Distributed fault recovery method and device based on 5G power distribution intelligent terminal, and medium

By adopting a distributed fault recovery method based on 5G distribution smart terminals in the intelligent distributed power distribution system, and using automatic switching between 5G links and fiber links, the problem of large fault recovery delays and high communication costs in the existing technology is solved. The problem has achieved fast and reliable fault load recovery and communication switching, providing technical support for urban power grid distribution automation.

CN118890262APending Publication Date: 2024-11-01北京电科智芯科技有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410814245.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The existing intelligent distributed power distribution system has a large delay during the fault recovery process, high communication costs, and optical fiber layout increases labor and material costs, affecting the rapid response and fault isolation efficiency of the power grid.

Method used

Adopt a distributed fault recovery method based on 5G distribution smart terminals. By determining the fault segment, the target terminal equipment is controlled to send fault information to the contact node, and the automatic switching between the 5G link and the optical fiber link is used to determine the fault segment and the availability of the contact nodes. The margin is recovered for fault load, realizing automatic switching of fiber/5G communication between switches, reducing delay and ensuring communication reliability.

Benefits of technology

It realizes automatic switching of optical fiber/5G communication in the distribution network, reduces fault recovery delay, improves communication reliability, simplifies the fault load recovery process, reduces the number of information transmission times, and provides technical support for the automation of urban power grid distribution networks. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118890262A_ABST
    Figure CN118890262A_ABST
Patent Text Reader

Abstract

The invention discloses a distributed fault recovery method and device based on a 5G power distribution intelligent terminal and a medium, and relates to the technical field of communication networks. The method comprises the following steps: under the condition that a power grid has a fault, determining a fault section; determining a target terminal device according to the fault section, and controlling the target terminal device to send fault information of the fault section to the contact node; under the condition that the response information of the contact node is not received within the preset time, determining an abnormal optical fiber link, and controlling a 5G link corresponding to the abnormal optical fiber link to be in a connected state, so that the target terminal sends the fault information of the fault section to the contact node; and when the response information of each contact node is received, recovering the power-losing load of the fault area according to the number of the downstream contact nodes of the fault area and the available margin of the contact nodes. Therefore, the reliability of communication can be ensured, the fault recovery time of the intelligent power distribution network can be shortened, and the load recovery amount is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of communication network technology, and in particular to a distributed fault recovery method based on a 5G power distribution intelligent terminal, a distributed fault recovery device based on a 5G power distribution intelligent terminal, and a computer-readable storage medium. Background Art

[0002] The intelligent distributed power distribution terminal exchanges information with a designated intelligent distributed power distribution terminal in the same power supply loop through a high-speed communication network, automatically locates faults, isolates faults, and restores non-faulty areas according to preset conditions, which can achieve rapid fault isolation and self-healing, greatly reducing the joint power outages of fault-free lines, narrowing the scope of fault power outages, and shortening the power outage time for users, thereby improving the power supply reliability of the users and the safe operation coefficient of the power grid. Since the intelligent distributed feeder automation system requires ultra-low latency communication network support, at present, the intelligent distributed feeder automation system mainly provides connections through optical fiber wiring, and the laying of optical fiber requires corresponding communication costs such as labor and materials.

[0003] With the development of 5G technology and the gradual improvement of 5G networks, 5G will provide network latency below 10 milliseconds and gigabit throughput in the future, which will enable them to conduct intelligent analysis and respond to abnormal information in real time, thereby achieving faster and more accurate grid control. Therefore, 5G-based power distribution intelligent terminals are bound to be widely used in intelligent distribution networks in the future, and have good prospects for promotion and application. Summary of the invention

[0004] The present invention aims to solve one of the technical problems in the related art at least to a certain extent. To this end, the first purpose of the present invention is to propose a distributed fault recovery method based on a 5G power distribution intelligent terminal. In the event of a power grid failure, the fault section is determined; the target terminal device is determined according to the fault section, and the target terminal device is controlled to send the fault information of the fault section to the contact node; if the response information of the contact node is not received within a preset time, the abnormal optical fiber link is determined, and the 5G link corresponding to the abnormal optical fiber link is controlled to be in a connected state, so that the target terminal sends the fault information of the fault section to the contact node; when the response information of each contact node is received, the power-lost load in the fault area is restored according to the number of downstream contact nodes in the fault area and the available margin of the contact node. In this way, the automatic switching of optical fiber / 5G communication between switches in the distribution network can be realized, the delay can be reduced, and the reliability of communication can be ensured; the characteristics of the 5G peer-to-peer communication architecture are fully considered, the power supply of important load nodes is quickly and preferentially restored, and the fault load recovery process is simple, and the number of information transmission times is small, which provides assistance for the development of future urban power grid distribution automation.

