Shield construction risk assessment method based on multi-source data and stacking integration technology
Through multi-source data and stacked integrated learning models, the problem of insufficient data fusion and risk assessment accuracy in traditional methods is solved, and high-precision risk assessment and engineering management support for shield tunneling construction are achieved to ensure safe and efficient construction.
Patent Information
- Application Number
- CN202410761598.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2024-10-22
AI Technical Summary
Traditional shield excavation construction risk assessment methods rely on limited data sources and simplified statistical models, which limits their accuracy and reliability. It is difficult to effectively integrate and process multi-source heterogeneous data, thus affecting the accurate assessment of risk levels.
Using methods based on multi-source data and stacked ensemble learning models, through data identification, classification, sensitivity analysis, dimensionality reduction and feature extraction, a stacked ensemble model is constructed to synthesize the prediction results of multiple base learners to improve the accuracy and accuracy of risk assessment. robustness.
It significantly improves the accuracy of shield excavation construction risk assessment and project management decision support, helps reduce construction risks and ensures the safety and efficiency of the project.
Smart Images

Figure CN118822249A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of big data processing technology and relates to a method for quantitatively assessing the risks of shield tunneling construction, specifically a method for quantitatively assessing the risks of shield tunneling construction based on multi-source data and a stacked integrated learning model. Background Technology
[0002] In tunnel boring machine (TBM) projects, risk assessment has always been a complex and critical task. However, traditional methods, relying on limited data sources and simplified statistical models, have limitations in accuracy and reliability. With the development of big data technology and advancements in on-site data acquisition techniques, a wealth of diverse data has emerged, such as geotechnical test data, photographic image data, and tunneling performance data. Summary of the Invention
[0003] The purpose of this invention is to propose a risk assessment method for tunnel boring machine (TBM) construction based on multi-source data and stacking integration technology. This method aims to address the issues of multi-source heterogeneous data fusion and risk level assessment methods and system construction in the quantitative risk assessment of the TBM tunneling interface. The method extracts and fuses features from multi-source data at the TBM tunneling interface to obtain a TBM tunneling parameter evaluation system, thereby forming a risk level assessment method.
[0004] The objective of this invention is achieved through the following technical solution:
[0005] A method for risk assessment in tunnel boring machine (TBM) construction based on multi-source data and stacking integration technology includes the following steps:
[0006] Step S1: Identification and classification of multi-source heterogeneous data from tunnel boring machines (TBMs):
[0007] Step S11: Establish a keyword list for multi-source heterogeneous data of tunnel boring machine (TBM) excavation;
[0008] Step S12: Collect multi-source heterogeneous data of shield tunneling: Collect multi-source heterogeneous data of shield tunneling based on the keywords in the keyword list, targeting the data type, output device, and structure.
[0009] Step S13: Identification and classification of multi-source heterogeneous data in shield tunneling: Based on data characteristics and data analysis requirements, classify the multi-source heterogeneous data in shield tunneling according to its category, structure, etc.
[0010] Step S2: Removal and filtering of heterogeneous data from multiple sources:
[0011] Step S21: Obtain multi-source heterogeneous data of shield tunneling and set the preset data standard format;
[0012] Step S22: Evaluate the quality of multi-source heterogeneous data from tunnel boring machine (TBM) excavation;
[0013] Step S23: Locating and identifying inferior multi-source heterogeneous data of shield tunneling: Extracting features and generating patterns for different types of data quality problem instances, filtering and locating suspected inferior data based on statistical indicators and violation pattern information, and ensuring the effectiveness and reliability of the detection method.
