Battery management device and method
Through battery management equipment and methods, multiple reference curves are used to calculate the health status, remaining service life and safety score of lithium batteries, and the weight value is used to calculate the battery life score, which solves the problem of lithium battery life evaluation and provides intuitive performance evaluation results. Improve battery efficiency.
Patent Information
- Application Number
- CN202280093847.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-03-21
- Filing Date
- 2022-11-25
- Publication Date
- 2024-11-01
Smart Images

Figure CN118891533A_ABST
Abstract
Description
Technical Field
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This application claims priority to and the benefit of Korean Patent Application No. 10-2022-0034948 filed in the Korean Intellectual Property Office on March 21, 2022, the entire contents of which are incorporated herein by reference. Technical Field
[0004] The present disclosure relates to a battery management device and method, and more particularly to a battery management device and method capable of evaluating battery life. Background Art
[0005] Recently, with the rapid growth in demand for portable electronic products such as laptop computers, camcorders, and mobile phones, and the rapid development of electric vehicles, energy storage batteries, robots, satellites, etc., research on high-performance batteries that can be repeatedly charged and discharged is being actively carried out.
[0006] The batteries currently available on the market include nickel-cadmium batteries, nickel-metal hydride batteries, nickel-zinc batteries, lithium batteries, etc. Among them, compared with nickel-based batteries, lithium batteries have attracted much attention due to their small memory effect, very low self-discharge rate, high energy density and the advantages of free charging and discharging.
[0007] Generally, since batteries degrade with use, it is necessary to accurately diagnose the state of the battery to improve the expected life of the battery. Conventionally, performance tests have been performed on the current life and remaining life of the battery by estimating the battery's state of charge (SOH), remaining useful life (RUL), etc. in various ways.
[0008] However, these terms are unfamiliar to ordinary users, leading to concerns that ordinary users may not accurately understand the meaning of SOH, RUL, etc. Therefore, it is necessary to develop a technology that helps ordinary users to intuitively understand by comprehensively evaluating the battery life from all aspects. Summary of the invention
[0009] Technical issues
[0010] The present disclosure aims to provide a battery management device and method capable of evaluating and scoring battery life.
[0011] Other purposes and advantages of the present disclosure can be understood through the following description, and will be more clearly understood through the embodiments of the present disclosure. In addition, it will be easily understood that the purposes and advantages of the present disclosure can be achieved through the means provided in the claims and their combinations.
[0012] Technical Solution
[0013] A battery management device according to one aspect of the present disclosure includes: a data acquisition unit, which is configured to acquire battery information including at least one of a voltage and a current of a battery; and a controller, which is configured to estimate a state of health (SOH) of the battery based on the battery information, calculate a SOH score of the battery based on the SOH in multiple reference curves and a reference value corresponding to the SOH, predict multiple SOHs of the battery during a target period, calculate a remaining useful life (RUL) score of the battery based on the multiple SOHs, and determine a safety score of the battery according to a safety level of the battery based on the battery information.
[0014] The plurality of reference curves may be configured to include a first reference curve indicating a maximum SOH per unit time of the battery and a second reference curve indicating a minimum SOH per unit time of the battery.
[0015] The controller may be further configured to determine a first reference value corresponding to the SOH in the first reference curve, determine a second reference value corresponding to the SOH in the second reference curve, and calculate the SOH score based on a ratio of the SOH relative to the first reference value and the second reference value.
[0016] The controller may be further configured to determine a SOH reference interval of the first reference value and the second reference value, calculate a ratio of the SOH relative to the SOH reference interval, and score the calculated ratio to calculate the SOH score.
[0017] The controller may be further configured to determine a plurality of first reference values in the first reference curve during the target period, determine a plurality of second reference values in the second reference curve during the target period, and calculate the RUL score based on a ratio of the plurality of SOHs relative to the plurality of first reference values and the plurality of second reference values.
[0018] The controller may be further configured to determine a RUL reference interval of the sum of the plurality of first reference values and the sum of the plurality of second reference values, calculate a ratio of the sum of the plurality of SOHs relative to the RUL reference interval, and score the calculated ratio to calculate the RUL score.
[0019] The plurality of reference curves may be configured to include a third reference curve indicating an average SOH per unit time of the battery.
[0020] The controller may be further configured to determine a target time point corresponding to a preset threshold in the third reference curve, and set a period from a current time point at which the SOH is estimated to the target time point as the target period.
[0021] The target period may be set as a period from the current time point at which the SOH is estimated to an expiration time point of a warranty period preset for the battery.
[0022] The controller may be further configured to calculate the security score corresponding to the security level based on a preset security level table.
[0023] The controller may be further configured to determine an abnormal behavior of the battery information, calculate a similarity between the determined abnormal behavior and a preset abnormal curve, and determine the safety level based on the calculated similarity.
[0024] The controller may be further configured to determine a battery life score by applying a weight value preset to correspond to each of the SOH score, the RUL score, and the safety score and summing application results.
[0025] A battery system according to another aspect of the present disclosure includes the battery management device according to this aspect of the present disclosure.
[0026] A battery pack according to another aspect of the present disclosure includes the battery management device according to this aspect of the present disclosure.
[0027] According to another aspect of the present disclosure, a battery management method includes the following operations: a battery information acquisition operation, acquiring battery information including at least one of a voltage and a current of a battery; a health state SOH score calculation operation, estimating the SOH of the battery based on the battery information, and calculating the SOH score of the battery based on the SOH in multiple reference curves and a reference value corresponding to the SOH; a remaining service life RUL score calculation operation, predicting multiple SOHs of the battery during a target period, and calculating the RUL score of the battery based on the multiple SOHs; and a safety score calculation operation, calculating the safety score of the battery according to the safety level of the battery based on the battery information.
[0028] Beneficial effects
[0029] According to an aspect of the present disclosure, a battery management apparatus may evaluate the performance of a battery from various aspects by calculating each of a SOH score, a RUL score, and a safety score of a battery.
[0030] According to one aspect of the present disclosure, the battery management device can provide not only detailed scores of the battery such as SOH score, RUL score, safety score, etc., but also a battery life score calculated by combining the detailed scores. Therefore, the user can recognize the detailed scores of the battery management device and the battery life score as a combined score. In particular, when the user fails to accurately recognize the meaning of the detailed scores, the user can recognize the battery life score, thereby intuitively recognizing the performance evaluation result of the battery used by the user.
