Construction water and site spraying combined water supply system and method
By introducing pressurized water storage tanks and water pressure control devices into the water supply system of the construction site, the combined water supply of construction water and spray water is realized, which solves the problem of insufficient water pressure in the water supply pipeline, simplifies the construction process and reduces costs.
Patent Information
- Application Number
- CN202411070510.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-01
AI Technical Summary
The water pressure of the water supply pipeline in the construction site cannot guarantee construction water and spray water at the same time, resulting in the need to build water supply pipelines separately, increasing the construction volume and water cost.
Design a water supply system that combines construction water with site spraying, including a water supply main pipe, a pressurized water storage tank and a water pressure control device. By adding a pressurized water source connection point and a water pressure detection device at the water inlet end of the water supply main pipe, and A pressurized water pump is installed on the pressurized water outlet pipe, combined with the spray intelligent switch and water pressure control device to realize the automatic linkage of water pressure, ensuring that the construction water and spray water are carried out smoothly at the same time.
The construction of water supply pipelines is simplified, the water use cost is reduced, and the construction and spraying water are carried out simultaneously, improving construction efficiency and resource utilization.
Smart Images

Figure CN118880979A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of construction technology, and more specifically, to a water supply system and method combining construction water with site spraying. Background Art
[0002] During the construction process, the water used on the construction site can be roughly divided into construction water and site sprinkler system water. As the name suggests, construction water refers to the water used in the construction process. The site sprinkler system is mainly used for dust reduction on the site. The sprinkler system is distributed on the walls, both sides of the road, around the construction area, on the working surface, and on the tower crane spraying. The sprinkler system fully covers the entire construction site and can effectively control dust; for example, installing sprinkler heads on both sides of the road can simultaneously complete road watering and dust reduction and atomization dust reduction.
[0003] At present, due to the instability of water supply pressure in most construction sites, the construction water network and the water network of the sprinkler system in the construction site mostly use different water supply pipelines for water supply to avoid insufficient water pressure in the water supply pipeline when construction and spraying are carried out at the same time, resulting in the inability to carry out construction and spraying normally. The construction water and the sprinkler system use different water supply pipes, which increases the construction volume and water cost during the construction of the site water pipeline. Summary of the invention
[0004] In view of the above problems, the purpose of the present invention is to provide a water supply system and method that combines construction water and site spraying, so as to solve the problem in the prior art that the water pressure of the water supply pipeline at the construction site cannot guarantee the simultaneous supply of construction water and spraying water, so it is necessary to build water supply pipelines separately, thereby increasing the construction volume and increasing the water cost.
[0005] The present invention provides a water supply system combining construction water and site spraying, comprising a water supply main, a pressurized water storage tank and a water pressure control device; wherein,
[0006] The water outlet of the water supply main is connected to the water main of the construction water network and the spray main of the site spray network respectively; the water supply source connection point and the pressurized water source connection point are respectively arranged at the water inlet of the water supply main; the water supply source connection point is connected to the normal water supply source through the water inlet pipeline; a water pressure detection device is arranged on the water supply main; and a spray intelligent switch is arranged on the spray main;
[0007] The water outlet of the pressurized water storage tank is connected to the pressurized water source connection point through a pressurized water outlet pipe, and a pressurized water pump is arranged on the pressurized water outlet pipe;
[0008] The water pressure control device is respectively connected to the spray intelligent switch, the water pressure detection device and the booster water pump; when the spray intelligent switch is turned on, the water pressure control device obtains the current water pressure detection value of the water pressure detection device according to the signal of turning on the spray intelligent switch, and compares it with the preset water pressure value pre-stored in the water pressure control device. If the current water pressure detection value is less than the preset water pressure value, the water pressure control device controls the booster water pump to turn on.
[0009] In addition, a preferred solution is that the intelligent spray switch has a timed opening function.
[0010] In addition, a preferred solution is to further include an online dust detection system arranged at the construction site; the online dust detection system is connected to the spray intelligent switch; when the online dust detection system detects that the current dust index of the construction site reaches a preset dust index, the processing mechanism of the online dust detection system controls the spray intelligent switch to turn on.
