Power grid planning method and system based on benefits
By analyzing power consumption data and geographical structure characteristics, the power grid planning is optimized, which solves the problem of the existing power grid planning not considering users as stakeholders, and achieves the stable operation and sustainable development of the power grid.
Patent Information
- Application Number
- CN202411104568.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-10-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing power grid planning scheme does not regard users as the main stakeholders, resulting in a lack of practical significance in the planning results, a waste of resources and insufficient power supply, making it difficult to meet the needs of regional power grid construction.
By collecting and analyzing electricity consumption data in different regions, we can predict future electricity demand, determine transmission line paths and power generation methods based on geographical structural characteristics, conduct cost-benefit analysis and sensitivity analysis, optimize power grid planning to meet user needs, and reduce resource waste and risk.
Ensure the stable operation of the power grid, improve power supply efficiency and reliability, reduce power generation costs, promote sustainable development, meet users' growing demand for electricity, and promote the sustainable development of the power industry.
Smart Images

Figure CN118822210A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power grid planning, and in particular to a benefit-based power grid planning method and system. Background Art
[0002] With the continuous development of science and technology and economy, the power grid has become an important infrastructure for people's production and life. Reasonable power grid planning is an important prerequisite for ensuring the stable operation of the power system. Reasonable power grid planning can meet the growing demand for electricity, improve the operating efficiency of the power grid, reduce energy waste, and promote the sustainable development of society.
[0003] In the prior art, traditional power grid planning schemes only take power supply enterprises as the main stakeholders, and do not take users as the main beneficiaries, which makes the planning results lack practical significance. As a result, many short-term power grid projects have been operating at a loss or even shut down, resulting in a waste of resources and making it difficult to meet the actual needs of regional power grid construction. Summary of the invention
[0004] In order to overcome the above-mentioned deficiencies of the prior art, the present application provides a benefit-based power grid planning method and system.
[0005] In a first aspect, the present application provides a benefit-based power grid planning method, the method comprising:
[0006] Collect electricity consumption data from different regions, analyze the electricity consumption data, and predict future electricity demand in different regions based on the analysis results of the electricity consumption data in combination with the local industrial structure and population growth trend, and generate electricity demand forecast data;
[0007] Obtaining power load distribution information of different regions, determining transmission line path information and transmission line length information of different regions based on the power load distribution information and geographical structure characteristics of each region, and generating transmission line data;
[0008] Collect energy resource data from different regions, combine the geographical structure characteristics of each region, determine the power generation methods in different regions, and generate power generation type data;
[0009] Based on the electricity demand forecast data, transmission line data and power generation type data of different regions, preliminary grid planning is carried out to generate preliminary grid planning results;
[0010] Conducting a cost-benefit analysis on the preliminary power grid planning results, generating cost-benefit analysis results, and obtaining net benefit data;
[0011] Conducting sensitivity analysis on the net benefit data to determine the degree of influence of uncertainty factors on the preliminary power grid planning results and generating sensitivity analysis results;
[0012] The preliminary power grid planning results are optimized and adjusted according to the cost-benefit analysis results and the sensitivity analysis results to generate standard power grid planning results, and the power grid planning is implemented to provide power supply according to the standard power grid planning results.
[0013] By adopting the above technical solutions, by collecting and analyzing the electricity consumption data of different regions, understanding the electricity consumption structure and characteristics of each region, and thus scientifically predicting the future electricity demand of different regions, providing forward-looking guidance for power grid planning, ensuring the stable operation of the power grid and meeting the electricity demand of users, avoiding waste of resources and insufficient power supply. In combination with the distribution of power loads and geographical structure characteristics in various regions, determining the path and length of transmission lines can improve power supply efficiency, reduce line losses, and ensure the stability and reliability of power supply. By collecting energy resources in various regions and analyzing the availability of renewable energy and traditional energy to determine the appropriate power generation methods for different regions, the cost of power generation can be reduced, the utilization rate of renewable energy can be increased, and sustainable development can be promoted. Cost-benefit analysis is conducted on the preliminary power grid planning scheme to evaluate the net benefits of the preliminary power grid planning scheme, provide an economic basis for power grid planning, improve the return on investment, and reduce resource waste. Through sensitivity analysis, the impact of risk factors on the cost and benefits of power grid planning is understood, so that the power grid planning scheme can be adjusted to reduce the impact of potential risks on power grid planning, ensure the stability and sustainability of power grid planning, meet the growing electricity demand of users, and promote the sustainable development of the power industry.
[0014] Preferably, electricity consumption data from different regions are collected, the collected electricity consumption data are cleaned, duplicate data and erroneous data are deleted, and standard electricity consumption data are generated;
[0015] Conducting in-depth analysis of the standard electricity demand data through regression analysis methods to understand the electricity consumption structure and characteristics of different regions and generate electricity consumption data analysis results;
[0016] Based on the analysis results of the electricity consumption data, combined with the local industrial structure and population growth trend, a neural network prediction model is used to predict the future electricity demand in different regions to generate electricity demand prediction data.
