High-energy-consumption enterprise source-load collaborative optimization operation method considering wind and light uncertainty and demand response
By constructing a wind and solar uncertainty source output characterization model and a load-side optimization model, the problem of wind and solar uncertainty and demand response not being considered in the existing technology has been solved, and efficient source-load collaborative optimization of high-energy-consuming enterprises has been achieved, reducing costs. Grid operating costs and carbon emissions are applicable to different types of high energy-consuming enterprises.
Patent Information
- Application Number
- CN202410995808.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-10-29
AI Technical Summary
The existing technology lacks a source-load collaborative optimization operation method for high-energy-consuming enterprises that considers wind and solar uncertainty and demand response, resulting in high power grid operating costs, increased carbon emissions, and difficulty in effectively adjusting resource utilization.
By obtaining historical data of wind and solar and user-side electricity/heat loads, a wind and solar uncertainty source output representation model is constructed, and the Latin hypercube sampling method and Kantorovich scene reduction method are used to generate typical wind and solar output scenarios, and establish wind and solar uncertainties and demand responses. The source-load collaborative optimization operation model of high-energy-consuming enterprises optimizes the price elasticity coefficient of electricity/heat prices and the energy consumption cost model to achieve reduction, transferability, and replaceable load classification and optimization on the load side.
It effectively reduces the operating costs of the power grid, reduces the dependence on traditional fossil fuels, improves resource utilization and system flexibility, is suitable for different types of high energy-consuming enterprises, and realizes peak shaving and valley filling and the consumption of new energy.
Smart Images

Figure CN118864147A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of optimized operation of high-energy-consuming enterprises, and in particular to a method for source-load coordinated optimized operation of high-energy-consuming enterprises taking into account wind and solar uncertainty and demand response. Background Art
[0002] The uncertainty brought by the access of large-scale renewable energy generators to the power system has put tremendous pressure on the operation and control of the power grid. Therefore, it is particularly important to tap into large-scale rapid regulation resources to improve the flexibility and resource utilization of the power system. The electrical / thermal load of aluminum processing enterprises has the characteristics of large installed capacity and easy centralized control. Adjusting the load power of aluminum processing enterprises in a short period of time will not affect product quality, and the output will only change slightly, so its regulation potential is huge.
[0003] As domestic aluminum processing enterprises have increasingly prominent energy consumption problems and lack of economic scheduling, and the contradiction between the existing development model and the low-carbon economy is becoming more and more prominent, it is crucial to promote the high-quality development of the aluminum processing industry. By analyzing the types of aluminum processing electricity / heat loads and the output equipment on the source side, the production process can be optimized, the operating costs can be significantly reduced, the efficient allocation and coordinated scheduling of cross-domain resources can be promoted, and the sustainable development of the regional economy can be promoted.
[0004] In the prior art, there is a lack of source-load coordinated optimization operation of high-energy-consuming enterprises that takes into account both uncertainty and demand response. For example, Chinese patent publication number CN114723332A discloses a source-load coordinated scheduling method and device under wind power uncertainty. This method generates a scenario with the lowest total operating cost on the source side, and then matches the power of the aluminum electrolytic cell and its spare capacity with it, but does not involve a demand response mechanism. Chinese patent publication number CN116914731A discloses an optimization method for high-energy-consuming flexible load aggregators to participate in new energy consumption. This method analyzes the electricity cost of flexible loads and uses an improved genetic algorithm to optimize high-energy-consuming flexible loads to participate in large-scale new energy consumption, but does not involve research on new energy uncertainty. Therefore, the present invention provides a source-load coordinated optimization operation method for high-energy-consuming enterprises that takes into account wind and solar uncertainty and demand response. Summary of the invention
[0005] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a method for optimizing the coordinated operation of sources and loads for high-energy-consuming enterprises taking into account the uncertainty of wind and solar power and demand response.
