Self-walking and self-lifting trestle bridge section

By designing a self-moving self-lifting trest bridge section, using a crawler chassis truck and automation system, the problems of long construction time and construction complexity of elevated trest bridges are solved, and rapid and stable erection in complex marine environments are achieved.

CN118880717APending Publication Date: 2024-11-01CHINA HARZONE IND CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411061826.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The existing elevated trestle bridge has a long construction time, a large amount of operating equipment and high construction complexity.

Method used

A self-moving self-lifting trest bridge section is designed, including a crawler chassis truck, pile leg assembly, pile leg lifting system, bridge deck assembly and springboard assembly. It can realize automatic operation through hydraulic system and electronic control system, which can Walk by yourself, lift automatically and adjust length to reduce manpower operation.

Benefits of technology

It significantly shortens the installation time, improves operational flexibility and stability, enhances the safety of the overall structure, and is suitable for rapid installation in complex marine environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880717A_ABST
    Figure CN118880717A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of bridge engineering, and particularly relates to a self-walking and self-lifting trestle bridge section which comprises a crawler-type chassis truck, a pile leg assembly, a lifting system, a bridge deck assembly and a springboard assembly. The crawler chassis is provided with pile leg mounting holes in the four corners. The pile leg assembly is connected to the chassis through the mounting hole and provided with a lifting rack. The pile leg lifting system is installed on the bridge deck slab assembly and comprises a gear lifting mechanism meshed with the rack, and the gear lifting mechanism controls pile legs to ascend and descend. And the bridge deck assembly is arranged above the chassis, and is sleeved and locked with the pile leg assembly through the connecting holes. The gangplank assembly comprises a first gangplank and a second gangplank, one end of the first gangplank is hinged to the bridge deck through a turnover mechanism, the other end of the first gangplank is hinged to the second gangplank, and a connecting rod unfolding and folding mechanism is arranged. The device is suitable for erecting an elevated trestle in a complex marine environment, and the deployment process is simple and convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge engineering, and in particular relates to a self-propelled and self-lifting trestle bridge section. Background Art

[0002] The construction of a shore-to-shore trestle is an extremely effective way to land in areas without docks and unload equipment and materials from ship to shore. As a continuous channel from sea to shore, together with transport ships and the coast, ordinary land equipment and transport vehicles can be continuously rolled ashore through the shore-to-shore trestle, and the unloading efficiency has been greatly improved. When constructing a trestle near the coast, it is necessary to overcome the influence of the marine environment. First, the strength and stability of the trestle structure under the combined effects of wind, waves, and currents must be safe both in the construction conditions and in the operating load conditions; secondly, the trestle unit must also be able to simultaneously meet the construction requirements in a certain water depth area and a shallow area, that is, the trestle unit must be able to walk (sail) in the water and must be able to travel in the shallow area, and after entering the axis of the erection bridge, the unit axis can be adjusted to align with the bridge axis to ensure that it is connected in sequence to form a shore-to-shore trestle.

[0003] At present, there is no similar solution in China. Foreign equipment modular elevated trestles are mainly connected by connecting the trestle modules and using positioning piles to lift the trestle system above the wave area, thereby forming a shore-connected channel across the wave zone. This channel is used to transfer vehicles, materials, container cargo, etc. from ships moored at sea with a deep draft to the land-shore system. Such systems can be connected and separated in sea conditions of level 3 and can survive in sea conditions of level 6. However, the system requires a lot of operating equipment to erect a 1,000-meter-long trestle, which requires 7 consecutive days of 24-hour work, and the erection process is relatively long. In addition, when erecting an elevated trestle, foreign solutions require cranes to hoist the bridge sections, and the erection needs to be carried out section by section from the shore to the sea, which makes the construction operation time long and the workload large. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] The present invention mainly aims at the above problems and proposes a self-propelled and self-lifting trestle bridge section, the purpose of which is to solve the problems of the existing elevated trestle that the construction time is long, a large amount of operating equipment is required, and the construction is highly complex.