[0005] The second object of the present invention is to propose a distributed fault recovery device based on a 5G power distribution intelligent terminal.

[0006] A third object of the present invention is to provide a computer-readable storage medium.

[0007] To achieve the above-mentioned purpose, the first aspect of the embodiment of the present invention proposes a distributed fault recovery method based on a 5G power distribution intelligent terminal, the method comprising: in the event of a power grid failure, determining the fault section; determining the target terminal device according to the fault section, and controlling the target terminal device to send the fault information of the fault section to the contact node; in the event that no response information from the contact node is received within a preset time, determining the abnormal optical fiber link, and controlling the 5G link corresponding to the abnormal optical fiber link to be in a connected state, so that the target terminal sends the fault information of the fault section to the contact node; when receiving the response information of each contact node, restoring the power-lost load in the fault area according to the number of downstream contact nodes in the fault area and the available margin of the contact node.

[0008] According to one embodiment of the present invention, the above-mentioned fault recovery method also includes: when there is no abnormal optical fiber link, or the abnormal optical fiber link returns to normal, controlling the 5G link to be in a disconnected state.

[0009] According to one embodiment of the present invention, the optical fiber link and the 5G link back up each other.

[0010] According to one embodiment of the present invention, the power-lost load in the fault area is restored according to the number of downstream contact nodes in the fault area and the available margin of the contact nodes, including: when the number of contact nodes is less than a preset number, if the available margin of the contact node is sufficient to restore the load of all nodes on the link where it is located, the switch of the contact node is controlled to be closed; if the available margin of the contact node is not sufficient to restore the load of all nodes on the link where it is located, the nodes to be restored and the unrestored nodes are determined according to the priority order of the loads of all nodes on the link or the principle of restoring the most loads; the switch of the contact node is controlled to be closed to restore the nodes to be restored, and the terminal equipment at the unrestored nodes is controlled to disconnect the load switch.

[0011] According to one embodiment of the present invention, the power-lost load in the fault area is restored according to the number of downstream contact nodes in the fault area and the available margin of the contact nodes, including: when the number of contact nodes is greater than or equal to a preset number, determining a linked list corresponding to a target number of common nodes in a linked list corresponding to each contact node as a target linked list; determining a common node in the target linked list with the shortest distance from the current contact node; determining the remaining available margin after the current contact node is restored to the common node; and supplying power to the power-lost load in the fault area according to the remaining available margin.

[0012] According to one embodiment of the present invention, the power-lost load in the fault area is restored according to the remaining available margin, including: when the remaining available margin is greater than the preset margin, determining the remaining available margin of other priority nodes in the target linked list; when the remaining available margin of other priority nodes is insufficient and node load update information is received, if all node loads cannot be restored, sending a locking signal to other contact nodes and closing the contact switch of the current contact node.

[0013] According to one embodiment of the present invention, the above-mentioned fault recovery method also includes: if the remaining available margin of other priority nodes is sufficient and all node loads cannot be restored, then the remaining available margin information is exchanged with other priority nodes; when the remaining available margin of the current network node is greater than the remaining available margin of other public nodes, if the available margin of other priority nodes restored to the public node is sufficient, then the other network nodes downstream of the fault area are locked, the corresponding connecting switch is closed, and a recovery completion signal is sent.

[0014] According to one embodiment of the present invention, the power-lost load in the fault area is restored according to the remaining available margin, including: when the remaining available margin is less than or equal to the preset margin, sending a remaining available margin insufficient signal to a nearby irrecoverable node, and sending a recovery mark information to a distant recoverable node; when confirmation information is received from the nearby irrecoverable node and the distant recoverable node, sending a recovery area locking signal to other contact nodes, and closing the contact switch of the current contact node.