[0006] The purpose of the present invention can be achieved by the following technical solutions:
[0007] The present invention provides a method for optimizing the coordinated operation of sources and loads of high energy-consuming enterprises by taking into account the uncertainty of wind and solar power and demand response, comprising the following steps:
[0008] Step S1, obtaining a historical data set of wind, solar, and user-side electricity / heat loads, and preprocessing the historical data set;
[0009] Step S2: According to the historical data set of wind and solar, a wind and solar uncertainty source output characterization model is constructed based on Weibull distribution and Beta distribution, and a historical data set of wind and solar output is generated;
[0010] Step S3: Based on the wind and solar power output historical data set, Latin hypercube sampling method combined with Kantorovich scene reduction method is used to generate and reduce scenes of the wind and solar power historical data to generate typical wind and solar power output scenes;
[0011] Step S4, constructing the price elasticity coefficient of electricity / heat price and the price elasticity coefficient matrix;
[0012] Step S5: constructing an energy consumption cost model for the load side of high energy-consuming enterprises based on the price elasticity coefficient matrix;
[0013] Step S6: Establish a source-load coordinated optimization operation model for high-energy-consuming enterprises including wind and solar uncertainty and demand response, and introduce the objective function and constraint conditions for the optimization operation;
[0014] Step S7, input the historical data set of user-side electric / heat load in step S1 and the typical wind / solar output scenario in step S3 into the source-load collaborative optimization operation model of high-energy-consuming enterprises in step S6 to obtain the source-load collaborative optimization operation results of high-energy-consuming enterprises.
[0015] In step S1, the preprocessing includes the following steps:
[0016] Step S1.1, collecting and cleaning the historical data set;
[0017] Step S1.2: Synchronize the time of historical data of wind and solar power and historical data of electricity / heat load at the user side.
[0018] In the step S2, constructing a wind and solar uncertainty source output characterization model includes constructing a wind and solar uncertainty source output characterization model based on a wind and solar output probability density function; wherein the wind and solar output probability density function includes a wind speed probability density function and an irradiance probability density function, the wind speed probability density function obeys a Weibull distribution, and the irradiance probability density function obeys a Beta distribution.
[0019] The step S3 comprises the following steps:
[0020] Step S3.1: Based on the wind and solar power output historical data set, Latin hypercube sampling is used to evenly divide each input variable into N intervals, and a value is randomly selected in each interval;
[0021] Step S3.2, calculating the Kantorovich distance according to the relationship between the elements in the two sequences;
[0022] Step S3.3, based on the Kantorovich distance, select the elements to be retained and reduce other elements;
[0023] Step S3.4: Repeat steps S3.2 and S3.3, iterate until the same sequence length is reached, perform cluster analysis on the final retained samples, and generate a typical wind and solar output scenario.
[0024] In step S4, the price elasticity coefficient of electricity / heat price and the price elasticity coefficient matrix formula are as follows:
[0025]
[0026] Among them, g t,j is the price elasticity coefficient, △P t is the load change value at time t; is the initial load value at time t; △M j is the change in electricity price at time j; is the initial electricity price at time j; G is the price elasticity coefficient matrix, f is the peak load period; g is the valley load period; p is the flat load period.
[0027] In the step S5, based on the price elasticity coefficient matrix, the load side of high energy-consuming enterprises is classified into: load that can be reduced, load that can be transferred, and load that can be replaced; specifically, the following formula is used to express it:
[0028]
[0029] Among them, △P c, t is the load change that can be reduced at time t, is the initial load reduction value at time t, G c (t, j) is the price elasticity coefficient matrix of load reduction, ΔP s, t is the change in the transferable load at time t, is the initial transferable load value at time t; G s (t, j) is the price elasticity coefficient matrix of transferable load, and are the replaceable electrical and thermal loads at time t respectively; is the electric heat substitution coefficient.
[0030] The energy consumption cost model is expressed by the following formula:
[0031] C n,t =aPm,t M coal +bQ g,t M coal
[0032]
[0033] Among them, C n,t is the energy consumption cost at time t, a and b are the discount coefficients of electricity and natural gas energy respectively; P m,t is the output power of the coal-fired unit at time t; Q g,t M is the amount of natural gas purchased at time t; coal The price of coal purchased by the enterprise, C n is the energy consumption cost, and T is an operation cycle.
[0034] In step S6, the source-load collaborative optimization operation model of high-energy-consuming enterprises is the sum of operation and maintenance costs, energy consumption costs and energy purchase costs; the objective function is the minimum value of the sum of operation and maintenance costs, energy consumption costs and energy purchase costs, which is expressed by the following formula:
[0035] f=min(C y +C n +C g )
[0036]
[0037] Among them, f is the objective function, C y is the operation and maintenance cost, T is an operation cycle; ω i is the operation and maintenance cost of the i-th process; i is 1, 2, ..., 8, representing smelting, casting, compounding, hot rolling, return, cold rolling, slitting and packaging respectively; c is the unit operation and maintenance cost of the energy storage device; P ES,t and P HS,t are the output power of the electric storage device and the heat storage device at time t, C g is the energy purchase cost, P g,t is the power purchased from the grid at time t; μ g,t is the electricity price purchased by the enterprise at time t; μ h,t It is the hot purchase price of the enterprise at time t.
