Electric energy meter identification method, electronic equipment and readable storage medium
By obtaining the line voltage of multi-user power meter and judging its access form, the measurement error problem caused by inconsistent types of power meters is solved, automatic identification and accurate measurement are realized, and user experience is improved.
Patent Information
- Application Number
- CN202411012877.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-01
AI Technical Summary
In the prior art, when a multi-user power meter is connected to a three-phase power line, the actual type does not match the preset type, resulting in an error in the power metering and affecting the user experience.
By obtaining the line voltage between the first phase, second phase and third phase of the target energy meter, determining the identification result of the electricity meter based on these voltage values, and determining whether it is a three-phase electricity meter or three single-phase electricity meter. Formal access, or judgment of wiring errors, and send prompt information to the user equipment when the identification result is inconsistent with the preset configuration.
The actual access form of automatic identification of multi-user power meter is realized, avoiding power metering errors, and improving user experience and accuracy of power metering.
Smart Images

Figure CN118884337A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of electric energy meters, and in particular to an electric energy meter identification method, an electronic device and a readable storage medium. Background Art
[0002] With the rapid development of smart grid technology, multi-user electricity meters are becoming more and more widely used in multi-user scenarios such as homes and schools because they can monitor and record the electricity usage of multiple users at the same time and achieve accurate management of power resources.
[0003] In the relevant technology, electric energy meters are usually divided into two types: single-phase electric energy meters and three-phase electric energy meters. Single-phase electric energy meters are mainly used for household users, while three-phase electric energy meters are mostly used for industrial users and some occasions that require higher power. When the installer installs a multi-user electric energy meter, if the installer mistakenly selects the three-phase power line that the electric energy meter needs to be connected to, it may cause the type of electric energy meter actually connected to the three-phase power line to be inconsistent with the type of electric energy meter preset by the power management department to be connected to the three-phase power line. If the power management department fails to find that the type of electric energy meter actually connected to the three-phase power line is inconsistent with the preset electric energy meter type, it will cause the electric energy meter actually connected to the three-phase power line to measure the electric energy incorrectly, causing losses to users and affecting user experience. Summary of the invention
[0004] The present application provides an electric energy meter identification method, an electronic device and a readable storage medium to solve the problem in the prior art that the electric energy meter type actually connected to the three-phase power line does not match the preset electric energy meter type, resulting in electric energy meter measurement errors.
[0005] In a first aspect, the present application provides an electric energy meter identification method, which is applied to a multi-user electric energy meter, wherein the multi-user electric energy meter includes a controller and a plurality of electric energy meters, wherein the plurality of electric energy meters includes a target electric energy meter, and the target electric energy meter is connected to a three-phase power line, wherein the method includes:
[0006] Acquire the line voltage of the target electric energy meter; the line voltage includes a first line voltage between the first phase and the second phase of the target electric energy meter, a second line voltage between the second phase and the third phase of the target electric energy meter, and a third line voltage between the first phase and the third phase of the target electric energy meter;
[0007] Based on the first line voltage, the second line voltage and the third line voltage, the identification result of the target electric energy meter is determined, wherein the identification result is used to indicate that the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter, or to indicate that the target electric energy meter is respectively connected to the three-phase power line in the form of three single-phase electric energy meters, or to indicate that the target electric energy meter is incorrectly wired.
[0008] In a possible design, determining the identification result of the target electric energy meter based on the first line voltage, the second line voltage, and the third line voltage includes:
[0009] When the first line voltage, the second line voltage and the third line voltage meet a first preset condition, the identification result of the target electric energy meter is determined; wherein the identification result is used to indicate that the target electric energy is respectively connected to the three-phase power line in the form of three single-phase electric energy meters.
[0010] In a possible design, the first preset condition is that at least one line voltage among the first line voltage, the second line voltage and the third line voltage is 0V.
[0011] In a possible design, determining the identification result of the target electric energy meter based on the first line voltage, the second line voltage, and the third line voltage includes:
[0012] When the first line voltage, the second line voltage and the third line voltage meet a second preset condition, acquiring multiple groups of electric energy data corresponding to the target electric energy meter at preset time intervals;
[0013] In the case where the multiple groups of electric energy data are consistent, determining the identification result of the target electric energy meter; wherein the identification result is used to indicate that the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter;
[0014] In the case that the multiple groups of electric energy data are inconsistent, the identification result of the target electric energy meter is determined; wherein the identification result is used to indicate that the target electric energy meter is respectively connected to the three-phase power line in the form of three single-phase electric energy meters.
[0015] In a possible design, the second preset condition is that the first line voltage, the second line voltage and the third line voltage are all 380V.
[0016] In a possible design, determining the identification result of the target electric energy meter based on the first line voltage, the second line voltage, and the third line voltage includes:
[0017] When the first line voltage, the second line voltage and the third line voltage satisfy a third preset condition, an identification result of the target electric energy meter is determined; wherein the identification result is used to indicate that the target electric energy meter is incorrectly wired.
