Method and system for determining benchmark string of photovoltaic power station and medium

By preprocessing the sampling data of photovoltaic power station sub-array strings and calculating multi-dimensional feature data, and using the hierarchical clustering model to determine the benchmark string, the problems of benchmark string stability and environmental factors in the traditional method are solved, and an efficient , Stable power generation capacity reflection and loss quantification.

CN118863237APending Publication Date: 2024-10-29HANGZHOU PINNET TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410845910.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

The traditional photovoltaic power station benchmark string selection method cannot guarantee stability, cannot objectively reflect the theoretical power generation capacity of the power station under normal operating conditions, and cannot effectively quantify power generation losses under abnormal conditions.

Method used

By collecting the sampling data of each string of the photovoltaic power station sub-array, preprocessing and multi-dimensional operating characteristic data calculation are performed, and the hierarchical clustering model is input to determine the benchmark string, which is updated regularly to reduce the impact of environmental factors.

Benefits of technology

It realizes the selection of benchmark strings with efficient and stable power generation, which can objectively reflect the theoretical power generation capacity of the power station under normal operation conditions, and quantify the power generation loss under abnormal conditions, ensuring that the data truly reflects the status of the power station.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118863237A_ABST
    Figure CN118863237A_ABST
Patent Text Reader

Abstract

The invention discloses a method and a system for determining a benchmark group string of a photovoltaic power station and a medium. Relates to the technical field of photovoltaic power generation. Performing first preprocessing on the sampling data; calculating multi-dimensional operation characteristic data of each group of strings based on the sampling data after the first preprocessing; inputting the multi-dimensional operation characteristic data of each group string into a hierarchical clustering model, determining a benchmark group string, calculating the multi-dimensional operation characteristic data of each group string through sampling data, inputting the multi-dimensional operation characteristic data into the hierarchical clustering model, determining the benchmark group string, and calculating the multi-dimensional operation characteristic data of each group string; a benchmark group string with efficient and stable power generation can be regularly selected, and meanwhile, the influence of environmental factors is reduced, so that the theoretical power generation capacity of the power station under the normal operation condition is objectively reflected, and the power generation loss under various abnormal conditions is quantified based on the theoretical power generation capacity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of photovoltaic power generation, and in particular to a method, system and medium for determining a benchmark string of a photovoltaic power station. Background Art

[0002] With the improvement of environmental awareness and the advancement of technology, solar photovoltaic power generation has been widely used as a renewable energy source. In the operation of photovoltaic power stations, in order to accurately analyze the operation level of the power station and scientifically quantify the losses of photovoltaic power stations, photovoltaic power stations will select a part of photovoltaic strings with excellent power generation capacity and representativeness as benchmark strings, so as to objectively reflect the theoretical power generation capacity of the power station as a whole under normal operation, and use this as a benchmark to scientifically quantify the power generation losses under various abnormal conditions.

[0003] However, the existing benchmark string selection methods often cannot accurately reflect the actual operating status of the power station. For example, rule-based selection, this method automatically selects strings that meet the conditions by setting some rules, such as thresholds of parameters such as power and efficiency. This method can ensure that the power generation efficiency of the benchmark string is high, but it cannot guarantee its stability. Similarly, for example, CN103294896B selects benchmark strings through PCA, but does not take into account the stability of string efficiency. There is also a method of selecting by stability, selecting a part of the most stable photovoltaic strings as benchmark strings, but it cannot guarantee the normal and efficient power generation of the benchmark strings. Because the sub-arrays of large ground power stations are far apart and the string models in the same sub-array are consistent, the benchmark strings should be selected with representative positions or representative models, but in actual applications, sometimes due to convenience or other reasons, strings with less representative positions are selected as benchmarks. If it is not possible to select a benchmark for each sub-array, when the photovoltaic string models of different sub-arrays are inconsistent, this may cause the obtained data to not truly reflect the overall status of the power station or sub-array. Environmental factors (such as climate and surrounding changes) will affect the operation of photovoltaic power plants, so the benchmark strings should be updated regularly. However, existing methods often fail to take this into account, resulting in unsatisfactory selection of benchmark strings.