[0006] (II) Technical solution

[0007] To achieve the above-mentioned object, the first aspect of the present invention provides a self-propelled and self-lifting trestle bridge section, comprising a crawler chassis, a pile leg assembly, a pile leg lifting system, a bridge deck assembly, and a gangway assembly;

[0008] The crawler chassis is arranged at the bottom of the whole device and has pile leg mounting holes at four corners;

[0009] The pile leg assembly is connected to the crawler chassis through the pile leg mounting hole, and a lifting rack is installed on the pile leg assembly;

[0010] The pile leg lifting system is installed on the bridge deck assembly, and includes a gear lifting mechanism meshing with the lifting rack, and is used to control the lifting of the pile leg assembly;

[0011] The bridge deck assembly is installed above the crawler chassis, inserted into the pile leg assemblies at the four corners of the crawler chassis through the connection holes, and locked by a locking mechanism, which is installed on the bridge deck assembly;

[0012] The springboard assembly includes a first springboard and a second springboard, one end of the first springboard is hinged to the bridge deck assembly through a connecting rod flipping mechanism, the other end of the first springboard is hinged to the second springboard, and a connecting rod expansion and retraction mechanism is provided between the first springboard and the second springboard.

[0013] Furthermore, the connecting rod extension and retraction mechanism comprises:

[0014] The triangular swing frame is formed by three supporting rods hinged to each other end to end, including a first hinge point, a second hinge point and a third hinge point, wherein the second hinge point is hinged to the second springboard;

[0015] An expansion cylinder is mounted on the first springboard, and an output end thereof is hinged to the first hinge point;

[0016] a connecting rod, one end of which is hinged at the second hinge point, and the other end of which is hinged on the second springboard;

[0017] The triangular swing frame rotates around the second hinge point to drive the second springboard to unfold or fold.

[0018] Furthermore, the connecting rod flipping mechanism comprises:

[0019] A swing arm bracket has a fourth hinge point, a fifth hinge point, a sixth hinge point and a seventh hinge point; the swing arm bracket is hinged to the bridge deck assembly at the fourth hinge point, and is hinged to the first springboard at the sixth hinge point;

[0020] A bridge section unfolding lower oil cylinder is installed on the bridge deck assembly, and its output end is hinged to the fifth hinge point;

[0021] The bridge section unfolding upper oil cylinder is installed on the first springboard, and its output end is hinged at the seventh hinge point.

[0022] Furthermore, the locking mechanism comprises:

[0023] A connecting rod double-ear plate, fixed on the bridge deck assembly;

[0024] A first guide rod, one end of which is hinged to the connecting rod double-ear plate, and the other end of which is hinged to the second guide rod and the output end of the locking cylinder;

[0025] A second guide rod, one end of which is connected to the first guide rod and the other end of which is hinged to a locking block;

[0026] A locking oil cylinder is mounted on a double-eared plate of the oil cylinder, and an output end thereof is connected to the first guide rod and the second guide rod, and the double-eared plate of the oil cylinder is fixed on the bridge deck assembly;

[0027] A guide sleeve is installed on the bridge deck assembly and embedded with the locking block. The locking block is provided with a toothed portion on the side facing the pile leg assembly and meshes with the rack on the pile leg assembly in a locked state.

[0028] Furthermore, the two ends of the bridge deck assembly are designed to have a slope form that matches the linear shape of the bottom of the springboard end and a structure of a hinged springboard, so that multiple bridge sections can be overlapped longitudinally in sequence to form a continuous trestle channel.

[0029] Furthermore, a small springboard is hingedly connected to the end of the second springboard.

[0030] Furthermore, a base is provided at the bottom of the pile leg assembly.

[0031] Furthermore, it also includes a hydraulic system, which is used to drive the operation of the entire platform and its various parts.