[0018] In a possible design, the third preset condition is that at least one of the first line voltage, the second line voltage and the third line voltage is not 0V and is not 380V.
[0019] In one possible design, after determining the identification result of the target electric energy meter based on the first line voltage, the second line voltage, and the third line voltage, the method further includes:
[0020] When the identification result of the target electric energy meter is inconsistent with the target configuration result of the target electric energy meter, a prompt message is sent to the user device; wherein the target configuration result is the form in which the user expects the target electric energy meter to be connected to the three-phase power line; the prompt message is used to prompt that the identification result of the target electric energy meter is inconsistent with the target configuration result of the target electric energy meter.
[0021] In a second aspect, the present application provides an electric energy meter identification device, including: a module for executing any method embodiment of the first aspect.
[0022] In a third aspect, the present application provides an electronic device, including: a memory and a processor;
[0023] The memory is configured to store computer program instructions;
[0024] The processor is configured to execute the computer program instructions so that the electronic device implements the method as described in any one of the first aspects.
[0025] In a fourth aspect, the present application provides a readable storage medium, including: computer program instructions;
[0026] At least one processor of the electronic device runs the computer program instructions so that the electronic device implements the method as described in any one of the first aspects.
[0027] In a fifth aspect, the present application provides a chip, comprising: an interface circuit and a logic circuit, wherein the interface circuit is used to receive signals from other chips outside the chip and transmit them to the logic circuit, or to send signals from the logic circuit to other chips outside the chip, and the logic circuit is used to implement any method described in the first aspect.
[0028] In the electric energy meter identification method provided in the present application, the electric energy meter that needs to be connected to the three-phase power line is set as the target electric energy meter in the preset electric energy meter of the multi-user electric energy meter as the target electric energy meter, and the first line voltage between the first phase and the second phase of the target electric energy meter, the second line voltage between the second phase and the third phase of the target electric energy meter, and the third line voltage between the first phase and the third phase of the target electric energy meter are obtained, and based on the first line voltage, the second line voltage and the third line voltage, it is determined whether the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter, or is connected to the three-phase power line in the form of three single-phase electric energy meters, or whether the wiring is wrong. The present application can automatically identify the form in which the target electric energy meter is actually connected to the three-phase power line, that is, automatically identify the actual type of the target electric energy meter connected to the three-phase power line, avoiding the problem of electric energy measurement error of the target electric energy meter due to the inconsistency between the actual type of the target electric energy meter and the preset type, and the user experience is good. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 A schematic diagram of a flow chart of an electric energy meter identification method provided in an embodiment of the present application;
[0030] Figure 2 A schematic diagram of the structure of an electric energy meter system provided in an embodiment of the present application;
[0031] Figure 3 A schematic flow chart of another electric energy meter identification method provided in an embodiment of the present application;
[0032] Figure 4 A schematic diagram of the structure of an electric energy identification device provided in an embodiment of the present application;
[0033] Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0035] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used in the specification of the application are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" and any variations thereof in the specification, claims and drawings of this application are intended to cover non-exclusive inclusions.
[0036] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase "embodiments" in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0037] The term "and / or" in this article is only a description of the association relationship of the associated objects, indicating that three relationships can exist. For example, A and / or B can mean: A exists, A and B can exist at the same time, and B exists. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0038] In addition, the terms "first", "second", etc. in the specification and claims of this application or the above-mentioned drawings are used to distinguish different objects rather than to describe a specific order, and may explicitly or implicitly include one or more of the features.
[0039] In the description of this application, unless otherwise specified, "multiple" and "at least two" mean more than two (including two). Similarly, "multiple groups" and "at least two groups" mean more than two groups (including two).
[0040] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense. For example, "connected" or "connection" can refer to not only physical connection, but also electrical connection or signal connection. For example, it can be directly connected, that is, physically connected, or indirectly connected through at least one intermediate element, as long as the circuit is connected, or it can be the internal connection of two elements; signal connection can refer to signal connection through a circuit or through a media medium, such as radio waves. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0041] In order to make those skilled in the art better understand the present application, the technical solutions in the embodiments of the present application will be described clearly and completely in conjunction with the accompanying drawings. It should be noted that different technical features in the present application can be combined with each other without conflict.
[0042] A multi-user electric energy meter comprises a controller and N electric energy meters, and the N electric energy meters are all communicatively connected to the controller; the N electric energy meters are used to collect electric energy data of N users, and the output ends of the N electric energy meters are provided with M circuits, M and N are both positive integers, and the output ends of the multi-user electric energy meters are respectively connected to the power supply lines of the N users, and the power supply line used by each user is a single-phase power supply line end or a three-phase power supply line end.
[0043] Among them, when the user's home circuits are all single-phase, the power input terminal to the user's home is a single-phase power input terminal. When the user's home circuits are all three-phase, the power input terminal to the user's home is a three-phase power input terminal. The user's home electrical equipment can work by connecting to the power input terminal.
