A BIM model and equipment data consistency verification method and consistency verification system
By performing consistency verification on the BIM model and equipment data during the building operation and maintenance management phase, the problem of affected management functions and low efficiency of manual verification caused by inconsistent equipment data is solved, achieving fast and accurate data verification, improving Improve operation and maintenance management efficiency and data integrity.
Patent Information
- Application Number
- CN202411390467.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-08
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2044-10-08
AI Technical Summary
During the construction operation and maintenance management stage, the equipment data in the BIM model is inconsistent with the equipment ledger in the actual operation and maintenance platform, resulting in the impact of the equipment management function, the data display is incorrect, and manual verification has timeliness and accuracy problems, which consumes a lot of money. Time and human resources.
Provide a BIM model and device data consistency verification method. By obtaining platform equipment data from the equipment operation and maintenance management platform, and obtaining model device data from the BIM model, consistent verification is performed. If it is discovered inconsistent, the depth verification process is performed, including the maximum or minimum cubes of the construction of a three -dimensional model to evaluate the accuracy of the equipment position point.
Realize the consistency verification of the device data in the BIM model and the device accounts in the actual operation and maintenance platform in the BIM model, improve the efficiency and accuracy of data initialization, reduce artificial errors and human burdens, and improve the platform. The accuracy, integrity and security of delivery reduces costs.
Smart Images

Figure CN118898106B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building digitization, and in particular to a BIM model and equipment data consistency verification method and consistency verification system. Background Art
[0002] BIM technology is the abbreviation of Building Information Modeling, which is a technology based on digital construction. It integrates all data in the process of building design, construction and operation and maintenance into a collaborative 3D model, making all stages of the construction project more efficient, accurate and reliable.
[0003] The core of BIM technology is the building information model, which not only contains the geometric shape of the building, but also includes various information such as building equipment, materials, components, pipelines, electrical systems, etc. This enables the BIM model to provide a full range of perspectives and support multiple data display and analysis methods. In the operation and maintenance management stage, BIM technology can provide a comprehensive building equipment and maintenance information management solution to help maintenance personnel improve work efficiency, accuracy and reliability.
[0004] However, the BIM model is only digital building information. It needs to be accurately matched and bound to the actual building space and equipment to meet the needs in the actual operation and maintenance process. After entering the building operation and maintenance management stage, once the equipment in the BIM model is inconsistent with the equipment in the operation and maintenance platform, it will affect the equipment management function of the platform, and there will be problems such as equipment data display errors and missing data for insufficient equipment. Due to the large number of equipment, often thousands of units, the current method can only rely on manual verification, but manual inspection has great problems in timeliness and accuracy, requires a lot of time and human resources, and is prone to errors and inaccurate results, and cannot ensure the accuracy and completeness of equipment information. Therefore, the accuracy and completeness of data initialization work in the operation and maintenance management stage are very important.
[0005] In view of this, this application is hereby filed. Summary of the invention
[0006] The first purpose of the present invention is to provide a method for checking the consistency of BIM models and equipment data, which can quickly and accurately check the consistency of equipment data in the BIM model with the equipment ledger in the actual operation and maintenance platform, greatly improving the efficiency and accuracy of data initialization in the operation and maintenance management stage, greatly reducing human errors and alleviating the manpower burden, improving the accuracy, integrity and security of platform delivery, reducing costs while also improving delivery efficiency.
[0007] The second purpose of the present invention is to provide a consistency verification system, which can quickly and accurately perform consistency verification on the equipment data in the BIM model and the equipment ledger in the actual operation and maintenance platform, greatly improving the efficiency and accuracy of data initialization in the operation and maintenance management stage, greatly reducing human errors and alleviating the manpower burden, improving the accuracy, integrity and security of platform delivery, reducing costs while also improving delivery efficiency.