[0017] By adopting the above technical solution, the collected electricity consumption data can be cleaned to delete duplicate data and erroneous data, improve the accuracy and reliability of electricity consumption data, and provide a more accurate data basis for subsequent data analysis and prediction. Through regression analysis of electricity consumption data, we can understand the electricity consumption structure and characteristics of different regions, and predict the future electricity demand in different regions in combination with the local industrial structure and population growth trend, provide forward-looking guidance for power grid planning, ensure the stable operation of the power grid and meet the electricity demand of users, and avoid waste of resources and power shortage.
[0018] Preferably, the power load data of different regions in different time periods are obtained to understand the distribution and change of the hoisting capacity demand in each region, and generate the power load distribution data;
[0019] Acquire geographic information data of different regions, process and analyze the geographic information data using a geographic information system, and extract geographic structural features related to transmission line planning;
[0020] In combination with the power load distribution data and geographical structure characteristics, the relationship between power demand and geographical conditions in each region is analyzed, a transmission line path is planned, and transmission line path information and transmission line length information are generated;
[0021] The transmission line path information and the transmission line length information are integrated to generate standard transmission line data.
[0022] By adopting the above technical solutions, we can analyze the distribution and changes of power demand in different regions, as well as the impact of geographical conditions on transmission line planning, plan reasonable transmission line paths, generate standard transmission line data, and provide complete data support for subsequent power grid planning and construction, ensuring the stable operation of the power grid and meeting the power needs of users. At the same time, it can also provide basic data support for subsequent power grid optimization and upgrading.
[0023] Preferably, energy resource data of different regions are collected, wherein the energy resource data includes traditional energy resource data and renewable energy resource data;
[0024] Analyze the traditional energy resource data and renewable energy resource data using statistical analysis methods to understand the reserves and development conditions of traditional energy resources and renewable energy resources in different regions and generate energy resource analysis results;
[0025] Based on the energy resource analysis results and geographical structure characteristics, the power generation methods in different regions are determined and power generation type data is generated.
[0026] By adopting the above technical solutions and analyzing the energy resource data of different regions, we can understand the reserves and development of traditional energy resources and renewable energy resources in different regions, and determine the appropriate power generation method in a targeted manner based on the local geographical structure characteristics and the actual situation, so as to ensure the rationality and feasibility of the power generation method, thereby ensuring the stable operation and sustainable development of the power system.
[0027] Preferably, based on the preliminary power grid planning result, cost indicator data are obtained, the cost indicator data including transmission line construction cost C1, transmission line operation and maintenance cost C2 and electricity price cost C3;
[0028] Based on the preliminary power grid planning result, obtaining benefit index data, the benefit index data including power sales income R1 and saved power consumption income R2;
[0029] Based on the cost index data and benefit index data, a cost-benefit analysis is performed on the preliminary power grid planning result to generate a cost-benefit analysis result and obtain net benefit data P=(R1+R2)-(C1+C2+C3).
[0030] By adopting the above technical solution, based on the cost indicator data and benefit indicator data, the net benefit data of the preliminary power grid planning is calculated through cost-benefit analysis, which can determine the economic benefits and investment returns of the preliminary power grid planning solution, and provide direction for the subsequent optimization and adjustment of the power grid planning, thereby promoting the economy and sustainable development of the power grid planning.
[0031] Preferably, the uncertainty factors include electricity demand change data, electricity price change data and equipment failure rate data;
[0032] Establish a sensitivity analysis model, conduct sensitivity analysis on the electricity demand change data, electricity price change data and equipment failure rate data, and calculate the sensitivity coefficient of each uncertainty factor to the net benefit data;
[0033] According to the size of the sensitivity coefficient, the uncertainty factors are sorted to obtain the influence degree of the uncertainty factors on the preliminary power grid planning result, and the sensitivity analysis result is generated.
[0034] By adopting the above technical solution and establishing a sensitivity analysis model, we conduct a sensitivity analysis on the net benefit data, quantify the size and degree of influence of each uncertainty factor on the net benefit data in the power grid planning process, and prevent potential problems in advance for factors that have a greater impact on the power grid planning results, so as to reduce the adverse effects of potential uncertainties and improve the robustness of the power grid planning results.
[0035] Preferably, standard value ranges are set for the electricity demand change data, the electricity price change data and the equipment failure rate data to obtain uncertainty factor change data δ;
[0036] Establish a sensitivity analysis model, input the electricity demand change data, electricity price change data and equipment failure rate data into the sensitivity analysis model, and output the corresponding change net benefit data P0;
[0037] Based on the net benefit data P and the changed net benefit data P0, the net benefit change data P1=P-P0 is obtained;
[0038] Based on the uncertainty factor change data δ and the net benefit change data P1, the sensitivity coefficient D=P1 / δ of each uncertainty factor to the net benefit data is calculated.