[0032] Furthermore, it also includes an electric control system, which is used to control and coordinate the operations of all the above systems.

[0033] (III) Beneficial effects

[0034] Compared with the prior art, the self-propelled and self-lifting trestle bridge section provided by the present invention effectively solves the problems of long erection time, multiple equipment requirements and complex operation of existing elevated trestles through the following innovative designs: First, the use of a crawler chassis allows the bridge section to walk to the designated position by itself without the need for external lifting equipment, significantly shortening the erection time; second, the combination of the pile leg assembly and the lifting system enables the bridge section to be automatically lifted and lowered to adapt to different water depths and terrains, improving the flexibility and stability of operation; third, the design of the bridge deck assembly and the springboard assembly realizes the automatic adjustment of the bridge section length and the automatic deployment of the springboard, reducing manual operation and improving work efficiency; finally, the locking mechanism ensures the stable connection of the bridge section and enhances the safety of the overall structure. These innovations enable the present invention to quickly and stably erect elevated trestles in complex marine environments, and are particularly suitable for scenarios that require efficient response, such as emergency material transportation and military deployment. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 This is a schematic structural diagram of a self-propelled and self-lifting trestle bridge section disclosed in this application.

[0036] Figure 2 This is an elevated state diagram of a self-propelled and self-lifting trestle bridge section disclosed in this application.

[0037] Figure 3 This is a three-dimensional structural diagram of a connecting rod extension and retraction mechanism disclosed in this application.

[0038] Figure 4 This is a three-dimensional structural diagram of a connecting rod flipping mechanism disclosed in this application.

[0039] Figure 5 This is a diagram of the unfolded overlap form of a bridge section disclosed in this application.

[0040] Figure 6 This is a connection diagram of a connecting rod extension and retraction mechanism and a springboard assembly disclosed in this application.

[0041] Figure 7 This is a diagram of the expanded state of a bridge section disclosed in this application.

[0042] Fig. 9 This is a structural diagram of a connecting rod flipping mechanism connected to a first springboard disclosed in this application.

[0043] Reference numerals shown in the figures: 1, crawler chassis; 2, pile leg assembly; 3, pile leg lifting system; 4, bridge deck assembly; 5, springboard assembly; 6, hydraulic system; 7, electric control system; 8, connecting rod extension and retraction mechanism; 9, connecting rod flipping mechanism; 10, locking mechanism; 20, base; 50, first springboard; 51, second springboard; 52, small springboard; 80, triangular swing frame; 81, support rod; 82, first hinge point; 83, second hinge point; 84. The third hinge point; 85. The expansion cylinder; 86. The connecting rod; 90. The rocker arm bracket; 91. The lower cylinder for expanding the bridge section; 92. The upper cylinder for expanding the bridge section; 93. The fourth hinge point; 94. The fifth hinge point; 95. The sixth hinge point; 96. The seventh hinge point; 100. The connecting rod double-ear plate; 101. The first guide rod; 102. The second guide rod; 103. The locking cylinder; 104. The locking block; 105. The cylinder double-ear plate; 106. The guide sleeve. DETAILED DESCRIPTION

[0044] The present invention will be described in detail below in conjunction with the accompanying drawings, and the technical solutions in the embodiments of the present invention will be clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] It should be noted that when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may also be a component centered. When a component is considered to be "connected to" another component, it may be directly connected to the other component or there may also be a component centered. When a component is considered to be "set on" another component, it may be directly set on the other component or there may also be a component centered. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.

[0046] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0047] See also Figure 1 The figure shows a schematic diagram of a self-propelled and self-lifting trestle bridge section provided by a preferred embodiment of the present application. Figure 1 In the illustrated embodiment, a self-propelled and self-lifting trestle bridge section is disclosed, comprising a crawler chassis 1, a pile leg assembly 2, a pile leg lifting system 3, a bridge deck assembly 4 and a gangway assembly 5.