[0014] Step S3: Sensitivity analysis of multi-source heterogeneous data parameters in shield tunneling:
[0015] Step S31: Determine the sensitivity matrix of each shield tunneling data for a single evaluation index of the tunneling construction parameters;
[0016] Step S32: Determine the sensitivity entropy of the shield tunneling parameters and its entropy weight;
[0017] Step S33: Determine the comprehensive sensitivity matrix that takes into account the entropy weights of the shield tunneling parameters;
[0018] Step S34, Comprehensive Sensitivity Attribute Identification: Construct a comprehensive sensitivity attribute spatial judgment matrix for each factor, classifying the sensitivity level into four categories: insensitive, relatively sensitive, moderately sensitive, and highly sensitive; based on the comprehensive sensitivity judgment matrix considering the entropy weights of each shield tunneling parameter in the evaluation index, calculate the sensitivity index value, and combine it with the entropy weights of each evaluation index to obtain the attribute measure; identify the sensitivity attribute measure of each factor according to the confidence criterion, select the confidence level, conduct a comprehensive evaluation based on the strong order combination, and compare and rank the sensitivity of the parameters according to the scoring criteria of attribute identification, using the results for data dimensionality reduction;
[0019] Step S4: Dimensionality reduction of multi-source heterogeneous data from tunnel boring machines:
[0020] Step S41: Feature selection based on expert knowledge;
[0021] Step S42: Dimensionality reduction of multi-source heterogeneous data in shield tunneling based on embedding method: The machine learning model is trained to obtain the weight coefficients of each feature. Features are selected according to the weight coefficients from large to small, and variables with low correlation and low redundancy are screened out, thereby realizing dimensionality reduction of multi-source heterogeneous data in shield tunneling.
[0022] Step S5: Feature extraction and fusion of multi-source heterogeneous data from tunnel boring machines (TBMs):
[0023] Step S51: Extract statistical feature vectors;
[0024] Step S52: Extract time series feature vectors;
[0025] Step S53: Perform feature fusion on the statistical feature vector and the time series feature vector;
[0026] Step S54: Use the fused features obtained in step S53 as vectors as input to the machine learning method to realize modeling based on the shield tunneling process;
[0027] Step S6: Establish a risk assessment indicator system
[0028] Step S61: Calculate the indicator weights;
[0029] Step S62: Classify risk levels: Classify risk levels based on industry standards or expert experience;
[0030] Step S63, Consistency check of the judgment matrix: Construct a judgment matrix using the selected weight allocation method; perform a consistency check to ensure that the results of the expert evaluation are reasonable and consistent; if the consistency ratio does not meet the requirements, the weight allocation needs to be readjusted until a satisfactory consistency level is achieved.
[0031] Step S7: Applying the stacked integrated model to the shield tunneling construction quality risk assessment using multi-source data:
[0032] Step S71: Establish a stacked ensemble model: Select multiple different base learners, each of which is independently trained on multi-source heterogeneous data of tunnel boring machines; design a base classifier, whose function is to integrate the prediction results of each base learner and output the final result; during the model building process, adjust and optimize the parameters of each base learner and base classifier to ensure that the performance of the entire stacked ensemble model reaches the optimal level.
[0033] Step S72: Construction of multi-source heterogeneous database; Use the shield tunneling multi-source heterogeneous data after data processing and feature extraction to construct the database;
[0034] Step S73: Model training, testing, validation, and evaluation; During training, each base learner is trained independently on the training set and produces prediction results; The prediction results are used as input to the base classifier to train the base classifier to effectively synthesize the prediction results of the base learners; The model is tested using a test set; Advanced evaluation techniques are used to validate the model to ensure that the model not only performs well on the training data but also has good generalization ability;
[0035] Step S74: Model Application: Apply the model to the actual shield tunneling construction quality risk assessment scenario. During the application process, the model will receive real-time or historical shield tunneling multi-source heterogeneous data, and then predict the possible risk level based on these data.