[0039] By adopting the above technical solution and establishing a sensitivity analysis model, we can conduct a sensitivity analysis on the uncertainty factors of electricity demand change data, electricity price change data and equipment failure rate data, and calculate the sensitivity coefficient of each uncertainty factor to the net benefit data, so as to fully understand the impact of uncertainty factors on power grid planning results, which will help to more accurately formulate risk management strategies and optimize power grid planning schemes, thereby making scientific and reasonable planning decisions and promoting the sustainable development of the power industry.
[0040] Preferably, an optimization model is established, and based on the cost-benefit analysis results and the sensitivity analysis results, the optimization model is constrained to determine the optimization direction;
[0041] Inputting the preliminary power grid planning results into the optimization model, running the optimization model to optimize and adjust the preliminary power grid planning results, so as to reduce costs, improve benefits and reduce dependence on highly sensitive factors, and generate standard power grid planning results;
[0042] Based on the standard grid planning results, an implementation plan is formulated, and the grid planning is executed according to the implementation plan to provide power supply.
[0043] By adopting the above technical solution, the preliminary power grid planning results are adjusted by establishing an optimization model to find a power grid planning strategy that meets all constraints and achieves the optimal goal, and generate standard power grid planning results. This not only improves the economic benefits of power grid planning, but also reduces the sensitivity of uncertainty factors, enhances the feasibility of power grid planning schemes, and ensures that the power grid can maintain a stable power supply capacity in the face of various uncertain factors.
[0044] In the second aspect, a benefit-based power grid planning system includes:
[0045] Information acquisition module, where users collect electricity consumption data, electricity load distribution information and energy resource data from different regions;
[0046] The analysis and prediction module is used to analyze electricity consumption data. Based on the analysis results of electricity consumption data and combined with the local industrial structure and population growth trend, it predicts the future electricity demand in different regions and generates electricity demand forecast data;
[0047] The transmission line planning module is used to determine the transmission line path information and transmission line length information of different regions according to the power load distribution information and the geographical structure characteristics of each region, and generate transmission line data;
[0048] Energy resource planning module, which is used to determine the power generation methods in different regions and generate power generation type data based on energy resource data and geographical structure characteristics of each region;
[0049] The power grid planning module is used to carry out preliminary power grid planning based on the power demand forecast data, transmission line data and power generation type data of different regions, and generate preliminary power grid planning results;
[0050] The cost-benefit analysis module is used to conduct cost-benefit analysis on the preliminary power grid planning results, generate cost-benefit analysis results, and obtain net benefit data;
[0051] A sensitivity analysis module, used to perform sensitivity analysis on the net benefit data, determine the degree of influence of uncertainty factors on the preliminary power grid planning results, and generate sensitivity analysis results;
[0052] The optimization and adjustment module is used to optimize and adjust the preliminary power grid planning results according to the cost-benefit analysis results and the sensitivity analysis results to generate standard power grid planning results.
[0053] Compared with the prior art, the present invention has the following characteristics and beneficial effects:
[0054] 1. By collecting and analyzing electricity consumption data from different regions, we can understand the electricity consumption structure and characteristics of each region, so as to scientifically predict the future electricity demand in different regions, provide forward-looking guidance for power grid planning, ensure the stable operation of the power grid and meet the electricity demand of users, avoid waste of resources and insufficient power supply. In combination with the distribution of power loads and geographical structure characteristics in various regions, determine the path and length of transmission lines, improve power supply efficiency, reduce line losses, and ensure the stability and reliability of power supply. By collecting energy resources from various regions and analyzing the availability of renewable energy and traditional energy to determine the appropriate power generation methods for different regions, we can reduce the cost of power generation, improve the utilization rate of renewable energy, and promote sustainable development. Conduct a cost-benefit analysis on the preliminary power grid planning scheme, evaluate the net benefit of the preliminary power grid planning scheme, provide an economic basis for power grid planning, improve the return on investment, and reduce resource waste. Through sensitivity analysis, understand the impact of risk factors on the cost and benefits of power grid planning, so as to adjust the power grid planning scheme, reduce the impact of potential risks on power grid planning, ensure the stability and sustainability of power grid planning, meet the growing electricity demand of users, and promote the sustainable development of the power industry.
[0055] 2. Based on the cost indicator data and benefit indicator data, the net benefit data of the preliminary power grid planning is calculated through cost-benefit analysis, which can determine the economic benefits and investment returns of the preliminary power grid planning scheme, and provide direction for the subsequent optimization and adjustment of the power grid planning, thereby promoting the economy and sustainable development of the power grid planning.