[0031] The effects of the present disclosure are not limited to the above-mentioned effects, and other unmentioned effects will be apparent to those of ordinary skill in the art from the claims. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] The following drawings attached to this specification are used to further understand the technical spirit of the present disclosure and the detailed description of the present disclosure to be provided later, and thus the present disclosure should not be construed as being limited to the matters described in the drawings.
[0033] Figure 1 is a diagram schematically showing a battery management apparatus according to one embodiment of the present disclosure.
[0034] Figure 2 is a view schematically illustrating an example of a plurality of curves considered for calculating a state of health (SOH) score for a battery management apparatus according to one embodiment of the present disclosure.
[0035] Figure 3 is a view schematically illustrating an example of calculating a SOH score according to one embodiment of the present disclosure.
[0036] Figure 4 is a view schematically illustrating an example of a plurality of curves considered for calculating a remaining useful life (RUL) score for a battery management apparatus according to one embodiment of the present disclosure.
[0037] Figure 5 is a view schematically showing an example of calculating a RUL score according to one embodiment of the present disclosure.
[0038] Figure 6 is a view schematically illustrating another example of a plurality of curves considered for calculating a RUL score for a battery management apparatus according to one embodiment of the present disclosure.
[0039] Figure 7 is a view schematically showing an example of a preset security level table according to one embodiment of the present disclosure.
[0040] Figure 8 is a diagram schematically showing an exemplary configuration of a battery system according to another embodiment of the present disclosure.
[0041] Fig. 9 : is a view schematically showing an output example of a lifespan score provided to a user according to one embodiment of the present disclosure.
[0042] Fig.10 is a diagram schematically showing an exemplary configuration of a battery pack according to another embodiment of the present disclosure.
[0043] Fig.11 and Fig.12 is a diagram schematically illustrating a battery management method according to another embodiment of the present disclosure. DETAILED DESCRIPTION
[0044] Furthermore, the terms or words used in the following description and claims should not be interpreted as only the general meaning or dictionary meaning, but rather as the meaning and concept that satisfies the technical spirit of the present invention based on the fact that the inventor can appropriately define his / her invention with the concept of the terms in order to describe the principle of the present invention in the best way.
[0045] Therefore, since the embodiments described in this specification and the configurations shown in the drawings are only one of the most preferred embodiments of the present invention and do not represent the entire technical spirit of the present disclosure, it should be understood that various equivalents and modifications that can replace them may exist when the present disclosure is submitted.
[0046] When describing the present disclosure, if a related well-known configuration or technique obscures the subject matter of the present invention, its detailed description will be omitted.
[0047] Terms including ordinal numbers such as first, second, etc. are used to distinguish one of various components from other components, rather than to limit the components by the terms.
[0048] Throughout the specification of the present disclosure, when it is assumed that a certain portion includes a certain component, the term “comprising” means that the corresponding component may further include other components unless otherwise described contrary thereto.
[0049] In the description of the embodiments of the present disclosure, when one part is “connected” to another part, the part is not only “directly connected” to the other part but also “indirectly connected” to the other part with another device.
[0050] Generally, a battery cell may include a negative terminal and a positive terminal, and refers to an independent unit that is physically separable. For example, a lithium-ion battery or a lithium polymer battery may be considered a battery cell. In addition, a battery module may include a plurality of battery cells connected in series and / or in parallel. A battery pack may include a plurality of battery modules or a plurality of battery cells connected in series and / or in parallel. The battery described below may be a battery cell, a battery module, or a battery pack.
[0051] Hereinafter, preferred embodiments of the present disclosure will be described in detail with reference to the accompanying drawings.
[0052] Figure 1 is a diagram schematically showing a battery management apparatus 100 according to one embodiment of the present disclosure.
[0053] Reference Figure 1 , the battery management device 100 may include a data acquisition unit 110 and a controller 120 .
[0054] The data acquiring unit 110 may be configured to acquire battery information of at least one of a voltage and a current of the battery.
[0055] For example, the data acquisition unit 110 may receive the battery information from an external source through wired and / or wireless communication. Here, the battery information may include at least one of a voltage and a current of the battery acquired during the charging and discharging process of the battery.
[0056] Preferably, in order to minimize omission or redundancy of the acquired battery information, the data acquisition unit 110 may periodically receive the battery information to acquire the battery information. For example, the data acquisition unit 110 may acquire the battery information once every 24 hours.
[0057] The controller 120 may be configured to estimate a state of health (SOH) of the battery based on the battery information.
[0058] Here, SOH may be a performance indicator indicating the health state (aging state or degradation state) of the battery. Typically, SOH may be estimated by comparing the state of the battery at the beginning of life (BoL) with the current state of the battery, and may be expressed as 0 to 1 or 0% to 100%.
[0059] For example, the controller 120 may determine the current state of the battery with respect to capacity, internal resistance, coulombic efficiency (CE), diffusion coefficient, amount of active material, etc. based on the battery information. The controller 120 may estimate the SOH of the battery by comparing the determined current state of the battery with an initial state preset for the BOL battery.
[0060] The controller 120 may be configured to calculate the SOH score of the battery based on the SOH in a plurality of reference curves and a reference value corresponding to the SOH.
[0061] Here, the SOH score may be a score obtained by evaluating the SOH of the battery and may be expressed as 0 to 100. More specifically, the maximum SOH and minimum SOH of the battery may be set based on various experimental data of the battery. The ratio of the current SOH to the maximum SOH and the minimum SOH may be calculated according to the SOH score.
[0062] The plurality of reference curves may be configured to include a first reference curve RP1 indicating a maximum SOH per unit time of the battery and a second reference curve RP2 indicating a minimum SOH per unit time of the battery. The first reference curve RP1 may be an SOH curve P representing the highest performance of the battery among various experimental data acquired in advance, and the second reference curve RP2 may be an SOH curve P representing the lowest performance of the battery among various experimental data acquired in advance. Preferably, the current battery and batteries of the same type are subjected to charge / discharge experiments under various experimental conditions, and experimental data for each experimental condition may be acquired in advance.
[0063] Figure 2 is a view schematically illustrating an example of a plurality of curves considered for calculating a SOH score SCORE_SOH for the battery management apparatus 100 according to one embodiment of the present disclosure. Figure 3 is a view schematically showing an example of calculating a SOH score SCORE_SOH according to one embodiment of the present disclosure.