[0015] According to an embodiment of the present invention, the fault recovery method further includes: after determining the fault section, controlling the protection devices at both ends of the fault section to cut off the switches at both ends of the fault section to isolate the fault section.

[0016] To achieve the above-mentioned purpose, the second embodiment of the present invention proposes a distributed fault recovery device based on a 5G power distribution intelligent terminal, and the device includes: a first determination module, which is used to determine the fault section when a power grid fails; a control module, which is used to determine the target terminal device according to the fault section, and control the target terminal device to send the fault information of the fault section to the contact node; a second determination module, which is used to determine the abnormal optical fiber link when no response information from the contact node is received within a preset time, and control the 5G link corresponding to the abnormal optical fiber link to be in a connected state, so that the target terminal sends the fault information of the fault section to the contact node; a recovery module, which is used to restore the power-lost load in the fault area according to the number of downstream contact nodes in the fault area and the available margin of the contact nodes when the response information of each contact node is received.

[0017] To achieve the above-mentioned objectives, the third aspect embodiment of the present invention proposes a computer-readable storage medium, on which a distributed fault recovery program based on a 5G power distribution intelligent terminal is stored. When the distributed fault recovery program based on the 5G power distribution intelligent terminal is executed by a processor, the aforementioned distributed fault recovery method based on the 5G power distribution intelligent terminal is implemented.

[0018] According to the distributed fault recovery method, device and medium based on 5G power distribution intelligent terminal of the embodiment of the present invention, in the case of a fault in the power grid, the fault section is determined; the target terminal device is determined according to the fault section, and the target terminal device is controlled to send the fault information of the fault section to the contact node; in the case of no response information from the contact node within the preset time, the abnormal optical fiber link is determined, and the 5G link corresponding to the abnormal optical fiber link is controlled to be in a connected state, so that the target terminal sends the fault information of the fault section to the contact node; when the response information of each contact node is received, the power-lost load in the fault area is restored according to the number of downstream contact nodes in the fault area and the available margin of the contact node. In this way, the automatic switching of optical fiber / 5G communication between switches in the distribution network can be realized, the delay can be reduced, and the reliability of communication can be ensured; the characteristics of the 5G peer-to-peer communication architecture are fully considered, the power supply of important load nodes is quickly and preferentially restored, and the fault load recovery process is simple, and the number of information transmission times is small, which provides assistance for the development of future urban power grid distribution network automation. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 A flowchart of a distributed fault recovery method based on a 5G power distribution intelligent terminal according to some embodiments of the present invention;

[0020] Figure 2 A block diagram of a distributed fault recovery device based on a 5G power distribution intelligent terminal according to some embodiments of the present invention. DETAILED DESCRIPTION

[0021] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0022] The following describes in detail the distributed fault recovery method, device and medium based on 5G power distribution intelligent terminal according to an embodiment of the present invention with reference to the accompanying drawings.

[0023] Figure 1 Flow chart of a distributed fault recovery method based on a 5G power distribution intelligent terminal according to some embodiments of the present invention. Figure 1, the distributed fault recovery method based on the 5G power distribution intelligent terminal of the embodiment of the present application may include the following steps:

[0024] S110, when a fault occurs in the power grid, determining a fault section.

[0025] Specifically, when a fault occurs in the power grid, fault recorders, fault indicators and telecontrol communication equipment can be used to detect the location and nature of the fault. At the same time, power grid topology analysis and data processing are also required to determine the fault section.

[0026] S120, determining a target terminal device according to the fault section, and controlling the target terminal device to send fault information of the fault section to the contact node.

[0027] Specifically, the target terminal device located in the fault section is determined, and the target terminal device located in the fault section is determined, for example, according to the device identification, GPS location data or a specific identifier in the device management system. Use telecontrol communication equipment or similar equipment to send a command to the target terminal device through remote control or instructions, requiring it to send fault information. After receiving the control signal, the target terminal device sends the fault information to the contact node according to the preset program or communication protocol, where the information may include key data such as fault type, location, and timestamp.

[0028] S130, if no response information is received from the contact node within a preset time, determine the abnormal optical fiber link, and control the 5G link corresponding to the abnormal optical fiber link to be in a connected state, so that the target terminal sends the fault information of the fault section to the contact node. The preset time is determined according to the actual situation and is not specifically limited here.