[0056] 3. Through the establishment of a sensitivity analysis model, a sensitivity analysis is conducted on the net benefit data to quantify the size and degree of impact of each uncertainty factor on the net benefit data during the power grid planning process. For factors that have a greater impact on the power grid planning results, potential problems are prevented in advance to reduce the adverse effects of potential uncertainties and improve the robustness of the power grid planning results. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] Figure 1 is a flowchart of a benefit-based power grid planning method provided in this embodiment;
[0058] Figure 2 is a step flowchart of the S1 sub-step provided in this embodiment;
[0059] Figure 3 is a flowchart of the step S2 sub-step provided in this embodiment;
[0060] Figure 4 is a flowchart of sub-step S5 provided in this embodiment;
[0061] Figure 5 is a flowchart of sub-step S6 provided in this embodiment;
[0062] Figure 6 is a step flowchart of the S62 sub-step provided in this embodiment;
[0063] Figure 7 It is a structural block diagram of a benefit-based power grid planning system mainly embodied in this embodiment.
[0064] Explanation of the accompanying drawings: 1. Information acquisition module; 2. Analysis and prediction module; 3. Transmission line planning module; 4. Energy resource planning module; 5. Power grid planning module; 6. Cost-benefit analysis module; 7. Sensitivity analysis module; 8. Optimization and adjustment module. DETAILED DESCRIPTION
[0065] The present invention is further described in detail below in conjunction with the following examples.
[0066] Reference Figure 1 , a benefit-based power grid planning method and system, the method comprising the following steps:
[0067] S1. Collect electricity consumption data from different regions, analyze the electricity consumption data, and predict the future electricity demand in different regions based on the analysis results of the electricity consumption data, combined with the local industrial structure and population growth trend, to generate electricity demand forecast data;
[0068] S2. Obtaining power load distribution information in different regions, based on the power load distribution information and the geographical structure characteristics of each region, determining the transmission line path information and transmission line length information in different regions, and generating transmission line data;
[0069] S3. Collect energy resource data from different regions, combine the geographical structure characteristics of each region, determine the power generation methods in different regions, and generate power generation type data;
[0070] S4. Conduct preliminary grid planning based on electricity demand forecast data, transmission line data, and power generation type data in different regions, and generate preliminary grid planning results;
[0071] S5. Perform a cost-benefit analysis on the preliminary grid planning results, generate cost-benefit analysis results, and obtain net benefit data;
[0072] S6. Conduct sensitivity analysis on the net benefit data to determine the degree of influence of uncertainty factors on the preliminary power grid planning results and generate sensitivity analysis results;
[0073] S7. Optimize and adjust the preliminary power grid planning results according to the cost-benefit analysis results and the sensitivity analysis results, generate standard power grid planning results, and implement power grid planning for power supply according to the standard power grid planning results.
[0074] Specifically, electricity consumption data from different regions are collected and analyzed to generate electricity consumption data analysis results, understand the electricity consumption structure and characteristics of each region, and scientifically predict the future electricity demand in different regions based on the local industrial structure and population growth trend, and generate electricity demand forecast data, so as to provide forward-looking guidance for power grid planning, ensure the stable operation of the power grid and meet the electricity demand of users, and avoid resource waste and power supply shortage. Obtaining the distribution information of power load in different regions, combining the geographical structure characteristics of each region, determining the transmission line path information and transmission line length information in different regions, and generating transmission line data can improve power supply efficiency, reduce line losses, and ensure the stability and reliability of power supply. By collecting energy resources in various regions, analyzing the availability of renewable energy and traditional energy, and determining the appropriate power generation methods in different regions based on the results of energy resource analysis and the geographical structure characteristics of each region, generating power generation type data, it is possible to reduce power generation costs, improve the utilization rate of renewable energy, and promote sustainable development. Integrating power demand forecast data, transmission line data, and power generation type data, preliminarily planning the layout, scale, and power supply strategy of the power grid, and generating preliminary power grid planning results can ensure the comprehensiveness and rationality of power grid planning. By conducting a cost-benefit analysis on the preliminary grid planning results and generating net benefit data, we can provide an economic basis for grid planning, improve the return on investment, and reduce resource waste. We can conduct a sensitivity analysis on the net benefit data to determine the impact of key risk factors on the cost and benefits of preliminary grid planning, and optimize and adjust the preliminary grid planning results from now on, reducing the impact of potential risks on grid planning, ensuring the stability and sustainability of grid planning, and thus improving the efficiency and quality of grid planning and construction, making grid planning schemes more targeted and practical, meeting the growing electricity demand of users, and promoting the sustainable development of the power industry.
[0075] Reference Figure 2 , the specific step S1 includes the following sub-steps:
[0076] S11. Collect electricity consumption data from different regions, clean the collected electricity consumption data, delete duplicate data and erroneous data, and generate standard electricity consumption data;
[0077] S12. Conducting an in-depth analysis of the standard electricity demand data through regression analysis methods to understand the electricity consumption structure and characteristics of different regions and generate electricity consumption data analysis results;
[0078] S13. Based on the analysis results of the electricity consumption data, combined with the local industrial structure and population growth trend, a neural network prediction model is used to predict the future electricity demand in different regions to generate electricity demand prediction data.