[0064] exist Figure 2 In an embodiment of the present invention, the first reference curve RP1 may indicate the maximum SOH per unit time of the battery, and the second reference curve RP2 may indicate the minimum SOH per unit time of the battery. The third reference curve RP3 may indicate the reference SOH per unit time of the battery. The SOH curve P may indicate the SOH per unit time estimated for the current battery.
[0065] The controller 120 may determine a first reference value SOH_R1 corresponding to the estimated SOH in the first reference curve RP1 and a second reference value SOH_R2 corresponding to the estimated SOH in the second reference curve RP2. The controller 120 may be configured to calculate a SOH score SCORE_SOH based on a ratio of SOH relative to the first reference value SOH_R1 and the second reference value SOH_R2.
[0066] For example, the controller 120 may normalize the second reference value SOH_R2 to 0 points and the first reference value SOH_R1 to 100 points. The controller 120 may calculate the SOH score SCORE_SOH by converting the estimated SOH into any one of 0 to 100 points.
[0067] For example, in Figure 3 In an embodiment of the present invention, the first reference value SOH_R1 may be 96%, and the second reference value SOH_R2 may be 78%. The current SOH of the battery may be estimated to be 88%. In this case, the SOH reference interval SOH_R between the first reference value SOH_R1 and the second reference value SOH_R2 may be 78% to 96%, and the size of the SOH reference interval SOH_R may be 18%. Therefore, the controller 120 may calculate the SOH score SCORE_SOH as 55.6 points.
[0068] That is, the controller 120 may evaluate the performance of the battery according to the SOH by calculating the SOH score SCORE_SOH of the battery based on the maximum SOH and the minimum SOH of the battery with respect to various experimental data acquired in advance.
[0069] The controller 120 may be configured to predict a plurality of SOHs of the battery during the target period TR.
[0070] More specifically, the controller 120 may be configured to predict the SOH at a future time point after the current time point TC based on the SOH of the battery estimated until the current time point TC. Here, the target period TR may be a period for selecting the SOH value for calculating the RUL score SCORE_RUL, and may be a preset period. Details of the target period TR will be described later.
[0071] For example, in Figure 2 In an embodiment of the present invention, the SOH value of the SOH curve P after the current time point TC may be a value predicted based on the SOH of the battery estimated from the past to the present. That is, the controller 120 may predict the future SOH based on the SOH of the battery estimated from the past to the present. The controller 120 may generate the SOH curve P to include the SOH estimated in the past, the SOH estimated at the current time point TC, and the SOH predicted for the future time point.
[0072] The controller 120 may be configured to calculate a remaining useful life (RUL) score of the battery based on a plurality of SOHs in a plurality of reference curves and a plurality of reference values corresponding to the plurality of SOHs.
[0073] Here, the RUL may be an indicator of the remaining life of the battery.
[0074] More specifically, the controller 120 may determine a plurality of SOHs and a plurality of reference values corresponding thereto at each predetermined interval in the target period TR. The controller 120 may also calculate a RUL score SCORE_RUL of the battery based on ratios of the plurality of SOHs relative to the plurality of reference values.
[0075] Figure 4 is a view schematically illustrating an example of a plurality of curves considered for calculating a RUL score SCORE_RUL for the battery management apparatus 100 according to one embodiment of the present disclosure. Figure 5 FIG. 4 is a diagram schematically showing an example of calculating a RUL score SCORE_RUL according to one embodiment of the present disclosure. Figure 6 is a view schematically illustrating another example of a plurality of curves considered for calculating a RUL score SCORE_RUL for the battery management apparatus 100 according to one embodiment of the present disclosure.
[0076] exist Figure 4 In the embodiment of the present invention, the target period TR is assumed to be from the current time point TC to the target time point TT. The controller 120 may determine a plurality of first reference values SOH_R1, a plurality of second reference values SOH_R2, and a plurality of SOH at predetermined intervals in the target period TR. Here, it should be noted that the first reference value SOH_R1, the second reference value SOH_R2, and SOH may consider the same time point.
[0077] More specifically, unlike the SOH score SCORE_SOH, the RUL score SCORE_RUL may not be calculated for each time point and may be calculated by collecting SOH changes in the target period TR. The controller 120 may determine a plurality of first reference values SOH_R1 in the first reference curve RP1 and a plurality of second reference values SOH_R2 in the second reference curve RP2. The controller 120 may calculate the RUL score SCORE_RUL by scoring the ratio relative to the sum of the plurality of SOHs in the RUL reference interval RUL_R corresponding to the plurality of first reference values SOH_R1 and the plurality of second reference values SOH_R2.
[0078] For example, the controller 120 may normalize the sum of the plurality of first reference values SOH_R1 to 100 points and the sum of the plurality of second reference values SOH_R2 to 0 points. The controller 120 may calculate the RUL score SCORE_RUL by converting the sum of the plurality of SOHs into any one of 0 to 100 points.
[0079] For example, in Figure 5 In the embodiment, it is assumed that the RUL score SCORE_RUL is calculated based on the current time point TC, the first future time point TF1, the second future time point TF2, the third future time point TF3 and the target time point TT.
[0080] The five first reference values SOH_R1 selected in the first reference curve RP1 may be 96%, 94%, 92%, 90% and 88% respectively. The five second reference values SOH_R2 selected in the second reference curve RP2 may be 78%, 76%, 74%, 72% and 70% respectively. The five SOHs selected in the SOH curve P may be 88%, 87%, 86%, 85% and 84% respectively. The RUL reference interval RUL_R of the target period may be from 370% to 460%, and the size of the RUL reference interval RUL_R may be 90%. Therefore, the controller 120 may calculate the RUL score SCORE_RUL as 66.7 points.
[0081] That is, the controller 120 may evaluate the performance of the battery according to the RUL by calculating the RUL score SCORE_RUL based on the plurality of first reference values SOH_R1 and the plurality of second reference values SOH_R2 during the target period TR.
[0082] The controller 120 may be configured to determine a safety score SCORE_SAFETY of the battery according to a safety level of the battery based on the battery information.
[0083] Here, the safety level may be calculated based on the battery information and may be an indicator indicating the safety level of the battery. For example, the controller 120 may determine the safety level of the battery based on the voltage and / or current in the battery information.
[0084] More specifically, the controller 120 may determine the safety level of the battery based on the similarity between the battery information and a plurality of preset abnormal data.