[0048] The crawler chassis 1 is located at the bottom of the entire device and is provided with four pile leg mounting holes, which are located at the four corners of the crawler chassis 1. The crawler chassis 1 is designed to be highly maneuverable and can move on various terrains, including beaches and shallow waters, thereby providing extremely high flexibility and adaptability.

[0049] Based on the crawler chassis 1, the pile leg assembly 2 is connected to the crawler chassis 1 through the pile leg mounting holes. The pile leg assembly 2 is equipped with a lifting rack for adjusting the height of the trestle bridge section under different water depths and terrain conditions to ensure stability and safety.

[0050] The pile leg lifting system 3 is installed on the bridge deck assembly 4, and includes a gear lifting mechanism that meshes with the lifting rack. This system controls the lifting of the pile leg assembly 2 so that the trestle bridge section can reach a predetermined height, thereby avoiding the influence of waves and tides and ensuring the continuity of operation and the stability of the equipment. Specifically, the motor drives the gear to rotate, and the gear meshes with the rack of the pile leg assembly 2, thereby driving the pile leg assembly 2 to rise and fall. When the bottom of the pile leg assembly 2 contacts the seabed, the continued driving of the linear motor will drive the bridge deck assembly 4 to move along the axis of the pile leg assembly 2. Figure 2 This is a schematic diagram of the structure after elevation.

[0051] The bridge deck assembly 4 is installed above the crawler chassis 1 and inserted into the pile leg assemblies 2 at the four corners of the crawler chassis 1 through the connection holes. The bridge deck assembly 4 is equipped with a locking mechanism 10 for locking the bridge deck assembly 4 with the pile leg assembly 2 to prevent the bridge deck assembly 4 from moving and rotating during operation, thereby increasing the stability and safety of the entire device.

[0052] like Figure 6-Figure 8 As shown, the springboard assembly 5 is composed of a first springboard 50 and a second springboard 51. One end of the first springboard 50 is hinged to the bridge deck assembly 4 through a connecting rod flipping mechanism 9, and the other end is hinged to the second springboard 51. A connecting rod unfolding and retracting mechanism 8 is provided between the first springboard 50 and the second springboard 51. This design allows the springboard to be variable in length between the transport and operation states to meet different operational requirements, and is also convenient for storage and transportation.

[0053] Through this design, the trestle bridge section can not only move to the predetermined position by itself, but also adjust its height through the self-lifting system to form a stable elevated bridge section. This implementation method of the trestle bridge section provides an efficient and flexible solution for the rapid deployment of temporary or semi-permanent bridges.

[0054] The typical working process of the self-propelled and self-lifting trestle bridge section is as follows:

[0055] 1) After the self-propelled and self-lifting trestle bridge section enters the water, the crawler chassis 1 contacts the seabed and drives and turns through hydraulic drive. When it reaches the erection point, it brakes (without shutting down the engine);

[0056] 2) Start the hydraulic pump and operate the control system to unlock the locking mechanism 10 of the pile leg assembly 2, so that the pile leg assembly 2 is only controlled by the gear of the lifting mechanism (at this time, only the gear of the lifting mechanism and the rack on the pile leg assembly 2 are engaged to maintain the position of the pile leg);

[0057] 3) Operate the control reversing valve to lower the pile leg assembly 2. After the pile leg assembly 2 touches the bottom, continue to operate the pile leg assembly 2 to lower it. At this time, the platform will rise together with the lifting mechanism until it reaches a predetermined height from the sea level. Then, the lowering of the pile leg assembly 2 is stopped. The control system is operated to lock the pile leg through the locking mechanism 10, so that the pile leg assembly and the bridge span are mechanically locked.

[0058] 4) Flip the first springboard 50 to a vertical state, unfold the second springboard 51 while flipping the first springboard 50, until the first springboard 50 and the second springboard 51 are horizontal and fully stretched, continue flipping the springboard and overlap the springboard on the slope of the span end of the adjacent bridge section, that is, complete the erection of a single bridge section;

[0059] 5) The same operation process is followed to complete the erection of each bridge section in sequence, so that each bridge section is longitudinally overlapped in sequence to form a continuous trestle channel (see Figure 5 ).