[0029] Specifically, after deploying 5G routers in the distribution network, every two switches are equivalent to having three links to transmit services, namely the original optical fiber link, the 5G horizontal GOOSE (Generic Object-Oriented Substation Events) optical fiber link and the 5G link. Furthermore, if no response information is received from the contact node within the preset time, it means that both optical fiber links on the same device are abnormal. At this time, the data service needs to be switched to the 5G wireless link, and the 5G link corresponding to the abnormal optical fiber link is controlled to be in a connected state, so that the target terminal can send the fault information of the faulty section to the contact node.

[0030] S140: When response information from each connection node is received, the power-lost load in the fault area is restored according to the number of downstream connection nodes in the fault area and the available margin of the connection nodes.

[0031] Specifically, upon receiving the response information from each contact node, such as the current load status of the node, backup power supply status, equipment availability, etc., the number of downstream contact nodes in the fault area is determined, and the available margin of each contact node is analyzed. The strategy for restoring the power-lost load is determined based on the above information. During the recovery process, the system status and node load are monitored, and the strategy is adjusted according to real-time changes. To a certain extent, it is ensured that the power-lost load in the fault area can be effectively restored in a timely manner, minimizing the impact on users.

[0032] In this way, automatic switching of optical fiber / 5G communications between switches in the distribution network can be achieved, reducing latency and ensuring communication reliability. It also fully considers the characteristics of the 5G peer-to-peer communication architecture, quickly and preferentially restores power supply to important load nodes, and the fault load recovery process is simple, with fewer information transmission times, providing support for the development of future urban power grid distribution automation.

[0033] In some embodiments, the fault recovery method further includes: when there is no abnormal optical fiber link or the abnormal optical fiber link returns to normal, controlling the 5G link to be disconnected. The optical fiber link and the 5G link are backups for each other.

[0034] Specifically, the LAN port of the 5G router is connected to the network port of the switch. At the same time, the 5G router is configured to realize the 5G horizontal networking of N switch rooms. The N switch rooms form a VPN (Virtual Private Network) LAN, which can realize horizontal communication. In addition, the switch is configured to realize the automatic switching function. The original switch is a layer 2 switch, and the spanning tree protocol needs to be configured on it to realize the automatic switching of the optical port and the network port. The upgrade / replacement of the switch does not affect the original optical fiber horizontal GOOSE communication function. All protection units in the station room are still connected to the switch through the network cable, and the switch is still connected to the original optical fiber channel through the optical fiber. The original optical fiber horizontal GOOSE channel is retained, and the 5G horizontal GOOSE communication channel optical fiber channel and the 5G channel are added as the main and standby relationship. In other words, every two switches are equivalent to having three links to transmit services, namely the original optical fiber link, the 5G horizontal GOOSE optical fiber link and the 5G link. In order to ensure that the optical fiber link is used as the main one and the 5G wireless is used as the backup, the path overhead of the port of each switch connected to the 5G router needs to be configured to a large value, for example, set to 20000000. If both fiber optic links on the same device experience anomalies, the data service will switch to the 5G wireless link, and when the fiber is restored, it will switch back to fiber optic communication.

[0035] In this way, automatic switching of optical fiber / 5G communications between switches in the distribution network can be achieved, reducing latency and ensuring communication reliability.

[0036] In some embodiments, the power-off load in the fault area is restored according to the number of downstream contact nodes in the fault area and the available margin of the contact nodes, including: when the number of contact nodes is less than the preset number, if the available margin of the contact node is sufficient to restore the load of all nodes on the link where it is located, then the switch of the contact node is controlled to close; if the available margin of the contact node is not sufficient to restore the load of all nodes on the link where it is located, then the node to be restored and the node not restored are determined according to the priority order of the load of all nodes on the link or the principle of restoring the most load; the switch of the contact node is controlled to close to restore the node to be restored, and the terminal device at the unrestored node is controlled to disconnect the load switch. Among them, the preset number is determined according to the actual situation, and no specific limitation is made here.

[0037] Specifically, after the contact node receives the fault information, the downstream contact node in the fault area first determines the direction of the fault in order to select the corresponding available load margin. If the linked list in the direction of the fault contains a DG (Directed Graph, diagonal) adjacent node, it can be determined whether to forward the fault message to it by judging the distance relationship between the node and the source node of the fault message. If the DG adjacent node is closer to the contact node, it should be informed of the fault message. Then, when the number of contact nodes is less than the preset number, for example, when the number of contact nodes is 1, the power-off load in the fault area is restored according to the available margin of the contact node.

