Drainage basin base flow change contribution rate quantification method under ecological construction

By constructing a time-varying Budyko framework and base flow attribution model in the basin, the contribution rate of ecological construction measures to base flow changes is quantified, and the problem of difficult to quantify the impact of base flow changes in the basin is solved, and scientific decision-making support is provided.

CN118886202APending Publication Date: 2024-11-01XIAN UNIV OF TECH
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410945247.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The prior art is difficult to quantify the impact of different climate backgrounds and human activities (such as ecological construction) on changes in basin base flow, especially in non-point source contamination areas, making it difficult to quickly identify and prevent pollutants.

Method used

Using the method of quantifying the contribution rate of the basin base flow change under ecological construction, the time-varying Budyko framework and base flow attribution model are constructed by collecting meteorological and hydrological data and ecological construction measures, and combining the least squares method and linear correlation test to determine runoff and basis The flow controls the ecological construction measures and calculates the contribution rate of climate factors and ecological construction measures to base flow changes.

Benefits of technology

It has achieved simple and efficient quantification of the contribution rate to the changes in the basin base flow, supported scientific decision-making on basin ecological environment protection and water resource planning, and fully considered the impact of climate and ecological construction measures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886202A_ABST
    Figure CN118886202A_ABST
Patent Text Reader

Abstract

The invention discloses a drainage basin base flow change contribution rate quantification method under ecological construction. The method specifically comprises the following steps of collecting day-by-day meteorological and hydrological data, various ecological construction measure data and a drainage basin area of a weather station and a hydrological station of a drainage basin in a time period; calculating to obtain year-by-year actual runoff, actual base flow, surface precipitation and surface potential evapotranspiration, performing sliding window processing on the results and various year-by-year ecological construction measure data, and dividing a reference period and a change period; a time varying Budyko framework is constructed; constructing a time-varying base flow attribution model; and calculating the total contribution rate of the ecological construction measures to the base flow change. The method can simply and efficiently determine the contribution rate of climatic factors and ecological construction to the basin base flow change.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of basin water resources evolution analysis, and relates to a method for quantifying the contribution rate of basin base flow change under ecological construction. Background Art

[0002] Baseflow, as a stable core part of the river runoff system, plays a key role in replenishing river flow during the dry season and plays a vital role in maintaining the health of river ecosystems. In non-point source pollution areas that are greatly affected by human activities, the pollutant emissions brought by baseflow have a more persistent lag effect and a more hidden process compared to surface runoff. The accumulation time of pollutants may range from several years to decades, which makes it more difficult to quickly identify and prevent pollution. Therefore, exploring the changing patterns and causes of baseflow is of great theoretical and practical significance for ensuring water resources and ecological security.

[0003] In the context of global climate change, frequent extreme hydrological events such as droughts and floods, as well as human activities such as increased land use intensity, will inevitably affect the dynamics of baseflow. It is particularly important to assess the specific impact of these changing factors on baseflow and conduct in-depth attribution analysis. Factors such as drought conditions, water storage capacity of the basin, coal mining and groundwater exploitation, and large-scale soil and water conservation and ecological construction measures have a significant impact on baseflow changes. Although many studies have achieved results in baseflow changes and their attribution analysis, there is still a lack of detailed quantitative research on the impact of different factors in different periods, especially in different climate backgrounds and human activities such as ecological construction. Given its advantages such as simple structure and clear physical mechanism, the Budyko model has been widely used in runoff attribution analysis and simulation studies. Based on this, it is very meaningful to propose a method to quantify the contribution rate of basin baseflow changes under ecological construction. Summary of the invention

[0004] The purpose of the present invention is to provide a method for quantifying the contribution rate of basin base flow change under ecological construction, which can simply and efficiently determine the contribution rate of climate factors and ecological construction to basin base flow change.

[0005] The technical solution adopted by the present invention is a method for quantifying the contribution rate of base flow change in a watershed under ecological construction, which specifically includes the following processes: collecting daily meteorological and hydrological data of meteorological stations and hydrological stations in the watershed, various ecological construction measures data and watershed area within a period of time; calculating the actual runoff, actual base flow, surface precipitation and surface potential evapotranspiration year by year, and performing sliding window processing on the above results and various ecological construction measures data year by year to divide the baseline period and the change period; constructing a time-varying Budyko framework; constructing a time-varying base flow attribution model; clarifying the main ecological construction measures for runoff and the main ecological construction measures for base flow; determining the contribution of each main ecological construction measure to the change of model parameters; calculating the contribution rate of each sliding window climate factor and model parameter to the change of base flow, and then calculating the contribution rate of each main ecological construction measure to the change of base flow, and finally obtaining the total contribution rate of ecological construction measures to the change of base flow.

[0006] The present invention is also characterized in that:

[0007] The specific steps include:

[0008] Step 1: Define the research basin and time period, collect daily meteorological and hydrological data from meteorological stations and basin control hydrological stations in and around the basin, data on various ecological construction measures in the basin, and basin area;

[0009] Step 2: Calculate the actual annual runoff, actual base flow, surface precipitation and surface potential evapotranspiration using the daily meteorological and hydrological data of the meteorological stations in and around the basin and the basin control hydrological stations collected in step 1, and perform sliding window processing on the annual actual runoff, actual base flow, surface precipitation and surface potential evapotranspiration and the data of various ecological construction measures in the basin collected in step 1, and divide the base period and the change period;

[0010] Step 3: Use the multi-year average surface precipitation, multi-year average actual runoff and multi-year average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 as input data to construct a time-varying Budyko framework, and calculate the parameter value of the time-varying Budyko framework of each sliding window using the least squares method; perform correlation tests on the various ecological construction measures data of each sliding window processed by the sliding window in step 2 and the parameter values ​​of the time-varying Budyko framework, and clarify the main ecological construction measures for runoff control;

[0011] Step 4: Use the multi-year average surface precipitation, multi-year average actual base flow, multi-year average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 and the parameter value of the time-varying Budyko framework of each sliding window obtained in step 3 as input data to build a time-varying base flow attribution model, and calculate the parameter value of the time-varying base flow attribution model of each sliding window by combining the least squares method; use the data of various ecological construction measures in each sliding window processed by the sliding window in step 2 to perform correlation tests with the parameter values ​​of the time-varying base flow attribution model, and clarify the main ecological construction measures for base flow control;

[0012] Step 5, using the parameter values ​​of each sliding window time-varying Budyko framework calculated in step 3 and the parameter values ​​of each sliding window time-varying baseflow attribution model calculated in step 4, respectively establish regression equations with the runoff main control ecological construction measures and baseflow main control ecological construction measures obtained in steps 3 and 4; then use the variance decomposition method to determine the contribution of each main control ecological construction measure to the model parameter changes;

[0013] Step 6: Use the elasticity coefficient method to calculate the contribution rate of each sliding window climate factor and model parameter to the base flow change. Then, based on the impact of each main ecological construction measure on the model parameter change obtained in step 5, calculate the contribution rate of each main ecological construction measure to the base flow change, as well as the total contribution rate of ecological construction measures to the base flow change.

[0014] The specific process of step 2 is:

[0015] Step 2.1: Use the meteorological data of daily precipitation and potential evapotranspiration of meteorological stations in and around the basin collected in step 1 to sum up and calculate the annual precipitation and potential evapotranspiration of each meteorological station. Then take the arithmetic mean of the annual precipitation and potential evapotranspiration of all meteorological stations to obtain the annual area precipitation and area potential evapotranspiration of the basin. The specific formula is as follows:

[0016]

[0017] Where P j is the basin surface precipitation in the jth year, mm; PET i,j,k is the potential evapotranspiration of the basin in the jth year, mm; P n,j,k,i is the precipitation on the i-th day of the k-th month of the j-th year at the n-th weather station, mm; PET n,j,k,i is the potential evapotranspiration of the nth meteorological station on the ith day of the kth month of the jth year, mm; N is the number of meteorological stations; m j,k is the number of days in the kth month of the jth year, PET j is the annual potential evaporation of the basin;

[0018] Step 2.2, using the daily actual flow hydrological data of the basin control hydrological station collected in step 1 and the basin area, calculate the annual actual runoff; then use the digital filtering method to calculate the daily base flow, and sum it up to get the annual actual base flow. The specific calculation formula is as follows:

[0019]

[0020] In the formula, R j is the actual runoff in the jth year, mm; m j,k is the number of days in the kth month of the jth year; q j,k,i is the actual flow rate on the i-th day of the k-th month of the j-th year, m 3 / s; F is the basin area controlled by the basin control hydrological station, km 2 ;

