Predictive equipment maintenance method and device, equipment and computer storage medium
Through the small-batch cluster center iteration method, the time-consuming problem of traditional fuzzy clustering algorithm in processing big data is solved, and the efficiency and accuracy of predictive maintenance of industrial equipment are improved.
Patent Information
- Application Number
- CN202410400107.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-10-22
AI Technical Summary
Traditional fuzzy clustering algorithms increase system time when processing large amounts of equipment data, reducing the efficiency of predictive maintenance of industrial equipment.
Using the thinking of the mini-batch gradient descent method, a mini-batch cluster center iteration method is proposed, which randomly selects samples to iterate the cluster center, thereby reducing the number of samples in iterative calculations, avoiding local optimal problems, and improving calculation efficiency.
It effectively shortens the data processing time, improves the efficiency of predictive maintenance of industrial equipment, and ensures real-time and accuracy.
Smart Images

Figure CN118822484A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of data processing technology, and in particular, relates to a method, apparatus, device and computer storage medium for predictive maintenance of equipment. Background Art
[0002] In the industrial field, motors are the power source of equipment and production lines. Monitoring the motor status of key machines can avoid process downtime and maximize return on investment. Predictive maintenance of motors is also an important application of the Industrial Internet. Early motor failure prediction was only a regular manual inspection. Once there were too many motors, the efficiency became very low and the accuracy could not be guaranteed. The gradual advancement and maturity of industrial artificial intelligence technology and edge computing technology, from the initial attempts to be used in the field of aircraft engines and high-end equipment predictive maintenance to the current application of large-scale motors in the industrial field, predictive maintenance is a very valuable application in the Industrial Internet.
[0003] At present, most of the equipment predictive maintenance solutions monitor the speed, acceleration, temperature, vibration and other parameters of the motor to achieve motor status monitoring, health assessment, abnormal warning, fault diagnosis, maintenance decision, etc. In the entire predictive maintenance algorithm, the processing of a large amount of front-end data is generally achieved through the fuzzy clustering algorithm (FCM).
[0004] In the process of predictive maintenance of industrial equipment, data needs to be collected every 1ms. If data is collected continuously for 1 hour, there will be 3.6 million data, which is a huge amount of data to process. However, using traditional fuzzy clustering algorithms to process the data increases the system time consumption, resulting in low efficiency of predictive maintenance of industrial equipment. Summary of the invention
[0005] The embodiments of the present application provide a method, apparatus, device and computer storage medium for predictive maintenance of equipment to solve the problem that the processing of data volume through traditional fuzzy clustering algorithm increases system time consumption and leads to low efficiency of predictive maintenance of industrial equipment.
[0006] In a first aspect, an embodiment of the present application provides a method for predictive maintenance of equipment, the method comprising:
[0007] Acquire an initial data sample of a device, wherein the initial data sample includes data to be predicted;
[0008] Extracting data from the initial data sample to obtain a random sample;
[0009] According to a preset number of clusters, fuzzy clustering is performed on the random samples to obtain cluster centers corresponding to the number of clusters;
[0010] Determining abnormal data points in the random sample according to the cluster center;
[0011] Eliminate the abnormal data points in the random sample to obtain a target random sample;
[0012] predicting the health status of the device based on the target random sample;
[0013] When the health status is abnormal, the device is maintained.
[0014] In a second aspect, an embodiment of the present application provides a device for predictive maintenance of equipment, the device comprising:
[0015] An acquisition module, used to acquire an initial data sample of a device, wherein the initial data sample includes data to be predicted;
[0016] An extraction module, used for extracting data from the initial data sample to obtain a random sample;
[0017] A clustering module, used to perform fuzzy clustering on the random samples according to a preset number of clusters to obtain cluster centers corresponding to the number of clusters;
[0018] A determination module, configured to determine abnormal data points in the random sample according to the cluster center;
[0019] A removal module, used to remove the abnormal data points in the random sample to obtain a target random sample;
[0020] A prediction module, used for predicting the health status of the device according to the target random sample;
[0021] A maintenance module is used to maintain the device when the health status is abnormal.
[0022] In a third aspect, an embodiment of the present application provides a terminal device, the device comprising: a processor and a memory storing computer program instructions;
[0023] When the processor executes the computer program instructions, it implements the equipment predictive maintenance method as in the first aspect, or implements the equipment predictive maintenance method as in the second aspect.
