System and method for intelligently managing power data of transformer area based on Internet of Things

By building an intelligent power data management cloud platform in the station area, analyzing the data of power equipment and power users, the damage to power equipment and insufficient power supply caused by changes in power supply load and demand is solved, and the intelligent monitoring and fault prediction of the power system are realized , ensuring the stability and safety of power supply.

CN118917824AInactive Publication Date: 2024-11-08江苏桩联联新能源科技有限公司
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410918123.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the station area, the power supply load of power equipment and the power supply demand of power users are inconsistent, which may lead to damage to power equipment or insufficient power supply, causing safety problems. It is difficult for the existing technology to effectively monitor and adjust to ensure the stability and safety of power supply.

Method used

By building a smart cloud platform for power data in Taiwan, analyzing the historical maintenance records and current data of power equipment, evaluating fault risks, combining the historical power consumption data of power users, adjusting power supply strategies, realizing intelligent monitoring and fault prediction, and optimizing power equipment power supply strategy.

Benefits of technology

It improves the accuracy of the status determination of power equipment, ensures normal power supply from power users, and maximizes the avoidance of damage to power equipment and insufficient power supply, which improves the safety and reliability of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917824A_ABST
    Figure CN118917824A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of intelligent management of power data, in particular to an intelligent management system and method for power data of a transformer area based on the Internet of Things, and the method comprises the steps: analyzing the fault relevance between power equipment in the transformer area; extracting each piece of equipment data of each piece of power equipment from each historical maintenance record of each piece of power equipment in the transformer area, and analyzing equipment states of the power equipment in different data ranges of each piece of equipment data to obtain feature equipment data of the power equipment in the transformer area; performing fault risk assessment on each power device in the current period; calculating a first power supply demand quantity of each power utilization unit to the transformer area in the current period; and based on the characteristic power equipment data of the transformer area in the current period and in combination with the first power supply demand of the power utilization unit, intelligently adjusting a power supply strategy of the transformer area to the power utilization unit, and intelligently monitoring power equipment in the transformer area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent management of electric power data, and in particular to an intelligent management system and method for electric power data in a substation based on the Internet of Things. Background Art

[0002] In the power system, a substation usually refers to a specific area. A substation can usually include multiple power equipment, such as switchgear, transformers, distribution equipment, etc. These power equipment work together to provide stable and safe power supply to users in the substation. The Internet of Things technology can be connected with the Internet and communication technology to connect various physical devices, sensors, software and data. The use of Internet of Things technology in the intelligent management of power data in the substation can monitor the operating status and power load status of each power equipment in the substation in real time, and realize remote control and adjustment. In addition, the Internet of Things technology can also realize the automatic collection and analysis of power data in the substation. In general, the use of Internet of Things technology in the intelligent management of power data in the substation can not only improve the operating efficiency of the power system, but also greatly improve the reliability of power supply.

[0003] There are many power equipment in the substation, which supply power to power users through corresponding transmission lines. However, when the substation supplies power to power users, the power equipment may fail or be severely damaged, resulting in the power equipment being unable to be used normally. At this time, in order not to affect the normal power consumption of the power users, other power equipment is needed to share the power supply task of the power equipment that cannot be used normally. However, the power supply load of each power equipment is different, and the power supply demand of the power users at different times is also different. Too high a power supply load may cause damage to the power equipment, and too low a power supply load may cause insufficient power supply to the power users. All of these may cause a series of safety issues. Summary of the invention

[0004] The purpose of the present invention is to provide an intelligent management system and method for power data in an area based on the Internet of Things to solve the problems raised in the above-mentioned background technology.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a method for intelligent management of power data in a substation area based on the Internet of Things, the method comprising:

[0006] Step S100: constructing a cloud platform for intelligent management of power data in the substation area, obtaining each historical maintenance record of each power device in the substation area, and analyzing the fault correlation between each power device in the substation area based on each historical maintenance record of each power device;

[0007] Step S200: extracting various equipment data of each power equipment from various historical maintenance records of each power equipment in the substation, and analyzing the equipment status of the power equipment under different data ranges of various equipment data to obtain characteristic equipment data of the power equipment in the substation;

[0008] Step S300: monitor each power device in the substation in the current cycle, obtain various equipment data of each power device in the current cycle, and perform a fault risk assessment on each power device in the current cycle based on the characteristic equipment data of the power devices and the fault correlation between different power devices, and obtain the characteristic power equipment data of the substation in the current cycle;

[0009] Step S400: obtaining the power consumption units responsible for power supply in the substation, and obtaining the historical power consumption data of the power consumption units in various historical periods, and calculating the first power supply demand of each power consumption unit for the substation in the current period;

[0010] Step S500: Based on the characteristic power equipment data of the substation in the current cycle and in combination with the first power supply demand of the power user, the power supply strategy of the substation to the power user is intelligently adjusted, and the power equipment in the substation is intelligently monitored.