[0021] A single-parameter digital filter equation is used to achieve base flow segmentation. The specific formula is as follows:

[0022]

[0023] q b,j,k,i =q j,k,i -q d,j,k.i (5);

[0024]

[0025] In the formula, q b,j,k,i is the actual base flow on the i-th day of the k-th month of the j-th year, m 3 / s;q j,k,i is the actual flow rate on the i-th day of the k-th month of the j-th year, m 3 / s;q d,j,k,i is the actual surface flow on the i-th day of the k-th month of the j-th year, m 3 / s;q d,j,k,i-1 is the actual surface flow on the i-1th day of the kth month of the jth year, m 3 / s;q j,k,i-1 is the actual flow rate on the i-1th day of the kth month of the jth year, m 3 / s; α is a parameter; BR j is the actual base flow in the jth year, mm;

[0026] Step 2.3, the annual surface precipitation, surface potential evapotranspiration, actual runoff and actual base flow obtained in steps 2.1 and 2.2 and the annual data of various ecological construction measures in the basin collected in step 1 are processed by sliding windows respectively, and the first sliding window is used as the base period, and the subsequent sliding windows are used as change period 1, change period 2, change period 3, ..., respectively. The specific calculation formula is as follows:

[0027]

[0028] In the formula: when x j When X is the surface precipitation in the jth year, h is the multi-year average surface precipitation of the corresponding h-th sliding window; when x j When X is the potential evapotranspiration in the jth year, h is the multi-year average surface potential evapotranspiration of the corresponding h-th sliding window; when x j When X is the actual runoff in the jth year, h is the multi-year average actual runoff of the corresponding h-th sliding window; when x j When X is the actual base flow in the jth year, h is the multi-year average actual base flow of the corresponding h-th sliding window; when x j When various ecological construction measures are taken in year j, X h is the multi-year average value of various ecological construction measures in the corresponding h-th sliding window; H is the size of the h-th sliding window.

[0029] The specific process of step 3 is:

[0030] Step 3.1, using the multi-year average surface precipitation, multi-year average actual runoff and multi-year actual average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 as input data, construct a time-varying Budyko framework. The specific calculation formula is as follows:

[0031]

[0032] In the formula, R sim,h is the multi-year average theoretical runoff of the hth sliding window, mm; P h is the multi-year average surface precipitation of the hth sliding window, mm; PET h is the multi-year average surface potential evapotranspiration of the hth sliding window, mm; w h is the time-varying Budyko frame parameter of the h-th sliding window;

[0033] Step 3.2, based on the time-varying Budyko framework constructed in step 3.1, the least squares method is used to calculate the time-varying Budyko framework parameter value of each sliding window. The specific formula is as follows:

[0034] w h =argminSum(R sim,h -R h ) 2 (9);

[0035] In the formula, R his the multi-year average actual runoff of the h-th sliding window, mm; Sum means summation; argmin means the parameter result corresponding to the minimum value;

[0036] Step 3.3, using the average values ​​of various ecological construction measures in each sliding window obtained by sliding processing in step 2.3, first use the linear correlation test method to test the linear correlation between the average values ​​of various ecological construction measures, eliminate the ecological construction measures with significant correlation, and thus select the best combination of ecological construction measures without significant correlation. Then, use formula (10) to perform a linear correlation test on each ecological construction measure in the best combination of ecological construction measures and the time-varying Budyko framework parameter value, and judge the maximum correlation between the best combination of ecological construction measures and the time-varying Budyko framework parameter value according to formula (11), and determine the main ecological construction measure for runoff control according to formula (12). The specific calculation formula is as follows:

[0037] r R,l =cor(E l ,w) (10);

[0038] r R,max =max(r R,1 ,…,r R,l ) (11);

[0039]

[0040] Where: E l is the lth ecological construction measure in the optimal ecological construction measure combination; w is the time-varying Budyko framework parameter value; r R,l is the correlation between the lth ecological construction measure in the optimal ecological construction measure combination and the time-varying Budyko framework parameter value; cor represents the linear correlation test; r R,max is the maximum correlation between the optimal combination of ecological construction measures and the time-varying Budyko framework parameter value; E R,max The ecological construction measure with the greatest correlation with the time-varying Budyko framework parameter value in the optimal ecological construction measure combination; E R,max-1 It is the ecological construction measure with the second largest correlation with the time-varying Budyko framework parameter value in the optimal ecological construction measure combination; E R,m It is an ecological construction measure for the main control of runoff.

[0041] The specific process of step 4 is as follows: Step 4.1, using the multi-year average surface precipitation, multi-year average base flow, multi-year average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 and the parameter value of the time-varying Budyko framework of each sliding window obtained in step 3 as input data, a time-varying base flow attribution model is constructed. The specific formula is as follows:

[0042]

[0043] In the formula, BR sim,h is the multi-year average theoretical base flow of the hth sliding window, mm; α h is the time-varying base flow attribution model parameter of the h-th sliding window;

[0044] Step 4.2: Based on the time-varying base flow attribution model constructed in step 4.1, the least squares method is used to calculate the time-varying base flow attribution model parameter α of each sliding window: h , the specific formula is as follows:

[0045] α h =argminSum(BR sim,h -BR h ) 2 (14);

[0046] In the formula, BR h is the multi-year average actual base flow of the h-th sliding window, mm;

[0047] Step 4.3, according to the best combination of ecological construction measures without significant correlation selected in step 3.3, use formula (15) to test the linear correlation between each ecological construction measure in the best combination of ecological construction measures and the parameter value of the time-varying base flow attribution model, and determine the maximum correlation between the best combination of ecological construction measures and the parameter value of the time-varying base flow attribution model according to formula (16), and determine the base flow main control ecological construction measures according to formula (17). The specific calculation formula is as follows:

[0048] r BR,l =cor(E l ,α) (15);

[0049] r BR,max =max(r BR,1 ,…,r BR,l ) (16);

[0050]

[0051] Where: α is the parameter value of the time-varying base flow attribution model, mm; r BR,l is the correlation between the lth ecological construction measure in the best ecological construction measure combination and the parameter value of the time-varying base flow attribution model; r BR,max is the maximum correlation with the parameter value of the time-varying baseflow attribution model in the optimal combination of ecological construction measures; E BR,max The ecological construction measure with the greatest correlation with the parameter value of the time-varying base flow attribution model in the optimal ecological construction measure combination; E BR,max-1It is the ecological construction measure with the second largest correlation with the parameter value of the time-varying base flow attribution model in the best ecological construction measure combination; E BR,m It is the ecological construction measure for base flow control.

[0052] The specific process of step 5 is:

[0053] Step 5.1, use the parameter values ​​of each sliding window time-varying Budyko framework calculated in step 3 and the runoff main control ecological construction measures obtained in step 3 to establish a linear regression equation. The specific formula is as follows:

[0054] w=f1·E R,m,1 +…+f z ·E R,m,z +g (18);

[0055] In the formula, E R,m,1 It is the first ecological construction measure among the main ecological construction measures for runoff control; E R,m,z is the zth ecological construction measure among the main ecological construction measures for runoff control; f1 is the regression coefficient corresponding to the first ecological construction measure among the main ecological construction measures for runoff control; f z is the regression coefficient corresponding to the zth ecological construction measure in the main ecological construction measures for runoff control; g represents the intercept of the regression model; w is the parameter value of the time-varying Budyko framework, which is the dependent variable in the regression equation;

[0056] Step 5.2: Use the parameter values ​​of the time-varying base flow attribution model of each sliding window calculated in step 4 and the base flow control ecological construction measures obtained in step 4 to establish a linear regression equation. The specific formula is as follows:

[0057] α=a1·E BR,m,1 +…+a u ·E BR,m,u +b (19);

[0058] In the formula, E BR,m,1 It is the first ecological construction measure among the base flow control ecological construction measures; E BR,m,u is the uth ecological construction measure in the baseflow main control ecological construction measures; a1 is the regression coefficient corresponding to the first ecological construction measure in the baseflow main control ecological construction measures; a u is the regression coefficient corresponding to the uth ecological construction measure in the baseflow main control ecological construction measures; b represents the intercept of the regression model; α is the parameter value of the time-varying baseflow attribution model, which is the dependent variable in the regression equation;

[0059] Step 5.3, use the IMG importance ranking method in the variance decomposition method to calculate the contribution of each runoff control ecological construction measure in the linear regression equation established in step 5.1 to the change of time-varying Budyko framework parameters; calculate the contribution of each base flow control ecological construction measure in the linear regression equation established in step 5.2 to the change of time-varying base flow attribution model parameters. The specific formula is as follows:

[0060] R w 2 =R w,1 2 +…+R w,z 2 (20);

[0061] In the formula, R w 2 is the certainty coefficient of the linear regression model established between the main ecological construction measures for runoff control and the time-varying Budyko framework parameters, and its value ranges from 0 to 1; R w,1 2 is the contribution of the first ecological construction measure in the main ecological construction measures for runoff control to the deterministic coefficient of the linear regression model; R w,z 2 is the contribution of the zth ecological construction measure in the main ecological construction measures for runoff control to the deterministic coefficient of the linear regression model;

[0062] R α 2 =R α,1 2 +…+R α,u 2 (twenty one);

[0063] In the formula, R α 2 The deterministic coefficient of the linear regression model established for the baseflow control ecological construction measures and the parameters of the time-varying baseflow attribution model; R α,1 2 is the contribution of the first ecological construction measure in the baseflow main control ecological construction measures to the certainty coefficient of the linear regression model; R α,u 2 is the contribution of the uth ecological construction measure among the baseflow main control ecological construction measures to the certainty coefficient of the linear regression model.