[0079] Specifically, electricity consumption data from different regions are collected. The electricity consumption data includes the load power, load type and load growth trend data of each region. The collected electricity consumption data is cleaned, duplicate data and erroneous data are deleted, and standard electricity consumption data is generated to improve the integrity and reliability of electricity consumption data, providing a more accurate data basis for subsequent data analysis and prediction. Regression analysis is performed on electricity consumption data through regression analysis. Regression analysis is a commonly used statistical analysis method that can model and analyze the relationship between multiple variables. By performing regression analysis on standard electricity consumption data, the electricity consumption structure and electricity consumption characteristics between different regions can be understood, and the analysis results of electricity consumption data can be generated. Since the local industrial structure and population growth trend are important factors affecting electricity demand, these factors and the analysis results of electricity consumption data are combined, and the neural network prediction model is used to predict the future electricity demand in different regions, and the electricity demand prediction data is generated, so that the prediction results are more accurate and reliable, providing a more accurate and comprehensive basis for power grid planning, ensuring the stable operation of the power grid and meeting the electricity demand of users.
[0080] Reference Figure 3 , the specific step S2 includes the following sub-steps:
[0081] S21. Obtain the power load data of different regions in different time periods, understand the distribution and changes of the lifting capacity demand in each region, and generate power load distribution data;
[0082] S22. Obtain geographic information data from different regions, process and analyze the geographic information data using a geographic information system, and extract geographic structural features related to transmission line planning;
[0083] S23. Combining the power load distribution data and geographical structure characteristics, analyzing the relationship between power demand and geographical conditions in various regions, planning the transmission line path, and generating transmission line path information and transmission line length information;
[0084] S24. Integrate the transmission line path information and the transmission line length information to generate standard transmission line data.
[0085] Specifically, obtain the power load data of different regions in different time periods, analyze the power load data, understand the distribution and changes of power demand in different regions, and thus understand the power demand characteristics and change patterns of each region, generate power load distribution data, and provide basic data for subsequent transmission line planning and construction. Obtain geographic information data from different regions, use geographic information systems to process and analyze geographic information data, and extract geographic structural features related to transmission line planning, including terrain features and landform features. These geographic features will affect the path selection and construction difficulty of transmission lines. For example, hilly areas, river areas, and forest areas require longer lines, higher construction costs, and more protection measures to reduce the impact on the environment and wildlife. Therefore, when planning routes, it is necessary to avoid areas with complex terrain, sensitive environments, or high construction costs. By analyzing the relationship between power demand and geographical conditions in various regions, we can more accurately predict power demand in different regions, provide a scientific basis for the planning of transmission lines, plan more reasonable transmission line paths, generate transmission line path information and transmission line length information, integrate the determined transmission line path information and transmission line length information, and generate standard transmission line data, including key information such as the starting point, midpoint, path and length of the line, which reduces the workload of engineering construction, reduces construction costs and maintenance difficulties, ensures the stable operation of the power grid and meets the power needs of users. At the same time, it can also provide basic data support for subsequent power grid optimization and upgrading.
[0086] Furthermore, the energy resource data of different regions are collected, and the power generation methods of different regions are determined in combination with the geographical structure characteristics of each region. The specific steps for generating power generation type data are as follows:
[0087] Collecting energy resource data from different regions, wherein the energy resource data includes traditional energy resource data and renewable energy resource data;
[0088] Analyze the traditional energy resource data and renewable energy resource data using statistical analysis methods to understand the reserves and development conditions of traditional energy resources and renewable energy resources in different regions and generate energy resource analysis results;
[0089] Based on the energy resource analysis results and geographical structure characteristics, the power generation methods in different regions are determined and power generation type data is generated.
[0090] Specifically, energy resource data from different regions are collected, including traditional energy resource data and renewable energy resource data, and statistical analysis methods are used to analyze traditional energy resource data and renewable energy resource data, so as to understand the reserves and development of traditional energy resources and renewable energy resources in different regions, generate energy resource analysis results, and thus understand the characteristics and advantages of energy resources in different regions. Combined with the geographical structure characteristics of different regions, combined with the actual situation, the power generation methods in different regions are determined, and power generation type data are generated. For example, for regions rich in coal resources, thermal power generation is suitable, while for regions rich in wind energy resources, wind power generation is suitable, so as to ensure the rationality and feasibility of the power generation method, and further ensure the stable operation and sustainable development of the power system.
[0091] Reference Figure 4 , the specific step S5 includes the following sub-steps:
[0092] S51. Based on the preliminary grid planning results, obtain cost index data, the cost index data including transmission line construction cost C1, transmission line operation and maintenance cost C2 and electricity price cost C3;
[0093] S52. Based on the preliminary grid planning results, obtaining benefit index data, the benefit index data including electricity sales income R1 and saved electricity consumption income R2;
[0094] S53. Based on the cost index data and benefit index data, a cost-benefit analysis is performed on the preliminary power grid planning result to generate a cost-benefit analysis result and obtain net benefit data P=(R1+R2)-(C1+C2+C3).