[0038] The constraints mainly include energy purchase constraints, gas turbine and gas boiler output constraints, energy storage constraints, equipment operation constraints and electricity / heat power balance constraints.
[0039] In a second aspect, the present invention provides an electronic device, comprising a memory, a processor, and a program stored in the memory, wherein the processor implements any of the above-described methods when executing the program.
[0040] Compared with the prior art, the present invention has the following beneficial effects:
[0041] (1) Assisting the grid side to reduce peak loads and fill valleys: The present invention introduces a demand response mechanism and reasonably dispatches the adjustable loads within the enterprise, which can effectively smooth out the fluctuations of the load curve and thus achieve peak reduction and fill valleys. High-energy-consuming enterprises increase their electricity consumption during valley periods when electricity prices are lower, and reduce their electricity consumption during peak periods when electricity prices are higher. This method effectively reduces the operating cost of the power grid, alleviates the power supply pressure during peak periods, and helps to achieve efficient operation of the power system.
[0042] (2) Reducing enterprise operating costs: The present invention optimizes the operating mode of high-energy-consuming enterprises, adjusts the electricity consumption strategy according to the time-of-use electricity price, and selects production activities during periods with lower electricity prices. This not only reduces electricity costs, but also reduces dependence on coal-fired units and gas-fired units, thereby obtaining government subsidies and further reducing operating costs.
[0043] (3) Energy saving and carbon reduction: In this invention, high-energy-consuming enterprises actively respond to new energy power generation and actively consume new energy, reducing their dependence on traditional fossil fuel power generation, thereby reducing carbon emissions. This not only meets the requirements of the national dual carbon goals, but also helps enterprises obtain more policy support.
[0044] (4) Wide scope of application: Based on the high-energy-consuming enterprises utilizing the demand response mechanism to optimize their own production benefits, the present invention also considers the uncertainty of wind and solar power output, analyzes the production process, understands the enterprise equipment, classifies and models the adjustable loads of high-energy-consuming enterprises, and introduces an energy consumption cost model. While improving the overall benefits of the system, it reduces energy consumption and is applicable to different types of high-energy-consuming enterprises.
[0045] (5) Strong adaptability: The present invention uses the description of wind and solar output that obeys Weibull distribution and Beta distribution to deal with its output uncertainty, and uses the Latin hypercube sampling method and Kantorovich's scenario method to generate typical scenarios. Therefore, for different meteorological data of different types of industrial parks, this method can be used to generate typical wind and solar output scenarios, which can effectively reduce the impact of uncertainty on the optimization of operation decisions of high-energy-consuming enterprises, improve decision-making accuracy and efficiency, and provide decision-making assistance for high-energy-consuming enterprises to help them absorb new energy and assist the grid in peak load shaving and valley filling.
[0046] (6) By introducing the price elasticity coefficient, the present invention can effectively simulate the response of loads to price changes, help enterprises adjust energy use strategies according to energy price changes in different time periods, thereby achieving peak shaving and valley filling, and optimizing energy use efficiency. The price elasticity coefficient matrix provides the sensitivity of various loads to price changes, accurately measures and regulates the response of loads to electricity prices and heat prices, optimizes the energy use behavior of different load types under different energy price conditions, actively absorbs new energy, and avoids unnecessary energy waste and cost increase. In a complex production and energy use environment, a comprehensive operating cost model for high-energy-consuming enterprises is established to achieve coordinated optimization of multiple energy forms. By setting reasonable objective functions and constraints, the economic benefits, production stability and energy consumption issues in the operation process of high-energy-consuming enterprises are optimized. The optimization model can adapt to changes in the power grid and the market based on real-time data and forecast information, and improve flexibility and response speed. Using the results of the optimization operation model, an effective load distribution and scheduling strategy is formulated to ensure the operability and effectiveness of the theoretical optimization results in practice. Through scientific scheduling strategies, the impact of energy supply uncertainty on production can be reduced, and production risks and losses caused by unstable power supply can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 It is a schematic diagram of the process of the present invention;
[0048] Figure 2 Optimize the basic operation framework and structural diagram for high energy consumption enterprises;
[0049] Figure 3 This is a schematic diagram of actual power optimization operation results;
[0050] Figure 4 This is a schematic diagram of the actual thermal energy optimization operation results.