[0044] One output terminal of a multi-user electric energy meter is connected to a single-phase power supply incoming terminal, and three output terminals are connected to a three-phase power supply incoming terminal. M and N satisfy the relationship: M=3n1+n2, and n1+n2=N, n1 is the number of three-phase power supply incoming terminals, n2 is the number of single-phase power supply incoming terminals, and n1 and n2 are both positive integers.
[0045] It should be noted that the value of N can be set by the power management department, and the maximum value of N can be 36.
[0046] Next, some specific embodiments and drawings are used to describe in detail how the present application solves the problem in the prior art that the type of electric energy meter actually connected to the three-phase power line does not match the preset electric energy meter type, resulting in incorrect electric energy measurement by the electric energy meter.
[0047] Figure 1 A schematic diagram of a flow chart of an electric energy meter identification method provided in an embodiment of the present application. Figure 1 As shown, the execution entity of the electric energy meter identification method provided in the embodiment of the present application can be a cloud platform in the electric energy meter system. The electric energy meter identification method specifically includes S101 and S102. S101 and S102 are described in detail below.
[0048] Figure 2 This is a schematic diagram of the structure of an electric energy meter system provided in an embodiment of the present application. Figure 2 As shown, the electric energy meter system 2 includes a multi-user electric energy meter 21 , a cloud platform 22 and a user device 23 .
[0049] The multi-user electric energy meter 21 includes a controller 211 , an electric energy meter 212 and a communication module 213 .
[0050] Among them, there are multiple electric energy meters 212, and each electric energy meter 212 is provided with a metering chip 212-1. The metering chip 212-1 can simultaneously collect electric energy data from three single-phase power supply incoming terminals. In actual use, according to actual needs, the metering chip 212-1 can also collect electric energy data from only one single-phase power supply incoming terminal or two single-phase power supply incoming terminals.
[0051] The electric energy meter 212 is also connected to the controller 211 via a communication bus, and the electric energy meter 212 sends the electric energy data collected by its internal metering chip 212 - 1 to the controller 211 .
[0052] The controller 211 is connected to the cloud platform 22 via the communication module 213 , so that the electric energy data collected by the metering chip 212 - 1 in each electric energy meter 212 can be reported to the cloud platform 22 via the communication module 213 .
[0053] Among them, the communication module 213 can be various communication modules such as a Wi-Fi module, a cellular communication module (such as a 4G module, a 5G module), an Ethernet module, a LoRa module, a NB-IoT module, a Zigbee module, etc., and this embodiment does not make specific limitations on this.
[0054] The cloud platform 22 is used to analyze and process all electric energy data reported by the multi-user electric energy meter 21 to obtain the electric energy consumption of multiple users corresponding to the multi-user electric energy meter 21 .
[0055] It should be noted that the cloud platform 22 can also monitor the power consumption of multiple users corresponding to the multi-user power meter 21 in real time, and send alarm notifications when abnormal power consumption or failures occur, so as to facilitate timely processing and maintenance. The cloud platform 22 can also store historical power data of multi-user power meters, provide data query and statistical functions, and support users to view power consumption records and historical trend analysis. The cloud platform 22 can also analyze the user's power consumption behavior pattern based on the user's power consumption data, identify energy-saving potential, and make optimization suggestions to help users achieve energy conservation and emission reduction.
[0056] The user device 23 can be connected to the Internet via Wi-Fi, cellular network or Bluetooth, and then access the cloud platform 22. The cloud platform 22 can analyze the collected data and send the analysis results and reports to the user device 23.
[0057] The user device 23 may be an electronic device such as a mobile phone, a tablet computer, or a PDA, which is not specifically limited in this embodiment.
[0058] In the embodiment of the present application, the electric energy meter system realizes accurate identification, real-time monitoring, remote management and data analysis of multi-user electric energy meters through the combination of multi-user electric energy meters 21, cloud platform 22 and user equipment 23, which significantly improves the use reliability and user experience of multi-user electric energy meters.
[0059] S101. The cloud platform obtains the line voltage of the target electric energy meter.
[0060] The target electric energy meter is an electric energy meter among the multi-user electric energy meters, and the target electric energy meter is connected to a three-phase power line.
[0061] It should be noted that a three-phase power line is a power line used to transmit and distribute electrical energy. A three-phase power line consists of three alternating current lines with a phase difference of 120 degrees between each other and is widely used in industry, commerce and large buildings.
[0062] A three-phase power line includes three phase wires (L1, L2, and L3), a neutral wire (N), and a ground wire (PE).
[0063] The three phase lines (L1, L2 and L3) are also called phase A, phase B and phase C. The voltage phases of phase A, phase B and phase C are 120 degrees different from each other. In each cycle, phase A, phase B and phase C reach their peak voltages respectively, thereby providing continuous and stable power output.
[0064] Neutral (N) is usually used for single-phase load circuits and is also used as a reference point for three-phase circuits.
[0065] The ground wire (PE) is mainly used for safe grounding to prevent electric shock hazards caused by electrical equipment failures.