[0011] Furthermore, step S100 includes:

[0012] Step S101: constructing a cloud platform for intelligent management of power data in the substation area, and obtaining each historical maintenance record of each power equipment in the substation area;

[0013] Step S102: Set a unit time length, extract the time point of the power equipment failure from the historical maintenance record, and use it as the time point of the historical maintenance record, and obtain the historical maintenance records of each power equipment before the time point of the bth historical maintenance record of the ath power equipment. When the distance time length between the historical maintenance records of each power equipment and the time point of the bth historical maintenance record of the ath power equipment is greater than the unit time length, record the bth historical maintenance record of the ath power equipment as the first historical maintenance record of the substation where the ath power equipment is located;

[0014] Step S103: in the area where the ath power device is located, historical maintenance records of each power device after the first historical maintenance record time point of the ath power device are obtained. When there are two historical maintenance record time points in the historical maintenance records of each power device with a time length greater than the unit time length, the historical maintenance record of the power device with the shortest time length to the first historical maintenance record of the ath power device is obtained and recorded as the characteristic historical maintenance record;

[0015] Step S104: obtaining a distance duration between the characteristic historical maintenance record and the first historical maintenance record of the a-th power device, and recording it as a first characteristic duration of the first historical maintenance record of the a-th power device;

[0016] Step S105: Obtain the first characteristic duration of each first historical maintenance record of the ath power device, and obtain the first data collection period of the εth first historical maintenance record of the ath power device in, is the time point corresponding to each first historical maintenance record of the a-th power equipment, is the first characteristic duration of the εth first historical maintenance record of the ath power equipment;

[0017] Step S106: Acquire each power device in the substation where the ath power device is located. When there is a time point of the historical maintenance record corresponding to the θth power device, which is within the first data collection period of the εth first historical maintenance record of the ath power device, record the θth power device as the second marked power device of the ath power device in the first data collection period, acquire each second marked power device of the ath power device in the first data collection period and collect them, so as to obtain the power device set of the ath power device in the first data collection period;

[0018] Step S107: obtaining a set of power devices of the ath power device in each first data collection period, taking an intersection of the set of power devices of the ath power device in each first data collection period, obtaining a first passive power device of the ath power device, and determining whether the ath power device has a fault association with the first passive power device;

[0019] Step S108: Acquire and aggregate the first passive power equipment of each power equipment in the substation to obtain first power equipment data corresponding to the power equipment in the substation;

[0020] The first passive power device of the power equipment is obtained in the above steps, taking into account that some power equipment in the substation may affect each other in real life. Sometimes the data of the power equipment is normal, but it may be affected by other power equipment, which may cause power equipment failure. This makes the power equipment failure correlated. This step takes this into consideration to obtain the first passive power device of the power equipment, thereby greatly improving the accuracy of the prediction of the power equipment.

[0021] Further, step S200 includes:

[0022] Step S201: Obtaining each historical maintenance record of each power equipment in the substation, and extracting each equipment data of the power equipment from the historical maintenance record;

[0023] Step S202: Obtain each historical maintenance record of the fth power equipment in the substation, extract the corresponding values ​​of each equipment data of the fth power equipment from each historical maintenance record of the fth power equipment in the substation, and obtain the maximum value G of the gth equipment data of the fth power equipment max , get the minimum value G of the g-th item of equipment data of the f-th power equipment min , obtain the first equipment data accuracy value n preset by the staff; obtain the first data difference value G of the g-th equipment data of the f-th power equipment D-value =G max -G min ;

[0024] Step S203: Calculate the first data value of the g-th item of equipment data of the f-th power equipment Get the kth data range of the gth item of equipment data of the fth power equipment

[0025] Calculate the fth power device The first data ratio value

[0026]

[0027] Among them, S sum is the total number of historical maintenance records of the fth power equipment; is the total number of historical maintenance records corresponding to the f-th power equipment when the value corresponding to the g-th item of equipment data of the f-th power equipment is within the k-th data range;

[0028] Step S204: Setting a first data ratio threshold value, when the fth power device The first data ratio value is greater than the threshold, and the first data ratio value corresponding to the k-1th data range of the g-th data of the f-th power device is less than the first data ratio value threshold, the k-th data range of the g-th data of the f-th power device is used as the characteristic data range corresponding to the g-th data of the f-th power device;

[0029] Step S205: Acquire and aggregate the characteristic data ranges corresponding to the equipment data of each power equipment in the substation to obtain the characteristic equipment data of the power equipment in the substation.