[0060] It can be seen from the above working process that the crawler chassis 1 that can sneak on the shore shallows can realize the bridge section to the predetermined position of the bridge axis to realize the positioning of the bridge section; the pile leg assembly 2 and the self-lifting system can realize the bridge span to the predetermined height, forming an elevated bridge span to avoid the influence of waves on the bridge span; the bridge span has a self-straightening springboard to realize the variable length of the bridge section, and the variable length of the transportation state and the operation state, which not only solves the length restriction of the bridge span during transportation, but also can realize the predetermined erection length with fewer bridge section units; the bridge span is a combined structure, one end is designed to match the slope structure of the bottom line of the springboard end, and the other end is hinged to the bridge span self-straightening springboard, so as to form a universal bridge section unit, which can then be longitudinally overlapped in sequence to form a trestle of predetermined length. The bridge span springboard realizes the 180° flipping of the bridge span through the connecting rod flipping mechanism 9, and realizes the self-straightening of the springboard through the connecting rod unfolding and retracting mechanism 8, so as to solve the problem of shortening the length dimension during transportation, and to unfold to form a long springboard during erection, so as to ensure the erection length of the single-span bridge span unit.

[0061] In the above embodiment, the design of the connecting rod extension and retraction mechanism 8 enables the gangway assembly 5 to have a high degree of flexibility and functionality, and supports the length adjustment of the trestle bridge section under different operating conditions to adapt to various operating requirements. Figure 3 , Figure 6 As shown, the connecting rod extension and retraction mechanism 8 includes: a triangular swing frame 80, an expansion cylinder 85 and a connecting rod 86.

[0062] The triangular swing frame 80 is composed of three support rods 81, which are connected end to end to form a movable triangular structure. The triangular swing frame 80 includes three hinge points: a first hinge point 82, a second hinge point 83 and a third hinge point 84. The second hinge point 83 is located at the top of the triangular swing frame 80 and is directly hinged on the second springboard 51, becoming the center point of support and rotation.

[0063] The deployment cylinder 85 is mounted on the first springboard 50, and its output end is hinged to the first hinge point 82. When the output end of the deployment cylinder 85 is pushed out or retracted, it directly affects the position of the first hinge point 82 of the triangular swing frame 80, thereby causing the entire triangular swing frame 80 to rotate clockwise or counterclockwise around the second hinge point 83.

[0064] One end of the connecting rod 86 is hinged at the second hinge point 83, and the other end is hinged on the second springboard 51. When the triangular swing frame 80 rotates, the configuration of the connecting rod 86 allows the second springboard 51 to be unfolded or folded following the rotation of the triangular swing frame 80. Specifically, when the output end of the unfolding oil cylinder 85 is pushed out, the triangular swing frame 80 will rotate counterclockwise around the second hinge point 83, pushing the second springboard 51 to gradually unfold from the folded state until it is completely flattened. On the contrary, when the unfolding oil cylinder 85 is retracted, the triangular swing frame 80 will rotate clockwise, guiding the second springboard 51 to transform to the folded state, thereby reducing the total length of the trestle bridge section, which is convenient for transportation and storage.

[0065] Through this design, the gangway assembly 5 can be quickly and smoothly unfolded and folded, optimizing the application of the trestle bridge section in different environments and operating conditions, and enhancing its applicability and efficiency. The movement accuracy and stability of this mechanism are guaranteed by an efficient hydraulic control system, ensuring the safety and reliability of the operation.