[0066] Among them, a single-phase energy meter only needs to be connected to one of the three phase lines of the three-phase power line and a neutral line to realize the basic functions of a single-phase energy meter. A three-phase energy meter needs to be connected to the three phase lines of the three-phase power line and the neutral line or ground line to realize the basic functions of a three-phase energy meter.
[0067] Specifically, the target electric energy meter refers to an electric energy meter among the multi-user electric energy meters that is preset by the electric power management department and needs to be connected to three phase lines of the three-phase power line.
[0068] The line voltage includes a first line voltage between the first phase and the second phase of the target electric energy meter, a second line voltage between the second phase and the third phase of the target electric energy meter, and a third line voltage between the first phase and the third phase of the target electric energy meter.
[0069] It should be noted that a line voltage detection module is provided in the target electric energy meter, and the line voltage detection module is used to detect the line voltage between any two phase lines among the three phase lines connected to the target electric energy meter.
[0070] The line voltage detection module is an existing line voltage detection module, which will not be described in detail in this embodiment.
[0071] In this embodiment, the cloud platform obtains the first line voltage, the second line voltage and the third line voltage of the target electric energy meter through the line voltage detection module in the target electric energy meter, so as to subsequently determine the actual connection form of the target electric energy meter to the three-phase power line based on the first line voltage, the second line voltage and the third line voltage of the target electric energy meter.
[0072] S102: The cloud platform determines an identification result of a target electric energy meter based on the first line voltage, the second line voltage, and the third line voltage.
[0073] Among them, the identification result is used to indicate that the target power meter is connected to the three-phase power line in the form of a three-phase power meter, or, to indicate that the target power meter is connected to the three-phase power line in the form of three single-phase power meters respectively, or, to indicate that the target power meter is incorrectly wired.
[0074] It should be noted that the cloud platform can determine whether the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter, or is connected to the three-phase power line in the form of three single-phase electric energy meters based on the values of the first-line voltage, the second-line voltage and the third-line voltage of the target electric energy meter, or determine that the target electric energy meter is connected to the three-phase power line incorrectly, thereby avoiding manual detection and identification of the form in which the target electric energy meter is connected to the three-phase power line, ensuring that the target electric energy meter can be connected to the three-phase power line in a preset type, and further ensuring that the target electric energy meter can accurately measure the user's electricity usage, thereby improving the accuracy of electric energy metering, reducing metering errors, and safeguarding the interests of users.
[0075] In an embodiment of the present application, an electric energy meter that needs to be connected to a three-phase power line is set as a target electric energy meter in a preset electric energy meter of a multi-user electric energy meter as the target electric energy meter, and the first line voltage between the first phase and the second phase of the target electric energy meter, the second line voltage between the second phase and the third phase of the target electric energy meter, and the third line voltage between the first phase and the third phase of the target electric energy meter are obtained, and based on the first line voltage, the second line voltage and the third line voltage, it is determined whether the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter, or is connected to the three-phase power line in the form of three single-phase electric energy meters, or whether the wiring is wrong. The present application can automatically identify the form in which the target electric energy meter is actually connected to the three-phase power line, that is, automatically identify the actual type of the target electric energy meter connected to the three-phase power line, avoid the problem of electric energy measurement error of the target electric energy meter due to the actual type of the target electric energy meter not matching the preset type, and provide good user experience.
[0076] In the above embodiment, the cloud platform needs to determine the identification result of the target electric energy meter based on the first line voltage, the second line voltage and the third line voltage. Next, the specific implementation method of determining the identification result of the target electric energy meter based on the first line voltage, the second line voltage and the third line voltage is described in detail.
[0077] In a possible embodiment, S102, the cloud platform determines the identification result of the target electric energy meter based on the first line voltage, the second line voltage and the third line voltage, which can be achieved through step a. Step a is described in detail below.
[0078] Step a: When the first line voltage, the second line voltage and the third line voltage meet the first preset condition, the cloud platform determines the identification result of the target electric energy meter.
[0079] The identification result is used to indicate that the target electric energy meter is connected to the three-phase power line in the form of three single-phase electric energy meters.
[0080] The first preset condition is that at least one of the first line voltage, the second line voltage and the third line voltage is 0V.
[0081] Figure 3 A schematic diagram of another method for identifying an electric energy meter provided in an embodiment of the present application. Figure 3 As shown, after the cloud platform obtains the line voltage of the target electric energy meter in S101, it executes step 1021.
[0082] Step 1021: Whether at least one of the first line voltage, the second line voltage and the third line voltage of the cloud platform is 0V. When at least one of the first line voltage, the second line voltage and the third line voltage of the target electric energy meter is 0V, determine the identification result of the target electric energy meter. The identification result is used to indicate that the target electric energy meter is connected to the three-phase power line in the form of three single-phase electric energy meters, corresponding to step a.
