical processing status of the information data includes the historical processing data volume of the information data on different dates and the change in the historical processing data volume between different adjacent dates.
[0046] Specifically, Figure 2 As shown, the method for determining the possibility of energy consumption control in the time period is:
[0047] Determine the historical data processing volume of the information data of the period on different dates according to the historical processing situation of the information data of the period, and determine the data processing difficulty of the information data of the period based on the historical data processing volume;
[0048] Obtaining a change in the amount of historical processed data in the time period between different adjacent dates, and determining a processing change in the information data in the time period based on the change in the amount of historical processed data in the time period between different adjacent dates;
[0049] The possibility of energy consumption control in the time period is determined according to the processing variation of the information data in the time period and the difficulty of data processing.
[0050] Furthermore, when the energy consumption control possibility of the time period is within a set interval, the time period is determined to be an energy consumption control time period.
[0051] Specifically, when the time period does not belong to the energy consumption control time period, there is no need to perform energy consumption control processing in the time period.
[0052] The possibility of energy consumption control in different time periods and the determination of energy consumption control time periods are determined based on historical processing conditions.
[0053] In another embodiment, the method for determining the possibility of energy consumption control in the time period is:
[0054] S11 determines the historical data processing volume of the information data of the time period on different dates through the historical processing of the information data of the time period, and uses the date on which the historical data processing volume of the information data is greater than the preset processing data volume as the screening processing date, and judges whether the number of the screening processing dates meets the requirement, if so, proceeds to the next step, if not, determines that the time period does not belong to the energy consumption control period;
[0055] S12: obtaining the number of screening processing dates of the time period, and determining the screening processing difficulty of the time period in combination with the historical data processing amount of information data of different screening processing dates, and judging whether the screening processing difficulty of the time period is within a preset range, if so, proceeding to the next step, if not, determining that the time period does not belong to the energy consumption control period;
[0056] S13 determines the data processing difficulty of the information data of the period based on the historical data processing volume of different dates in the period and the screening processing difficulty of the period, and judges whether the data processing difficulty of the information data of the period is greater than the preset processing difficulty. If so, proceed to the next step; if not, proceed to step S15;
[0057] S14: obtaining the variation of the amount of historical processed data in the time period between different adjacent dates, and determining the variation of the amount of information data processed in the time period based on the variation of the amount of historical processed data in the time period between different adjacent dates, and judging whether the variation of the amount of information data processed meets the requirement, if yes, proceeding to the next step, if no, determining that the time period does not belong to the energy consumption control time period;
[0058] S15 determines the possibility of energy consumption control in the time period according to the processing variation of the information data in the time period and the difficulty of data processing.
[0059] In another embodiment, the method for determining the possibility of energy consumption control in the time period is:
[0060] S21 determines the historical data processing volume of the information data of the period on different dates through the historical processing of the information data of the period, and takes the date on which the historical data processing volume of the information data is greater than the preset processing volume as the screening processing date, and judges whether the number of the screening processing dates is greater than the preset number of dates, if so, proceeds to step S23, if not, proceeds to the next step;
[0061] S22: obtaining the number of screening processing dates of the time period, and determining the screening processing difficulty of the time period in combination with the historical data processing volume of information data of different screening processing dates, determining the data processing difficulty of the information data of the time period based on the historical data processing volume of different dates of the time period and the screening processing difficulty of the time period, and judging whether the data processing difficulty of the information data of the time period is greater than the preset processing difficulty, if so, proceeding to the next step, if not, proceeding to step S25;
[0062] S23 obtains the change amount of the historical processed data volume in the time period between different adjacent dates, and takes the date whose change amount does not meet the requirement as the abnormal change date, and determines whether the number of the abnormal change dates meets the requirement, if so, proceeds to the next step, if not, determines that the time period does not belong to the energy consumption control period;
[0063] S24 determines the processing change amount of the information data in the period based on the change amount of the historical processing data in the period between different adjacent dates, and whether the processing change amount of the information data meets the requirements. If so, proceed to the next step; if not, determine that the period does not belong to the energy consumption control period;
[0064] S25 determines the possibility of energy consumption control in the time period according to the processing variation of the information data in the time period and the difficulty of data processing.