[0095] Specifically, according to the preliminary grid planning results, cost indicator data is obtained. Cost indicators include transmission line construction costs, transmission line operation and maintenance costs, and electricity price costs, so as to accurately evaluate the initial investment, operation and maintenance costs of the preliminary grid planning scheme, and provide a basis for subsequent cost-benefit analysis. According to the preliminary grid planning results, benefit indicator data is obtained. Benefit indicators include electricity sales revenue and saved electricity consumption revenue, so as to understand the impact of the preliminary grid planning scheme on power supply and quality, as well as the resulting economic benefits. According to the cost indicator data and benefit indicator data, a cost-benefit analysis is conducted on the preliminary grid planning results, and the benefit indicator data is reduced by the cost indicator data to generate net benefit data, so as to judge the economic benefits and investment returns of the preliminary grid planning scheme, realize the feasibility and economic evaluation of the preliminary grid planning scheme, and provide reference and direction for the subsequent grid planning adjustment and optimization, thereby promoting the economy and sustainable development of grid planning.
[0096] Reference Figure 5, the specific step S6 includes the following sub-steps:
[0097] S61. The uncertain factors include electricity demand change data, electricity price change data and equipment failure rate data;
[0098] S62. Establish a sensitivity analysis model, conduct sensitivity analysis on the electricity demand change data, electricity price change data and equipment failure rate data, and calculate the sensitivity coefficient of each uncertainty factor to the net benefit data;
[0099] S63. Sort the uncertainty factors according to the size of the sensitivity coefficient, obtain the influence of the uncertainty factors on the preliminary power grid planning results, and generate sensitivity analysis results.
[0100] Specifically, since the data on electricity demand changes, electricity price changes and equipment failure rate data are key uncertainties in power grid planning, changes in electricity demand, fluctuations in electricity prices and changes in equipment failure rates may all have an impact on the cost and benefits of power grid planning. By establishing a sensitivity analysis model and conducting sensitivity analysis on the data on electricity demand changes, electricity price changes and equipment failure rate data, we can quantify the degree of influence of each uncertainty factor on the net benefit data and calculate the sensitivity coefficient of each uncertainty factor on the net benefit data. The sensitivity coefficient is an indicator that measures the degree of influence of variable changes on target variable changes, and provides a quantitative basis for the priority of different factors. According to the size of the sensitivity coefficient, the uncertainty factors are sorted to determine which factors have the most significant impact on the power grid planning results, thereby obtaining the degree of influence of uncertainty factors on the preliminary power grid planning results, generating sensitivity analysis results, and preventing potential problems in advance for factors that have a greater impact on the power grid planning results, reducing the adverse effects of potential uncertainties, better risk management, and improving the robustness of power grid planning results.
[0101] Reference Figure 6 , the specific step S62 includes the following sub-steps:
[0102] S621. Set standard value ranges for the electricity demand change data, electricity price change data and equipment failure rate data, respectively, to obtain uncertainty factor change data δ;
[0103] S622. Establish a sensitivity analysis model, input the electricity demand change data, electricity price change data and equipment failure rate data into the sensitivity analysis model, and output the corresponding change net benefit data P0;
[0104] S623. Based on the net benefit data P and the change net benefit data P0, obtain the net benefit change data P1=P-P0;
[0105] S624. Based on the uncertainty factor change data δ and the net benefit change data P1, calculate the sensitivity coefficient D = P1 / δ of each uncertainty factor to the net benefit data.
[0106] Furthermore, the preliminary grid planning results are optimized and adjusted according to the cost-benefit analysis results and the sensitivity analysis results to generate standard grid planning results. The specific steps for implementing grid planning and power supply according to the standard grid planning results are as follows:
[0107] Establishing an optimization model, constraining the optimization model based on the cost-benefit analysis results and the sensitivity analysis results, and determining the optimization direction;
[0108] Inputting the preliminary power grid planning results into the optimization model, running the optimization model to optimize and adjust the preliminary power grid planning results, so as to reduce costs, improve benefits and reduce dependence on highly sensitive factors, and generate standard power grid planning results;
[0109] Based on the standard grid planning results, an implementation plan is formulated, and the grid planning is executed according to the implementation plan to provide power supply.
[0110] Specifically, by establishing an optimization model and constraining the optimization model according to the results of cost-benefit analysis and sensitivity analysis, complex power grid planning problems can be transformed into mathematical forms, making it easier to analyze and determine the optimization direction, such as reducing costs, improving efficiency, and reducing dependence on highly sensitive factors, making the solution process more targeted. The preliminary power grid planning results are input into the optimization model, and the preliminary power grid planning results are adjusted through the optimization algorithm to find a power grid planning strategy that meets all constraints and achieves the best goal, generate standard power grid planning results, and formulate an implementation plan based on the standard power grid planning results, execute real-time steps, and realize power supply, thereby improving the economic benefits and robustness of the power grid, while ensuring that the power grid can still maintain a stable power supply capacity in the face of various uncertainties.