[0036] Compared with the prior art, the present invention has the following advantages:
[0037] This invention proposes a method that focuses on the integration and processing of multi-source heterogeneous data. It utilizes advanced data processing techniques to identify, classify, and evaluate data quality, and then delves into the underlying information through sensitivity analysis, dimensionality reduction, and feature extraction. The core element is the construction of a stacked ensemble model, which integrates the prediction results of multiple base learners, thereby improving the accuracy and robustness of predictions. The implementation of this method not only significantly improves the accuracy of tunnel boring machine (TBM) risk assessment but also provides strong decision support for engineering management, helping to effectively reduce construction risks and ensure the safety and efficiency of the project. Attached Figure Description
[0038] Figure 1 This is a flowchart of a shield tunneling construction risk assessment based on multi-source data and stacking integration technology; Figure 2 A flowchart for training a stacked ensemble learning model; Figure 3 This is a scenario for quality risk assessment in tunnel boring machine (TBM) construction. Detailed Implementation
[0040] The technical solution of the present invention will be further described below with reference to the accompanying drawings, but it is not limited thereto. Any modifications or equivalent substitutions to the technical solution of the present invention that do not depart from the spirit and scope of the technical solution of the present invention should be covered within the protection scope of the present invention.
[0041] This invention provides a method for risk assessment in tunnel boring machine (TBM) construction based on multi-source data and stacking integration technology, such as... Figure 1 As shown, the method includes the following steps:
[0042] Step S1: Identification and Classification of Multi-Source Heterogeneous Data from Tunnel Boring Machines
[0043] The multi-source heterogeneous data of tunnel boring machine (TBM) excavation includes, but is not limited to, various forms of geotechnical test data, photographic image data, and tunneling performance data. The specific steps for its identification and classification are as follows:
[0044] Step S11: Establish a keyword table for multi-source heterogeneous data from tunnel boring machines. This keyword table is determined by the data source, and the keywords of the data source include output data keywords, equipment keywords, data structure information, etc.
[0045] Step S12: Collect multi-source heterogeneous data of tunnel boring machine (TBM) excavation. This involves collecting TBM excavation data based on keywords in the keyword list, considering data type, output device, and structure. This includes contact behavior data collection: data collected through direct contact with construction equipment or built-in sensors, such as the TBM's propulsion speed, torque, earth pressure, and cutterhead wear status; and non-contact behavior data collection: data collected through non-direct contact methods such as video monitoring, such as monitoring the construction site environment and the stability of surrounding buildings.
[0046] Step S13: Data identification and classification for tunnel boring machines (TBMs), namely: based on data characteristics and data analysis needs, data classification is performed on the categories and structures of TBMs, including qualitative indicators, which are indicators that can be analyzed through descriptive analysis, such as the area and orientation of weak interlayers and the area of groundwater; and quantitative indicators, which are indicators that can be expressed numerically, such as the advance speed of the TBM, earth pressure, and the degree of rock weathering.
[0047] Step S2: Multi-source heterogeneous data removal and filtering
[0048] In view of the characteristics of high complexity, inconsistent accuracy, and complex quality issues of multi-source heterogeneous data in tunnel boring machine (TBM) excavation, the specific steps for multi-source heterogeneous data removal and filtering are as follows:
[0049] Step S21: Acquire multi-source heterogeneous data from the tunnel boring machine and set a preset data standard format. The data standard format is set according to actual usage requirements, including structured, unstructured, and semi-structured standard formats.
[0050] Step S22: Evaluate the quality of multi-source heterogeneous data from tunnel boring machines (TBMs). The data quality evaluation mainly includes dimensions such as data integrity, consistency, timeliness, and validity. Considering the complex relationships between these quality dimensions, including conditions, composition, and concurrency, determine the reliability indicators and thresholds for the multi-source heterogeneous data from TBMs.
[0051] Step S23: Locate and identify substandard multi-source heterogeneous data from shield tunneling, namely: extract features and generate patterns for different types of data quality problem instances, filter and locate suspected substandard data based on statistical indicators and violation pattern information, and ensure the effectiveness and reliability of the detection method.