[0051] Figure 5 Schematic diagram of costs before and after enterprise optimization. DETAILED DESCRIPTION
[0052] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.
[0053] Example 1
[0054] This embodiment provides a method for optimizing the coordinated operation of sources and loads of high energy-consuming enterprises by considering the uncertainty of wind and solar power and demand response. Figure 1As shown, firstly, the actual meteorological and user-side electric / heat load historical data sets are preprocessed, and the uncertainty source output characterization model is constructed based on Weibull and Beta distribution. The Latin hypercube sampling method and Kantorovich distance method are used to generate and reduce the wind and solar data set (part of the meteorological data set) to obtain the actual typical scene wind and solar output. Then the adjustable loads are classified and the model is constructed, and the energy consumption cost model is constructed at the same time. Finally, an optimization operation model for high-energy-consuming enterprises including energy consumption costs, operation and maintenance costs, and energy purchase costs is established. Through the comparison and verification before and after optimization, high-energy-consuming enterprises have significantly optimized the energy consumption structure of the enterprise, saved total costs, actively responded to the new energy consumption policy on the grid side, and helped to achieve peak shaving and valley filling. Therefore, it is shown that the scheduling decision model provided in this embodiment is economical and low-carbon.
[0055] The specific steps are as follows:
[0056] Step S1, obtaining historical data sets of actual weather and user-side electricity / heat load, and preprocessing the historical data. Specifically, the steps include:
[0057] Step S1.1: Data collection and cleaning: Collect meteorological data including wind speed, temperature, humidity, irradiance, etc., and process missing values, outliers, and erroneous data.
[0058] Step S1.2, time synchronization. Synchronize meteorological data and user-side load data to ensure the consistency of data timestamps. Perform feature engineering analysis on load history data and meteorological history data to extract useful features, including average wind speed, wind direction changes, power consumption trends, peak and valley loads, etc., to better describe meteorological conditions and user power consumption behavior.
[0059] Step S2: According to the meteorological historical data set, a wind and solar power uncertainty source output characterization model is constructed based on Weibull and Beta distribution, which specifically includes the following steps:
[0060] Step S2.1, based on the wind and solar meteorological data set, in a certain period of time, the solar irradiance obeys the Beta distribution and the wind speed obeys the Weibull distribution;
[0061] The probability density function of irradiance that obeys the Beta distribution is:
[0062]
[0063] Where s is the current irradiance sor t The maximum photovoltaic output power P PV,max The corresponding irradiance sor max The ratio of s = so t / sor max; α, β are the shape parameters of Beta distribution:
[0064] α=μ pv [μ pv (1-μ pv ) / σ pv -1]
[0065] β=(1-μ pv )[μ pv (1-μ pv ) / σ pv -1]
[0066] Among them, μ pv , σ pv are the mean and standard deviation respectively.
[0067] The wind speed probability density function that obeys the Weibull distribution is:
[0068]
[0069] Among them, k and c are the shape parameter and scale parameter of the Weibull probability density function respectively.
[0070] Step S2.2: Calculate the photovoltaic output power P at time t based on the irradiance probability density function PV,t The wind turbine output power P at time t is calculated based on the probability density function of wind speed. WT,t The probability density function of
[0071] The probability density function of photovoltaic output power that obeys Beta distribution is:
[0072]
[0073] Among them, N PV is the number of photovoltaic devices; S pv is the total area of the photovoltaic array; η pv is the light-to-electricity energy conversion rate.
[0074] Step S2.3: According to the described wind-solar output probability density function, a wind-solar uncertainty source output characterization model is established, and a wind-solar output historical data set is generated.
[0075] The actual photovoltaic output is described as:
[0076] P PV,t =N PV sor t S pv η pv
[0077] Among them, P PV,t is the photovoltaic output power at time t.
[0078] The output of a wind turbine is described as:
[0079]
[0080] Among them, P WT,t is the output power of WT during period t; N WT is the number of units; P WT,r is the rated power; v r 、v in 、v out They are rated, cut-in and cut-out wind speeds respectively.