[0065] S2 determines the deviation between different adjacent operating time periods and historical processing conditions through the processing conditions of the information data of the adjacent operating time periods, and when it is determined based on the deviation conditions that the data processing fluctuation probability of the time period meets the requirements, proceeds to the next step;
[0066] Specifically, Figure 3 As shown, determining that the probability of data processing fluctuation in the time period meets the requirements specifically includes:
[0067] Determine the deviation between the processing conditions of the information data in different adjacent operating periods and the historical processing conditions on different dates based on the historical processing conditions of the information data in different adjacent operating periods, and determine the fluctuation of the processing data in different adjacent operating periods based on the deviation;
[0068] Determine the basic weight values of different adjacent operating time periods by the interval lengths between different adjacent operating time periods and the time period, and determine the data processing fluctuation probability of the time period in combination with the processed data fluctuation amounts of different adjacent operating time periods;
[0069] A preset probability threshold and the data processing fluctuation probability of the time period are used to determine whether the data processing fluctuation probability of the time period meets the requirement.
[0070] Further, using a preset probability threshold and the data processing fluctuation probability of the time period to determine whether the data processing fluctuation probability of the time period meets the requirement, specifically includes:
[0071] When the data processing fluctuation probability of the time period is less than the preset probability threshold, it is determined that the data processing fluctuation probability of the time period meets the requirement.
[0072] It should be noted that when the data processing fluctuation probability in the time period does not meet the requirements, there is no need to perform energy consumption control processing in the time period.
[0073] In another embodiment, determining that the probability of data processing fluctuation during the time period meets the requirement specifically includes:
[0074] Determine the deviation between the processing conditions of information data in different adjacent operating periods and the historical processing conditions on different dates based on the historical processing conditions of information data in different adjacent operating periods, and determine the fluctuation amounts of processed data in different adjacent operating periods based on the deviation amounts, and judge whether there is an adjacent operating period whose fluctuation amount of processed data does not meet the requirements. If so, proceed to the next step; if not, determine whether the data processing fluctuation probability of the period meets the requirements;
[0075] The adjacent operation time periods in which the processing data fluctuation amount does not meet the requirement are taken as adjacent fluctuation time periods, and whether the number of the adjacent fluctuation time periods meets the requirement is determined, and if so, the next step is entered; if not, it is determined that the data processing fluctuation probability of the time period does not meet the requirement;
[0076] Determine the basic weight values of different adjacent operating time periods by the interval lengths between different adjacent operating time periods and the time period, and judge whether the sum of the basic weight values of the adjacent fluctuation time periods meets the requirements. If so, proceed to the next step; if not, determine that the data processing fluctuation probability of the time period does not meet the requirements;
[0077] Determine the comprehensive fluctuation amount by using the basic weight values of different adjacent fluctuation periods, the fluctuation amount of processed data, and the number of adjacent fluctuation periods, and judge whether the comprehensive fluctuation amount meets the requirements. If so, proceed to the next step; if not, determine that the data processing fluctuation probability of the period does not meet the requirements;
[0078] The data processing fluctuation probability of different adjacent operating time periods is determined according to the basic weight values of the different adjacent operating time periods and the processing data fluctuation amounts of the different adjacent operating time periods, and whether the data processing fluctuation probability of the time period meets the requirements is determined using the preset probability threshold and the data processing fluctuation probability of the time period.