[0111] Reference Figure 7A benefit-based power grid planning system, by applying a benefit-based power grid planning method as described above, includes an information acquisition module 1, an analysis and prediction module 2, a transmission line planning module 3, an energy resource planning module 4, a power grid planning module 5, a cost-benefit analysis module 6, a sensitivity analysis module 7 and an optimization and adjustment module 8. The information acquisition module 1 is used to collect power consumption data of different regions, and the power consumption data is analyzed by the analysis and prediction module 2. According to the analysis results of the power consumption data, combined with the local industrial structure and population growth trend, the future power demand of different regions is predicted to generate power demand prediction data; the information acquisition module 1 is used to obtain the power load distribution information and energy resource data of different regions, and the transmission line planning module 3 determines the transmission line path information and transmission line length information of different regions based on the power load distribution information and the geographical structure characteristics of each region, and generates transmission line data, and the energy resource planning module 4 determines the transmission line path information and transmission line length information of different regions based on the energy resource data and the geographical structure characteristics of each region, and generates transmission line data. The geographical structure characteristics of each region are determined to determine the power generation methods in different regions and generate power generation type data; then, the power grid planning module 5 is used to perform preliminary power grid planning according to the power demand forecast data, transmission line data and power generation type data of different regions, and generate preliminary power grid planning results; the cost-benefit analysis module 6 is used to perform cost-benefit analysis on the preliminary power grid planning results, generate cost-benefit analysis results, and obtain net benefit data; the sensitivity analysis module 7 is used to perform sensitivity analysis on the net benefit data, determine the degree of influence of uncertainty factors on the preliminary power grid planning results, and generate sensitivity analysis results; finally, the optimization and adjustment module 8 is used to optimize and adjust the preliminary power grid planning results according to the cost-benefit analysis results and the sensitivity analysis results, generate standard power grid planning results, and implement power grid planning for power supply according to the standard power grid planning results; the economic benefits and robustness of power grid planning are improved, while ensuring that the power grid can still maintain a stable power supply capacity in the face of various uncertain factors.
[0112] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A benefit-based power grid planning method, characterized in that: The following steps are involved: Collect electricity consumption data from different regions, analyze the electricity consumption data, and predict future electricity demand in different regions based on the analysis results of the electricity consumption data in combination with the local industrial structure and population growth trend, and generate electricity demand forecast data; Obtaining power load distribution information of different regions, determining transmission line path information and transmission line length information of different regions based on the power load distribution information and geographical structure characteristics of each region, and generating transmission line data; Collect energy resource data from different regions, combine the geographical structure characteristics of each region, determine the power generation methods in different regions, and generate power generation type data; Based on the electricity demand forecast data, transmission line data and power generation type data of different regions, preliminary grid planning is carried out to generate preliminary grid planning results; Conducting a cost-benefit analysis on the preliminary power grid planning results, generating cost-benefit analysis results, and obtaining net benefit data; Conducting sensitivity analysis on the net benefit data to determine the degree of influence of uncertainty factors on the preliminary power grid planning results and generating sensitivity analysis results; The preliminary power grid planning results are optimized and adjusted according to the cost-benefit analysis results and the sensitivity analysis results to generate standard power grid planning results, and the power grid planning is implemented to provide power supply according to the standard power grid planning results.
2. A benefit-based power grid planning method according to claim 1, characterized in that: The steps of collecting electricity consumption data from different regions, analyzing the electricity consumption data, predicting future electricity demand in different regions based on the analysis results of the electricity consumption data and combining the local industrial structure and population growth trend, and generating electricity demand forecast data include: Collect electricity consumption data from different regions, clean the collected electricity consumption data, delete duplicate data and erroneous data, and generate standard electricity consumption data; Conducting in-depth analysis of the standard electricity demand data through regression analysis methods to understand the electricity consumption structure and characteristics of different regions and generate electricity consumption data analysis results; Based on the analysis results of the electricity consumption data, combined with the local industrial structure and population growth trend, a neural network prediction model is used to predict the future electricity demand in different regions to generate electricity demand prediction data.
3. The benefit-based power grid planning method according to claim 1, characterized in that: The step of obtaining power load distribution information of different regions, determining transmission line path information and transmission line length information of different regions based on the power load distribution information and the geographical structure characteristics of each region, and generating transmission line data includes: Obtain power load data in different regions at different time periods, understand the distribution and changes of crane capacity demand in each region, and generate power load distribution data; Acquire geographic information data of different regions, process and analyze the geographic information data using a geographic information system, and extract geographic structural features related to transmission line planning; In combination with the power load distribution data and geographical structure characteristics, the relationship between power demand and geographical conditions in each region is analyzed, a transmission line path is planned, and transmission line path information and transmission line length information are generated; The transmission line path information and the transmission line length information are integrated to generate standard transmission line data.