[0066] In the above embodiment, the design of the connecting rod flipping mechanism 8 provides a highly efficient springboard unfolding and flipping function for the trestle bridge section, so that the springboard can smoothly transition from a vertical storage state to a horizontal use state, further enhancing the flexibility and adaptability of the entire trestle. Figure 4 , Figure 8 As shown, the connecting rod flipping mechanism 9 includes a bridge section unfolding lower cylinder 91, a rocker arm bracket 90, and a bridge section unfolding upper cylinder 92.

[0067] The swing arm bracket 90 is the core component of the connecting rod flipping mechanism 9, and includes four key hinge points: a fourth hinge point 93, a fifth hinge point 94, a sixth hinge point 95, and a seventh hinge point 96. These hinge points allow the swing arm bracket 90 to dynamically interact with other parts, thereby achieving complex motion and force transmission.

[0068] Specifically, the fourth hinge point 93 is located at one end of the swing arm bracket 90 and is hinged to the bridge deck assembly 4. The sixth hinge point 95 is located at the other end of the swing arm bracket 90 and is hinged to the first springboard 50. This configuration enables the first springboard 50 to flip and unfold with the movement of the swing arm bracket 90.

[0069] The bridge section deployment lower cylinder 91 is installed on the bridge deck assembly 4, and its output end is hinged to the fifth hinge point 94 of the rocker bracket 90. When the piston of the bridge section deployment lower cylinder 91 is pushed out, it pushes the rocker bracket 90 to rotate from the fourth hinge point 93, and this rotation causes the first springboard 50 connected to the sixth hinge point 95 to flip from a vertical position to a horizontal position for use.

[0070] The bridge section deployment upper cylinder 92 is installed on the first springboard 50, and its output end is hinged at the seventh hinge point 96 of the swing arm bracket 90. The action of this cylinder further controls the precise position and angle of the first springboard 50, ensuring its smooth deployment and precise docking to the adjacent bridge section or the required position.

[0071] The process of the first springboard 50 changing from the state after flipping to the state before flipping is as follows: the output end of the bridge section deployment upper cylinder 92 is pushed out, and the first springboard 50 flips clockwise at the sixth hinge point 95 until it reaches the limit position of the bridge section deployment upper cylinder 92, and then, the output end of the bridge section deployment lower cylinder 91 is pushed out, so that the rocker bracket 90, the first springboard 50, and the bridge section deployment upper cylinder 92 rotate clockwise at the fourth hinge point 93 until they reach the state before flipping.

[0072] The design of the connecting rod flipping mechanism 9 not only improves the efficiency and speed of operation, but also ensures the reliability and stability of the trestle in extreme or irregular terrain by accurately controlling the flipping and unfolding of the gangway. The operation of the entire mechanism relies on an efficient hydraulic system, which ensures fast response and smooth movement, greatly improving the practicality and safety of the trestle bridge section in actual operation.

[0073] like Fig. 9 As shown, the locking mechanism 10 is designed to ensure that the trestle bridge section remains stable and safe during operation by effectively locking the relative positions of the bridge deck assembly 4 and the pile leg assembly 2. The locking mechanism 10 includes: a connecting rod double-ear plate 100, a first guide rod 101, a second guide rod 102, a cylinder double-ear plate 105, a locking cylinder 103, a guide sleeve 106, a locking block 104 and other key components, which work together to achieve a powerful locking function.

[0074] The connecting rod double ear plate 100 is fixed on the bridge deck assembly 4 and serves as a static connection point of the locking mechanism 10. It provides a mounting base for other dynamic components of the locking mechanism 10.

[0075] The first guide rod 101 and the second guide rod 102 are two interconnected rods, wherein one end of the first guide rod 101 is hinged to the connecting rod double-ear plate 100 , and the other end is hinged to the second guide rod 102 and the output end of the locking cylinder 103 .

[0076] The locking cylinder 103 is mounted on the cylinder double-ear plate 105 on the bridge deck assembly 4, and its output end transmits power through the first guide rod 101 and the second guide rod 102. When the locking cylinder 103 is activated, its output end pushes the guide rod system, thereby driving the locking block 104 to move to a predetermined locking position.