[0052] Step S3: Sensitivity Analysis of Multi-Source Heterogeneous Data Parameters in Shield Tunneling
[0053] Under a certain baseline state, each factor is allowed to vary within its possible range of values deviating from the baseline state. The influence of these variations on the shield tunneling parameter is studied. A dimensionless sensitivity function is defined, and the sensitivity of each factor is compared and analyzed. The specific steps are as follows:
[0054] Step S31: Determine the sensitivity matrix of each shield tunneling parameter for individual evaluation indexes of tunneling construction parameters.
[0055] A sample matrix is constructed by determining the sensitivity of the electromagnetic susceptibility analysis factors and the shield tunneling parameters corresponding to the evaluation index. The matrix is then normalized to obtain a normalized matrix.
[0056] Step S32: Determine the sensitivity entropy and entropy weight of the evaluation index (shield tunneling parameters).
[0057] Entropy weighting is used to weight the sensitivity samples. The entropy weighting method determines the weight coefficient of each indicator by its information utility value (entropy value), which is used to eliminate human interference in the calculation of the weight coefficient and make the evaluation results more consistent with objective reality.
[0058] Step S33: Determine the comprehensive sensitivity matrix that takes into account the entropy weights of the shield tunneling parameters.
[0059] To comprehensively consider the influence of each shield tunneling parameter on the evaluation index obtained from random analysis, the sensitivity entropy weight of each shield tunneling parameter is determined by the entropy weight method, and the comprehensive sensitivity judgment matrix of the influencing factors of each shield tunneling parameter on the evaluation index is calculated accordingly.
[0060] Step S34: Comprehensive sensitivity attribute identification.
[0061] A comprehensive sensitivity attribute space judgment matrix for each factor is constructed, classifying sensitivity levels into four categories: insensitive, moderately sensitive, moderately sensitive, and highly sensitive. Based on the comprehensive sensitivity judgment matrix considering the entropy weights of each shield tunneling parameter in the evaluation indicators, sensitivity index values are calculated. Attribute measures are obtained by combining the entropy weights of each evaluation indicator. The sensitivity attribute measures of each factor are identified according to the confidence criterion, and confidence levels are selected. A comprehensive evaluation is conducted based on strong order combinations, and the sensitivity of parameters is compared and ranked according to the attribute identification scoring criteria. The results are used for data dimensionality reduction.
[0062] Step S4: Dimensionality reduction of multi-source heterogeneous data from tunnel boring machines
[0063] Step S41: Feature selection based on expert knowledge. Dimensions with high relevance are retained by incorporating domain expert knowledge.
[0064] Step S42: Dimensionality reduction of multi-source heterogeneous data in tunnel boring machines based on embedding method. A machine learning model is trained to obtain the weight coefficients of each feature. Features are selected based on the weight coefficients from largest to smallest, filtering out variables with low correlation and redundancy, thereby achieving dimensionality reduction of multi-source heterogeneous data in tunnel boring machines.
[0065] Step S5: Feature Extraction and Fusion of Multi-Source Heterogeneous Data from Shield Tunneling
[0066] Feature extraction and fusion of multi-source heterogeneous data from tunnel boring machines includes statistical feature extraction, time series feature extraction, and data feature fusion. The specific steps are as follows:
[0067] Step S51: Extract statistical feature vectors, the specific process is as follows:
[0068] Step S511: Define the statistical feature vector categories. The statistical features of each frame of data include: mean, variance, mode, median, upper edge, upper quartile, lower quartile, and lower edge.
[0069] Step S512: Considering the existence of outliers in each frame of data, extract the upper edge, upper quartile, lower quartile, and lower edge as statistical feature vectors;
[0070] Step S513: The difference between the upper quartile and the lower quartile defines the interval between them, thereby determining the upper and lower edges of the intra-frame data.
[0071] Step S52: Extract time series feature vectors and use clustering methods to extract time series features of intra-frame data.