[0081] Step S3: Generate and reduce the wind and solar output historical data set based on Latin hypercube sampling method and Kantorovich distance method to obtain the actual typical scenario wind and solar output. According to the actual typical example scenario determined, the user-side electricity / heat load curve of the day is determined through the actual user-side data set. The wind and solar output and user-side load are as follows: Figure 3 shown.
[0082] Specifically, the generation of typical wind and solar power output scenarios based on the Latin hypercube sampling method and the Kantorovich distance method includes the following steps:
[0083] Step S3.1: Based on the historical data set of wind and solar power output, Latin hypercube sampling is used to evenly divide each input variable into N intervals, and a value is randomly selected in each interval:
[0084]
[0085] x i =x min +(i-1)·Δx+U(0,Δx)i=1,2,3,...,N
[0086] Among them, Δx, x i are the interval length and the random value in each interval respectively; x min 、x max are the lower and upper limits of the variable respectively; U(0,Δx) is a uniformly distributed random number in the range of 0 to Δx.
[0087] S3.2 uses the Kantorovich distance method to represent the distance between scenes, measure the distance between two probability distributions, and describe the difference between the sample distribution and the historical distribution. The Kantorovich distance is defined as:
[0088]
[0089] Where P and Q are the marginal distributions of γ(i,j), γ(i,j) is the joint distribution, and xi ,y j They are represented as sample points, d(x i ,y j ) is the distance between sample points.
[0090] S3.3 Based on the Kantorovich distance, select the elements to be retained and reduce the other elements.
[0091] Step S3.4: Repeat steps S3.2 and S3.3, iterate until the same sequence length is reached, perform cluster analysis on the final retained samples, and generate a typical wind and solar output scenario.
[0092] Step S4: construct the price elasticity coefficients of electricity and heat prices and the price elasticity coefficient matrix.
[0093] Specifically, the value of the price elasticity coefficient is used to help understand the demand characteristics of electricity and heat in the enterprise, and guide the aluminum processing enterprise to calculate the adjustable load. The price elasticity coefficient of electricity and heat prices and the price elasticity coefficient matrix formula are as follows:
[0094]
[0095] Among them, g t,j is the price elasticity coefficient, ΔP t is the load change value at time t; is the initial load value at time t; ΔM j is the change in electricity price at time j; is the initial electricity price at time j, G is the price elasticity coefficient matrix, f is the peak load period, g is the valley load period, and p is the flat load period.
[0096] Step S5: classify the load side of high energy-consuming enterprises and build an energy consumption cost model.
[0097] Specifically, for the classification of the enterprise load side, electric energy can be divided into three types: curtailable, transferable, and replaceable. Thermal energy can also be divided into three types: curtailable, transferable, and replaceable. Therefore, the load of high-energy-consuming enterprises can be divided into curtailable load, transferable load, and replaceable load. Preferably, an energy consumption cost model can be constructed based on the three types, or the energy consumption cost model can be directly constructed without classification.
[0098] Preferably, after classifying them, this embodiment constructs an energy consumption cost model, which is specifically expressed by the following formula:
[0099]
[0100] C n , t= aP m,t Mcoal +bQ g,t M coal
[0101]
[0102] Among them, △P c,t is the load change that can be reduced at time t, is the initial load reduction value at time t, G c (t, j) is the price elasticity coefficient matrix of load reduction, △P s,t is the change in transferable load at time t, is the initial transferable load value at time t; G s (t, j) is the price elasticity coefficient matrix of transferable load, and are the replaceable electrical and thermal loads at time t respectively; is the electric heat substitution coefficient, C n,t is the energy consumption cost at time t, a and b are the discount coefficients of electricity and natural gas energy respectively; P m,t is the output power of the coal-fired unit at time t; Q g,t M is the amount of natural gas purchased at time t; coal The price of coal purchased by the enterprise, C n For energy cost.
[0103] Step S6: Establish a source-load coordinated optimization operation model for high-energy-consuming enterprises including wind and solar uncertainty and demand response, and introduce the objective function and constraint conditions for the optimization operation.
[0104] Specifically, the final dispatch model established includes wind and solar uncertainties, such as Figure 2 As shown, the following steps are included:
[0105] Step S6.1, construct the dispatch objective function of the optimization operation model of high energy-consuming enterprises with wind and solar uncertainties; the dispatch objective function is:
[0106] f=min(C y +C n +C g )
[0107] Among them, f is the minimum total operating cost, C y , C n and C g They are operation and maintenance cost, energy consumption cost and energy purchase cost respectively; π e,t , π h,t are the revenue from selling electricity and providing heat to users at time t, π STG,t is the income from surfing the Internet at time t; R BFG,t is the cost of purchasing electricity from the main grid at time t.gas,t is the fuel cost at time t; R D,t is the equipment operation and maintenance cost at time t.
