Virtual power plant peak regulation market income prediction method and settlement system

By constructing the virtual power plant's response historical data prediction model and response price strategy, it solves the problem of insufficient economic efficiency and risk response capabilities of distributed resource grid peak shaving, realizes effective aggregation of virtual power plant resources and peak shaving services, and improves the market Revenue forecasting and settlement efficiency.

CN118840147APending Publication Date: 2024-10-25BEIJING GUONENG GUOYUAN ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411177324.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

Existing technology makes it difficult to effectively manage and utilize distributed resources for power grid peak shaving, causing market-based peak shaving services to face problems of insufficient economic efficiency and risk response capabilities.

Method used

By constructing a response historical data prediction model of the virtual power plant, a response price strategy is formulated, peak regulation constraints are established, and the total revenue of the virtual power plant participating in peak regulation is calculated to optimize resource response and cost management.

Benefits of technology

It achieves effective aggregation of virtual power plant resources and peak-shaving services, improves economics and risk response capabilities, and improves forecast accuracy and revenue settlement efficiency through the reasonable formulation and calculation of response prices.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118840147A_ABST
    Figure CN118840147A_ABST
Patent Text Reader

Abstract

The invention discloses a virtual power plant peak regulation market income prediction method and a settlement system, belongs to the technical field of virtual power plant peak regulation, and aims to solve the problem that in the prior art, internal resource response price calculation is not accurate enough. The method mainly comprises the following steps: constructing a prediction model of response behaviors of a virtual power plant to internal resources based on response historical data; based on the prediction model, constructing a response price making model of the virtual power plant; establishing a response peak regulation constraint of the virtual power plant based on a response price making model; and making a model according to the response price, and obtaining the total income of the virtual power plant participating in peak regulation response by agency of internal resources. According to the method, the response price can be formulated by considering the specific peak regulation time period and synchronously considering the relationship between the operation and maintenance cost of the energy storage equipment and the response price according to the difference between the peak regulation potentials and the peak regulation intentions of various resources in different time periods, and the total income of the virtual power plant participating in the peak regulation response is calculated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of virtual power plant peak-shaving, and in particular to a virtual power plant peak-shaving market revenue prediction method and a settlement system. Background Art

[0002] At present, with the access of large-scale clean energy, the flexible regulation of traditional thermal power units, pumped storage and other functions cannot meet the future peak-shaving needs. Peak-shaving services are gradually becoming market-oriented. The introduction of concepts such as virtual power plants (VPPs) has made the participation of various distributed resources in grid peak-shaving a research hotspot. Virtual power plants can explore and utilize the potential for flexible regulation of distributed resources and participate in power system congestion management; various users can participate in the market through virtual power plant operations to generate income and reduce energy consumption costs; virtual power plants can achieve wind and solar power generation through demand response, which is an important way to increase the penetration rate of new energy. In addition, virtual power plants can also provide auxiliary services such as peak-shaving for new power systems.

[0003] Virtual power plants can aggregate various distributed resources as a whole to participate in multiple types of power services, providing a dynamic energy management and delivery method for distributed resources. At the same time, virtual power plants can guide user-side resource response peak load regulation through price, and how to formulate pricing strategies has an important impact on virtual power plants to improve their own economic performance and risk response capabilities. Summary of the invention

[0004] To this end, the present invention provides a virtual power plant peak-shaving market revenue prediction method and settlement system to solve the above-mentioned problems in the prior art.

[0005] In order to achieve the above object, the present invention provides the following technical solutions: According to a first aspect of the present invention, a method for predicting the peak-shaving market revenue of a virtual power plant mainly comprises the following steps: S1. Based on historical response data, a prediction model of the virtual power plant’s response behavior to internal resources is constructed; S2. Based on the prediction model of step S1, construct a response price formulation model for the virtual power plant; S3. Based on the response price formulation model, establish the response peak load constraints of the virtual power plant; S4. Based on the response price formulation model, the total revenue of the virtual power plant participating in the peak load response by acting as an agent for internal resources is obtained.

[0006] Further: In step S1, the annual electricity consumption data of internal resources is first collected, and the response data is selected for training and analysis, and the data is normalized so that the different features of all sample data can be compared; then based on the date label, the initial electricity consumption of the internal resources and various environmental information as input, the peak load response amount of the internal resources under the given response price signal is output through training; The specific method for each training set is as follows: Where: To normalize the response price, In response to price, max is the maximum value of the response price in each training set, min is the minimum value of the response price in each training set.