[0004] Therefore, a new method for selecting benchmark strings for photovoltaic power stations is urgently needed to objectively reflect the theoretical power generation capacity of the power station under normal operating conditions, and use this as a benchmark to quantify the power generation losses under various abnormal conditions. Summary of the invention

[0005] The technical problem to be solved by the present invention is that under factors such as differences in environmental changes and differences in the properties of the strings themselves, the stability of the traditional photovoltaic power station benchmark strings cannot be guaranteed during the selection process, resulting in the benchmark strings being unable to objectively reflect the theoretical power generation capacity of the power station under normal operating conditions. The purpose of the present invention is to provide a method, system and medium for determining the benchmark strings of a photovoltaic power station, by calculating multi-dimensional operating characteristic data of each string through sampling data, and inputting the multi-dimensional operating characteristic data into a hierarchical clustering model to determine the benchmark strings, and regularly selecting efficient and stable benchmark strings while reducing the impact of environmental factors, so as to objectively reflect the theoretical power generation capacity of the power station under normal operating conditions, and use this as a benchmark to quantify power generation losses under various abnormal conditions.

[0006] The present invention is achieved through the following technical solutions:

[0007] This solution provides a method for determining a benchmark string of a photovoltaic power station, including:

[0008] Obtain sampling data of each string in the PV power station subarray;

[0009] Performing a first preprocessing on the sampled data;

[0010] Calculate multi-dimensional operation characteristic data of each string group based on the first pre-processed sampling data;

[0011] The multi-dimensional operating characteristic data of each string group is input into the hierarchical clustering model to determine the benchmark string group.

[0012] A further optimization scheme is that the method of obtaining the sampling data of each group of strings in the photovoltaic power station subarray includes:

[0013] With f as the sampling period, the string current I, string voltage U, string capacity C, irradiation intensity W, and component backplane temperature T of each string during the sunshine period are collected.

[0014] A further optimization scheme is that the first preprocessing of the sampled data includes the following method:

[0015] S1, remove all sampling data of abnormal strings;

[0016] S2, determining whether there is empty data in the sampling data of each string, and eliminating all sampling data of the string containing empty data.

[0017] A further optimization scheme is that the multi-dimensional operation characteristic data of each string group is calculated based on the first pre-processed sampling data; including the method:

[0018] Based on the first pre-processed sampling data, direct operation data of each string group is calculated as first-dimensional operation characteristic data;

[0019] Based on the first preprocessed sampling data and the first-dimensional operation characteristic data, statistical distribution data of the first-dimensional operation characteristic data is calculated as the second-dimensional operation characteristic data.

[0020] A further optimization scheme is to normalize the direct operation data to standard test conditions during the calculation of the direct operation data of each string.

[0021] A further optimization scheme is to input the multi-dimensional operation characteristic data of each string group into a hierarchical clustering model to determine the benchmark string group, including the following method:

[0022] Obtain multi-dimensional operation characteristic data and its dimension number n;

[0023] Set classification rules: preset m thresholds for each dimension to divide the current dimension into m+1 categories, and freely combine categories of different dimensions to obtain (m+1) n Cluster classification; from (m+1) n The optimal cluster classification is determined in advance among the cluster classifications;

[0024] The multidimensional operation characteristic data is subjected to a second preprocessing, and the multidimensional operation characteristic data after the second preprocessing is divided into corresponding cluster classifications based on classification rules, and a benchmark group string is determined from the optimal cluster classification.

[0025] A further optimization scheme is that the second pretreatment method includes:

[0026] Based on the multi-dimensional running feature data, a feature data set C is constructed, which is expressed as: A: (a 1 , a 2 , a 3 …, a i ); A represents the name of the group string; a i represents the i-th dimension running characteristic data, i = 1, 2, ..., n;

[0027] The data in the feature data set C is subjected to MinMax normalization processing.

[0028] A further optimization scheme is that the benchmark group string is determined from the optimal cluster classification, including the method:

[0029] Get the data of each cluster classification;

[0030] Calculate the mean of the data for each cluster classification;

[0031] Verify the classification accuracy of the optimal cluster classification based on the data mean of each cluster classification;

[0032] On the premise that the optimal cluster classification is accurate, a benchmark group string is selected from the optimal cluster classification.

