Adaptive optimization method and device for control channel resource scheduling, medium and product
By calculating the uplink and downlink CCE service requirements and scheduling success rate, and updating the scheduling strategy, the problem of inflexible and accurate downlink control channel resource scheduling caused by changes in the channel environment in the existing technology is solved, achieving better user experience and resource utilization efficiency. .
Patent Information
- Application Number
- CN202410581877.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-11
- Publication Date
- 2024-10-22
Smart Images

Figure CN118828962A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of wireless communication technology, and in particular to an adaptive optimization method, device, medium and product for controlling channel resource scheduling. Background Art
[0002] PDCCH (Physical Downlink Control Channel) mainly carries control information such as uplink CCE (Control Channel Element) and downlink CCE. It can schedule uplink service channels and downlink service channel resources respectively, dynamically adjust uplink and downlink CCE resources, thereby enhancing the uplink service channel scheduling capability and ensuring the user's uplink and downlink service perception experience.
[0003] The existing technical solutions mainly allocate uplink and downlink CCE scheduling resources based on business needs, without considering the uplink and downlink resource scheduling results of the channel. Especially in high-capacity scenarios where the channel environment changes drastically, the control resource scheduling results will significantly affect the user experience. The lack of feedback on the resource scheduling results leads to the lack of adaptive adjustment of the current technical solutions, making the downlink control channel resource scheduling not flexible and accurate enough. Summary of the invention
[0004] Compared with the prior art, the present invention proposes an adaptive optimization method, device, medium and product for control channel resource scheduling, which can adaptively adjust the uplink and downlink CCE scheduling strategies to achieve accurate scheduling of control channels.
[0005] An embodiment of the present invention provides an adaptive optimization method for control channel resource scheduling, the method comprising:
[0006] Control channel resource scheduling is performed according to the acquired uplink and downlink CCE service requirements and the current control channel resource scheduling strategy;
[0007] Calculate the scheduling success rate of CCE successful allocation according to the result of control channel resource scheduling;
[0008] According to the scheduling success rate, an adaptive scheduling scheme is matched to update the current scheduling strategy.
[0009] Preferably, before calculating the scheduling success rate of successful CCE allocation according to the result of control channel resource scheduling, the method further includes:
[0010] Determine whether the uplink and downlink service transmission is completed;
[0011] If so, end the control channel resource scheduling;
[0012] If not, calculate the scheduling success rate of successful CCE allocation according to the result of control channel resource scheduling, and after matching the adaptive scheduling scheme according to the scheduling success rate and updating the current scheduling strategy, continue to perform control channel resource scheduling according to the latest control channel resource scheduling strategy and the uplink and downlink CCE service requirements, and re-judge whether the uplink and downlink service transmission is completed until the uplink and downlink service transmission is completed.
[0013] Preferably, calculating the scheduling success rate of successful CCE allocation according to the control channel resource scheduling result includes:
[0014] According to the control channel resource scheduling result, the successful allocation index in the current cycle is counted;
[0015] The proportion of the number of successful scheduling to the total number of scheduling in the current cycle is calculated according to the successful allocation index and the preset weight to obtain the scheduling success rate.
[0016] Furthermore, the scheduling success rate
[0017] Among them, S n,j (T) is the CCE scheduling success allocation index of the nth scheduling within the preset period T, with aggregation degree j. If the CCE allocation is successful, then S n,j (T) is 1. If CCE allocation fails, S n,j (T) is recorded as 0, R j is the weight corresponding to the aggregation degree j, M is the number of scheduling times within the statistical time T, J is the set of aggregation degrees, M j is the number of CCE scheduling with aggregation level j within the statistical time T.
[0018] As a preferred solution, updating the scheduling strategy of the control channel resources according to the adaptive scheduling scheme corresponding to the scheduling success rate includes:
[0019] When the scheduling success rate is not lower than the preset current scheduling threshold, the scheduling strategy of the current period is determined to be reasonable, and the current scheduling strategy is maintained;
[0020] When the scheduling success rate is lower than the current scheduling threshold, it is determined that the scheduling strategy of the current period is unreasonable, the scheduling success rate is added to the feedback item of the scheduling strategy, and the current scheduling strategy is updated.