[0007] Further: The total benefits of the virtual power plant peak load response are as follows: In the formula, F VPP is the total revenue of the virtual power plant participating in the peak load response, T R is the number of peak load periods in which the virtual power plant participates, The peak load that the virtual power plant obtains by participating in the peak load market. is the clearing price of the peak-shaving market, The cost of operating the energy storage equipment. For the internal resource benefits of the virtual power plant, Penalize costs for response deviations.

[0008] Further: The specific calculation of the operating cost of the energy storage equipment is: In the formula, Real-time electricity purchase and sales prices for energy storage equipment interacting with the power grid. The amount of energy storage equipment to compensate for the is the energy storage operation and maintenance coefficient, As unit time.

[0009] Further: The specific calculation of the internal resource benefits of the virtual power plant is as follows: N all is the total number of resources participating in the response, is the response compensation for resource i; N AC is the air conditioning coefficient involved in the response, N WH is the electric water heater participating in the response, N DR The number of other adjustable loads participating in the response; is the peak load response of resource i, which is obtained by RNN response behavior prediction; As unit time.

[0010] Further: When the actual response volume within the virtual power plant does not meet the needs of the peak load market, A response deviation penalty fee is generated, and the virtual power plant needs to pay this fee; the deviation penalty fee of the virtual power plant is specifically calculated as: In the formula, , The deviation penalty cost coefficient for the peak load response of the virtual power plant; For peak load deviation, Set values ​​for deviation assessment segments; Peak load deviation The calculation formula is: In the formula, is the peak deviation power, is the unit time; In the formula, is the actual peak load regulation power of the virtual power plant, The peak load required for the virtual power plant to participate in the peak load market; The calculation of the set value for the deviation assessment segment is: In the formula, u UB To respond to the deviation assessment ratio, The peak-shaving capacity obtained by the virtual power plant participating in the peak-shaving market.

[0011] Further: The constraints in step S3 mainly include: (1) It is necessary to balance the peak-shaving power. The virtual power plant needs to maintain a power balance between the market interaction and internal response. The imbalance between the actual response of the virtual power plant and the peak-shaving target is the response deviation value. The actual peak-shaving power of the virtual power plant is calculated as follows: In the formula, is the actual peak load regulation power of the virtual power plant, is the actual response power of the air conditioning system, is the actual response power of the electric water heater, is the actual response power of other adjustable loads, Compensation for energy storage equipment; (2) It is necessary to constrain the response deviation of the virtual power plant energy storage equipment. The constraints on the charging and discharging power of the energy storage equipment when compensating for the response deviation are as follows: In the formula, , The minimum and maximum values ​​of charge and discharge when the energy storage device deviation is compensated respectively.

[0012] The present invention also discloses a virtual power plant peak load regulation market revenue settlement system, which is characterized by comprising a training analysis module, a construction and constraint module, and a response settlement price formulation module; The training and analysis module is used to filter and classify historical data, and then obtain a prediction model of the virtual power plant's response behavior to internal resources; The construction and constraint module builds a response price formulation model for a virtual power plant based on the prediction model of the training and analysis module, and imposes constraints on the model, so that the formulation of the response price is more in line with actual usage needs; The response settlement price formulation module obtains the basic response price formulated by the virtual power plant based on the training analysis module, the construction and constraint module, and then defines the response settlement price of internal resources in period t based on the peak-shaving response speed and response integrity.

[0013] Further: The response settlement price is specifically: In the formula, t represents the time period, is the response settlement price of internal resource i in period t, The base response price for the virtual power plant, k i is the response speed incentive coefficient of resource i, is the response integrity coefficient of resource i.

[0014] Further: The response integrity coefficient is jointly developed by the virtual power plant agent VPPA and the power grid company PGC.