[0085] For example, the controller 120 may calculate the similarity between the battery information and the plurality of abnormal data without checking the abnormal behavior of the battery information. This is because, when no abnormal behavior occurs in the battery information, the similarity with the abnormal data may be calculated to be low. The controller 120 may determine the safety level of the battery based on the similarity with the plurality of abnormal data.
[0086] In another example, when abnormal behavior is identified based on the battery information, the controller 120 may calculate the similarity between the battery information and a plurality of preset abnormal data. This is intended to prevent system resources from being wasted unnecessarily by calculating the similarity between the battery information and a plurality of abnormal data when abnormal behavior is identified. The controller 120 may determine the safety level of the battery based on the similarity calculated for the plurality of abnormal data.
[0087] The controller 120 may be configured to calculate a safety score SCORE_SAFETY corresponding to a safety level based on a preset safety level table.
[0088] Figure 7 is a view schematically showing an example of a preset security level table according to one embodiment of the present disclosure.
[0089] For example, in Figure 7 In an embodiment, the safety level of the battery can be classified into level A, level B, and level C. For level A, level B, and level C, the safety score SCORE_SAFETY can be set to 100 points, 95 points, and 90 points, respectively. Figure 7 The safety level table is only one embodiment, and it should be noted that the number of classified safety levels and the safety score SCORE_SAFETY set for each safety level may be changed.
[0090] The battery management apparatus 100 according to one embodiment of the present disclosure may evaluate the performance of the battery from various aspects by calculating each of the SOH score SCORE_SOH, the RUL score SCORE_RUL, and the safety score SCORE_SAFETY of the battery.
[0091] Since the battery management apparatus 100 provides a normalized score (normalized between 0 and 100 points) as each performance evaluation result, the user can intuitively recognize the current performance of the battery.
[0092] At the same time, the controller 120 included in the battery management device 100 may selectively include a processor, an application specific integrated circuit (ASIC), other chipsets, logic circuits, registers, communication modems, data processing devices, etc., which are well known in the art and are used to execute the various control logics performed herein. Therefore, when the control logic is implemented as software, the controller 120 can be implemented as a set of program modules. In this case, the program modules can be stored in a memory and can be executed by the controller 120. The memory can be inside or outside the controller 120 and can be connected to the controller 120 in various well-known ways.
[0093] In addition, the battery management device 100 may further include a storage unit 130. The storage unit 130 may store data or programs required for each component of the battery management device 100 to perform the operation and function of each component, or data generated in the process of performing the operation and function, etc. The storage unit 130 may not be particularly limited to a specific type as long as it is a known information storage device that records, erases, updates, and reads data. For example, the information storage device may include a RAM, a flash memory, a ROM, an EEPROM, a register, etc. In addition, the storage unit 130 may store a program code in which a process that can be executed by the controller 120 is defined.
[0094] The battery information acquired by the data acquisition unit 110 may be stored in the storage unit 130. The controller 120 may access the storage unit 130 to acquire the battery information.
[0095] Hereinafter, an embodiment in which the controller 120 calculates the SOH score SCORE_SOH will be described in detail.
[0096] The controller 120 may be configured to determine a SOH reference interval SOH_R of a first reference value SOH_R1 and a second reference value SOH_R2 .
[0097] More specifically, the first reference value SOH_R1 may be an SOH value determined in a first reference curve RP1 indicating the maximum SOH of the battery, and the second reference value SOH_R2 may be an SOH value determined in a second reference curve RP2 indicating the minimum SOH of the battery. That is, the first reference value SOH_R1 may be equal to or greater than the second reference value SOH_R2. Therefore, the controller 120 may determine the SOH interval from the second reference value SOH_R2 to the first reference value SOH_R1 as the SOH reference interval SOH_R. That is, the lower limit of the SOH reference interval SOH_R may be the second reference value SOH_R2, and the upper limit of the SOH reference interval SOH_R may be the first reference value SOH_R1.
[0098] For example, in Figure 3 In the implementation manner, the SOH reference interval SOH_R may be an interval of SOH from 78% to 96%.
[0099] The controller 120 may be configured to calculate a ratio of the SOH relative to the SOH reference interval SOH_R and score the calculated ratio to calculate the SOH score SCORE_SOH. More specifically, the controller 120 may calculate the SOH score SCORE_SOH by using Equation 1 below.
[0100] [Equation 1]
[0101]
[0102] Here, SCORE_SOH may indicate an SOH score, SOH_R1 may indicate a first reference value, SOH_R2 may indicate a second reference value, and SOH_P may indicate an estimated SOH value of a battery. 100 may be a constant added to represent the SOH score SCORE_SOH as a score between 0 and 100 points, and may be omitted.
[0103] For example, in Figure 3In an embodiment, the size of the SOH reference interval SOH_R may be "18%" calculated according to the equation of "96%-78%". The difference between the estimated SOH SOH_P and the second reference value SOH_R2 may be "10%" calculated according to the equation of "88%-78%". Therefore, the SOH score SCORE_SOH may be 55.6 calculated according to the equation of "10% ÷ 18% × 100".
[0104] Hereinafter, an implementation of the controller 120 calculating the RUL score SCORE_RUL will be described in detail.
[0105] The controller 120 may determine a plurality of first reference values SOH_R1 in the first reference curve RP1 during the target period TR and a plurality of second reference values SOH_R2 in the second reference curve RP2 during the target period TR. For example, the controller 120 may determine the first reference value SOH_R1 and the second reference value SOH_R2 at predetermined intervals in the target period TR.
[0106] For example, in Figure 5 In the embodiment, the controller 120 may determine the first reference value SOH_R1 and the second reference value SOH_R2 at each of the current time point TC, the first future time point TF1, the second future time point TF2, the third future time point TF3, and the target time point TT. The determined first reference value SOH_R1 may be 96%, 94%, 92%, 90%, and 88%, and the determined second reference value SOH_R2 may be 78%, 76%, 74%, 72%, and 70%.
[0107] The controller 120 may be configured to calculate a RUL score SCORE_RUL based on ratios of the plurality of SOHs with respect to the plurality of first reference values SOH_R1 and the plurality of second reference values SOH_R2 .
[0108] For example, in Figure 5 In the embodiment of the present invention, the controller 120 may estimate the SOHSOH_P of the battery at each of the current time point TC, the first future time point TF1, the second future time point TF2, the third future time point TF3, and the target time point TT. The estimated SOH SOH_P may be 88%, 87%, 86%, 85%, and 84%.