[0021] Preferably, the method further comprises:
[0022] When the current cycle is the first cycle of service transmission, the preset initial threshold is used as the current scheduling threshold;
[0023] When the current cycle is not the first cycle of service transmission, and the scheduling success rate in the previous cycle is not less than the scheduling threshold of the previous cycle, the scheduling threshold of the previous cycle is determined as the current scheduling threshold;
[0024] When the current cycle is not the first cycle of service transmission and the scheduling success rate in the previous cycle is less than the scheduling threshold of the previous cycle, the difference between the scheduling threshold of the previous cycle and the preset adjustment coefficient is determined as the current scheduling threshold.
[0025] An embodiment of the present invention further provides an adaptive optimization device for control channel resource scheduling, the device comprising:
[0026] A scheduling module is used to schedule control channel resources according to the acquired uplink and downlink CCE service requirements and the current scheduling strategy of control channel resources;
[0027] A calculation module, used for calculating the scheduling success rate of CCE successful allocation according to the result of control channel resource scheduling;
[0028] The adaptive module is used to match the adaptive scheduling scheme according to the scheduling success rate and update the current scheduling strategy.
[0029] Preferably, the device further comprises a circulation module, for:
[0030] Before calculating the scheduling success rate of successful CCE allocation according to the result of control channel resource scheduling, judging whether uplink and downlink service transmission is completed;
[0031] If so, end the control channel resource scheduling;
[0032] If not, calculate the scheduling success rate of successful CCE allocation according to the result of control channel resource scheduling, and after matching the adaptive scheduling scheme according to the scheduling success rate and updating the current scheduling strategy, continue to perform control channel resource scheduling according to the latest control channel resource scheduling strategy and the uplink and downlink CCE service requirements, and re-judge whether the uplink and downlink service transmission is completed until the uplink and downlink service transmission is completed.
[0033] Preferably, the calculation module is used for:
[0034] According to the control channel resource scheduling result, the successful allocation index in the current cycle is counted;
[0035] The ratio of the number of successful scheduling to the total number of scheduling in the current cycle is calculated according to the successful allocation index and the preset weight to obtain the scheduling success rate.
[0036] Preferably, the scheduling success rate
[0037] Among them, Sn,j (T) is the CCE scheduling success allocation index of the nth scheduling within the preset period T, with aggregation degree j. If CCE allocation is successful, then S n,j (T) is 1. If CCE allocation fails, S n,j (T) is recorded as 0, R j is the weight corresponding to the aggregation degree j, M is the number of scheduling times within the statistical time T, J is the set of aggregation degrees, M j is the number of CCE scheduling with aggregation level j within the statistical time T.
[0038] Preferably, the adaptive module is used for:
[0039] When the scheduling success rate is not lower than the preset current scheduling threshold, the scheduling strategy of the current period is determined to be reasonable, and the current scheduling strategy is maintained;
[0040] When the scheduling success rate is lower than the current scheduling threshold, it is determined that the scheduling strategy of the current period is unreasonable, the scheduling success rate is added to the feedback item of the scheduling strategy, and the current scheduling strategy is updated.
[0041] Preferably, the device further comprises a threshold calculation module, which is used to:
[0042] When the current cycle is the first cycle of service transmission, the preset initial threshold is used as the current scheduling threshold;
[0043] When the current cycle is not the first cycle of service transmission, and the scheduling success rate in the previous cycle is not less than the scheduling threshold of the previous cycle, the scheduling threshold of the previous cycle is determined as the current scheduling threshold;
[0044] When the current cycle is not the first cycle of service transmission and the scheduling success rate in the previous cycle is less than the scheduling threshold of the previous cycle, the difference between the scheduling threshold of the previous cycle and the preset adjustment coefficient is determined as the current scheduling threshold.
[0045] An embodiment of the present invention also provides an adaptive optimization device for control channel resource scheduling, comprising a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein when the processor executes the computer program, it implements an adaptive optimization method for control channel resource scheduling as described in any of the above embodiments.
[0046] An embodiment of the present invention also provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute an adaptive optimization method for control channel resource scheduling as described in any of the above embodiments.
[0047] An embodiment of the present invention further provides a computer program product, including a computer program / instruction, which implements the steps of the method described in any of the above embodiments when executed by a processor.