[0030] Furthermore, step S300 includes:

[0031] Step S301: monitor each power device in the substation area in the current cycle, and obtain various equipment data of each power device in the substation area in the current cycle;

[0032] Step S302: Acquire characteristic equipment data of the power equipment in the substation, extract the equipment data of the εth power equipment in the substation, and when the corresponding value of the βth equipment data of the εth power equipment in the substation in the current cycle is greater than the maximum value of the βth equipment data within the characteristic data range, determine that the εth power equipment has a risk of failure in the current cycle, and record the εth power equipment as the target power equipment;

[0033] Step S303: obtaining first power equipment data corresponding to the power equipment in the substation, extracting each first passive power equipment of the εth power equipment in the substation, and recording the first passive power equipment of the εth power equipment as the second target power equipment;

[0034] Step S304: Acquire each target power device in the current cycle of the substation and the second target power device corresponding to the target power device, collect each target power device in the current cycle of the substation and the second target power device corresponding to each target power device, and obtain the characteristic power device data of the substation in the current cycle.

[0035] Furthermore, step S400 includes:

[0036] Step S401: Acquire each power consumption unit in the substation area, and extract the corresponding power consumption of each power consumption unit in each historical period from the historical power consumption data of each power consumption unit in each historical period;

[0037] Step S402: The power consumption of the zth power consumption unit in each historical period is collected to obtain the power consumption set of the zth power consumption unit, and the characteristic data change value M of the τth historical period in the zth power consumption unit is calculated:

[0038]

[0039] in, is the electricity consumption of the z-th electricity user in the τ-th historical period; is the electricity consumption of the z-th electricity user in the τ-th historical period;

[0040] Step S403: Obtain the characteristic data change value of the zth power consumption unit in each historical period, and obtain the median L of the power consumption of the zth power consumption unit in each historical period from the power consumption set of the zth power consumption unit. median , recorded as characteristic power consumption; calculate the first power supply demand R of the zth power user to the substation in the current cycle z :

[0041] R z =L median ×M max +L median ;

[0042] Among them, M max is the maximum value of the characteristic data change value of the z-th electricity user in each historical period;

[0043] Step S404: Record and collect the first power supply demand of each power consuming unit to the substation in the current cycle to obtain characteristic power consumption data of the power consuming unit in the current cycle.

[0044] Furthermore, step S500 includes:

[0045] Step S501: extracting the target power equipment and the corresponding second target power equipment in the current period from the characteristic power equipment data of the substation in the current period, obtaining the power lines where the target power equipment and the second target power equipment in the current period are located, and obtaining the power users responsible for supplying power to the power lines;

[0046] Step S502: When there are target power equipment and second target power equipment in the σth power line in the substation, the σth power line is adjusted. The line adjustment process is to obtain the power supply reduction of the σth power line when the target power equipment and the second target power equipment stop running, and obtain the first power supply demand of the power user that the σth power line is responsible for supplying power from the characteristic power consumption data of the power user in the current cycle, obtain each backup power equipment started by the σth power line in the current cycle, perform equipment maintenance on the target power equipment and the second target power equipment in the σth power line, and connect each backup power equipment to the σth power line in the substation.

[0047] In order to better implement the above method, an intelligent management system for power data in the substation area is also proposed. The intelligent management system includes a power equipment prediction module, a power unit module, and an intelligent management module;

[0048] The power equipment prediction module is used to evaluate the failure risk of each power equipment in the current cycle and obtain the characteristic power equipment data of the substation in the current cycle;

[0049] The power consumption unit module is used to obtain the historical power consumption data of each power consumption unit in each historical period, and calculate the first power supply demand of each power consumption unit for the substation in the current period;

[0050] The intelligent management module is used to intelligently adjust the power supply strategy of the power users responsible for power supply in the substation area and to intelligently monitor the power equipment in the substation area.

[0051] Further, the power equipment prediction module includes a power equipment impact unit, a device data unit, and a power equipment prediction unit;

[0052] The power equipment impact unit is used to obtain the substation area where each power equipment in the substation area is located, and analyze the fault correlation between each power equipment in the substation area based on each historical maintenance record of each power equipment;

[0053] The equipment data unit is used to extract various equipment data of each power equipment from various historical maintenance records of each power equipment in the substation area, and analyze the equipment status of the power equipment under different data ranges of various equipment data;

[0054] The power equipment prediction unit is used to evaluate the failure risk of each power equipment in the current cycle and obtain the characteristic power equipment data of the substation in the current cycle.

[0055] Further, the power consumption unit module includes a first power demand unit and a characteristic power consumption data unit;

[0056] The first power supply demand unit is used to obtain the characteristic data change value of the power user in each historical period, and calculate the first power supply demand of the power user to the substation in the current period;

[0057] The characteristic power consumption data unit is used to record and collect the first power supply demand of each substation unit to the substation in the current cycle, so as to obtain the characteristic power consumption data of the power consumption units in the current cycle.