[0024] In a fourth aspect, an embodiment of the present application provides a computer storage medium, on which computer program instructions are stored. When the computer program instructions are executed by a processor, the equipment predictive maintenance method as in the first aspect is implemented, or the equipment predictive maintenance method as in the second aspect is implemented.
[0025] In a fifth aspect, an embodiment of the present application provides a computer program product, characterized in that when the instructions in the computer program product are executed by a processor of an electronic device, the electronic device executes the equipment predictive maintenance method as in the first aspect, or implements the equipment predictive maintenance method as in the second aspect.
[0026] The embodiment of the present application provides a method for predictive maintenance of equipment applied to electronic equipment. This solution draws on the idea of the small batch gradient descent method and proposes a small batch cluster center iteration method. The core idea of the improved method is that when the sample space is huge, a certain proportion of samples are randomly selected, and their distribution characteristics are the same as the original sample space. Before each cluster center iteration, a small batch of samples are randomly selected. Since the number of samples for iterative calculation is reduced, the iterative calculation time will be effectively improved; since the sample data for each iteration is different, the local optimal problem caused by using the same sample iteration is effectively avoided. This solves the problem that the traditional fuzzy clustering algorithm completes the processing of the data volume, increases the system time consumption, and improves the efficiency of predictive maintenance of industrial equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the technical solution of the embodiments of the present application, the following is a brief introduction to the drawings required for use in the embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.
[0028] Figure 1 It is a flow chart of the equipment predictive maintenance method provided in the embodiment of the present application;
[0029] Figure 2 It is a structural schematic diagram of a device predictive maintenance apparatus provided in an embodiment of the present application;
[0030] Figure 3 It is a schematic diagram of the structure of the terminal device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0031] The features and exemplary embodiments of various aspects of the present application will be described in detail below. In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only intended to explain the present application, rather than to limit the present application. For those skilled in the art, the present application can be implemented without the need for some of these specific details. The following description of the embodiments is only to provide a better understanding of the present application by illustrating the examples of the present application.
[0032] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "include..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0033] In order to solve the problems of the prior art, the embodiments of the present application provide a method, apparatus, device and computer storage medium for predictive maintenance of equipment.
[0034] The following first introduces the equipment predictive maintenance method provided in the embodiment of the present application.
[0035] Figure 1 FIG. 1 is a flow chart of a method for predictive maintenance of equipment provided by an embodiment of the present application. Figure 1 As shown, the method includes:
[0036] Step 101, obtaining an initial data sample of a device, wherein the initial data sample includes data to be predicted;
[0037] Step 102, extracting data from the initial data sample to obtain a random sample;
[0038] Step 103, performing fuzzy clustering on the random samples according to a preset number of clusters to obtain cluster centers corresponding to the number of clusters;
[0039] Step 104, determining abnormal data points in the random sample according to the cluster center;
[0040] Step 105, removing the abnormal data points in the random sample to obtain a target random sample;
[0041] Step 106, predicting the health status of the device according to the target random sample;
[0042] Step 107: When the health status is abnormal, perform maintenance on the device.
[0043] In step 101, the initial data sample refers to a data sample set including the motor to be predicted, and the sample set also includes multiple groups of data to be predicted, which may include the effective value of motor speed, acceleration peak, envelope peak and device temperature. The data to be predicted can be collected through 5G data acquisition gateway, serial port, Ethernet, data IO, etc. Specifically, the effective value of motor speed, acceleration peak, envelope peak and device temperature can be collected every 1ms as a group of data to be predicted, and 60,000 data can be continuously acquired for 1min to form an initial data sample X. It can be obtained by X={x1,x2......,x 60000}. Among them, x1, x2...x 60000 Indicates different data to be predicted.
[0044] In step 102, since the initial data sample is relatively large, in order to improve the calculation efficiency, random sampling can be performed in the initial sample to obtain a random sample. Define the random sample as X', then
[0045] X′=Random(X,s)
[0046] Where X is the initial data sample and s is the number of random samples. Based on the randomly selected sample x.
[0047] In step 103, the number of clusters can be set as needed, such as 3, 4 or 5. If X is to be divided into c categories, there are c cluster centers V = {v1, v2, ..., v c}. Each cluster center can be obtained specifically through the following embodiments:
[0048] In one embodiment, the step 103 further includes:
[0049] According to a preset number of clusters, fuzzy clustering is performed on the random samples so that a preset optimization objective function reaches a minimum value;
[0050] When the optimization objective function reaches a minimum value, a random membership matrix expression of the random sample is obtained;
[0051] Iteratively process the random membership matrix expression to construct a cluster center expression of the random sample;
[0052] The random samples are iteratively processed according to the cluster center expression to obtain cluster centers corresponding to the number of clusters.
