Power distribution network dynamic multi-stage day-ahead reactive power scheduling method based on real-time power prediction

Through real-time power prediction and multi-stage optimization methods, different reactive power supplies are coordinated, and prediction errors and uncertainties in reactive power optimization are solved, the risk of voltage overload and equipment costs are reduced, and the service life of the equipment is extended.

CN118920615APending Publication Date: 2024-11-08STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410920337.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-08

Smart Images

  • Figure CN118920615A_ABST
    Figure CN118920615A_ABST
Patent Text Reader

Abstract

The invention discloses a power distribution network dynamic multi-stage day-ahead reactive power scheduling method based on real-time power prediction, and the method comprises the specific steps: A, considering a DG prediction error, employing opportunity constraint to carry out the preliminary static optimization of the reactive power of a parallel capacitor and a DG, and taking an obtained result as an initial value of a next optimization stage; b, performing rough reactive power optimization on the switching capacity of the discrete parallel capacitor by taking the minimum line loss and action cost as an optimization target; c, DG and load uncertainty is comprehensively considered, the minimum line loss serves as an optimization target, reactive power output of the DG serves as an optimization variable, and fine reactive power optimization is carried out; and D, taking the switching capacity of the parallel capacitor in the rough reactive power optimization stage as an input value of the fine reactive power optimization stage, returning a DG output value obtained in the fine reactive power optimization stage to the rough reactive power optimization stage to update the switching capacity, and continuously iterating to realize the dynamic multi-stage day-ahead dynamic reactive power optimization of the power distribution network. Coordination among reactive power supplies with different adjusting characteristics is fully considered, and uncertainty of DG and load is represented by opportunity constraint, so that the purposes of fully utilizing reactive capacity, reducing voltage out-of-limit risk, reducing adjusting cost of reactive compensation equipment and prolonging service life of the equipment are achieved.
Need to check novelty before this filing date? Find Prior Art