[0033] The present solution also provides a system for selecting a benchmark string of a photovoltaic power station, which is used to implement the above-mentioned method for determining a benchmark string of a photovoltaic power station; the system comprises:

[0034] The acquisition module is used to obtain the sampling data of each string in the photovoltaic power station subarray;

[0035] A preprocessing module, used for performing a first preprocessing on the sampled data;

[0036] A calculation module, used to calculate multi-dimensional operation characteristic data of each string group based on the first pre-processed sampled data;

[0037] The clustering module is used to input the multi-dimensional operating characteristic data of each string group into the hierarchical clustering model to determine the benchmark string group.

[0038] The present solution also provides a computer-readable medium having a computer program stored thereon, and the computer program is executed by a processor to implement the above-mentioned method for selecting a benchmark string of a photovoltaic power station.

[0039] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0040] The present invention provides a method, system and medium for determining a benchmark group string of a photovoltaic power station. The multi-dimensional operation characteristic data of each group string is calculated by sampling data, and the multi-dimensional operation characteristic data is input into a hierarchical clustering model to determine the benchmark group string. The benchmark group string with high efficiency and stability in power generation can be regularly selected while reducing the influence of environmental factors, so as to objectively reflect the theoretical power generation capacity of the power station under normal operation, and use this as a benchmark to quantify the power generation loss under various abnormal conditions.

[0041] The present invention provides a method, system and medium for determining a benchmark string of a photovoltaic power station. Because the string models in the same subarray of a photovoltaic power station are consistent and the subarrays are far apart, the benchmark string of the photovoltaic subarray is selected based on the subarray to ensure that its position and model are more representative. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:

[0043] Figure 1 It is a flow chart of a method for determining a benchmark string of a photovoltaic power station;

[0044] Figure 2The schematic diagram of the system structure for determining the benchmark string of a photovoltaic power station. DETAILED DESCRIPTION

[0045] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0046] In scenarios where the environment changes greatly, when the benchmark strings are determined by comparing the power and efficiency thresholds, when the environment changes significantly, environmental factors will cause differences in the benchmark string screening process, and the screening results will easily become unstable; in addition, when the benchmark strings are selected by PCA, the normal and efficient power generation of the benchmark strings cannot be guaranteed. Because the subarrays of large ground power stations are far apart and the string models in the same subarray are consistent, the benchmark strings should be selected with representative locations or representative models. However, in actual applications, strings with less representative locations are sometimes selected as benchmarks for convenience or other reasons. If it is not possible to select a benchmark for each subarray, when the photovoltaic string models of different subarrays are inconsistent, this may result in the data obtained not being able to truly reflect the overall condition of the power station or subarray. In view of this, the present invention provides the following embodiments to solve the above technical problems:

[0047] Example 1

[0048] This embodiment provides a method for determining a benchmark string of a photovoltaic power station, such as Figure 1 As shown, including:

[0049] Step 1: Obtain sampling data of each string in the PV power station subarray; specific methods include:

[0050] Take f as sampling period, collect the string current I of each string in sunshine period, unit A, string voltage U, unit V, string capacity C, unit kW, irradiation intensity W, unit W / m 2 , and the component backplane temperature T in °C; in the specific implementation process, all sampling data of the photovoltaic power station sub-array in the local sunshine time period in the past month are obtained, and the specific sampling period f=5min.

[0051] Step 2: performing a first preprocessing on the sampled data;

[0052] The first preprocessing of the sampled data comprises a method:

[0053] S1, remove all sampling data of abnormal strings;

[0054] S2, determining whether there is empty data in the sampling data of each string, and eliminating all sampling data of the string containing empty data.

[0055] The method of calculating the multi-dimensional operation characteristic data of each string based on the first pre-processed sampling data includes:

[0056] Based on the first preprocessed sampling data, direct operation data of each string group is calculated as first-dimensional operation characteristic data;

[0057] The direct operating data described in the embodiment include the real-time power of each string, the power generation of each string, the power generation efficiency of each string, and other physical quantity data that can characterize the operating status of the strings. Since the comprehensive power generation efficiency can characterize the real-time power of each string and the power generation of each string, this embodiment uses the comprehensive power generation efficiency as the first dimension of operating characteristic data.