[0053] In this embodiment, the fuzzy c-means algorithm can be used for fuzzy clustering, and the optimization objective function can be expressed by the following expression:
[0054]
[0055] Among them, u ij The following constraints are met:
[0056]
[0057] Among them, let d ij =||x i -v j ||, represents the i-th sample x in the random sample i With the jth cluster center v j The distance; let U be the fuzzy membership matrix, u ij represents the i-th sample x i Belongs to the jth cluster center v j The membership degree of m is the fuzzy index. In practical applications, its optimal value range is m∈(1.5,2.5), and m=2 is generally taken.
[0058] The clustering criterion of the fuzzy c-means algorithm is to obtain The minimum value of
[0059]
[0060] If the following conditions are met, The minimum value can be obtained:
[0061]
[0062] Therefore, according to the above formula, the random membership matrix expression U′ can be obtained as follows:
[0063]
[0064] The random membership matrix expression is used for iterative processing to construct the cluster center expression of the random sample:
[0065]
[0066] in, is the i-th sample x in the random sample i Belongs to the jth cluster center v j The membership degree of x i Represents the i-th sample in the random sample.
[0067] After obtaining the above cluster center expression, the samples in the random sample are iteratively processed in turn to obtain the cluster center corresponding to the number of clusters. It should be noted that the initial cluster center V0, the iteration stop threshold e and the maximum number of iterations b can be set in advance so that the iterative calculation is stopped when the maximum number of iterations is reached.
[0068] In step 104, abnormal data points in the random sample are determined according to the cluster center;
[0069] In one embodiment, the step 104 further includes:
[0070] Obtaining the Euclidean distance between each of the cluster centers and each sample in the random samples;
[0071] constructing a normal distribution function based on the Euclidean distance;
[0072] According to the preset abnormal data extraction criterion and the normal distribution function, abnormal data points in the random sample are extracted.
[0073] In this embodiment, the random sample X' and the cluster center V are calculated. i The Euclidean distance d ij , where each cluster center corresponds to each sample one by one.
[0074] Since there are multiple random samples, there are also multiple corresponding Euclidean distances. Constructing the normal distribution function G based on the Euclidean distance j (v j ),get:
[0075]
[0076] Among them, according to the Euclidean distance, it can be determined:
[0077]
[0078]
[0079] where v j represents the jth cluster center, d ij Indicates that the i-th belongs to v j Sample x i With the jth cluster center v j The distance Indicates that it belongs to v j All samples X j With v j The average distance.
[0080] The above abnormal data points can be determined based on the above average distance and abnormal data extraction criteria, where according to the PauTu criterion, 3σ is taken j is the abnormal data judgment boundary, and the expression of the abnormal data extraction criterion is as follows:
[0081]
[0082] When Si = 0, record x i is an abnormal data point. Therefore, when d ij Not When it is within the range, the corresponding sample is an abnormal data point.
[0083] In this embodiment, by constructing a normal distribution function of the random sample, and then extracting abnormal data points in the random sample according to the normal distribution function and the abnormal data extraction criteria, it is possible to ensure that the abnormal data points are accurately identified, and prevent the problem of inaccurate target random samples ultimately used for prediction due to data anomalies, thereby improving the accuracy of health prediction.
[0084] In step 105, the abnormal data points in the random sample are removed to obtain a target random sample;
[0085] In this embodiment, abnormal data points of the random sample are removed, thereby improving the accuracy of the target random sample.
[0086] Step 106, predicting the health status of the device according to the target random sample;
[0087] In one embodiment, predicting the health status of the device according to the target random sample includes:
[0088] Obtaining the distance between each sample in the target random sample and the cluster center;
[0089] The health status of the device is predicted according to the distance and a preset health threshold.
[0090] In this embodiment, after obtaining the target random sample, the distance d′ between each sample in the target random sample and the corresponding cluster center is calculated. ij , and then predict the health status of the device based on the distance, where the health status is expressed according to the following expression:
[0091]
[0092] Among them, w ij is the health state, and λ is the health threshold.
[0093] In step 107, when the health status is abnormal, the device is maintained.
[0094] In one embodiment, when the health status is abnormal, maintaining the device includes:
[0095] In the case where the health status is abnormal, matching maintenance measures corresponding to the health status in a preset knowledge base;
[0096] The equipment is maintained based on the maintenance measures.