[0038] Exemplarily, the contact node determines whether the available margin at its own node is sufficient to restore the load of all nodes on the linked list. Then, different operation strategies are selected according to whether the available margin is sufficient. If it is sufficient to restore the load of all nodes on the linked list, the contact switch is directly notified to close; if it is not enough to restore the load of all nodes on the linked list, the limited available margin should be used to restore the high-priority load first, and as many loads as possible should be restored under this premise. Therefore, the contact node determines the nodes that can be restored according to the load priority and the principle of restoring the most loads, and orders the STU at the node that cannot be restored to disconnect the load switch of the section. Subsequently, after receiving the message that the switch has been disconnected returned by the STU (Spanning Tree of Undirected Graph) at the corresponding node, the STU at the contact node notifies the contact switch to close. The contact node informs the STU at the central node of the island operation area that it can be reconnected to the grid.

[0039] In some embodiments, the power-lost load in the fault area is restored based on the number of downstream contact nodes in the fault area and the available margin of the contact nodes, including: when the number of contact nodes is greater than or equal to a preset number, determining a linked list corresponding to a target number of common nodes in a linked list corresponding to each contact node as a target linked list; determining a common node in the target linked list with the shortest distance from the current contact node; determining the remaining available margin after the current contact node is restored to the common node; and supplying power to the power-lost load in the fault area according to the remaining available margin.

[0040] Specifically, when the number of connecting nodes is greater than or equal to a preset number, for example, when the number of connecting nodes is greater than 1, the power-lost load in the fault area is restored according to the available margin of the connecting nodes.

[0041] Exemplarily, when the number of contact nodes is greater than 1, the downstream contact nodes of each fault section exchange the selected topological path linked lists with each other, first screen out the linked lists corresponding to the faulty downstream contact nodes, then select a group of linked lists with the largest number of common nodes from these linked lists as the target linked lists, and define the contact nodes corresponding to this group of linked lists as the priority nodes of the recovery process. If the contact node where the node is located is a priority node, select the one closest to the node from the common nodes of the link corresponding to the node and the links corresponding to other priority nodes, calculate the remaining available margin to be restored to this node, and determine whether the remaining available margin is sufficient, so as to select different strategies to supply power to the power-lost loads in the fault area.

[0042] In some embodiments, the power-off load in the fault area is restored according to the remaining available margin, including: when the remaining available margin is greater than the preset margin, determining the remaining available margin of other priority nodes in the target linked list; when the remaining available margin of other priority nodes is insufficient and node load update information is received, if all node loads cannot be restored, sending a locking signal to other contact nodes and closing the contact switch of the current contact node. The preset margin is determined according to actual conditions and is not specifically limited here.

[0043] In some embodiments, the above-mentioned fault recovery method also includes: if the remaining available margin of other priority nodes is sufficient and all node loads cannot be restored, then the remaining available margin information is exchanged with other priority nodes; when the remaining available margin of the current network node is greater than the remaining available margin of other public nodes, if the available margin of other priority nodes restored to the public node is sufficient, then the other network nodes downstream of the fault area are locked, the corresponding connecting switches are closed, and a recovery completion signal is sent.

[0044] Specifically, if the remaining available margin of its own node is sufficient, it will exchange the remaining available margin information with other priority nodes, and determine whether the remaining available margin of its own node is the largest among all priority nodes. If its remaining available margin information is not the largest, it will select the node that can only be restored by itself and select the node farthest from its own node in the linked list among these nodes, and command the STU at the node to cut off the upstream section switch. After receiving the message that the switch has been disconnected returned by the STU at the corresponding node, the STU at the contact node notifies the contact switch to close. The contact node informs the STU at the central node of the island operation area that it can be reconnected to the grid. If its own remaining available margin information is the largest, it will determine whether the available margin restored to the public node by other priority nodes is sufficient, so as to restore the power-lost load in the fault area according to the remaining available margin.