[0058] Based on the pre-processed sampling data, the standard power generation efficiency of each string under standard test conditions is calculated; including the method:

[0059] The real-time power P of each string is calculated based on the following formula: 时 :P 时 =I*U;

[0060] Based on real-time power P 时 Calculate the standard power generation efficiency α 标 :α 标 =P 时 / C.

[0061] In the process of calculating the direct operation data of each string, some of the direct operation data are normalized to the standard test conditions. The standard test conditions refer to the data measured when the illumination is 1 kilowatt per square meter, the panel temperature is 25 degrees Celsius, and the spectral distribution is AM1.5. The theoretical power is obtained by the sum of the maximum output power of all unit cells on the panel.

[0062] Specifically, this embodiment normalizes the real-time power of the strings according to the real-time irradiation intensity and the backplane temperature, and converts it to obtain the standard theoretical power of the strings under standard conditions:

[0063] Standard theoretical power of string = (U*I) / 1000 / ((W / 1000) / (1-Q)*(T-25)); Q is the temperature coefficient of component power, which is 0.004 by default;

[0064] When there is no backplane temperature telemetry value, it can be obtained by fitting the data of individual power stations: backplane temperature = 1.2952 * ambient temperature + irradiation intensity W * conversion coefficient - 1.0227; the conversion coefficient defaults to 0.0205;

[0065] Step 3: Calculate the multi-dimensional operation characteristic data of each string group based on the first pre-processed sampling data;

[0066] In the specific implementation process, the multi-dimensional operation characteristic data in this scheme mainly includes the first-dimensional operation characteristic data and the second-dimensional operation characteristic data;

[0067] Based on the first preprocessed sampling data and the first dimension operation characteristic data, the statistical distribution data of the first dimension operation characteristic data is calculated as the second dimension operation characteristic data. The specific second dimension operation characteristic data includes the efficiency comprehensive discrete rate;

[0068] In the specific implementation process, this embodiment first calculates the standard power generation efficiency of each string under standard test conditions based on the preprocessed sampling data; then, according to the standard power generation efficiency, the clean power generation efficiency, the comprehensive power generation efficiency and the comprehensive efficiency dispersion rate of the string are statistically calculated; the specific method includes:

[0069] The standard power generation efficiency of the string on that day is α 标 The average value is taken as the daily power generation efficiency α 日 , based on the daily power generation efficiency of the string in the past month from that day α 日 As the comprehensive power generation efficiency α 综 ;

[0070] The daily efficiency dispersion rate E of the string is calculated according to the following formula: 日 :

[0071]

[0072] in, Indicates the average of the real-time efficiency of the string on that day; Indicates the standard deviation of the real-time efficiency of the string on that day;

[0073] The daily dispersion rate of the efficiency of the string in the past month from that day is E 日 The mean of the efficiency comprehensive dispersion rate is taken as the dispersion rate. The dispersion rate is a relative statistic that measures the dispersion degree of data. It is mainly used to compare the dispersion degree of different sample data. A large dispersion rate indicates a large dispersion degree of data; a small dispersion rate indicates a small dispersion degree of data.

[0074] Step 4: Input the multi-dimensional operating characteristic data of each string group into the hierarchical clustering model to determine the benchmark string group.

[0075] The multi-dimensional operation characteristic data of each string group is input into the hierarchical clustering model to determine the benchmark string group, including the following methods:

[0076] Obtain multi-dimensional operation characteristic data and its dimension number n;

[0077] Set classification rules: preset m thresholds for each dimension to divide the current dimension into m+1 categories, and freely combine categories of different dimensions to obtain (m+1) n Cluster classification; from (m+1) nThe optimal cluster classification is determined in advance among the cluster classifications;

[0078] The multidimensional operation characteristic data is subjected to a second preprocessing, and the multidimensional operation characteristic data after the second preprocessing is divided into corresponding cluster classifications based on classification rules, and a benchmark group string is determined from the optimal cluster classification.

[0079] In the specific implementation process, the second preprocessing method includes:

[0080] Based on the multi-dimensional running feature data, a feature data set C is constructed, which is expressed as: A: (a 1 , a 2 , a 3 …, a i ); A represents the name of the group string; a i represents the i-th dimension running characteristic data, i = 1, 2, ..., n;

[0081] Perform MinMax normalization on the data in feature dataset C.