[0072] Step S53: Perform feature fusion on the statistical feature vector and the time series feature vector, and use it as input for relevant machine learning methods. Feature fusion involves merging the obtained statistical feature vectors from each frame of data with the time series feature vector to obtain a fused feature vector.
[0073] Step S54: Use the fused features obtained in step S53 as vectors as input to the machine learning method to realize modeling based on the shield tunneling process.
[0074] Step S6: Establish a risk assessment indicator system:
[0075] Step S61: Calculate the indicator weights. The specific steps are as follows:
[0076] Step S611: Select appropriate risk assessment indicators, including but not limited to shield tunneling interface instability, shield tail instability, project time delay, cost overrun, and frequency of safety accidents;
[0077] Step S612: Select the weight allocation method as the Analytic Hierarchy Process (AHP);
[0078] Step S613: The importance of each indicator is evaluated by experts, and weights are assigned according to the evaluation results. The assigned weights are normalized to ensure that the sum of the weights of all indicators is 1.
[0079] Step S62: Risk Level Classification: Based on industry standards or expert experience, risk levels are classified. The specific steps are as follows:
[0080] Step S621: Define the risk level as low, medium, and high.
[0081] Step S622: Based on the specific circumstances of the project and historical data, set the threshold for each risk level;
[0082] Step S623: Analyze the correlation between each risk indicator and the risk level to ensure the reasonable classification of risk levels.
[0083] Step S63: Judgment Matrix Consistency Check: Construct a judgment matrix using the selected weight allocation method; perform a consistency check to ensure that the expert evaluation results are reasonable and consistent; if the consistency ratio does not meet the requirements, the weight allocation needs to be readjusted until a satisfactory consistency level is achieved.
[0084] Step S7: Applying the stacked integrated model to the shield tunneling construction quality risk assessment using multi-source data:
[0085] Step S71: Establish a stacked ensemble model: Select multiple different base learners, which can be different types of machine learning algorithms such as decision trees, support vector machines, and neural networks. Figure 2 As shown, each base learner is independently trained on multi-source heterogeneous data from tunnel boring machines (TBMs). A base classifier (or secondary learner) is designed to synthesize the predictions from all base learners and produce the final output. During model building, the parameters of each base learner and base classifier need to be adjusted and optimized to ensure that the performance of the entire stacked ensemble model reaches its optimal level.
[0086] Step S72: Construction of a multi-source heterogeneous database; A database is constructed using multi-source heterogeneous data from tunnel boring machines after data processing and feature extraction. The database is divided into a training set and a test set, where the training set is used to train the model, and the test set is used for subsequent model validation.
[0087] Step S73: Model Training, Testing, Validation, and Evaluation; During training, each base learner is trained independently on the training set and produces predictions. These predictions are used as input to the base classifier to train it to effectively synthesize the predictions from the base learners. The model is tested using a test set. This process includes evaluating the model's performance on independent datasets, such as accuracy, recall, and F1 score. Advanced evaluation techniques, such as cross-validation, are used to validate the model, ensuring it not only performs well on the training data but also has good generalization ability.
[0088] Step S74: Model Application: Apply the model to actual shield tunneling construction quality risk assessment scenarios, such as... Figure 3As shown in the diagram. During application, the model receives real-time or historical multi-source heterogeneous data on tunnel boring machine (TBM) excavation and then predicts potential risk levels based on this data. The model's output helps engineers and project managers better understand potential risks during construction, enabling them to take appropriate preventative or mitigation measures to ensure the safety and efficiency of the construction process.