[0048] Compared with the prior art, the present invention provides an adaptive optimization method, device, medium and product for control channel resource scheduling, which performs control channel resource scheduling according to the acquired uplink and downlink CCE service requirements and the current control channel resource scheduling strategy; calculates the scheduling success rate of CCE successful allocation according to the result of control channel resource scheduling; and updates the current scheduling strategy according to the adaptive scheduling scheme corresponding to the scheduling success rate. The present application scheme can adaptively adjust the uplink and downlink CCE scheduling strategies to achieve accurate scheduling of control channels. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is a flow chart of a method for scheduling control channel resources in the prior art;
[0050] Figure 2 It is a flow chart of an adaptive optimization method for control channel resource scheduling provided by an embodiment of the present invention;
[0051] Figure 3 It is another flow chart of an adaptive optimization method for control channel resource scheduling provided by an embodiment of the present invention;
[0052] Figure 4 It is another flow chart of an adaptive optimization method for control channel resource scheduling provided by an embodiment of the present invention;
[0053] Figure 5 It is a structural schematic diagram of an adaptive optimization device for control channel resource scheduling provided by an embodiment of the present invention;
[0054] Figure 6 It is another structural schematic diagram of an adaptive optimization device for control channel resource scheduling provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0055] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0056] The existing technical solutions mainly allocate uplink and downlink CCE scheduling resources based on business needs, without considering the uplink and downlink resource scheduling results of the channel. Especially in high-capacity scenarios where the channel environment changes drastically, the control resource scheduling results will significantly affect the user experience. The lack of feedback on the resource scheduling results leads to the lack of adaptive adjustment of the current technical solutions, making the downlink control channel resource scheduling not flexible and accurate enough.
[0057] See also Figure 1 , is a flow chart of a control channel resource scheduling method in the prior art. After obtaining the user's service requirements, the PDCCH resource dynamic allocation algorithm determines the uplink available CCE resources and the downlink available CCE resources according to the uplink CCE requirements and the downlink CCE requirements with the goal of matching the uplink and downlink service requirements.
[0058] Regarding the above technical problems of the prior art, see Figure 2 , is a flow chart of an adaptive optimization method for control channel resource scheduling provided by an embodiment of the present invention, the method comprising steps S1 to S3;
[0059] S1, control channel resource scheduling is performed according to the acquired uplink and downlink CCE service requirements and the current control channel resource scheduling strategy;
[0060] S2, calculating the scheduling success rate of CCE successful allocation according to the result of control channel resource scheduling;
[0061] S3, updating the current scheduling strategy according to the adaptive scheduling scheme corresponding to the scheduling success rate.
[0062] In the specific implementation of this embodiment, when performing service transmission, the uplink and downlink CCE service requirements are obtained, and the downlink control channel resource adaptive matching algorithm based on the scheduling success rate is used to perform control channel resource scheduling for the current period according to the current control channel resource scheduling strategy in the 5G network downlink control channel dynamic scheduling scenario;
[0063] For the scenario of dynamic scheduling of downlink control channel CCE resources, a statistical indicator of the number of successful CCE allocations is proposed based on the control channel scheduling results to measure the number of successful CCE allocations at different aggregation levels within a period of time. This indicator will be used as the input of the CCE resource scheduling success rate to construct the CCE resource scheduling success rate algorithm theory. According to the control channel resource scheduling results of the current period, the scheduling success rate of CCE successful allocation is calculated to measure the number of successful allocations of uplink and downlink CCE resources after the dynamic scheduling of control channel resources. Avoid the existing technical solutions that schedule downlink control channel resources based on changing business needs, but both uplink and downlink business channel scheduling require the use of downlink control channel resources. The dynamic allocation method of uplink and downlink CCE resources leads to dynamic changes in the available uplink and downlink resources, making it impossible to measure the uplink and downlink resource occupancy ratio, thereby affecting the downlink control channel resource allocation of the next period.
[0064] See also Figure 3 , is another flow chart of an adaptive optimization method for control channel resource scheduling provided by an embodiment of the present invention. After obtaining the user's business needs, the PDCCH resource adaptive dynamic allocation algorithm determines the uplink available CCE resources and the downlink available CCE resources according to the uplink CCE demand, the downlink CCE demand and the current scheduling strategy, and then calculates the scheduling success rate, that is, including the uplink CCE allocation success rate and the downlink CCE allocation success rate. According to the scheduling success rate, the PDCCH resource adaptive dynamic allocation algorithm is updated to match the uplink and downlink business needs with the control channel resource allocation results as the goal.