[0097] In this embodiment, when the health status is When , that is, when the distance is greater than the preset health level, the health status is determined to be abnormal, and then according to the abnormal value, the maintenance measures corresponding to the health status are matched in the preset knowledge base.
[0098] In this embodiment, the idea of small batch gradient descent method is borrowed to propose a small batch cluster center iteration method. The core idea of the improved method is that when the sample space is huge, a certain proportion of samples are randomly selected, and their distribution characteristics are the same as the original sample space. Before each cluster center iteration, a small batch of samples are randomly selected. Since the number of samples for iterative calculation is reduced, the iterative calculation time will be effectively improved; since the sample data of each iteration is different, the local optimal problem caused by using the same sample iteration is effectively avoided. Then the traditional fuzzy clustering algorithm is solved to complete the processing of data volume, which increases the time consumption of the system and improves the efficiency of predictive maintenance of industrial equipment.
[0099] In one embodiment, the equipment predictive maintenance method is tested, and the actual test results are as follows:
[0100] Take the data of 100ms when a motor switches mode (a total of 100 data), set the number of random sample spaces to 30, and use the sample space optimization method and normalization to obtain the following basic data:
[0101]
[0102] Table 1
[0103] After being processed by the optimized FCM algorithm, the discrimination results are as follows:
[0104]
[0105] Table 2
[0106] The optimized FCM algorithm can identify two abnormal data, of which the fourth-level risk is a low-risk warning, indicating that it is switching between working modes, which shows the effectiveness of the optimized algorithm in identifying abnormal data. In addition, industrial equipment will generate 3.6 million data per hour of operation. The optimized FCM algorithm greatly shortens the algorithm iteration time and better guarantees real-time performance.
[0107] like Figure 2 As shown, the embodiment of the present application further provides a device predictive maintenance apparatus 200, and the device predictive maintenance apparatus 200 includes:
[0108] An acquisition module 201 is used to acquire an initial data sample of a device, wherein the initial data sample includes data to be predicted;
[0109] An extraction module 202 is used to extract data from the initial data sample to obtain a random sample;
[0110] The clustering module 203 is used to perform fuzzy clustering on the random samples according to a preset number of clusters to obtain cluster centers corresponding to the number of clusters;
[0111] A determination module 204, configured to determine abnormal data points in the random sample according to the cluster center;
[0112] A removal module 205 is used to remove the abnormal data points in the random sample to obtain a target random sample;
[0113] A prediction module 206, configured to predict the health status of the device according to the target random sample;
[0114] The maintenance module 207 is used to maintain the device when the health status is abnormal.
[0115] Optionally, the clustering module 203 includes:
[0116] A clustering submodule, used for performing fuzzy clustering on the random samples according to a preset number of clusters, so as to minimize a preset optimization objective function;
[0117] A first determination submodule is used to obtain a random membership matrix expression of the random sample when the optimization objective function reaches a minimum value;
[0118] A first construction submodule is used to perform iterative processing using the random membership matrix expression to construct a cluster center expression of the random sample;
[0119] The second determination submodule is used to iteratively process the random samples according to the cluster center expression to obtain cluster centers corresponding to the number of clusters.
[0120] Optionally, the determining module 204 includes:
[0121] A first acquisition submodule, used for acquiring the Euclidean distance between each of the cluster centers and each sample in the random samples;
[0122] A second construction submodule is used to construct a normal distribution function based on the Euclidean distance;
[0123] The extraction submodule is used to extract abnormal data points in the random sample according to a preset abnormal data extraction criterion and the normal distribution function.
[0124] Optionally, the prediction module 206 includes:
[0125] A second acquisition submodule is used to obtain the distance between each sample in the target random sample and the cluster center;
[0126] The prediction submodule is used to predict the health status of the device according to the distance and a preset health threshold.
[0127] Optionally, the maintenance module 207 includes:
[0128] A matching submodule, used for matching maintenance measures corresponding to the health state in a preset knowledge base when the health state is abnormal;
[0129] A maintenance submodule is used to maintain the equipment based on the maintenance measures.
[0130] It should be noted that the equipment predictive maintenance device 200 is a device corresponding to the above-mentioned equipment predictive maintenance method applied to the server. All implementation methods in the above-mentioned method embodiment are applicable to the embodiment of the device and can achieve the same technical effect.
[0131] Figure 3 A schematic diagram of the hardware structure of a terminal device provided in an embodiment of the present application is shown.
[0132] The terminal device may include a processor 301 and a memory 302 storing computer program instructions.