Claims
1. A shield construction risk assessment method based on multi-source data and stacking integration technology, characterized in that The method comprises the following steps: Step S1: Identification and classification of multi-source heterogeneous data of shield tunneling: Step S11, establishing a keyword table of multi-source heterogeneous data of shield tunneling; Step S12, collecting multi-source heterogeneous data of shield tunneling: collecting multi-source heterogeneous data of shield tunneling according to the keywords in the keyword table, based on the type, output device, and structure of the data; Step S13, identifying and classifying multi-source heterogeneous data of shield tunneling: classifying the multi-source heterogeneous data of shield tunneling according to the category and structure of the data according to the data characteristics and data analysis requirements; Step S2: Elimination and filtering of multi-source heterogeneous data: Step S21, obtaining multi-source heterogeneous data of shield tunneling, and setting a preset data standard format; Step S22, evaluating the quality of multi-source heterogeneous data of shield tunneling; Step S23, positioning and identifying inferior multi-source heterogeneous data of shield tunneling: extracting features and generating patterns for different types of data quality problem instances, screening and positioning suspected inferior data based on statistical indicators and violation pattern information, and ensuring the effectiveness and reliability of the detection method; Step S3: Parameter sensitivity analysis of multi-source heterogeneous data of shield tunneling: Step S31, determining the sensitivity matrix of each shield tunneling data of a single evaluation index of tunneling construction parameters; Step S32, determining shield tunneling parameter sensitivity entropy and its entropy weight; Step S33, determining a comprehensive sensitivity matrix considering the entropy weights of shield tunneling parameters; Step S34, comprehensive sensitivity attribute identification: construct a comprehensive sensitivity attribute space judgment matrix of each factor, and divide the sensitivity degree into four categories: insensitive, relatively sensitive, moderately sensitive and highly sensitive; based on the comprehensive sensitivity judgment matrix considering the entropy weight of each shield tunneling parameter of the evaluation index, calculate the sensitivity index value, and obtain the attribute measurement by combining the entropy weight of each evaluation index; identify the sensitivity attribute measurement of each factor according to the confidence criterion, select the confidence, conduct a comprehensive evaluation according to the strong order combination, and compare and sort the sensitivity of the parameters by size according to the scoring criterion of attribute identification, and the results are used for data dimensionality reduction; Step S4: Dimensionality reduction of multi-source heterogeneous data in shield tunneling: Step S41: feature selection based on expert knowledge; Step S42, dimensionality reduction of shield tunneling multi-source heterogeneous data based on embedding method: use machine learning model for training to obtain weight coefficients of various features, select features from large to small according to the weight coefficients, and screen out variables with small correlation and low redundancy, so as to achieve dimensionality reduction of shield tunneling multi-source heterogeneous data; Step S5: Feature extraction and fusion of multi-source heterogeneous data of shield tunneling: Step S51, extracting statistical feature vectors; Step S52, extracting time series feature vectors; Step S53, performing feature fusion on the statistical feature vector and the time series feature vector; Step S54, using the fused feature vector obtained in step S53 as the input of the machine learning method to achieve modeling based on the shield tunneling process; Step S6: Establish a risk assessment indicator system Step S61, calculating the index weight; Step S62, classify the risk levels: classify the risk levels according to industry standards or expert experience; Step S63, judgment matrix consistency check: construct a judgment matrix using the selected weight distribution method; Conduct consistency checks to ensure that the results of expert evaluations are reasonable and consistent; If the consistency ratio does not meet the requirements, the weight distribution needs to be readjusted until a satisfactory consistency level is reached; Step S7: Applying the stacked integrated model to the shield tunneling construction quality risk assessment based on multi-source data: Step S71, establishing a stacked ensemble model: selecting a plurality of different base learners, each of which is independently trained on multi-source heterogeneous data of shield tunneling; designing a base classifier, which is used to integrate the prediction results of each base learner and make a final output; In the process of building the model, adjust and optimize the parameters of each base learner and base classifier to ensure the performance of the entire stacked ensemble model is optimal; Step S72: constructing a multi-source heterogeneous database; using the shield tunneling multi-source heterogeneous data after data processing and feature extraction to construct a database; Step S73: model training, testing, verification and evaluation; During the training process, each base learner is trained independently on the training set and generates prediction results. The prediction results are used as inputs to the base classifiers to train the base classifiers to effectively synthesize the prediction results of the base learners. Use the test set to test the model; use advanced evaluation techniques to verify the model to ensure that the model not only performs well on the training data but also has good generalization ability; Step S74: Model application: Apply the model to the actual shield tunneling construction quality risk assessment scenario. During the application process, the model will receive real-time or historical shield tunneling multi-source heterogeneous data, and then predict the possible risk level based on this data.