[0065] By formulating the threshold range of CCE allocation success rate, the scheduling success rate of CCE allocation is used as a feedback indicator to match the adaptive scheduling scheme, coordinate with business needs to adaptively adjust the scheduling strategy of control channel resources, accurately improve the efficiency of CCE resource utilization, and ensure that both uplink and downlink business channels can be allocated reasonable CCE resources.
[0066] The downlink control channel CCE dynamic resource scheduling scheme provided by the present application can accurately count the total number of uplink and downlink available resources, calculate the scheduling success rate of successful CCE allocation, and accurately evaluate the uplink and downlink CCE resource allocation efficiency.
[0067] In another embodiment provided by the present invention, before calculating the scheduling success rate of successful CCE allocation according to the result of control channel resource scheduling, service transmission needs to be performed.
[0068] See also Figure 4 , is another flow chart of the adaptive optimization method for control channel resource scheduling provided in an embodiment of the present invention.
[0069] After the downlink control channel CCR scheduling process starts, the uplink and downlink CCE service requirements are obtained, the downlink control channel CCE is adaptively and dynamically scheduled according to the scheduling strategy of the control channel resources, and the uplink and downlink service data are transmitted according to the scheduling.
[0070] Determine whether the service data transmission is completed. If the service data is not completed, calculate the scheduling success rate of CCE successful allocation according to the result of control channel resource scheduling, match the adaptive scheduling scheme according to the scheduling success rate, and update the current scheduling strategy.
[0071] Continue to return to control channel resource scheduling according to uplink and downlink CCE service requirements, and continue uplink and downlink service data transmission in the next cycle.
[0072] The control channel resource scheduling ends until the uplink and downlink service transmission is completed.
[0073] Based on the CCE resource scheduling success rate indicator and business needs as feedback, the scheduling strategy is combined with the CCE allocation success rate to achieve the effect of adaptive adjustment, and a more accurate number of available CCEs for uplink and downlink is obtained, thereby realizing accurate scheduling of the control channel in the next time period and adaptive scheduling control of the business data transmission process.
[0074] In another embodiment of the present invention, when calculating the scheduling success rate of successful CCE allocation, the following steps are specifically performed:
[0075] See also Figure 4 , based on the CCE successful allocation times indicator statistics of the control channel scheduling results, the CCE successful allocation times indicators of each aggregation degree of the downlink control channel are counted, and the downlink control channel scheduling times are counted, and the proportion of the number of successful scheduling times to the total number of scheduling times in the current cycle is calculated according to the successful allocation indicator and the preset weight, and the downlink CCE allocation success rate is calculated.
[0076] This embodiment provides Figure 4 The calculation method of the downlink CCE allocation success rate is explained by taking the downlink control channel as an example. When calculating the uplink CCE allocation success rate, the uplink control channel each aggregation degree CCE allocation success number index is counted, and the uplink control channel scheduling number is counted. The proportion of the number of successful schedulings in the current cycle is calculated according to the successful allocation index and the preset weight, and the uplink CCE allocation success rate is calculated.
[0077] The scheduling success rate is obtained according to the downlink CCE allocation success rate and the uplink CCE allocation success rate.
[0078] It should be noted that the successful allocation index in the current cycle may also be directly counted, and the ratio of the number of successful scheduling to the total number of scheduling in the current cycle may be calculated to obtain the scheduling success rate.
[0079] It should be noted that, during specific implementation, the downlink CCE allocation success rate or the uplink CCE allocation success rate may also be specifically calculated as the scheduling success rate to perform resource adaptive matching control.
[0080] This application proposes a statistical indicator of the number of successful CCE allocations based on the control channel scheduling results, measures the number of successful CCE allocations at different aggregation levels within a period of time, constitutes a CCE resource scheduling success rate algorithm, and then accurately guides the adaptive scheduling of control channel resources.
[0081] In another embodiment of the present invention, when calculating the scheduling success rate, based on the CCE successful allocation times index statistics of the control channel scheduling result, the CCE scheduling success allocation index of the nth scheduling within the preset period T and the aggregation degree j is determined, S n,j (T) is used to measure whether CCE scheduling is successful or not. If CCE allocation is successful, then S n,j (T) is 1. If CCE allocation fails, S n,j (T) is recorded as 0.