4. The benefit-based power grid planning method according to claim 1, characterized in that: The step of collecting energy resource data from different regions, combining the geographical structure characteristics of each region, determining the power generation methods of different regions, and generating power generation type data includes: Collecting energy resource data from different regions, wherein the energy resource data includes traditional energy resource data and renewable energy resource data; Analyze the traditional energy resource data and renewable energy resource data using statistical analysis methods to understand the reserves and development conditions of traditional energy resources and renewable energy resources in different regions and generate energy resource analysis results; Based on the energy resource analysis results and geographical structure characteristics, the power generation methods in different regions are determined and power generation type data is generated.
5. The benefit-based power grid planning method according to claim 1, characterized in that: The step of performing a cost-benefit analysis on the preliminary power grid planning result, generating a cost-benefit analysis result, and obtaining net benefit data comprises: Based on the preliminary grid planning result, cost indicator data is obtained, wherein the cost indicator data includes transmission line construction cost C1, transmission line operation and maintenance cost C2 and electric energy price cost C3; Based on the preliminary power grid planning result, obtaining benefit index data, the benefit index data including power sales income R1 and saved power consumption income R2; Based on the cost index data and benefit index data, a cost-benefit analysis is performed on the preliminary power grid planning result to generate a cost-benefit analysis result and obtain net benefit data P=(R1+R2)-(C1+C2+C3).
6. The benefit-based power grid planning method according to claim 1, characterized in that: The step of performing a sensitivity analysis on the net benefit data, determining the degree of influence of uncertainty factors on the preliminary power grid planning results, and generating sensitivity analysis results comprises: The uncertain factors include electricity demand change data, electricity price change data and equipment failure rate data; Establish a sensitivity analysis model, conduct sensitivity analysis on the electricity demand change data, electricity price change data and equipment failure rate data, and calculate the sensitivity coefficient of each uncertainty factor to the net benefit data; According to the size of the sensitivity coefficient, the uncertainty factors are sorted to obtain the influence degree of the uncertainty factors on the preliminary power grid planning result, and the sensitivity analysis result is generated.
7. A benefit-based power grid planning method according to claim 6, characterized in that: The step of establishing a sensitivity analysis model, performing sensitivity analysis on the electricity demand change data, the electricity price change data and the equipment failure rate data, and calculating the sensitivity coefficient of each uncertainty factor to the net benefit data includes: Setting standard value ranges for the electricity demand change data, the electricity price change data, and the equipment failure rate data, respectively, to obtain uncertainty factor change data δ; Establish a sensitivity analysis model, input the electricity demand change data, electricity price change data and equipment failure rate data into the sensitivity analysis model, and output the corresponding change net benefit data P0; Based on the net benefit data P and the changed net benefit data P0, the net benefit change data P1=P-P0 is obtained; Based on the uncertainty factor change data δ and the net benefit change data P1, the sensitivity coefficient D=P1 / δ of each uncertainty factor to the net benefit data is calculated.
8. The benefit-based power grid planning method according to claim 1, characterized in that: The step of optimizing and adjusting the preliminary power grid planning results according to the cost-benefit analysis results and the sensitivity analysis results, generating a standard power grid planning result, and implementing the power grid planning to supply power according to the standard power grid planning result includes: Establishing an optimization model, constraining the optimization model based on the cost-benefit analysis results and the sensitivity analysis results, and determining the optimization direction; Inputting the preliminary power grid planning results into the optimization model, running the optimization model to optimize and adjust the preliminary power grid planning results, so as to reduce costs, improve benefits and reduce dependence on highly sensitive factors, and generate standard power grid planning results; Based on the standard grid planning results, an implementation plan is formulated, and the grid planning is executed according to the implementation plan to provide power supply.
9. A benefit-based power grid planning system, characterized in that: A benefit-based power grid planning method applicable to any one of claims 1 to 8, comprising: Information acquisition module (1), where users collect electricity consumption data, electricity load distribution information, and energy resource data from different regions; The analysis and prediction module (2) is used to analyze the electricity consumption data, and based on the analysis results of the electricity consumption data, combined with the local industrial structure and population growth trend, predict the future electricity demand in different regions and generate electricity demand prediction data; A transmission line planning module (3) is used to determine the transmission line path information and transmission line length information of different regions according to the power load distribution information and the geographical structure characteristics of each region, and generate transmission line data; An energy resource planning module (4) is used to determine the power generation methods in different regions and generate power generation type data based on energy resource data and geographical structure characteristics of each region; A power grid planning module (5), used to perform preliminary power grid planning based on power demand forecast data, transmission line data, and power generation type data of different regions, and generate preliminary power grid planning results; A cost-benefit analysis module (6), used for performing a cost-benefit analysis on the preliminary power grid planning results, generating a cost-benefit analysis result, and obtaining net benefit data; A sensitivity analysis module (7) is used to perform sensitivity analysis on the net benefit data, determine the degree of influence of uncertainty factors on the preliminary power grid planning results, and generate sensitivity analysis results; The optimization and adjustment module (8) is used to optimize and adjust the preliminary power grid planning results according to the cost-benefit analysis results and the sensitivity analysis results to generate standard power grid planning results.