[0064] The specific process of step 6 is as follows: Step 6.1, using the elasticity coefficient method, calculate the contribution rate of the four factors of precipitation, potential evapotranspiration, time-varying Budyko framework parameters and time-varying baseflow attribution model parameters in each sliding window to the baseflow change during the change period relative to the base period. The specific formula is as follows:

[0065] ΔBR h =BRh -BR1, h≥2 (22);

[0066]

[0067] In the formula, ΔBR h represents the actual change in base flow in the hth sliding window relative to the reference period, mm; dBR h represents the theoretical change of base flow in the ith sliding window relative to the base period, mm; BR1 represents the multi-year average actual base flow in the first sliding window, mm; BR h represents the multi-year average actual base flow of the h-th sliding window, mm; represents the multi-year average value of the Tth factor; represents the multi-year average measured base flow; Δy T,h It represents the change of the Tth factor in the hth sliding window relative to the base period; represents the elasticity coefficient of base flow to the Tth factor on a multi-year scale; represents the contribution rate of the Tth factor to the baseflow change in the hth sliding window; T represents any factor of precipitation, potential evapotranspiration, time-varying Budyko framework parameters and time-varying baseflow attribution model parameters in each sliding window;

[0068] Step 6.2, based on the contribution of each runoff control ecological construction measure to the change of time-varying Budyko framework parameters obtained in step 5.3, calculate the contribution rate of each runoff control ecological construction measure to the base flow change. The specific formula is as follows:

[0069]

[0070] In the formula, It represents the contribution rate of the zth ecological construction measure in the main ecological construction measures for runoff control to the base flow change in the hth sliding window through the influencing parameter w; represents the contribution rate of the time-varying Budyko framework parameter w to the base flow change in the hth sliding window; R w,z 2 It represents the contribution of the zth ecological construction measure in the runoff main control ecological construction measures to the certainty coefficient of the linear regression model established between the runoff main control ecological construction measures and the time-varying Budyko framework parameters;

[0071] Step 6.3, based on the contribution of each baseflow control ecological construction measure to the change of time-varying baseflow attribution parameters obtained in step 5.3, calculate the contribution rate of each baseflow control ecological construction measure to the baseflow change. The specific formula is as follows:

[0072]

[0073] In the formula, It represents the contribution rate of the u-th ecological construction measure in the base flow main control ecological construction measures to the base flow change in the h-th sliding window through the influencing parameter α; represents the contribution rate of the time-varying baseflow attribution model parameter α to the baseflow change in the hth sliding window; R α,u 2 It represents the contribution of the uth ecological construction measure in the baseflow main control ecological construction measures to the certainty coefficient of the linear regression model established between the baseflow main control ecological construction measures and the time-varying baseflow attribution model parameters;

[0074] Step 6.4: Calculate the contribution rate of each runoff control ecological construction measure to base flow change based on step 6.2, and calculate the contribution rate of each base flow control ecological construction measure to base flow change based on step 6.3. Sum the two to calculate the total contribution rate of ecological construction measures to base flow change. The specific formula is as follows:

[0075]

[0076] In the formula, It represents the total contribution rate of ecological construction measures to base flow change in the hth sliding window.

[0077] The beneficial effect of the present invention is that the method for quantifying the contribution rate of basin base flow change under ecological construction provided by the present invention is not only simple in calculation process and reasonable in results, but also fully considers the main climate factors and ecological construction measures that affect basin base flow change. It is based on the principle of basin water balance, has a solid physical mechanism foundation, and can effectively support scientific decision-making on basin ecological environment protection and water resources planning. BRIEF DESCRIPTION OF THE DRAWINGS

[0078] Figure 1 It is a flow chart of the method for quantifying the contribution rate of base flow change in the watershed under ecological construction of the present invention;

[0079] Figure 2 It is a result schematic diagram of actual change amount and theoretical change amount of base flow in different sliding windows of the control basin of the Wenjiachuan hydrological station of Kuye River in the embodiment of the method for quantifying the contribution rate of base flow change in the watershed under ecological construction of the present invention;

[0080] Figure 3 It is a schematic diagram of the result of the base flow contribution rate of different factors in different sliding windows of the control basin of the Wenjiachuan hydrological station of the Kuye River in the embodiment of the method for quantifying the contribution rate of base flow change in the watershed under ecological construction of the present invention;

[0081] Figure 4 It is a schematic diagram of the results of the total contribution rate of base flow to different sliding window ecological construction measures in the control basin of the Wenjiachuan hydrological station of the Kuye River in the embodiment of the method for quantifying the contribution rate of base flow change in the basin under ecological construction of the present invention. DETAILED DESCRIPTION

[0082] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0083] Example 1

[0084] The method for quantifying the contribution rate of base flow change in a watershed under ecological construction of the present invention specifically comprises the following steps:

[0085] Step 1: Define the research basin and time period, collect daily meteorological and hydrological data from meteorological stations and basin control hydrological stations in and around the basin, data on various ecological construction measures in the basin, and basin area;

[0086] Step 2: Calculate the actual annual runoff, actual base flow, surface precipitation and surface potential evapotranspiration using the daily meteorological and hydrological data collected in step 1 from the meteorological stations in and around the basin and the basin control hydrological stations; and perform sliding window processing on the above results and the data on various ecological construction measures collected in step 1 in the basin year by year to divide the base period and the change period;

[0087] Step 2.1: Use the meteorological data of daily precipitation and potential evapotranspiration of meteorological stations in and around the basin collected in step 1 to sum up and calculate the annual precipitation and potential evapotranspiration of each meteorological station. Then take the arithmetic mean of the annual precipitation and potential evapotranspiration of all meteorological stations to obtain the annual area precipitation and area potential evapotranspiration of the basin. The specific formula is as follows:

[0088]

[0089] Where P j is the basin surface precipitation in the jth year, mm; PET i,j,k is the potential evapotranspiration of the basin in the jth year, mm; P n,j,k,i is the precipitation on the i-th day of the k-th month of the j-th year at the n-th weather station, mm; PET n,j,k,i is the potential evapotranspiration of the nth meteorological station on the ith day of the kth month of the jth year, mm; N is the number of meteorological stations; m j,k is the number of days in the kth month of the jth year; PET j is the annual potential evaporation of the basin;

[0090] Step 2.2, using the daily actual flow hydrological data of the basin control hydrological station collected in step 1 and the basin area, calculate the annual actual runoff; then use the digital filtering method to calculate the daily base flow, and sum it up to get the annual actual base flow. The specific calculation formula is as follows:

[0091]

[0092] In the formula, Rj is the actual runoff in the jth year, mm; m j,k is the number of days in the kth month of the jth year; q j,k,i is the actual flow rate on the i-th day of the k-th month of the j-th year, m 3 / s; F is the basin area controlled by the basin control hydrological station, km 2 ;

[0093] The single-parameter digital filter equation proposed by LYNE and HOLLICK is used to realize base flow segmentation. The specific formula is as follows:

[0094]

[0095] q b,j,k,i =q j,k,i -q d,j,k.i (5);

[0096]

[0097] In the formula, q b,j,k,i is the actual base flow on the i-th day of the k-th month of the j-th year, m 3 / s;q j,k,i is the actual flow rate on the i-th day of the k-th month of the j-th year, m 3 / s;q d,j,k,i is the actual surface flow on the i-th day of the k-th month of the j-th year, m 3 / s;q d,j,k,i-1 is the actual surface flow on the i-1th day of the kth month of the jth year, m 3 / s;q j,k,i-1 is the actual flow rate on the i-1th day of the kth month of the jth year, m 3 / s; α is a parameter; BR j is the actual base flow in the jth year, mm;