[0011] In addition, a preferred solution is that the pressurized water outlet pipe includes a pressurized water outlet main pipe connected to the pressurized water storage tank and at least two pressurized water outlet branches arranged at the water outlet end of the pressurized water outlet main pipe; the pressurized water pump is arranged on each pressurized water outlet branch; the pressurized water outlet branch is respectively connected to the pressurized water source connection point through a first pipeline and to the reflux port of the pressurized water storage tank through a second pipeline; a first gate valve, a second gate valve and a first check valve are respectively arranged on the first pipeline; the first gate valve is arranged between the pressurized water pump and the pressurized water outlet main pipe, and the second gate valve is arranged between the pressurized water pump and the pressurized water source connection point; the first check valve is arranged between the second gate valve and the pressurized water pump; and a first ball valve is arranged on the second pipeline.
[0012] In addition, a preferred solution is that the pressurized water outlet main is connected to the pressurized water storage tank through a third pipeline; a third gate valve and a filter are arranged on the third pipeline.
[0013] In addition, a preferred solution is that it also includes a drainage ditch set up at the construction site and a sedimentation tank connected to the drainage ditch; the water outlet of the sedimentation tank is connected to the first water inlet of the pressurized water storage tank; an upper drainage outlet and a lower drainage outlet are respectively provided at the upper and lower parts of the pressurized water storage tank; the upper drainage outlet and the lower drainage outlet are respectively connected to the drainage ditch through drainage pipelines; and a fourth gate valve and a fifth gate valve are respectively provided at the upper drainage outlet and the lower drainage outlet.
[0014] In addition, a preferred solution is that a liquid level gauge is provided in the pressurized water storage tank; the second water inlet of the pressurized water storage tank is connected to the normal water supply source through a normal water supply pipeline; and a second ball valve is provided on the normal water supply pipeline.
[0015] In addition, a preferred solution is that a sixth gate valve and a second check valve are provided on the water inlet pipeline.
[0016] In addition, a preferred solution is that a water control valve and a spray control valve are respectively provided on the water main pipe and the spray main pipe; and / or the regular water supply source is a municipal water intake point.
[0017] The present invention provides a water supply method combining construction water and spraying, by adopting the water supply system combining construction water and site spraying as described above, water for construction site and spraying for dust reduction of construction site are jointly supplied.
[0018] It can be seen from the above technical scheme that the water supply system and method for combining construction water with site spraying provided by the present invention, by adding a pressurized water source connection point and setting a water pressure detection device at the water inlet end of the water supply main pipe, the water outlet of the pressurized water storage tank is connected to the pressurized water source connection point through a pressurized water outlet pipe, and a pressurized water pump is set on the pressurized water outlet pipe, and combined with the design of the spray intelligent switch and the water pressure control device set on the spray main pipe, when the spray intelligent switch is turned on, the water pressure control device can obtain the current water pressure detection value of the water pressure detection device according to the signal of the spray intelligent switch being turned on, and compare it with the preset water pressure value pre-stored in the water pressure control device to determine whether it is necessary to turn on the pressurized water pump, thereby performing automatic and linked intelligent control of the water pressure of the water supply main pipe, so as to achieve the purpose of sharing the same water supply main pipe for the construction water network and the site spray network on the premise of ensuring that the construction water and spray water can be smoothly carried out at the same time, which greatly simplifies the construction of water supply pipelines and reduces water costs.
[0019] In order to achieve the above and related purposes, one or more aspects of the present invention include the features that will be described in detail later. The following description and the accompanying drawings describe some exemplary aspects of the present invention in detail. However, these aspects indicate only some of the various ways in which the principles of the present invention can be used. In addition, the present invention is intended to include all these aspects and their equivalents. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] By referring to the following description in conjunction with the accompanying drawings, and with a more comprehensive understanding of the present invention, other objects and results of the present invention will become more apparent and easy to understand. In the accompanying drawings:
[0021] Figure 1 A schematic diagram of the site layout of a water supply system combining construction water and site spraying according to an embodiment of the present invention;
[0022] Figure 2 for Figure 1 A magnified view of the structure in the middle;
[0023] Figure 3 It is a schematic diagram of the principle of a water supply system combining construction water and site spraying according to an embodiment of the present invention.
