A construction method for combining a river channel in a site with a permanent drain
By using a transverse "品"-shaped concrete box culvert structure at the junction of the river and drainage pipes within the site, rainwater and sewage are separated, and a secondary recycling pond is set up. This solves the problem of rainwater and sewage crossing during construction within the site, achieves efficient diversion and secondary recycling of water resources, and improves construction safety.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- SHANGHAI BAOYE GRP CORP
- Filing Date
- 2024-08-28
- Publication Date
- 2026-05-08
AI Technical Summary
In the existing technology, there is a lack of effective methods for the construction of cross rivers and stormwater and sewage drainage pipes within the site, which leads to frequent water waste and pollution incidents, and there is a lack of means for the secondary recycling and reuse of water resources.
The structure adopts a transverse "品"-shaped concrete box culvert to separate rainwater and sewage from the river. It is equipped with a dedicated channel for river water and separate drainage channels for rainwater and sewage. A secondary recycling pool is set up next to the concrete box culvert to realize the secondary recycling and reuse of rainwater and river water.
It effectively separates rainwater, sewage, and river water, improves drainage efficiency, reduces water waste, enhances the secondary recycling of water resources, and reduces the risk of people falling into the river.
Smart Images

Figure CN118911262B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of in-site drainage construction, specifically a construction method combining a river across the site with a permanent drainage pipeline. Background Art
[0002] In view of the construction intersection of a transverse river and in-site rainwater and sewage drainage pipelines in the site area, there is no corresponding construction method to solve the problems of rainwater, sewage, and river water diversion and partial secondary recycling of water resources at one time, and water resource waste and pollution incidents are likely to occur.
[0003] Therefore, a construction method for solving the combination and utilization of a river across the site and in-site drainage pipelines is a problem worthy of research. Summary of the Invention
[0004] The present invention aims to overcome the defects of the prior art, and provides a construction method combining a river across the site with a permanent drainage pipeline, which solves the cross-construction of a river across the site and in-site rainwater and sewage pipelines, and solves the cross-diversion of in-site rainwater, sewage, and river water and partial water resource recycling at one time.
[0005] In order to solve the above technical problems, the present invention is implemented as follows:
[0006] A construction method combining a river across the site with a permanent drainage pipeline, characterized in that: firstly, the original river across the site is excavated by slope cutting of earthwork, and the river trend and slope are measured and set out for positioning; secondly, a transverse "pin" - shaped concrete box culvert structure is constructed along the river; then, a secondary recovery pool structure is added at the in-site water use points to meet the in-site water use requirements; finally, after the structure construction is completed, the earthwork is backfilled and compacted, and the road surface is hardened.
[0007] The described construction method combining a river across the site with a permanent drainage pipeline is characterized in that: the overall combination and diversion of rainwater, sewage, and river water are solved by a transverse "pin" - shaped concrete box culvert. A dedicated river water circulation channel is set on one side, and the other side is divided into two layers. The upper part is provided with a rainwater drainage channel, and the lower part is provided with a sewage drainage channel.
[0008] The described construction method combining a river across the site with a permanent drainage pipeline is characterized in that: the upper rainwater channel is discharged by converging into the in-site rainwater pipeline on one side. An overflow port is set on the other side of the rainwater channel. When the in-site rainwater volume is too large, it can overflow through the overflow port and be discharged into the river channel, which can effectively enhance the drainage effect.
[0009] The described construction method combining a river across the site with a permanent drainage pipeline is characterized in that: a secondary recovery pool can be set beside the transverse "pin" - shaped concrete box culvert to supply water for in-site greening and car washing by using rainwater recycling and secondary river water replenishment.
[0010] A construction method combining a river channel and a permanent drainage pipeline across a site is characterized in that the "pin" - shaped concrete box culvert can be constructed by prefabrication or in - situ casting, and anti - permeation concrete is used; when prefabricated concrete construction is adopted, anti - leakage measures should be taken at the joint part.
[0011] A construction method combining a river channel and a permanent drainage pipeline across a site is characterized in that after the construction of the concrete box culvert structure of the concrete structure, the soil is backfilled and compacted, and the top is hardened.
[0012] The beneficial effects of the present invention are as follows: As can be seen from the above technical solutions, the present application provides a construction method combining a river channel and a permanent drainage pipeline across a site. The "pin" - shaped concrete box culvert structure in the transverse section is simple in structure, high in bearing capacity, and has a mature construction technology; it can effectively achieve the diversion of rainwater, sewage, and river water and the secondary recycling of part of the water resources; after the construction of the "pin" - shaped concrete box culvert structure in the transverse section is completed, it can be backfilled and hardened, improving the cross - river commuting efficiency and reducing the risk of people falling into the river. Brief Description of the Drawings
[0013] The following further describes the present invention in detail in conjunction with the drawings and embodiments:
[0014] Figure 1 is the "pin" - shaped box culvert in the transverse section;
[0015] Figure 2 is the sectional view of 1 - 1;
[0016] Figure 3 is the sectional view of 2 - 2;
[0017] Figure 4 is the plan view of the secondary recovery pool;
[0018] Figure 5 is the sectional view of 4 - 4 (sectional view of the secondary recovery pool);
[0019] Figure 6 is the sectional view of 3 - 3 (structural drawing of the secondary recovery pool). Detailed Embodiments
[0020] The technical solutions of the embodiments of the present application will be clearly and completely described below in conjunction with the drawings. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of them. Based on the embodiments in the embodiments of the present application, all other embodiments obtained by those of ordinary skill in the art without creative efforts belong to the scope claimed by the present application.