[0058] Further, the intelligent management module includes an intelligent management unit;

[0059] The intelligent management unit is used to obtain the power lines where each target power equipment and the second target power equipment are located in the current cycle, and to obtain the power users responsible for the power lines, to adjust the power lines for each power line that supplies power to the power users in the current cycle, and to intelligently manage each power equipment in the substation.

[0060] Compared with the prior art, the beneficial effects achieved by the present invention are: the present invention can realize the safety monitoring of the power equipment in the substation, and according to the influence relationship between different power equipment in the substation, to assist in judging the equipment status of the power equipment in the substation, so that the judgment of the equipment status of the power equipment is more accurate, and considering that when the power equipment is under maintenance, the power user responsible for power supply by the power equipment will also be affected, the various power lines in the substation are adjusted based on the power user, so as to ensure the normal power consumption of the power user to the greatest extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0062] Figure 1 It is a method flow chart of an intelligent management system and method for power data in a substation area based on the Internet of Things of the present invention;

[0063] Figure 2 It is a module schematic diagram of an intelligent management system and method for power data in an area based on the Internet of Things of the present invention. DETAILED DESCRIPTION

[0064] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0065] See also Figure 1-Figure 2 The present invention provides a technical solution: a method for intelligent management of power data in a substation area based on the Internet of Things, the method comprising:

[0066] Step S100: constructing a cloud platform for intelligent management of power data in the substation area, obtaining each historical maintenance record of each power device in the substation area, and analyzing the fault correlation between each power device in the substation area based on each historical maintenance record of each power device;

[0067] Wherein, step S100 includes:

[0068] Step S101: constructing a cloud platform for intelligent management of power data in the substation area, and obtaining each historical maintenance record of each power equipment in the substation area;

[0069] Step S102: Set a unit time length, extract the time point of the power equipment failure from the historical maintenance record, and use it as the time point of the historical maintenance record, and obtain the historical maintenance records of each power equipment before the time point of the bth historical maintenance record of the ath power equipment. When the distance time length between the historical maintenance records of each power equipment and the time point of the bth historical maintenance record of the ath power equipment is greater than the unit time length, record the bth historical maintenance record of the ath power equipment as the first historical maintenance record of the substation where the ath power equipment is located;

[0070] Step S103: in the area where the ath power device is located, historical maintenance records of each power device after the first historical maintenance record time point of the ath power device are obtained. When there are two historical maintenance record time points in the historical maintenance records of each power device with a time length greater than the unit time length, the historical maintenance record of the power device with the shortest time length to the first historical maintenance record of the ath power device is obtained and recorded as the characteristic historical maintenance record;

[0071] Step S104: obtaining a distance duration between the characteristic historical maintenance record and the first historical maintenance record of the a-th power device, and recording it as a first characteristic duration of the first historical maintenance record of the a-th power device;

[0072] Step S105: Obtain the first characteristic duration of each first historical maintenance record of the ath power device, and obtain the first data collection period of the εth first historical maintenance record of the ath power device in, is the time point corresponding to each first historical maintenance record of the a-th power equipment, is the first characteristic duration of the εth first historical maintenance record of the ath power equipment;

[0073] Step S106: Acquire each power device in the substation where the ath power device is located. When there is a time point of the historical maintenance record corresponding to the θth power device, which is within the first data collection period of the εth first historical maintenance record of the ath power device, record the θth power device as the second marked power device of the ath power device in the first data collection period, acquire each second marked power device of the ath power device in the first data collection period and collect them, so as to obtain the power device set of the ath power device in the first data collection period;

[0074] Step S107: obtaining a set of power devices of the ath power device in each first data collection period, taking an intersection of the set of power devices of the ath power device in each first data collection period, obtaining a first passive power device of the ath power device, and determining whether the ath power device has a fault association with the first passive power device;

[0075] Step S108: Acquire and aggregate the first passive power equipment of each power equipment in the substation to obtain first power equipment data corresponding to the power equipment in the substation;

[0076] Step S200: extracting various equipment data of each power equipment from various historical maintenance records of each power equipment in the substation, and analyzing the equipment status of the power equipment under different data ranges of various equipment data to obtain characteristic equipment data of the power equipment in the substation;

[0077] For example, various data of power equipment include voltage and current of power equipment;

[0078] Wherein, step S200 includes:

[0079] Step S201: Obtaining each historical maintenance record of each power equipment in the substation, and extracting each equipment data of the power equipment from the historical maintenance record;

[0080] Step S202: Obtain each historical maintenance record of the fth power equipment in the substation, extract the corresponding values ​​of each equipment data of the fth power equipment from each historical maintenance record of the fth power equipment in the substation, and obtain the maximum value G of the gth equipment data of the fth power equipment max , get the minimum value G of the g-th item of equipment data of the f-th power equipment min , obtain the first equipment data accuracy value n preset by the staff; obtain the first data difference value G of the g-th equipment data of the f-th power equipment D-value =G max -G min ;