[0083] It should be noted that when the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter, the first phase, the second phase and the third phase of the target electric energy meter are respectively connected to the A phase line, the B phase line and the C phase line of the three-phase power line. In this case, the first line voltage, the second line voltage and the third line voltage of the target electric energy meter are all 380 V. When at least one of the first line voltage, the second line voltage and the third line voltage of the target electric energy meter is 0 V, it means that the target electric energy meter is not connected to the A phase line, the B phase line and the C phase line of the three-phase power line at the same time. Therefore, it can be seen that the target electric energy meter is connected to the three-phase power line in the form of three single-phase electric energy meters.
[0084] In an embodiment of the present application, the cloud platform detects the three line voltages corresponding to the target electric energy meter. When at least one of the three line voltages is 0V, the cloud platform can automatically identify and determine that the target electric energy meter is connected to the three-phase power line in the form of three single-phase electric energy meters, thereby reducing the cost of manual identification and improving the reliability of the use of multi-user electric energy meters.
[0085] In the above embodiment, the cloud platform needs to determine whether at least one of the first line voltage, the second line voltage and the third line voltage of the target electric energy meter is 0 V. Next, the method executed by the cloud platform when the first line voltage, the second line voltage and the third line voltage of the target electric energy meter are not 0 V is described in detail.
[0086] In a possible embodiment, S102, the cloud platform determines the identification result of the target electric energy meter based on the first line voltage, the second line voltage and the third line voltage, which can be achieved through steps b1 to b4. Steps b1 to b4 are described in detail below.
[0087] Step b1: When the first line voltage, the second line voltage and the third line voltage meet the second preset condition, the cloud platform obtains multiple groups of electric energy data corresponding to the target electric energy meter at preset time intervals.
[0088] The second preset condition is that the first line voltage, the second line voltage and the third line voltage are all 380V.
[0089] Figure 3 A schematic diagram of another method for identifying an electric energy meter provided in an embodiment of the present application. Figure 3 As shown, in step 1021, the cloud platform determines whether at least one of the first line voltage, the second line voltage and the third line voltage of the target electric energy meter is 0V. If the cloud platform determines that all three line voltages of the first line voltage, the second line voltage and the third line voltage of the target electric energy meter are not 0V, the cloud platform continues to execute step 1022.
[0090] Step 1022: The cloud platform determines whether the first line voltage, the second line voltage, and the third line voltage are all 380V.
[0091] In step 1022, when the cloud platform determines that the first line voltage, the second line voltage and the third line voltage of the target electric energy meter are all 380V, the cloud platform executes step b1.
[0092] It should be noted that when the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter, the first phase, the second phase and the third phase of the target electric energy meter are respectively connected to the A phase line, the B phase line and the C phase line of the three-phase power line. In this case, the first line voltage, the second line voltage and the third line voltage of the target electric energy meter are all 380 V. In addition, when the target electric energy meter is connected to the three-phase power line in the form of three single-phase electric energy meters, and the three single-phase electric energy meters are respectively connected to the A phase line, the B phase line and the C phase line of the three-phase power line, the first line voltage, the second line voltage and the third line voltage of the target electric energy meter are also 380 V. Therefore, when the first line voltage, the second line voltage and the third line voltage of the target electric energy meter are all 380 V, it is necessary to obtain multiple sets of electric energy data corresponding to the target electric energy meter at preset time intervals, and by comparing the multiple sets of electric energy data, it is determined whether the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter or in the form of three single-phase electric energy meters.
[0093] The preset time interval may be set by the power management personnel of the power management department, and this embodiment does not specifically limit this.
[0094] For example, the preset time interval may be 1 hour.
[0095] The number of the multiple groups of electric energy data corresponding to the target electric energy meter obtained at the preset time interval may also be set by the electric energy management personnel of the electric energy management department, and this embodiment does not specifically limit this.
[0096] For example, the number of the multiple groups of electric energy data corresponding to the target electric energy meter is 24 groups.
[0097] Wherein, multiple groups of electric energy data corresponding to the target electric energy meter are obtained according to preset time intervals.
[0098] Figure 3 A schematic diagram of another method for identifying an electric energy meter provided in an embodiment of the present application. Figure 3 As shown, after step b1, the cloud platform obtains multiple groups of electric energy data corresponding to the target electric energy meter according to preset time intervals, the cloud platform executes step b2.
[0099] Step b2: The cloud platform determines whether the multiple sets of electric energy data corresponding to the target electric energy meter are consistent. If the multiple sets of electric energy data corresponding to the target electric energy meter are consistent, the cloud platform executes step b3; if the multiple sets of electric energy data corresponding to the target electric energy meter are inconsistent, the cloud platform executes step b4.
[0100] Step b3: When the multiple sets of electric energy data are consistent, the cloud platform determines the identification result of the target electric energy meter.
[0101] The identification result is used to indicate that the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter.
[0102] It should be noted that the amplitudes of the first line voltage, the second line voltage and the third line voltage of the three-phase electric energy meter are the same. Therefore, when multiple sets of electric energy data are consistent, it means that the target electric energy meter is connected to a user's home, that is, it is determined that the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter.