[0045] Exemplarily, if there are other priority nodes with insufficient available margin, after waiting for the node load update information, if all node loads cannot be restored, a locking signal is sent to the other contact nodes, and the contact switch of the current contact node is closed. If the available margin of other priority nodes is restored to the public node, the other network nodes downstream of the fault area are locked, the corresponding contact switches are closed, and a recovery completion signal is sent.

[0046] In some embodiments, the power-lost load in the fault area is restored based on the remaining available margin, including: when the remaining available margin is less than or equal to the preset margin, sending a remaining available margin insufficient signal to a nearby unrecoverable node, and sending a recovery mark information to a distant recoverable node; when confirmation information is received from a nearby unrecoverable node and a distant recoverable node, sending a recovery area lock signal to other contact nodes, and closing the contact switch of the current contact node.

[0047] Exemplarily, if the remaining available margin of the node itself is insufficient, the farthest recoverable node and the nearest unrecoverable node in the linked list are determined based on the available margin information of this contact node. Subsequently, a signal of insufficient available margin of this node is sent to the nearest unrecoverable node, and a command to cut off the switch of its upstream section is sent to the farthest recoverable node. Then, after receiving the message returned by the STU at the corresponding node that the switch has been disconnected, the STU at the contact node notifies the contact switch to close. The contact node informs the STU at the central node of the island operation area that it can be reconnected to the grid. After receiving the signal of insufficient available margin, the STU at the nearest unrecoverable node of the contact node marks this node as the end of the pure load branch, and then forwards the signal of insufficient available margin of the downstream contact node and the load information of this node upstream until a branch node is encountered.

[0048] In some embodiments, the fault recovery method further includes: after determining the fault section, controlling the protection devices at both ends of the fault section to cut off the switches at both ends of the fault section to isolate the fault section.

[0049] Specifically, if a permanent fault occurs in a certain section of the network, the protection devices at both ends of the faulty section will act quickly, cutting off the switches at both ends of the faulty section to complete the isolation of the faulty section. The STUs at both ends of the faulty section begin the reclosing process. Since it is a permanent fault, the reclosing fails and the fault recovery process begins immediately. The downstream adjacent STU of the faulty section sends the fault message and all the contact node numbers downstream of itself to each downstream contact node in sequence.

[0050] In this way, the fault recovery time of the smart distribution network can be shortened and the load recovery capacity can be increased.

[0051] In summary, the fault recovery method of the present invention can realize the automatic switching of optical fiber / 5G communication between switches in the distribution network, reduce latency, and ensure the reliability of communication; it also fully considers the characteristics of the 5G peer-to-peer communication architecture, quickly and preferentially restores the power supply of important load nodes, and the fault load recovery process is simple, with fewer information transmission times, which provides support for the development of future urban power grid distribution automation.

[0052] Corresponding to the above embodiments, the present application also proposes a distributed fault recovery device based on a 5G power distribution intelligent terminal.

[0053] Reference Figure 2 The distributed fault recovery device 200 based on the 5G power distribution intelligent terminal includes: a first determination module 210, a control module 220, a second determination module 230 and a recovery module 240.

[0054] Among them, the first determination module 210 is used to determine the fault section when a power grid fails. The control module 220 is used to determine the target terminal device according to the fault section, and control the target terminal device to send the fault information of the fault section to the contact node. The second determination module 230 is used to determine the abnormal optical fiber link when no response information from the contact node is received within a preset time, and control the 5G link corresponding to the abnormal optical fiber link to be in a connected state, so that the target terminal sends the fault information of the fault section to the contact node. The recovery module 240 is used to restore the power-lost load in the fault area according to the number of downstream contact nodes in the fault area and the available margin of the contact node when receiving the response information of each contact node.

[0055] According to one embodiment of the present invention, the second determination module 230 is also used to control the 5G link to be in a disconnected state when there is no abnormal optical fiber link or the abnormal optical fiber link returns to normal.

[0056] According to one embodiment of the present invention, the optical fiber link and the 5G link back up each other.

[0057] According to one embodiment of the present invention, the recovery module 240 is specifically used to, when the number of connection nodes is less than a preset number, if the available margin of the connection node is sufficient to restore the load of all nodes on the link where it is located, control the switch of the connection node to close; if the available margin of the connection node is not sufficient to restore the load of all nodes on the link where it is located, determine the nodes to be restored and the unrestored nodes according to the priority order of the loads of all nodes on the link or the principle of restoring the most load; control the switch of the connection node to close to restore the nodes to be restored, and control the terminal equipment at the unrestored nodes to disconnect the load switches.