[0108] When the power generation and heat storage of an enterprise cannot meet its own needs, it can purchase them from the upper-level power grid and gas grid respectively. Since the solar power generation within the enterprise can be fully absorbed, the electricity and heat in the energy storage device can be consumed by the enterprise itself, so there is no situation where excess electricity and heat are sold to the grid side. y and C g Specifically:
[0109]
[0110] Among them, T is an operation cycle; ω i is the operation and maintenance cost of the i-th process; i is 1, 2, ..., 8, representing smelting, casting, compounding, hot rolling, return, cold rolling, slitting and packaging respectively; c is the unit operation and maintenance cost of the energy storage device; P ES,t , P HS,t are the output power of the power storage device and the heat storage device at time t respectively. g,t is the power purchased from the grid at time t; μ g,t is the electricity purchase price of the enterprise at time t; μ h,t It is the hot purchase price of the enterprise at time t.
[0111] Step S6.2, set the constraints of the source-load coordinated optimization operation model of high-energy-consuming enterprises including wind and solar uncertainty and demand response, the constraints include: energy purchase constraints, gas turbine and gas boiler output constraints, energy storage constraints, equipment operation constraints and electric / thermal power balance constraints.
[0112] Specifically, the above constraints are as follows:
[0113] (1) Constraints on purchasing power:
[0114] 0≤P em ≤P em,max
[0115] 0≤P hm ≤P hm,max
[0116] Among them, P em,max , P hm,max They are the upper limits of electricity and heat energy purchased from the source side respectively.
[0117] (2) Gas turbine and gas boiler output constraints:
[0118]
[0119] in, are the lower and upper limits of the gas turbine output respectively; They are the lower and upper limits of GB output respectively.
[0120] (3) Energy storage constraints:
[0121] C E S, min≤C E S≤C E S, max
[0122] C T S, min≤C T S≤C T S, max
[0123]
[0124] Among them, C ES , C ES,max , C ES,min They represent the upper and lower limits of the battery capacity and its charging and discharging power respectively; C TS , C TS,max , C TS,min They represent the upper and lower limits of the capacity of the heat storage device and its charging and discharging power respectively; They are the charging and discharging states of the power storage device at time t, both of which are 0-1 variables; They are respectively the heat storage and release states of the heat storage device at time t, and are both 0-1 variables.
[0125] (4) Equipment operation constraints:
[0126]
[0127] Among them, P i is the power consumption of the i-th production process; are the minimum and maximum power consumption of the ith production process respectively. are the heat and electricity generated by GT at time t; Q GT,t is the amount of natural gas consumed by GT at time t; α , β are the GT gas-to-heat and gas-to-electricity efficiency coefficients respectively; V g is the calorific value of natural gas.
[0128] (5) Electric power balance constraints:
[0129]
[0130] Among them, P RV,t , P WT,t , P PV,t , is the amount of hydropower, wind power, photovoltaic power, and GT power output to the enterprise at time t; are the charging power and discharging power of the energy storage device respectively.
[0131] (6) Thermal power balance constraints:
[0132]
[0133] in, P GB,t are the thermal power output by GT and GB to the enterprise at time t; are the heat storage and heat release powers at time t respectively; They are the initial electricity and heat loads before the enterprise participates in the response.
[0134] Step S7: Input the actual user-side electricity / heat load data set and the wind / solar output under the actual typical scenario obtained after the scenario generation and reduction in step S3 into the source-load coordinated optimization operation model of high-energy-consuming enterprises determined in step S6 to obtain the actual scheduling results participating in demand response.