[0082] In the specific implementation process, the dimension number of this scheme is 2. According to the first dimension operation characteristic data (comprehensive power generation efficiency), the threshold Y1 is set to divide the current dimension into two categories: high efficiency and low efficiency. According to the second dimension operation characteristic data (efficiency daily discrete rate), the threshold Y2 is set to divide the current dimension into two categories: stable and unstable. The categories of different dimensions are freely combined to obtain 4 cluster classifications: ① low efficiency and stable; ② low efficiency and unstable; ③ high efficiency and stable; ④ high efficiency and unstable;

[0083] The method of determining the benchmark group string from the optimal cluster classification includes:

[0084] Get the data of each cluster classification;

[0085] Calculate the data mean of each cluster classification;

[0086] Verify the classification accuracy of the optimal cluster classification based on the data mean of each cluster classification;

[0087] In the specific implementation process, the discrete rate mean Qi and efficiency mean Pi of each category are calculated for the four categories of clusters obtained by clustering (i=1 represents inefficient stable classification, i=2 represents inefficient unstable classification, i=3 represents efficient stable classification, and i=4 represents efficient unstable classification). The accurate characterization of the optimal clustering classification, efficient stable classification, is ensured by comparing the discrete rate and efficiency between categories. The accurate classification of the optimal clustering classification requires that Q3 and P3 meet the following conditions at the same time:

[0088] P3>P1 and P3>P2 and Q3>Q4 and Q3>Q2;

[0089] On the premise that the optimal cluster classification is accurate, a benchmark group string is selected from the optimal cluster classification.

[0090] The best power generation efficiency of all strings classified as efficient and stable are ranked, and the top N (N>=1, set according to the actual needs of the power station, generally greater than 1 and multiple strings are taken as backup) strings with no obstruction, no fault alarm and the best power generation efficiency are selected as benchmark strings. Selecting multiple benchmark strings can avoid the situation where no benchmark strings are available and subsequent diagnosis and analysis cannot be performed when a benchmark fails. At the same time, the remaining subsequent strings that meet the requirements are taken as backups and adjusted when the benchmark strings are under maintenance.

[0091] This scheme uses a hierarchical clustering model to set the number of classifications according to multi-dimensional operating characteristic data and its number of dimensions, and also conducts stability analysis on different classification results. Under the condition of ensuring the stability of the classification results, the benchmark string group is determined from the optimal cluster classification. When the environment changes significantly, environmental factors will cause the impact of each string group in the classification result screening process to be synchronized. Screening is carried out under the condition of ensuring that the impact on each string group is synchronized and the classification results are stable, which ensures that the benchmark string group objectively reflects the theoretical power generation capacity of the power station under normal operation.

[0092] This solution combines discrete rate and hierarchical clustering to screen benchmark strings, solving the problem that other methods cannot simultaneously guarantee high power generation efficiency and stability of strings;

[0093] The present invention starts from the historical data of the string group and combines the power generation and environmental data to reduce the impact of environmental changes, can handle complex and changing situations, optimize the selection of benchmark strings, and can regularly update and adjust the benchmark strings;

[0094] The present invention can select benchmarks based on the sub-array of a photovoltaic power station, and the positions and equipment models thereof are more representative and can truly reflect the power generation conditions of different sub-arrays of the power station.

[0095] Example 2

[0096] This embodiment provides a system for selecting a benchmark string of a photovoltaic power station, which is used to implement a method for determining a benchmark string of a photovoltaic power station described in Embodiment 1; Figure 2 As shown, the system comprises:

[0097] The acquisition module is used to obtain the sampling data of each string in the photovoltaic power station subarray;

[0098] A preprocessing module, used for performing a first preprocessing on the sampled data;

[0099] A calculation module, used to calculate multi-dimensional operation characteristic data of each string group based on the first pre-processed sampled data;

[0100] The clustering module is used to input the multi-dimensional operating characteristic data of each string group into the hierarchical clustering model to determine the benchmark string group.

[0101] Example 3

[0102] This embodiment provides a computer-readable medium on which a computer program is stored. The computer program is executed by a processor to implement a method for selecting a benchmark string of a photovoltaic power station as described in Embodiment 1, specifically performing the following steps:

[0103] Step 1: Obtain sampling data of each string in the PV power station subarray;

[0104] Step 2: performing a first preprocessing on the sampled data;

[0105] Step 3: Calculate the multi-dimensional operation characteristic data of each string group based on the first pre-processed sampling data;

[0106] Step 4: Input the multi-dimensional operating characteristic data of each string group into the hierarchical clustering model to determine the benchmark string group.