[0098] Step 2.3, the annual surface precipitation, surface potential evapotranspiration, actual runoff and actual base flow obtained in steps 2.1 and 2.2 and the annual data of various ecological construction measures in the basin collected in step 1 are processed by sliding windows respectively, and the first sliding window is used as the base period, and the subsequent sliding windows are used as change period 1, change period 2, change period 3, ..., respectively. The specific calculation formula is as follows:

[0099]

[0100] In the formula: when x j When X is the surface precipitation in the jth year, h is the multi-year average surface precipitation of the corresponding h-th sliding window; when x j When X is the potential evapotranspiration in the jth year, his the multi-year average surface potential evapotranspiration of the corresponding h-th sliding window; when x j When X is the actual runoff in the jth year, h is the multi-year average actual runoff of the corresponding h-th sliding window; when x j When X is the actual base flow in the jth year, h is the multi-year average actual base flow of the corresponding h-th sliding window; when x j When various ecological construction measures are taken in year j, X h is the multi-year average of various ecological construction measures in the corresponding h-th sliding window;

[0101] H is the size of the sliding window;

[0102] Step 3: Use the multi-year average surface precipitation, multi-year average actual runoff and multi-year average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 as input data to construct a time-varying Budyko framework, and calculate the parameter value of the time-varying Budyko framework of each sliding window by combining the least squares method; Use the data of various ecological construction measures in each sliding window processed by the sliding window in step 2 to perform correlation tests with the parameter values ​​of the time-varying Budyko framework, and clarify the main ecological construction measures for runoff control;

[0103] Step 3.1, using the multi-year average surface precipitation, multi-year average actual runoff and multi-year actual average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 as input data, construct a time-varying Budyko framework. The specific calculation formula is as follows:

[0104]

[0105] In the formula, R sim,h is the multi-year average theoretical runoff of the hth sliding window, mm; P h is the multi-year average surface precipitation of the hth sliding window, mm; PET h is the multi-year average surface potential evapotranspiration of the hth sliding window, mm; w h is the time-varying Budyko frame parameter of the h-th sliding window;

[0106] Step 3.2, based on the time-varying Budyko framework constructed in step 3.1, the least squares method is used to calculate the time-varying Budyko framework parameter value of each sliding window. The specific formula is as follows:

[0107] w h =argminSum(R sim,h -R h ) 2 (9);

[0108] In the formula, Rh is the multi-year average actual runoff of the h-th sliding window, mm; Sum means summation; argmin means the parameter result corresponding to the minimum value;

[0109] Step 3.3, using the average values ​​of various ecological construction measures in each sliding window obtained by sliding processing in step 2.3, first use the linear correlation test method (such as the Pearson correlation test method) to test the linear correlation between the average values ​​of various ecological construction measures, and eliminate the ecological construction measures with significant correlation (i.e., significance level p < 0.05), so as to select the best combination of ecological construction measures without significant correlation (significance level p ≥ 0.05) to avoid collinearity problems.

[0110] Next, the linear correlation test between each ecological construction measure in the optimal ecological construction measure combination and the time-varying Budyko framework parameter value is performed using formula (10). The maximum correlation between the optimal ecological construction measure combination and the time-varying Budyko framework parameter value is determined according to formula (11), and the main control ecological construction measure for runoff is determined according to formula (12). The specific calculation formula is as follows:

[0111] r R,l =cor(E l ,w) (10);

[0112] r R,max =max(r R,1 ,…,r R,l ) (11);

[0113]

[0114] Where: E l is the lth ecological construction measure in the optimal ecological construction measure combination; w is the time-varying Budyko framework parameter value; r R,l is the correlation between the lth ecological construction measure in the optimal ecological construction measure combination and the time-varying Budyko framework parameter value; cor represents the linear correlation test; r R,max is the maximum correlation between the optimal combination of ecological construction measures and the time-varying Budyko framework parameter value; E R,max The ecological construction measure with the greatest correlation with the time-varying Budyko framework parameter value in the optimal ecological construction measure combination; E R,max-1 It is the ecological construction measure with the second largest correlation with the time-varying Budyko framework parameter value in the optimal ecological construction measure combination; E R,m To provide ecological construction measures for runoff control;

[0115] Step 4: Use the multi-year average surface precipitation, multi-year average actual base flow, multi-year average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 and the parameter value of the time-varying Budyko framework of each sliding window obtained in step 3 as input data to build a time-varying base flow attribution model, and calculate the parameter value of the time-varying base flow attribution model of each sliding window by combining the least squares method; use the data of various ecological construction measures in each sliding window processed by the sliding window in step 2 to perform correlation tests with the parameter values ​​of the time-varying base flow attribution model, and clarify the main ecological construction measures for base flow control;

[0116] Step 4.1, using the multi-year average surface precipitation, multi-year average base flow, multi-year average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 and the parameter values ​​of the time-varying Budyko framework of each sliding window obtained in step 3 as input data, a time-varying base flow attribution model is constructed. The specific formula is as follows:

[0117]

[0118] In the formula, BR sim,h is the multi-year average theoretical base flow of the hth sliding window, mm; α h is the time-varying base flow attribution model parameter of the h-th sliding window;

[0119] Step 4.2: Based on the time-varying base flow attribution model constructed in step 4.1, the least squares method is used to calculate the time-varying base flow attribution model parameter α of each sliding window: h , the specific formula is as follows:

[0120] α h =argminSum(BR sim,h -BR h ) 2 (14);

[0121] In the formula, BR h is the multi-year average actual base flow of the h-th sliding window, mm;

[0122] Step 4.3, according to the best combination of ecological construction measures without significant correlation selected in step 3.3, use formula (15) to perform linear correlation test on each ecological construction measure in the best combination of ecological construction measures and the parameter value of the time-varying base flow attribution model, and determine the maximum correlation between the best combination of ecological construction measures and the parameter value of the time-varying base flow attribution model according to formula (16), and determine the base flow main control ecological construction measures according to formula (17). The specific calculation formula is as follows:

[0123] r BR,l =cor(E l ,α) (15);

[0124] r BR,max =max(r BR,1 ,…,r BR,l ) (16);

[0125]

[0126] Where: α is the parameter value of the time-varying base flow attribution model, mm; r BR,l is the correlation between the lth ecological construction measure in the best ecological construction measure combination and the parameter value of the time-varying base flow attribution model; r BR,max is the maximum correlation with the parameter value of the time-varying baseflow attribution model in the optimal combination of ecological construction measures; E BR,max The ecological construction measure with the greatest correlation with the parameter value of the time-varying base flow attribution model in the optimal ecological construction measure combination; E BR,max-1 It is the ecological construction measure with the second largest correlation with the parameter value of the time-varying base flow attribution model in the best ecological construction measure combination; E BR,m Ecological construction measures for base flow control;

[0127] Step 5: Use the parameter values ​​of each sliding window time-varying Budyko framework calculated in step 3 and the parameter values ​​of each sliding window time-varying baseflow attribution model calculated in step 4 to establish regression equations with the runoff main control ecological construction measures and baseflow main control ecological construction measures obtained in steps 3 and 4, respectively; then use the variance decomposition method to clarify the contribution of each main control ecological construction measure to the change of model parameters;

[0128] Step 5.1, use the parameter values ​​of each sliding window time-varying Budyko framework calculated in step 3 and the runoff main control ecological construction measures obtained in step 3 to establish a linear regression equation. The specific formula is as follows:

[0129] w=f1·E R,m,1 +…+f z ·E R,m,z +g (18);

[0130] In the formula, E R,m,1 It is the first ecological construction measure among the main ecological construction measures for runoff control; E R,m,z is the zth ecological construction measure among the main ecological construction measures for runoff control; f1 is the regression coefficient corresponding to the first ecological construction measure among the main ecological construction measures for runoff control; f z is the regression coefficient corresponding to the zth ecological construction measure in the main ecological construction measures for runoff control; g represents the intercept of the regression model; w is the parameter value of the time-varying Budyko framework, which is the dependent variable in the regression equation;

[0131] Step 5.2: Use the parameter values ​​of the time-varying base flow attribution model of each sliding window calculated in step 4 and the base flow control ecological construction measures obtained in step 4 to establish a linear regression equation. The specific formula is as follows:

[0132] α=a1·E BR,m,1 +…+a u ·E BR,m,u +b (19);

[0133] In the formula, E BR,m,1 It is the first ecological construction measure among the base flow control ecological construction measures; E BR,m,u is the uth ecological construction measure in the baseflow main control ecological construction measures; a1 is the regression coefficient corresponding to the first ecological construction measure in the baseflow main control ecological construction measures; a u is the regression coefficient corresponding to the uth ecological construction measure in the baseflow main control ecological construction measures; b represents the intercept of the regression model; α is the parameter value of the time-varying baseflow attribution model, which is the dependent variable in the regression equation;

[0134] Step 5.3, use the IMG importance ranking method in the variance decomposition method to calculate the contribution of each runoff control ecological construction measure in the linear regression equation established in step 5.1 to the change of time-varying Budyko framework parameters; calculate the contribution of each base flow control ecological construction measure in the linear regression equation established in step 5.2 to the change of time-varying base flow attribution model parameters. The specific formula is as follows:

[0135] R w 2 =R w,1 2 +…+R w,z 2 (20);

[0136] In the formula, R w 2 is the certainty coefficient of the linear regression model established between the main ecological construction measures for runoff control and the time-varying Budyko framework parameters, and its value ranges from 0 to 1; R w,1 2 is the contribution of the first ecological construction measure in the main ecological construction measures for runoff control to the deterministic coefficient of the linear regression model; R w,z 2 is the contribution of the zth ecological construction measure in the main ecological construction measures for runoff control to the deterministic coefficient of the linear regression model;

[0137] R α 2 =R α,1 2 +…+R α,u 2 (twenty one);

[0138] In the formula, R α 2 The deterministic coefficient of the linear regression model established between the baseflow control ecological construction measures and the time-varying baseflow attribution model parameters, and its value ranges from 0 to 1; R α,1 2 is the contribution of the first ecological construction measure in the baseflow main control ecological construction measures to the certainty coefficient of the linear regression model; R α,u 2 is the contribution of the uth ecological construction measure in the baseflow main control ecological construction measures to the certainty coefficient of the linear regression model;

[0139] Step 6: Use the elasticity coefficient method to calculate the contribution rate of each sliding window climate factor and model parameter to the base flow change. Then, based on the impact of each main ecological construction measure on the model parameter change obtained in step 5, calculate the contribution rate of each main ecological construction measure to the base flow change, as well as the total contribution rate of ecological construction measures to the base flow change.

[0140] Example 2

[0141] Based on Example 1, the specific process of step 6 is as follows:

[0142] Step 6.1, use the elasticity coefficient method to calculate the contribution rate of the four factors of precipitation, potential evapotranspiration, time-varying Budyko framework parameters and time-varying baseflow attribution model parameters in each sliding window to the baseflow change during the change period relative to the base period. The specific formula is as follows:

[0143] ΔBR h =BR h -BR1 (h≥2) (22);

[0144]

[0145] In the formula, ΔBR h represents the actual change in base flow in the hth sliding window relative to the reference period, mm; dBR h represents the theoretical change of base flow in the ith sliding window relative to the base period, mm; BR1 represents the multi-year average actual base flow in the first sliding window (i.e., the base period), mm; BR h represents the multi-year average actual base flow of the h-th sliding window, mm; represents the multi-year average value of the Tth factor; represents the multi-year average measured base flow; Δy T,h It represents the change of the Tth factor in the hth sliding window relative to the base period; represents the elasticity coefficient of base flow to the Tth factor on a multi-year scale; represents the contribution rate of the Tth factor to the baseflow change in the hth sliding window; T represents any factor of precipitation, potential evapotranspiration, time-varying Budyko framework parameters and time-varying baseflow attribution model parameters in each sliding window;

[0146] Step 6.2, based on the contribution of each runoff control ecological construction measure to the change of time-varying Budyko framework parameters obtained in step 5.3, calculate the contribution rate of each runoff control ecological construction measure to the base flow change. The specific formula is as follows:

[0147]

[0148] In the formula, It represents the contribution rate of the zth ecological construction measure in the main ecological construction measures for runoff control to the base flow change in the hth sliding window through the influencing parameter w; represents the contribution rate of the time-varying Budyko framework parameter w to the base flow change in the hth sliding window; R w,z 2 It represents the contribution of the zth ecological construction measure in the runoff main control ecological construction measures to the certainty coefficient of the linear regression model established between the runoff main control ecological construction measures and the time-varying Budyko framework parameters;

[0149] Step 6.3, based on the contribution of each baseflow control ecological construction measure to the change of time-varying baseflow attribution parameters obtained in step 5.3, calculate the contribution rate of each baseflow control ecological construction measure to the baseflow change. The specific formula is as follows:

[0150]

[0151] In the formula, It represents the contribution rate of the u-th ecological construction measure in the base flow main control ecological construction measures to the base flow change in the h-th sliding window through the influencing parameter α; represents the contribution rate of the time-varying baseflow attribution model parameter α to the baseflow change in the hth sliding window; R α,u 2 It represents the contribution of the uth ecological construction measure in the baseflow main control ecological construction measures to the certainty coefficient of the linear regression model established between the baseflow main control ecological construction measures and the time-varying baseflow attribution model parameters;

[0152] Step 6.4: Calculate the contribution rate of each runoff control ecological construction measure to base flow change based on step 6.2, and calculate the contribution rate of each base flow control ecological construction measure to base flow change based on step 6.3. Sum the two to calculate the total contribution rate of ecological construction measures to base flow change. The specific formula is as follows:

[0153]

[0154] In the formula, represents the total contribution rate of ecological construction measures to base flow change in the hth sliding window;

[0155] Example 3

[0156] Taking the control basin of Wenjiachuan hydrological station on Kuye River as an example, the technical process is as follows: Figure 1 As shown, the specific implementation steps are as follows:

[0157] Step 1: Collect the daily precipitation and potential evapotranspiration data of eight meteorological stations in and around the control basin of the Kuye River Wenjiachuan hydrological station from 1965 to 2015, the daily flow of the Wenjiachuan hydrological station from 1965 to 2015, and the control basin area of ​​the Wenjiachuan hydrological station (5891 km). 2 , as well as the statistical quantity or area data of five ecological construction measures, namely key check dams, terraces, afforestation, grass planting and closed management, from 1965 to 2015;

[0158] Step 2: The specific steps are as follows:

[0159] Step 2.1, using the daily precipitation and daily potential evapotranspiration data of 8 meteorological stations in and around the control basin of the Kuye River Wenjiachuan hydrological station collected in step 1 from 1965 to 2015, summing up and calculating the annual precipitation and potential evapotranspiration of each meteorological station, and then taking the arithmetic mean of the annual precipitation and potential evapotranspiration of all meteorological stations, respectively, to obtain the annual surface precipitation and surface potential evapotranspiration of the basin, the specific calculation process is shown in the above formula (1) and formula (2); in this embodiment, the specific values ​​of the relevant parameters in formula (1) and formula (2) are as follows: j refers to any year from 1965 to 2015, k=1-12, n=1-8;

[0160] Step 2.2: Use the daily flow of the Wenjiachuan hydrological station from 1965 to 2015 collected in step 1 and the controlled basin area of ​​5891 km2 at the Wenjiachuan hydrological station. 2 , calculate the actual annual runoff; then use the digital filtering method to calculate the daily base flow, and sum it up to get the actual annual base flow. The specific calculation process is shown in the above formula (3); in this embodiment, the specific values ​​of the relevant parameters in formula (3) are as follows: j refers to any year from 1965 to 2015, k = 1 to 12; F is 5891km 2 ;

[0161] The single-parameter digital filter equation proposed by LYNE and HOLLICK is used to realize base flow segmentation and obtain the actual base flow BR in the jth year. j, mm; the specific calculation process is shown in the above formulas (4) to (6); in this embodiment, the specific values ​​of the relevant parameters in formulas (4) to (6) are as follows: j refers to any year from 1965 to 2015, k = 1 to 12;

[0162] Step 2.3, the annual surface precipitation, surface potential evapotranspiration, actual runoff and actual base flow obtained in steps 2.1 and 2.2 and the data of five ecological construction measures in the basin collected in step 1 are respectively processed by sliding windows, and the first sliding window is used as the base period, and the subsequent sliding windows are used as change period 1, change period 2, change period 3, ..., respectively. The specific calculation process is shown in the above formula (7); in this embodiment, the specific values ​​of the relevant parameters in formula (7) are as follows: j refers to any year from 1965 to 2015, k = 1 to 12, H is the sliding window size, which is 11 years here, and h = 1 to 41 (the calculation process of 41 here is: (2015-1965) + 1-11 + 1); the multi-year average values ​​of various ecological construction measures of h sliding windows corresponding to the five ecological construction measures of backbone check dam, terrace, afforestation, grass planting and closed management are obtained according to the above formula (7), that is, the five ecological construction measures are solved five times.