[0082] It should be noted that the statistical sensitivity of the statistical period can be determined according to specific scenarios and business requirements. The smaller T is, the finer the granularity of the CCE scheduling policy is.
[0083] The value of j corresponds to the CCE aggregation degree of the downlink control channel of the 5G network, and can be 1, 2, 4, 8, or 16. By setting the CCE successful allocation times indicator, the scheduling success status of all CCEs in a statistical period will be recorded in S n,j (T) Medium.
[0084] The scheduling success rate algorithm based on the number of successful CCE allocations calculates the scheduling success rate within the time period T as follows:
[0085]
[0086] R j is the weight corresponding to the aggregation degree j, M is the number of scheduling times within the statistical time T, J is the set of aggregation degrees, M j is the number of CCE scheduling with aggregation level j within the statistical time T.
[0087] Since the requirements for CCEs with different aggregation degrees are different in different scenarios or services, different weights are corresponding to CCE scheduling with different aggregation degrees when calculating the CCE allocation success rate. This series of weights is determined by specific scenarios and is used as input items in the scheduling process to calculate the scheduling success rate. Each successful scheduling item is multiplied by the corresponding aggregation degree weight to reflect the impact of different CCE aggregation degrees on the scheduling success rate. The association between different CCE aggregation degrees and scheduling success rate calculation weight parameters is shown in Table 1.
[0088] Table 1. Correspondence between aggregation degree and scheduling success rate calculation weight parameters
[0089]
[0090]
[0091] The calculated scheduling success rate can accurately evaluate the wireless resource usage, match business needs, and ensure user experience.
[0092] In another embodiment provided by the present invention, after the scheduling success rate is calculated, the input scheduling success rate threshold range is used as the boundary. If the scheduling success rate is lower than , it means that after this CCE scheduling, when allocating uplink and downlink CCE resources, the CCE allocation failure times are large, the scheduling strategy is unreasonable, and the scheduling result will have a negative impact on the user service experience. At this time, the negative impact needs to be eliminated.
[0093] When it is identified that the scheduling success rate is lower than the current scheduling threshold, the current scheduling strategy is determined to be unreasonable, and the scheduling success rate is included in the adaptive dynamic scheduling feedback item. In the next round of control channel resource scheduling, the scheduling strategy is adaptively adjusted in coordination with the uplink and downlink CCE service requirements to improve the scheduling success rate.
[0094] When the scheduling success rate is not lower than the current scheduling threshold, it means that after this CCE scheduling, when allocating uplink and downlink CCE resources, the number of CCE allocation failures is small, and the scheduling strategy is relatively reasonable. The current scheduling strategy is maintained in the future, and in the next round of control channel resource scheduling, the scheduling strategy can be adaptively adjusted based on the current uplink and downlink CCE service requirements, without considering the control channel resource scheduling result itself as feedback.
[0095] In this case, the CCE allocation success rate threshold interval is divided, and the CCE allocation success rate is used as feedback. Based on the CCE service demand, the scheduling strategy of the control channel resources is adaptively adjusted to ensure that both the uplink and downlink service channels can be allocated reasonable CCE resources.
[0096] In another embodiment provided by the present invention, the current scheduling threshold needs to be adjusted according to the resource scheduling adaptive process. When the resource scheduling control of each cycle is performed, the scheduling success rate PDCCH_SRate of the current cycle i needs to be determined. i The current scheduling threshold Threshold of the current cycle i i The size of the control channel resources is updated.
[0097] Therefore, the scheduling threshold of the current resource scheduling is determined first, and the initial threshold of the scheduling success rate Threshold0 is pre-set.
[0098]
[0099] When the service transmission process starts, the scheduling threshold Threshold1 of the first cycle of service transmission is the initial threshold Threshold i .
[0100] The current scheduling threshold PDCCH_SRate for subsequent periods i-1 Determined according to the scheduling threshold of the migration period, that is, when i>1, the scheduling success rate PDCCH_SRate in the previous period i-1 Not less than the scheduling threshold of the previous cycle i-1 When the scheduling threshold of the previous cycle is i-1 Determine the current scheduling threshold Threshold i The scheduling success rate in the previous cycle PDCCH_SRate i-1 Less than the scheduling threshold of the previous cycle i-1 When the scheduling threshold of the previous cycle is i-1 The difference between the preset adjustment coefficient c and Threshold i-1 -c determines the current scheduling threshold Threshold i .