[0015] The present invention has the following advantages: the virtual power plant can effectively aggregate distributed resources and provide peak-shaving services. According to the differences in peak-shaving potential and peak-shaving willingness of various types of resources in different time periods, the specific peak-shaving period is taken into consideration, and the relationship between the operation and maintenance cost of the energy storage equipment and the response price is simultaneously considered to formulate the response price, so that the formulation of the response price is more reasonable. At the same time, based on the response price formulation model, the total revenue of the virtual power plant participating in the peak-shaving response is calculated; the revenue obtained from the internal resources of the virtual power plant participating in the peak-shaving response is settled at the end of each day, and the response results are stored in the information database for updating the resource response prediction model, so that the prediction is more accurate. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1This is a flow chart of a method for predicting market revenue of a virtual power plant peak load regulation according to the present invention.

[0017] Figure 2 This is a structural diagram of the prediction of internal resource response behavior based on RNN in a virtual power plant peak-shaving market revenue prediction method of the present invention.

[0018] Figure 3 A system block diagram of a virtual power plant peak-shaving market revenue settlement system provided for some embodiments of the present invention. DETAILED DESCRIPTION

[0019] The following is a description of the implementation of the present invention by specific embodiments. People familiar with the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] like Figure 1 As shown, a method for predicting the peak-shaving market revenue of a virtual power plant mainly includes the following steps: S1. Based on historical response data, a prediction model of the virtual power plant’s response behavior to internal resources is constructed; There are many types of distributed resources with peak load potential, such as air-conditioning systems, electric water heaters, electric heating equipment, public transportation battery swap stations, and small energy storage batteries on the user side.

[0021] For the internal air conditioning system and electric water heater load of the virtual power plant, power consumption period, response price, basic power consumption curve, weather, etc. are the main influencing factors of response peak regulation. Based on the collected annual power consumption data of internal resources, considering the differences in power consumption characteristics of some resources on weekdays and weekends, 52 weeks of response data were selected for training and analysis, with a sampling time interval of 1 hour, and a total of 52×7×24 groups of training data were obtained. The weather data came from the weather website database, and the power consumption data of the remaining resources were derived from it; it is necessary to screen and classify the temperature control load data that is not in operation under some weather conditions, and perform data normalization so that the different characteristics of all sample data can be compared.

[0022] The specific method for each training set is as follows: Where: To normalize the response price, In response to price, max is the maximum value of the response price in each training set, min is the minimum value of the response price in each training set.

[0023] like Figure 2 The RNN-based internal resource response behavior prediction structure shown is trained based on historical response data, and does not require internal resources to provide specific data and electricity consumption information. It takes date labels, initial electricity consumption of internal resources, and various environmental information as input, and outputs the peak-shaving response amount of internal resources under a given response price signal through training.

[0024] S2. Based on the prediction model of step S1, construct a response price formulation model for the virtual power plant; The total benefits of the virtual power plant peak load response are as follows: In the formula, F VPP is the total revenue of the virtual power plant participating in the peak load response, T R is the number of peak load periods in which the virtual power plant participates, The peak load that the virtual power plant obtains by participating in the peak load market. is the clearing price of the peak-shaving market, The cost of operating the energy storage equipment. For the internal resource benefits of the virtual power plant, Penalize costs for response deviations.

[0025] The specific calculation of the operating cost of energy storage equipment is: In the formula, Real-time electricity purchase and sales prices for energy storage equipment interacting with the power grid. The amount of energy storage equipment to compensate for the is the energy storage operation and maintenance coefficient, As unit time.

[0026] The specific calculation of the internal resource benefits of the virtual power plant is as follows: N all is the total number of resources participating in the response, is the response compensation for resource i; N AC is the air conditioning coefficient involved in the response, N WH is the electric water heater participating in the response, N DR The number of other adjustable loads participating in the response; is the peak load response of resource i, which is obtained by RNN response behavior prediction; As unit time.

[0027] When the actual response volume within the virtual power plant does not meet the needs of the peak-shaving market, a response deviation penalty fee will be incurred, and the virtual power plant will need to pay this fee. The specific calculation of the deviation penalty fee of the virtual power plant is: In the formula, , The deviation penalty cost coefficient for the peak load response of the virtual power plant; For peak load deviation, Set values ​​for the deviation assessment segments.

[0028] Peak load deviation The calculation formula is: In the formula, is the peak deviation power, As unit time.

[0029] In the formula, is the actual peak load regulation power of the virtual power plant, The peak-shaving capacity obtained by the virtual power plant participating in the peak-shaving market.