[0109] More specifically, the controller 120 may be configured to determine a RUL reference interval RUL_R with respect to a sum of a plurality of first reference values SOH_R1 and a sum of a plurality of second reference values SOH_R2 .
[0110] For example, in Figure 5In an embodiment of the present invention, the sum of the plurality of first reference values SOH_R1 may be 460%, and the sum of the plurality of second reference values SOH_R2 may be 370%. The controller 120 may determine the SOH interval from the sum of the plurality of second reference values SOH_R2 to the sum of the plurality of first reference values SOH_R1 as the RUL reference interval RUL_R. That is, the lower limit of the RUL reference interval RUL_R may be the sum of the plurality of second reference values SOH_R2, and the upper limit of the RUL reference interval RUL_R may be the sum of the plurality of first reference values SOH_R1.
[0111] The controller 120 may be configured to calculate a ratio of the sum of the plurality of SOH SOH_Ps to the RUL reference interval RUL_R and score the calculated ratio to calculate a RUL score SCORE_RUL. More specifically, the controller 120 may calculate the RUL score SCORE_RUL by using Equation 2 below.
[0112] [Equation 2]
[0113]
[0114] Here, SCORE_RUL may indicate a RUL score, ∑SOH_R1 may indicate a sum of a plurality of first reference values, ∑SOH_R2 may indicate a sum of a plurality of second reference values, and ∑SOH_P may indicate a sum of a plurality of SOHs. 100 may be a constant added to represent the RUL score SCORE_RUL as a score between 0 and 100, and may be omitted.
[0115] For example, in Figure 5 In an embodiment, the size of the RUL reference interval RUL_R may be "90%" calculated according to the equation of "460%-370%". The difference between the sum of the plurality of SOH SOH_P and the sum of the plurality of second reference values SOH_R2 may be "60%" calculated according to the equation of "430%-370%". Therefore, the RUL score SCORE_RUL may be 66.7 calculated according to the equation of "60% ÷ 90% × 100".
[0116] That is, the SOH score SCORE_SOH may be calculated based on the first reference value SOH_R1, the second reference value SOH_R2, and the estimated SOH SOH_P at one time point, but the RUL score SCORE_RUL may be calculated based on a plurality of first reference values SOH_R1, a plurality of second reference values SOH_R2, and a plurality of SOH SOH_P determined in the target period TR. Therefore, each of the SOH score SCORE_SOH and the RUL score SCORE_RUL may be evaluated as a performance indicator of the battery.
[0117] Meanwhile, the target period TR considered for calculating the RUL score SCORE_RUL may be a preset period. Preferably, the target period TR may be a period from the current time point TC to the future target time point TT.
[0118] For example, the target period TR may be set as a period from a current time point TC at which the SOH is estimated to an expiration time point of a warranty period preset for the battery.
[0119] Generally, since the battery will degrade with use, the battery manufacturer will set a warranty period to guarantee the performance of the battery. For example, the warranty period of the battery can be set to 5 years, 10 years, etc. The controller 120 can identify the warranty period set for the battery and set the period from the current time point to the expiration time point of the warranty period as the target period TR.
[0120] For example, in Figure 4 In the embodiment of the present invention, the target time point TT as the expiration time point of the warranty period may be TT. Therefore, the controller 120 may set the period from the current time point TC to the target time point TT as the target period TR. The controller 120 may calculate the RUL score SCORE_RUL based on the plurality of first reference values SOH_R1, the plurality of second reference values SOH_R2, and the plurality of SOHs.
[0121] In another example, the target period TR may be set to correspond to a preset threshold value TH.
[0122] The plurality of reference curves may be configured to include a third reference curve RP3 indicating an average SOH per unit time of the battery.
[0123] The controller 120 may be configured to determine a target time point TT corresponding to a preset threshold value TH according to the third reference curve RP3 .
[0124] Here, the third reference curve RP3 may be an SOH curve P indicating the SOH of the reference battery. That is, the third reference curve RP3 may mean an SOH curve that may appear when the battery is operated under recommended conditions. For example, the third reference curve RP3 may mean an SOH curve that may appear when the reference battery included in the electric vehicle is operated under recommended conditions.
[0125] The controller 120 can determine the target time point TT corresponding to the preset threshold value TH according to the third reference curve RP3. Figure 6 In the implementation manner, the target time point TT corresponding to the preset threshold TH may be TT.
[0126] For example, the threshold TH may be a guaranteed SOH preset for the battery. The guaranteed SOH may be a lower limit of SOH set to achieve maintenance, repair, etc. of the battery, and may be set by the battery manufacturer like a warranty period.
[0127] In another example, the threshold TH may be an SOH corresponding to a predetermined ratio of the current SOH. Here, the predetermined ratio may be any one of more than 0% and less than 100%. For example, the threshold TH may be an SOH corresponding to 80% of the currently estimated SOH.
[0128] Finally, the controller 120 may be configured to set a period from a current time point TC of estimating the SOH to a target time point TT as a target period TR.
[0129] For example, in Figure 6 In the embodiment of the present invention, the controller 120 may set the period from the current time point TC to the target time point TT as the target period TR. The controller 120 may calculate the RUL score SCORE_RUL based on the plurality of first reference values SOH_R1, the plurality of second reference values SOH_R2, and the plurality of SOHs.
[0130] Hereinafter, an embodiment in which the controller 120 calculates the safety score SCORE_SAFETY will be described in detail. However, for convenience of description, an embodiment in which the controller 120 calculates the safety score SCORE_SAFETY based on voltage will be described.
[0131] The controller 120 may be configured to determine abnormal behavior of the battery information.
[0132] More specifically, the controller 120 may determine whether abnormal behavior occurs in the voltage curve of the battery. Here, the voltage curve may be a curve indicating the voltage distribution of the battery over time. In addition, abnormal behavior may mean that the voltage of the battery deviates from the normal range at one or more time points.
[0133] The controller 120 may be configured to calculate a similarity between the determined abnormal behavior and a preset abnormal curve.
[0134] Here, the abnormal curve may mean a plurality of experimental data acquired in advance through experiments and may be a curve in which abnormal behavior occurs in the voltage curve. The controller 120 may calculate the similarity between the abnormal behavior determined for the battery and the plurality of abnormal curves. As an algorithm for measuring the similarity between two curves (the voltage curve and the abnormal curve of the battery), a conventional similarity determination algorithm may be applied.
[0135] The controller 120 may be configured to determine a security level based on the calculated similarity.