[0103] Step b4: When multiple sets of electric energy data are inconsistent, the cloud platform determines the identification result of the target electric energy meter.
[0104] The identification result is used to indicate that the target electric energy meter is connected to the three-phase power line in the form of three single-phase electric energy meters.
[0105] It should be noted that if the target electricity meter is connected to the three-phase power line in the form of three single-phase electricity meters, since each single-phase electricity meter is ultimately connected to a different user's home, the electricity consumption of different users' homes will not always be the same in multiple time periods. Therefore, when multiple sets of electricity data are inconsistent, it can be determined that the target electricity meter is connected to the three-phase power line in the form of three single-phase electricity meters.
[0106] In the embodiment of the present application, the cloud platform detects the three line voltages corresponding to the target electric energy meter. When the three line voltages are all 380V, the cloud platform obtains multiple groups of electric energy data corresponding to the target electric energy meter at preset time intervals, and determines the identification result of the target electric energy meter according to the consistency of the multiple groups of electric energy data, thereby automatically distinguishing whether the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter, or is connected to the three-phase power line in the form of three single-phase electric energy meters, thereby realizing the identification of the actual type of the target electric energy meter with high identification efficiency.
[0107] In the above embodiment, the cloud platform needs to determine whether the first line voltage, the second line voltage and the third line voltage of the target electric energy meter are all 380 V. Next, the method executed by the cloud platform when the first line voltage, the second line voltage and the third line voltage of the target electric energy meter are not 380 V is described in detail.
[0108] In a possible embodiment, S102, the cloud platform determines the identification result of the target electric energy meter based on the first line voltage, the second line voltage and the third line voltage, which can be achieved through step c, and step c is described in detail below.
[0109] Step c: When the first line voltage, the second line voltage and the third line voltage meet a third preset condition, the cloud platform determines an identification result of the target electric energy meter.
[0110] The recognition result is used to indicate that the target electric energy meter is incorrectly wired.
[0111] The third preset condition is that at least one of the first line voltage, the second line voltage and the third line voltage is not 0V and is not 380V.
[0112] Figure 3 A schematic diagram of another method for identifying an electric energy meter provided in an embodiment of the present application. Figure 3 As shown, in step 1022, if the cloud platform determines that the first line voltage, the second line voltage and the third line voltage are not all 380V, the cloud platform directly executes step c.
[0113] It should be noted that, when at least one of the first line voltage, the second line voltage and the third line voltage of the target electric energy meter is neither 0V nor 380V, it can be determined that the target electric energy meter is incorrectly wired.
[0114] In an embodiment of the present application, the cloud platform determines that the target electric energy meter has a wiring error when at least one of the first line voltage, the second line voltage, and the third line voltage of the target electric energy meter is neither 0V nor 380V, thereby realizing automatic detection of the target electric energy meter's wiring error.
[0115] In a possible embodiment, S102, after the cloud platform determines the identification result of the target electric energy meter based on the first line voltage, the second line voltage and the third line voltage, the electric energy meter identification method also includes: when the identification result of the target electric energy meter is inconsistent with the target configuration result of the target electric energy meter, the cloud platform sends a prompt message to the user device.
[0116] The target configuration result is the form in which the user expects the target electric energy meter to be connected to the three-phase power line, and the user is the power management personnel of the power management department.
[0117] The prompt information is used to prompt that the recognition result of the target electric energy meter is inconsistent with the target configuration result of the target electric energy meter.
[0118] It should be noted that, when the recognition result of the target electric energy meter is consistent with the target configuration result of the target electric energy meter, the cloud platform no longer collects the first line voltage, the second line voltage and the third line voltage of the target electric energy meter.
[0119] It should be noted that when the cloud platform's identification result of the target electricity meter is inconsistent with the target configuration result of the target electricity meter, after sending a prompt message to the user device, it continues to collect the first-line voltage, second-line voltage and third-line voltage of the target electricity meter, and identifies the actual type of the target electricity meter until the actual type of the target electricity meter is consistent with the preset type.
[0120] In an embodiment of the present application, the cloud platform compares the identification result of the target electric energy meter with the target configuration result of the target electric energy meter pre-configured by the user, and if the identification result of the target electric energy meter is inconsistent with the target configuration result of the target electric energy meter, the cloud platform sends a prompt message to the user device of the power management personnel of the power management department, so as to inform the power management personnel that the actual identification result of the target electric energy meter is inconsistent with the expected configuration result, and remind the user that the target electric energy meter may have a wiring error or a configuration error, so that the user can quickly understand and deal with potential wiring errors or configuration errors, and avoid inaccurate electricity metering or equipment failure caused by incorrect wiring or incorrect configuration.
[0121] In a possible embodiment, the metering chip in the target electric energy meter is configured to simultaneously collect electric energy data of the first phase, the second phase, and the third phase of the target electric energy meter.