[0008] The embodiment of the present invention is achieved as follows:
[0009] A method for checking consistency between a BIM model and equipment data comprises the following steps:
[0010] S1. Obtain platform equipment data from the equipment operation and maintenance management platform of the target building, where the platform equipment data includes the location of the platform equipment;
[0011] S2. Determine model equipment data according to the BIM model of the target building, where the model equipment data includes model equipment location points;
[0012] S3. Verify whether the platform device data and the model device data are completely consistent and correspond to each other; if so, the consistency check is qualified; if not, the consistency check is unqualified.
[0013] Further, in S3, if the platform device location point and the model device location point are inconsistent between the platform device data and the model device data, a deep verification process is executed, and the deep verification process includes the following steps:
[0014] S'1. Construct a maximum cuboid within the spatial range of the three-dimensional model of the corresponding equipment in the BIM model of the target building, and take the maximum cuboid as the evaluation object;
[0015] S'2. Determine the volume ratio of the evaluation object to the corresponding device. If the volume ratio is greater than or equal to a first ratio threshold, use the evaluation object as a reference benchmark;
[0016] S'3. If the platform equipment position point is within the reference datum range, it is determined that the platform equipment data and the model equipment data are completely consistent and corresponding.
[0017] Further, in S'2, if the volume ratio is less than the first ratio threshold, a minimum cuboid that can completely contain the three-dimensional model of the equipment is constructed according to the three-dimensional model of the corresponding equipment in the BIM model of the target building, and the minimum cuboid is used as the evaluation object;
[0018] The evaluation object is intercepted with a plane parallel to a surface of the evaluation object, and the volume proportion of the device in the intercepted object is determined. If the volume proportion is less than the second ratio threshold, the remaining part after the interception is used as a new evaluation object and the interception operation is repeated until the volume proportion of the device in the intercepted object is always greater than or equal to the second ratio threshold. At this time, the final intercepted remaining part is used as a reference benchmark and S'3 is executed.
[0019] Furthermore, in S3, when verifying whether the platform device data and the model device data are completely consistent and corresponding, it includes: and verifying whether the platform device location point and the model device location point are consistent.
[0020] Furthermore, the BIM model and equipment data consistency verification method also includes the following steps:
[0021] S4. Generate a consistency check result report and mark the equipment that fails the consistency check in the BIM model of the target building.
[0022] A consistency verification system comprises: a first information acquisition end, a second information acquisition end and a processing end.
[0023] The first information acquisition end is used to execute S1 in the above-mentioned BIM model and equipment data consistency verification method, and the first information acquisition end is used to communicate with the equipment operation and maintenance management platform to obtain platform equipment data.
[0024] The second information acquisition end is used to execute S2 in the above-mentioned BIM model and equipment data consistency verification method, and the second information acquisition end is used to communicate with the BIM model system to obtain model equipment data.
[0025] The first information acquisition terminal and the second information acquisition terminal are both connected to the processing terminal for communication. The processing terminal is used to execute S3 in the above-mentioned BIM model and equipment data consistency verification method.
[0026] Furthermore, the consistency verification system further includes: a data reporting end. The data reporting end is used to execute S4 in the above-mentioned BIM model and equipment data consistency verification method.
[0027] Furthermore, the data reporting end is also used to collect statistics on consistency check failure rates of different types of devices according to the consistency check result report, and sort them in order of high to low consistency check failure rates.
[0028] The beneficial effects of the technical solution of the embodiment of the present invention include:
[0029] The BIM model and equipment data consistency verification method provided by the embodiment of the present invention can quickly complete the consistency verification between the equipment operation and maintenance management platform and the equipment actually existing in the target building during the data initialization stage of the operation and maintenance management stage, and realize the intuitive and rapid positioning of the problem equipment.