[0135] The specific results of source-load coordinated optimization are as follows: Figure 3 , Figure 4 , Figure 5As shown. In the typical example scenario, there is a certain gap in the output of new energy, and other units are required to fill the energy gap. Compared with the initial electric load curve, the optimized electric load curve reduces the load in the period with higher electricity prices, i.e., 10:00-13:00, 17:00-21:00, because the curtailable load responds to the peak electricity price; the transferable load transfers part of the electricity load in the period with higher electricity prices to the period with lower electricity prices (00:00-08:00). Similarly, compared with the initial heat load curve, the optimized heat load curve reduces the load in the period with higher heat prices, i.e., 11:00-15:00, 20:00-23:00, because the curtailable load responds to the peak heat price; the transferable load transfers the heat load in the period with higher heat prices to the period with lower heat prices (18:00-20:00, 23:00-08:00). The replaceable load resource adjustment period is 08:00-12:00 and 15:00-24:00, which can effectively improve the operation results of the enterprise. While optimizing its own electricity consumption, the enterprise helps the supply meter to achieve peak shaving and valley filling, so that the power grid effectively solves the task of new energy consumption. Compared with the scenario before optimization, the total cost of the enterprise's electric-heat system operation after optimization is reduced to about 94.4% of the initial cost, saving about 18,187.7 yuan; the actual energy purchase cost after optimization is reduced to about 96.6% of the initial energy purchase cost, saving about 8,576.99 yuan. This is because the DR and electricity price mechanism are taken into account during the optimization, reducing the peak power load and increasing the valley power load. At the same time, the normal power load is adjusted according to the electricity and heat prices, so that high-energy-consuming enterprises can choose an operation mode with a more economical energy purchase cost. In contrast, the optimized operation and maintenance cost is about 4.47% higher, and the energy consumption cost is reduced by 16.56%. The energy consumption cost is reduced because the company has chosen to actively consume new energy when it generates electricity, reducing the use of coal-fired and gas-fired units, reducing energy consumption and obtaining policy subsidies. The operation and maintenance cost has increased because the company's electricity consumption has increased compared to before the optimization, and the machine operation time of each process has increased. The company's energy consumption structure has been significantly optimized, actively responding to the new energy consumption policy on the grid side, and effectively coordinating the system's operating economy and low carbon.
[0136] Example 2
[0137] This embodiment provides a computer device, which includes a processor, a memory, a user interface and a network interface, wherein the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes the method described in Example 1. The same contents as those in Example 1 are not repeated here. The difference from Example 1 is that this embodiment provides a hardware device, which is an important carrier for implementing the method of Example 1, wherein the memory includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0138] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A method for optimizing the coordinated operation of sources and loads of high energy-consuming enterprises considering the uncertainty of wind and solar power and demand response, characterized in that: The following steps are involved: Step S1, obtaining a historical data set of wind, solar, and user-side electricity / heat loads, and preprocessing the historical data set; Step S2: According to the historical data set of wind and solar, a wind and solar uncertainty source output characterization model is constructed based on Weibull distribution and Beta distribution, and a historical data set of wind and solar output is generated; Step S3: Based on the wind and solar power output historical data set, Latin hypercube sampling method combined with Kantorovich scene reduction method is used to generate and reduce scenes of the wind and solar power historical data to generate typical wind and solar power output scenes; Step S4, constructing the price elasticity coefficient of electricity / heat price and the price elasticity coefficient matrix; Step S5: constructing an energy consumption cost model for the load side of high energy-consuming enterprises based on the price elasticity coefficient matrix; Step S6: Establish a source-load coordinated optimization operation model for high-energy-consuming enterprises including wind and solar uncertainty and demand response, and introduce the objective function and constraint conditions for the optimization operation; Step S7, input the historical data set of user-side electric / heat load in step S1 and the typical wind / solar output scenario in step S3 into the source-load collaborative optimization operation model of high-energy-consuming enterprises in step S6 to obtain the source-load collaborative optimization operation results of high-energy-consuming enterprises.
2. According to claim 1, a method for optimizing the operation of sources and loads in a high-energy-consuming enterprise considering the uncertainty of wind and solar power and demand response, characterized in that: In step S1, the preprocessing includes the following steps: Step S1.1, collecting and cleaning the historical data set; Step S1.2: Synchronize the time of historical data of wind and solar power and historical data of electricity / heat load at the user side.
3. According to claim 1, a method for optimizing the operation of sources and loads of high-energy-consuming enterprises considering the uncertainty of wind and solar power and demand response, characterized in that: In the step S2, constructing a wind and solar uncertainty source output characterization model includes constructing a wind and solar uncertainty source output characterization model based on a wind and solar output probability density function; wherein the wind and solar output probability density function includes a wind speed probability density function and an irradiance probability density function, the wind speed probability density function obeys a Weibull distribution, and the irradiance probability density function obeys a Beta distribution.