[0081] Step S203: Calculate the first data value of the g-th item of equipment data of the f-th power equipment Get the kth data range of the gth item of equipment data of the fth power equipment

[0082] Calculate the fth power device The first data ratio value

[0083]

[0084] Among them, S sum is the total number of historical maintenance records of the fth power equipment; is the total number of historical maintenance records corresponding to the f-th power equipment when the value corresponding to the g-th item of equipment data of the f-th power equipment is within the k-th data range;

[0085] For example, the staff presets n as 7 according to the accuracy requirement, and obtains the second equipment data of the third power equipment as the equipment voltage of the power equipment. At this time, the maximum value of the equipment voltage G max The minimum value of the equipment voltage is 1000kv. min is 300kv, obtain the first data difference G of the second item of data of the third power equipment D-value =1000kv-300kv=700kv;

[0086] Calculate the first data value of the second item of data of the third power device Get the 4th data range of the 2nd data of the 3rd power equipment

[0087] The total number of historical maintenance records of the third power equipment S sum is 50; the corresponding value of the second item of data of the third power equipment is within the fourth data range, and the total number of historical maintenance records corresponding to the third power equipment is 20;

[0088] Calculation of the third power device The first data ratio value

[0089] Step S204: Setting a first data ratio threshold value, when the fth power device The first data ratio value is greater than the threshold, and the first data ratio value corresponding to the k-1th data range of the g-th data of the f-th power device is less than the first data ratio value threshold, the k-th data range of the g-th data of the f-th power device is used as the characteristic data range corresponding to the g-th data of the f-th power device;

[0090] Step S205: Acquire and aggregate the characteristic data ranges corresponding to the equipment data of each power equipment in the substation to obtain characteristic equipment data of the power equipment in the substation;

[0091] Step S300: monitor each power device in the substation in the current cycle, obtain various equipment data of each power device in the current cycle, and perform a fault risk assessment on each power device in the current cycle based on the characteristic equipment data of the power devices and the fault correlation between different power devices, and obtain the characteristic power equipment data of the substation in the current cycle;

[0092] Wherein, step S300 includes:

[0093] Step S301: monitor each power device in the substation area in the current cycle, and obtain various equipment data of each power device in the substation area in the current cycle;

[0094] Step S302: Acquire characteristic equipment data of the power equipment in the substation, extract the equipment data of the εth power equipment in the substation, and when the corresponding value of the βth equipment data of the εth power equipment in the substation in the current cycle is greater than the maximum value of the βth equipment data within the characteristic data range, determine that the εth power equipment has a risk of failure in the current cycle, and record the εth power equipment as the target power equipment;

[0095] Step S303: obtaining first power equipment data corresponding to the power equipment in the substation, extracting each first passive power equipment of the εth power equipment in the substation, and recording the first passive power equipment of the εth power equipment as the second target power equipment;

[0096] Step S304: Acquire each target power device in the current cycle of the substation and the second target power device corresponding to the target power device, collect each target power device in the current cycle of the substation and the second target power device corresponding to each target power device, and obtain characteristic power device data of the substation in the current cycle;

[0097] Step S400: obtaining the power consumption units responsible for power supply in the substation, and obtaining the historical power consumption data of the power consumption units in various historical periods, and calculating the first power supply demand of each power consumption unit for the substation in the current period;

[0098] Wherein, step S400 includes:

[0099] Step S401: Acquire each power consumption unit in the substation area, and extract the corresponding power consumption of each power consumption unit in each historical period from the historical power consumption data of each power consumption unit in each historical period;

[0100] Step S402: The power consumption of the zth power consumption unit in each historical period is collected to obtain the power consumption set of the zth power consumption unit, and the characteristic data change value M of the τth historical period in the zth power consumption unit is calculated:

[0101]

[0102] in, is the electricity consumption of the z-th electricity user in the τ-th historical period; is the electricity consumption of the z-th electricity user in the τ-th historical period;

[0103] Step S403: Obtain the characteristic data change value of the zth power consumption unit in each historical period, and obtain the median L of the power consumption of the zth power consumption unit in each historical period from the power consumption set of the zth power consumption unit. median , recorded as characteristic power consumption; calculate the first power supply demand R of the zth power user to the substation in the current cycle z :

[0104] R z =L median ×M max +L median ;

[0105] Among them, M max is the maximum value of the characteristic data change value of the z-th electricity user in each historical period;

[0106] Step S404: recording and collecting the first power supply demand of each power user to the substation in the current cycle to obtain characteristic power consumption data of the power users in the current cycle;