[0024] In the attached drawings, 1-water supply pipe, 11-water inlet pipeline, 12-water pressure detection device, 13-sixth gate valve, 14-second check valve, 2-pressurized water storage tank, 21-pressurized water outlet pipe, 211-pressurized water outlet pipe, 212-pressurized water outlet branch, 213-first pipeline, 214-second pipeline, 215-first gate valve, 216-second gate valve, 217-first check valve, 218-first ball valve, 219-third pipeline, 2110-third gate valve, 2111-filter, 2 ... pipe, 212-pressurized water outlet pipe, 212-pressurized water outlet pipe, 212-pressurized water outlet pipe, 212-pressurized water outlet pipe, 212-pressurized water outlet pipe, 212-pressurized water outlet pipe, 212-pressurized water outlet pipe, 212-pressur Water pressure pump, 23-drainage pipeline, 24-the fourth gate valve, 25-the fifth gate valve, 26-liquid level meter, 27-normal water supply pipeline, 28-the second ball valve, 3-water pressure control device, 31-main control module, 32-signal receiving module, 4-construction water network, 41-water main pipe, 411-water control valve, 5-site spray network, 51-spray main pipe, 511-spray control valve, 52-spray intelligent switch, 6-normal water supply source, 7-dust online detection system, 81-drainage ditch, 82-sedimentation tank.
[0025] The same reference numerals throughout the drawings indicate similar or corresponding features or functions. DETAILED DESCRIPTION
[0026] In the following description, for the purpose of explanation, numerous specific details are set forth in order to provide a thorough understanding of one or more embodiments. However, it is apparent that these embodiments may also be implemented without these specific details.
[0027] In view of the problem that in the above-mentioned prior art, the water pressure of the water supply pipeline at the construction site cannot guarantee the simultaneous supply of construction water and spraying water, so it is necessary to build water supply pipelines separately, thereby increasing the construction volume and increasing the water cost, a water supply system and method combining construction water and site spraying are proposed.
[0028] The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0029] In order to illustrate the water supply system and method for combining construction water with site spraying provided by the present invention, Figure 1 The site layout of a water supply system combining construction water and site spraying according to an embodiment of the present invention is shown; Figure 2 Shows Figure 1 The enlarged structure of the middle part structure; Figure 3 The principle of a water supply system combining construction water and site spraying according to an embodiment of the present invention is shown.
[0030] like Figures 1 to 3As shown together, the water supply system for construction water and site spraying provided by the present invention comprises a water supply main 1, a pressurized water storage tank 2 and a water pressure control device 3; wherein,
[0031] The water outlet of the water supply pipe 1 is connected to the water pipe 41 of the construction water network 4 and the spray pipe 51 of the site spray network 5 respectively; a water supply source connection point and a pressurized water source connection point are respectively provided at the water inlet end of the water supply pipe 1; the water supply source connection point is connected to the regular water supply source 6 through the water inlet pipeline 11; a water pressure detection device 12 is provided on the water supply pipe 1; and a spray intelligent switch 52 is provided on the spray pipe 51;
[0032] The water outlet of the pressurized water storage tank 2 is connected to the pressurized water source connection point through a pressurized water outlet pipe 21, and a pressurized water pump 22 is provided on the pressurized water outlet pipe 21;
[0033] The water pressure control device 3 is respectively connected to the spray intelligent switch 52, the water pressure detection device 12 and the pressure boosting pump 22; when the spray intelligent switch 52 is turned on, the water pressure control device 3 obtains the current water pressure detection value of the water pressure detection device 12 according to the signal of turning on the spray intelligent switch 52, and compares it with the preset water pressure value pre-stored in the water pressure control device 3. If the current water pressure detection value is less than the preset water pressure value, the water pressure control device 3 controls the pressure boosting pump 22 to turn on.
[0034] Specifically, the water pressure control device 3 includes a main control module 31 and a signal receiving module 32 connected to the main control module 31. The signal receiving module 32 is connected to the spray intelligent switch 52 by signal, and is used to receive the start signal sent by the spray intelligent switch 52. It can be an intelligent switch responsible for signal reception; the main control module 31 is connected to the water pressure detection device 12 and the pressure pump 22 respectively, and is used to obtain the current water pressure detection value of the water pressure detection device 12 according to the start signal sent by the spray intelligent switch 52, and compare it with the preset water pressure value pre-stored therein. If the current water pressure detection value is less than the preset water pressure value, the pressure pump 22 is controlled to start. The main control module 31 can be a single-chip microcomputer or a control host.