[0163] Step 3, the specific steps are as follows:

[0164] Step 3.1, using the multi-year average surface precipitation, multi-year average actual runoff and multi-year actual average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 as input data, and using the above formula (8) to construct a time-varying Budyko framework;

[0165] Step 3.2, based on the time-varying Budyko framework constructed in step 3.1, the time-varying Budyko framework parameter value of each sliding window is calculated using the least square method according to the above formula (9);

[0166] Step 3.3, using the average values ​​of the five ecological construction measures in each sliding window obtained by sliding processing in step 2.3, first use a linear correlation test method such as the Pearson correlation test method to test the linear correlation between the average values ​​of the five ecological construction measures, eliminate ecological construction measures with significant correlation, and thus select the best combination of ecological construction measures without significant correlation to avoid collinearity problems. Next, use the above formula (10) to perform a linear correlation test on each ecological construction measure in the best combination of ecological construction measures and the time-varying Budyko framework parameter value, and select the ecological construction measures with the largest correlation as the main ecological construction measures for runoff according to the above formula (11). According to the above formula (12), if the maximum correlation is lower than 0.65, select the two ecological construction measures with the first and second highest correlations in the best combination of ecological construction measures as the main ecological construction measures for runoff. The calculation results show that in the Kuye River Basin, the backbone silt dam, terraces, and afforestation are the most important factors in controlling runoff. There is an extremely significant strong positive correlation between the five ecological construction measures, including closure management, grass planting and water conservation, and the linear correlation coefficients between them are all greater than or equal to 0.87, which shows that there is a high degree of collinearity between the statistical indicators of the five ecological construction measures in the Kuye River Basin. Therefore, the single measure with the strongest correlation with parameter w can be selected as the independent variable to construct a linear regression equation with parameter w. That is, the best combination of ecological construction measures in the Yanhe River Basin is only closure management, which shows an extremely significant positive correlation with parameter w, with a correlation coefficient of 0.98 (p<0.001).

[0167] Step 4: The specific steps are as follows:

[0168] Step 4.1, using the multi-year average surface precipitation, multi-year average base flow, multi-year average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 and the parameter value of the time-varying Budyko framework of each sliding window obtained in step 3 as input data, the time-varying base flow attribution model is constructed using the above formula (13);

[0169] Step 4.2, based on the time-varying base flow attribution model constructed in step 4.1, the parameter values ​​of the time-varying base flow attribution model of each sliding window are calculated using the least square method according to the above formula (14);

[0170] Step 4.3, according to the best combination of ecological construction measures without significant correlation selected in step 3.3, use the above formula (15) to test the linear correlation between each ecological construction measure in the best combination of ecological construction measures and the parameter value of the time-varying base flow attribution model, and select the ecological construction measures with the largest correlation as the main control ecological construction measures for base flow according to the above formula (16). According to the above formula (17), if the maximum correlation is lower than 0.65, select the two ecological construction measures with the first and second correlation rankings in the best combination of ecological construction measures as the main control ecological construction measures for base flow;

[0171] The calculation results show that in the Kuye River Basin, there is a very significant strong positive correlation between the five ecological construction measures, namely, backbone silt dams, terraces, afforestation, grass planting and closed management (p<0.001), and the linear correlation coefficients between them are all greater than or equal to 0.87, which indicates that there is a high degree of collinearity between the statistical indicators of the five ecological construction measures in the Kuye River Basin. Therefore, the single measure with the strongest correlation with parameter α can be selected as the independent variable to construct a linear regression equation with parameter α, that is, the best combination of ecological construction measures in the Yanhe River Basin is only closed management, which shows a very significant positive correlation with parameter α, with a correlation coefficient of 0.67 (p<0.001).

[0172] Step 5: The specific steps are as follows:

[0173] Step 5.1, using the parameter values ​​of each sliding window time-varying Budyko framework calculated in step 3 and the runoff control ecological construction measures obtained in step 3 to establish a linear regression equation as shown in the above formula (18). In this example, the runoff control ecological construction measures are only closure management, and the constructed regression model is a univariate linear regression model;

[0174] Step 5.2, using the parameter values ​​of each sliding window time-varying base flow attribution model calculated in step 4 and the base flow control ecological construction measures obtained in step 4 to establish a linear regression equation as shown in the above formula (19); in this example, the base flow control ecological construction measures are only closure management, and the constructed regression model is a univariate linear regression model;

[0175] Step 5.3, using the IMG importance ranking method in the variance decomposition method, calculate the contribution of each runoff control ecological construction measure in the linear regression equation established in step 5.1 to the change of time-varying Budyko framework parameters according to the above formula (20); calculate the contribution of each baseflow control ecological construction measure in the linear regression equation established in step 5.2 to the change of time-varying baseflow attribution model parameters according to the above formula (21); in this example, the runoff control ecological construction measure is only closure management, and its contribution to the determinism coefficient of the linear regression model is 0.96, that is, the determinism coefficient of the univariate linear regression model is 0.96.

[0176] In this example, the only ecological construction measure for base flow control is closure management, and its contribution to the certainty coefficient of the linear regression model is 0.45, that is, the certainty coefficient of the univariate linear regression model is 0.45.

[0177] Step 6: Use the elasticity coefficient method to calculate the contribution rate of each sliding window climate factor and model parameter to the base flow change. Then, based on the impact of each main ecological construction measure on the model parameter change obtained in step 5, calculate the contribution rate of each main ecological construction measure to the base flow change, as well as the total contribution rate of ecological construction measures to the base flow change. The specific steps are as follows:

[0178] Step 6.1: Using the elasticity coefficient method, the contribution of precipitation, potential evapotranspiration, time-varying Budyko framework parameters, and time-varying baseflow attribution model parameters to baseflow change in each sliding window is calculated relative to the baseflow change in the change period according to the above formulas (22) to (25).

[0179] In this example, the elasticity coefficients of the four factors, namely, precipitation, potential evapotranspiration, parameter w and α, on base flow in the Kuye River Basin are 1.53, -1.10, -2.18 and 0.58, respectively, which indicates that precipitation and parameter α have a positive effect on base flow in the Kuye River Basin, while potential evapotranspiration and parameter w have a negative effect on base flow. Figure 2 The actual change and theoretical change of the base flow in different sliding windows of the control basin of the Wenjiachuan hydrological station of the Kuye River in the present invention are as follows: Figure 2 As shown in the figure, the results of the contribution of different factors to the base flow in different sliding windows of the Wenjiachuan hydrological station in the Kuye River are as follows: Figure 3 shown.

[0180] Step 6.2, according to the contribution of each runoff control ecological construction measure to the change of time-varying Budyko framework parameters obtained in step 5.3, the contribution rate of each runoff control ecological construction measure to the base flow change is calculated using the above formula (26);

[0181] Step 6.3, according to the contribution of each baseflow control ecological construction measure to the change of time-varying baseflow attribution parameters obtained in step 5.3, the contribution rate of each baseflow control ecological construction measure to the baseflow change is calculated using the above formula (27);

[0182] Step 6.4, according to step 6.2, calculate the contribution rate of each runoff main control ecological construction measure to the base flow change, and step 6.3 calculates the contribution rate of each base flow main control ecological construction measure to the base flow change, and uses the above formula (28) to sum the two to calculate the total contribution rate of the ecological construction measures to the base flow change; in this embodiment, the runoff main control ecological construction measures and the base flow main control ecological construction measures are both closed management, and the calculated total contribution rate of each sliding window ecological construction measure to the base flow change is as follows: Figure 4 shown.

Claims

1. A quantitative method for the contribution rate of basin base flow change under ecological construction, characterized by: The specific process includes the following: collecting daily meteorological and hydrological data, various ecological construction measures data and basin area from meteorological stations and hydrological stations in the basin within the time period; calculating the actual runoff, actual base flow, surface precipitation and surface potential evapotranspiration year by year, and performing sliding window processing on the above results and various ecological construction measures data year by year, dividing the baseline period and the change period; constructing a time-varying Budyko framework; constructing a time-varying baseflow attribution model; clarifying the main ecological construction measures for runoff and the main ecological construction measures for baseflow; determining the contribution of each main ecological construction measure to the change of model parameters; calculating the contribution rate of each sliding window climate factor and model parameter to the change of baseflow, and then calculating the contribution rate of each main ecological construction measure to the change of baseflow, and finally obtaining the total contribution rate of ecological construction measures to the change of baseflow.