[0107] Step S500: Based on the characteristic power equipment data of the substation in the current cycle and in combination with the first power supply demand of the power user, the power supply strategy of the substation to the power user is intelligently adjusted, and the power equipment in the substation is intelligently monitored;

[0108] Wherein, step S500 includes:

[0109] Step S501: extracting the target power equipment and the corresponding second target power equipment in the current period from the characteristic power equipment data of the substation in the current period, obtaining the power lines where the target power equipment and the second target power equipment in the current period are located, and obtaining the power users responsible for supplying power to the power lines;

[0110] Step S502: When the target power equipment and the second target power equipment exist in the σth power line in the substation, the σth power line is adjusted. The line adjustment process is to obtain the power supply reduction of the σth power line when the target power equipment and the second target power equipment stop running, and obtain the first power supply demand of the power user unit that the σth power line is responsible for supplying power from the characteristic power consumption data of the power user unit in the current cycle, obtain each backup power equipment started by the σth power line in the current cycle, perform equipment maintenance on the target power equipment and the second target power equipment in the σth power line, and connect each backup power equipment to the σth power line in the substation;

[0111] In order to better implement the above method, an intelligent management system for power data in the substation area is also proposed. The intelligent management system includes a power equipment prediction module, a power unit module, and an intelligent management module;

[0112] The power equipment prediction module is used to evaluate the failure risk of each power equipment in the current cycle and obtain the characteristic power equipment data of the substation in the current cycle;

[0113] The power consumption unit module is used to obtain the historical power consumption data of each power consumption unit in each historical period, and calculate the first power supply demand of each power consumption unit for the substation in the current period;

[0114] Intelligent management module, used to intelligently adjust the power supply strategy of the power users responsible for power supply in the substation area, and intelligently monitor the power equipment in the substation area;

[0115] Among them, the power equipment prediction module includes a power equipment impact unit, a device data unit, and a power equipment prediction unit;

[0116] The power equipment impact unit is used to obtain the substation area where each power equipment in the substation area is located, and analyze the fault correlation between each power equipment in the substation area based on each historical maintenance record of each power equipment;

[0117] The equipment data unit is used to extract various equipment data of each power equipment from various historical maintenance records of each power equipment in the substation area, and analyze the equipment status of the power equipment under different data ranges of various equipment data;

[0118] The power equipment prediction unit is used to evaluate the failure risk of each power equipment in the current cycle and obtain the characteristic power equipment data of the substation in the current cycle;

[0119] Among them, the power consumption unit module includes a first power demand unit and a characteristic power consumption data unit;

[0120] The first power supply demand unit is used to obtain the characteristic data change value of the power user in each historical period, and calculate the first power supply demand of the power user to the substation in the current period;

[0121] The characteristic power consumption data unit is used to obtain and record the first power supply demand of each substation unit to the substation in the current cycle and collect it to obtain the characteristic power consumption data of the power consumption unit in the current cycle;

[0122] Wherein, the intelligent management module includes an intelligent management unit;

[0123] The intelligent management unit is used to obtain the power lines where each target power equipment and the second target power equipment are located in the current cycle, and to obtain the power users responsible for the power lines, to adjust the power lines for each power line that supplies power to the power users in the current cycle, and to intelligently manage each power equipment in the substation.

[0124] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0125] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for intelligent management of power data in a substation area based on the Internet of Things, characterized in that: The method comprises: Step S100: constructing a cloud platform for intelligent management of power data in the substation area, obtaining each historical maintenance record of each power device in the substation area, and analyzing the fault correlation between each power device in the substation area based on each historical maintenance record of each power device; Step S200: extracting various equipment data of each power equipment from various historical maintenance records of each power equipment in the substation, and analyzing the equipment status of the power equipment under different data ranges of various equipment data to obtain characteristic equipment data of the power equipment in the substation; Step S300: monitor each power device in the substation in the current cycle, obtain various equipment data of each power device in the current cycle, and perform a fault risk assessment on each power device in the current cycle based on the characteristic equipment data of the power devices and the fault correlation between different power devices, and obtain the characteristic power equipment data of the substation in the current cycle; Step S400: obtaining the power consumption units responsible for power supply in the substation, and obtaining the historical power consumption data of the power consumption units in various historical periods, and calculating the first power supply demand of each power consumption unit for the substation in the current period; Step S500: Based on the characteristic power equipment data of the substation in the current cycle and in combination with the first power supply demand of the power user, the power supply strategy of the substation to the power user is intelligently adjusted, and the power equipment in the substation is intelligently monitored.