[0058] According to one embodiment of the present invention, the recovery module 240 is specifically used to, when the number of communication nodes is greater than or equal to a preset number, determine the linked list corresponding to each communication node when the number of common nodes in the linked list corresponding to the target number is the target number, as the target linked list; determine the common node in the target linked list with the smallest distance from the current communication node; determine the remaining available margin after the current communication node is restored to the common node; and supply power to the power-lost load in the fault area according to the remaining available margin.

[0059] According to one embodiment of the present invention, the recovery module 240 is specifically used to determine the remaining available margin of other priority nodes in the target linked list when the remaining available margin is greater than the preset margin; when the remaining available margin of other priority nodes is insufficient and the node load update information is received, if all node loads cannot be restored, a locking signal is sent to other contact nodes, and the contact switch of the current contact node is closed.

[0060] According to one embodiment of the present invention, the recovery module 240 is specifically used to exchange remaining available margin information with other priority nodes if the remaining available margin of other priority nodes is sufficient and all node loads cannot be restored; when the remaining available margin of the current network node is greater than the remaining available margin of other public nodes, if the available margin of other priority nodes restored to the public node is sufficient, other network nodes downstream of the fault area are locked, the corresponding connecting switches are closed, and a recovery completion signal is sent.

[0061] According to one embodiment of the present invention, the recovery module 240 is specifically used to, when the remaining available margin is less than or equal to the preset margin, send a remaining available margin insufficient signal to a nearby irrecoverable node, and send a recovery mark information to a distant recoverable node; when receiving confirmation information from a nearby irrecoverable node and a distant recoverable node, send a recovery area lock signal to other contact nodes, and close the contact switch of the current contact node.

[0062] According to one embodiment of the present invention, after the fault section is determined, the protection devices at both ends of the fault section are controlled to cut off the switches at both ends of the fault section to isolate the fault section.

[0063] It should be pointed out that the above-mentioned explanation of the embodiments and beneficial effects of the distributed fault recovery method based on the 5G power distribution intelligent terminal is also applicable to the distributed fault recovery device based on the 5G power distribution intelligent terminal of the embodiment of the present invention. In order to avoid redundancy, it will not be elaborated here.

[0064] Corresponding to the above embodiments, the present application also proposes a computer-readable storage medium.

[0065] The computer-readable storage medium of the present application stores a distributed fault recovery program based on a 5G power distribution intelligent terminal. When the distributed fault recovery program based on a 5G power distribution intelligent terminal is executed by a processor, the aforementioned distributed fault recovery method based on a 5G power distribution intelligent terminal is implemented.

[0066] It should be pointed out that the above-mentioned explanation of the embodiments and beneficial effects of the distributed fault recovery method based on the 5G power distribution intelligent terminal is also applicable to the computer-readable storage medium of the embodiment of the present invention. In order to avoid redundancy, it will not be elaborated here.

[0067] It should be noted that the logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as a sequenced list of executable instructions for implementing logical functions, and can be specifically implemented in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection portion with one or more wirings (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0068] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0069] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0070] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0071] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0072] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A distributed fault recovery method based on 5G power distribution intelligent terminal, characterized in that: The method comprises: In case of a power grid fault, determine the faulty section; Determine a target terminal device according to the fault section, and control the target terminal device to send fault information of the fault section to a contact node; If no response information from the contact node is received within a preset time, an abnormal optical fiber link is determined, and a 5G link corresponding to the abnormal optical fiber link is controlled to be in a connected state, so that the target terminal sends the fault information of the faulty section to the contact node; When the response information of each connecting node is received, the power-lost load in the fault area is restored according to the number of connecting nodes downstream of the fault area and the available margin of the connecting nodes.

2. The distributed fault recovery method based on 5G power distribution intelligent terminal according to claim 1 is characterized in that: Also includes: When there is no abnormal optical fiber link or the abnormal optical fiber link returns to normal, the 5G link is controlled to be in a disconnected state.

3. The distributed fault recovery method based on 5G power distribution intelligent terminal according to claim 2 is characterized in that: The optical fiber link and the 5G link back up each other.