[0035] The site spray network 5 includes but is not limited to systems set up at the site's fence, both sides of the road, around the construction area, on the work surface, and on the tower crane spray system, and is connected to the water supply pipe through a spray pipe 51. It is used for water spraying and dust removal and atomization. The number of spray pipes 51 can be set as needed, such as Figure 1 and Figure 2 As shown, preferably two lines can be provided.
[0036] By adding a pressurized water source connection point and setting a water pressure detection device 12 at the water inlet end of the water supply main 1, the water outlet of the pressurized water storage tank 2 is connected to the pressurized water source connection point through a pressurized water outlet pipe 21, and a pressurized water pump 22 is set on the pressurized water outlet pipe 21, and combined with the spray intelligent switch 52 and the water pressure control device 3 set on the spray main 51, when the spray intelligent switch 52 is turned on, the water pressure control device 3 can obtain the current water pressure detection value of the water pressure detection device 12 according to the signal of the spray intelligent switch 52 being turned on, and compare it with the preset water pressure value pre-stored in the water pressure control device 3 to determine whether it is necessary to turn on the pressurized water pump 22, thereby performing automatic and linked intelligent control of the water pressure of the water supply main 1, so as to achieve the purpose of sharing the same water supply main with the construction water network and the site spray network on the premise of ensuring that the construction water and the spray water can be used smoothly at the same time, which greatly simplifies the construction of the water supply pipeline and reduces the water cost.
[0037] As a preferred solution of the present invention, the intelligent spray switch 52 has a timed opening function.
[0038] Specifically, the spray intelligent switch 52 can be set with an automatic start function. When the start time is reached, the spray intelligent switch 52 automatically turns on to complete automatic spraying.
[0039] As a preferred solution of the present invention, it also includes an online dust detection system 7 set up at the construction site; the online dust detection system 7 is connected to the spray intelligent switch 52; when the online dust detection system 7 detects that the current dust index of the construction site reaches the preset dust index, the processing mechanism of the online dust detection system 7 controls the spray intelligent switch 52 to turn on.
[0040] Specifically, the online dust detection system 7 is arranged at the place where detection is required on the construction site. The online dust detection system 7 includes a processing mechanism (a single-chip microcomputer or a processor or a host) and a detection mechanism (for detecting the dust index). The detection mechanism sends the detected dust index to the processing mechanism in real time. The processing mechanism compares the dust index with a preset dust index pre-stored therein. When the dust index reaches the preset dust index, the processing mechanism controls the spray intelligent switch 52 to turn on.
[0041] As a preferred embodiment of the present invention, the pressurized water outlet pipe 21 includes a pressurized water outlet main pipe 211 connected to the pressurized water storage tank 2 and at least two pressurized water outlet branches 212 arranged at the water outlet end of the pressurized water outlet main pipe 211; a pressurized water pump 22 is arranged on each pressurized water outlet branch 212; the pressurized water outlet branch 212 is respectively connected to the pressurized water source connection point through the first pipeline 213 and is connected to the reflux port of the pressurized water storage tank 2 through the second pipeline 214; a first gate valve 215, a second gate valve 216 and a first check valve 217 are respectively arranged on the first pipeline 213; the first gate valve 215 is arranged between the pressurized water pump 22 and the pressurized water outlet main pipe 211, and the second gate valve 216 is arranged between the pressurized water pump 22 and the pressurized water source connection point; the first check valve 217 is arranged between the second gate valve 216 and the pressurized water pump 22; and a first ball valve 218 is arranged on the second pipeline 214.
[0042] Specifically, in order to ensure that the water pressure in the water supply main 1 can quickly reach the preset water pressure, at least two pressurized water outlet branches 212 can be set to connect to the pressurized water source connection point, and the second pipeline 214 can be set to connect to the return port of the pressurized water storage tank 2 to avoid accidents caused by excessive water pressure in the water supply main 1, so that the pressurized water that has flowed out of the pressurized water storage tank 2 returns to the inside of the water tank. The first gate valve 215 and the second gate valve 216 can be set to a normally open state, which is convenient for manual control of water supply when an accident occurs; the first ball valve 218 can control the return flow according to the water level state in the pressurized water storage tank 2.
[0043] As a preferred solution of the present invention, the pressurized water outlet main pipe 211 is connected to the pressurized water storage tank 2 through a third pipeline 219 ; a third gate valve 2110 and a filter 2111 are provided on the third pipeline 219 .