[0101] It should be noted that the reasonable initial value is determined based on the service's requirements for channel quality, c is the adjustment coefficient, (0% <c≤2%)。
[0102] The present invention provides an adaptive matching algorithm for downlink control channel resources based on scheduling success rate, taking into account that not only are the service types in 5G networks more abundant, but the channel environment is also more complex, resulting in large fluctuations in available network resources, which affects network resource evaluation. Based on CCE service requirements, the present invention uses the downlink control channel CCE scheduling results as feedback, and coordinates service requirements to adjust the downlink control channel resource strategy, thereby more accurately evaluating the use of wireless resources, matching service requirements, and ensuring user experience.
[0103] See also Figure 5 , is a schematic diagram of the structure of an adaptive optimization device for control channel resource scheduling provided by an embodiment of the present invention, the device comprising:
[0104] A scheduling module is used to schedule control channel resources according to the acquired uplink and downlink CCE service requirements and the current scheduling strategy of control channel resources;
[0105] A calculation module, used for calculating the scheduling success rate of CCE successful allocation according to the result of control channel resource scheduling;
[0106] The adaptive module is used to match the adaptive scheduling scheme according to the scheduling success rate and update the current scheduling strategy.
[0107] It should be noted that the adaptive optimization device for control channel resource scheduling provided in this embodiment can execute all steps and functions of the adaptive optimization method for control channel resource scheduling provided in any of the above embodiments, and the specific functions of the device are not described in detail here.
[0108] See also Figure 6 , is another structural diagram of an adaptive optimization device for control channel resource scheduling provided by an embodiment of the present invention. The adaptive optimization device for control channel resource scheduling includes: a processor, a memory, and a computer program stored in the memory and executable on the processor, such as an adaptive optimization program for control channel resource scheduling. When the processor executes the computer program, the steps of each of the above-mentioned adaptive optimization methods for control channel resource scheduling are implemented, such as Figure 1 Alternatively, the processor implements the functions of each module in the above-mentioned device embodiments when executing the computer program.
[0109] Exemplarily, the computer program may be divided into one or more modules, and the one or more modules are stored in the memory and executed by the processor to complete the present invention. The one or more modules may be a series of computer program instruction segments capable of completing specific functions, and the instruction segments are used to describe the execution process of the computer program in the adaptive optimization device for controlling channel resource scheduling. For example, the computer program may be divided into several modules, and the specific functions of each module have been described in detail in the adaptive optimization method for controlling channel resource scheduling provided in any of the above embodiments, and the specific functions of the device will not be repeated here.
[0110] The adaptive optimization device for controlling channel resource scheduling can be a computing device such as a desktop computer, a notebook, a PDA, and a cloud server. The adaptive optimization device for controlling channel resource scheduling can include, but is not limited to, a processor and a memory. Those skilled in the art can understand that the schematic diagram is only an example of an adaptive optimization device for controlling channel resource scheduling, and does not constitute a limitation on an adaptive optimization device for controlling channel resource scheduling. It can include more or fewer components than shown in the figure, or combine certain components, or different components. For example, the adaptive optimization device for controlling channel resource scheduling can also include input and output devices, network access devices, buses, etc.
[0111] The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the adaptive optimization device for controlling channel resource scheduling, and uses various interfaces and lines to connect various parts of the adaptive optimization device for controlling channel resource scheduling.
[0112] The memory can be used to store the computer program and / or module, and the processor realizes various functions of the adaptive optimization device for controlling channel resource scheduling by running or executing the computer program and / or module stored in the memory, and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area can store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0113] Wherein, if the module integrated in the adaptive optimization device for controlling channel resource scheduling is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on such an understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Wherein, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form, etc. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electrical carrier signal, telecommunication signal and software distribution medium, etc.
[0114] An embodiment of the present invention further provides a computer program product, including a computer program / instruction, which implements the steps of the method described in any of the above embodiments when executed by a processor.
[0115] It should be noted that the computer program product provided in this embodiment can execute all the steps and functions of the adaptive optimization method for control channel resource scheduling provided in any of the above embodiments, and the specific functions of the device are not described in detail here.
[0116] It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention, and these improvements and modifications are also considered to be within the protection scope of the present invention.