[0079] In another embodiment, determining that the probability of data processing fluctuation during the time period meets the requirement specifically includes:
[0080] Determine the deviation between the processing conditions of information data in different adjacent operating periods and the historical processing conditions on different dates based on the historical processing conditions of information data in different adjacent operating periods, and determine the fluctuation amounts of processed data in different adjacent operating periods based on the deviation amounts, and judge whether there is an adjacent operating period whose fluctuation amount of processed data does not meet the requirements. If so, proceed to the next step; if not, determine whether the data processing fluctuation probability of the period meets the requirements;
[0081] The adjacent operation time period in which the processing data fluctuation amount does not meet the requirements is taken as the adjacent fluctuation time period, and the adjacent operation time period with an interval time length less than a preset time length is taken as the adjacent operation time period, and it is determined whether there is an adjacent fluctuation time period in the adjacent operation time period, if so, it is determined that the data processing fluctuation probability of the time period does not meet the requirements, if not, proceed to the next step;
[0082] Determine the basic weight values of different adjacent operating time periods by the interval lengths between different adjacent operating time periods and the time period, obtain the number of adjacent fluctuation time periods and the proportion of the number in the adjacent operating time periods, and determine the fluctuation amount evaluation value of the adjacent fluctuation time period in combination with the basic weight values of different adjacent fluctuation time periods, and judge whether the fluctuation amount evaluation value of the adjacent fluctuation time period meets the requirements. If not, determine that the data processing fluctuation probability of the time period does not meet the requirements. If so, proceed to the next step;
[0083] The comprehensive fluctuation amount is determined by the basic weight values of different adjacent fluctuation time periods, the processing data fluctuation amount, and the number of adjacent fluctuation time periods; the data processing fluctuation probability of the time period is determined according to the basic weight values of different adjacent operating time periods and the processing data fluctuation amount of different adjacent operating time periods; and whether the data processing fluctuation probability of the time period meets the requirements is determined using the preset probability threshold and the data processing fluctuation probability of the time period.
[0084] S3: When it is determined that the energy consumption of the time period can be controlled through the energy consumption control possibilities of different future adjacent time periods and the time interval between the time period and the time period, the next step is entered;
[0085] Furthermore, the future adjacent time period is a time period within a preset time threshold after the time period.
[0086] Specifically, Figure 4 As shown, determining that energy consumption control can be performed during the time period specifically includes:
[0087] Dividing the future adjacent time periods into energy consumption control time periods and energy consumption uncontrollable time periods based on the energy consumption control possibility of the future adjacent time periods;
[0088] Determine the basic running quantity of servers in different energy consumption control periods according to the energy consumption control possibilities in different energy consumption control periods, and determine the fluctuation amount of the start-up quantity of servers in the energy consumption control period in combination with the time interval between different energy consumption control periods and the period;
[0089] Determine the fluctuation amount of the number of servers started in the energy-uncontrollable period based on the number of different energy-uncontrollable periods and the time intervals between the different energy-uncontrollable periods and the period;
[0090] The fluctuation amount of the number of servers turned on during the energy consumption uncontrollable period and the fluctuation amount of the number of servers turned on during the energy consumption control period are used to calculate the comprehensive fluctuation amount of the number of servers turned on, and whether energy consumption control can be performed in the period is determined based on the comprehensive fluctuation amount.
[0091] Further, determining whether energy consumption control can be performed in the time period based on the comprehensive fluctuation amount of the quantity specifically includes:
[0092] When the comprehensive fluctuation amount of the quantity does not meet the requirement, it is determined that energy consumption control cannot be performed during the time period.
[0093] In another embodiment, determining that the time period is capable of energy consumption control specifically includes:
[0094] Based on the possibility of energy consumption control of the future adjacent time periods, the future adjacent time periods are divided into energy consumption control time periods and energy consumption uncontrollable time periods, and whether the number of the energy consumption uncontrollable time periods meets the requirement is determined, if yes, then the next step is entered, if not, it is determined that the time periods cannot be energy consumption controlled;
[0095] Determine the fluctuation amount of the number of servers turned on during the uncontrollable energy consumption period based on the number of different uncontrollable energy consumption periods and the time interval between the different uncontrollable energy consumption periods and the period, and judge whether the fluctuation amount of the number of servers turned on during the uncontrollable energy consumption period meets the requirement, if yes, proceed to the next step, if not, determine that the period cannot be energy-controlled;
[0096] Determine the basic running quantity of servers in different energy consumption control periods according to the energy consumption control possibilities in different energy consumption control periods, and determine the fluctuation amount of the start-up quantity of servers in the energy consumption control period in combination with the time interval between different energy consumption control periods and the period;
[0097] The fluctuation amount of the number of servers turned on during the energy consumption uncontrollable period and the fluctuation amount of the number of servers turned on during the energy consumption control period are used to calculate the comprehensive fluctuation amount of the number of servers turned on, and whether energy consumption control can be performed in the period is determined based on the comprehensive fluctuation amount.