4. According to claim 1, a method for optimizing the operation of sources and loads in a high-energy-consuming enterprise considering the uncertainty of wind and solar power and demand response, characterized in that: The step S3 comprises the following steps: Step S3.1: Based on the wind and solar power output historical data set, Latin hypercube sampling is used to evenly divide each input variable into N intervals, and a value is randomly selected in each interval; Step S3.2, calculating the Kantorovich distance according to the relationship between the elements in the two sequences; Step S3.3, based on the Kantorovich distance, select the elements to be retained and reduce other elements; Step S3.4: Repeat steps S3.2 and S3.3, iterate until the same sequence length is reached, perform cluster analysis on the final retained samples, and generate a typical wind and solar output scenario.
5. According to claim 1, a method for optimizing the coordinated operation of sources and loads of high energy-consuming enterprises considering the uncertainty of wind and solar power and demand response, characterized in that: The price elasticity coefficient and price elasticity coefficient matrix formula of the electricity / heat price are as follows: Among them, g t,j is the price elasticity coefficient, ΔP t is the load change value at time t; P t 0 is the initial load value at time t; ΔM j is the change in electricity price at time j; is the initial electricity price at time j; G is the price elasticity coefficient matrix, f is the peak load period; g is the valley load period; p is the flat load period.
6. According to claim 5, a method for optimizing the coordinated operation of sources and loads of high energy-consuming enterprises considering the uncertainty of wind and solar power and demand response is characterized in that: In the step S5, based on the price elasticity coefficient matrix, the load side of high energy-consuming enterprises is classified into: load that can be reduced, load that can be transferred, and load that can be replaced; specifically, the following formula is used to express it: Where ΔP c,t is the load change that can be reduced at time t, is the initial load reduction value at time t, G c (t, j) is the price elasticity coefficient matrix of load reduction, ΔP s,t is the change in transferable load at time t, is the initial transferable load value at time t; G s (t, j) is the price elasticity coefficient matrix of transferable load, and are the replaceable electrical and thermal loads at time t respectively; is the electric heat substitution coefficient.
7. According to claim 1, a method for optimizing the operation of energy-intensive enterprises with sources and loads in consideration of wind and solar uncertainty and demand response, characterized in that: The energy consumption cost model is expressed by the following formula: C n,t =aP m,t M coal +bQ g,t M coal Among them, C n,t is the energy consumption cost at time t, a and b are the discount coefficients of electricity and natural gas energy respectively; P m,t is the output power of the coal-fired unit at time t; Q g,t M is the amount of natural gas purchased at time t; coal The price of coal purchased by the enterprise, C n is the energy consumption cost, and T is an operation cycle.
8. According to claim 7, a method for optimizing the operation of energy-intensive enterprises with sources and loads in consideration of wind and solar uncertainty and demand response, characterized in that: In step S6, the source-load collaborative optimization operation model of high-energy-consuming enterprises is the sum of operation and maintenance costs, energy consumption costs and energy purchase costs; the objective function is the minimum value of the sum of operation and maintenance costs, energy consumption costs and energy purchase costs, which is expressed by the following formula: f=min(C y +C n +C g ) Among them, f is the objective function, C y is the operation and maintenance cost, T is an operation cycle; ω i is the operation and maintenance cost of the i-th process; i is 1, 2, ..., 8, representing smelting, casting, compounding, hot rolling, return, cold rolling, slitting and packaging respectively; c is the unit operation and maintenance cost of the energy storage device; P ES,t and P HS,t are the output power of the electric storage device and the heat storage device at time t, C g is the energy purchase cost, P g,t is the power purchased from the grid at time t; μ g,t is the electricity price purchased by the enterprise at time t; μ h,t It is the hot purchase price of the enterprise at time t.
9. A method for optimizing the coordinated operation of sources and loads of high energy-consuming enterprises considering the uncertainty of wind and solar power and demand response according to claim 8, characterized in that: The constraints mainly include energy purchase constraints, gas turbine and gas boiler output constraints, energy storage constraints, equipment operation constraints and electricity / heat power balance constraints.
10. An electronic device comprising a memory, a processor, and a program stored in the memory, characterized in that: When the processor executes the program, the method according to any one of claims 1 to 9 is implemented.
Citation Information
Cited By
Two-dimensional uncertainty modeling method and system based on random process and deep learning
CN121169623A
Method, system and equipment for decomposing green electricity transaction volume in high-altitude area and medium
CN121190253A