Claims
1. An adaptive optimization method for control channel resource scheduling, characterized in that: The method comprises: Control channel resource scheduling is performed according to the acquired uplink and downlink CCE service requirements and the current control channel resource scheduling strategy; Calculate the scheduling success rate of CCE successful allocation according to the result of control channel resource scheduling; According to the scheduling success rate, an adaptive scheduling scheme is matched to update the current scheduling strategy.
2. The adaptive optimization method for control channel resource scheduling according to claim 1, characterized in that: Before calculating the scheduling success rate of successful CCE allocation according to the result of control channel resource scheduling, the method further includes: Determine whether the uplink and downlink service transmission is completed; If so, end the control channel resource scheduling; If not, calculate the scheduling success rate of successful CCE allocation according to the result of control channel resource scheduling, and after matching the adaptive scheduling scheme according to the scheduling success rate and updating the current scheduling strategy, continue to perform control channel resource scheduling according to the latest control channel resource scheduling strategy and the uplink and downlink CCE service requirements, and re-judge whether the uplink and downlink service transmission is completed until the uplink and downlink service transmission is completed.
3. The adaptive optimization method for control channel resource scheduling according to claim 1, characterized in that: The scheduling success rate of CCE successful allocation is calculated according to the control channel resource scheduling result, including: According to the control channel resource scheduling result, the successful allocation index in the current cycle is counted; The ratio of the number of successful scheduling to the total number of scheduling in the current cycle is calculated according to the successful allocation index and the preset weight to obtain the scheduling success rate.
4. The adaptive optimization method for control channel resource scheduling according to claim 1, characterized in that: The scheduling success rate Among them, S n,j (T) is the CCE scheduling success allocation index of the nth scheduling within the preset period T, with aggregation degree j. If the CCE allocation is successful, then S n,j (T) is 1. If CCE allocation fails, S n,j (T) is recorded as 0, R j is the weight corresponding to the aggregation degree j, M is the number of scheduling times within the statistical time T, J is the set of aggregation degrees, M j is the number of CCE scheduling with aggregation level j within the statistical time T.
5. The adaptive optimization method for control channel resource scheduling according to claim 1, characterized in that: According to the scheduling success rate, the scheduling strategy of the control channel resources is updated according to the adaptive scheduling scheme corresponding to the scheduling success rate, including: When the scheduling success rate is not lower than the preset current scheduling threshold, the scheduling strategy of the current period is determined to be reasonable, and the current scheduling strategy is maintained; When the scheduling success rate is lower than the current scheduling threshold, it is determined that the scheduling strategy of the current period is unreasonable, the scheduling success rate is added to the feedback item of the scheduling strategy, and the current scheduling strategy is updated.
6. The adaptive optimization method for control channel resource scheduling according to claim 5, characterized in that: The method further comprises: When the current cycle is the first cycle of service transmission, the preset initial threshold is used as the current scheduling threshold; When the current cycle is not the first cycle of service transmission, and the scheduling success rate in the previous cycle is not less than the scheduling threshold of the previous cycle, the scheduling threshold of the previous cycle is determined as the current scheduling threshold; When the current cycle is not the first cycle of service transmission and the scheduling success rate in the previous cycle is less than the scheduling threshold of the previous cycle, the difference between the scheduling threshold of the previous cycle and the preset adjustment coefficient is determined as the current scheduling threshold.
7. An adaptive optimization device for control channel resource scheduling, characterized in that: The device comprises: A scheduling module is used to schedule control channel resources according to the acquired uplink and downlink CCE service requirements and the current scheduling strategy of control channel resources; A calculation module, used for calculating the scheduling success rate of CCE successful allocation according to the result of control channel resource scheduling; The adaptive module is used to match the adaptive scheduling scheme according to the scheduling success rate and update the current scheduling strategy.
8. An adaptive optimization device for control channel resource scheduling, characterized in that: The method comprises a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein when the processor executes the computer program, the method for adaptive optimization of control channel resource scheduling as claimed in any one of claims 1 to 6 is implemented.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute the adaptive optimization method for control channel resource scheduling according to any one of claims 1 to 6.
10. A computer program product comprising a computer program / instructions, characterized in that When the computer program / instructions are executed by a processor, the steps of the method described in any one of claims 1 to 6 are implemented.
Citation Information
Cited By
Enterprise computing power resource allocation scheduling method and system
CN119356898A
Intelligent high-speed communication resource scheduling optimization method and system
CN120152044A