[0136] For example, the safety level may be predetermined for each of the plurality of abnormal curves. Thus, the controller 120 may determine the safety level of the battery based on the similarity between the abnormal behavior of the voltage curve and each of the plurality of abnormal curves.
[0137] For example, in Figure 7 In an embodiment of the present invention, the safety level of the battery can be classified into level A, level B and level C.
[0138] The controller 120 may be configured to calculate a safety score SCORE_SAFETY corresponding to a safety level based on a preset safety level table.
[0139] In the safety level table, the safety level and the safety score SCORE_SAFETY corresponding thereto may be mapped to each other and stored. Therefore, the controller 120 may be configured to calculate the safety score SCORE_SAFETY corresponding to the safety level based on the safety level table.
[0140] For example, in Figure 7 In an implementation manner, for level A, level B and level C, the safety score SCORE_SAFETY can be set to 100 points, 95 points and 90 points respectively.
[0141] Hereinafter, an embodiment in which the controller 120 recognizes abnormal behavior of the battery will be described.
[0142] The controller 120 may determine an observation matrix indicative of a voltage profile over time.
[0143] The controller 120 may extract the first sub-matrix, the second sub-matrix, and the third sub-matrix by applying matrix decomposition to the observation matrix.
[0144] Here, the controller 120 may apply matrix decomposition to the observation matrix by using singular value decomposition (SVD), principal component analysis (PCA), or the like.
[0145] The observation matrix can be decomposed into a first submatrix, a second submatrix, and a third submatrix by matrix decomposition. The first submatrix can be an m×m matrix, the second submatrix can be an m×n matrix, and the third submatrix can be an n×n matrix. Here, the product of the first submatrix, the second submatrix, and the third submatrix can be the same as the observation matrix. In addition, n can mean the number of batteries, and m can mean the number of measured voltages. That is, the m×n matrix can mean that for each of the n batteries, the voltage is measured m times.
[0146] Matrix factorization is a widely used scheme, so its detailed theoretical description will be omitted.
[0147] The first submatrix as an orthogonal matrix may include multiple principal component vectors indicating variance information of the observation matrix. Each of the multiple principal component vectors may be referred to as a left singular vector. Each principal component may include m elements and may be a column vector of the first submatrix.
[0148] The second submatrix is a diagonal matrix, in which all elements except the n elements in the main diagonal may be zero.
[0149] The third sub-matrix is an orthogonal matrix including a plurality of coefficient vectors indicating dependency information of a plurality of principal component vectors. Each of the plurality of coefficient vectors may be referred to as a right singular vector.
[0150] The controller 120 may determine a principal component vector including an invalid coefficient among a plurality of principal component vectors included in the third submatrix. For example, the controller 120 may calculate an average value of a plurality of coefficients of each principal component vector. The controller 120 may determine a principal component vector including a coefficient (as an invalid coefficient) that differs from the calculated average value by a preset first reference value or more.
[0151] The controller 120 may determine a partial voltage vector corresponding to the determined main component vector according to the observation matrix. Here, the partial voltage vector may be an m×1 matrix. When the difference between the maximum partial voltage and the minimum partial voltage of the partial voltage vector is equal to or greater than a preset second reference value, the controller 120 may determine that an abnormal behavior occurs in the battery corresponding to the partial voltage vector.
[0152] Finally, the controller 120 may determine the similarity between the voltage curve of the battery in which the abnormal behavior occurs and a plurality of preset abnormal curves and determine the safety level of the battery according to the determination result. The controller 120 may calculate a safety score SCORE_SAFETY of the battery based on the determined safety level.
[0153] The controller 120 may be configured to determine the battery life score by applying a weight value preset to correspond to each of the SOH score SCORE_SOH, the RUL score SCORE_RUL, and the safety score SCORE_SAFETY and summing the application results.
[0154] Here, the lifespan score may be a score evaluated by the controller 120 by combining the SOH score SCORE_SOH, the RUL score SCORE_RUL, and the safety score SCORE_SAFETY. More specifically, the controller 120 may determine the battery lifespan score by using Equation 3 below.
[0155] [Equation 3]
[0156] SCORE_LIFE=SCORE_SOH×a+SCORE_RUL×b+SCORE_SAFETY×c
[0157] Here, SCORE_LIFE may mean a battery life score, SCORE_SOH may mean a SOH score, SCORE_RUL may mean a RUL score, and SCORE_SAFETY may mean a safety score. a indicates a first weight value applied to the SOH score SCORE_SOH, b indicates a second weight value applied to the RUL score SCORE_RUL, and c indicates a third weight value applied to the safety score SCORE_SAFETY.
[0158] For example, the sum of a, b and c may be equal to 1. That is, the sum of a first score corresponding to ratio a of the SOH score SCORE_SOH, a second score corresponding to ratio b of the RUL score SCORE_RUL, and a third score corresponding to ratio c of the safety score SCORE_SAFETY may be calculated as the battery life score SCORE_LIFE.
[0159] The battery management device 100 according to one embodiment of the present disclosure can not only provide detailed scores of the battery, such as the SOH score SCORE_SOH, the RUL score SCORE_RUL, the safety score SCORE_SAFETY, etc., but also can provide a battery life score SCORE_LIFE calculated by combining the detailed scores. Therefore, the user can recognize the detailed scores of the battery management device 100 and the battery life score SCORE_LIFE as a combined score. In particular, when the user fails to accurately recognize the meaning of the detailed scores, the user can recognize the battery life score SCORE_LIFE, thereby intuitively recognizing the performance evaluation result of the battery used by the user.
[0160] Figure 8 is a diagram schematically showing an exemplary configuration of a battery system 1 according to another embodiment of the present disclosure.
[0161] A battery system 1 according to another embodiment of the present disclosure may include a battery management apparatus 100 according to one embodiment of the present disclosure.
[0162] Reference Figure 8 , the battery system 1 may include a battery management device 100 , a battery management system (BMS) 200 , and a user terminal 300 .
[0163] The battery managing device 100 and the BMS 200 may be connected to communicate with each other through a wired and / or wireless network. The battery managing device 100 and the user terminal 300 may be connected to communicate with each other through a wireless network.
[0164] For example, the BMS 200 may be included in an electric vehicle of a user. The BMS 200 may measure battery information such as voltage, current, etc. of a battery pack included in the electric vehicle and transmit the measured battery information to the battery management device 100. More specifically, the BMS 200 may transmit the battery information to the data acquisition unit 110 of the battery management device 100.