[0107] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for determining a benchmark string of a photovoltaic power station, characterized in that: include: Obtain sampling data of each string in the PV power station subarray; Performing a first preprocessing on the sampled data; Calculate multi-dimensional operation characteristic data of each string group based on the first pre-processed sampling data; The multi-dimensional operating characteristic data of each string group is input into the hierarchical clustering model to determine the benchmark string group.

2. A method for determining a benchmark string of a photovoltaic power station according to claim 1, characterized in that: The method of obtaining the sampling data of each string in the photovoltaic power station subarray includes: With f as the sampling period, the string current I, string voltage U, string capacity C, irradiation intensity W, and component backplane temperature T of each string during the sunshine period are collected.

3. A method for determining a benchmark string of a photovoltaic power station according to claim 2, characterized in that: The first preprocessing of the sampled data comprises a method: S1, remove all sampling data of abnormal strings; S2, determining whether there is empty data in the sampling data of each string, and eliminating all sampling data of the string containing empty data.

4. A method for determining a benchmark string of a photovoltaic power station according to claim 2, characterized in that: The multi-dimensional operation characteristic data of each string group is calculated based on the first pre-processed sampling data; include method: Based on the first preprocessed sampling data, direct operation data of each string group is calculated as first-dimensional operation characteristic data; Based on the first preprocessed sampling data and the first-dimensional operation characteristic data, statistical distribution data of the first-dimensional operation characteristic data is calculated as the second-dimensional operation characteristic data.

5. A method for determining a benchmark string of a photovoltaic power station according to claim 4, characterized in that: In the process of calculating the direct operation data of each string group, the direct operation data is normalized to the standard test conditions.

6. A method for determining a benchmark string of a photovoltaic power station according to claim 1, characterized in that: The multi-dimensional operation characteristic data of each string group is input into the hierarchical clustering model to determine the benchmark string group, including the following method: Obtain multi-dimensional operation characteristic data and its dimension number n; Set classification rules: preset m thresholds for each dimension to divide the current dimension into m+1 categories, and freely combine categories of different dimensions to obtain (m+1) n Cluster classification; from (m+1) n The optimal cluster classification is determined in advance among the cluster classifications; The multidimensional operation characteristic data is subjected to a second preprocessing, and the multidimensional operation characteristic data after the second preprocessing is divided into corresponding cluster classifications based on classification rules, and a benchmark group string is determined from the optimal cluster classification.

7. A method for determining a benchmark string of a photovoltaic power station according to claim 6, characterized in that: The second pretreatment method comprises: Based on the multi-dimensional running feature data, a feature data set C is constructed, which is expressed as: A: (a1, a2, a3…, a i ); A represents the name of the group string; a i represents the i-th dimension running characteristic data, i = 1, 2, ..., n; The data in the feature data set C is subjected to MinMax normalization processing.

8. A method for determining a benchmark string of a photovoltaic power station according to claim 7, characterized in that: The method of determining the benchmark group string from the optimal cluster classification includes: Get the data of each cluster classification; Calculate the mean of the data for each cluster classification; Verify the classification accuracy of the optimal cluster classification based on the data mean of each cluster classification; On the premise that the optimal cluster classification is accurate, a benchmark group string is selected from the optimal cluster classification.

9. A system for selecting a benchmark string of a photovoltaic power station, characterized in that: A method for determining a benchmark string of a photovoltaic power station according to any one of claims 1 to 8; the system comprises: The acquisition module is used to obtain the sampling data of each string in the photovoltaic power station subarray; A preprocessing module, used for performing a first preprocessing on the sampled data; A calculation module, used to calculate multi-dimensional operation characteristic data of each string group based on the first pre-processed sampled data; The clustering module is used to input the multi-dimensional operating characteristic data of each string group into the hierarchical clustering model to determine the benchmark string group.

10. A computer readable medium having a computer program stored thereon, characterized in that: The computer program is executed by a processor to implement a method for selecting a benchmark string of a photovoltaic power station as described in any one of claims 1 to 8.