2. The method for quantifying the contribution rate of basin base flow change under ecological construction according to claim 1 is characterized in that: The specific steps include: Step 1: Define the research basin and time period, collect daily meteorological and hydrological data from meteorological stations and basin control hydrological stations in and around the basin, data on various ecological construction measures in the basin, and basin area; Step 2: Calculate the actual annual runoff, actual base flow, surface precipitation and surface potential evapotranspiration using the daily meteorological and hydrological data of the meteorological stations in and around the basin and the basin control hydrological stations collected in step 1, and perform sliding window processing on the annual actual runoff, actual base flow, surface precipitation and surface potential evapotranspiration and the data of various ecological construction measures in the basin collected in step 1, and divide the base period and the change period; Step 3: Use the multi-year average surface precipitation, multi-year average actual runoff and multi-year average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 as input data to construct a time-varying Budyko framework, and calculate the parameter value of the time-varying Budyko framework of each sliding window using the least squares method; perform correlation tests on the various ecological construction measures data of each sliding window processed by the sliding window in step 2 and the parameter values ​​of the time-varying Budyko framework, and clarify the main ecological construction measures for runoff control; Step 4: Use the multi-year average surface precipitation, multi-year average actual base flow, multi-year average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 and the parameter value of the time-varying Budyko framework of each sliding window obtained in step 3 as input data to build a time-varying base flow attribution model, and calculate the parameter value of the time-varying base flow attribution model of each sliding window by combining the least squares method; use the data of various ecological construction measures in each sliding window processed by the sliding window in step 2 to perform correlation tests with the parameter values ​​of the time-varying base flow attribution model, and clarify the main ecological construction measures for base flow control; Step 5, using the parameter values ​​of the time-varying Budyko framework of each sliding window calculated in step 3 and the parameter values ​​of the time-varying baseflow attribution model of each sliding window calculated in step 4, respectively establish regression equations with the runoff main control ecological construction measures and baseflow main control ecological construction measures obtained in steps 3 and 4; Then, the variance decomposition method is used to determine the contribution of each main ecological construction measure to the change of model parameters; Step 6: Use the elasticity coefficient method to calculate the contribution rate of each sliding window climate factor and model parameter to the base flow change. Then, based on the impact of each main ecological construction measure on the model parameter change obtained in step 5, calculate the contribution rate of each main ecological construction measure to the base flow change, as well as the total contribution rate of ecological construction measures to the base flow change.

3. The method for quantifying the contribution rate of basin base flow change under ecological construction according to claim 2 is characterized in that: The specific process of step 2 is: Step 2.1: Use the meteorological data of daily precipitation and potential evapotranspiration of meteorological stations in and around the basin collected in step 1 to sum up and calculate the annual precipitation and potential evapotranspiration of each meteorological station. Then take the arithmetic mean of the annual precipitation and potential evapotranspiration of all meteorological stations to obtain the annual area precipitation and area potential evapotranspiration of the basin. The specific formula is as follows: Where P j is the basin surface precipitation in the jth year, mm; PET i,j,k is the potential evapotranspiration of the basin in the jth year, mm; P n,j,k,i is the precipitation on the i-th day of the k-th month of the j-th year at the n-th weather station, mm; PET n,j,k,i is the potential evapotranspiration of the nth meteorological station on the ith day of the kth month of the jth year, mm; N is the number of meteorological stations; m j,k is the number of days in the kth month of the jth year, PET j is the annual potential evaporation of the basin; Step 2.2, using the daily actual flow hydrological data of the basin control hydrological station collected in step 1 and the basin area, calculate the annual actual runoff; then use the digital filtering method to calculate the daily base flow, and sum it up to get the annual actual base flow. The specific calculation formula is as follows: In the formula, R j is the actual runoff in the jth year, mm; m j,k is the number of days in the kth month of the jth year; q j,k,i is the actual flow rate on the i-th day of the k-th month of the j-th year, m 3 / s; F is the basin area controlled by the basin control hydrological station, km 2 ; A single-parameter digital filter equation is used to achieve base flow segmentation. The specific formula is as follows: qb,j,k,i=qj,k,i-qd,j,ki (5); In the formula, q b,j,k,i is the actual base flow on the i-th day of the k-th month of the j-th year, m 3 / s;q j,k,i is the actual flow rate on the i-th day of the k-th month of the j-th year, m 3 / s; qd,j,k,i is the actual surface flow on the i-th day of the k-th month of the j-th year, m 3 / s;q d,j,k,i-1 is the actual surface flow on the i-1th day of the kth month of the jth year, m 3 / s;q j,k,i-1 is the actual flow rate on the i-1th day of the kth month of the jth year, m 3 / s; α is a parameter; BR j is the actual base flow in the jth year, mm; Step 2.3, the annual surface precipitation, surface potential evapotranspiration, actual runoff and actual base flow obtained in steps 2.1 and 2.2 and the annual data of various ecological construction measures in the basin collected in step 1 are processed by sliding windows respectively, and the first sliding window is used as the base period, and the subsequent sliding windows are used as change period 1, change period 2, change period 3, ..., respectively. The specific calculation formula is as follows: In the formula: when x j When X is the surface precipitation in the jth year, h is the multi-year average surface precipitation of the corresponding h-th sliding window; When x j When X is the potential evapotranspiration in the jth year, h is the multi-year average surface potential evapotranspiration of the corresponding h-th sliding window; When x j When X is the actual runoff in the jth year, h is the multi-year average actual runoff of the corresponding h-th sliding window; When x j When X is the actual base flow in the jth year, h is the multi-year average actual base flow of the corresponding h-th sliding window; When x j When various ecological construction measures are taken in year j, X h is the multi-year average of various ecological construction measures in the corresponding h-th sliding window; H is the size of the sliding window.

4. The method for quantifying the contribution rate of basin base flow change under ecological construction according to claim 3 is characterized in that: The specific process of step 3 is as follows: Step 3.1, using the multi-year average surface precipitation, multi-year average actual runoff and multi-year actual average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 as input data, construct a time-varying Budyko framework. The specific calculation formula is as follows: In the formula, R sim,h is the multi-year average theoretical runoff of the h-th sliding window, mm; Ph is the multi-year average surface precipitation of the h-th sliding window, mm; PET h is the multi-year average surface potential evapotranspiration of the hth sliding window, mm; w h is the time-varying Budyko frame parameter of the h-th sliding window; Step 3.2, based on the time-varying Budyko framework constructed in step 3.1, the least squares method is used to calculate the time-varying Budyko framework parameter value of each sliding window. The specific formula is as follows: w h =argminSum(R sim,h -R h ) 2 (9); In the formula, R h is the multi-year average actual runoff of the h-th sliding window, mm; Sum means summation; argmin means the parameter result corresponding to the minimum value; Step 3.3, using the average values ​​of various ecological construction measures in each sliding window obtained by sliding processing in step 2.3, first use the linear correlation test method to test the linear correlation between the average values ​​of various ecological construction measures, eliminate the ecological construction measures with significant correlation, and thus select the best combination of ecological construction measures without significant correlation. Then, use formula (10) to perform a linear correlation test on each ecological construction measure in the best combination of ecological construction measures and the time-varying Budyko framework parameter value, and judge the maximum correlation between the best combination of ecological construction measures and the time-varying Budyko framework parameter value according to formula (11), and determine the main ecological construction measure for runoff control according to formula (12). The specific calculation formula is as follows: r R,l =cor(E l ,w) (10); r R,max =max(r R,1 ,…,r R,l ) (11); Where: E l is the lth ecological construction measure in the optimal ecological construction measure combination; w is the time-varying Budyko framework parameter value; r R,l is the correlation between the lth ecological construction measure in the optimal ecological construction measure combination and the time-varying Budyko framework parameter value; cor represents the linear correlation test; r R,max is the maximum correlation between the optimal combination of ecological construction measures and the time-varying Budyko framework parameter value; E R,max The ecological construction measure with the greatest correlation with the time-varying Budyko framework parameter value in the optimal ecological construction measure combination; E R,max-1 It is the ecological construction measure with the second largest correlation with the time-varying Budyko framework parameter value in the optimal ecological construction measure combination; E R,m It is an ecological construction measure for the main control of runoff.