[0165] The battery managing device 100 may store the battery information received from the BMS 200. Upon receiving a request message for a battery life score from the user terminal 300, the battery managing device 100 may calculate a battery life score based on the stored battery information and transmit a response message to the calculated battery life score to the user terminal 300.
[0166] For example, the battery managing apparatus 100 may be included in a server apparatus such as a cloud server connected to both the BMS 200 and the user terminal 300 .
[0167] The battery management device 100 can provide battery life scores for multiple users. Statistics can be provided for multiple users along with the battery life scores.
[0168] The user terminal 300 may transmit a request message of a battery life score to the battery managing apparatus 100 and receive a response message to the request message. The battery life score corresponding to the response message may be output through the display unit of the user terminal 300.
[0169] Fig. 9 : is a view schematically showing an output example of a lifespan score provided to a user according to one embodiment of the present disclosure.
[0170] For example, in Fig. 9 In the embodiment of FIG. 1 , it is assumed that the life score of the battery is determined to be 73 points. The battery life score SCORE_LIFE may be output from the user terminal 300. In addition, statistical information indicating that the battery life score SCORE_LIFE of the corresponding user is in the bottom 45% among the battery life scores of the plurality of users.
[0171] The user can request scores of detailed items such as SOH score SCORE_SOH, RUL score SCORE_RUL, safety score SCORE_SAFETY, and request a battery life score SCORE_LIFE as a combined score. The user can compare the user's battery life score with battery life scores of multiple users.
[0172] Furthermore, the battery managing apparatus 100 may transmit guide information corresponding to each of the battery life score, the SOH score SCORE_SOH, the RUL score SCORE_RUL, and the safety score SCORE_SAFETY to the user terminal 300. That is, appropriate guide information for improving battery life may be provided from the battery managing apparatus 100 to the user.
[0173] Fig.10 is a diagram schematically showing an exemplary configuration of a battery pack 2 according to another embodiment of the present disclosure.
[0174] A battery pack 2 according to another embodiment of the present disclosure may include the battery management device 100 according to one embodiment of the present disclosure. The battery pack 2 may further include electrical components (relays, fuses, etc.), a housing, and the like.
[0175] The positive terminal of the battery 10 may be connected to the positive terminal P+ of the battery pack 2 , and the negative terminal of the battery 10 may be connected to the negative terminal P− of the battery pack 2 .
[0176] The BMS 200 may be connected to the first, second, and third sensing lines SL1, SL2, and SL3. More specifically, the BMS 200 may include a measuring module capable of periodically measuring the voltage and current of the battery 10.
[0177] The BMS 200 may be connected to the positive terminal of the battery 10 through the first sensing line SL1 and to the negative terminal of the battery 10 through the second sensing line SL2. The BMS 200 may measure the voltage of the battery 10 based on the voltage measured in each of the first sensing line SL1 and the second sensing line SL2.
[0178] The BMS 200 may be connected to the current measuring unit A through the third sensing line SL3. For example, the current measuring unit A may be an ammeter or a shunt resistor capable of measuring the charging current and the discharging current of the battery 10. The BMS 200 may measure the charging current of the battery 10 through the third sensing line SL3 to calculate the charging amount. The BMS 200 may also measure the discharging current of the battery 10 through the third sensing line SL3 to calculate the discharging amount.
[0179] although Fig.10 Not shown, but the BMS 200 may be configured to further measure the temperature of the battery 10 .
[0180] The BMS 200 may transmit the measured battery information to the battery managing apparatus 100. More specifically, the BMS 200 may transmit the measured battery information to the data acquiring unit 110 of the battery managing apparatus 100.
[0181] Although the battery management device 100 and the BMS 200 have been described as separate components, according to an embodiment, the battery management device 100 may be included as a component of the BMS 200. That is, the battery management device 100 according to the present disclosure may be applied to the BMS 200. That is, the BMS 200 according to the present disclosure may include the above-mentioned battery management device 100. With this configuration, at least some components of the battery management device 100 may be implemented by supplementing or adding the functions of the components included in the BMS 200. For example, the data acquisition unit 110, the controller 120, and the storage unit 130 of the battery management device 100 may be implemented as components of the BMS 200.
[0182] Fig.11 and Fig.12 is a diagram schematically illustrating a battery management method according to another embodiment of the present disclosure.
[0183] Preferably, each operation of the battery management method may be performed by the battery management device 100. Hereinafter, matters irrelevant to the above matters will be omitted or briefly described.
[0184] Reference Fig.11 , the battery management method may include a battery information acquiring operation S100 , a SOH score calculating operation S200 , a RUL score calculating operation S300 , and a safety score calculating operation S400 .
[0185] although Fig.11 , the SOH score calculation operation S200, the RUL score calculation operation S300, and the safety score calculation operation S400 are performed in sequence, but the SOH score calculation operation S200, the RUL score calculation operation S300, and the safety score calculation operation S400 are independent operations. Therefore, it should be noted that the execution order of the SOH score calculation operation S200, the RUL score calculation operation S300, and the safety score calculation operation S400 is not affected by Fig.11 limitations on the implementation methods.
[0186] The battery information acquisition operation S100 may be an operation of acquiring battery information including at least one of a voltage and a current of a battery, and may be performed by the data acquisition unit 110 .
[0187] The SOH score calculation operation S200 is an operation of estimating the SOH of the battery based on the battery information and calculating the SOH score SCORE_SOH of the battery based on the SOH in a plurality of reference curves and a reference value corresponding to the SOH, and may be performed by the controller 120 .
[0188] The controller 120 may estimate the SOH SOH_P of the battery based on the battery information. The controller 120 may determine a first reference value SOH_R1 in the first reference curve RP1 and a second reference value SOH_R2 in the second reference curve RP2 based on the estimated SOH SOH_P. Finally, the controller 120 may calculate a SOH score SCORE_SOH by scoring a ratio of the estimated SOH SOH_P in the SOH reference interval SOH_R corresponding to the first reference value SOH_R1 and the second reference value SOH_R2.
[0189] The RUL score calculation operation S300 is an operation of predicting multiple SOHs of the battery in the target period TR and calculating a RUL score SCORE_RUL of the battery based on the multiple SOHs in multiple reference curves and multiple reference values corresponding to the multiple SOHs, and may be performed by the controller 120 .