[0133] Specifically, the processor 301 may include a central processing unit (CPU), or an application specific integrated circuit (ASIC), or may be configured to implement one or more integrated circuits of the embodiments of the present application.
[0134] The memory 302 may include a large capacity memory for data or instructions. By way of example and not limitation, the memory 302 may include a hard disk drive (HDD), a floppy disk drive, a flash memory, an optical disk, a magneto-optical disk, a magnetic tape, or a universal serial bus (USB) drive or a combination of two or more of these. In appropriate cases, the memory 302 may include a removable or non-removable (or fixed) medium. In appropriate cases, the memory 302 may be inside or outside the integrated gateway disaster recovery device. In a specific embodiment, the memory 302 is a non-volatile solid-state memory.
[0135] In certain embodiments, the memory 302 may include a read-only memory (ROM), a random access memory (RAM), a magnetic disk storage medium device, an optical storage medium device, a flash memory device, an electrical, optical or other physical / tangible memory storage device. Thus, in general, the memory includes one or more tangible (non-transitory) computer-readable storage media (e.g., a memory device) encoded with software including computer-executable instructions, and when the software is executed (e.g., by one or more processors), it is operable to perform the operations described with reference to the method according to an aspect of the present disclosure.
[0136] The processor 301 implements any one of the equipment predictive maintenance methods in the above embodiments by reading and executing computer program instructions stored in the memory 302 .
[0137] In one example, the terminal device may further include a communication interface 303 and a bus 310. Figure 3 As shown, the processor 301, the memory 302, and the communication interface 303 are connected via a bus 310 and communicate with each other.
[0138] The communication interface 303 is mainly used to implement communication between various modules, devices, units and / or equipment in the embodiments of the present application.
[0139] Bus 310 includes hardware, software or both, and the parts of online data flow billing equipment are coupled to each other. For example, but not limitation, bus may include accelerated graphics port (AGP) or other graphics bus, enhanced industrial standard architecture (EISA) bus, front-end bus (FSB), hypertransport (HT) interconnection, industrial standard architecture (ISA) bus, infinite bandwidth interconnection, low pin count (LPC) bus, memory bus, micro channel architecture (MCA) bus, peripheral component interconnection (PCI) bus, PCI-Express (PCI-X) bus, serial advanced technology attachment (SATA) bus, video electronics standard association local (VLB) bus or other suitable bus or two or more of these combinations. In appropriate cases, bus 310 may include one or more buses. Although the present application embodiment describes and shows a specific bus, the present application considers any suitable bus or interconnection.
[0140] In addition, in combination with the equipment predictive maintenance method in the above embodiment, the embodiment of the present application can provide a computer storage medium for implementation. The computer storage medium stores computer program instructions; when the computer program instructions are executed by the processor, any one of the equipment predictive maintenance methods in the above embodiment is implemented.
[0141] It should be clear that the present application is not limited to the specific configuration and processing described above and shown in the figures. For the sake of simplicity, a detailed description of the known method is omitted here. In the above embodiments, several specific steps are described and shown as examples. However, the method process of the present application is not limited to the specific steps described and shown, and those skilled in the art can make various changes, modifications and additions, or change the order between the steps after understanding the spirit of the present application.
[0142] The functional blocks shown in the above block diagram can be implemented as hardware, software, firmware or a combination thereof. When implemented in hardware, it can be, for example, an electronic circuit, an application specific integrated circuit (ASIC), appropriate firmware, a plug-in, a function card, etc. When implemented in software, the elements of the present application are programs or code segments that are used to perform the required tasks. The program or code segment can be stored in a machine-readable medium, or transmitted on a transmission medium or a communication link by a data signal carried in a carrier wave. "Machine-readable medium" can include any medium capable of storing or transmitting information. Examples of machine-readable media include electronic circuits, semiconductor memory devices, ROM, flash memory, erasable ROM (EROM), floppy disks, CD-ROMs, optical disks, hard disks, optical fiber media, radio frequency (RF) links, etc. The code segment can be downloaded via a computer network such as the Internet, an intranet, etc.
[0143] It should also be noted that the exemplary embodiments mentioned in this application describe some methods or systems based on a series of steps or devices. However, this application is not limited to the order of the above steps, that is, the steps can be performed in the order mentioned in the embodiment, or in a different order from the embodiment, or several steps can be performed simultaneously.