[0030] The calculation of the deviation assessment segment setting value is: In the formula, u UB To respond to the deviation assessment ratio, The peak-shaving capacity obtained by the virtual power plant participating in the peak-shaving market.

[0031] S3. Based on the response price formulation model, establish the response peak load constraints of the virtual power plant; (1) It is necessary to balance the peak-shaving power. The virtual power plant needs to maintain a power balance between the market interaction and internal response. The imbalance between the actual response of the virtual power plant and the peak-shaving target is the response deviation value. The actual peak-shaving power of the virtual power plant is calculated as follows: In the formula, is the actual peak load regulation power of the virtual power plant, is the actual response power of the air conditioning system, is the actual response power of the electric water heater, is the actual response power of other adjustable loads, To compensate for the energy storage equipment.

[0032] (2) It is necessary to constrain the response deviation of the virtual power plant energy storage equipment. The constraints on the charging and discharging power of the energy storage equipment when compensating for the response deviation are as follows: In the formula, , The minimum and maximum values ​​of charge and discharge when the energy storage device deviation is compensated respectively.

[0033] S4. Based on the response price formulation model, the total revenue of the virtual power plant participating in the peak load response by acting as an agent for internal resources is obtained.

[0034] The total revenue can be calculated based on the total revenue calculation model of the virtual power plant participating in the peak load response in step S2.

[0035] Virtual power plants set prices to encourage internal resources to respond to peak load regulation. The actual electricity consumption of internal resources in turn affects the peak load regulation effect of virtual power plants. The two use technical environments such as intelligent interactive terminals to achieve two-way interaction of information flow, business flow, and power flow. Virtual power plants obtain target capacity and market prices in the peak load regulation market, and use them as a basis to set internal peak load regulation response prices, publish peak load regulation requirements to proxy resources, and guide resource electricity consumption.

[0036] The virtual power plant predicts the best response quantity that can be obtained in the peak-shaving market based on the summarized electricity consumption curve data set in order to participate in the bidding. After obtaining the next day's target response quantity and market price in the market, the virtual power plant considers the resource response behavior and formulates an internal peak-shaving response price to incentivize resource response. The virtual power plant can adjust the energy storage equipment to compensate for deviations and reduce the deviation penalty fees at the time of settlement. The income from the virtual power plant's internal resources participating in peak-shaving is settled at the end of each day, and the response results are stored in the information database for updating the resource response prediction model.

[0037] In this embodiment, Figure 3 As shown, a virtual power plant peak-shaving market revenue settlement system includes a training and analysis module, a construction and constraint module, and a response settlement price formulation module.

[0038] The training and analysis module is used to filter and classify historical data, and then obtain a prediction model of the virtual power plant's response behavior to internal resources; The construction and constraint module constructs a response price formulation model for a virtual power plant based on the prediction model of the training and analysis module, and imposes constraints on the model, so that the formulation of the response price is more in line with actual usage needs.

[0039] The response settlement price formulation module obtains the basic response price formulated by the virtual power plant based on the training analysis module, the construction and constraint module, and then defines the response settlement price of internal resources in period t based on the peak-shaving response speed and response integrity.

[0040] The specific settlement price is: In the formula, t represents the time period, is the response settlement price of internal resource i in period t, The base response price for the virtual power plant, k iis the response speed incentive coefficient of resource i, is the response integrity coefficient of resource i.

[0041] In addition, the response integrity coefficient is jointly formulated by the virtual power plant agent VPPA (virtual power plant agent) and the power grid company PGC (power grid company).

[0042] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for predicting the peak-shaving market revenue of a virtual power plant, characterized in that: The main steps include: S1. Based on historical response data, a prediction model of the virtual power plant’s response behavior to internal resources is constructed; First, the annual electricity consumption data of internal resources is collected, and the response data is selected for training and analysis, and the data is normalized so that the different features of all sample data can be compared; then based on the date label, the initial electricity consumption of internal resources and various environmental information as input, the peak-shaving response amount of internal resources under a given response price signal is output through training; S2. Based on the prediction model of step S1, construct a response price formulation model for the virtual power plant; Among them, the total benefits of the virtual power plant peak load response are as follows: , In the formula, F VPP is the total revenue of the virtual power plant participating in the peak load response, T R is the number of peak load periods in which the virtual power plant participates, The peak load that the virtual power plant obtains by participating in the peak load market. is the clearing price of the peak-shaving market, The cost of operating the energy storage equipment. For the internal resource benefits of the virtual power plant, Penalize costs for response deviations; S3. Based on the response price formulation model, establish the response peak load constraints of the virtual power plant; S4. Based on the response price formulation model, the total revenue of the virtual power plant participating in the peak load response by acting as an agent for internal resources is obtained.