[0044] Specifically, by providing the third pipeline 219 , the third gate valve 2110 and the filter 2111 , it is convenient to control and filter the pressurized water flow from the pressurized water storage tank 2 .
[0045] As a preferred embodiment of the present invention, it also includes a drainage ditch 81 arranged at the construction site and a sedimentation tank 82 connected to the drainage ditch 81; the water outlet of the sedimentation tank 82 is connected to the first water inlet of the pressurized water storage tank 2; an upper drainage outlet and a lower drainage outlet are respectively arranged at the upper part and the lower part of the pressurized water storage tank 2; the upper drainage outlet and the lower drainage outlet are respectively connected to the drainage ditch 81 through a drainage pipeline 23; and a fourth gate valve 24 and a fifth gate valve 25 are respectively arranged at the upper drainage outlet and the lower drainage outlet.
[0046] Specifically, the drainage ditch 81 is used to collect rainwater and wastewater generated by construction water, and after sedimentation in the sedimentation tank 82, it enters the pressurized water storage tank 2 for pressurizing the water supply main 1. Among them, the sedimentation tank 82 is preferably but not limited to a three-stage sedimentation tank. The upper and lower drain ports are respectively provided at the upper and lower parts of the pressurized water storage tank 2, and when the water quality or water level therein is too high, it is used to discharge it to the drainage ditch 81. Through the comprehensive utilization of rainwater and wastewater collection, resources are saved and the environment is protected.
[0047] As a preferred solution of the present invention, a liquid level meter 26 is provided in the pressurized water storage tank 2; the second water inlet of the pressurized water storage tank 2 is connected to the normal water supply source 6 through a normal water supply pipeline 27; and a second ball valve 28 is provided on the normal water supply pipeline 27.
[0048] Specifically, the liquid level meter 26 is used to detect the water level in the pressurized water storage tank 2. When the water level is insufficient and the sedimentation tank cannot be replenished, water is supplied through the normal water supply pipeline 27.
[0049] As a preferred solution of the present invention, a sixth gate valve 13 and a second check valve 14 are provided on the water inlet pipeline 11 .
[0050] Specifically, the sixth gate valve 13 is provided to facilitate the control of the entry of common water, and the second check valve 14 is used to prevent the water in the water inlet pipeline 11 from flowing back.
[0051] As a preferred solution of the present invention, a water control valve 411 and a spray control valve 511 are respectively provided on the water main pipe 41 and the spray main pipe 51; and / or, the regular water supply source 6 is a municipal water intake point.
[0052] Specifically, the water control valve 411 and the spray control valve 511 are used for manual control according to the on-site conditions, and the regular water source 6 is preferably but not limited to a municipal water intake point. The combination of traditional water sources and non-traditional water sources conforms to the concept of "saving resources and reusing resources".
[0053] In a preferred embodiment of the present invention, the spray intelligent switch 52 is connected to the mobile terminal via a 5G network, so that the staff can start the spray.
[0054] The water supply method combining construction water and spraying provided by the present invention combines water supply for the construction site and spraying for dust reduction at the construction site by adopting the water supply system combining construction water and site spraying as described above.
[0055] It can be seen from the above specific embodiments that the water supply system and method for combining construction water with site spraying provided by the present invention, by adding a pressurized water source connection point and setting a water pressure detection device at the water inlet end of the water supply main pipe, the water outlet of the pressurized water storage tank is connected to the pressurized water source connection point through a pressurized water outlet pipe, a pressurized water pump is set on the pressurized water outlet pipe, and combined with the design of the spray intelligent switch and the water pressure control device set on the spray main pipe, when the spray intelligent switch is turned on, the water pressure control device can obtain the current water pressure detection value of the water pressure detection device according to the signal of the spray intelligent switch being turned on, and compare it with the preset water pressure value pre-stored in the water pressure control device to determine whether it is necessary to turn on the pressurized water pump, thereby performing automatic and linked intelligent control of the water pressure of the water supply main pipe, so as to achieve the purpose of sharing the same water supply main pipe for the construction water network and the site spray network on the premise of ensuring that the construction water and spray water can be smoothly carried out at the same time, which greatly simplifies the construction of water supply pipelines and reduces water use costs.