2. The shield construction risk assessment method based on multi-source data and stacking integration technology according to claim 1 is characterized in that The shield tunneling multi-source heterogeneous data includes various forms of geotechnical test data, photographic image data, and tunneling performance data.
3. The shield construction risk assessment method based on multi-source data and stacking integration technology according to claim 1 is characterized in that The keyword table is determined by a data source, and the keywords of the data source include output data keywords, device keywords, and data structural information.
4. The shield construction risk assessment method based on multi-source data and stacking integration technology according to claim 1 is characterized in that The data standard formats include structured, unstructured and semi-structured standard formats.
5. The shield construction risk assessment method based on multi-source data and stacking integration technology according to claim 1 is characterized in that The data quality assessment includes the dimensions of data integrity, consistency, timeliness, and effectiveness, and determines the reliability indicators and thresholds of multi-source heterogeneous data of shield tunneling based on the conditions, composition, and concurrent complex relationships between the quality dimensions.
6. The shield construction risk assessment method based on multi-source data and stacking integration technology according to claim 1 is characterized in that The specific process of step S51 is as follows: Step S511: define the statistical feature vector category, the statistical features of each frame data include: mean value, variance, mode, median, upper edge, upper quartile, lower quartile and lower edge; Step S512: Considering the presence of outlier data in each frame data, extract the upper edge, upper quartile point, lower quartile point and lower edge as statistical feature vectors; Step S513: The difference between the upper quartile point and the lower quartile point is used to define the interval between the two, thereby determining the upper edge and the lower edge of the data in the frame.
7. The shield construction risk assessment method based on multi-source data and stacking integration technology according to claim 1 is characterized in that The specific steps of step S61 are as follows: Step S611: Select appropriate risk assessment indicators; Step S612: Selecting the weight allocation method as the analytic hierarchy process; Step S613: Experts evaluate the importance of each indicator, assign weights according to the evaluation results, and normalize the assigned weights to ensure that the sum of the weights of all indicators is 1.
8. The shield construction risk assessment method based on multi-source data and stacking integration technology according to claim 7 is characterized in that The risk assessment indicators include instability of the shield excavation interface, instability of the shield tail, project time delay, cost overrun, and frequency of safety accidents.
9. The shield construction risk assessment method based on multi-source data and stacking integration technology according to claim 1 is characterized in that The specific steps of step S62 are as follows: Step S621: define the risk level as low, medium and high; Step S622: setting the threshold of each risk level according to the specific situation and historical data of the project; Step S623: Analyze the correlation between each risk indicator and the risk level to ensure the reasonable division of risk levels.
Citation Information
Patent Citations
Geological disaster susceptibility evaluation method and system based on integration strategy
CN112232526A
Multi-model fusion shield construction settlement prediction method and system
CN113204824A
Shield equipment fault fusion prediction method based on ensemble learning
CN115859826A
Shield tunnel construction risk grade assessment method, system, equipment and medium
CN116402339A
Seabed shield tunnel construction quality risk assessment method based on PSO-BP neural network
CN116629712A
Cited By
Method and system for dynamically evaluating large-diameter shield tunneling risk in volcanic ash stratum
CN119397923A
A method and system for dynamically evaluating the risk of large-diameter shield tunneling in a volcanic ash stratum
CN119397923B
Equipment system performance evaluation method and device oriented to multi-source heterogeneous data
CN120278389A
Engineering construction whole process digital management method and system
CN120806232A