2. According to the method of intelligent management of power data in substations based on the Internet of Things in claim 1, it is characterized in that: The step S100 includes: Step S101: constructing a cloud platform for intelligent management of power data in the substation area, and obtaining each historical maintenance record of each power equipment in the substation area; Step S102: Set a unit time length, extract the time point of the power equipment failure from the historical maintenance record, and use it as the time point of the historical maintenance record, and obtain the historical maintenance records of each power equipment before the time point of the bth historical maintenance record of the ath power equipment. When the distance time length between the historical maintenance records of each power equipment and the time point of the bth historical maintenance record of the ath power equipment is greater than the unit time length, record the bth historical maintenance record of the ath power equipment as the first historical maintenance record of the substation where the ath power equipment is located; Step S103: in the area where the ath power device is located, historical maintenance records of each power device after the first historical maintenance record time point of the ath power device are obtained. When there are two historical maintenance record time points in the historical maintenance records of each power device with a time length greater than the unit time length, the historical maintenance record of the power device with the shortest time length to the first historical maintenance record of the ath power device is obtained and recorded as the characteristic historical maintenance record; Step S104: obtaining a distance duration between the characteristic historical maintenance record and the first historical maintenance record of the a-th power device, and recording it as a first characteristic duration of the first historical maintenance record of the a-th power device; Step S105: Obtain the first characteristic duration of each first historical maintenance record of the ath power device, and obtain the first data collection period of the εth first historical maintenance record of the ath power device in, is the time point corresponding to each first historical maintenance record of the a-th power equipment, is the first characteristic duration of the εth first historical maintenance record of the ath power equipment; Step S106: Acquire each power device in the substation where the ath power device is located. When there is a time point of the historical maintenance record corresponding to the θth power device, which is within the first data collection period of the εth first historical maintenance record of the ath power device, record the θth power device as the second marked power device of the ath power device in the first data collection period, acquire each second marked power device of the ath power device in the first data collection period and collect them, so as to obtain the power device set of the ath power device in the first data collection period; Step S107: obtaining a set of power devices of the ath power device in each first data collection period, taking an intersection of the set of power devices of the ath power device in each first data collection period, obtaining a first passive power device of the ath power device, and determining whether the ath power device has a fault association with the first passive power device; Step S108: Acquire and aggregate the first passive power equipment of each power equipment in the substation to obtain first power equipment data corresponding to the power equipment in the substation.

3. According to the method of intelligent management of power data in substations based on the Internet of Things in claim 2, it is characterized in that: The step S200 includes: Step S201: Obtaining each historical maintenance record of each power equipment in the substation, and extracting each equipment data of the power equipment from the historical maintenance record; Step S202: Obtain each historical maintenance record of the fth power equipment in the substation, extract the corresponding values ​​of each equipment data of the fth power equipment from each historical maintenance record of the fth power equipment in the substation, and obtain the maximum value G of the gth equipment data of the fth power equipment max , get the minimum value G of the g-th item of equipment data of the f-th power equipment min , obtain the first equipment data accuracy value n preset by the staff; obtain the first data difference value G of the g-th equipment data of the f-th power equipment D-value =G max -G min ; Step S203: Calculate the first data value of the g-th item of equipment data of the f-th power equipment Get the kth data range of the gth item of equipment data of the fth power equipment Calculate the fth power device The first data ratio value Among them, S sum is the total number of historical maintenance records of the f-th power equipment; The total number of historical maintenance records corresponding to the f-th power equipment when the corresponding value of the g-th item of equipment data of the f-th power equipment is within the k-th data range; Step S204: Setting a first data ratio threshold value, when the fth power device The first data ratio value is greater than the threshold, and the first data ratio value corresponding to the k-1th data range of the g-th data of the f-th power device is less than the first data ratio value threshold, the k-th data range of the g-th data of the f-th power device is used as the characteristic data range corresponding to the g-th data of the f-th power device; Step S205: Acquire and aggregate the characteristic data ranges corresponding to the equipment data of each power equipment in the substation to obtain the characteristic equipment data of the power equipment in the substation.

4. According to the method of intelligent management of power data in substations based on the Internet of Things in claim 3, it is characterized in that: The step S300 includes: Step S301: monitor each power device in the substation area in the current cycle, and obtain various equipment data of each power device in the substation area in the current cycle; Step S302: Acquire characteristic equipment data of the power equipment in the substation, extract the equipment data of the εth power equipment in the substation, and when the corresponding value of the βth equipment data of the εth power equipment in the substation in the current cycle is greater than the maximum value of the βth equipment data within the characteristic data range, determine that the εth power equipment has a risk of failure in the current cycle, and record the εth power equipment as the target power equipment; Step S303: acquiring first power equipment data corresponding to the power equipment in the substation, extracting each first passive power equipment of the εth power equipment in the substation, and recording the first passive power equipment of the εth power equipment as the second target power equipment; Step S304: Acquire each target power device in the current cycle of the substation and the second target power device corresponding to the target power device, collect each target power device in the current cycle of the substation and the second target power device corresponding to each target power device, and obtain the characteristic power device data of the substation in the current cycle.