2. A virtual power plant peak load market revenue prediction method according to claim 1, characterized in that: In step S1, the specific method for each training set is as follows: Where: To normalize the response price, In response to price, max is the maximum value of the response price in each training set, min is the minimum value of the response price in each training set.

3. A virtual power plant peak load market revenue prediction method according to claim 1, characterized in that: The specific calculation of the operating cost of energy storage equipment is: In the formula, Real-time electricity purchase and sales prices for energy storage equipment interacting with the power grid. The amount of energy storage equipment to compensate for the is the energy storage operation and maintenance coefficient, As unit time.

4. A virtual power plant peak load market revenue prediction method according to claim 1, characterized in that: The specific calculation of the internal resource benefits of the virtual power plant is as follows: , N all is the total number of resources participating in the response, is the response compensation for resource i; N AC is the air conditioning coefficient involved in the response, N WH is the electric water heater participating in the response, N DR The number of other adjustable loads participating in the response; is the peak load response of resource i, which is obtained by RNN response behavior prediction; As unit time.

5. A method for predicting the peak-shaving market revenue of a virtual power plant according to claim 1, characterized in that: When the actual response volume within the virtual power plant does not meet the needs of the peak-shaving market, a response deviation penalty fee will be incurred, and the virtual power plant needs to pay this fee; the specific calculation of the deviation penalty fee of the virtual power plant is: In the formula, , The deviation penalty cost coefficient for the peak load response of the virtual power plant; For peak load deviation, Set values ​​for deviation assessment segments; Peak load deviation The calculation formula is: In the formula, is the peak deviation power, is the unit time; In the formula, is the actual peak load regulation power of the virtual power plant, The peak load required for the virtual power plant to participate in the peak load market; The calculation of the set value for the deviation assessment segment is: In the formula, u UB To respond to the deviation assessment ratio, The peak-shaving capacity obtained by the virtual power plant participating in the peak-shaving market.

6. A virtual power plant peak load market revenue prediction method according to claim 1, characterized in that: The constraints in step S3 mainly include: (1) It is necessary to balance the peak-shaving power. The virtual power plant needs to maintain a power balance between the market interaction and internal response. The imbalance between the actual response of the virtual power plant and the peak-shaving target is the response deviation value. The actual peak-shaving power of the virtual power plant is calculated as follows: In the formula, is the actual peak load regulation power of the virtual power plant, is the actual response power of the air conditioning system, is the actual response power of the electric water heater, is the actual response power of other adjustable loads, Compensation for energy storage equipment; (2) It is necessary to constrain the response deviation of the virtual power plant energy storage equipment. The constraints on the charging and discharging power of the energy storage equipment when compensating for the response deviation are as follows: , In the formula, , The minimum and maximum values ​​of charge and discharge when the energy storage device deviation is compensated respectively.

7. A virtual power plant peak load market revenue settlement system, characterized in that: It includes training analysis module, construction and constraint module and response settlement price formulation module; The training and analysis module is used to filter and classify historical data, and then obtain a prediction model of the virtual power plant's response behavior to internal resources; The construction and constraint module builds a response price formulation model for a virtual power plant based on the prediction model of the training and analysis module, and imposes constraints on the model, so that the formulation of the response price is more in line with actual usage needs; The response settlement price formulation module obtains the basic response price formulated by the virtual power plant based on the training analysis module, the construction and constraint module, and then defines the response settlement price of internal resources in period t based on the peak-shaving response speed and response integrity.

8. A virtual power plant peak load market revenue settlement system according to claim 7, characterized in that: The response settlement price is as follows: In the formula, t represents the time period, is the response settlement price of internal resource i in period t, is the basic response price set for the virtual power plant, ki is the response speed incentive coefficient of resource i, is the response integrity coefficient of resource i.

9. A virtual power plant peak load market revenue settlement system according to claim 8, characterized in that: The response integrity coefficient is jointly established by the virtual power plant agent VPPA and the power grid company PGC.