[0190] The controller 120 may select a plurality of SOHs SOH_P in the SOH curve P during the target period TR. The controller 120 may also determine a plurality of first reference values SOH_R1 in the first reference curve RP1 and a plurality of second reference values SOH_R2 in the second reference curve RP2 based on the plurality of selected SOHs SOH_P. Finally, the controller 120 may calculate a RUL score SCORE_RUL by scoring a ratio relative to a sum of a plurality of SOHs in the RUL reference interval RUL_R corresponding to the plurality of first reference values SOH_R1 and the plurality of second reference values SOH_R2.
[0191] The safety score calculation operation S400 may be an operation of calculating a safety score SCORE_SAFETY of the battery according to a safety level of the battery based on the battery information.
[0192] The controller 120 may determine the safety level of the battery based on the similarity between the battery information and a plurality of preset abnormal data. Therefore, the controller 120 may calculate a safety score SCORE_SAFETY corresponding to the determined safety level based on the safety level table.
[0193] The battery management method may have an advantage of evaluating various aspects of battery performance by calculating the SOH score SCORE_SOH, the RUL score SCORE_RUL, and the safety score SCORE_SAFETY based on battery information.
[0194] Reference Fig.12 , the battery management method may further include a battery life score determining operation S500 .
[0195] The battery life score determination operation S500 may be an operation of determining a battery life score by applying a weight value preset to correspond to each of the SOH score SCORE_SOH, the RUL score SCORE_RUL, and the safety score SCORE_SAFETY and summing the application results, and may be performed by the controller 120 .
[0196] The controller 120 may apply a first weight value to the SOH score SCORE_SOH, a second weight value to the RUL score SCORE_RUL, and a third weight value to the safety score SCORE_SAFETY. The controller 120 may determine the battery life score SCORE_LIFE by summing the SOH score SCORE_SOH, the RUL score SCORE_RUL, and the safety score SCORE_SAFETY to which the weight values are applied.
[0197] The battery management method can not only calculate scores of detailed items such as SOH score SCORE_SOH, RUL score SCORE_RUL, safety score SCORE_SAFETY, etc., but also determine the battery life score SCORE_LIFE as a combined score. Therefore, the user can objectively check the current state of the battery by checking the battery life score SCORE_LIFE as a comprehensive indicator.
[0198] The above-mentioned embodiments of the present disclosure are not realized only by devices and methods, but can be realized by a program that realizes functions corresponding to the configuration of the embodiments of the present disclosure or a recording medium that records the program, and this implementation method can be easily realized through the description of the above-mentioned embodiments by experts in the technical field to which the present disclosure belongs.
[0199] Although the present disclosure has been described above with limited embodiments and drawings, the present disclosure is not limited thereto, and a person skilled in the art may make various modifications and changes within the scope equivalent to the technical spirit of the present invention and the appended claims.
[0200] In addition, without departing from the technical spirit of the present invention, ordinary technicians in this field can make various substitutions, modifications and changes to the above invention. Therefore, the present invention is not limited to the above embodiments and drawings, but can selectively combine all or some embodiments to make various modifications.
Claims
1. A battery management device, the battery management device include: a data acquisition unit configured to acquire battery information including at least one of a voltage and a current of the battery; as well as A controller is configured to estimate a state of health (SOH) of the battery based on the battery information, calculate a SOH score of the battery based on the SOH in a plurality of reference curves and a reference value corresponding to the SOH, predict a plurality of SOHs of the battery during a target period, calculate a remaining useful life (RUL) score of the battery based on the plurality of SOHs, and determine a safety score of the battery according to a safety level of the battery based on the battery information.
2. The battery management device according to claim 1, in, The plurality of reference curves include a first reference curve indicating a maximum SOH per unit time of the battery and a second reference curve indicating a minimum SOH per unit time of the battery.
3. The battery management device according to claim 2, in, The controller is further configured to determine a first reference value corresponding to the SOH in the first reference curve, determine a second reference value corresponding to the SOH in the second reference curve, and calculate the SOH score based on a ratio of the SOH relative to the first reference value and the second reference value.
4. The battery management device according to claim 3, in, The controller is further configured to determine a SOH reference interval of the first reference value and the second reference value, calculate a ratio of the SOH relative to the SOH reference interval, and score the calculated ratio to calculate the SOH score.
5. The battery management device according to claim 2, in, The controller is further configured to determine a plurality of first reference values in the first reference curve during the target period, determine a plurality of second reference values in the second reference curve during the target period, and calculate the RUL score based on a ratio of the plurality of SOHs relative to the plurality of first reference values and the plurality of second reference values.
6. The battery management device according to claim 5, in, The controller is further configured to determine a RUL reference interval of the sum of the plurality of first reference values and the sum of the plurality of second reference values, calculate a ratio of the sum of the plurality of SOHs relative to the RUL reference interval, and score the calculated ratio to calculate the RUL score.
7. The battery management device according to claim 2, in, The plurality of reference curves include a third reference curve indicating an average SOH per unit time of the battery, and The controller is further configured to determine a target time point corresponding to a preset threshold in the third reference curve, and set a period from a current time point of estimating the SOH to the target time point as the target period.
8. The battery management device according to claim 1, in, The target period is set as a period from the current time point when the SOH is estimated to an expiration time point of a warranty period preset for the battery.
9. The battery management device according to claim 1, in, The controller is further configured to calculate the security score corresponding to the security level based on a preset security level table.
10. The battery management device according to claim 9, in, The controller is further configured to determine an abnormal behavior of the battery information, calculate a similarity between the determined abnormal behavior and a preset abnormal curve, and determine the safety level based on the calculated similarity.
11. The battery management device according to claim 1, in, The controller is further configured to determine a battery life score by applying a weight value preset to correspond to each of the SOH score, the RUL score, and the safety score and summing application results. 12 . A battery system, comprising the battery management device according to claim 1 . 13 . A battery pack comprising the battery management device according to claim 1 .
14. A battery management method, the battery management method include: A battery information acquisition operation, acquiring battery information including at least one of a voltage and a current of a battery; a state of health SOH score calculation operation of estimating the SOH of the battery based on the battery information, and calculating the SOH score of the battery based on the SOH in a plurality of reference curves and a reference value corresponding to the SOH; a remaining useful life (RUL) score calculation operation of predicting a plurality of SOHs of the battery during a target period and calculating a RUL score of the battery based on the plurality of SOHs; as well as A safety score calculation operation is performed to calculate a safety score of the battery according to a safety level of the battery based on the battery information.
Citation Information
Patent Citations
Electronic device
KR1020220034948A