[0030] In general, the BIM model and equipment data consistency verification method provided in the embodiment of the present invention can quickly and accurately perform consistency verification on the equipment data in the BIM model and the equipment ledger in the actual operation and maintenance platform, greatly improving the data initialization work efficiency and accuracy in the operation and maintenance management stage, greatly reducing human errors and reducing the manpower burden, improving the accuracy, integrity and security of platform delivery, reducing costs while also improving delivery efficiency. The consistency verification system provided in the embodiment of the present invention can quickly and accurately perform consistency verification on the equipment data in the BIM model and the equipment ledger in the actual operation and maintenance platform, greatly improving the data initialization work efficiency and accuracy in the operation and maintenance management stage, greatly reducing human errors and reducing the manpower burden, improving the accuracy, integrity and security of platform delivery, reducing costs while also improving delivery efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0032] Figure 1 A schematic diagram of the overall process of the method for verifying the consistency of BIM model and equipment data provided by an embodiment of the present invention;
[0033] Figure 2 A schematic diagram for determining the evaluation object based on the three-dimensional model of the equipment;
[0034] Figure 3 This is a schematic diagram of intercepting the evaluation object using the first interception method;
[0035] Figure 4 A schematic diagram of a cutout portion of the evaluation object;
[0036] Figure 5 A schematic diagram of the second interception method of the evaluation object;
[0037] Figure 6 Schematic diagram of the third interception method of the evaluation object. DETAILED DESCRIPTION
[0038] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0039] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0041] The terms “first”, “second”, etc. are only used for distinguishing descriptions and should not be understood as indicating or implying relative importance.
[0042] As shown in this specification and claims, unless the context clearly provides an example, the words "a", "an", "the", etc. do not refer to the singular, but also include the plural. Generally speaking, the terms "include" and "comprise" only indicate the inclusion of the steps and elements that have been clearly identified, and these steps and elements do not constitute an exclusive list. The method or device may also include other steps or elements.
[0043] The flowcharts used in this specification are used to illustrate the operations performed by the system according to the embodiments of this specification. It is understood that the operations of each step are not necessarily performed precisely in order. On the contrary, the steps can be processed in reverse order or simultaneously. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.
[0044] Please refer to Figure 1 , this embodiment provides a method for checking consistency between a BIM model and equipment data, the method comprising the following steps:
[0045] S1. Obtain platform equipment data from the equipment operation and maintenance management platform of the target building, where the platform equipment data includes the location points of the platform equipment. The platform equipment data refers to the relevant information of the equipment recorded in the equipment operation and maintenance management platform.
[0046] S2. Determine model equipment data according to the BIM model of the target building, where the model equipment data includes model equipment location points. The model equipment data refers to the relevant information of the equipment reflected in the BIM model of the target building.
[0047] S3. Check whether the platform device data and the model device data are completely consistent. If yes, the consistency check is qualified. If not, the consistency check is unqualified.
[0048] Specifically, in S3, verifying whether the platform device data and the model device data are completely consistent and corresponding includes: verifying whether the platform device location point and the model device location point are consistent.
[0049] The method for checking the consistency of the BIM model and equipment data also includes the step: S4, generating a consistency check result report, and marking the equipment that fails the consistency check in the BIM model of the target building.
[0050] In this way, the consistency check between the equipment operation and maintenance management platform and the actual equipment in the target building can be quickly completed during the data initialization phase of the operation and maintenance management phase, and the problem equipment can be intuitively and quickly located.
[0051] Optionally, when extracting model equipment data from the BIM model of the target building, the BIM model may be lightweight converted and converted into an offline data package to facilitate on-site verification at the target building site.
[0052] In this embodiment, in S3, if the platform device location point and the model device location point are inconsistent between the platform device data and the model device data, the deep verification process is executed. In other words, the deep verification process is also part of S3. Specifically, the deep verification process includes the following steps:
[0053] S'1. Construct the largest cuboid within the spatial range of the 3D model of the corresponding equipment in the BIM model of the target building, that is, construct the largest cuboid inside the 3D model of the equipment, which is equivalent to making the largest cuboid inside the 3D model of the equipment and inscribed with the 3D model. Take the largest cuboid as the evaluation object. In particular, when the 3D model of the equipment is spherical, the constructed largest cuboid becomes a special cuboid with equal side lengths, that is, a cube.
[0054] S'2. Determine the volume ratio of the evaluation object to the corresponding device. If the volume ratio is greater than or equal to the first ratio threshold, the evaluation object is used as a reference benchmark. The reference benchmark is essentially a spatial range. The first ratio threshold can be adjusted according to actual conditions.