[0021] As Figure 1-6Shown: A construction method combining a river channel across a site with a permanent drainage pipeline, characterized in that: First, the original river channel across the site is excavated by slope cutting of earthwork, and the river channel direction and slope are measured, set out and positioned; Second, a transverse "pin" - shaped concrete box culvert structure is constructed along the river; Then, a secondary recycling pool structure is added at the water - using points within the site to meet the water - using requirements within the site; Finally, after the structure construction is completed, the earthwork is backfilled and compacted, and the road surface is hardened.
[0022] Specifically, the combined diversion of the overall rainwater, sewage and river water is solved by a transverse "pin" - shaped concrete box culvert. A dedicated river water circulation channel is set on one side, and on the other side, it is divided into two layers. The upper part is provided with a rainwater drainage channel, and the lower part is provided with a sewage drainage channel.
[0023] The upper - part rainwater channel is汇 入排出 (should be "drained into and discharged through") the rainwater pipeline within the site on one side. An overflow outlet is set on the other side of the rainwater channel. When the rainwater volume within the site is too large, it can overflow through the overflow outlet and be discharged into the river channel, which can effectively enhance the drainage effect.
[0024] A secondary recycling pool can be set beside the transverse "pin" - shaped concrete box culvert to supply water for the greening and car washing within the site by using rainwater recycling and secondary river water replenishment.
[0025] The "pin" - shaped concrete box culvert can be constructed by pre - casting or in - situ casting, and anti - permeable concrete is used; when pre - cast concrete construction is adopted, anti - leakage measures should be taken for the joint part.
[0026] After the construction of the concrete box culvert structure of the concrete structure is completed, the earthwork is backfilled and compacted, and the top is hardened.
[0027] In the present invention, the original river channel across the site is excavated by slope cutting of earthwork, and the river channel direction and slope are measured, set out and positioned. A transverse "pin" - shaped concrete box culvert structure (such as Figure 1 ) is constructed along the river. A secondary recycling pool structure (such as Figure 4 ) is added at the water - using points within the site to meet the water - using requirements within the site. After the structure construction is completed, the earthwork is backfilled and compacted, and the road surface is hardened.
[0028] The above are only the embodiments provided by this application and are not used to limit this application. Although this application has been described in detail with reference to the embodiments, for those skilled in the art, they can still modify the technical solutions recorded in the foregoing embodiments, or perform equivalent substitution on some of the technical features. However, any modification, equivalent substitution, improvement, etc. made within the spirit and principle of this application shall be included within the protection scope of this application.
Claims
1. A construction method combining a river crossing within a site with a permanent drainage pipeline, characterized in that: First, the original river within the site was excavated by earthwork slope cutting, and the alignment and slope of the river were measured and set out; secondly, a transverse "pin" - shaped concrete box culvert structure was constructed along the river flow; then, a secondary recycling pool structure was added at the water - use points within the site to meet the water - use requirements within the site; finally, after the structural construction was completed, the earthwork was backfilled and compacted, and the road surface was hardened. The combined diversion of rainwater, sewage, and river water is solved through a transverse "pin" - shaped concrete box culvert. A dedicated river - water circulation channel is set on one side, and on the other side, it is divided into two layers. The upper part is provided with a rain - water drainage channel, and the lower part is provided with a sewage drainage channel. The upper - part rain - water channel converges and discharges through the rain - water pipes on one side of the site. An overflow outlet is set on the other side of the rain - water channel. When the rainwater volume within the site is too large, it overflows through the overflow outlet and is discharged into the river channel, effectively enhancing the drainage effect. A secondary recycling pool is set beside the transverse "pin" - shaped concrete box culvert to supply water for the greenery and car - washing within the site by using rain - water recycling and secondary river - water replenishment.
2. The construction method combining a river crossing within a site with a permanent drainage pipeline as described in claim 1, characterized in that: The "pin" - shaped concrete box culvert is constructed by pre - casting or in - situ casting, and anti - seepage concrete is used. When pre - cast concrete construction is adopted, anti - leakage measures should be taken for the joint part.
3. The construction method combining a river crossing within a site with a permanent drainage pipeline as described in claim 1, characterized in that: After the construction of the concrete box culvert structure of the concrete structure is completed, the earthwork is backfilled and compacted, and the top is hardened.
Citation Information
Patent Citations
Urban river channel complex