[0077] The guide sleeve 106 is mounted on the bridge deck assembly 4 and is designed to stabilize and guide the movement of the locking block 104. The locking block 104 moves linearly in the guide sleeve 106 to ensure the accuracy and stability of its movement path.

[0078] The locking block 104 is designed with teeth, which mesh with the rack on the leg assembly 2 in the locked state. The tooth design of the locking block 104 ensures a strong mechanical interlocking, greatly enhancing the stability and anti-torsion ability of the entire structure.

[0079] When the bridge section needs to be fixed or released, the operator can activate the locking cylinder 103 through the control system. After activation, the locking cylinder 103 pushes the first guide rod 101 and the second guide rod 102, and then pushes the locking block 104 to move to the locking or unlocking position along the guide sleeve 106. In this process, the teeth of the locking block 104 engage or disengage with the rack on the pile leg assembly 2, thereby achieving stable fixation or free movement of the bridge section.

[0080] In the above embodiment, a small springboard 52 is hinged at the end of the second springboard 51, and the small springboard 52 is used for overlapping adjacent bridge sections.

[0081] In the above embodiment, a flat base 20 is disposed at the bottom of the pile leg assembly 2. This design enhances the stability and support of the trestle bridge section on various terrains, especially in soft soil or uneven surface conditions. The base 20 provides a larger contact surface, disperses the load, reduces the pressure on the ground, thereby avoiding settlement or slippage, and ensuring the safety and stability of the entire trestle.

[0082] In this embodiment, the hydraulic system 6 and the electronic control system 7 jointly ensure the functional execution, operational efficiency and safety of the entire trestle. The hydraulic system 6 is used to drive various movable parts in the trestle bridge section, including the pile leg lifting system 3, the flipping and unfolding and retracting mechanism of the springboard, etc. These operations rely on the flow and control of high-pressure hydraulic oil to provide the necessary power to perform heavy-load and precise mechanical movements. The hydraulic system 6 usually includes a hydraulic pump, various hydraulic cylinders, oil pipes, control valves and oil tanks, etc. The hydraulic pump provides power for the entire system, pressurizes the hydraulic oil, transmits it to each hydraulic cylinder through the oil pipe, and drives the corresponding mechanical parts to move.

[0083] The electronic control system 7 is responsible for controlling and coordinating all mechanical and electronic components on the trestle bridge section, including the activation of the hydraulic system, the data processing of the sensors, and the management of the safety monitoring system. This system usually includes a control panel, an electronic control unit (ECU), various sensors and actuators.

[0084] In practical applications, the close cooperation between the hydraulic system 6 and the electronic control system 7 ensures the efficient and safe operation of the trestle bridge sections in a complex and changing environment. For example, during the rapid deployment or emergency evacuation of the trestle, the operator can quickly issue instructions through the electronic control system, and the hydraulic system will respond immediately to complete the rapid deployment, installation or retraction of the bridge sections, greatly improving the emergency response capability and operation efficiency.

[0085] Therefore, no matter from which point of view, the embodiments should be regarded as illustrative and non-restrictive, and the scope of the present application is limited by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present application. Any figure mark in the claims should not be regarded as limiting the claims involved. In addition, it is obvious that the word "comprising" does not exclude other units or steps, and the singular does not exclude the plural. Multiple units or devices stated in the device claim can also be implemented by the same unit or device through software or hardware. The words first, second, etc. are used to indicate names, and do not indicate any particular order.

[0086] The above embodiments are only used to illustrate the technical solution of the present application and are not intended to limit it. Although the present application has been described in detail with reference to the preferred embodiments, a person skilled in the art should understand that the technical solution of the present application may be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present application.