[0055] S'3. If the platform device position point is within the reference datum range, that is, the platform device position point of the device is located inside or on the surface of the reference datum, it is determined that the platform device data and the model device data are completely consistent and corresponding.
[0056] Furthermore, in S'2, if the volume ratio is less than the first ratio threshold, a minimum cuboid that can completely contain the three-dimensional model of the device is constructed based on the three-dimensional model of the corresponding device in the BIM model of the target building, that is, a minimum cuboid is constructed to surround the three-dimensional model of the device, so that the three-dimensional model of the device is located in the minimum cuboid, and the three-dimensional model of the device is inscribed in the minimum cuboid. The minimum cuboid is used as the evaluation object. In particular, when the three-dimensional model of the device is spherical, the constructed minimum cuboid becomes a special cuboid with equal side lengths, that is, a cube.
[0057] like Figure 2 As shown, the evaluation object corresponding to device A is cuboid a. The cuboid a is the smallest cuboid that can contain device A.
[0058] The object to be evaluated is intercepted by a plane parallel to one surface of the object to be evaluated, such as Figure 3 As shown, the cuboid a is intercepted by plane P1, and the intercepted object is object p, as shown in Figure 4 shown.
[0059] In the intercepted object, the device corresponds to the space K1, and the overall space of the intercepted object (object p) is K2.
[0060] Determine the volume ratio of the device in the intercepted object, volume ratio = volume of space K1 / volume of space K2. If the volume ratio is less than the second ratio threshold, the remaining part after interception is used as a new evaluation object and the interception operation is repeated. The second ratio threshold can be set and adjusted according to actual needs. Among them, the "thickness" of each interception can be flexibly selected according to actual needs, that is, the unit thickness of each interception can be adjusted according to actual conditions.
[0061] When the volume proportion of the device in the intercepted object is always greater than or equal to the second ratio threshold, the remaining portion is used as a reference benchmark and S'3 is executed.
[0062] It should be noted that the plane P1 can be intercepted from both ends of the cuboid a. Since the cuboid a has multiple surfaces, the cuboid a can also be intercepted by replacing the plane parallel to the other surfaces of the cuboid a, such as Figure 5 The plane P2 and Figure 6 Plane P3 in .
[0063] When intercepting from various directions, the volume proportion of the device in the intercepted object is always greater than or equal to the second ratio threshold, and the final remaining part can be used as a reference benchmark.
[0064] Through this design, the main part of the device on its three-dimensional structure can be smoothly confirmed, which facilitates reasonable judgment of its position points, thereby completing the consistency verification of the position points of devices with irregular shapes and helping to troubleshoot problems with incorrect equipment installation positions.
[0065] This embodiment also provides a consistency verification system, which includes: a first information acquisition end, a second information acquisition end and a processing end.
[0066] The first information acquisition end is used to execute S1 in the above-mentioned BIM model and equipment data consistency verification method, and the first information acquisition end is used to communicate with the equipment operation and maintenance management platform to obtain platform equipment data.
[0067] The second information acquisition end is used to execute S2 in the above-mentioned BIM model and equipment data consistency verification method, and the second information acquisition end is used to communicate with the BIM model system to obtain model equipment data.
[0068] The first information acquisition terminal and the second information acquisition terminal are both connected to the processing terminal for communication. The processing terminal is used to execute S3 in the above-mentioned BIM model and equipment data consistency verification method.
[0069] The consistency verification system further includes: a data reporting end. The data reporting end is used to execute S4 in the above-mentioned BIM model and equipment data consistency verification method.
[0070] In addition, the data reporting end is also used to count the consistency check failure rates of different types of equipment according to the consistency check result report, and sort them in order of high and low consistency check failure rates. This allows managers to quickly understand the status of different types of equipment and to troubleshoot equipment types with high consistency check failure rates.