[0144] Aspects of the present disclosure are described above with reference to the flowcharts and / or block diagrams of the methods, devices (systems) and computer program products according to the embodiments of the present disclosure. It should be understood that each box in the flowchart and / or block diagram and the combination of each box in the flowchart and / or block diagram can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable device predictive maintenance device to produce a machine so that these instructions executed by the processor of the computer or other programmable device predictive maintenance device enable the implementation of the functions / actions specified in one or more boxes of the flowchart and / or block diagram. Such a processor can be, but is not limited to, a general-purpose processor, a special-purpose processor, a special application processor, or a field programmable logic circuit. It can also be understood that each box in the block diagram and / or flowchart and the combination of boxes in the block diagram and / or flowchart can also be implemented by dedicated hardware that performs the specified function or action, or can be implemented by a combination of dedicated hardware and computer instructions.
[0145] The above are only specific implementation methods of the present application. Those skilled in the art can clearly understand that for the convenience and simplicity of description, the specific working processes of the systems, modules and units described above can refer to the corresponding processes in the aforementioned method embodiments, and will not be repeated here. It should be understood that the protection scope of the present application is not limited to this. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in this application, and these modifications or replacements should be included in the protection scope of this application.
Claims
1. A method for predictive maintenance of equipment, It is characterized in that The method comprises: Acquire an initial data sample of a device, wherein the initial data sample includes data to be predicted; Extracting data from the initial data sample to obtain a random sample; According to a preset number of clusters, fuzzy clustering is performed on the random samples to obtain cluster centers corresponding to the number of clusters; Determining abnormal data points in the random sample according to the cluster center; Eliminate the abnormal data points in the random sample to obtain a target random sample; predicting the health status of the device based on the target random sample; When the health status is abnormal, the device is maintained.
2. The equipment predictive maintenance method according to claim 1, It is characterized in that The step of performing fuzzy clustering on the random samples according to a preset number of clusters to obtain cluster centers corresponding to the number of clusters includes: According to a preset number of clusters, fuzzy clustering is performed on the random samples so that a preset optimization objective function reaches a minimum value; When the optimization objective function reaches a minimum value, a random membership matrix expression of the random sample is obtained; Iteratively process the random membership matrix expression to construct a cluster center expression of the random sample; The random samples are iteratively processed according to the cluster center expression to obtain cluster centers corresponding to the number of clusters.
3. The equipment predictive maintenance method according to claim 2, It is characterized in that The cluster center expression v′ j It is expressed by the following expression: in, is the i-th sample x in the random sample i Belongs to the jth cluster center v j The membership degree of x i Represents the i-th sample in the random sample.
4. The equipment predictive maintenance method according to claim 1, It is characterized in that Determining the abnormal data points in the random sample according to the cluster center includes: Obtaining the Euclidean distance between each of the cluster centers and each sample in the random samples; constructing a normal distribution function based on the Euclidean distance; According to the preset abnormal data extraction criterion and the normal distribution function, abnormal data points in the random sample are extracted.
5. The equipment predictive maintenance method according to claim 4, It is characterized in that The predicting the health status of the device according to the target random sample includes: Obtaining the distance between each sample in the target random sample and the cluster center; The health status of the device is predicted according to the distance and a preset health threshold.
6. The equipment predictive maintenance method according to claim 1, It is characterized in that When the health status is abnormal, maintaining the device includes: In the case where the health status is abnormal, matching maintenance measures corresponding to the health status in a preset knowledge base; The equipment is maintained based on the maintenance measures.
7. A device for predictive maintenance of equipment, It is characterized in that The device includes: An acquisition module, used to acquire an initial data sample of a device, wherein the initial data sample includes data to be predicted; An extraction module, used for extracting data from the initial data sample to obtain a random sample; A clustering module, used to perform fuzzy clustering on the random samples according to a preset number of clusters to obtain cluster centers corresponding to the number of clusters; A determination module, configured to determine abnormal data points in the random sample according to the cluster center; A removal module, used to remove the abnormal data points in the random sample to obtain a target random sample; A prediction module, used for predicting the health status of the device according to the target random sample; A maintenance module is used to maintain the device when the health status is abnormal.
8. A terminal device, It is characterized in that The device comprises: a processor and a memory storing computer program instructions; When the processor executes the computer program instructions, the equipment predictive maintenance method as described in any one of claims 1-6 is implemented.
9. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores computer program instructions, and when the computer program instructions are executed by a processor, the equipment predictive maintenance method according to any one of claims 1 to 6 is implemented.
10. A computer program product, It is characterized in that The computer product includes a computer program, which, when executed by a processor, implements the equipment predictive maintenance method described in any one of claims 1 to 6.