Claims

1. A self-propelled and self-lifting trestle bridge section, characterized in that: Including crawler chassis, pile leg assembly, pile leg lifting system, bridge deck assembly, and springboard assembly; The crawler chassis is arranged at the bottom of the whole device and has pile leg mounting holes at four corners; The pile leg assembly is connected to the crawler chassis through the pile leg mounting hole, and a lifting rack is installed on the pile leg assembly; The pile leg lifting system is installed on the bridge deck assembly, and includes a gear lifting mechanism meshing with the lifting rack, and is used to control the lifting of the pile leg assembly; The bridge deck assembly is installed above the crawler chassis, inserted into the pile leg assemblies at the four corners of the crawler chassis through the connection holes, and locked by a locking mechanism, which is installed on the bridge deck assembly; The springboard assembly includes a first springboard and a second springboard, one end of the first springboard is hinged to the bridge deck assembly through a connecting rod flipping mechanism, the other end of the first springboard is hinged to the second springboard, and a connecting rod expansion and retraction mechanism is provided between the first springboard and the second springboard.

2. The self-propelled and self-lifting trestle bridge section according to claim 1 is characterized in that: The connecting rod extension and retraction mechanism comprises: The triangular swing frame is formed by three supporting rods hinged to each other end to end, including a first hinge point, a second hinge point and a third hinge point, wherein the second hinge point is hinged to the second springboard; An expansion cylinder is mounted on the first springboard, and an output end thereof is hinged to the first hinge point; a connecting rod, one end of which is hinged at the second hinge point, and the other end of which is hinged on the second springboard; The triangular swing frame rotates around the second hinge point to drive the second springboard to unfold or fold.

3. The self-propelled and self-lifting trestle bridge section according to claim 1 is characterized in that: The connecting rod turning mechanism comprises: A swing arm bracket has a fourth hinge point, a fifth hinge point, a sixth hinge point and a seventh hinge point; the swing arm bracket is hinged to the bridge deck assembly at the fourth hinge point, and is hinged to the first springboard at the sixth hinge point; A bridge section unfolding lower oil cylinder is installed on the bridge deck assembly, and its output end is hinged to the fifth hinge point; The bridge section unfolding upper oil cylinder is installed on the first springboard, and its output end is hinged at the seventh hinge point.

4. The self-propelled and self-lifting trestle bridge section according to claim 1 is characterized in that: The locking mechanism comprises: A connecting rod double-ear plate, fixed on the bridge deck assembly; A first guide rod, one end of which is hinged to the connecting rod double-ear plate, and the other end of which is hinged to the second guide rod and the output end of the locking cylinder; A second guide rod, one end of which is connected to the first guide rod and the other end of which is hinged to a locking block; A locking oil cylinder is mounted on a double-eared plate of the oil cylinder, and an output end thereof is connected to the first guide rod and the second guide rod, and the double-eared plate of the oil cylinder is fixed on the bridge deck assembly; A guide sleeve is installed on the bridge deck assembly and embedded with the locking block. The locking block is provided with a toothed portion on the side facing the pile leg assembly and meshes with the rack on the pile leg assembly in a locked state.

5. The self-propelled and self-lifting trestle bridge section according to claim 1 is characterized in that: The two ends of the bridge deck assembly are designed to have a slope form that matches the linear shape of the bottom of the springboard end and a structure of a hinged springboard, so that multiple bridge sections can be overlapped longitudinally in sequence to form a continuous trestle channel.

6. The self-propelled and self-elevating trestle bridge section according to claim 1 is characterized in that: A small springboard is hinged at the end of the second springboard.

7. The self-propelled and self-elevating trestle bridge section according to claim 1 is characterized in that: A base is arranged at the bottom of the pile leg assembly.

8. The self-propelled and self-elevating trestle bridge section according to claim 1, characterized in that: It also includes a hydraulic system, which is used to drive the operation of the entire platform and its various parts.

9. The self-propelled and self-elevating trestle bridge section according to claim 1, characterized in that: It also includes an electronic control system, which is used to control and coordinate the operations of all the above systems.