[0098] S4 determines the minimum number of operating servers in the time period based on the probability of data processing fluctuations and the possibility of energy consumption control in the time period, determines the temperature control range of the matching data center through the processing of information data of different servers, and uses the minimum number of operating servers and temperature control range as constraints to determine the energy consumption control method for the time period with the goal of minimizing carbon emissions.
[0099] Specifically, Figure 5 As shown, the method for determining the minimum number of running servers in the time period is:
[0100] Determine the preset running quantity corresponding to the data processing fluctuation probability of the time period according to the data processing fluctuation probability of the time period, and use it as the fluctuation preset quantity;
[0101] Determine the preset running quantity corresponding to the energy consumption control possibility of the time period based on the energy consumption control possibility of the time period, and use it as the preset energy consumption quantity;
[0102] The maximum value of the fluctuation preset number and the energy consumption preset number is used as the minimum operating number of the servers in the time period.
[0103] Furthermore, the temperature control interval of the matched data center is determined according to the processing data volume of the information data of the server.
[0104] In another embodiment, determining the energy consumption control method for the time period specifically includes:
[0105] Determine the predicted processing data volume of the information data of the server in the period based on the historical processing status of the information data;
[0106] Based on the preset processing data volume and the minimum running number, determine the temperature control range of the data center under different running numbers of servers, and determine the energy consumption under different running numbers of servers in combination with the processing data volume of different servers;
[0107] Based on the energy consumption under different numbers of running servers, the carbon emissions under different numbers of running servers are determined according to the corresponding function of energy consumption and carbon emissions, and the energy consumption control method of the time period is determined with the lowest carbon emissions as the goal.
[0108] Furthermore, the predicted processing data volume of the information data of the server in the time period is determined according to the average value of the historical processing data volume of the information data in the time period on different dates.
[0109] Example 2
[0110] In a second aspect, the present invention provides a computer system comprising: a memory and a processor connected in communication, and a computer program stored in the memory and capable of running on the processor, characterized in that: when the processor runs the computer program, it executes the above-mentioned low-carbon control method for a data center.
[0111] Example 3
[0112] Thirdly, Figure 6 As shown, the present invention provides a computer storage medium on which a computer program is stored. When the computer program is executed in a computer, the computer is caused to execute the above-mentioned data center low-carbon control method.
[0113] Through the above embodiments, the present invention achieves the following beneficial effects:
[0114] 1. The possibility of energy consumption control in different time periods and the determination of energy consumption control time periods are carried out according to the historical processing conditions, thereby realizing the evaluation of the possibility of energy consumption control in different time periods from the perspective of the historical processing data volume, avoiding the technical problem that the reliability of data processing cannot meet the requirements due to energy consumption control in time periods with a large amount of processing data, and realizing accurate control of energy consumption in different time periods.
[0115] 2. Taking the minimum number of operations and the temperature control range as constraints and the lowest carbon emissions as the goal, the energy consumption control method for the time period is determined. This not only takes into account the differences in temperature control requirements due to differences in the amount of data processed by the servers, but also further combines the constraint of the minimum number of operations of the servers to ensure the reliability of data processing in the said time period while ensuring the lowest carbon emissions.
[0116] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0117] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0118] The above description is only one or more embodiments of this specification and is not intended to limit this specification. For those skilled in the art, one or more embodiments of this specification may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of one or more embodiments of this specification shall be included in the scope of the claims of this specification.