5. According to the method of intelligent management of power data in substations based on the Internet of Things in claim 4, it is characterized in that: The step S400 includes: Step S401: Acquire each power consumption unit in the substation area, and extract the corresponding power consumption of each power consumption unit in each historical period from the historical power consumption data of each power consumption unit in each historical period; Step S402: The power consumption of the zth power consumption unit in each historical period is collected to obtain the power consumption set of the zth power consumption unit, and the characteristic data change value M of the τth historical period in the zth power consumption unit is calculated: in, is the electricity consumption of the z-th electricity user in the τ-th historical period; is the electricity consumption of the z-th electricity user in the τ-th historical period; Step S403: Obtain the characteristic data change value of the zth power consumption unit in each historical period, and obtain the median L of the power consumption of the zth power consumption unit in each historical period from the power consumption set of the zth power consumption unit. median , recorded as characteristic power consumption; calculate the first power supply demand R of the zth power user to the substation in the current cycle z : R z =L median ×M max +L median ; Among them, M max is the maximum value of the characteristic data change value of the z-th electricity user in each historical period; Step S404: Record and collect the first power supply demand of each power consuming unit to the substation in the current cycle to obtain characteristic power consumption data of the power consuming unit in the current cycle.

6. The method for intelligent management of power data in a substation area based on the Internet of Things according to claim 5 is characterized in that: The step S500 includes: Step S501: extracting the target power equipment and the corresponding second target power equipment in the current period from the characteristic power equipment data of the substation in the current period, obtaining the power lines where the target power equipment and the second target power equipment in the current period are located, and obtaining the power users responsible for supplying power to the power lines; Step S502: When there are target power equipment and second target power equipment in the σth power line in the substation, the σth power line is adjusted. The line adjustment process is to obtain the power supply reduction of the σth power line when the target power equipment and the second target power equipment stop running, and obtain the first power supply demand of the power user that the σth power line is responsible for supplying power from the characteristic power consumption data of the power user in the current cycle, obtain each backup power equipment started by the σth power line in the current cycle, perform equipment maintenance on the target power equipment and the second target power equipment in the σth power line, and connect each backup power equipment to the σth power line in the substation.

7. An intelligent management system for power data in a substation area using an intelligent management method for power data in a substation area based on the Internet of Things as described in any one of claims 1 to 6, characterized in that: The intelligent management system includes an electric power equipment prediction module, an electric power unit module, and an intelligent management module; The power equipment prediction module is used to evaluate the failure risk of each power equipment in the current cycle and obtain the characteristic power equipment data of the substation in the current cycle; The power consumption unit module is used to obtain the historical power consumption data of each power consumption unit in each historical period, and calculate the first power supply demand of each power consumption unit for the substation in the current period; The intelligent management module is used to intelligently adjust the power supply strategy of the power users responsible for power supply in the substation area and to intelligently monitor the power equipment in the substation area.

8. The intelligent management system for power data in substations according to claim 7 is characterized in that: The power equipment prediction module includes a power equipment impact unit, a device data unit, and a power equipment prediction unit; The power equipment impact unit is used to obtain the substation where each power equipment in the substation is located, and analyze the fault correlation between each power equipment in the substation based on each historical maintenance record of each power equipment; The equipment data unit is used to extract various equipment data of each power equipment from various historical maintenance records of each power equipment in the substation area, and analyze the equipment status of the power equipment under different data ranges of various equipment data; The power equipment prediction unit is used to perform fault risk assessment on each power equipment in the current cycle to obtain characteristic power equipment data of the substation in the current cycle.

9. The intelligent management system for power data in substations according to claim 7, characterized in that: The power consumption unit module includes a first power demand unit and a characteristic power consumption data unit; The first power supply demand unit is used to obtain the characteristic data change value of the power user in each historical period, and calculate the first power supply demand of the power user to the substation in the current period; The characteristic power consumption data unit is used to record and collect the first power supply demand of each substation unit to the substation in the current cycle, so as to obtain the characteristic power consumption data of the power consumption units in the current cycle.

10. The intelligent management system for power data in substations according to claim 7, characterized in that: The intelligent management module includes an intelligent management unit; The intelligent management unit is used to obtain the power lines where each target power equipment and the second target power equipment are located in the current cycle, and to obtain the power users that the power lines are responsible for supplying power to, to adjust the power lines of each power line that supplies power to the power users in the current cycle, and to intelligently manage each power equipment in the substation.

Citation Information

Patent Citations

  • Power supply regulation monitoring system and method based on big data analysis

    CN117134480A

  • Big data monitoring and early warning system and method for electricity room environment control box

    CN117192269A

  • Power equipment state data monitoring system and method based on OCR technology

    CN117787947A

  • Intelligent network security system and method based on big data analysis

    CN117879963A