[0122] When the identification result indicates that the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter, the target configuration result of the target electric energy meter indicates that the target form of the target electric energy meter being connected to the three-phase power line is: three single-phase electric energy meters being connected to the three-phase power line. At this time, the cloud platform can use the first-phase, second-phase and third-phase electric energy data of the target electric energy meter collected by the metering chip in the target electric energy meter as the electric energy data of the three single-phase electric energy meters when the target electric energy meter is connected to the three-phase power line as three single-phase electric energy meters.
[0123] When the identification result indicates that the target electric energy meter is connected to the three-phase power line in the form of three single-phase electric energy meters, the target configuration result of the target electric energy meter indicates that the target form of the target electric energy meter being connected to the three-phase power line is: connecting to the three-phase power line with a three-phase electric energy meter. At this time, the cloud platform can use the sum of the first-phase, second-phase and third-phase electric energy data of the target electric energy meter collected by the metering chip in the target electric energy meter as the electric energy data of the three-phase electric energy meter when the target electric energy meter is connected to the three-phase power line as a three-phase electric energy meter, effectively avoiding electric energy measurement errors of the target electric energy meter.
[0124] In an embodiment of the present application, based on the above method, regardless of whether the actual type of the three-phase power line connected to the target electric energy meter is consistent with the preset type, the correct power of the target electric energy meter can be calculated to achieve the correct metering function of the target electric energy meter, thereby reducing power losses and facilitating the replenishment of power.
[0125] Figure 4 This is a schematic diagram of the structure of an electric energy identification device provided in an embodiment of the present application. Figure 4 As shown, the electric energy identification device 400 provided in this embodiment can exist independently or be integrated into other devices.
[0126] The electric energy identification device 400 may include: a transceiver module 401 and a processing module 402. The processing module 402 is used for data processing, and the transceiver module 401 may implement corresponding communication functions. The transceiver module 401 may also be called a communication interface or a communication unit.
[0127] Optionally, the electric energy identification device 400 may also include a storage unit, which can be used to store instructions and / or data. The processing module 402 can read the instructions and / or data in the storage unit so that the electric energy identification device 400 implements the steps performed by the cloud platform in the aforementioned method embodiment.
[0128] The transceiver module 401 is used to perform the reception-related operations of the cloud platform in the above method embodiment, and the processing module 402 is used to perform the processing-related operations of the cloud platform in the above method embodiment.
[0129] Optionally, the transceiver module 401 may include a sending module and a receiving module. The sending module is used to perform the sending operation in the above method embodiment. The receiving module is used to perform the receiving operation in the above method embodiment.
[0130] It should be noted that the power identification device 400 may include a sending module but not a receiving module. Alternatively, the power identification device 400 may include a receiving module but not a sending module. Specifically, it depends on whether the above solution executed by the power identification device 400 includes a sending action and a receiving action.
[0131] As an example, the electric energy identification device 400 is used to perform the above Figure 1 Actions performed by the cloud platform in the illustrated embodiment.
[0132] The electric energy identification device 400 may include: a transceiver module 401 and a processing module 402 .
[0133] The transceiver module 401 obtains the line voltage of the target electric energy meter; the line voltage includes a first line voltage between the first phase and the second phase of the target electric energy meter, a second line voltage between the second phase and the third phase of the target electric energy meter, and a third line voltage between the first phase and the third phase of the target electric energy meter.
[0134] The processing module 402 is used to determine the identification result of the target electric energy meter based on the first line voltage, the second line voltage and the third line voltage, wherein the identification result is used to indicate that the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter, or to indicate that the target electric energy meter is respectively connected to the three-phase power line in the form of three single-phase electric energy meters, or to indicate that the target electric energy meter is incorrectly wired.
[0135] It should be understood that the execution of the above corresponding processes by each module has been described in detail in the above method embodiment, and for the sake of brevity, it will not be repeated here.
[0136] The processing module 402 in the above embodiment can be implemented by at least one processor or processor-related circuit. The transceiver module 401 can be implemented by a transceiver or a transceiver-related circuit. The transceiver module 401 can also be called a communication unit or a communication interface. The storage unit can be implemented by at least one memory.
[0137] Figure 5 This is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. Figure 5 As shown, the electronic device 500 provided in this embodiment includes: a memory 501 and a processor 502 .
[0138] The memory 501 may be an independent physical unit, and may be connected to the processor 502 via a bus 603. The memory 501 and the processor 502 may also be integrated together and implemented by hardware. The memory 501 is used to store program instructions, and the processor 502 calls the program instructions to execute the operations performed by the cloud platform in any of the above method embodiments.
[0139] Optionally, when part or all of the methods of the above embodiments are implemented by software, the electronic device 500 may also include only a processor 502. The memory 501 for storing programs is located outside the electronic device 500, and the processor 502 is connected to the memory through circuits / wires for reading and executing the programs stored in the memory. The processor 502 may be a central processing unit (CPU), a network processor (NP) or a combination of a CPU and a NP. The processor 502 may further include a hardware chip. The hardware chip may be an application-specific integrated circuit (ASIC), a programmable logic device (PLD) or a combination thereof. The PLD may be a complex programmable logic device (CPLD), a field-programmable gate array (FPGA), a generic array logic (GAL) or any combination thereof.