Claims
1. A data center low-carbon control method, characterized in that: Specifically include: Obtain the historical processing of information data of the data center at different time periods, and determine the possibility of energy consumption control at different time periods and the energy consumption control time period according to the historical processing situation, and when the time period is the energy consumption control time period, proceed to the next step; Determine the deviation between different adjacent operating time periods and historical processing conditions through the processing conditions of information data in adjacent operating time periods, and proceed to the next step when it is determined based on the deviation conditions that the data processing fluctuation probability of the time period meets the requirements; When it is determined that the energy consumption control of the time period can be performed through the energy consumption control possibilities of different future adjacent time periods and the time interval between the time period and the time period, proceed to the next step; The minimum number of operating servers in the time period is determined based on the probability of data processing fluctuations and the possibility of energy consumption control in the time period. The temperature control range of the matching data center is determined through the processing of information data of different servers. The energy consumption control method for the time period is determined based on the minimum number of operating servers and the temperature control range as constraints and the goal of minimizing carbon emissions.
2. The data center low-carbon control method according to claim 1, characterized in that: The historical processing status of the information data includes the historical processing data volume of the information data on different dates and the variation of the historical processing data volume between different adjacent dates.
3. The data center low-carbon control method according to claim 1, characterized in that: The method for determining the possibility of energy consumption control in the time period is: Determine the historical data processing volume of the information data of the period on different dates according to the historical processing situation of the information data of the period, and determine the data processing difficulty of the information data of the period based on the historical data processing volume; Obtaining a change in the amount of historical processed data in the time period between different adjacent dates, and determining a processing change in the information data in the time period based on the change in the amount of historical processed data in the time period between different adjacent dates; The possibility of energy consumption control in the time period is determined according to the processing variation of the information data in the time period and the difficulty of data processing.
4. The data center low-carbon control method according to claim 3, characterized in that: When the energy consumption control possibility of the time period is within a set interval, the time period is determined to be an energy consumption control time period.
5. The data center low-carbon control method according to claim 1, characterized in that: When the time period does not belong to the energy consumption control time period, there is no need to perform energy consumption control processing in the time period.
6. The data center low-carbon control method according to claim 1, characterized in that: Determine that the probability of data processing fluctuations during the period meets the requirements, specifically including: Determine the deviation between the processing conditions of the information data in different adjacent operating periods and the historical processing conditions on different dates based on the historical processing conditions of the information data in different adjacent operating periods, and determine the fluctuation of the processing data in different adjacent operating periods based on the deviation; Determine the basic weight values of different adjacent operating time periods by the interval lengths between different adjacent operating time periods and the time period, and determine the data processing fluctuation probability of the time period in combination with the processed data fluctuation amounts of different adjacent operating time periods; A preset probability threshold and the data processing fluctuation probability of the time period are used to determine whether the data processing fluctuation probability of the time period meets the requirement.
7. The data center low-carbon control method according to claim 6, characterized in that: Determining whether the data processing fluctuation probability of the time period meets the requirements by using the preset probability threshold and the data processing fluctuation probability of the time period specifically includes: When the data processing fluctuation probability of the time period is less than the preset probability threshold, it is determined that the data processing fluctuation probability of the time period meets the requirement.
8. The data center low-carbon control method according to claim 1, characterized in that: The future adjacent time period is a time period within a preset time length threshold after the time period.
9. A computer system comprising: A memory and a processor in communication connection, and a computer program stored in the memory and capable of running on the processor, characterized in that: when the processor runs the computer program, a low-carbon control method for a data center as described in any one of claims 1-8 is executed.
10. A computer storage medium having a computer program stored thereon, which, when executed in a computer, causes the computer to execute a data center low-carbon control method according to any one of claims 1 to 8.
Citation Information
Patent Citations
Low-carbon machine room management method and system based on digital cloud
CN117010720A
Managing emission demand response event generation
CN117651964A
Smart cabinet for high-density data center server and its operation method
KR102503776B1
Method of Making Power Saving Recommendations in a Server Pool
US20120144219A1
Time varying power management within datacenters
WO2019213466A1
Cited By
Low-carbon control method and system for data center
CN119376451A
A low-carbon control method and system for data centers
CN119376451B
Data center energy-saving control method and system and storage medium
CN119512349A
Data Center Energy Saving Control Method, System and Storage Medium
CN119512349B
Data center energy consumption and carbon emission prediction method and system based on ARIMA
CN119808027A