[0056] As described above with reference to the accompanying drawings, the water supply system and method for combining construction water with site spraying proposed by the present invention are described by way of example. However, those skilled in the art should understand that various improvements can be made to the water supply system and method for combining construction water with site spraying proposed by the present invention without departing from the content of the present invention. Therefore, the protection scope of the present invention should be determined by the content of the attached claims.
Claims
1. A water supply system that combines construction water with site spraying. It is characterized in that It includes a water supply main, a pressurized water storage tank and a water pressure control device; among which, The water outlet of the water supply main is connected to the water main of the construction water network and the spray main of the site spray network respectively; the water supply source connection point and the pressurized water source connection point are respectively arranged at the water inlet of the water supply main; the water supply source connection point is connected to the normal water supply source through the water inlet pipeline; a water pressure detection device is arranged on the water supply main; and a spray intelligent switch is arranged on the spray main; The water outlet of the pressurized water storage tank is connected to the pressurized water source connection point through a pressurized water outlet pipe, and a pressurized water pump is arranged on the pressurized water outlet pipe; The water pressure control device is respectively connected to the spray intelligent switch, the water pressure detection device and the booster water pump; when the spray intelligent switch is turned on, the water pressure control device obtains the current water pressure detection value of the water pressure detection device according to the signal of turning on the spray intelligent switch, and compares it with the preset water pressure value pre-stored in the water pressure control device. If the current water pressure detection value is less than the preset water pressure value, the water pressure control device controls the booster water pump to turn on.
2. The water supply system combining construction water and site spraying according to claim 1, It is characterized in that The spray intelligent switch has a timed opening function.
3. The water supply system combining construction water and site spraying according to claim 1, It is characterized in that It also includes an online dust detection system installed at the construction site; The dust online detection system is connected to the spray intelligent switch; When the online dust detection system detects that the current dust index of the construction site reaches a preset dust index, the processing mechanism of the online dust detection system controls the spray intelligent switch to turn on.
4. The water supply system combining construction water and site spraying according to claim 1, It is characterized in that The pressurized water outlet pipe comprises a pressurized water outlet main pipe connected to the pressurized water storage tank and at least two pressurized water outlet branches arranged at the water outlet end of the pressurized water outlet main pipe; The pressurized water pump is arranged on each pressurized water outlet branch; The pressurized water outlet branch is respectively connected to the pressurized water source connection point through a first pipeline and connected to the return port of the pressurized water storage tank through a second pipeline; A first gate valve, a second gate valve and a first check valve are respectively arranged on the first pipeline; the first gate valve is arranged between the pressurized water pump and the pressurized water outlet main pipe, and the second gate valve is arranged between the pressurized water pump and the pressurized water source connection point; The first check valve is arranged between the second gate valve and the pressurized water pump; A first ball valve is arranged on the second pipeline.
5. The water supply system combining construction water and site spraying according to claim 4, It is characterized in that The pressurized water outlet main is connected to the pressurized water storage tank via a third pipeline; The third pipeline is provided with a third gate valve and a filter.
6. The water supply system combining construction water and site spraying according to claim 1, It is characterized in that It also includes a drainage ditch set at the construction site and a sedimentation tank connected to the drainage ditch; The water outlet of the sedimentation tank is connected to the first water inlet of the pressurized water storage tank; An upper drain outlet and a lower drain outlet are respectively provided at the upper part and the lower part of the pressurized water storage tank; The upper drain outlet and the lower drain outlet are connected to the drain ditch through drainage pipelines respectively; A fourth gate valve and a fifth gate valve are respectively provided at the upper drain outlet and the lower drain outlet.
7. The water supply system combining construction water and site spraying according to claim 1, It is characterized in that A liquid level gauge is provided in the pressurized water storage tank; The second water inlet of the pressurized water storage tank is connected to the regular water supply source through a regular water supply pipeline; A second ball valve is arranged on the normal water supply pipeline.
8. The water supply system combining construction water and site spraying according to claim 1, It is characterized in that A sixth gate valve and a second check valve are arranged on the water inlet pipeline.
9. The water supply system combining construction water and site spraying according to claim 1, It is characterized in that A water control valve and a spray control valve are respectively provided on the water main pipe and the spray main pipe; and / or, The regular water supply source is a municipal water intake point.
10. A water supply method combining construction water and spraying, It is characterized in that By adopting the water supply system combining construction water and site spraying as described in any one of claims 1 to 9, water for the construction site and spraying for dust reduction at the construction site are jointly supplied.