4. The distributed fault recovery method based on 5G power distribution intelligent terminal according to claim 1 is characterized in that: Restoring the power-lost load in the fault area according to the number of the contact nodes downstream of the fault area and the available margin of the contact nodes includes: When the number of the contact nodes is less than the preset number, if the available margin of the contact node is sufficient to restore the load of all nodes on the link, control the switch of the contact node to close; If the available margin of the contact node is not sufficient to restore the load of all nodes on the link, determine the nodes to be restored and the unrestored nodes according to the priority order of the loads of all nodes on the link or the principle of restoring the most load; The switch of the contact node is controlled to close to restore the node to be restored, and the terminal equipment at the unrestored node is controlled to disconnect the load switch.

5. The distributed fault recovery method based on 5G power distribution intelligent terminal according to claim 4 is characterized in that: Restoring the power-lost load in the fault area according to the number of the contact nodes downstream of the fault area and the available margin of the contact nodes includes: When the number of the contact nodes is greater than or equal to the preset number, determining a linked list corresponding to a target number of common nodes in the linked list corresponding to each contact node as a target linked list; Determine the public node in the target linked list that has the shortest distance from the current contact node; Determine that the current contact node is restored to the remaining available margin of the public node; The power-off loads in the fault area are supplied with power according to the remaining available margin.

6. The distributed fault recovery method based on 5G power distribution intelligent terminal according to claim 5 is characterized in that: Restoring the power-lost load in the fault area according to the remaining available margin includes: In the case where the remaining available margin is greater than the preset margin, determining the remaining available margins of other priority nodes in the target linked list; When the remaining available margin of the other priority nodes is insufficient and the node load update information is received, if all node loads cannot be restored, a locking signal is sent to the other contact nodes, and the contact switch of the current contact node is closed.

7. The distributed fault recovery method based on 5G power distribution intelligent terminal according to claim 6 is characterized in that: The method further comprises: If the remaining available margin of the other priority nodes is sufficient and cannot restore all node loads, exchanging remaining available margin information with the other priority nodes; When the remaining available margin of the current network node is greater than the remaining available margin of the other public nodes, if the available margin of the other priority nodes is sufficient to restore to the public node, the other network nodes downstream of the fault area are locked, the corresponding contact switches are closed, and a recovery completion signal is sent.

8. The distributed fault recovery method based on 5G power distribution intelligent terminal according to claim 6 is characterized in that: Restoring the power-lost load in the fault area according to the remaining available margin includes: When the remaining available margin is less than or equal to the preset margin, a remaining available margin insufficient signal is sent to the non-recoverable node at a close distance, and recovery mark information is sent to the recoverable node at a far distance; When confirmation information is received from a nearby non-recoverable node and a distant recoverable node, a recovery area locking signal is sent to other contact nodes, and the contact switch of the current contact node is closed.

9. The distributed fault recovery method based on 5G power distribution intelligent terminal according to claim 1 is characterized in that: Also includes: After the fault section is determined, the protection devices at both ends of the fault section are controlled to cut off the switches at both ends of the fault section to isolate the fault section.

10. A distributed fault recovery device based on a 5G power distribution intelligent terminal, characterized in that: The device comprises: A first determination module is used to determine a fault section when a fault occurs in the power grid; A control module, used for determining a target terminal device according to the fault section, and controlling the target terminal device to send fault information of the fault section to a contact node; A second determination module is used to determine an abnormal optical fiber link if no response information from the contact node is received within a preset time, and control the 5G link corresponding to the abnormal optical fiber link to be in a connected state, so that the target terminal sends the fault information of the fault section to the contact node; A recovery module is used to recover the power-lost load in the fault area according to the number of the contact nodes downstream of the fault area and the available margin of the contact nodes when receiving the response information of each contact node.

11. A computer-readable storage medium, characterized in that: A distributed fault recovery program based on a 5G power distribution intelligent terminal is stored thereon, and when the distributed fault recovery program based on a 5G power distribution intelligent terminal is executed by a processor, a distributed fault recovery method based on a 5G power distribution intelligent terminal is implemented according to any one of claims 1-9.

Citation Information

Cited By

  • Distributed feeder fault processing and load recovery method for multi-segment looped network

    CN119891120A