5. The method for quantifying the contribution rate of basin base flow change under ecological construction according to claim 4 is characterized in that: The specific process of step 4 is as follows: Step 4.1, using the multi-year average surface precipitation, multi-year average base flow, multi-year average surface potential evapotranspiration of each sliding window obtained by the sliding window processing in step 2 and the parameter values ​​of the time-varying Budyko framework of each sliding window obtained in step 3 as input data, a time-varying base flow attribution model is constructed. The specific formula is as follows: In the formula, BR sim,h is the multi-year average theoretical base flow of the hth sliding window, mm; α h is the time-varying base flow attribution model parameter of the h-th sliding window; Step 4.2: Based on the time-varying base flow attribution model constructed in step 4.1, the least squares method is used to calculate the time-varying base flow attribution model parameter α of each sliding window: h , the specific formula is as follows: α h =argminSum(BR sim,h -BR h ) 2 (14); In the formula, BR h is the multi-year average actual base flow of the h-th sliding window, mm; Step 4.3, according to the best combination of ecological construction measures without significant correlation selected in step 3.3, use formula (15) to test the linear correlation between each ecological construction measure in the best combination of ecological construction measures and the parameter value of the time-varying base flow attribution model, and determine the maximum correlation between the best combination of ecological construction measures and the parameter value of the time-varying base flow attribution model according to formula (16), and determine the base flow main control ecological construction measures according to formula (17). The specific calculation formula is as follows: r BR,l =cor(E l ,a) (15); r BR,max =max(r BR,1 ,…,r BR,l ) (16); Where: α is the parameter value of the time-varying base flow attribution model, mm; r BR,l is the correlation between the lth ecological construction measure in the best ecological construction measure combination and the parameter value of the time-varying base flow attribution model; r BR,max is the maximum correlation with the parameter value of the time-varying baseflow attribution model in the optimal combination of ecological construction measures; E BR,max The ecological construction measure with the greatest correlation with the parameter value of the time-varying base flow attribution model in the optimal ecological construction measure combination; E BR,max-1 It is the ecological construction measure with the second largest correlation with the parameter value of the time-varying base flow attribution model in the best ecological construction measure combination; E BR,m It is the ecological construction measure for base flow control.

6. The method for quantifying the contribution rate of basin base flow change under ecological construction according to claim 5 is characterized in that: The specific process of step 5 is as follows: Step 5.1, use the parameter values ​​of each sliding window time-varying Budyko framework calculated in step 3 and the runoff main control ecological construction measures obtained in step 3 to establish a linear regression equation. The specific formula is as follows: w=f1·E R,m,1 +…+f z ·HAVE BEEN R,m,z +g (18); In the formula, E R,m,1 It is the first ecological construction measure among the main ecological construction measures for runoff control; E R,m,z is the zth ecological construction measure among the main ecological construction measures for runoff control; f1 is the regression coefficient corresponding to the first ecological construction measure among the main ecological construction measures for runoff control; f z is the regression coefficient corresponding to the zth ecological construction measure in the main ecological construction measures for runoff control; g represents the intercept of the regression model; w is the parameter value of the time-varying Budyko framework, which is the dependent variable in the regression equation; Step 5.2: Use the parameter values ​​of the time-varying base flow attribution model of each sliding window calculated in step 4 and the base flow control ecological construction measures obtained in step 4 to establish a linear regression equation. The specific formula is as follows: α=a1·E BR,m,1 +…+a u ·E BR,m,u +b (19); Where, EBR,m,1 is the first ecological construction measure in the base flow main control ecological construction measures; E BR,m,u is the uth ecological construction measure in the baseflow main control ecological construction measures; a1 is the regression coefficient corresponding to the first ecological construction measure in the baseflow main control ecological construction measures; a u is the regression coefficient corresponding to the uth ecological construction measure in the baseflow main control ecological construction measures; b represents the intercept of the regression model; α is the parameter value of the time-varying baseflow attribution model, which is the dependent variable in the regression equation; Step 5.3, use the IMG importance ranking method in the variance decomposition method to calculate the contribution of each runoff control ecological construction measure in the linear regression equation established in step 5.1 to the change of time-varying Budyko framework parameters; calculate the contribution of each base flow control ecological construction measure in the linear regression equation established in step 5.2 to the change of time-varying base flow attribution model parameters. The specific formula is as follows: R w 2 =R w,1 2 +…+R w,z 2 (20); In the formula, R w 2 is the certainty coefficient of the linear regression model established between the main ecological construction measures for runoff control and the time-varying Budyko framework parameters, and its value ranges from 0 to 1; R w,1 2 is the contribution of the first ecological construction measure in the main ecological construction measures for runoff control to the deterministic coefficient of the linear regression model; R w,z 2 is the contribution of the zth ecological construction measure in the main ecological construction measures for runoff control to the deterministic coefficient of the linear regression model; R α 2 =R α,1 2 +…+R α,u 2 (21); In the formula, R α 2 The deterministic coefficient of the linear regression model established for the baseflow control ecological construction measures and the parameters of the time-varying baseflow attribution model; R α,1 2 is the contribution of the first ecological construction measure in the baseflow main control ecological construction measures to the certainty coefficient of the linear regression model; R α,u 2 is the contribution of the uth ecological construction measure among the baseflow main control ecological construction measures to the certainty coefficient of the linear regression model.

7. The method for quantifying the contribution rate of basin base flow change under ecological construction according to claim 6 is characterized in that: The specific process of step 6 is as follows: Step 6.1, use the elasticity coefficient method to calculate the contribution rate of the four factors of precipitation, potential evapotranspiration, time-varying Budyko framework parameters and time-varying baseflow attribution model parameters in each sliding window to the baseflow change during the change period relative to the base period. The specific formula is as follows: ΔBR h =BR h -BR1 ,h≥2 (22); In the formula, ΔBR h represents the actual change in base flow in the hth sliding window relative to the reference period, mm; dBR h represents the theoretical change of base flow in the ith sliding window relative to the base period, mm; BR1 represents the multi-year average actual base flow in the first sliding window, mm; BR h represents the multi-year average actual base flow of the h-th sliding window, mm; represents the multi-year average value of the Tth factor; represents the multi-year average measured base flow; Δy T,h represents the change of the Tth factor in the hth sliding window relative to the base period; ε yT represents the elasticity coefficient of base flow to the Tth factor on a multi-year scale; C yT,h represents the contribution rate of the Tth factor to the baseflow change in the hth sliding window; T represents any factor of precipitation, potential evapotranspiration, time-varying Budyko framework parameters and time-varying baseflow attribution model parameters in each sliding window; Step 6.2, based on the contribution of each runoff control ecological construction measure to the change of time-varying Budyko framework parameters obtained in step 5.3, calculate the contribution rate of each runoff control ecological construction measure to the base flow change. The specific formula is as follows: In the formula, It represents the contribution rate of the zth ecological construction measure in the main ecological construction measures for runoff control to the base flow change in the hth sliding window through the influencing parameter w; represents the contribution rate of the time-varying Budyko framework parameter w to the base flow change in the hth sliding window; R w,z 2 It represents the contribution of the zth ecological construction measure in the runoff main control ecological construction measures to the certainty coefficient of the linear regression model established between the runoff main control ecological construction measures and the time-varying Budyko framework parameters; Step 6.3, based on the contribution of each baseflow control ecological construction measure to the change of time-varying baseflow attribution parameters obtained in step 5.3, calculate the contribution rate of each baseflow control ecological construction measure to the baseflow change. The specific formula is as follows: In the formula, It represents the contribution rate of the u-th ecological construction measure in the base flow main control ecological construction measures to the base flow change in the h-th sliding window through the influencing parameter α; represents the contribution rate of the time-varying baseflow attribution model parameter α to the baseflow change in the hth sliding window; R α,u 2 It represents the contribution of the uth ecological construction measure in the baseflow main control ecological construction measures to the certainty coefficient of the linear regression model established between the baseflow main control ecological construction measures and the time-varying baseflow attribution model parameters; Step 6.4: Calculate the contribution rate of each runoff control ecological construction measure to base flow change based on step 6.2, and calculate the contribution rate of each base flow control ecological construction measure to base flow change based on step 6.

3. Sum the two to calculate the total contribution rate of ecological construction measures to base flow change. The specific formula is as follows: In the formula, It represents the total contribution rate of ecological construction measures to base flow change in the hth sliding window.

Citation Information

Cited By

  • Method and equipment for determining influence degree of drought on base flow change and medium

    CN120509610A

  • Contribution decomposition calculation method for lake expansion

    CN121435686A