[0071] In summary, the BIM model and equipment data consistency verification method provided in the embodiment of the present invention can quickly and accurately perform consistency verification on the equipment data in the BIM model and the equipment ledger in the actual operation and maintenance platform, greatly improving the data initialization work efficiency and accuracy in the operation and maintenance management stage, greatly reducing human errors and reducing the manpower burden, improving the accuracy, integrity and security of platform delivery, reducing costs while also improving delivery efficiency. The consistency verification system provided in the embodiment of the present invention can quickly and accurately perform consistency verification on the equipment data in the BIM model and the equipment ledger in the actual operation and maintenance platform, greatly improving the data initialization work efficiency and accuracy in the operation and maintenance management stage, greatly reducing human errors and reducing the manpower burden, improving the accuracy, integrity and security of platform delivery, reducing costs while also improving delivery efficiency.
[0072] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for checking consistency between BIM model and equipment data, characterized in that: The steps include: S1. Acquire platform equipment data from the equipment operation and maintenance management platform of the target building, wherein the platform equipment data includes the location point of the platform equipment; S2. Determine model equipment data according to the BIM model of the target building, wherein the model equipment data includes model equipment location points; S3, verifying whether the platform device data and the model device data are completely consistent and corresponding; if so, the consistency check is qualified; if not, the consistency check is unqualified; In S3, if the platform device location point and the model device location point are inconsistent between the platform device data and the model device data, a deep verification process is performed, and the deep verification process includes the following steps: S'1. Construct a maximum cuboid within the spatial range of the three-dimensional model of the corresponding equipment in the BIM model of the target building, and take the maximum cuboid as the evaluation object; S'2, determining the volume ratio of the evaluation object to the corresponding device, and if the volume ratio is greater than or equal to a first ratio threshold, taking the evaluation object as a reference benchmark; S'3. If the platform device position point is within the reference datum range, it is determined that the platform device data and the model device data are completely consistent and correspond to each other; In S'2, if the volume ratio is less than the first ratio threshold, a minimum cuboid that can completely contain the three-dimensional model of the corresponding equipment in the BIM model of the target building is constructed, and the minimum cuboid is used as an evaluation object; The evaluation object is intercepted with a plane parallel to a surface of the evaluation object to determine the volume ratio of the device in the intercepted object. If the volume ratio is less than a second ratio threshold, the remaining portion after interception is used as a new evaluation object and the interception operation is repeated until the volume ratio of the device in the intercepted object is always greater than or equal to the second ratio threshold. At this time, the final intercepted remaining portion is used as the reference benchmark and S'3 is executed.
2. The method for checking consistency between BIM model and equipment data according to claim 1, characterized in that: The BIM model and equipment data consistency verification method also includes the following steps: S4. Generate a consistency check result report, and mark the equipment that fails the consistency check in the BIM model of the target building.
3. A consistency verification system, characterized in that: include: A first information acquisition terminal, a second information acquisition terminal and a processing terminal; The first information acquisition end is used to perform S1 in the BIM model and equipment data consistency verification method according to any one of claims 1 to 2, and the first information acquisition end is used to communicate with the equipment operation and maintenance management platform to obtain the platform equipment data; The second information acquisition end is used to perform S2 in the BIM model and equipment data consistency verification method according to any one of claims 1 to 2, and the second information acquisition end is used to communicate with the BIM model system to obtain the model equipment data; The first information acquisition end and the second information acquisition end are both communicatively connected to the processing end; the processing end is used to execute S3 in the BIM model and equipment data consistency verification method as described in any one of claims 1 to 2.
4. The consistency checking system according to claim 3, characterized in that: The consistency verification system also includes: a data reporting end; the data reporting end is used to execute S4 in the BIM model and equipment data consistency verification method as described in claim 2.
5. The consistency checking system according to claim 4, characterized in that: The data reporting end is further used to collect statistics on consistency check failure rates of different types of equipment according to the consistency check result report, and sort the consistency check failure rates in order of high and low.
Citation Information
Patent Citations
Building construction pre-assembly method and system based on BIM technology
CN110414170A
Building period digital monitoring method and system based on surveying and mapping point cloud
CN117808852A