[0140] The memory 501 may include a volatile memory, such as a random-access memory (RAM); the memory may also include a non-volatile memory, such as a flash memory, a hard disk drive (HDD) or a solid-state drive (SSD); the memory may also include a combination of the above types of memory.
[0141] Exemplarily, the present application provides a chip, comprising: an interface circuit and a logic circuit, wherein the interface circuit is used to receive signals from other chips outside the chip and transmit them to the logic circuit, or to send signals from the logic circuit to other chips outside the chip, and the logic circuit is used to execute the operations performed by the cloud platform in any of the above method embodiments.
[0142] Exemplarily, the present application provides a readable storage medium on which computer program instructions are stored. The computer program instructions are executed by a processor of an electronic device so that the electronic device performs the operations performed by the cloud platform in any of the above method embodiments.
[0143] Exemplarily, the present application provides a computer program product, which, when executed on an electronic device, enables the electronic device to execute the operations executed by the cloud platform in any of the above method embodiments.
[0144] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments described herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for identifying an electric energy meter, applied to a multi-user electric energy meter, wherein the multi-user electric energy meter comprises a controller and a plurality of electric energy meters, wherein the plurality of electric energy meters comprises a target electric energy meter, and the target electric energy meter is connected to a three-phase power line. It is characterized in that The method comprises: Acquire the line voltage of the target electric energy meter; the line voltage includes a first line voltage between the first phase and the second phase of the target electric energy meter, a second line voltage between the second phase and the third phase of the target electric energy meter, and a third line voltage between the first phase and the third phase of the target electric energy meter; Based on the first line voltage, the second line voltage and the third line voltage, the identification result of the target electric energy meter is determined, wherein the identification result is used to indicate that the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter, or to indicate that the target electric energy meter is respectively connected to the three-phase power line in the form of three single-phase electric energy meters, or to indicate that the target electric energy meter is incorrectly wired.
2. The method according to claim 1, It is characterized in that The determining the identification result of the target electric energy meter based on the first line voltage, the second line voltage and the third line voltage includes: When the first line voltage, the second line voltage and the third line voltage meet a first preset condition, the identification result of the target electric energy meter is determined; wherein the identification result is used to indicate that the target electric energy is respectively connected to the three-phase power line in the form of three single-phase electric energy meters.
3. The method according to claim 2, It is characterized in that The first preset condition is that at least one of the first line voltage, the second line voltage and the third line voltage is 0V.
4. The method according to claim 1, It is characterized in that The determining the identification result of the target electric energy meter based on the first line voltage, the second line voltage and the third line voltage includes: When the first line voltage, the second line voltage and the third line voltage meet a second preset condition, acquiring multiple groups of electric energy data corresponding to the target electric energy meter at preset time intervals; In the case where the multiple groups of electric energy data are consistent, determining the identification result of the target electric energy meter; wherein the identification result is used to indicate that the target electric energy meter is connected to the three-phase power line in the form of a three-phase electric energy meter; In the case that the multiple groups of electric energy data are inconsistent, the identification result of the target electric energy meter is determined; wherein the identification result is used to indicate that the target electric energy meter is respectively connected to the three-phase power line in the form of three single-phase electric energy meters.
5. The method according to claim 4, It is characterized in that The second preset condition is that the first line voltage, the second line voltage and the third line voltage are all 380V.
6. The method according to claim 1, It is characterized in that The determining the identification result of the target electric energy meter based on the first line voltage, the second line voltage and the third line voltage includes: When the first line voltage, the second line voltage and the third line voltage satisfy a third preset condition, an identification result of the target electric energy meter is determined; wherein the identification result is used to indicate that the target electric energy meter is incorrectly wired.
7. The method according to claim 6, It is characterized in that The third preset condition is that at least one of the first line voltage, the second line voltage and the third line voltage is not 0V and is not 380V.
8. The method according to claim 1, It is characterized in that After determining the identification result of the target electric energy meter based on the first line voltage, the second line voltage and the third line voltage, the method further includes: When the identification result of the target electric energy meter is inconsistent with the target configuration result of the target electric energy meter, a prompt message is sent to the user device; wherein the target configuration result is the form in which the user expects the target electric energy meter to be connected to the three-phase power line; the prompt message is used to prompt that the identification result of the target electric energy meter is inconsistent with the target configuration result of the target electric energy meter.
9. An electronic device, It is characterized in that include: Memory and processor; The memory is configured to store computer program instructions; The processor is configured to execute the computer program instructions so that the electronic device implements the method according to any one of claims 1 to 8.
10. A readable storage medium, It is characterized in that include: Computer program instructions, at least one processor of an electronic device executes the computer program instructions so that the electronic device implements the method according to any one of claims 1 to 8.
